Home

GeneAmp® PCR System 2700 Routine Maintenance

image

Contents

1. the Temperature Calibration Test and Temperature Non Uniformity Test TNU These tests are designed to assess the thermal dynamics of the instrument Please refer to the GeneAmp PCR System 2700 User s Manual for complete instructions NOTE The following procedures require the use of a Temperature Verification System 96 well block TVS P N 4317939 e Temperature Calibration Test verifies that the instrument meets temperature accuracy specifications e Temperature Non Uniformity Test verifies the temperature uniformity of the sample block An instrument that fails these tests may require service by a qualified Applied Biosystems repair specialist Please call 1 800 762 4001 to contact Thermal Cycler Service Support U S only For all other countries please contact your local Applied Biosystems service representative Running the System Performance Tests The System Performance Tests include running the Rate Test and the Cycle Test These tests are designed to assess the integrity of the heating and cooling system Please refer to the GeneAmp PCR System 2700 User s Manual for complete instructions e Rate Test verifies that the Peltier units are operating correctly e Cycle Test verifies that the PCR cycling function is operating correctly An instrument that fails these tests may require service by a qualified Applied Biosystems repair Applied Bibsystems specialist Please call 1 800 762 4001 to contact Thermal Cycler Ser
2. GeneAmp PCR System 2700 Routine Maintenance To maintain the instrument in top working order it is advisable to perform routine maintenance on the instrument Depending on the level of usage of the instrument it is recommended that the following procedures be performed at least 2 4 times per year For high end users a 3 month maintenance cycle is recommended and for lower end users a 6 month maintenance cycle is recommended Cleaning the Sample Wells e Turn off the instrument and let instrument cool for 10 15 minutes e Thoroughly clean wells with a cotton swap soaked with 100 isopropanol e f wells are contaminated clean thoroughly with a cotton swab soaked with a 10 bleach solution e Rinse wells with water e Wells should be completely dry before using instrument Cleaning the Heated Cover Assembly e Turn off the instrument and let instrument cool for 20 30 minutes e Raise the lever on the heated cover assembly Please refer to the GeneAmp PCR System 2700 Users Manual for detailed information on raising the heated cover assembly e Gently wipe the bottom of the heated platten with a cloth soaked with 100 isopropanol e If the heated platten is contaminated wipe the bottom of the cover with a cloth soaked in a 10 bleach solution e Rinse with water e Wait for the platten to dry before returning the cover to its normal position Running the Temperature Verification Tests The Temperature Verification Tests includes running
3. vice Support U S only For all other countries please contact your local Applied Biosystems service representative 104GU12 01 Part Number 4371088 Revision B Applied BS Bibsystems

Download Pdf Manuals

image

Related Search

Related Contents

Angebote - Wir gemeinsam  _ EG-Konformitätserklärung  Manual de instruções F9  機種名 順 機種名 車いす/スキッ トジリ一ス 取扱説明書  AM/FM Stereo CD Receiver  GUÍA GZ-MS120 U  Molift Smart 150 Technical Manual  Ricoh 2416L User's Manual    la sélection par polygone, mode d  

Copyright © All rights reserved.
Failed to retrieve file