Home

View Document

image

Contents

1. intention to support with technical services spares or repairs 3 The Manufacturer shall provide Network Rail Technology Introduction Group at least 12 twelve months notice of its intention to discontinue supply or to provide such notice as is reasonable if such discontinuance is outside its control and will offer the opportunity of a Last Time Buy to Network Rail together with date for last order placement and supply of the parts affected The introduction of proposed alternative products shall be communicated to the Network Rail Technology Introduction Group 4 Provide further copies of operating and maintenance manuals to purchasers users of the product as necessary including certificates of conformance calibration etc 5 Provide further copies of training manuals and an appropriate level of training to purchasers or users of the product as necessary 6 Where applicable specialist technical support repairs and servicing of the product shall be carried out by the Original Equipment Manufacturer OEM or authorised agent only 7 Network Rail may request information from the manufacturer to prove product compliance with clauses 1 and 2 above and reserve the right to suspend and or withdraw any application where information is not forthcoming within a reasonable timeframe 8 In accordance with Network Rails Quality Assurance Policy Statement 2011 where the specification and or Product Acceptance Certificates specify quality assurance classif
2. 1 input expanded to 8 087 000559 RS485 Multi drop outputs 19 rack mounted 1u high 250mm deep 19 Rack Mount ipDVC Unit Controller to drive CRT TFT or Plasma monitors via a number of video signal formats IPDVC EuroRack Houses Power supply and up to 12 Eurocard eg 1 off PEC 1 and 11 off PCG1 PTC 1 PEC1 Eurocard Interfaces Euro Rack to WAN LAN one required per station PCG1 Eurocard Plug in Graphics Control Card outputs video to one CRT P4011 PTC1 Eurocard Plug in through connector card distributes 087 000621 RS485 via BNC connectors over Coax Triax Quadax etc Supplied FOC with New LED TFT displays one per display PGC1 VGA Inline converter connects PCG1 RS485 output via BNC connector over Coax Triax Quadax Coaxial Converter Module 3U Rack mount unit provides up to 5 off RS485 feeds to displays over Coaxial cables RJ45 to Triaxial P4015 IPH3 Terminal Server Connects directly to LAN or WAN and 087 000624 converts and distributes RS232 RS485 and TCP IP Ethernet to displays Built in Timebase decoder 19 Rack mounted 1u high 250mm deep Page 2 of 6 NetworkRail See Certificate of Acceptance PA05 02652 Manufacturer Issue 3 Infotec Valid From 01 05 2014 Review Date Infotec Supported PartNo Description _ _ _ _ CatalogueNo P4024 In Line CAT5 to BNC Converter Cable delivered complete 087 000625 with Male Male connectors for both CAT5 and Coax Cables R
3. 7 Only send products for repair or reconditioning to the Original Equipment Manufacturer OEM or authorised agent 8 Users are to be aware that Product Acceptance is not a substitute for design approval Page 5 of 6 NetworkRail Certificate of Acceptance PA05 02652 Manufacturer Issue 3 Infotec Valid From 01 05 2014 Review Date 4 Compliance Railways and Other Guided Systems ROGS Regulations 1 Where the product is to be used in areas where Network Rail is not the Infrastructure Manager e g leased stations the sponsor shall additionally obtain formal consent from the Infrastructure Manager for the locality where the equipment is to be installed This may include a requirement for additional safety verification The decision of that Infrastructure Manager is binding and cannot be overridden by Network Rail except by the escalation processes established in the ROGS regulations 2 As required in Railway Group Standard GE RT8270 at each use of this product the project or group responsible for installation and commissioning shall be required to demonstrate compatibility with a All rail vehicle types that have access rights over the area affected by the change b Infrastructure managed by others c Neighbours Railway Interoperability Regulations 3 For interoperable constituents of systems the project or group responsible for installation and commissioning shall be required to demonstrate compliance with the relevant Tec
4. NetworkRail Certificate of Acceptance PA05 02652 Manufacturer Issue 3 Infotec Valid From 01 05 2014 Review Date Communications Equipment Product Description Product Image EEEE CIS Communication Hubs Display controllers for data only protocols to be received recognised displayed and animated In resort ri HITTI OANE Eeee PAPAA RAAT AATA TTT TTEA LALA AAA addition to the principal function of displaying ZAMEEN service information Infotec displays can be E T eTA accessed simultaneously by several users for the purpose of re configuration health monitoring and firmware upgrades without interrupting the standard receipt and interpretation of display data Scope of Acceptance Full Acceptance This range of items are accepted for use on all Network Rail infrastructure including Section 12 stations Network Rail Acceptance Panel NRAP hereby authorises the product above for use and trial use on railway infrastructure for which Network Rail is the Infrastructure Manager under the ROGS regulations Authorised by Digitally signed ee Ri oe rd Lawes DN cn Richard La o Network Rail Biter s Asset Management email ri ihar d lawes networkrail co uk c De a que Date ene 00 Cosmas Okoye eer C Rollings MSc CEng MIET FIRSE Process amp Change Specialist Professional Head Signalling amp Telecommunications Please contact technologyintroduction networkrail co uk Network Rail Infr
5. astructure Ltd Registered Office Kings Place 90 York Way London N1 9AG Registered in England and Wales No 2904587 www networkrail co uk Version 6 1 February 2013 NetworkRail Seas Certificate of Acceptance PA05 02652 Manufacturer Issue 3 Infotec Valid From 01 05 2014 Review Date Specific Conditions The following Conditions are specific to the approved product s contained within this Certificate These conditions must be adhered to in addition to the Network Rail General Conditions contained within the General Terms and Conditions section Failure to adhere to these conditions may result in the withdrawal or suspension of Acceptance of some or all of the items contained within the accepted configuration Manufacturer 1 Please refer to General Terms and Conditions 2 Contact Network Rail Technology Introduction group via technologyintroduction networkrail co uk regarding any configuration changes to the systems covered by this certificate The email shall include product acceptance number and details of the product configuration changes User 1 Product to be installed in line with latest manufacturers guidelines and Engineering guidance on luminance configuration 2 Equipment shall be installed and maintained in accordance with Network Rail standards Product Configuration System or Complete Assembly Current PartNo Description _ Z CatalogueNo P4002 RS485 8 Way Router Expansion Unit
6. e amended by Network Rail Technology Introduction Group Any alterations made by a different person will invalidate the entire certificate 2 Failure to abide by the requirements in this Certificate of Acceptance may invalidate the certificate thereby restricting the right to operate the product and or limiting the future supply and deployment of the product on the infrastructure 3 Upon the review date this certificate and the product it relates to is invalid and not accepted for use Manufacturers are to make an application for a review prior to the review date 2 Manufacturer The Manufacturer shall 1 Ensure that all products supplied comply with the standards defined in the Acceptance Requirements or otherwise documented as part of the assessment including meeting the reliability requirements included in the Acceptance Requirements and in any deed of warranty for the relevant certificate number 2 Notify Network Rail Technology Introduction Group a Within 48 hours of any deficiencies affecting the quality functionality or safety integrity of the product including corrective action undertaken or proposed b Of any intended change to the accepted product changes include i a change to the product configuration to the actual product or its application ii a variation to or addition of manufacturing locations or processes iii a change in the name or ownership of the manufacturing company iv any changes to the ability or
7. epair Only PartNo Description CCC Catalogue No IPH2 Terminal Server Connects directly to LAN or WAN and 087 000558 converts and distributes RS485 to displays Built in Timebase decoder 19 Rack mounted 1u high 250mm deep P4005 Wall Mount ipDVC Unit Controller to drive CRT TFT or 087 00061 7 Plasma monitors via a number of video signal formats Assessed Documentation Reference Title Date and Applies to Cert issue No Email Arvind Bali Alan Reilly MPA05 2795 15 07 2008 is a Infotec P 4001 IPH2 Terminal Server 19 Rack Mount eG Infotec P 4002 RS485 8 Way Router 19 Rack Mount es oe ae a Manuals and Training Materials Reference Title Doc Date and Applies Rev to Cert issue No 13212U_ Generic System Connection O amp M D 24 05 12 3 13213U_ Generic Communicating Hubs O amp M _ 1 22 0543 3 Certificate History Issue _ Date ss Issue History _ _ _ gt gt S Page 3 of 6 NetworkRail Certificate of Acceptance PA05 02652 Manufacturer Issue 3 Infotec Valid From 01 05 2014 Review Date Contact Details Manufacturer Sponsor Infotec The Maltings N A Tamworth Road Ashby de la Zouch Leicestershire LE65 2PS Page 4 of 6 NetworkRail Certificate of Acceptance PA05 02652 Manufacturer Issue 3 Infotec Valid From 01 05 2014 Review Date General Terms amp Conditions 1 General 1 This certificate can only b
8. hnical Specifications for Interoperability TSI where appropriate 4 An authorisation from the national safety authority i e the Railway Safety Directorate of the Office of Rail Regulation is required before the equipment is to be used in revenue earning service 5 Supply Chain Arrangements 1 Certificates of acceptance do not imply any particular quantity of supply nor any exclusivity of supply 2 Products may be purchased by Network Rail or its agents suppliers or contractors 3 Manufacturers should note that it is not necessary to enter into any exclusive supply arrangements with resellers or other suppliers Page 6 of 6
9. ications QA1 to QA5 for the products the manufacturer shall comply with the specified level of quality assurance for each product and allow Network Rail access to carry out its quality assurance checks 9 The manufacturer shall give Network Rail s representatives access at all reasonable times to its premises and allow them to inspect its quality systems and production methods and if requested to inspect examine and test the products both during and after their manufacture and the materials being used in their manufacture 3 Conditions of Use Specifiers installers operators maintainers etc using the product shall 1 Comply with the certificate conditions If a condition is not understood guidance must be sought from Network Rail Technology Introduction Group 2 Check that the application of use complies with the relevant certificate s scope of acceptance 3 Report any defect if it is a design or manufacturing fault likely to affect performance and or the safe operation of the railway in writing to Network Rail Technology Introduction Group 4 Inform Network Rail Technology Introduction Group in writing of a change to the product configuration or to the actual product or its application 5 Operate maintain and service the product in accordance with Network Rail standards and Operation and Maintenance manuals as appropriate 6 Be appropriately trained and authorised for the installation maintenance and use of the product

Download Pdf Manuals

image

Related Search

Related Contents

Lightolier C7P38MHA User's Manual  Manual do utilizador do computador portátil    User Manual - Sitebox Ltd  ZyXEL P-312 User's Manual  C0470  Starlite Garden TT-WB Installation Guide  Mode d`emploi du questionnaire  Standing Contract for Ground Tarps and Growth Blankets  Windows 10  

Copyright © All rights reserved.
Failed to retrieve file