February 2015 Wayne Electric Shop Intrusion Page 1 of 17 WAYNE
Contents
1. The Contractor is to furnish and install new intrusion devices in the locations shown on the attached drawings The Intrusion System shall be non proprietary The alarm equipment must be readily available for purchase installation and service by any reputable contractor regularly engaged in the burglar intrusion alarm installation and service business Additionally the equipment must be capable of being readily monitored without losing type alarm intrusion supervisory and trouble and specific zone or point by any non proprietary receiver Further replacement parts and system training must be readily available at a reasonable cost to whoever maintains the alarm equipment for SEPTA This may include SEPTA personnel or a third party contractor If required Contractor shall apply for permits with the City of Philadelphia The Alarm contractor shall submit for SEPTA approval all of the specific Intrusion Devices that will be used in this contract The Contractor is expected to ensure high quality in all components of the system that are specified Wayne Electric Shop Intrusion Page 1 of 17 February 2015 1 02 REFERENCES A Underwriters Laboratories UL 1 UL385 Grades A AA Police Connect 2 UL609 Grade A Local Mercantile Premises and Mercantile Safe and Vault 3 UL611 UL610 Grades A AA Central Station 4 UL684 Local Central Station and Remote Station B Federal Communications Commission FCC 1 FCC Part 15
2. P Wires shall be color coded and labeled to allow zone identification at terminal and junction locations Zone identification labels must be of high quality and equal to the 3M ScotchCode Wire Marking Tape Q If the installation is located where it has an increased potential risk of damage from vehicle damage or vandalism this portion of the conduit shall be required to be rigid steel EMT will not be permitted in these situations Review these locations with the project manager prior to procuring and installing conduits Project Manager has the right to have any section of EMT changed to Rigid Steel even if EMT has already been installed and at no additional cost to SEPTA R If the installation is located in an area that requires an explosion proof system the installation should be in accordance with NFPA 69 Wayne Electric Shop Intrusion Page 12 of 17 2 08 2 09 February 2015 SURGE PROTECTION MODULES Provide surge protection for the incoming power to the intrusion alarm main panel and all remote power supply panels Protection device shall be mounted either in or adjacent to each intrusion alarm panel and not at the electrical distribution panel serving the fire alarm panel s The surge protection shall be a Ditek Model DTK 120SR Module or SEPTA approved equivalent for incoming fire alarm panel power circuits Surge protection shall be UL 497B Listed and be compatible with the FACP Surge protection shall be installed in ac
3. labor at no charge to SEPTA during the warranty period C All manufacturers warranties shall be in SEPTA s name If the Contractor modifies any equipment to void any manufacturers warranty the Contractor shall provide a warranty equivalent to that of the original manufacturer s warranty D The Contractor shall provide a maximum two hour response time for service calls during the warranty period E The Warranty period starts the day when the SEPTA 3 Party Burglar Intrusion Fire Alarm Maintenance Monitoring and Inspection Co has accepted the intrusion alarm system to their central monitoring station PART 2 PRODUCTS 2 01 SYSTEM PERFORMANCE A The Main Burglar Intrusion Control Panel shall be an ADEMCO VISTA 128BPT or SEPTA approved equal 1 The Control Panel must be an 8 partition unit capable of supporting hardwire hardwire expansion and wireless zones Peripheral devices supported by the Control Panel shall include bells cellular communicator dialers telephone lines keypads RF receivers and relays The following minimum performance requirements shall be met a Basic Hardwire Zones A total of 9 style B hardwire zones shall be capable of supporting the following i EOLR supervision supporting normally open N O or normally closed N C sensors ii Individually assignable to one of 2 partitions iii Individually assignable to bell outputs and or auxiliary relay Wayne Electric Shop Intrusion Page
4. material etc INTRUSION ALARM MONITORING CUTOVER Contractor shall be responsible for the payment to the current burglar intrusion alarm monitoring company TYCOIS for the final installation of this intrusion alarm system to their monitoring system and database The Contractor shall be solely responsible for coordinating with TYCOIS and confirming that their monitoring practices and protocols are compliant with the intrusion alarm system design and final installation Contractor shall be responsible for coordinating the installation with the SEPTA Project Manager and the alarm monitoring company TYCOIS Wayne Electric Shop Intrusion Page 16 of 17 February 2015 3 08 INVOICING A Contractor shall submit payment at 100 of project completion to be approved by the Project Manager and or their designee prior to final approval for payment No interim payments shall be permitted B Invoice shall be mailed to SEPTA ATTN Robert J Tangi 12 Floor 1234 Market Street Philadelphia PA 19107 END OF SPECIFICATION Wayne Electric Shop Intrusion Page 17 of 17
5. plans and tested in accordance with the manufacturer s specifications and the appropriate local code requirements 2 Provide a hardcopy and MSExcel versions of the zone list with its descriptions as installed in the intrusion alarm system NOTE Final Zone list descriptions must be approved by the Project Manager prior to being installed in the intrusion alarm system Provide a Record of Alarm Inspection Testing and Certification Provide a copy of any require permits and approvals by the City of Philadelphia if applicable Provide a copy of the final electrical inspection performed on this installation Provide a copy of UL certificates or FM placards Provide four sets of all keys to the Alarm system panel Provide copies of the user manual Provide a record of the installed Operating System Software Sometimes referred to as firmware BIOS or Executive Program and site specific software runs at a level below the operating system software and is specific to the Alarm System installation version numbers 10 Provide two copies of the site specific software A W OOO Oo Upon satisfactory completion of the acceptance requirements the contractor shall coordinate with SEPTA E M amp C Contract Services the exact date of cut over of system monitoring to the current burglar intrusion fire alarm monitoring contractor Successful programming of the system to the 3 party alarm monitoring contractor will complete the accep
6. whip Floor mounted contacts are not permitted B All equipment devices shall be installed in all locations as follows 2 06 2 07 1 Each overhead door throughout the building shall receive a single intrusion contact Each single man door shall receive a single intrusion contact Each double door shall receive a single contact for EACH opening door There shalll be a horn and strobe installed at each single man door and each double door location 5 There shall be a horn and strobe installed half way between column line C 1 and C 17 6 Install an outdoor horn and strobe outside of the man door located at column line G 1 7 There shall be a keypad installed inside the man door at column G 1 and a second keypad installed on the door of the main intrusion panel AON INTRUSION SYSTEM PROGRAMMING Entry Exit Delay Man door at column line G 1 shall have a 30 second entry and exit time delay Intrusion detection i Each single man door and overhead contact shall have its own individual address ii Double man door shall have an individual address for both doors Double door contacts shall annunciate on a single address point iii If any one contact is breached activated all of the horn and strobes and keypad tone devices shall activate FIRE ALARM SYSTEM POWER RACEWAY AND WIRING Intrusion wiring shall be permit to be run free air only if it is installed no less than 10 feet above the finished floor All fr
7. 2 FCC Part 68 1 03 SYSTEM DESCRIPTION A Provide a and Burglary Intrusion Alarm System that includes the following capabilities Commercial UL listed system Supporting up to 32 zones Interfacing with an alpha numeric paging device Operating with a long range radio unit Operating with an integrated security and access control systems Supporting zone for supervision of peripheral devices at Oe ee ee NS A scheduling capability to allow for automated operations 1 04 SUBMITTALS A Submittals shall include manufacturer data sheets for all major system components 1 05 QUALITY ASSURANCE A The alarm manufacture shall be certified as being compliant with ISO900l1 1 06 VISIT TO JOB SITE K it is the contractor s responsibility to familiarize himself herself with the existing conditions of the shops The acceptance of this bid shall presuppose the contractor s entire familiarity with the conditions and no extra cost will be allowed due to the contractor having failed to visit the sites and to note the conditions affecting the work Wayne Electric Shop Intrusion Page 2 of 17 February 2015 1 07 SCHEDULING A Work shall commence immediately upon award of Notice To Proceed 1 08 NON PERFORMANCE BY CONTRACTOR A If the contractor fails to perform services in accordance with contract requirements SEPTA shall obtain those services through other means including the use of internal resources or issuing a contract or purchase ord
8. 4 of 17 February 2015 b Polling Loop Expansion Zones The Control Panel shall also be capable of supporting up to 24 additional hardwire zones using a built in 2 wire polling addressable loop interface The polling loop shall provide power and data to remote point modules and constantly monitor the status of all zones on the loop The polling loop zones shall be capable of Using Remote Point Module RPM devices Providing individual point addresses for each intrusion point unless otherwise directed in the contract documents iii Supervision by the Control Panel iv Individually assignable to one of the partitions Individually assignable to bell outputs and or auxiliary relay vi 4 000 foot capability without shielded cable C Partitions The independent partitions shall provide the following features vi A Common Lobby partition shall be capable of automatic arming when the last partition sharing the lobby is armed and automatically disarmed when the first partition sharing the common lobby is disarmed A Master Partition shall be provided for assigning keypads capable of simultaneously viewing the system status of both partitions Both partitions shall be capable of having keypads assigned Both partitions shall be capable of supporting relays The ability to display burglary and panic and or trouble conditions at all other partition keypads shall be optional The ability to support selectable opti
9. February 2015 WAYNE JUNCTION CAR SHOP INTRUSION DETECTION SYSTEM PART 1 GENERAL 1 01 A B DESCRIPTION All of the work within this project shall be at SEPTA s Wayne Electric Car Shop located at 4500 Germantown Ave Philadelphia PA The Contractor shall design and install a completely functional Intrusion Alarm System in full compliance with all codes regulations SEPTA Standards and guidance as stated in this scope of work The Fire Alarm System shall include but not be limited to control panel power supply remote power supplies alarm initiating and notification devices connections to supplementary systems conduit wire and accessories to provide a complete and fully operational system The intent of this project is to provide intrusion detection at all the exterior man doors and overhead bay doors in the locations shown in the attached building drawing Contractor shall thoroughly instruct and has the responsibility to fully inform all their workers and agents of the fact that they are working next to adjacent active rail maintenance shops Proper safety precautions must be taken by the Contractor to prevent accidents Contractor employees and their supervisor must attend and successfully complete Railroad Track Safety safety class prior to any work starting at the railroad job sites This maintenance shop building is occupied therefore work will need to be coordinated with daily work activities in this location
10. The trigger connector pins change state for different conditions in order to interface with equipment such as long range radio equipment LRR remote keypad sounders and key switch ARMED and READY LEDs or a system event log printer p Event Log The Control Panel shall contain a programmable event log capable of the following i Storing up to 224 events ii Viewable at the keypad iii Printed on a serial printer iv Storing access control system events v Sending printed events to an alphanumeric pager q Scheduling The Control Panel shall provide the following automated scheduling capabilities i Open Close schedules used to control arming disarming and reporting ii Holiday schedules which allow different time windows for open close schedules iii Timed events which activate relays auto bypassing un bypassing auto arming and disarming iv Access schedules which limit system access to users by name v End User Output Programming Mode shall provide 20 timers for relay control r Communication Formats The Control Panel shall be able to communicate Fire Trouble Supervisory and Contact ID signals back to the central monitoring company TycolS without the use of a separate communicator device s Audio Alarm Verification The Control Panel shall support programmable audio alarm verification AAV devices capable of operating in conjunction with an output relay to permit two way voice dialog be
11. a relay command mode v Supervised by control panel vi Assigned an alpha descriptor k Ancillary Control The Control Panel shall be capable of being programmed to activate up to 16 control relays which could open doors turn on off lights etc 12 Volt Power Supply The Control Panel shall have a 12 Volt power supply transformer The transformer shall supply a total of 2 3 amps total for both panel notification circuits and ancillary functions i Alarm notification appliances including but not limited to sirens and strobes ii Power for relays keypad annunciators 4 wire smoke detectors access control devices etc m Telephone Dialers The Control Panel shall be equipped with a built in supervised telephone dialer for communications with the central station It shall also be capable of supporting a supervised backup dialer for connecting to a second telephone line for commercial fire applications n Trigger Output Connector The Control Panel shall contain an internal connector equipped for a single input and seven outputs The outputs shall interface with i Remote keypad sounder ii UL Listed key switch iii LED indicator module iv Auxiliary alarm signaling equipment v Event logging serial printer vi Computer used to direct wire downloading via a serial module Wayne Electric Shop Intrusion Page 7 of 17 February 2015 o Voltage Triggers The Control Panel shall provide a trigger outputs
12. bruary 2015 PART 3 EXECUTION 3 01 A 3 02 3 03 3 04 POWER WIRING Contractor shall provide 120Volt volt power to the new intrusion alarm system main panel and any other panel or devices as required to complete the system SYSTEM COMMUNICATION The intrusion alarm system will a single dedicated telephone line to communicate with the Central Monitoring Station Contractor shall provide conduit and wiring back to the designated communications room or cabinet as required to allow the new intrusion alarm system the capability to communicate with the central monitoring MOUNTING OF EQUIPMENT AND DEVICES All equipment and intrusion devices must be secured by using screws and hollow walls anchors as required Double Sided Tape of any kind will not be permitted to anchor any device and or equipment to its mounting surface Main Intrusion Alarm Panel shall be mounted in the second floor office area immediately next to the existing fire alarm panel Main Intrusion Alarm Panel shall have an independent keypad mounted on the door of the main panel unless the Project Manager specifies it to be installed at another location in the office area MONITORING AND ACCEPTANCE The contractor shall set this panel up to be monitored by individual zones One zone for intrusion entry exit by the main entrance Further breakdown of the zones may be requested by the project manager and if requested these zones shall be programmed at no additional c
13. cordance with Manufacturer s installation instructions Wire connections shall utilize screw terminal connections REMOTE ANNUNCIATOR Two remote annunciators shall be installed for the intrusion alarm system One shall be installed on the door of the main intrusion alarm panel A second one shall be installed at the at the main building entrance in the lobby at column line G 1 Remote annunciator shall be a Honeywell model 6160 or septa approved equal Remote annunciator shall be UL Listed and FM Approved with the main intrusion panel Remote annunciator shall indicate alarm Trouble and Supervisory alarm status for each monitored point Remote annunciator shall have the ability to control the intrusion panel Acknowledge Silence and Reset alarm functions Must have a minimum of 32 character display screen with English language messages SUPPLEMENTARY AND OTHER FIRE ALARM SYSTEM DEVICES If remote power supply modules are required they should be of the same manufacturer of the intrusion alarm system main panel The power module must have 6 0 amps of output power They must have sealed lead acid or gel type batteries capable of powering the connected load and have spare capacity to power a fully connected load for a minimum of 1 hour They must have built in battery chargers for sealed lead acid or gel type batteries with automatic switchover to standby battery when AC power fails Wayne Electric Shop Intrusion Page 13 of 17 Fe
14. d Total alarm current draw when using two NAC outputs shall not exceed 2 3 amps for battery independent operation h Auxiliary Relay A built in Form C relay shall be provided The relay contacts shall be rated at 28 VAC VDC 2 8 amps maximum The relay shall support i Alarm activation ii Trouble supervisory activation iii Reset of 4 wire smoke detectors iv Battery saving feature i Output Relays A total of 16 relay outputs shall be accommodated using relay modules Each relay module shall provide four Form C normally open and normally closed relays for general purpose use or two Y style supervised bell outputs The relay characteristics shall be capable of being i Programmed to activate in response to system events ii Programmed to activate using time intervals iii Used for additional y style supervised be NAC outputs Wayne Electric Shop Intrusion Page 6 of 17 February 2015 iv Activated manually using a relay command mode v Supervised by control panel vi Assigned an alpha descriptor i Addressable Loop Output Relay A total of 16 Form C normally open and normally closed shall be accommodated using the addressable detection loop single relay module The relay characteristics shall be capable of being i Programmed to activate in response to system events ii Programmed to activate using time intervals iii Used for additional y style supervised be NAC outputs iv Activated manually using
15. ded for End User convenience The following shall be provided i A brief explanation of keypad functions shall be provided at the keypad alphanumeric display Access Control i In addition the Control Panel shall be capable of being connected to an integrated access control systems ii The panel shall be capable of supporting three different methods of wiegand access control card readers These are by use of the ECP bus or the V Plex addressable loop ENCLOSURE The Control Panel shall be enclosed in a metal cabinet suitable for wall mounting The dimensions shall not exceed 18 inches in height 14 5 inches in width or 4 3 inches in depth Wayne Electric Shop Intrusion Page 9 of 17 February 2015 2 03 ELECTRICAL POWER REQUIREMENT S A System Power The Burglary Intrusion Alarm System main control panel shall operate using standard 120 volts AC 60 Hz power 1 2 Control Primary Power Transformer power shall be 18 VAC 17VA Backup Battery A rechargeable 12 VDC gel type lead acid backup battery shall be provided The battery shall be rated between 12 and 34 ampere hours AH Alarm Power Maximum alarm output power shall be 12 VDC 1 7 amps for each NAC output 4 Auxiliary Standby Power Standby power shall be 12 VDC 1 amp maximum 5 Total Power Combined auxiliary standby and alarm currents shall be 2 3 amps Fusing The battery input auxiliary and bell outputs shall be protected using PTC circuit b
16. ee air cabling must be properly supported at least every 10 feet Any wiring installed below 10 feet must be installed in conduit per this specification Metal Conduit must be used for all device wiring where wiring is being brought down from the main cable to the addressable module and final detection device s Design Installation must provide for the complete labeling of the raceway and all junction and pull boxes as INTRUSION ALARM SYSTEM Labels must be waterproof peal off type Connection box labels should be octagon shaped and measure 3 across Conduit should be labeled at a minimum of every 20 feet shorter lengths of conduit between connection boxes should be labeled at the midway point Conduit labels should be rectangular shaped and measure 3 4 wide by 5 12 long Wayne Electric Shop Intrusion Page 11 of 17 February 2015 D The raceway shall be installed in a manner that considers the effects of electrical and Radio Frequency noise to prevent or minimize induced or electromagnetic interference E Conduits and or wiring shall not be installed less than 12 inches from any conduit or exposed electrical bus work and or distribution panel containing 480Volt or higher voltage electrical conductors F Cast metal or plastic molded boxes not sheet metal shall be used for surface mounting any device s to any exposed wall surface or support beam i e in the ceiling above shop areas electrical substations boiler roo
17. er to another contractor for the services B Additionally SEPTA s increased cost to have the service performed by other means will be deducted from the Contractor s invoice 1 09 DUTY TO INFORM EMPLOYEES OF CONDITIONS A The contractor shall thoroughly instruct and has the responsibility to fully inform all his her workers and agents of the fact that they are working adjacent to active rail maintenance tracks and high voltage B Contractors employees and their supervisor who work on the job site must attend SEPTA s Roadway Worker track Safety Class not required if workers already have current certification 8 hours class time for an initial certification 4 hours class time if a renewal and attend a shop safety briefing 4 hours Attendance at these classes and in the SEPTA facility requires SEPTA approved vests and flashlights Attendance and equipment is at the Contractor s cost 1 10 CLEARANCES The contractor must conduct all of his operations in connection with this contract so that no part of his equipment including ladders may foul an operating or maintenance track electrical transmission or communication lines or damage any others 1 11 WORKMANSHIP A The contractor shall supply all necessary tools equipment and material required for the accomplishment of this contract B Competent personnel under the supervision and employment of the contractor shall perform all work The contractor and all parties empl
18. ms etc G Standard sheet metal 1900 Style back boxes shall be permitted for use on non surface mounted devices for office areas H Existing conduits and or suspended ceiling support systems cannot be used to mount new conduits or device back boxes l The distance between connection junction boxes for the Intrusion Alarm system shall not exceed 100 feet J All conduit shall be a minimum of 3 4 EMT with compression fittings set screw type connectors are not permitted and appropriately sized for the cable it will carry and allow for 25 expansion Non fire alarm cable shall not be installed in any fire alarm conduit K FMC Flexible Metal Conduit conduit shall be permitted to be used to connect all final devices to a junction box or condelet box L Wiring to be mounted vertically on any wall within the building will need to be installed in EMT conduit M Any all penetration into the building shall be properly and professionally sealed to prevent water weather infiltration into the buildings N The Intrusion Alarm system notification circuit shall be a minimum of 16 gauge 2 conductor the initiating circuit shall be a minimum of 18 gauge 2 pair single jacketed cable Outer cable jacket rating shall be a minimum of Riser jacket rating classification Outer jacket color shall be Dark Blue or SEPTA approved alternate O Conductors and Wiring material and methods shall meet all NEC and local code requirements
19. ons including entry exit delay and subscriber account in formation d User Codes The Control Panel shall accommodate 75 user codes The following characteristics shall be assigned to each user code Authority level Partitions operated by the user code Optional opening closing central station reporting Wayne Electric Shop Intrusion Page 5 of 17 February 2015 e Peripheral Devices The Control Panel shall support up to 16 addressable devices The devices shall include any combination of keypads RF receivers relay modules notification circuit modules and access control modules Peripheral devices shall have the following characteristics Each device shall be i Physically set to an individual address ii Enables using the Device Programming Mode f Remote Keypads The Control Panel shall be compatible with remote keypads and allow the user to i Arm and disarm the entire system or one partition in a multiple partition system ii Bypass zones iii Display zone descriptors alarm trouble bypass etc in the display window v Individually silence notification circuits and or reset panel g Notification Output Circuits The Control Panel shall internally provide two supervised NAC outputs for operating fire and burglar alarm notification appliances It shall also support two additional supervised NAC outputs when using a supervised NAC module Each NAC output shall be rated at 10 14VDC 1 7 amp max power limite
20. ost to SEPTA Each zone shall be required to report to the central monitoring station independently The contractor will be responsible for maintenance and response to alarms until the newly installed Alarm system responsibility is turned over to SEPTA E M amp C Acceptance will not take place until the Intrusion Alarm system is completely and satisfactorily installed the facility work is completed and documentation as contained in this specification is provided to the SEPTA Project Manager The equipment transferred from the Contractor to SEPTA must be free of dust dirt metal shavings etc When ready for acceptance the alarm contractor is to provide a separate overview briefing to SEPTA management to include but not limited to User Group representatives from E M amp C Contract Services and Facilities at a mutually agreed time This briefing will be followed by a walk through of the system to physically view the system devices and an activation of the Intrusion Alarm Wayne Electric Shop Intrusion Page 14 of 17 February 2015 At the above overview briefing the contractor must supply SEPTA the below items and documentation All of the items must be formally and professionally presented to SEPTA Further all items requiring signature must contain the printed or typed signature block of the signatory 1 Provide installing contractor s written statement stating that the system has been installed in accordance with approved
21. oyed on the work shall perform their work in a good and workmanlike manner The contractor must furnish labor which can work in harmony with all other elements of labor employed or to be employed by the Authority C The contractor must take all steps necessary to minimize interference with the normal operation of the station D The contractor must remove and dispose of all trash from the installation E Contractor shall clean up any construction related debris on the job site upon completion of the individual task that generated the debris F Work area must be cleaned of all work debris at the end of each work day Wayne Electric Shop Intrusion Page 3 of 17 February 2015 1 12 ACCIDENTS OR INCIDENTS A Any accidents or incidents occurring to the contractor s employees while performing work for this contract on SEPTA premises must be immediately reported to SEPTA s Project Manager or his designee A follow up written report must be submitted to the Project Manager or his designee within 24 hours of the accident or incident 1 13 WARRANTY A All major Intrusion Alarm equipment shall be installed adjusted and serviced by authorized representatives of the equipment manufacturers B The Contractor shall warrant the entire system and each of the individual components of the system All system components warranty must be for a minimum of one 1 year The warranty shall require the Contractor to provide all equipment material and
22. reakers All outputs shall be power limited 2 04 ENVIRONMENTAL CONDITIONS A Environmental Conditions The Burglary Alarm System shall be designed to meet the following environmental conditions 1 Storage Temperature The system shall be designed for a storage temperature of 100 C to 700 C Operating Temperature The system shall be designed for an operating temperature of 0 C to 50 C 32 F to 120 F Humidity The system shall be designed for normal operation in an 85 relative humidity environment Electromagnetic Interference The system shall meet or exceed the requirements of FCC Part 15 Class B devices FCC Part 68 IEC EMC directive 2 05 EQUIPMENT A The following equipment shall be provided as part of the Burglary Intrusion Alarm System 1 Horn Honeywell Ademco 748LC Dual Tone Siren with Low Current Draw or SEPTA approved equal Strobes Honeywell Ademco 112 113 or SEPTA approved equal Strobe shall be clear in color Outdoor Horn Strobe Weather proof style Honeywell Ademco System Sensor Wheelock or Gentex or SEPTA approved equal Keypad Annunciators Ademco Honeywell 6160 or SEPTA approved equal Door Window Contact Honeywell Heavy Duty style contacts or SEPTA approved equal Wayne Electric Shop Intrusion Page 10 of 17 February 2015 6 Overhead Garage Door Contacts Sentrol 2300 Series Wide Gap Style or SEPTA approved equal with a stainless steel armored cable
23. tance process Contractor shall provide qualified personnel to support the alarm system cut over to the monitoring service 3 05 CUTTING AND PATCHING A Work included This Section covers general requirements pertaining to cutting including excavating fitting and patching of the work required to 1 2 Make the installation fit properly in the existing structure Installing conduits Uncover work to provide for installing inspecting or both Remove and replace work not conforming to requirements of the Contract Documents and Removed and or replace defective or changed work Coordinate the Work with other separate contractors Repair holes and cracks caused by selective Demolition and or removal of accessories and equipment Wayne Electric Shop Intrusion Page 15 of 17 m 3 06 3 07 February 2015 Responsibilities Contractor shall be responsible to perform their own cutting fitting and patching work for the components of this project Request for Approval Prior to cutting any element submit written request to the SEPTA Project Manager for permission to proceed with cutting The request shall include but not limited to the following 1 A description of the extent of cutting and patching required the method for performing the cutting and patching and an explanation for why cutting and patching is required 2 Description of the anticipated results in terms of changes to existing construction including rela
24. ted changes to structural elements and functional components as well as changes in the structure s appearance and other significant visual elements 3 A list of products to be used and firms or entities that will perform work Areas to be cut and or drilled that are exposed to publicly visible or in occupied spaces shall not be cut or patched in a manner that would in the opinion of SEPTA s Project Manager negatively affect the aesthetic qualities of the building s structural and architectural elements or result in permanent visual evidence of cutting and patching The responsible Contractor shall remove and replace work cut and patched in a manner deemed to be visually unsatisfactory by any of the above parties Cut holes and slots neatly to the size required with minimum disturbance of adjacent surfaces Temporarily cover openings when not in use Restore all patched areas in a manner to eliminate evidence of patching Do not cut and patch operational elements or safety related components in a manner that would result in a reduction of their capacity to perform in the manner intended or that would result in increased maintenance or decreased operational life and or decreased safety SITE AND EQUIPMENT CLEAN UP Contractor shall clean up any debris left at the site due to their construction efforts i e packing materials from products used concrete dust from core drilling holes and or anchors metal shavings from drilling into metallic
25. tween a central station operator and the premises t Cross Zoning Capability In order to prevent false alarms the Control Panel shall prevent a zone from going into alarm unless its cross zone is also faulted within 5 minutes Wayne Electric Shop Intrusion Page 8 of 17 2 02 February 2015 Exit Error False Alarm Prevention The Control Panel shall be capable of differentiating between an actual alarm and a false one caused by leaving an entry exit door open The Control Panel shall be capable of i Being arming while the faulted entry exit zone s and or interior zones are bypassed ii Generating an Exit Error report by user and zone Downloading Features The Control Panel shall be capable of uploading and downloading at 300 baud It shall also be capable of uploading ECP devices their physical addresses programmed addresses and firmware revision levels Enhanced Walk Test Mode The Control Panel shall provide the installer with the following features i Automatic test of all integrated remote point module RPM devices equipped with an automatic test feature ii While automatic test is in progress all zones that remain untested shall be displayed iii An event log shall be capable of logging the results of tested and untested zones iv The ability to report the result of tested and untested zones to the central station Built in User s Manual and Descriptor Review A built in User s Manual shall be provi
Download Pdf Manuals
Related Search
Related Contents
Solo Windows 8.1 Peavey Axcelerator AX User's Manual PLAN D`OCCUPATION DES SOLS MODIFICATION N°8 Návod na obsluhu Original brugsanvisning Instruction manual Titres traités au catalogage sur demande pour la semaine du 29 ニュースリリース - Mad Catz マッドキャッツ Sarpeco IF - Duo System MANUAL DE INSTALACIÓN, USO Y Copyright © All rights reserved.