Home
IR468 Tank testing of Analite turbidity probes
Contents
1. Australian Government Department of the Environment and Heritage internal Supervising Scientist report Tank testing of Analite turbidity probes MJ Saynor BL Smith amp J Klein December 2003 Tank testing of Analite turbidity probes MJ Saynor BL Smith amp J Klein Hydrological and Ecological Processes Environmental Research Institute of the Supervising Scientist GPO Box 461 Darwin NT 0801 1 Klein Electronics PO Box 562 Humpty Doo NT 0836 December 2003 Registry File SG2004 0015 9 Australian Government Department of the Environment and Heritage Supervising Scientist Contents 1 Introduction 2 Equipment 3 Methods 4 Results Data file A170603 dxu Data file A260603 dxu Data file A070703 dxu Data file A220703 dxu Data file A310703 dxu Data file A070803 dxu Data file A180803 dxu Data file A290803 dxu Data file A020903 dxu Data file AD50903 dxu Data file A150903 dxu A160903 dxu amp A180903 03 Data file A260903 dxu Data file A071003 dxu Data file A051103 dxu Data file A171103 dxu 6 Calibration of the Probes 7 References Appendix 1 5 Conclusions and recommendations 15 16 16 17 Tank testing of Analite turbidity probes MJ Saynor BL Smith amp J Klein 1 Introduction Suspended sediment lt 63um gt 0 45um diameter is transported by water in rivers and streams It is important to know the loads of suspended sediment as po
2. P22 44 comma delimiter in unload mode P31 1 date format P32 5 5 significant figures Sample Taken 21CV W 0 1 rise above last height to activate sampler 22CV W 0 125 fall below last height to activate sampler 30CV W 0 600 min height at which turbidity is wiped 26CV W 0 sample number for No 1 sampler 36CV W 0 sample number for No 2 sampler 27 CV W 0 Reset Hour Counter 28CV W 0 Reset Wipe Counter 98CV W 0 BEGIN CARDID 4DSO W 1 turn probes on 3DSO W 20000 R 1 delay for Hawk Analite probes to stabilise 1L 120 S2 FF3 23CV reads Hawk depth 24CV W 23CV 21CV upper limit for sampler 25CV W 23CV 22CV lower limit for sampler 4DSO W 0 RA6M 4DSO W 1 3DSO W 20000 R 1 delay for Hawk Analite probes to stabilise 1L 120 S2 FF3 20CV reads Hawk depth 2V W S7 FFO 31CV reads Turbidity 3 31CV W 31CV 20C V lt 30CV 31CV depth is less than 30cv return a 0 3ICV FFO Turbidity 3L 120 S4 FF1 32CV ph value 1HSC R 35CV tipping bucket y 27CV W 27CV 4 1 1 10th Hour Counter RX 20CV FF3 water height 11SV forces a zero 11SV forces a zero 11SV forces a zero 11SV forces a zero 11SV forces a zero 28CV FFO Wipe Counter gt 26CV FF2 No 1 sample count 3 36CV FF2 No 2 sample count 4DSO W 0 turn probes off RZ6M IFR1 20CV 23CV gt 24CV 24CV W 24CV421CV 23CV W 25CV 21CV A 26CV 1
3. Data file A220703 dxu Figures 3 to 5 show that towards the end of the time period there was an increase in turbidity indicating a build up of algae on the end of the probes This suggested that perhaps 24 hours was not frequent enough The Analite turbidity probes have been used in the Gulf of Mexico and the wipe time was once every 15 minutes McVan instruments Pers Comm 2003 Therefore Probe 1 was set to wipe every 6 hours Before the Datalogger was reset to collect data for the next period both probes were taken out of the water and the optical lens carefully cleaned with a lint free cloth The datataker was restarted on the 7 Jul 03 at 16 16 hrs and collected data until 22 Jul 03 For the probe 1 data there is an unexplained high value of 38 NTU at 20 06 hrs on 7 Jul 03 Fig 6 This might have been some floating root material that was in the tank as there was nobody at the institute to disturb the probes or tank Interestingly Probe 2 remains constant at a value of around 1 for the same period Probe 2 shows a slight rise in turbidity value from 9 Jul 03 while Probe 1 has a turbidity value of 1 or 2 for the same period 7 J ul to 22 ul 2003 400 Wiped every 6 hours 350 300 250 4 E 200 4 150 4 100 50 4 0 j 7 Jul 03 9 Jul 03 11 Jul 03 15 Jul 03 17 Jul 03 19 Jul 03 21 Jul 03 Date 13 Jul 03 Figure 6 Turbidity probe data 7 July 2003 to 22 July 2003 At 11 46
4. i a 40 0 7 T T T 26 Sep 03 28 Sep 03 30 Sep 03 2 Oct 03 4 Oct 03 6 Oct 03 Date Figure 15 Turbidity probe data 26 September to 7 October 2003 Data file A051103 dxu The NTU values for Probe 2 are consistently up towards the maximum value of 400 NTU particularly towards the end of the measurement period Fig 16 The NTU values for Probe 1 are consistently lower than probe 2 7 Oct to 5 Nov 2003 Wiped every 3 hours 400 5 350 300 250 150 4 100 4 50 4 0 7 Oct 03 12 Oct 03 17 Oct 03 22 Oct 03 27 Oct 03 1 Nov 03 Date Figure 16 Turbidity probe data 7 October to 5 November 2003 Data file A171103 dxu Figure 17 below shows the data from the last month of the test Probe 1 has low NTU readings however the algal growth on the wiper arm seems affect the NTU values at times The highest value is just over 50 NTU The NTU values for Probe 2 are consistently up towards the maximum value of 400 NTU for the majority of the measurement period 5 to 17 Nov 2003 Wiped every 3 hours 400 eN im ai AIS Apr 300 250 y E 200 150 4 Probe 1 Probe 2 100 50 4 0 5 Nov 03 7 Nov 03 9 Nov 03 11 Nov 03 13 Nov 03 15 Nov 03 Date Figure 17 Turbidity probe data 5 to 17 November 2003 The testing was competed on 17 November 2003 The probes were cleaned and new wiper blades insta
5. 1DSO W 100 R 1 X IFR2 23CV lt 25CV 24CV W 24CV 22CV 23CV W 25CV 22CV 26CV W 26CV 1 1DSO W 100 R 1 X gt IFR3Q6CV gt 24 HZ1 HZ2 GZ4 GZ5 IFR4 20CV 23CV gt 24CV 24CV W 24CV421CV 25CV W 25CV 21CV HN 36CV 1 5DSO W 100 R 1 X IFR5 23CV lt 25CV 24CV W 24CV 22CV 23CV W 25CV 22CV 36CV W 36CV 1 SDSO W 100 R 1 X IFR6 36CV gt 24 HZ4 HZ5 IFR7 27CV gt 30 AND IFR8 31CV gt 1 27CV W 0 28CV W 28CV 1 2DSO W 500 R 1 3DSO W 10000 R 1 X Wipe if gt 3hrs amp report IFRY31CV gt 1 AND IFR10 31CV gt 395 28CV W 28CV 1 2DSO W 500 R 1 3DSO W 10000 R 1 X Wipe if Analite goes offscale IFR15 27CV lt 29 4DSO W 0 turn probes off END LOGON G HZ4 HZ5 RUNPROG
6. 40 40 2 39 9 40 1 40 2 400 399 9 399 1 400 3 397 6 The calibration on the Analite turbidity probes will be checked as soon as they are removed from the field at the end of the 2003 2004 Wet season 7 References McVan Instruments Pty Ltd 2003 Analite 390 Series user manual V1 4 Mulgrave Victoria Australia Saynor MJ Dawson JC Smith BL Crisp E amp Moliere DR 2001 Installation maintenance and running of gauging stations in the Swift Ngarradj Creek catchment Northern Territory Internal Report 384 Supervising Scientist Darwin Unpublished paper Appendix 1 The command file to run the Swift Creek gauging station in Ngarradj Creek for the 2003 2004 wet season is shown below The lines that refer directly to the turbidity probe are shown as bold MAIN03_1 CMD This program uses DataTaker to record the output of a Hawk Liquid level probe logged on Channel 1 which in turn drives TWO Gamet water samplers When the first is full the second takes over Analite NEP396 Turbidity sensor is logged on Channel 2 A Pluviometer is also logged on Counter 1 This program was adapted and modified by J Klein This command file was used for the 2003 04 wet season H H H CPROG CPROG CPROG RESET W5 CDATA H CLEAR CARDID MAINO3_1 T D ofu n c S2 0 2 0 100 water height in mm S4 0 14 0 100 ph S7 0 400 0 2500 NTU Span for Analite NEP396 P10 2000 ADC settling time P15 1 forced sleep mode
7. have a self wipe function that can be automated and will help to reduce build up of algae and other materials on the optical lens These probes can also be easily calibrated in the laboratory and even in the field if necessary The aim is to develop a relationship between in situ Analite turbidity probes and suspended sediment loads so that the time spent collecting samples in the field and filtering of the water samples in the laboratory will be greatly reduced and thereby optimising resources If relationships between the Analite turbidity probes and Suspended sediment loads are successfully developed for the three sites in the Ngarradj catchment then the method will be used for sites in Gulungul and M agela Creeks in the future The aim of the work presented in this Internal Report is to assess the usefulness of the wiping function of the Analite Turbidity probes and to also determine the frequency that the probes are wiped for optimum performance 2 Equipment Testing of the Analite NEP390 series turbidity probes was conducted at the Darwin office and laboratory prior to the installation in the field for the 2003 04 wet season The testing took place in a large tank shown in figure 2 located a covered outdoor area Two Analite probes were set up for this experiment referred to as Probe 1 and Probe 2 The Analite probes measure turbidity values ranging from 0 to 400 nephelometric turbidity units NTU Probe 1 was set to wipe at chosen inter
8. EHEIM universal pump rated at 2400 litres per hour capacity to reduce algal build up and stagnation of the water The outlet pipe is situated in the tank so that the flow is directed across the face of each probe to simulate current in a stream WATER LEVEL SAND LEVEL CABLES gt lt 7 PNE PIPE CABLE TIE PROBE SET AT SLIGHT ANGLE TO PREVENT AIR BUBBLES PROBES BEING TRAPPED UNDER LENS Figure 2 Schematic drawing showing the set up of the testing tank for the Analite probes Sand was placed into the bottom of the tank to simulate a sandy stream bed and also introduce some organics and turbidity to the tap water used to fill the tank Enough sand was collected to cover the bottom of the tank with 8 10 cm thickness of material The tank was filled with water to a depth of approximately 70 cm and was topped up occasionally to replace water lost through evaporation The probes were suspended approximately 35 40 cm above the sand bed The minimum distance between the optical end of the probe and the channel bed or any objects obstructions should be 5 cm as recommended in the manual McVan Instruments 2003 3 Methods The tank was filled with water on 10 June 2003 and allowed to settle overnight The turbidity probes were installed on 11 June 2003 and started logging at 16 13 hrs Over the duration of the testing the tank was checked intermittently to ensure that the equipment was functioning correctl
9. ataker was again downloaded on 26 Jun 03 at 14 28 hrs and data checked One high reading 379 was removed from the data for probe 1 as an outlier When checking the data for this period it is possible to see the Probe 2 values gradually rise more steadily than the values for Probe 1 which also show some small rise towards the end of the measurement period The diagram shows that there are occasional high readings from both probes 17 J un to 26 un 2003 60 5 Wiped every 24 hours 17 Jun 03 18 Jun 03 19 Jun 03 20 Jun 03 21 Jun 03 22 Jun 03 23 Jun 03 24 Jun 03 25 Jun 03 Date Figure 4 Turbidity probe data 17 June to 26 June 2003 Data file A070703 dxu The datataker was re started on 26 Jun 03 at 15 56 hrs and neither of the Probes had the optics end cleaned prior to the restart Data were collected until 07 Jul 03 The turbidity vales are shown in figure 5 26 J un to 7 J ul 2003 Wiped every 24 hours 120 5 100 4 80 4 Probe 1 Probe 2 40 20 4 0 r r r r r 26 Jun 03 28 Jun 03 30 Jun 03 2 Jul 03 4 Jul 03 6 Jul 03 Date Figure 5 Turbidity probe data 26 June to 7 July 2003 Both probes exhibit higher turbidity values from 4 Jul 2003 onwards Fig 5 Probe 2 values are markedly higher than Probe 1 which suggests that the wiping of the probe every 24 hours has some impact but that it is not frequent enough to maintain the cleanliness of the head of probe 1
10. d the turbidity readings from both probes to rise quite dramatically The readings for Probe 1 returned to much lower values just prior to the file being downloaded 18 to 29 Aug 2003 Wiped every 3 hours 400 350 300 250 Probe 1 Probe 2 18 Aug 03 20 Aug 03 22 Aug 03 24 Aug 03 26 Aug 03 28 Aug 03 Date Figure 10 Turbidity probe data 18 to 29 August 2003 10 Data file A020903 dxu The datataker was restarted on 29 August 03 at 15 00 hrs and collected data until it was downloaded on 2 September 03 There were no changes made to the command file and the end of the probes was not cleaned This file is essentially a continuation of the previous file and clearly shows the higher NTU vales for Probe 2 which isn t wiped Fig 11 Probe 1 NTU values are all very low and shows the effect of the end of the probe being wiped There was a gradual build up of algae growth on the actual wiper arms of both probes as well as on the end of Probe 2 29 Aug to 2 Sep 2003 Wiped every 3 hours 500 450 4 400 350 300 250 200 Probe 2 Probe 1 150 100 A _ _ Q_ _____ e RR eee O 29 Aug 03 30 Aug 03 30 Aug 03 31 Aug 03 31 Aug 03 1 Sep 03 1 Sep 03 2 Sep 03 Date Figure 11 Turbidity probe data 29 August to 2 September 2003 Data file A050903 dxu The end of both probes was cleaned and the datataker was restarted on 2 Sep 03 a
11. every minute and Probe 1 was set to wipe once every 24 hours The data were downloaded at 16 06 hrs on 17 June 03 Figure 3 shows the turbidity readings for the recorded period with the readings from Probe 2 rising towards the end of the measurement period For compatibility with later figures the equivalent 6 minute data is shown on Figure 3 There was one reading on Probe 1 of 100 NTU however immediately after this reading the values returned to 3 NTU s This outlier data was removed from the data Probe 1 also shows a rise toward the end of the measurement period This suggests that there is a build up on the lens and that for Probe 1 the wipe time was perhaps not frequent enough 11 un to 17 J un 2003 Wiped 24 h i iped every ours 35 T 11 Jun 03 12 Jun 03 13 Jun 03 14 Jun 03 15 Jun 03 16 Jun 03 17 Jun 03 Date Figure 3 Turbidity probe data 11 to 17 June 2003 Data file A260603 dxu The datataker was restarted at 17 44 hrs on the 17 Jun 03 with the program changed so a turbidity reading was taken every 2 minutes Probe 1 still wiped every 24 hours At approximately 16 27 hrs on the 18 Jun 03 the outlet hose from the pump was re positioned in the tank as it had moved around and the current was not flowing past the face of the probes This was repeated on the 19 Jun 03 at about 09 05 hrs as the hose had moved again This disturbance seems to have no effect on the readings obtained for this period Fig 4 The dat
12. hrs on 17 Jul 03 the tank was topped up with water and stirred again causing the turbidity value from both probes to rise initially rise The readings from probe 1 return to low NTU values after the initial rise but the values from probe 2 continue to steadily rise The data were downloaded at 14 24 hrs on the 22 Jul 03 Data file A310703 dxu The optical end of both probes was cleaned and the command file was altered to simulate field conditions of switching off the DT50 when not recording data The datataker was restarted on 22 Jul 03 at 15 54 hrs and collected data until 31 July 03 During this period the tank was topped up with water on 29 Jul 03 at 14 46 hrs and both probes registered a jump in NTU values Fig 7 Probe 1 values gradually lowered after this jump whilst the values for Probe 2 continued to rise At the end the recording period Probe 1 was reading an NTU value of 7 and Probe 2 had a NTU value of 18 20 22 J ul to 31 J ul 2003 Wiped every 6 hours 40 p ry 25 Probe 1 Probe 2 22 Jul 03 23 Jul 03 24 Jul 03 25 Jul 03 26 Jul 03 27 Jul 03 28 Jul 03 29 Jul 03 30 Jul 03 Date Figure 7 Turbidity probe data 22 July 2003 to 31 July 2003 Data file A070803 dxu The end of both probes was cleaned and the command file was altered so that Probe 1 wiped at 3 hourly intervals The datataker was restarted on 31 Jul 03 at 12 00 hrs and collected data until 7 Aug 03 Fig 8 There was no
13. ht that enables this to be done The Analite turbidity probes can be checked and calibrated in the field using the calibration standards however given that the wet season is 4 6 months long it is recommended that the calibration be checked prior to installation in the field and also when they are removed from the field This will reduce the chances of contamination and also reduce weight given that the gauging stations are accessed by helicopter 6 Calibration ofthe Probes The calibration of the Analite Turbidity probes uses standards non carcinogenic in the laboratory prior to placing them in the field It is possible to adjust the calibration of the probes to ensure that the turbidity readings are correct The calibration can be conducted in the field however it is recommended that to avoid contamination of the standards that the calibrations be checked prior to being positioned in the field and also at the end of the wet season The four IS Analite probes were calibrated using a 3 point calibration 0 40 amp 400 NTU according to the Instruction manual McVan Instruments 2003 The Standards were also checked on a calibrated Hach laboratory turbidity meter The final readings of the turbidity probes prior to installation in the field are shown in Table 2 Table 2 Turbidity values for the four eriss Analite probe prior to installation for the 2003 2004 Wet season Probe serial number Standard 84178 84179 84796 84797 0 0 0 0 1 0 1
14. lled ready for the field The water was removed from the tank and the sand allowed to dry 5 Conclusions and recommendations The results of the laboratory testing of the Analite turbidity probes show that it is important to program self wiping of the optical end of the turbidity probe on a frequent basis After some trial and error it is recommended that the wiper be activated to wipe the optical ends of the probes every 3 hours as this seems to be the optimum period to ensure accurate operation The command files that run the gauging stations in the field have been altered to allow the probes to wipe every three hours and to record in the data files when this occurs An example of a command file used for the 2003 2004 wet season is shown in Appendix 1 Towards the end of the testing the water had some discolouration from algal growth and may have started to become stagnant Even though a pump was used to simulate water movement it was not enough to be a true replication of the creeks in the environment Probe 1 had a growth on the wiper arm which may have been dragged across the end of the probe and caused higher readings The water in the creeks continually get refreshed with rainfall and move steadily down the creek channels It is not envisaged that the conditions will be suitable to allow the algal growth on the end of the wiper arms but it is recommended that the ends of the turbidity probes be checked visually whenever the water level is at a heig
15. n 16 September 29 and collected data until it was downloaded on 26 September 03 Neither of the probes had the optic lens cleaned The tank was stirred at 14 45 hrs on 19 September 2003 From 09 00 hrs to 09 40 hrs on 22 September 2003 September the pump was stopped and debris cleaned from the inlet pipe and pump housing The ends of the probes were not touched The large changes in NTU values for Probe 2 correspond to when the tank was stirred and the pump stopped and cleaned The NTU values for Pump 1 are generally much lower than Probe 2 Fig 14 however there are times when the values are higher possibly due to the position of the developing algal growth on the wiper arm 18 to 26 Sep 2003 Wiped every 3 hours ee 11 ar AN qai NENA t i i nn h TM m Al ts Pi El ee 18 Sep 03 19 Sep 03 20 Sep 03 21 Sep 03 22 Sep 03 23 Sep 03 24 Sep 03 25 Sep 03 Date Figure 14 Turbidity probe data 18 to 26 September 2003 Data file A071003 dxu The download files for 7 October onwards all show the NTU values for Probe 2 as much higher than Probe 1 Fig 15 however the values for Probe 1 are also much higher than would have been expected It is believed that this is due to the length of the time that the water had been in the tank the algal growth sediment material build up on the wiper blade and the pump not moving sufficient amount of water 26 Sep to 7 Oct 2003 Wiped every 3 hours 160 5 120 4 FUN E f
16. noticeable fluctuation in either probe for the duration of this period both remain around 2 3 NTUs for a few days then both probes read 1 for the remainder of the period There appears to be no algal build up during the week this download file covers 31 ul to 7 Aug 2003 Wiped every 3 hours 25 20 gt 5 15 Probe 1 Probe 2 10 5 0 r r r r r r r 31 Jul 03 1 Aug 03 2 Aug 03 3 Aug 03 4 Aug 03 5 Aug 03 6 Aug 03 7 Aug 03 Date Figure 8 Turbidity probe data 31 July 2003 to 7 August 2003 Data file A180803 dxu The datataker was restarted on 7 Aug at 14 00 hrs and collected data until 18 Aug 03 Fig 9 There were no changes made to the command file and Probe 1 was wiped every three hours The turbidity readings for the period remain low with only small fluctuations 7to 18 Aug 2003 Wiped every 3 hours 25 20 Probe 1 e Probe 2 Lo tu toy A A UR A LO 7 Aug 03 9 Aug 03 11 Aug 03 13 Aug 03 15 Aug 03 17 Aug 03 Date Figure 9 Turbidity probe data 7 to 18 August 2003 Data file A290803 dxu The datataker was restarted on 18 August at 15 00 and collected data until it was downloaded on 29 August 03 There were no changes made to the command file The NTU values remain low for both probes until towards the end of the recoding period when the values for Probe 2 slowly begin to rise Fig 10 The tank was stirred at 12 00 hrs on 29 Aug 03 which cause
17. s the command file being used and the time interval between wipes of the wiper blade Start Finish Command Probe 1 Wiped File name Date Time Date Time file used Hours A170603 dxu 11 Jun 03 16 13 17 Jun 03 16 06 Analitetest cmd 24 A260603 dxu 17 Jun 03 17 44 26 Jun 03 14 28 Analitetest cmd 24 A070703 dxu 26 Jun 03 15 56 07 Jul 03 14 32 Analitetest cmd 24 A220703 dxu 07 Jul 03 16 16 22 Jul 03 14 24 Analitetest2 cmd 6 A310703 dxu 22 Jul 03 15 54 31 Jul 03 11 18 Analitetest3SW cmd 6 A070803 dxu 31 Jul 03 12 00 07 Aug 03 14 00 Analitetest4SW cmd 3 A180803 dxu 07 Aug 03 14 00 18 Aug 03 14 00 Analitetest4SW cmd 3 A290803 dxu 18 Aug 03 15 00 29 Aug 03 15 48 Analitetest4SW cmd 3 A020903 dxu 29 Aug 03 16 00 02 Sep 03 13 48 Analitetest5SW cmd 3 A050903 dxu 02 Sep 03 15 42 05 Sep 03 16 12 Analitetest5SW cmd 3 A150903 dxu 05 Sep 03 16 30 15 Sep 03 12 06 Analitetest6SW cmd 3 A160903 dxu 15 Sep 03 12 42 16 Sep 03 12 54 Analitetest6SW cmd 3 A180903 dxu 16 Sep 03 14 00 18 Sep 03 15 12 Analitetest6SW cmd 3 A260903 dxu 18 Sep 03 16 18 26 Sep 03 12 48 AnaliteaverageBshow 3 A071003 dxu 26 Sep 03 12 54 07 Sep 03 11 54 AnaliteaverageBshow 3 A051103 dxu 07 Oct 03 12 18 05 Nov 03 16 48 AnaliteaverageBshow 3 A171103 dxu 05 Nov 03 16 54 17 Nov 03 13 36 AnaliteaverageBshow 3 Data file A170603 dxu The turbidity probes were placed in the tank and data started recording at 16 13 hrs on 11 June 2003 The probes were programmed to take and record a turbidity reading
18. t 15 42 hrs and collected data until 5 Sep 03 The readings for probe 1 remain constant for the period of record Fig 12 The readings for probe 2 are begin to rise ever so slightly towards the end of the recording period 2 to 5 Sep 2003 Wiped every 3 hours 30 25 y 20 Probe 1 Probe 2 10 4 0 r r r r r r 2 Sep 03 3 Sep 03 3 Sep 03 4 Sep 03 4 Sep 03 5 Sep 03 5 Sep 03 Date Figure 12 Turbidity probe data 2 to 5 September 2003 Data file A150903 dxu A160903 dxu amp A180903 03 The datataker was restarted on 5 September 29 August 03 at 15 00 and collected data until it was downloaded on 15 September 03 The downloads on 16 September 2003 amp 18 September 2003 were both only a day or two long and these have been added to the download from 15 September 2003 Fig 13 The NTU values for Probe 2 show a gradual climb during the measurement period but Probe 1 has very low readings 5 to 16 Sep 2003 Wiped every 3 hours 60 1 50 equ E A ps n A ate ahi ji mi n F 40 ji 7 i il th ay m ul in jir A a TAR Pe Ly tt Wl ur ai E 30 i a e i f ili i 20 Qui 4 ge Probe 1 Probe 2 10 5 fi L 1 l 1 L 0 r r r r T r 5 Sep 03 7 Sep 03 9 Sep 03 11 Sep 03 13 Sep 03 15 Sep 03 17 Sep 03 Date Figure 13 Turbidity probe data 5 to 18 September 2003 Data file A260903 dxu The datataker was restarted o
19. tential contaminants can be readily transported with the sediment Currently at eriss suspended sediment loads are determined for 3 three gauging stations located in the Ngarradj catchment Figure 1 by time consuming laboratory techniques A relationship between laboratory turbidity and suspended sediment loads has been developed for each of the gauging station sites in Ngarradj catchment The turbidity probes that were used initially at the Ngarradj gauging stations Saynor et al 2001 have proven unsuitable as they are not able be to field calibrated and also the output is unstable in the ranges that we were wanting to measure It has also been observed that algae can build up on the optical lens which may effect the data being collected and the initial turbidity probes did not have a wipe function Several Analite 396 turbidity probes were purchased to replace the initial turbidity probes Analite turbidity probes are used by Professor Des Walling University of Exeter England in many sites around the world with good results and are highly recommended by him Pers Comm 2003 They are also used in the USA by the USDA United States Department of Agriculture Closer to home they have been used by Peter Finch CSIRO Townsville in dry arid areas of Western Queensland The probes have survived very high temperature and limited rainfall and provided very good results when the creeks do flow Peter Fitch Pers Comm 2002 The Analite Turbidity probes
20. vals while Probe 2 did not wipe at all The probes were connected to a data logger Data Electronics DT50 series 3 data taker and are powered by mains power through a transformer The transformer allowed for direct mains power but was also used to simulate field conditions on switching the probe on and off and putting the data logger to sleep to save battery power Catchment Boundary JML Boundary pos a Arnhem Land Plateau i Magela Floodplain E Mine Site A Gauging Stations 0 1 2 3 km a Pee E Alligator Rivers Region Alligator Rivers Region Figure 1 The Swift Creek catchment showing the Jabiluka Mineral Lease eriss s gauging stations and local creek names SC refers to Swift Creek gauging station TN Tributary North ET East Tributary gauging station TC Tributary Central TS Tributary South TW Tributary West and UM upper Swift Creek gauging station The tanks dimensions were approximately 240 cm x 120cm x 120 cm deep and it was manufactured from heavy duty Perspex encased in a metal frame for support The probes were attached to a piece of 40 mm diameter PVC pipe with a T type fitting glued to one end and notches filed into the ends of the T for the probes to fit in to They were secured with cable ties to stop any movement caused by the water current The pipe is held in place by a G clamp on the side of the tank figure 2 The water in the tank was circulated by an
21. y When the wipe time was known the probes were checked visually to check that the wiping operation of Probe 1 took place Generally the tank cleared after a few days as the sediments settled out and so the water was stirred occasionally to re disperse the sediments Readings were taken by the probes every six minutes with the data logged on the DT50 The times between wipes was varied and this is discussed in the results section Over the length of the experiment algal growths appeared on the end of the probe that wasn t wiped and also on the wiper arms themselves The data was downloaded once every 1 to 2 weeks and is stored in SSD explorer in the following directory HEP Administration Equipment and Methods Turbidity 4 Results The results are shown and discussed in the figures and text below The graphs in the figures are for the time period between downloads and are differing periods generally between 1 and 2 weeks Due to the wide ranges of Turbidity values recorded the Y axis on the graphs are different Also in one instance when downloads were made on consecutive days the data are shown on one graph The download file names contain the date that the download was completed and the dxu is the DT50 file extension These downloaded file names have been used as headings within the results section Table 1 lists the dates of each of the downloads the command file being used the time between wipes Table 1 Start and finish times and date
Download Pdf Manuals
Related Search
Related Contents
Muvit MUEAF0145 mobile phone case Partageons la rue ! - internet voirie pour tous Prodigy Roboter-Sprühpistole Reflections on UNIX Vulnerabilities Candidate User manual: Severin DK 1014 festival mar.t.o. EZ675-5KM Model Rocket Altimeter Bestron ABL850GR vacuum cleaner 全部のファイルを一括してダウンロード Copyright © All rights reserved.