200W Solar Power System The Instruction for installation Topsky

image

Contents

1. amp TOPSKY i Topsky Electronics Technology HK CO LTD Address Bld A 494 Donghuan Road Shajing Town Baoan District Shenzhen China PRC Tel 86 755 8250 0506 Fax 86 755 6151 6055 Website http www topsky tech com Alibaba http top sky en alibaba com 200W Solar Power System The Instruction for installation Users manual of solar home system I Overview Correct installation use this product can play a better role therefore in the installation and use of this manual carefully before reading of manual and products the matters needing attention and warning clause should pay special attention to Abide the precautions and properly keep each instruction This product can provide AC voltage for your electrical equipment Widely used in no electricity or lack of power supply of place It can support lighting fan small home appliance and etc II Operating Principle Solar Panel Array amp Inverter Battery Bank Operating Principle Drawing ref The product is mainly consist of solar panel controller and inverter system battery bank brackets and distribution circuit etc The diagram shows as following As shown in drawing on above during the daytime solar panel will convert light to electricity the power will storage in the battery through the controller When loadings keep working the battery will supply the electricity power to loadings When the electricity power in the battery can t satisfy t
2. doctor Don t lay up the metal tools on the battery 1t may be caused short circuit Before operating the battery please pick off the metal thins in your body such as bracelet necklace watch etc The battery short circuit may be soldered the bracelet and cause serious burn The wires must be with suitable diameter There may cause fire if the wire diameter is too small 3 3 Solar power system installation 3 3 1 Solar panel installation When the solar array is installing please note matters as follows Accord with various standards and restricts The installation site should adapt environment and climate conditions Don t use sharp things stab the backside of solar panels Y VV WV Don t stand or pedal the solar panels gt Don t lay up the solar panels between the brackets gaps etc 3 3 2 Control Box installation When the controller box battery box is installing please note matters as follows Vertically install in the air expedite place Avoid foreign body fall into the controller box In strict according with the connection marks on the controller box to connect every equipment gt gt gt gt Keep the controller connection fastness keep the joint clearly gt Switch off all breakers before connection gt First connect the battery then connect solar panel and loadings 3 4 Notes of operate system 3 4 1 Operate Solar panel array When the solar panel is running gt Don t open the
3. power of applications is Change the system with bigger The continues working time of bigger than rating power power the system smaller than Battery aged or be damaged Change the battery anticipated Battery have not enough power The charge time is not enough have not be charged enough sunshine strength is not enough Users manual of solar home system Vil Maintenance of solar power system 8 1 Forbid irrelevant persons open the door of battery junction box 8 2 The system maintenance works must operation by the professional people 8 3 The system maintenance person should check the system state at fixed period and complete relevance notes 8 4 When the system have stoppage the system maintenance person overcome the stoppage in time and fill in maintain form 8 5 Inside the controller box must be keep better ventilate complete cleaning rat proof burglar proof works 8 6 Doing maintenance of solar power system as following list and fill in the maintain notes The maintain work times interval should be shorter if the environment have some scurviness Cesta win damage ropes OOOO Check all cables connection whether become less crowded Once half a year Check the total voltage simple link voltage and appearance when the battery Once half a year floating Check battery controller breaker connection whether become less crowded Cleaning the surface of solar panel correctly As appropriate Any stoppages can n
4. shock throw knock against when transporting If open box and transport be sure not lose accessories Under high reliability required places directly related with lives please don t use this product for lighting S The stability of electric output is influence by climatic There maybe happen major accidents related of lives 3 2 Safety Instructions of Battery For reduce harmful dangerous only can charge the chargeable lead acid battery To charge other batteries maybe happen explode caused personal injured The acid battery will produce explosiveness gas though under normally working conditions So please keep the well ventilate for battery box Important note don t blocking the ventilate window of the battery box Prohibit any works maybe produce open fire or spark in battery box Warning Strictly prohibit battery short circuit Users manual of solar home system 3 2 1 Operation of Battery It must be special carefully when operation the battery There are huge power be storage in battery the cables can be melt tools can be soldered even cause fire when short circuit You should pay high value for this even though it s small capacity battery Read carefully and understanding the notes from batteries manufacturer If the battery fracture careless and the acid liquor splash on skin or clothes clear with soap and fresh water immediately If splash in eyes use fresh water swash over 15 minutes and have checked by
5. cover of junction box to prevent electric shock gt Keep the children away gt To away from the danger of scald anybody mustn t touch solar panel Users manual of solar home system 3 4 2 Operate Control Box gt Turn off the connection breaker of battery first then connect it to solar panel gt To prevent overload or burn out electric fuse you must check the power of the load carefully gt Other unpredicted matters are shown in the controller instructions 3 4 3 Operate Inverter gt Turn off the connection breaker of battery first then connect it to inverter gt Connecting the inverter first then Turn on the connection breaker of battery then turn on the inverter gt To prevent overload or burn out electric fuse you must check the power of the load carefully gt Other unpredicted matters are shown in the controller instructions 3 4 4 Operate Battery gt Don t open or change the battery gt If there is abnormal voltage broken shell leaked battery fluid anomaly temperature etc you should find be fault reason timely and replace defective batteries 3 5 Notes of Maintenance of System 3 5 1 Maintenance of Solar panel array gt Don t open the cover of junction box on the back of solar panel Mustn t soak the solar panel in liquid Don t use broken or abnormal solar panel Don t remake or maintain solar panel Don t stand on or step on the solar panel VV VV WV Don t touch th
6. d then connect to the battery terminal Users manual of solar home system V Operation of system First connect on the battery switch Then connect on the solar array input switch Open the inverter switch connect to loadings Notice According the opposite procedure when power VI Standard of Technical 6 1 Technical inspecification of products Solar panel 100Wp 18V 2PCS connected in serial 12V120Ah 2PCS connected in serial 220V 500W 6 2 Standard Technical of Controller Details as per controller operation instruction manual 6 3 Standard Technical of Inverter Details as per inverter operation instruction manual VI Breakdown and repair 7 1 For the first time the system need continues charge for over 2 sunshine days 7 2 If there are continues many rainy cloudy days the time of power supply maybe shorten It s normal phenomenon 7 3 Without power output please check the load line whether become less crowded 7 4 The battery can not be charged please check whether the cables of solar panel and battery become less crowed Advise solutions Applications not working no any Have not open the battery main Connecting the battery main indicates switch switch Cables become less crowed bad Piece hecaple contact Solar power can not be charge Battery have damage ar the battery with same The sunshine is not enough for Lay the solar panel to the area solar panel with enough sunshine The
7. e cables of Solar Panel 3 5 2 Maintenance os Control Box To prevent electric shock or wrong connection of electrode 1t must be professional person to change standard components Details as per the instruction of controller operation Users manual of solar home system IV Installation of system Installation of Solar Panel main beam fixed footrest side clamps middie cllamps 1 Connect the fixed footrest and main beam with cramp and screw first see above pictures 2 Then put the screw to the groove of the main beam see below picture 3 Put the solar panels on the two main beams then use the middle clamps and side clamps to fix the Panels see below picture Users manual of solar home system 4 Connecting the cable and solar panel connectting two solar panel in series y 5 Then connect the positive pole and negative to the controller which fixed in the control box see the below picture 6 Connect the cable to the battey positive and negative terminal which fixed in the control box see abolve picture 7 Put the battery into the battery box and connect them in serial and then connect the step 6 cable to the battery positive and negative terminal separately Connected to the control box Connected in serial Connected to the control box Attention All air breaker must put on the off position and the battery cable must be connected to the control box terminal first an
8. he requirement the inverter will be auto closed for protect the battery can t work until the battery recover electric quantity Users manual of solar home system Ill Notes 3 1 General Safety Instructions Warning When working nearby the electric equipments there maybe cause electric short A N circuit personal injury or potential equipments damages Before installation please read carefully and fully understand this user manual and other safety documents for system equipments Please entrust professional for installation maintain and remove this system 1 If any nonstandard operation there may be electric shock or personal injury When installation debugging operation remove and maintain this product please don t get an electric shock There will be prduce DC current when solar panel be direct illuminate by sunshine or other light A N sources Please don t touch the bare solar panel cables when install the solar panel Jt may cause an electric shock when touch the battery conductors please take the rubber gloves before checking or maintenance When storage transport this product please avoid the bad impacts possibly Storage environment temperature between 20 C 50 C relative humidity not greater 90 and no water coagulate appearance Keep away from corrosive gas C liquid If you don t use batteries in a long time please charging and maintenance at fixed period Please avoid intense
9. ot be deal with please contact us at once

Download Pdf Manuals

image

Related Search

Related Contents

Quick Start Guide  Owner`s Manual Bicycle Sidecar For 17 Year Old (CP) Date: 4  PHEV Conversion Kit Users Manual  Chapter 7 - P2 Maint and TroubleshootinR1b.indd  Samsung 721S Brugervejledning  technical specification of mobile flash butt welding machine    

Copyright © All rights reserved.
Failed to retrieve file