Home

5.System Settings

image

Contents

1. Will be displayed after the measurement test results shown in Figure 3 1 4 Zeus Technology Co Ltd Shenzhen Battery test KE 3 1 3 If the test result lower right corner of the interface with an icon of the printer press lt Enter gt key to print the test results you can enter the test resul befor printing models the interface shown in Figure 3 1 5 Enter up to 16 A VW to select the character you want to enter You can enter letters nun vers there is a small part of the sign 4 P Select the digits to enter When you re finished press lt Enter gt to sae the rint t lt key does not save print 3 1 6 print result shown in Fig a Tes sting car V win E ees y cater J e Siir A pbk om a TTia t y i S quod y 1581 K1aggeg tittititttittiitkkkkkkkkkkkkkk Note 1 before the test ensure that the engine does not start all electronic devices have been turned off 2 after the car running for some time not immediately tested because the battery voltage is slightly higher than normal available open headlights etc 2 to 3 minutes before they can properly test Zeus Technology Co Ltd Shenzhen b Starter system test In the main menu Figure 3 1 0 Select option 2 starter system testing and Starter System Test press lt Enter gt key to enter the starter system test interface Figure 3 2 0 belo gt prompted display interface to operate After starting the en ne to
2. mdin guage press lt Enter gt key to confirm to change the language b Tine an n Jystem Settings menu Figure 3 5 0 select the time setting press nter gt key to enter the time setting interface Figure 3 5 3 gt YYYY MM DD to date HH MM SS last minutes and seconds Zeus Technology Co Ltd Shenzhen arrow keys lt q gt Select the object to change A VW adjust the value Press lt Enter gt to save the changes after modify press lt Esc gt key to discard changes 10
3. Battery Analyzer MST 8000 Instructions Zeus Technology Co Ltd Shenzhen PVA PP CAN ANCE forks sated do MEA MA O a De A IE A 2 o TAS iiit PA UA er e A AE ATA A AN AR ATA e AAA AE E ATA SOMA IIS e A 7 A AO O A VU A A RA A E y SA AAA AA el EA r e MA e A IR IA OA le MA io n A A NA E A Vd 0 RR A A 2 E A N eS Charona System Ee sac Mask cop ocacion sae AUTORS ae cesses olthade cod aate ta gti ss A iiss casado lados cope d Maximin LOAD CST ias ode dci cdo edi iio sen attos Mig ediudersgdettedeoe SA US IRA O pi E MA es o IRA A O OA A o 10 CRA y E TES Al It A o EN ral 7 AE E A RA a M0 A UR RN Eo y AAA po SAA AT A Me IA PE o A ANS E Mi 2 PERO Dr NTE A A e a ERE Po NIN I Appearance power is unprintable Zeus Technology Co Ltd Shenzhen 1 Storage battery tester host 2 Display Interface Using 320 240 color LCD screen that can display different functions and measurement data 3 Left 4 Switch pages or set of data 4 Right Switch pages e set of data 5 on the key A Selectior function or set of dat amp dov 1 ke vw Selection function r Set 01 uta Escape key Esc Exit current page or return to the previous level 8 OK key Enter OK option or enter the next level 9 detachable printer module print test results and related information including test time and test models Note If you need to use the printer you must install the printer before the host boot If the printer is in
4. ltage value can be multiplied by two test result print operations can refer battery test results pi nting operation d Maximum load test In the main menu Figure 3 1 0 Select option 4 r ax1 gt m lo d test and press lt Enter gt key to enter the maximum load c taper tion y compt interface Figure 3 2 0 below Maximum Load Testing gt gt Please turn turn on all e PP iease start SSP ee 2 E se iel lt Enter gt 3 4 1 Follow the prompts first open all the electrical equipment and then start the engine after waiting for about 15 seconds waiting for the stable operation of the engine press lt Enter gt to start testing intrusion detection interface Figure 3 4 1 Check the minimum voltage if the minimum voltage lt 12 8V then the load may be a problem check the generator belt or whether there is a short circuit wire Zeus Technology Co Ltd Shenzhen 5 System Settings a Language Settings gt Inthe main menu Figure 3 1 0 Select option 5 System Settings then press lt Enter gt key to enter system settings selection interface shown in Figure 3 5 0 Select the language setting press lt Enter er to e ter t e language selection list Figure 3 5 1 Figure 3 5 2 below av mM in Enzush Portuguese Spanish French German Italian Russiar impl Ww Chinese Japanese Turkish Traditional Chinese total of 11 1ds1 ho se from Use the arrow keys A Y d P select the correst
5. the process of loading operations after Zeus Technology Co Ltd Shenzhen 2 The boot 1 connecting wiring and battery battery tester between Red clip connect the battery positive black clip connect the battery negative If red or black clip clip connection is not reliable the following diagram interface 1 0 and Figure 1 1 shows there is a problem at this time need to disconnect to reconnect to clip 2 wiring to normal after vice tialization is successful the display will automatic LWL L key to continue P Zeus Technology Co Ltd Shenzhen 3 Functional testing a Battery Test gt After the normal boot press any key to enter the main menu as shown in Figure 3 1 0 a gt Press A V button select 1 batte y 2st p ess lt Enter gt key to enter the next one if the battery voltage is tr w less than 11 5V will be prompted interface Figure 3 1 1 pr ss HT gt i r gt k 7 w continue measuring lt Esc gt key to abandon measurement hh he bi voltage is normal it will go directly to the battery type sel ction s e Figure 3 1 2 On the subject of battery type battery by s ect the orresponding option gt Press lt nti gt key to enter the next one Enter battery specifications set vu F zu 1 3 a sm nv plus 5 X point minus 5 set value minus 100 D gt set value plus 100 After setting the setpoint press lt Enter gt key to start the measurement
6. wait around for about 15 seconds to read the test data minimum on value For 12V systems If the minimum voltage value is greater tb V th 1 tart the system normally If less than 9 6V shows the batterv vol age i lt 10w to start check that the relevant part of the connection nts li gt and starters If the 24V system the minimum voltage 19 2V jlace s gt reference boundaries Test result print operations can refe Y tte test sults printing operation c Charging System Tes In the main menu it ce 4 Select option 3 charging system test press lt Enter gt key t ente th charging system test then the operation prompt interface E 2 re 3 3 0 below will appear gt Charging System gt ee _ Zeus Technology Co Ltd Shenzhen Prompted interface prompts 1 first start the car the car starts to wait for about 15 seconds to ensure stable operation of the engine has been 2 press lt Enter gt to start testing enter the test screen Figure 3 3 1 3 the engine speed is gradually increased to 2000r min The device records the minimum and maximum charging voltage value in this process 4 the end of the test reading the test results Test Data Analysis 1 the voltage is normal charging system is 13 3 15 v Two if more than 15 v please check the car s regulator If less than 13 v please check the connections lines and alternators Note If the 24v system the reference vo

Download Pdf Manuals

image

Related Search

Related Contents

【スカパー!光用デジタルチューナー等レンタルサービス契約約款】  Canon EOS EOS-1DS DIG SLR CMOS 11.1MP  Nady Systems UHF-16 User's Manual  GPS AutoSteer System Installation Manual  BD-HP35S Operation-Manual DE  H610.4220.03.00_ROROS 4220 KULLANMA KILAVUZU  Use and Care Guide - Appliances Connection    Guia do Produto do PMO Accelerator do CA Clarity PPM  VERY LARGE TELESCOPE  

Copyright © All rights reserved.
Failed to retrieve file