Home
PM130 PLUS Quickstart
Contents
1. DAJY OZPO1d SS a Main Display P DE ENERGY fe l Calibration LED y 1o60 je Displayed 1 pulse Wh or Varh f TL parameters Ja G 84 s Communication indication p Okilo mega Measurement scale MAX THD RX TX DMD MAX MIN TDD HRM Energy button amp indication Min Max Max Demand E EH models Enter button amp indication Harmonics button amp indication Scroll up down Select EH model Escape There are two display modes readings and menus Readings Mode There are four groups of readings Common measurement Min Max Harmonics and Energy Use MAX MIN or H ll or ENERGY to switch between groups A or to scroll within the group or simultaneous A and to go to the first screen of the current display group Menu Mode Press SELECT to enter menu mode blinking line indicates the selection SELECT to change the selection ENTER to drill down or ESC to go up In editing mode use A or to change the value a number or submenu ENTER to accept it or ESC to cancel The following chart shows the structure of the menus SEA Status UPS Options Read only Status Indications display of the configuration CHG Change Configuration ch5 rok Phase rotation rkc RealTime Clock rSt Reset min max demands etc A Voltage angles bASc Basic configuration Same as OPS Options menu A Current angles F E COM2 setup r L Relay status D P t COM2 setup E G R P SEn DI status D
2. SBSATEC Powerful Solutions PM130 PLUS Quick Start Manual This Quick Start Manual is a short guide on how to mount connect configure and operate the PM130 PLUS It is not intended to replace reading the full User Manual and particularly the safety precautions The manual is available on the Product Documentation CD accordance with all applicable laws and or regulations and be performed by Mounting electrical connection and settings of the PM130 shall be made in A N authorized personnel only MOUNTING Position the PM130 meter in 92x92mm square or 4 round cutout Figure 1 If two PM130 are positioned side by side keep at least 150mm 5 9 between their centers to allow installation of add on modules 140mm 5 5 if only small form modules will be used Attach the PM130 unit using washers and nuts Make sure that the unit is securely attached into the wall or cabinet fixture FLAT WASHER WIDE 8 LOCK WASHER 8 NUT HEX 8 32 BG0441 REV A9 ENGLISH PM130 PLUS QuickStart www satec global com CONNECTION To connect follow these steps Figure 2 shows a 4W LV installation with conventional CTs Ensure that all incoming power sources are OFF Check that you have the appropriate power supply Connect the Power Supply inputs using 1 5 mm 14AWG dedicated wires and breaker Connect to the external CTs by passing the external CTs wires through the meter CT cores Observe the arrow that indicates the
3. rEL Relay Output D nk Counter value in 0 1 hours Holt Analog Output A ALA SF Alarm setpoint nEE Network configuration E d AG Diagnostics SEEF Setpoints SEr n Serial number d 5f Display Soft Firmware version IFES Options r551 GPRS status G NOTE Option availability depends on installed add in module D Digital I O A Analog Output E Ethernet G GPRS R RS232 422 485 P Profibus PM130 PLUS QuickStart www satec global com CONFIGURATION The essential configuration includes 1 Basic measurement setup 2 Communication setup and testing 3 Resetting the min max energy demands etc Additional recommended configuration set points TOU and data logging Note It may be easier first to configure communication and use PAS software for setup Basic Measurement Setup In any display screen press SELECT x 3 until CHG blinks then press ENTER 5t blinks then A xX 2 bA5c and ENTER to enter the Basic Settings Display Parameter Description Default LonF see below Network wiring configuration Hind Pk Transformation ratio of the Potential Transformers PEF Additional PT factor for EHV network HI Ck The Primary Rating Of The Current Transformers 5A quick access to this parameter press SELECT then simultaneous A and SELECT d F E amp EH models Duration in minutes of the power demand period calculations 5 E External pulse in DI1 nd F E amp EH models The number of blocks
4. to be averaged for sliding window demands l Ad F Duration in seconds for voltage and current demand 900 Freq The nominal frequency AO HE LoAd Max Demand Load Current in Amperes 0 CT primary current 0 Wiring Mode Setup 3 wire 2 element Delta direct connection using 2 CTs Jdi re 4 wire 3 element Wye direct connection or 3PTs and 3 CTs YLnd or dita 3 wire 2 element Open Delta connection using 2 PTs 2 CTs J0Fg 4 wire 2 element Wye connection using 2 PTs 3 CTs Jln or ILLI 3 wire 2 element Open Delta connection using 2 PTs 3 CTs JOP 4 wire 3 element Delta direct connection using 3 CTs diag orHLL3 3 wire 2 element Broken Delta connection using 2 PTs 3 CTs JbL ny or Jbl F LN or LL denotes the default use of L L or L N voltages in thresholds min max demands etc Communication setup and testing In any display screen press SELECT x 3 CHL blinks then press ENTER 5t blinks then A x3 FFE I and ENTER to setup the built in RS 485 port COM1 If communication module is present configure also COM2 Resetting the min max energy demands etc In any display screen press SELECT x 3 CH blinks then press ENTER 5E blinks then ENTER to enter the reset menu Select the value to be reset press SELECT to select then press ENTER for 5 seconds until the do notification is changed to dane PM130 PLUS QuickStart Copyright 2013 SATEC Ltd www satec global com
5. current direction Figure 2A For HACS connect the red or white wire to the and orange or black wire to the terminal 5 In case of a retrofit application where each external CT ends with two wires Note 2B 5 1 Pass one wire through the meter CT core 5 2 Connect the wire to one of the meter optional CT wire termination screws 5 3 Connect the second wire from the external CT to the termination screw 6 Connect the measured voltage inputs Connect COM1 RS 485 communication port 8 To connect the optional module 8 1 Make sure that the power is turned off 8 2 Remove the module cover 8 3 Attach the module and fasten the screws 8 4 Connect the module I O or communication see Figure 2C for DI O wiring 9 Turn the power up 10 Make sure the diagnostic led is off Line 1 A Kann ine1 AVO Tho Figure 2 Line 2 B Hep ii Line 3 C BWN PR N N Q Shorting u j CT MARKINGS The optional CT wire termination allows connection of the two wires from the CTs They have no internal connection and their use is optional PM130 PLUS QuickStart www satec global com OPERATION The PM130 PLUS is operated using the front panel which consists of a 3 line 7 segment display up to 33 LEDs depending on model and six keys as shown below Load bar graph se SATEC full load according to CT 3 PM130EH PLUS Diagnostic LED Off OK or in Display Setup C3 _
Download Pdf Manuals
Related Search
Related Contents
Harman Kardon HKTS 16 Product Information Sheet 25 ft Fall Prevention Kit Multiparameter-Messgerät Bedienungsanleitung Hitachi 8450H/R User's Manual Enterasys NMS-ADV-50 security management software EIE Quick Start Guide smartツーリングサポート契約約款(2012年5月24日制定版) Epson Stylus Pro 4900 Printer Warranty Statement Copyright © All rights reserved.
Failed to retrieve file