Home

to read User Manual & Installation Instructions

image

Contents

1. O OR Under the condition of turnning on press can start Sfi o up air draft function pressagain will colse it N 1 P l y 5 The setting of time or temperature Y A 1 Press pitch can adjust the time from 1 99 A LA a A 2 Press p Assembly of sliding door ZZ 30 60 Put the sliding door A onto the up and down aluminum trck to keep it balance STEPS l pitch can adjust the temperature from 4 4 WSK SANIT AR Y WARE NE L ur ra jr er eit peer bh 88 or 6 WON ON Oa Install the roof Leave the roof onto the top of the shower then fix tightly with bolts Then install the spare parts A Finishing install the whole set in order to avoid steam or water leaking the silicone should be used in all connection Time adjustment pitch 5 Temperatu re adjustment pitch position except the sliding glass door l B While connecting the cold and hot water pipe 2 Temperature adjustment pitch Fan Pitch to your house water pls wipe the silicone on the connection mouth to
2. seat 15 back light 9 drainage 16 cold hot water switch exhaust fan 17 nozzle bottom tray decorated light mirror shift switch SANITAR Y WARE INSTALLATION SKET The socket 1 of power and the socket of telephone Cold water pipe Hot water bi 183 03inch 216 Other screws M4x20 M4x25 am Install the screw M6x25 Active chain wheel of glass Q999 41 73X41 73X83 03 inch SIZE 1060X1060X2160mm ILLUSTRATION OF INSTALLA 1 The products should be installed by technical guy who are got the certificate or those technical who are assign by dealers The main power switch and electronic leakage device should be installed 2 The plug of electronic should be installed above the steam generator and the length of electronic wire not less then 1800MM from the earth 3 There are should be with main power switch for hot and cold water pipe of steam room and the water pipe should be connect to drainage water pipe 4 Install the products according to the diagram of installation 03 When fixed the place for the products 03 ATTENTION 1 In order to be tripped and fell down pay more attention when get into the steam room Please don t shut the finger in the door in order to be hurt 2 In order to avoid dam
3. DC12V L L
4. Pe n Chain wheel of glass door STEP 3 me j 1 Assembly of fix glass door 2 Assembly of sliding door Put the sliding door onto the up and down aluminum track to keep it balance SANITARY 1 The electrical pitch Press CW pitch can open the machine the temperature is the room temperature The time will show 30m At the same time it will open the ceiling lamp Press again will close all the functions After the closure of the machine the water case will drainfor 2 minutes 2 The application of the back lamp Press amp the sidelight is on Press 4 again the ceiling STEP 4 lamp is out press C amp J a third press the sidelight is out too 3 The steam function A Install the glass door onto the tray Put the water strip onto the aluminum post of glass door if the length of the water strip isn t suitable Pls cut it to suitable size then put it on the tray screw with bolts o lt 0O Pg startup the steam function the water case Press will pump water automati cally After 60minutes or so it will generate steam When the water case is lack ofwater the controller will replenish automatically 4 The air draft function
5. times Technical Parameter 3 CAUTION The system must be shut down before injecting Voltage Frequency Water Voltage Power generator Light cleaning liquid ACII0V 60HZ 0 1 0 2Mpa 2 65KW 12V amp 20W Packing list two pieces of glass body two pieces of fixed glass Packi 1 door two pieces of sliding glass door two pieces of aCKINg aluminum column two pieces of U shaped plastic seal four pieces of water resist strip one tray one roof two pieces of up and down bended Packing 2 aluminum column with eight pieces of wheels one piece of post one pieces of steam pipe Packing 3 Spare parts list one set shower two pairs of shaped handle eight pieces of wheel with cover one set of glass towel shelf M6 25 screws 1 M6 35 screws 2 ST4 20 screws 3 ST4 25 screws 4 ST4 20 screws 5 one instruction SCREW 1 M6x25 Qu 6pcs SCREW 2 M6x35 Tom H 6pcs SCREW 3 St4x20 qias po SCREW 4 St4x35 Omm 4pcs SCREW 5 St4x20 pa 20pcs SCREW 6 St4x25 M 20pcs 2 1S 9090K 1s 2x 3 4 os Os Ty SANITAR Y ZWARE CONSTRUCTION SK top light steam out top shower room body moveable shower control panel towel shelf 8y 10 11 12 13 14
6. aging the surface of products please do not use hardness and sharpness tool to curve the products 3 In order to course fire no smoking inside the bathroom 4 the jets of steam and drainage pipe both are high temperature when products working in order to be hurt please be careful 5 In order to be tripped and fell down please keep clear of the bathtub after taking shower each time 6 It will be leaking if the glass glue plastic sheet be off then please add some more for recover 7 If there are marks of water please clear with soft cloth and toothpaste 8 In order to be blocked of drainage device please keep clean of the surface of bathtub 9 Please do not hang up heavy things on the steam room or the handle of steam room 10 Please deal with the products according to the local laws when it is no longer be use 11 Any request please contact with local dealer ATTENTION FOR USAGE 1 check if power and cold hot water switch be turn on or be turn off each time before use this product 2 check if power of electronic leakage device be get through or not Checking way Press testing button light of power be off press button of restart then light of power be on lt is not being what mentioned above after operated step by step then that shows the electronic protection device out off control or there is something wrong with the electronic leakage device so should ask professional to check and maintain the product 3 Turn off the main po
7. http www eaglebath com All we do our best for the particular and definitude of the products information making but only for reference please depend on the practise and reality in detail Our company keep down the authority of amending the aspects and the spare parts according as the scheme s or parameter s redressal which was come out from technical renewal sorry to will not offer any notice xour company reserve the final explanation and modify right for all the contents waste Collection of such waste separately for special pe Do not dispose this product as unsorted municipal gues treatment is necessary INSTALL DIRECTION EAGLE BATT STEAM BATHROOM MODEL WS 801L YOu best choice C Intertek 3177783 SANITAR Y WARE Dera user Thank you very much for purchasing our sanitary ware To enable you to use this product safely and effectively please read this installation and operation manual carefully before use S elf clean system Notice Step 2 Step 1 1 Please connect the water pipe before installed the products gt 2 Please ensure that the product installed reliable electric lji Ooo leakage protection device the power plug contains earthing 1 A Da conductor and make sure it is reliable for earthing Check the y protect system of leakage protection each time before use l 3 Before turn on water pump check if the water level over je
8. make it connect well D Steam Pitch 3 CeilingLamp Back Lamp pitch C Connect the top shower pipe as drawing i 8 Main Cock Pitch Time adjustment pitch D Assembly of the other spare parts on top e g shower amp so one E After all spare parts have been installed well put the power supply and turn on the water switch to see whether every function works well 06 DRAWING OF WATER CONNECTION nstructions 1 You should install the water heater yourself 2 As the o lt from the picture please make the connection according to the serial number vl v2 etc Top shower Jojyeou Joye Water in Moveable shower clean system 4 Acupuncture sprayer weas Steam out yoyesouab Earth line Drainage OELECTRIC CIRCUIT SKETCH yclean system steam outlet gt ywater inlet Power Co oo S A SJ A z 5 O on D T Control B 5 gt pane LI CI E CI L of 44 Licht Fan AC12V
9. ts 10 to 20 mm or not make sure regular usage of water pump l otherwise it will be destroy because of water leakage C 4 Do not turn on water pump heat pump and air bubble pump without water 5 People with Hypertension symptom after drink or heart disease ae a are not allowed to use this product Children have a bath must Step 3 under adult s guidance 6 During using please noticed that don t block the jets completely in case of water leakage by the air switch Also keep lt _ _ this product clean and don t let it block with hair or mess 7 During using please firstly adjust the water temperature in Mt case of being burned 8 The outdoor spa is designed with ergonomic rise and fall changes are dis tinctly so pay more attention of slip 9 Please shut down the system when not use Cleaning method 10 Don t turn on all the water pump in the steamroom for long 1 Clean the steam engine regularly at least once by every time 2weeks or after using 20 times 2 Inject citric acid as main cleaning liquid add 1 5L each time after 10 minutes turn on and When the system turns on Step 4 Technical Parames press amp button to start the steam function for about Size 1060x1060x2150mm 30seconds and then shut down the system After vent the stagnant water repeat 2 or 3
10. wer of control panel after stop usage The plug of power should be pull out because only turn off all the functions of control panel that is not stop the power 4 People with hypertension or drunk are not allowed to have sauna steam bath Children should have sauna steam bath under adult s instruction 6 Please don t shut the finger in the door in order to be hurt when get into the steam room 7 In order to be tripped and fell down pay more attention when get into the steam room keep clean of the tray in order to be tripped and fell down Pay attention to the steam sprayer and water tank drainage they are in high temperature while working o1 c 4 4 WSK Attention The machine must be fixed in the circuit which protected by creepage protectionand should be well connected with the ground Nontechnical people can not be fixed or removed at random 6 Technical parameter Model Voltage Current Power protecting electrifying Waterproof Grade KL 824 110V 2650w_ l Top light Sidelight ao fae foen oov oew O ee ee a SANITAR Y WARE INSTALLATION PROCE 1 Assembly of tray If the ground is not smooth please adjust the nail under the tray to keep the balance of the tray and the ground 2 Install the shower body onto the tray Put the shower body onto the tray fix it LLAN y M4X20 f p y Toi pe

Download Pdf Manuals

image

Related Search

Related Contents

TDSHーBA 東芝フットライト取扱説明書  Télécharger la fiche technique  SC115 CS I/O 2G Flash Memory Drive with USB Interface 1  GE GFWS2505 Washer/Dryer User Manual  instruções para colheita, conservação e remessa de amostras ao  

Copyright © All rights reserved.
Failed to retrieve file