Home

Installing and Servicing

image

Contents

1. lam LEGEND P A Polypropylen Aluminium P A P A P A Room sealed system Figure 9 6 a Installation amp Servicing instructions ATAG R Range 9 6 1 Flue terminal locations gt gt gt The terminal should be located where dispersal of combustion products is not unimpeded and with due regard for the damage or discolouration that might occur to parts of the building in the vicinity see fig 9 6 1 c In certain weather conditions condensation may also accumulate on the outside of the air inlet pipe Such conditions must be considered and where necessary insulation of the inlet pipe may be required In cold and or humid weather water vapour may condense on leaving the flue terminal The effect of such plumeing must be considered The terminal must not be located in a place where it is likely to cause a nuisance For protection of combustibles refer to IS 813 section 9 10 1 where the terminal is less than 2m 6 6ft above a pavement or platform to which people have access including any balcony or flat roof The terminal must be protected by a guard of durable material Where a terminal is fitted below a window which is hinged at the top and where the hinge axis is horizontal and the window opens outwards the terminal shall be 1m below the bottom of the window opening If the boiler is to be located under stairs a smoke alarm meeting the requirements of I S 409 o
2. Gas safe register No At max rate Record At min rate Where Possible At max rate Record At min rate Where Possible Comments Comments Signature SERVICE 09 Signature SERVICE 10 Engineer name Engineer name Company name Company name Telephone No Telephone No Gas safe register No Gas safe register No At max rate Record At min rate Where Possible At max rate Record At min rate Where Possible Comments Comments Signature Signature AIT installations in England and Wales must be notified to Local Authority Building Control LABC either directly or through a Competent Persons Scheme A Building Regulations Compliance Certificate will then be issued to the customer Heating and Hotwater Industry Council HHIC benchmar THE MARK OF QUALITY FOR THE INSTALLATION COMMISSIONING AND SERVICING OF DOMESTIC HEATING AND HOT WATER SYSTEMS www centralheating co uk ATAG Heating Technology Ltd Phone 0800 254 5061 E mail energy saving trust e 47 Castle Street info atag heating co uk Reading e Internet Berkshire RG1 7SR www atagheating co uk This renewed publication cancels all previous installation instructions The company reserves the right to change the specifications and dimensions without prior notice
3. Installation amp Servicing instructions ATAG R Range Turn the unit up side down and remove the burner cassette 8 from the ventilator unit Check the burner cassette for wear and tear pollution and any breakages Clean the burner cassette with a soft brush and vacuum cleaner In the case of breakages always replace the complete burner cassette 8 Replace the gasket 9 between the burner 8 and upper casing 10 Replace the gasket 11 between the upper casing 10 and exchanger Figure 16 d Check the venturi 12 for pollution and clean them with a soft brush in combination with a vacuum cleaner if necessary Figure 16 e If the inside of the boiler casing is heavily polluted with dust it is likely that the fan impeller is also polluted To clean the fan it has to be removed from the upper tray and the venturi Clean the impeller with a soft brush and a vacuum cleaner Replace the gasket and take care that the new gasket is installed properly when reassembling the fan parts Reassembly takes place in reverse order Figure 16 e Installation amp Servicing instructions ATAG R Range 43 Heat exchanger Check the heat exchanger for pollution Clean it if necessary with a soft brush and a vacuum cleaner Avoid any pollution falling down A TOP FLUSHING THE EXCHANGER WITH WATER IS NOT ALLOWED Reassembly takes place in reverse order During installation pay att
4. OK confirm A UN OK DHW Button Scroll function scrolling through parameters Il Vv ee lt CH button ESC function ESC back to standard display Installation amp Servicing instructions ATAG R Range 33 34 13 Commissioning the boiler Make sure before the boiler is put into operation that the boiler and installation have been fully vented Vent the gas line and open the gas isolation valve to the boiler The boiler requires no adjustment of the burner pressure and quantity because it is self regulatory and has been set in the factory and should not be reset 1 Turn on the boiler electrical supply 2 When the boiler starts up for the first time the following will be shown power on All digits segment test parameter 9 from factory 0 boilertype parameter 8 03 followed by 03 software version part 1 and software version part 2 The code 105 appears on the display The 7 minute de aeration cycle starts I 4 This will take approx 7 minutes and will be followed by the default display OK The iR boilers are supplied with a flow switch If the external pump starts the flow switch is made the burner is set free if the flow switch not made the boiler will not fire Installation amp Servicing instructions ATAG iR Range CH system The CH program is always active after start up This is indicated by the upper TIT If there is heat request it is indicated
5. l O 3 n a not applicable pp ES n a not applicable 145 y A Z n a not applicable me O n a not applicable 5 Z j O n a not applicable A terminal block Figure 10 a Installation amp Servicing instructions ATAG iR Range Electrical diagram 10 1 J18V9 AlddNS YAMOd AOE OZ TFT N 1 TaNvd INOYA HLHVA 61 O HLY Lh D L SES ANIWA SVO SL x E NOILINOI EL 3 N q sale JOULNOD AOEZ 8L de mel E MN sou9S yl OVLV I I HSE E A0SZ 8x s3asna Haei K i ER NOILdO YAWIL TYNHALX3 A0 Z B a O I I Sa gt sr En B i O E mi ED I OLX OL a ypy Oz A0 Z 39VL10A HOIH 39VL10A MOT oe LIX NOILVSINOI Z 49819 0 Coe Jm a o IOS RE HO HOLIMHOS MOTH EZ IS CH r Q le EEN e OT Xr tO L 90 __ i Le ps OA PA ZL HOSNAS NSNL38 6 ie e YX MO VA LL YOSN3S MOT 8 000000000000 EME A E LX OO OOO YOLOANNOO SIMMS ZZ DAA r L OV ADE NVA bb Figure 10 1 a 31 Installation amp Servicing instructions ATAG iR Range 11 Filling system The central heating installation needs to be filled with potable water according to the requirements in chapter 9 3 Water quality For filling the CH installation use the the feed and expansion header tank Use the following procedure 1 3 Ensure all system and boi
6. min below grating but above water level end cut at 45 7 Sink lip 8 Minimum internal diameter 19mm fall at least 45mm per meter 9 Pipe size transition 10 Minimum internal diameter 30mm 11 Water weather proof insulation Drain requirements Figure 9 5 1 Drain requirements Figure 9 5 2 a 3 5 1 Boiler 1 Condensate discharge from boiler 2 Visible air break at plug hole 2 Condensate pump 3 75mm sink basin bath or shower waste trap 3 Visible air break at plug hole 4 Sink basin bath or shower with integral overflow 4 Sink or basin with integrated overflow 5 Open end of condensate drainage pipe direct into gully 25mm 5 75mm sink waste trap min below grating but above water level end cut at 45 6 Minimum internal diameter 19mm fall at least 45mm per meter 7 Pipe size transition 8 Minimum internal diameter 30mm 9 Water weather proof insulation Drain requirements Figure 9 5 2 b Drain requirements Figure 9 5 3 Installation amp Servicing instructions ATAG iR Range 19 External pipework The use of an externally run condensate drainage pipe terminating at a suitable foul water discharge point or purpose designed soakaway may be also be considered however if this termination method is chosen then the following measures should be adopted The pipe should be run internally as far as possible before going externally and the pipe diameter should be increased to a minimum of 30mm ID typically 32mm OD before it passes through the wa
7. C63 C83 C93 Flue gas temp CH 80 60 C on full load C 59 59 Flue gas temp CH 50 30 C on low load C 29 30 Categories I2H3P Gas consumption m hr 1 14 1 43 1 72 2 29 3 05 3 81 Electr power consumption max W 20 23 28 36 40 46 Electr power consumption part load W 15 17 21 27 30 35 Electr power consumption stand by W 4 Current V Hz 230 50 Degree of protection acc EN 60529 IPX4D B22 B33 IPX0D Weight boiler jig empty kg 32 32 32 32 35 35 Width mm 440 440 440 440 440 440 Height excl flue mm 700 700 700 700 700 700 Depth mm 355 355 355 355 355 355 Overrun time pump CH sec 60 Flow temperature max C 85 SAP Annual Efficiency NG 89 7 89 8 89 8 89 8 89 8 89 7 CE product identification number PIN 0063CQ3634 Technical specifications Propane gas Boiler type O AS PSSS SA Heat exchanger type Con1 iCon1 iCon1 iCon2 iCon2 iCon2 O at full load 51 CO at full load 10 3 Pre pressure mbar see data plate LPG Input CH Net kW 10 8 13 5 16 2 21 6 28 8 36 0 Gas consumption m hr 0 45 0 56 0 68 0 90 1 20 1 50 Output 80 60 C KW 10 7 13 3 15 9 21 2 28 4 35 4 Output 50 30 C KW 11 8 14 7 17 5 23 2 31 2 38 8 Weight boiler jig empty kg 32 32 32 35 35 35 ErP specifications according to European Guideline 2010 30 EU Boiler type Re Seasonal space heating energy efficiency class P Power output 11 Que Annual energy consumption 3 Ns Seasonal space heating energy efficiency 94 Lwa Sound power level indoors 37 Installation
8. by a flashing TI and the heating will be put into operation The circulation pump will switch on and the boiler will switch on after 1 to 2 minutes Pump function The central heating pump is wired to the pump electrical connections on the back of the control panel See figure 10 a Danger of frost If there is danger of frost damage to the CH installation it is advisable to let the pump run continuously By pressing both buttons at the same time for 8 seconds the pump can be switched on continuously If the pump is set to continuously this is displayed by Ke Boiler frost protection If the T1 flow sensor registers a temperature of 5 C or below in the boiler the boiler will fire up The boiler keeps on firing until the temperature reaches 10 C measured on the flow sensor and the boiler switches off again In this mode the Ke symbol will flash Installation amp Servicing instructions ATAG iR Range 35 13 1 Settings When the boiler is installed it is in principle ready to be put into service Most settings of the control system are already programmed from factory Only parameter PO kind of heating installation has to be checked and set if necessary to adjust the boiler to the connected installation To change this setting proceed as follows 1 Press the OK button for 3 seconds The display shows PO 2 Press the OK button for 3 seconds again The display shows on shortly followed by
9. error e g open short circuit out of range 61 Bus communication error contact open 105 Venting program active when power turned on or interrupted runs approx 7 mins 110 Safety temperature exceeded 111 Maximum temperature exceeded 119 Link on X2 position 4 and 5 missing 129 Fan error fan does not start up 133 No flame after 5 ignition attempts 151 Fan error speed control is not achieved or is out of range or control unit defective 154 Flow increases to fast AT to large return gt flow 180 No error shortly visible when leaving chimney sweep function 181 No error shortly visible when leaving commissioning mode Example of display of error message 46 Installation amp Servicing instructions ATAG R Range Annex System water additives When the filling water requirements as referred to in chapter Water Quality have been met certain additives are allowed for the below mentioned applications and related dosage Warranty on ATAG delivered installation products expires if these additives and concentrations are not used in accordance with this annex Additive type Supplier and specifications Application Corrosion inhibitors ATAG Central Heating Protector Build Cert Approved Sentinel X100 Corrosion resistant protection agent of CH systems Kiwa certified Fernox F1 Protector Corrosion resistant protection agent of CH systems Kiwa certified KIWA ATA K62581 Belgaqua certified Cat III Kalsbeek
10. plastic pipes or plastic pipes are used elsewhere in the installation one should ensure that the plastic pipes used comply with the DIN 4726 4729 standard It is set out in this standard that the pipes may not have oxygen permeability higher than 0 1 g m d at 40 C If the system does not comply with this DIN standard the underfloor heating component will have to be separated from the central heating appliance by means of a plate exchanger No recourse can be made to the terms of the warranty in the event of failure to observe the A regulations pertaining to plastic underfloor heating pipes Installation amp Servicing instructions ATAG R Range 15 16 9 4 A gt amp Gas connection in general The local gas supplier should be consulted at the installation planning stage in order to establish the availability of an adequate supply of gas An existing service pipe must NOT be used without prior consultation with the local gas supplier ATAG supplies boilers suitable for natural gas only and boilers for LPG only Verify the identification plate on the boiler if the boiler is suitable for the gas kind on site The boilers cannot be converted to another kind of gas Make sure that the gas pipe work does not contain dirt particularly with new pipes The complete installation MUST be tested for gas tightness and purged as described in the above code The boiler connection is provided with an isolation valve with 22mm compres
11. the fitting The ATAG flue system used is a push fit flue system which does not require screws to be fitted at each flue joint The flue system must be adequately supported at regular intervals between brackets of no more than 1 0 metres for horizontal sections and no more than 2 0 metres for vertical sections Adjust the telescopic flue and secure with sealing tape supplied or cut the fixed length terminal flue to the required length Fit the flue to the extensions if required by locating the inner duct into the seal joint and push fully home the inner and outer duct When connecting the horizontal flue terminal length ensure the terminal end outlet is at the uppermost part of the flue Pass the terminal flue assembly through the wall Fitthe bend to the boiler and rotate to the correct position and secure in position If the inside sealing collar white is being used to make good the inside wall then it will need to be fitted before assembling the flue Pull the flue assembly towards the bend locating the inner duct into the seal joint on the bend and secure the flue assembly to the bend by pushing fully home Make good the outside wall by fitting the outside sealing collar grey onto the location provided immediately behind the flue terminal grille Make good the inside wall using the inside sealing collar white if required Flow direction Figure 9 6 2 b Installation amp Servicing instr
12. will be an anti cycle time in operation for 5 minutes This means that the burner switches on again after 5 minutes if there is still a demand from the heating The ATAG IR is equipped with boiler sensors of 10kOhm The resistance value and corresponding temperature are shown in the accompanying table Installation amp Servicing instructions ATAG R Range 12 1 Controls and explanation of the functions Central heating Setting the CH water temperature Briefly press or the display will show the flashing preset value Briefly press or to change the set value Each change becomes active directly CH program OFF Press until the lowest value is reached and then press again The display is showing Switching on works in reverse order Boiler information Requesting current data Press the eco button for 6 seconds in order to obtain the following value using the scroll buttons A lt q scroll Water pressure A7 n a lonisation current in LA rpm of fan x100 To return to the standard view press ESC Reset button The reset button allows the boiler to restart if an error has occurred In case of an error the A symbol is displayed with a XXX code In other cases the Reset button does not function and will not respond to operation See chapter 17 for a brief overview of codes Ancillary functions Both buttons Commissioning mode for checking the CO ore a CH button
13. 00 Pump min percentage N A min XX XX Correction factor fan speed Donotchangel Boiler type Do not change 1 3 1 Natural gas fired boiler 2 Boiler with flue non return valve 3 Propane gas fired boiler Service parameter Do not change Depending of connected type of boiler control Installation amp Servicing instructions ATAG iR Range P N D N N N Ss N NS N N xe S 90 a S gt N N N A N gt SS N Sy N O _ Ol O Ol O y O JI NO O flow temperature in C S 3 3 3 N Ae gt N E E outside temperature in C heating line Graph 11 4 a 14 Isolating the boiler In some situations it may happen that the entire boiler has to be deactivated With the function buttons for the CH program the boiler is put out of service CH program OFF Press until the lowest value is reached and then press again The display is showing and the upper is off Switching on with the button takes place in reverse order ATAG recommends to leave the electrical power supply on so that the circulation pump is activated automatically once every 24 hours in order to prevent jamming A If there is danger of frost it is advisable in this case to drain the boiler and or installation See following chapter Installation amp Servicing instructions ATAG R Range 37 38 15 Commissioning A A Work on the installation and or boiler sh
14. 2 EMC Directive 2004 108 EG EN61000 3 2 2013 EN61000 3 3 2013 EN55014 1 2 2010 Report numbers GAD ED LVD EMC D and that the products are in conformity with EC type examination certificate number E0430 as stated by KIWA Gastec Certification BV Apeldoorn The Netherlands Date 24 04 2015 Signature Full name Drs C B rlo ATAG Verwarming Adres Galile straat 27 7131 PE Lichtenvoorde Postadres Postbus 105 7130 AC Lichtenvoorde Telefoon 31 0 544 391777 Fax 31 0 544 391703 E mail info atagverwarming com Internet http www atagverwarming nl Installation amp Servicing instructions ATAG iR Range Annex C Short parts list Installation amp Servicing instructions ATAG iR Range 49 50 Installation amp Servicing instructions ATAG R Range Installation amp Servicing instructions ATAG R Range 91 Benchmark Commissioning and Servicing Section It is a requirement that the boiler is installed and commissioned to the manufacturers instructions and the data fields on the commissioning checklist completed in full To instigate the boiler guarantee the boiler needs to be registered with the manufacturer within one month of the installation To maintain the boiler guarantee it is essential that the boiler is serviced annually by a Gas Safe registered engineer who has been trained on the boiler installed The service details should be recorded on the Benchmark Service Interval Rec
15. 4 921 44 4 547 46 4 205 48 3 892 50 3 605 52 3 343 54 3 102 56 2 880 58 2 677 60 2 490 62 2 318 64 2 159 66 2 013 68 1 878 70 1 753 72 1 638 74 1 531 76 1 433 78 1 341 80 1 256 82 1 178 84 1 105 86 1 037 88 974 90 915 table 12 a The boiler is equipped with self managing control system This control system takes over a large part of the manual settings which simplifies the start up of the installation considerably After filling the installation and switching on the electrical power supply a short start up program is activated This shows all digits boiler type and software version and the automatic de aeration program is activated The automatic de aeration program lasts for approx 7 minutes and stops automatically Then the boiler will switch on for the enabled program CH controls With a demand from the heating controls the boiler activates its 1 minute delay period This is to prevent the heat exchanger from losing its heat too quickly in the event of a hot water demand Then the pump starts and after 30 seconds the gradient control becomes active The starting point of the gradient control is the currently existing flow temperature A Delta T control 25K ensures a stable control according to heat request If the flow temperature is below the T set value of 20 C the boiler will immediately start If during a demand from the heating the burner switches off because the desired flow temperature is exceeded there
16. Installation Servicing Natural Gas Boilers Boiler IR 12 IR 15 IR 18 IR 24 IR 32 IR 40 G C No 47 310 30 47 310 32 47 310 34 47 310 36 47 310 38 47 310 40 Instructions Propane Gas Boilers Boiler IR 12 LPG IR 15 LPG IR 18 LPG IR 24 LPG IR 32 LPG IR 40 LPG CE PIN 0063CQ3634 G C No 47 310 31 47 310 33 47 310 35 47 310 37 47 310 39 47 310 41 These instructions are to be retained by the user IR 12 IR 15 IR 18 IR 24 IR 32 IR 40 Open Vent System PA 8G 51 81 01 07 15 Changes reserved E amp O E Explanation of the Control Panel Buttons A Error Error indication accompanied with a code Fy eco 6 TIM A Alert Service mode or blocking ILA gt 0 lan SE Flame Visible when boiler is active for heating or DHW ILIN vi o C Ul Heating Visible when heating program is active Flashing when there is a heat demand for heating Central heating program On Off Setting of boiler temperature max flow temperature function ancillary function OK and Escape Press 6 seconds for Information Reset button DHW button function ancillary function Scroll and function Commissioning function Press both buttons for 6 seconds See chapter 12 for more information about button functions and read out Installation amp Servicing instructions ATAG R Range 1 A PP PR comission 4 2 Rules amp Regulations Symbols ss 5 3 Technical specifica
17. LALY 99 RR 7 77 TIIIII MATA A AAA OA VA A A VA VA VA A A A RU SN 95 I CE Pee A TE KO RRS Ss CE MA ERA A A ENSERER Deo RE a o ER SS Es ER Boundary Boundary 600mm Building Building 300mm Terminal facing the boundary Terminal parallel to the boundary Terminal Window Adjacent building Boundary 300mm 600mm Boundary Building Buildin Terminal at an angle eu tone boundary Terminal facing an opening in adjacent building Terminal position Min distance mm Figure 9 6 1 c A Directly below an opening air brick windows etc 300 See Note 1 B Below gutters soil pipes or drain pipes 75 See Note 3 C Below eaves 200 See Note 3 D Below balconies 200 See Note 3 E From a vertical drain pipe or soil pipe 150 See Note 3 F From an internal or external corner 300 See Note 2 G Above ground roof or balcony level 300 H From a surface or boundary facing the terminal 600 See Note 4 From a terminal facing the terminal 1200 J Above an opening air brick window etc 300 See Note 1 K Vertically from a terminal on the same wall 1500 L Horizontally from a terminal on the same wall 300 M Horizontally from an opening air brick window etc 300 See Note 1 N Minimum protrusion through a roof 300 O From a vertical obstruction 300 P From an openable window 600 Q From an adjacent vertical termina
18. Monopropyleneglycol propane 1 2 diol inhibitors AKWA Colpro KIWA ATA Nr 2104 1 Tyfocor L Monopropyleneglycol propane 1 2 diol Anti freeze inhibitors Sentinel X500 Monopropyleneglycol inhibitors Kiwa certified Fernox Alphi 11 Monopropyleneglycol inhibitors Kiwa certified KIWA ATA K62581 Belgaqua certified Cat III ATAG Central Heating Universal Cleaner System cleaners Sentinel X300 Solution of phosphate organic heterocyclic compounds polymers and organic bases Kiwa certified Sentinel X400 Solution of synthetic organic polymers Sentinel X800 Jetflo Aqueous emulsion of dispersants moistening agents and inhibitors Fernox F3 Cleaner Liquid pH neutral universal cleaner for pre commissioning new systems Fernox F5 Cleaner Express pH neutral universal cleaner concentrate for pre commissioning new systems 500 ml 100 litres 1 2 1 100 litres CH water content 500 ml can or 265 ml Express 100 litres CH water content 50 w w 50 w w 20 50 w w 25 50 w w 500 ml 100 litres 1 litre 100 litres 1 2 litres 100 litres 1 2 litres 100 litres 500 ml 100 litres 295 100 litres Suitable for mixed metal and plastic systems Prevents corrosion and limscale Aqueous solution of organic and inorganic agents preventing corrosion and scale forming Preventing corrosion and scale forming Anti freeze Anti freeze Anti freeze Anti freeze in combina
19. OIN 600 mm distance to a boundary or surface facing a boundary unless it will cause a nuisance BS 5440 Part 1 recommends that care is taken when siting terminals in relation to boundaries Notes 1 See also Notes on previous page 2 Plume kits running horizontally must have a 10 fall back to the boiler for proper disposal of condensate 3 For details on specific lengths see relevant chapter Dimensioning of the flue gas and air intake duct 4 Aterminal must not be sited under a car port roof Installation amp Servicing instructions ATAG iR Range 9 6 2 Dimensioning of the flue gas and air intake duct The total length of the run of the flue is determined by the flue diameter including for the connection pipe elbows fittings and terminal covers etc An incorrect dimensioned flue system can lead to disorders Look at table 9 6 2 a for the choice of the boiler and the corresponding maximum flue lenght Explanation table 9 6 2 a Concentric flue gas system maximum noted length L distance between boiler from elbow or vertical adapter and the end of terminal When using bends the noted value behind every bend should be deducted from the maximum straight length Concentric flue system 660 100mm 260 100mm Maximum straight length 60 100 87 bend resistance length Ml 45 bend resistance length Example An R24 with a concentric flue gas system Maximum straight length 60 100 260 100mm has ac
20. PO 3 Press the OK button to enter PO 4 Choose one of the following options by using the left and button DHW symbol 1 CH Tmax 85 C Gradient 5 Heating line 24 2 CH Tmax 70 C Gradient 5 Heating line 19 3 CH Tmax 60 C Gradient 4 Heating line 15 4 CH Tmax 50 C Gradient 3 Heating line 11 5 Press the OK button to confirm your choice lt q scroll When you want to change more settings proceed with step 6 When you are ready press the ESC button until the default display is shown again 6 Press the Scroll button to select another parameter 7 Press the OK button if you want to change the selected parameter 8 Adjust the value if desired possible with the or button DHW button 9 Briefly press the OK button to confirm the new setting The display shows the selected parameter again 7 Press the ESC button until the default display is shown again If during 8 minutes no button is used the default display is automatically shown on the screen 13 2 Parameter chapter Par Factory Description Range setting 1 CH Tmax 85 C Gradient 5 Heating line 24 ing li Check and change if necessary 1 4 2 CH Tmax 70 C Gradient 5 Heating line 19 this parameter before taking the 3 CH Tmax 60 C Gradient 4 Heating line 15 boiler into on ration 4 CH Tmax 50 C Gradient 3 Heating line 11 p i Maximum power CH in 0 max Can only be reduced 0 low load Pump max percentage N A XX 1
21. TIONS At max rate CO ppm AND CO CO At min rate where possible CO ppm AND CO CO The heating and hot water system complies with the appropriate Building Regulations Record the following The boiler and associated products have been installed and commissioned in accordance with the manufacturer s instructions The operation of the boiler and system controls have been demonstrated to and understood by the customer The manufacturer s literature including Benchmark Checklist and Service Record has been explained and left with the customer Commissioning Engineer s Signature Customer s Signature To confirm satisfactory demonstration and receipt of manufacturer s literature All installations in England and Wales must be notified to Local Authority Building Control LABC either directly or through a enchmar Competent Persons Scheme A Building Regulations Compliance Certificate will then be issued to the customer THE MARK OF QUALITY FOR THE INSTALLATION COMMISSIONING AND SERVICING OF DOMESTIC HEATING AND HOT WATER SYSTEMS O Heating and Hotwater Industry Council HHIC www centralheating co uk SERVICE RECORD It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed Service Provider Before completing the appropriate Service Record below please ensure you have carried out the service as described i
22. amp Servicing instructions ATAG R Range IR 15 IR 18 IR 24 IR 32 IR 40 il gt gt E ES HL 13 16 21 28 35 4 5 V 9 12 94 94 94 94 94 37 43 46 48 54 4 Dimensions 137 Flue gas Air intake Gas connection CH Flow connection CH Return connection Condensate drain connection ATAG co Y co 1 O O L I T A Q D F gt 220 380 440 ATAG iR Series Regular IR 12 IR 15 IR 18 IR 24 IR 32 IR 40 60 100 22 22 22 213 Installation amp Servicing instructions ATAG iR Range 5 Delivery package The delivery package of the boiler is composed as follows Boiler frame Boiler with cover Automatic air vent in boiler Isolation valves with drainpoint CH 2x Gas isolating valve Fittings consisting of plugs and screws Drawing template Installation instructions User manual Warranty Card The following components are not present in the boiler packaging as a standard and should be included in the installation according to the requirements Flue system External controls 6 Boiler description The ATAG IR is a room sealed condensing and modulating CH boiler for open expansion tank systems open vent only The boiler is equipped with a compact stainless steel heat exchanger with smooth pipes It is a well thought out principle using sustainable materials The boiler burns gas to supply he
23. ap with a condensate seal of 180mm incorporated into the boiler minimum requirement is 38mm External length of pipe 3m maximum Open end of condensate drainage pipe direct into gully 25mm min below grating but above water level end cut at 45 7 Minimum internal diameter 19mm fall at least 45mm per meter 8 Pipe size transition point 9 Minimum internal diameter 30mm 10 Water weather proof insulation ND o Ol gt 500 11 Ss lt i S TT Condensate discharge pipe from boiler l Ground this section of the condensate drainage pipe may be run either above or below ground level End cut at 45 Diameter 100mm minimum plastic tube Bottom of tube sealed Limestone chippings Two rows of three 12mm holes at 25mm centres 50mm from bottom of tube and facing away from house Hole depth 400mm minimum by 300mm diameter Minimum internal diameter 19mm fall at least 45mm per meter Pipe size transition point 0 Minimum internal diameter 30mm 1 D BARRES PERRET SERA ARS gt 300 3 A 5 N a Oo BR 200 Y Water weather proof insulation Drain requirements Figure 9 5 6 Installation amp Servicing instructions ATAG R Range Drain requirements Figure 9 5 7 21 22 9 6 Flue gas exhaust system The flue gas exhaust system and air supply system consists of Flue gas pipe Air supply pipe Roof or wall terminal The flue gas exhaust system and ai
24. at natural gas and LPG versions available This heat is transferred in the heat exchanger to the water in the CH installation The rapid cooling off of the flue gases causes condensation This results in a very high efficiency The condensate that is formed has no negative impact on the heat exchanger and it s operation and is removed through the internal siphon This feature requires a condensate drain pipe connected to the drain of the building The boiler is equipped with an intelligent control system The boiler anticipates on the heat demand of the heating installation or hot water demand This will cause the boiler to tune its capacity to the installation This means that the boiler will function longer and at a low level C The boiler has been tested according to valid CE standards and has a CE certificate and gt 88 Efficient SEDBUK 2009 Statement No banned materials including asbestos mercury CFC s have or will not be included in the product Installation amp Servicing instructions ATAG R Range 7 Boiler photo components list O T1 T2 m 93 14 13 A G R ATAG iR Figure 7 a 1 Heat exchanger 9 Flue gas exhaust T1 Flow sensor 2 Ignition unit 10 Combustion air supply T2 Return sensor 3 Fan unit 11 Boiler data plate F1 Flow switch 4 Air supply damper 12 Siphon G Gas pipe 5 Gas valve 13 Isolation valve flow CH A Flow pipe CH 6 Automatic de aerator 14 Isolation valve gas R Return
25. ated internal areas Internal condensate drainage pipes run in unheated areas such as lofts basements and garages should be treated as external pipe Draining of the condensation water to the external rain guttering is not permitted in view of the danger of freezing A Before putting the boiler into operation fill the siphon with 150 ml of water Installation amp Servicing instructions ATAG R Range 1 Boiler 2 Visible air break 3 75mm trap 4 Visible air break and trap is not required because there is a trap with a condensate seal of 180mm incorporated into the boiler minimum requirement is 75mm 5 Soil and vent stack 6 Invert 7 450mm minimum up to three storeys 8 Minimum internal diameter 19mm fall at least 45mm per meter 9 Pipe size transition 10 Minimum internal diameter 30mm 11 Water weather proof insulation Drain requirements Figure 9 5 4 4 LLL VLLLLLLLE a Y Condensate discharge pipe from boiler Pipe size transition point Water weather proof insulation 43mm 90 male female bend External rain water pipe into foul water External air break Air gap 68 mm PVCu strap on fitting Minimum internal diameter 19mm 10 Minimum internal diameter 30mm 11 End cut at 45 Y O O1 BR ND gt Drain requirements Figure 9 5 5 Boiler Visible air break 38mm minimum trap Visible air break and trap is not required because there is a tr
26. ature control to hot water Cylinder thermostat and programmer timer Combination Boiler Heating zone valves Fitted Not required Hot water zone valves Fitted Not required Thermostatic radiator valves Fitted Not required Automatic bypass to system Fitted Not required Boiler interlock Provided ALL SYSTEMS The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer s instructions What system cleaner was used What inhibitor was used Quantity litres Has a primary water system filter been installed CENTRAL HEATING MODE measure and record Gas rate OR ft hr Burner operating pressure if applicable OR Gas inlet pressure mbar Central heating flow temperature C Central heating return temperature C COMBINATION BOILERS ONLY Is the installation in a hard water area above 200ppm If yes and if required by the manufacturer has a water scale reducer been fitted What type of scale reducer has been fitted DOMESTIC HOT WATER MODE Measure and Record Burner operating pressure at maximum rate OR Gas inlet pressure at maximum rate Cold water inlet temperature C Hot water has been checked at all outlets Temperature C Water flow rate l min CONDENSING BOILERS ONLY The condensate drain has been installed in accordance with the manufacturer s instructions and or BS5546 BS6798 ALL INSTALLA
27. cording 87 bend resistance length 45 1 6 1 0 to the table a maximum flue Band h nn Po canine system that is going to be put the maximum flue gas length is 13 2x 1 0 11 m 1 6 1 0 3 Dimensions flue gas system and air supply system Table 9 6 2 a Flue dimensions ST Telescopic flue FA100100 Side Flue Telescopic flue FA100100 435 CTscerue I rue Rear Flue L wall thickness B 150mm Side Flue L wall thickness B distance between boiler and wall C 150mm If the length L is more than 580mm rear flue or 585mm side flue then a Horizontal flue fixed length 1000mm 60 100mm with lock function elbow FA100250 will need to be used instead up to 810mm Figure 9 6 2 a 26 Installation amp Servicing instructions ATAG iR Range Fitting the flue Note If it is required to cut an extension DO NOT cut the end of the inner duct that incorporates the seal joint Ensure the inner duct end without the seal joint is cut so that it is flush with the outer duct Ensure that all cuts are square and free from burrs Once assembled with the components pushed home the flue is fully sealed 1 2 When mounting the flue gas system pay attention to the flow direction See figure 9 6 2 b It is not permitted to mount a system upside down and will lead to complaints Use a soap solvent or special grease supplied in the accessory bag with the boiler to simplify
28. ctions Advise the user that for continued efficient and safe operation the boiler should be serviced at least once a year by qualified servicing company It is important and strongly recommended that arrangements are made for a maintenance agreement with a qualified servicing company to ensure regular servicing of the boiler Please contact ATAG Heating Technology Ltd for further details Contact details can be found on the back page of this manual 16 3 Maintenance frequency ATAG Heating Technology Ltd advises an annual inspection or every 1600 running hours with a full strip down service as required every 4 years or every 6400 running hours whatever comes first 16 4 Warranty For the warranty conditions we refer to the Warranty Card that is supplied with the boiler Installation amp Servicing instructions ATAG R Range 45 17 Error codes and fault finding A detected failure is indicated on the display in blocking or error messages Blocking code with spanner symbol AH Error is temporary and will cancel itself or will lock the boiler after several attempts error code with bell symbol A Error Error means a lock on the boiler and can only be remedied by a reset and or intervention by a service technician 10 Outside sensor error e g open short circuit out of range 20 Flow sensor error e g open short circuit out of range 40 Return sensor error e g open short circuit out of range 50 T3 DHW sensor
29. e installation water are only permitted in consultation with the country distributor See chapter 9 2 for detailed information Water quality Fill the installation with mains cold water In most cases a heating system can be filled with water according to national standards for water and treatment of this water is not necessary In order to avoid problems with the CH installations the quality of the filling water has to meet the specifications mentioned in table 9 2 a If the filling water does not meet the required specifications you are advised to treat the water to such an extent that it does meet the required specifications The warranty becomes invalid if the installation is not being flushed and or the quality of the filling water does not meet the specifications recommended by ATAG Heating Technology Ltd Always contact ATAG Heating Technology Ltd in advance if things are not clear or you wish to discuss any deviations Without approval the warranty becomes invalid Installation The use of groundwater demi water and distilled water is prohibited on the next page you will find an explanation of these definitions lf the mains water quality meets the specifications mentioned in table 9 3 a you can start flushing the installation before installing the device Whilst flushing corrosion products magnetite fitting products cutting oil and other undesirable products have to be removed Another possibility is to remo
30. e pipe work must be installed at least 10mm inside the front of the frame 2 5 mm MINIMAL SIDE CLEARANCE MINIMAL SIDE CLEARANCE a T a Wg Lites UE Ley AS Se Joy ESC gt me ee PES el ce eM oe a MN A S q Te r horizontal flue terminal dir E to the rear or side through the Z y wall only 1 bend and 1 wall lt 1 al 5 terminal the terminal should be go al la placed horizontal The flue pipe ns 2 S inside the terminal is fitted in a 3 EF E degrees angle to ensur
31. e siphon cup with the securing clip 7 by turning it clockwise click Press the sealing ring 8 around the siphon cup and press turn it in the bottom plate of the boiler A Before putting the boiler into operation fill the siphon with 150 ml of water Installation amp Servicing instructions ATAG iR Range 29 Electrical connection The appliance complies with the actual directives The installation must continue to comply with A230V 50Hz mains electrical supply is required fused externally at 3A Adeviation on the grid of 230V 10 or 15 and 50Hz the national rules for electrical installations The appliance must be connected to an earthed socket This must be visible and within reach The following general stipulations also apply No changes may be made to the wiring of the appliance All connections should be designed in accordance with the enclosed regulations Should it be necessary to change it the mains power supply cable may only be replaced with an ATAG mains power supply cable The connection terminals are positioned at the back of the control unit Press handle A slightly to the left see fig 10 a Turn the control unit downwards 230V control terminal block R Range Switched live 230V live input only Live 230V live output Neutral Earth Live pump N 230V live output eutral pump to pump Earth pump KL Y Terminal block iR Range US E n a not applicable
32. e the ze S gu x condensation water can run back na g2 Sa to the boiler 222 2 oe Be gt E M Le z amp cae al lt Pa 395 Ey z Ss ia E i N al id 2 2 2 2 222 2 22D 9 l El El 8 K a oS y 7 355 440 225 a HA rig e 2 O O O AMM O a E E a NU EN S E E ul 3 A O A i O OM O O A be 380 mm 0 EXPANSION VESSEL HOSE PASSAGE E El E y LT 8 7 MM A eL O Se i 3 E MES H SN E E Nie MO Li AS JD SZ SF E E o rra A lu gt 2 ES Fra DES 190 mm ate E eo 320 E Sas 440 mm elo m3 Ez Me ee ES es a S 2 E lo iS z z ATAG i Serie template and boiler frame Figure 8 1 a Installation amp Servicing instructions ATAG R Range 9 Connecting boiler The boiler has the following connection pipes The central heating pipes The boiler is provided with isolation valves on the flow and return pipe to which the installation can be connected by means of 22mm compression fittings The gas pipe The boiler is provided with an isolation gas valve to which the gas line can be fitted with 22mm compression fitting The condensation drain pipe It consists of a 25mm flexible plastic pipe The drain pipe can be connected to this by means of an open connection The flue gas exhaust system and air supply system It consi
33. egulator is not closing correctly In this case the regulator should be replaced 9 4 4 Dimensioning of the low pressure gas line The gas line from the house pressure regulator to the boiler must have the dimensions according the table below Boiler type iR 12 IR 15 iR 18 IR 24 iR 32 R 40 Diameter gas line 9 4 5 De aerating the LPG tank A When placing a new or revised LPG tank the tank must alway be de aerated ATAG advices to inform the gas supplier that a central heating boiler is connected to the LPG tank For the boiler it is absolutly necessary that the tank is free of air When not the boiler will give ignition problems and will not function ATAG advices to measure the content of O This value should be lower than 1 3 Contact the gas supplier in case of doubt Installation amp Servicing instructions ATAG R Range 1 1 18 9 5 Condensation drain pipe The ATAG condensing boiler has the gt 88 Efficient SEDBUK 2009 for high energy efficiency in heating and domestic hot water The ATAG wall hung gas fired condensing boiler contain a siphonic condensate trap to collect and realease condensate The amount of condensate formed is determind by the type of boiler and the water temperature produced by the boiler Condensate pipework Use plastic pipework of an internal diameter no less then 19mm ID typically 22mm OD Routing of the pipework The condensate pipework must fall at least 45mm per metre away from the bo
34. ention to the correct position of the clamp bars These have to be in a vertical position Ignition electrode Replacing the ignition electrode is necessary when the pins are worn If the inspection hole is damaged the entire ignition electrode has to be replaced Figure 16 f It is replaced as follows Take away the plug connections on the ignition electrode Push the clip on top of the electrode upwards and take away the electrode Remove and replace the gasket Reassembly takes place in reverse order A Always replace the gaskets of the removed parts during maintenance Put the boiler back into operation and carry out a flue gas analysis see page 34 44 Installation amp Servicing instructions ATAG iR Range Always put back the cover after maintenance work and secure it with screws A and B Remind to connect this earth cable when placing back the boiler front panel and take care the wire does not get stuck between front panel and boiler Please contact your installer or ATAG Heating Technology Ltd for further details Contact details can be found on the back page of this manual After servicing complete the relevant Service Interval Record section of the Benchmark Checklist located on the inside back page of the document 16 1 Component replacement In the event that parts require replacement use only genuine parts supplied by ATAG Heating Technology Ltd 16 2 User s instru
35. ep a record of the type of water used its quality at the time and if applicable which additives and quantities were added Installation amp Servicing instructions ATAG iR Range Parameter Value Water type Potable water Softened water pH 6 0 8 5 Conductivity at 20 C in uS cm Max 2500 Iron ppm Max 0 2 Hardness dH ppm Installation volume capacity lt 20 I kW 1 12 dH 17 214 ppm Installation volume capacity gt 20 I kW 1 7 dH 17 125 ppm Oxygen No oxygen diffusion allowed during operation Max 5 filling water addition annually Corrosion inhibitors Refer to Additives Attachment pH increasing or lowering agents Refer to Additives Attachment Anti freeze additives Refer to Additives Attachment Other chemical additives Refer to Additives Attachment Solid substances Not allowed Residues of processing water not forming part of the drinking water Not allowed Water type definition table 9 2 a Potable water Tap water compliant with the European drinking water guideline 98 83 EG dated 3 November 1998 Softened water Water with partly de ionised calcium and magnesium Demi water Virtually completely demineralised water very low conductivity Distilled water Water no longer containing minerals 9 3 Heating systems with plastic pipes When connecting or using an underfloor heating system designed with
36. er supplied Figure 9 7 b 3 and 4 Take the boiler and hang it from approx 50mm higher than the boiler frame vertical downwards on the boiler frame so the fittings will be axial approached Installation amp Servicing instructions ATAG R Range Figure 9 7 c Fitting the nuts Turn each nut of the fittings on the boiler connections by hand and tighten each nut with a wrench Note 1 2 with 25Nm and 3 4 with 40Nm Figure 9 7 d Fitting siphon Press and turn the assembly 3 with the elbow first in the corresponding holes in the bottom plate of the boiler Press the black rubber elbow with flexible drain pipe 1 on the condensate tray 2 Press the black flexible pipe 1 from inside the boiler in the rubber T piece 3 Press the black rubber plug 9 from inside the boiler in the rubber elbow of assembly 3 Lead the long black flexible pipe 4 through the free hole of the boiler frame and press it in the T piece 3 Lead the other end of the flexible pipe outside the boiler to the drain as installed according to chapter 9 7 Fill the siphon cup 5 with 150 ml water insert the siphon pipe 6 in the siphon cup do not press and insert this through the hole in the bottom plate of the boiler into the condensate tray 2 of the heat exchanger without any force Secure th
37. ess to such as public footpaths access routes patios etc However If the terminal is fitted less than 2m above a surface where there is no public access the terminal must be protected by a terminal guard Installation amp Servicing instructions ATAG R Range The appliance produces a white wisp of condensate plumeing This wisp of condensation is harmless but can be unattractive particularly in the case of outlets in outside walls For wall terminals a plume management kit is available as an option see fig 9 8 1 d Plume management kit Figure 9 6 1 d balcon 150 0 150 200 Sup window so window o D S TD O Q Figure 9 6 1 e Terminal position Plume Management Kit mm 1 Clearance no less than 200 mm from the lowest point of the balcony or overhang 1 200 mm from an opening in a car port on the same wall i e door or window leading into dwelling The flue cannot be lower than 1 000 mm from the top of the light well due to the build up of combustion products 1 200 mm between air intake and facing terminal Internal external corners The air intake clearance can be reduced to 150 mm providing the flue exhaust outlet has a 300 mm clearance IAIA
38. fitting the boiler Also the flue system can be prepared Finally fitting of the flue system is done after fitting the boiler See next page for all options for connection the heating condensate flue and gas installation Before hanging the boiler to the boiler frame remove the front panel of the boiler first The front panel is also the air cabinet and is attached to the boiler case with 2 fasteners A and B see figure 8 a Note that there is an earth cable to disconnect when removing the boiler front panel Free space for removing the connector is about 400 mm Remember to connect this earth cable when placing back the boiler front panel and take care the wire does not get stuck between front panel and boiler 400 lt Service space Service space 100 Service dimensions in mm Figure 8 a See chapter 9 8 for further procedure to fit the boiler onto the boiler frame Installation amp Servicing instructions ATAG iR Range 11 12 8 1 Wall frame Position the boiler frame against the wall using the template and a level Use the level for horizontal positioning and checking the vertical position Drill 4x g10mm holes 60mm deep Press the nylon wall plug 10x55mm in the holes Mount the boiler frame to wall with the 4 coach screws 8x60mm using a 13mm wrench The boiler frame allows pipe work to be installed behind the boiler Th
39. ganisations may be adopted if these are considered suitable by the parties involved If an external soil vent stack is used as the external termination then the connection method shown in Figure 9 5 4 should be used together with the measures on insulation etc as described above and shown in the diagram When a rain water downpipe is used as the termination NB only permissible if this downpipe passes to a combined foul and rainwater drainage system an air break must be installed between the condensate drainage pipe and the downpipe to avoid reverse flow of rainwater into the boiler should the downpipe itself become flooded or frozen Figure 9 5 5 shows a suitable connection method Where the condensate drainage pipe is terminated over an open foul drain or gully the pipe should terminate below the grating level but above water level in order to minimise wind chill at the open end Pipe drainage will be improved if the end is cut at 45 as opposed to a straight cut The use of a drain cover such as those used to prevent blockage by leaves may offer further protection from wind chill Figure 9 5 6 shows a suitable connection method Where the condensate drain pipe terminates in a purpose designed soakaway see BS 6798 2009 or boiler installation manual for soakaway design requirements any above ground section of condensate drainage pipe should be run and insulated as described above Figure 9 5 7 shows a suitable connection method Unhe
40. has to be checked during inspection maintenance and in case of a failure This can be verified by means of the following action Set the external controls to call for heat Make sure the boiler is operational and can get rid of the heat it produces Calibrate the flue gas analyser Place the lance of the flue gas analyser into the flue gas test point see Figure 15 1 a Measuring point CO Figure 15 1 a Press both buttons for 6 seconds When the flame symbol appears in the display press both buttons again for 6 seconds The display shows the supply water temperature appears in the display The boiler will switch to maximum power of the heating capacity Press 1x the eco button the display shows XX heating capacity Leave measuring CO to the measuring equipment Natural gas Propane CO percentage at full load 9 0 0 4 0 6 10 3 0 6 If required you may turn the setting screw to set the correct CO percentage refer to Figure 15 1 b Adjustment screw CO Figure 15 1 b Installation amp Servicing instructions ATAG iR Range 39 40 Finally the CO percentage at low load must be checked Press on the button until the minimum value 0 has been reached low load Leave measuring CO to the measuring equipment and check if the measured CO percentage on low load is between following values Natural gas Propane CO percentage at low load betwee
41. iler taking the shortest practicle route to the termination point Support the pipe at least every 50 cm for near horizontal sections and 1 metre for vertical sections Wherever possible the condensate pipework should be routed internally to prevent freezing In order to minimise the risk of freezing during prolonged very cold spells one of the following methods of terminating condensate drainage pipe should be adopted Internal pipework Wherever possible the condensate drainage pipe should be terminated at a suitable internal foul water discharge point such as a an internal soil and vent stack or b an internal kitchen or bathroom waste pipe washing machine waste pipe etc suitable permanent connection to the foul waste pipe should be used Figures 9 5 1 9 5 2 a 9 5 2 b show appropriate connection methods The possibility of waste pipes freezing downstream of the connection point should be considered when determining a suitable connection point e g a slightly longer pipe run to an internal soil stack may be preferable to a shorter run connecting into a kitchen waste pipe discharging directly through the wall to an external drain Where gravity discharge to an internal termination is not physically possible e g the discharge point is above the appliance location or access is obstructed by a doorway or where very long internal pipe runs would be required to reach a suitable discharge point the following measures may be adop
42. l 600 R From an opening in the car port e g door window into the dwelling 1200 S Below a roof window 2000 T Terminal parallel to a boundary 300 Notes 1 In addition the terminal should not be nearer than 150mm to the framework of an opening into the building i e a window surround or door surround 2 This clearance may be reduced to 25mm without effecting the performance of the boiler However to ensure the condensate plume does not affect adjacent surfaces a clearance of 300mm is preferable 3 These clearances may be reduced to 25mm without effecting the performance of the boiler However to ensure the condensate plume does not affect adjacent surfaces the terminal can be extended beyond gutters pipes eaves balconies etc by up to 500mm If the flue is extended more than 500mm outside it should be boxed and insulated 4 To reduce the possibility of nuisance to neighbouring buildings etc it is recommended the terminal should not be less than 2500mm from car parking spaces building boundary walls fences etc 5 Aterminal must not be sited under a car port roof 6 In certain weather conditions the terminal will emit a plume of steam If possible avoid positioning the terminal where this may cause a nuisance i e positions A D G H Jor M 7 The flue terminal must be exposed to the external air and the position must allow the free passage of air across it at all times 8 Aterminal must not be sited below 2m where people have acc
43. ler drain points are closed Open all isolation and motorised valves 3 Turn on the water supply to the system header tank 4 Vent all radiators and pipework Check system for any visable leaks When powering up the boiler described in chapter 13 an automatic de aeration program will run to vent the boiler 12 Boiler controls Before the electrical power is switched on it helps to know the operation of the boiler in advance On this page the controls are described in short The next page describes the button functions and the symbols on the display Resistance table sensors ATAG iC iS and R series Outside sensor T4 NTC1k 25 C Temperature PC I ol ol lolalslwlwl lol inlolslloll lols 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 35 40 Resistance Ohm 4 574 4 358 4 152 3 958 3 774 3 600 3 435 3 279 3 131 2 990 2 857 2 730 2 610 2 496 2 387 2 284 2 186 2 093 2 004 1 920 1 840 1 763 1 690 1 621 1 555 1 492 1 433 1 375 1 320 1 268 1 218 1 170 1 125 1 081 1 040 1 000 962 926 892 858 827 687 575 Resistance table 32 Flow sensor T1 Return sensor T2 DHW sensor T3 Flue sensor T5 NTC10k 25 C Temperature Resistance PC Ohm 10 55 047 0 32 555 10 19 873 12 18 069 14 16 447 16 14 988 18 13 674 20 12 488 22 11 417 24 10 449 26 9 573 28 8 779 30 8 059 32 7 406 34 6 811 36 6 271 38 5 779 40 5 330 42
44. ll The external run should be kept as short as possible taking the most direct and most vertical route possible to the discharge point with no horizontal sections in which condensate might collect Do not exceed 3 metres outside the dwelling The external pipe should be insulated using suitable waterproof and weatherproof insulation Class O pipe insulation is suitable for this purpose The use of fittings elbows etc should be kept to a minimum and any internal burrs on cut pipework should be removed so that the internal pipe section is as smooth as possible The customer householder should be advised that even with the above measures this type of installation could freeze and that if this were to occur then boiler shutdown could result requiring remedial action possibly involving a chargeable engineer call out Where there are likely to be extremes of temperature or wind chill the use of a proprietary trace heating system for external condensate drainage pipework incorporating an external frost thermostat should therefore be considered If such a system is used then the installation instructions of the trace heating manufacturer and any specific recommendations regarding pipe diameter insulation etc should be followed All other relevant guidance on condensate drainage pipe installation should also be followed Other cold weather protection methods approved or endorsed by boiler manufacturers and or service or
45. n 8 7 and 9 6 9 5 and 10 5 Contact ATAG when the measured values are outside this range End of measuring Press the ESC button IL button The device switches off The display shows for 2 seconds code 180 or 181 This completes the procedure Installation amp Servicing instructions ATAG iR Range 16 Routine servicing Required tools Cross head screwdriver T handle key set with 3 bits hex key 4mm hex key 5mm and cross head PZ2 Open end wrench 8mm In order to perform maintenance the following actions have to be taken Switch off the electrical power to the boiler Remove the screws from the 2 fasteners A and B see fig 16 a Unlock the fasteners A and B and remove the cover in a forward motion and remove the earth cable from the cover Note that there is an earth cable to disconnect when removing the boiler front panel Free space for removing the connector is about 400 mm Remind to connect this earth cable when placing back the boiler front panel and take care the wire does not get stuck between front panel and boiler A yw Figure 16 a Air box cover The cover also doubles as air box Clean the air box cover with a cloth and a non abrasive cleaner Siphon see fig 16 b The degree of pollution resedue in the siphon is an important indication for the need of maintenance Turn the control unit towards by moving the handle C slightly to the left see figu
46. n the manufacturer s instructions Always use the manufacturer s specified spare part when replacing controls SERVICE 01 SERVICE 02 Engineer name Engineer name Company name Company name Telephone No Telephone No Gas safe register No Gas safe register No At max rate Record At min rate Where Possible At max rate Record At min rate Where Possible Comments Comments Signature SERVICE 03 Signature SERVICE 04 Engineer name Engineer name Company name Company name Telephone No Telephone No Gas safe register No Gas safe register No At max rate Record At min rate Where Possible CO At max rate Record At min rate Where Possible Comments Comments Signature SERVICE 05 Signature SERVICE 06 Engineer name Engineer name Company name Telephone No Company name Telephone No Gas safe register No Gas safe register No At max rate Record At min rate Where Possible At max rate Record At min rate Where Possible CO Comments Comments Signature SERVICE 07 Signature SERVICE 08 Engineer name Engineer name Company name Company name Telephone No Telephone No Gas safe register No
47. ne installation must be provided with its own house pressure regulator The house pressure regulator is a third party delivery The house pressure regulator must have a minimum capacity of 10 kg h 30 mbar and a CE certification ATAG advices to install the house pressure regulator as close as possible to the boiler When placing the regulator inside a discharge drain of g6mm must be installed The discharge drain must be directed outdoor In case of a discharge the gasses will go outside If fitting the regulator outside the regulator should be protected against influences of the weather The de aeration must be positioned downwards see figure 9 5 3 a ATAG advices to install measure points on all gas line parts to have the possibility to check for pressure loss High pressure regulator Cover House pressure 7 Sr inem gt Ventilation gt E fs E ESUR Weer N e oi T i g I ee ne A aoee gt lt A gt High pressure gas line Low pressure gas line example propane installation figure 9 4 3 a Pre pressure must be adjusted to 30 mbar by means of the house pressure regulator The maximum permitted closing pressure may be 5 mbar higher than the maximum pre pressure A too high closing pressure in the low pressure gas line can be caused by a high resistance or jam in this gas line When the closing pressure keeps increasing the valve in the r
48. ns Regulations and bye laws of the Local Water Authority and the Current Health and Safety Regulation The Benchmark Scheme Benchmark places responsibilities on both manufacturers and installers The purpose is to ensure that customers are provided with the correct equipment for their needs that it is installed commissioned and serviced in accordance with the manufacturer s instructions by competent persons and that it meets the requirements of the appropriate Building Regulations The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be provided to the customer for future reference Installers are required to carry out installation commissioning and servicing work in accordance with the Benchmark Code of Practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme Visit www centralheating co uk for more information The current Electricity at Work Regulation must be complied with and also be in accordance with the relevant and current editions of the British Standards The ATAG R boiler is a certified appliance and must not be modified or installed in any way contrary to this Installation Manual Manufacturers instructions must not be taken in any way as overriding statutory obligations The ATAG R boiler is a central heating boiler for open expansion tank systems open vent only The boiler must be connected according to these instructi
49. omponent replaceMent c oocnccocnncocnncccnncccnnoconnncnnnnnonnnonnnnonannnnnnnnnnnonnnnnnnnnnnnnnnonnnnonaninnas 45 162 Users ao PA O RUE ES O E eee EA EEEE 45 16 3 Maintenance M qUenCV ns nsc a old 45 A A A ES 45 17 Error codes and fault finding ss 46 AnnexA System water additives coooocccoconncoconnnccoonononanoconanononononnnnnnnnnnnnnnonannnnnnnnnnnnnnanenanens 47 AnnexB Declaration Of conformity nn 48 A AC o E e dena e a e bts E ina a Aa 49 Work on the installation should only be carried out by qualified personnel with calibrated equipment and appropriate tools REGISTER Installation amp Servicing instructions ATAG iR Range 1 Introduction These instructions describe the functioning installation use and primary maintenance of ATAG central heating boilers for the United Kingdom These instructions are intended for the use of Gas Safe registed installers in connection with the installation and putting into operation of ATAG boilers It is advisable to read these instructions thoroughly well in advance of installation Separate instructions for use are supplied with the boiler for users of ATAG central heating boilers ATAG is not liable for the consequences of mistakes or shortcomings which have found their way into the installation instructions or user s manual Further ATAG reserves the right to alter its products without prior notification When delivering the boiler give the customer clear ins
50. ons and all installation norms in respect of the part of the boiler to be connected The appliance is not to be used by children or persons with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given supervision or instruction Children being supervised not to play with the appliance Observe the following rules of safety All work on the boiler must take place in a dry environment ATAG boilers may never be in operation without their housing except in connection with maintenance or adjustments see Chapter 15 and 16 Never allow electrical or electronic components to come into contact with water Carry out the following tasks in connection with maintenance etc to an already installed boiler Shut down all programs Close the gas isolation valve Shut down the 230V power supply See chapter 15 and 16 for further instructions Installation amp Servicing instructions ATAG iR Range Take note of the following when maintenance or adjustments are needed The boiler must be able to function during these activities for this reason the boiler s 230V power supply gas pressure and water pressure must be maintained Ensure that there is not a source of potential danger during these activities Following maintenance or other activities always check the installation of all parts th
51. ord and left with the householder DCNCHIICN COLLECTIVE MARK THE MARK OF QUALITY FOR THE INSTALLATION COMMISSIONING AND SERVICING OF DOMESTIC HEATING AND HOT WATER SYSTEMS www centralheating co uk Heating and Hotwater Industry Council HHIC GAS BOILER SYSTEM COMMISSIONING CHECKLIST This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference Failure to install and commission according to the manufacturer s instructions and complete this Benchmark Commissioning Checklist will invalidate the warranty This does not affect the customer s statutory rights Customer name Telephone number Address Boiler make and model Boiler serial number Commissioned by PRINT NAME Gas Safe register number Company name Telephone number Company address Commissioning date To be completed by the customer on receipt of a Building Regulations Compliance Certificate Building Regulations Notification Number if applicable CONTROLS tick the appropriate boxes Room thermostat and programmer timer Programmable room thermostat Time and temperature control to heating Load weather compensation Optimum start control Time and temper
52. ould only be carried out by qualified personnel with calibrated equipment At the time of commissioning complete all revelant sections of the Benchmark Checklist located on the inside back pages of the document For maintenance of the boiler the cover has to be removed Unscrew the 2 locking screws from the fasteners at the top of the boiler unlock the fasteners and remove the cover in a forward motion Note that there is an earth cable to disconnect when removing the boiler front panel Free space for removing the connector is about 400 mm Remember to connect this earth cable when placing back the boiler front panel and take care the wire does not get stuck between front panel and boiler Changing settings such as the burner pressure and the amount of air flow is superfluous Only in case of a failure or when replacing the gas block venturi and or fan the CO percentage should be checked Always check all gas carrying parts for leaks with a leak detection spray after maintenance work to the boiler Close the relevant commissioning valves during the maintenance activities See figure 15 a Draining the boiler The heating installation must be provided with a fill and drain valve Use this feature also for draining the boiler gt SNE wi GOT ET CLOSED Figure 15 a Installation amp Servicing instructions ATAG iR Range 15 1 Checking the CO E The CO percentage is set in the factory This
53. pipe CH 7 Control unit 15 Isolation valve return CH C Condensation pipe 8 Control panel 10 Installation amp Servicing instructions ATAG iR Range Mounting boiler frame Install the boiler in a boiler room in accordance to the actual local regulations BS5440 2 2000 The installation location of the boiler has to be and remain frost free The boiler casing is splash water tight IPX4D and is suitable to be installed in e g a bathroom It is NOT necessary to have a purpose provided air vent in the room or internal space in which the boiler is installed Neither is it necessary to ventilate a cupboard or compartment in which the boiler is installed due to the extremely low surface temperature of the boiler casing during operation Therefore the requirements of BS 6798 Clause 12 and BS5440 2 may be disregarded The boiler can be mounted practically to any wall with the wall frame and the enclosed fixing equipment The wall must be flat and of sufficient strength in order to be able to carry the boiler weight with its water content Above the boiler there must be at least 175 mm working space in order to be able to fit a horizontal concentric flue system to the rear See chapter 9 6 for more flue options Make sure there is sufficient service space arround the boiler according figure 8 a The location of the boiler can be determined by using the template The wall frame allows the possibity to pre fit the complete heating system before
54. r equivalent must be fitted The flue must be terminated in a place not likely to cause a nuisance For horizontal flue terminal direct to the rear or side through the wall only 1 bend and 1 wall terminal the terminal should be placed horizontal The flue pipe inside the terminal is fitted in a 3 degrees angle to ensure the condensation water can run back to the boiler See figure 9 6 1 a For longer horizontal sections the outlet system should always be fitted on an incline 52 mm m 3 sloping down towards the boiler so that no condensation water is able to accumulate in the outlet system The chances of icicles forming on the outlet is minimised by causing the condensation water to run back towards the boiler See figure 9 6 1 b Installation amp Servicing instructions Maximum straight length ee a ra MECA ER 52 gt E 6m iC 36 40 iR 32 40 iS 32 40 ap S a PN e 4 El 89mm sete Fist Persia pone 403mm 456mm 508mm 560mm 612mm 1m 2m 6m 1m 8m 9m o 10m 11m 12m Figure 9 6 1 b 23 ATAG R Range 24 SIT JILI OII CE ARI SOT TDi E NR Oo A OR LEP TI EL EEL PT LIT LIT ie itt ile eSEEEEe 959055 COGESIADE DARAS EA VIVA Came ARE CINILI SRA RAT rT A ca AAA COS Pere A LUE AA SSA Begs T TIILI Onn PILIWNAVANVA
55. r supply system must comply with The flue gas outlet and air supply installation must comply with the current regulation requirements IG UP 10 and BS 715 The ATAG iR boiler as described in this manual is NOT suitable for a combined flue system The appliance concentric connection diameter is 60 100 mm to which the flue gas outlet and air supply system can be fitted with or without elbow pieces The maximum permissible pipe length is set out in Table 9 6 2 a For further information about the available components of the flue gas and air supply system we recommend you consult the Flue system literature Combinations with other brands or systems are without written permission from ATAG Heating not permitted The ATAG flue gas system is meant and designed solely for the use on ATAG central heating boilers adjusted to Nat gas or LPG For this purpose the CE Certificate has been supplemented under the Gastec nr 0063CQ3634 The maximum flue gas temperatures are below 70 C full load 80 60 C The proper operation may be adversely influenced by changes of or adjustments to the correct set up Possible warranty claims will not be honoured if incorrect changes result in non compliance with the installation manual or local rules and regulations Room sealed system Boiler Class C Permitted only mW A when the air P A intake and the flue gas outlet are in the same o pressure area
56. re 16 a Turn pull the sealing ring 1 downwards Turn the siphon securing clip 2 anti clockwise Pull the siphon cup 3 and siphon pipe 4 out of the heat exchanger Take the siphon cup and pipe out of the boiler by moving it downwards or turn it in forward motion upwards along the heat exchanger Clean the parts by rinsing them with water Check the O ring of the siphon cup and replace it if necessary Grease the O ring again with acid free O ring grease to simplify the reassembly Reassembly takes place in reverse order fill the siphon with 150 ml of water Ifa leakage has occurred to the siphon replace the entire siphon Figure 16 b Figure 16 b Installation amp Servicing instructions ATAG iR Range 41 42 Fan unit and burner cassette see fig 13 2 b f Remove the tie wrap from the silencer and remove the silencer 1 Unscrew the coupling 2 of the gas block and the coupling on the venturi 3 and remove the gasline 4 A Replace the gaskets of the gasline O ring with new ones 1 CLOSED Disconnect the electrical connections from the fan 5 Figure 16 c Turn the left 6 and right 7 clamp bars a quarter turn with the hex key and pull these out in a forward motion Mind the direction of rotation red control cams Now lift the complete fan unit 5 with the upper tray of the heat exchanger and remove it in a forward motion
57. rough which gas flows using leak detection spray The following safety symbols may be encountered in these installation instructions and on the boiler packaging Boiler must be stored away from frost Protect packaging and or contents from damage as a result of insufficient care taken during transport Protect the boiler from weather conditions during transport and storage whilst still in its packaging If and how to clamp when using transport trucks with clamp equipment If and how to transport when using a rolling jack The whole packaging is made of recycled materials and can be recycled again Transport and place the boiler in its packaging in this position Do not to step on or stand on the package An assembly or dismantling must be carried out Pay extra attention in connection with a particular operation Useful tip or advice Installation amp Servicing instructions ATAG R Range 3 Technical specifications Technical specifications Natural gas ATAG iR Series Regular Boiler type R 12 iR 15 iR 18 iR 24 R 32 iR 40 Type heat exchanger Con1 Con1 iCon1 iCon1 iCon2 iCon2 Input CH Net kW 10 8 13 5 16 2 21 6 28 8 36 0 Q Input CH Gross kW 12 0 15 0 18 0 24 0 32 0 40 0 Modulation range CH capacity 50 30 C kW 5 0 11 8 5 0 14 7 5 0 17 5 50 232 69 312 69 388 Nox class EN15502 1 5 O at full load 4 7 CO at full load 9 0 Temperature class flue T100 Appliance type B23 B33 C13 C33 C43 C53
58. sion fitting into which the gas line can be fitted 9 4 1 Natural gas connection NG The gas supply must comply to the current Gas Safety Installation amp Use Regulations in accordance with BS 6891 The nominal inlet working gas pressure measured at the appliance should be 21 mbar 2 mbar for Nat gas G20 Allowing for the acceptable pressure loss of 1 mbar across the installation pipework it can be assumed that a minimum permitted operating pressure of 18 mbar will be delivered to the inlet of the appliance Reference BS 6400 1 Clause 6 2 Pressure Absorption When tested at the gas valve the pressure drop from the meter to the gas valve must not be more than 3 8 mbar 9 4 2 Propane gas connection LPG A The LPG installation has to comply with British Standard 813 and Domestic Gas Installations Installing of a LPG installation should only be done by a registered LPG installer The tank must be provided with a high pressure regulator with a minimum capacity of 24 kg h to reduce the tank pressure from 5 to 1 5 bar The 1 5 bar high pressure gas line should have a minimum diameter of 15mm In the high pressure gas line a house pressure regulator must be installed When tested at the gas valve the pressure drop from the pressure regulator to the gas valve must not be more than 3 7 mbar Installation amp Servicing instructions ATAG R Range 9 4 3 House pressure regulator Each gas appliance which is connected to the propa
59. sts of a concentric connection 60 100 mm See following chapters for detailed information regarding each connection It is advisable to clean all of the boiler s connecting pipes and or to power flush the installation before connecting it to the boiler 9 1 Open vent heating system This boiler is only suitable for installations that have been equipped with open expansion tanks open vent Connect the central heating system according to the current regulations Open vent heating system a jus m Recommended relationship In neig between pump cold feet and vent DHW cylinder 1000 mm Min 22 mm Min vent feed and expansion cistern 15 mm Min cold feed u a he 2 o E TE NA D lt x lt _j gt lt Heating circuit O Pump Boller 150 mm Max Scheme open vent system Figure 9 1 a Installation amp Servicing instructions ATAG iR Range 1 3 14 9 2 The boiler pipes can be connected to the installation by means of 22mm compression fittings For connecting to thick walled pipe welded or fitted adapters should be used The boiler is NOT equipped with a built in internal filter Advice ATAG Heating Technology Ltd recommend the installation of an in line filter installed into the heating return as close to the boiler as possible ATAG Heating Technology Ltd recommend the use of the ATAG Guard Magnetic filter 22mm Brass FC000200 5 year warranty Additives in th
60. ted Use of a condensate pump to an internal termination Condensate can be removed using a proprietary condensate pump third party delivery of a specification recommended by the pump manufacturer The pump outlet should discharge to a suitable internal foul water discharge point such as a an internal soil and vent stack or b an internal kitchen or bathroom waste pipe washing machine waste pipe etc Figure 9 5 3 shows a typical connection method A suitable permanent connection to the foul waste pipe should be used and the manufacturer s detailed installation instructions for the pump should be followed Installation amp Servicing instructions ATAG iR Range L 1 Boiler 7 1 Boiler 7 2 Visible air break 6 2 Visible air break 6 3 75mm trap 3 75mm trap 4 Visible air break and trap is not required because there is a trap 4 Visible air break and trap is not required because there is a trap with a condensate seal of 180mm incorporated into the boiler with a condensate seal of 180mm incorporated into the boiler minimum requirement is 75mm minimum requirement is 75mm In this case the 100mm is 5 Soil and vent stack measured to the trap in the boiler 6 Invert 5 Sink basin bath or shower 7 450mm minimum up to three storeys 6 Open end of condensate drainage pipe direct into gully 25mm 8 Minimum internal diameter 19mm fall at least 45mm per meter
61. tion with F1 Protector Suitable for mixed metal and plastic systems Disperses sludge limescale and other deposits For new CH installations Removes oils grease and flow control agents For cleaning existing CH installations Removes sediments For cleaning new and existing CH installations Removes iron and lime related sediments For cleaning new and existing CH installations Removes sludge limescale and other debris For cleaning new and existing CH installations Removes sludge limescale and other debris ATAG support the use of inhibitors suitable for mixed metal applications that keep the pH level between 6 and 8 Dosage levels as per manufacturers instructions Preferred inhibitor suppliers are ATAG Heating Technology Fernox and Sentinel Installation amp Servicing instructions ATAG R Range 47 Annex B Declaration of conformity CE DECLARATION OF CONFORMITY Hereby declares ATAG Verwarming Nederland BV that the condensing boiler types ATAG IR 12 IR 32 IR 15 IR 40 IR 18 IR 24 are in conformity with the provisions of the following EC Directives including all amendments and with national legislation implementing these directives Directive Used standards Gas Appliance Directive 2009 142 EC EN15502 1 2012 ex 90 396 EEG EN15502 2 2012 EN297 2004 EN437 2009 Efficiency Directive 92 42 EEC ENG77 1998 EN13203 1 2 2006 Low Voltage Directive 2006 95 EG EN60335 2 102 2010 EN60335 1 201
62. tlonS iaa O EA AE A E ANE aA aN E AAO aAA T A DENON eee r ce A O e ee O EE 8 O DOI VO paoka dde ea ae lecci n ita une ti cin 9 CG 10 5 OC SCO eee ee ene eee eee eee eee RE 9 7 Boiler proto components SE ii 10 9 M unting JOON Si MANNS cocinas iniciado 11 8 1 MA o ocean 12 COMME CINE OO pic ltnec vestededadesedsedusmusetenseana ic EEE ni lido lso asin 13 9 1 Open vent heatina S YM siones daniela 13 I2 NO UE AM e OS SP OO un A nn 14 9 3 Heating systems with plastic pipes VV 15 9 4 Gas connection in general sise 16 9 4 1 Natural gas connection NG sise 16 9 4 2 Propane gas connection LPO inerte tin seen 16 959 Condensation diain DID nm ad 18 9 6 Flue gas exhaust system ista inicia 22 9 6 1 Flue terminal locations sise 23 9 6 2 Dimensioning of the flue gas and air intake duct ococonccncccccncccccnncnncnnononenononcnnnonenonnnnnnos 26 9 7 Fitting the boiler onto the boiler frame ooncccccnnncccononocononoconnnononcnnnnnnnnonannnononcncnnnnnnss 28 10 Electrical CONMECUON serisini seine sante idilio 30 10 1 FNS CUAG AN dagrar sisi rta ii 31 A e O ETS E 0 32 12 BOI COMM OMS erep E E EEEE E E E E EEE E 32 12 1 Controls and explanation of the functions 33 13 Commissioning Me DOST tarot riel ooo baii 34 i oS SUN Si ico 36 182 Parameter chapler sessi nuanian aaan 36 14 Bormo TNS DOG APA O E E E E E EE 37 TOC OMIS Ion ea E EE ccoo ios 38 15 1 e ee MAC E E ee t os 39 16 ROUNE Sec orcas a en io 41 16 1 C
63. tructions concerning its use present the customer with the user s manual and warranty card Each boiler is fitted with an identification plate Consult the details on this plate to verify whether the boiler is compliant with its intended location e g gas type power source and exhaust classification On completion of the installation the installer or commissioning engineer must fill out and complete the Benchmark Commissioning Checklist found on page 53 of this manual and hand this to the customer for future record keeping The Benchmark Service Record must also be completed by the service agent following each service call and return to the customer Installation amp Servicing instructions ATAG R Range gt gt Rules amp Regulations Symbols The following regulations apply to installation of ATAG central heating boilers Legislation and Regulations Gas Safety Installation and Use All gas appliances must by law be installed by a competent person eg Members of Gas Safe Register and in accordance with the current Gas Safety Regulation Failure to install appliance correctly could lead to prosecution All Gas Safe registered installers carry a Gas Safe ID card and have a registration number You can call Gas Safe Register directly on 0800 408 5577 In addition to the above regulations this appliance must be installed in compliance with the current IEE Regulations the Building Standards Scotland Consolidation Regulatio
64. uctions ATAG iR Range 27 9 7 gt gt gt gt Fitting the boiler onto the boiler frame After the pipe work of gas heating installation installation has been fitted to the boiler frame the boiler can be placed on the boilerframe Before hanging the boiler to the boiler frame remove first the cover of the boiler first The cover is also the air cabinet and is attached to the boiler case with 2 fasteners A and B see figure 8 a Note that there is an earth cable to disconnect when removing the cover from the boiler Free space for removing the connector is 400mm Remember to connect this earth cable when replacing the cover Always secure the fasteners with the screws A and B after replacing the cover Remove furthermore the 4 plastic caps from the boiler connections When removing the plastic sealing caps from the pipes contaminated testing water may be released Lift the boiler only by the boilers case Lifting and carrying precautions Lift only a manageable weight or ask for help When lifting the boiler bend the knees and keep the back straight and feet apart Do not lift and twist at the same time Lift and carry the boiler close to the body Wear protective clothing and gloves to protect from any sharp edges Bottom of boiler Jig nuts Figure 9 7 a 1 Press all connection underneath the boiler upwards 2 Put on each valve and the elbow fitting a fibre wash
65. ve the pollution by installing a filter The filter type has to fit the type and grain size of the pollution ATAG Heating Technology Ltd recommends filter usage In this case the whole piping system should be taken into consideration The CH installation has to be properly vented before using the system For that purpose we refer to the commissioning chapter Ifa regular water top up is required gt 5 on an annual basis then there is a structural problem and an installer has to solve the problem Regularly adding fresh water to the system also adds additional calcium and oxygen implying that magnetite and calcium residues can continue The result may be blockages and or leakages The use of anti freeze and other additives requires periodical quality checks of the filling water in accordance with the period laid down by the additives supplier Chemical additions are to be avoided and should only be used after ATAG Heating Technology Ltd has approved their corresponding use Should you wish to achieve the required water quality by using chemical additives then this is your own responsibility The warranty on the product delivered by ATAG Heating Technology Ltd expires if the water quality does not meet ATAG Heating Technology s specifications or the chemical additives have not been approved by ATAG Heating Technology Ltd On installation and during additions or changes at a later stage ATAG Heating Technology Ltd recommends to ke

Download Pdf Manuals

image

Related Search

Related Contents

LCT Moteurs  6. Disassembly and Reassembly  "取扱説明書"    AMFLO® SONIC DryX  3M OHP1808 Overhead Projector  Product User Manual Custom Microwave Oven Part No. 910883  It is important to note that nearly every function in Horizon can be  取扱説明書 - 有限会社 図工    

Copyright © All rights reserved.
Failed to retrieve file