Home
LTR8 user manual.fm
Contents
1. in the wall to accommodate the Extension If the hole coincides with a wall stud it will be necessary to drill a hole out of the side of the stud to allow the Supply Cord to exit 9 Push the Mounting Base Extension into the 16mm hole firmly until the back of the flange is flush with the wall 10 Feed the Supply Cord into the wall through the Mounting Base Extension 11 Continue with installation as per Visible Supply Cord steps 3 to 9 on page 7 12 It may be necessary to adjust the Cable Mounting Bracket so that it fits flush against the wall This can be done by loosening the side Leg Fixing Screw and moving the Bracket forwards or backwards see Figure 5 below 13 The wiring must then be connected to a suitable connection unit A suitable disconnection device acting in all supplies MUST be incorporated in the fixed supply wiring Mounting Leg Cable Mounting Bracket Leg Fixing Screw Figure 5 Cable Mounting Bracket Adjustment LTR8 Series 9 SKOPE Heated Ladder Towel Rail 8 Bar Optional Spacers Optional 8nm Spacers SKOPE Part No TUR9346 2 are available to space the top Mounting Brackets when the bottom half of the wall is tiled see Figure 6 below f lt Optional Spacer Top Mounting Bracket Wall Towel Rail Frame Concealed Supply Cord Visible Supply Cord Wall Tiles Figure 6 Optional Spacer Installation To fit the optional Spacers Optional Spacer 1 Befo
2. need be can be left running continuously 5 Maintenance The Heated Ladder Towel Rail is best wiped down from time to time with a damp cloth Do NOT use any abrasive or corrosive cleaners The supply cord on this product cannot be replaced without damaging the appliance If the supply cord becomes damaged in any way the appliance should be scrapped If the appliance is under warranty contact your nearest Authorised Service Agent Contact Addresses SEKOPE new zealand Industries Limited SKOPE INDUSTRIES LIMITED PO Box 1091 Christchurch New Zealand Freephone 0800 947 5673 Fax 03 983 3896 Email enquiry skope co nz Website www skope co nz Australia SKOPE AUSTRALIA PTY LTD A C N 000 384 270 PO Box 7543 Baulkham Hills B C NSW 2153 Australia Freephone 1800 121 535 Freefax 1800 121 533 Email enquiry skope com au Website www skope com au 1 D LTR8 Series SKOPE Heated Ladder Towel Rail 8 Bar
3. Adhesive Dots Table 1 Installation Components ros 6 m o 7 JEW a Figure 1 Installation Components Jh iM LTR8 Series 5 SKOPE Heated Ladder Towel Rail 8 Bar Visible Supply Cord As standard the supply cord exits through the bottom of either the left or right hand mounting leg see Figure 2 below Mounting Leg Towel Rail Frarme Cable Mounting Bracket Supply Cord Supply Cord Grommet Figure 2 Visible Supply Cord When installing the Towel Rail with the Supply Cord visible the Cable Mounting Bracket item 2 must be fitted to the wall with the Flat Washer item 6 fitted inside the Bracket and with the slot in the Bracket facing downwards to clear the supply cord see Figure 3 below Flat Washer Cable Wall Fixing Screw pu Mounting long Bracket Slot facing downwards Figure 3 Cable Mounting Bracket Fixing for visible supply cord Follow the instructions on the following page to install the Towel Rail with visible Supply Cord 6 LTR8 Series SKOPE Heated Ladder Towel Rail 8 Bar To install the Towel Rail with visible supply cord 1 10 LTR8 Series Firstly establish a suitable position on the wall for attaching the Towel Rail with at least two leg Mounting Brackets aligned with wall studs or dwangs Remove the Cable Mounting Bracket from the Towel Rail by undoing the Leg Fixing Screw see Figure 5 on page 9 Attach the Cable M
4. User Manual MAN4282 Rev 1 1 July 2010 LTR8 Series SKOPE Heated Ladder Towel Rail 8 Bar Wide Narrow and Slimline m SKOPE Heating Contents 1 Safety Information 5 3 2 Installation nnnnnnnnennnnnennnnnennnnn 4 Regulations rrrnnnrnnrrnnrnnnrnnrnnnnnnnnnnnnnnnnnnnnnnnnnnnnee 4 Mee paro ir E E 4 COP ecictarancntetaternvincanssanantineragincinnaerncnnn 5 Visible Supply Cord rrarannnnnnrnnnevannnnrvanernnnnnrnneenn 6 Concealed Supply Cord rrarnnannnnrnanenannnannnnrnnnenene 8 Optional Spacers rrrarannrnrnrnnornanrranenernnnenanennsnnn 10 3 Specifications cccceeeeeee eens 11 DIMENS ONS Lavvo eee 11 eg 210 eee ene nee ne cee ee E ee een eee 11 Construction EE EE 11 TN JG 12 5 Maintenance nxnnnnunnvnnnnnunnnnnn 12 1 Safety Information When using any electrical appliance safety precautions should always be observed Read these instructions carefully before installation and retain for future reference e This appliance is not intended for use by young children or infirm persons unless they are adequately supervised by a responsible person to ensure that they can use the appliance safely Young children should be supervised to ensure that they do not play with the appliance e This appliance is intended to dry towels and therefore is hot to the touch Any rise in ambient temperature is directly reflected in the applia
5. d inside the bottom mounting leg of the Towel Rail and wired directly into the wall Slot facing upwards Mounting Leg Supply Cord Cable Mounting Bracket Mounting Base Extension Towel Rail Frame Figure 4 Concealed Supply Cord Installation Before installing the Towel Rail with the concealed Supply Cord 1 Remove the Cable Mounting Bracket from the Towel Rail by undoing the Leg Fixing Screw see Figure 5 on page 9 Cut the plug off the end of the Supply Cord Slide the Supply Cord Grommet out of the slot in the bottom mounting leg and remove the grommet from the Supply Cord Feed the Supply Cord through the centre of the Cable Mounting Bracket see Figure 4 above Rotate the Cable Mounting Bracket so the slot underneath the mounting leg is blanked off Screw the Cable Mounting Bracket to the mounting leg with the side Leg Fixing Screw To install the Towel Rail on the wall follow the instructions on the following page 8 LTR8 Series SKOPE Heated Ladder Towel Rail 8 Bar To install the Towel Rail with concealed supply cord 7 Establish a suitable position on the wall for attaching the Towel Rail with at least two leg Mounting Brackets aligned with wall studs or dwangs Mark the wall with the location of the Concealed Cable Mounting Bracket 8 The recess in the back of the Cable Mounting Bracket fits over the flange of the Mounting Base Extension so you will need to drill a 16mm hole
6. nce and as a result of this the appliance will feel hotter to the touch during warmer periods Also the insulation effect of towels will cause the operating temperature to increase slightly e Do NOT use this appliance other than for its intended use e Do NOT immerse in any liquid e Do NOT allow the supply cord to come into contact with heated surfaces during operation e To avoid a hazard this heated towel rail MUST NOT be used to carry towels or any other articles that have been in contact with oil petroleum based products or dry cleaning fluids e Use this appliance only on the voltage specified on the rating label e Regulations require that electrical work be carried out only by authorised persons For your own safety and that of others please ensure this is done Caution If this appliance is supplied from a cord extension set or an electrical portable outlet device the cord extension set or electrical portable device must be positioned so that it is not subject to splashing or ingress of moisture LTR8 Series 3 SKOPE Heated Ladder Towel Rail 8 Bar 2 Installation Regulations This appliance MUST be installed in accordance with the relevant wiring rules and regulations which cover installation of appliances and accessories in damp situations such as bathrooms showers laundries and other areas with fixed water containers In Australia and New Zealand AS NZS 3000 2000 Wiring Rules NOTE This Class II applia
7. nce does NOT require Earthing The side frames of the Towel Rail should be mounted vertically with the heated rails horizontal and the supply entry at the bottom The Heated Ladder Towel Rail is supplied with a 900mm supply cord and plug Where protected by an RCD the Heated Towel Rail can be plugged directly into a socket outlet otherwise permanent connection to the supply via a permanent connection unit is required On directly wired models a suitable disconnection device acting in all supplies must be incorporated in the fixed supply wiring In order to avoid a hazard for young children this appliance must be installed so that the lowest heated rail is at least 600mm above the floor Methods The Towel Rail can be installed with either the supply cord VISIBLE or CONCEALED inside the bottom mounting leg and wired directly into the wall e To install the Towel Rail with the supply cord VISIBLE go to page 6 e To install the Towel Rail with the supply cord CONCEALED go to page 8 Optional Spacers see page 10 are available to space the top Mounting Brackets when the bottom part of the wall is tiled 4 LTR8 Series SKOPE Heated Ladder Towel Rail 8 Bar Components The SKOPE Heated Ladder Towel Rail is supplied with the following installation components Description Quantity Standard Mounting Bracket 3 Cable Mounting Bracket Mounting Base Extension Leg Fixing Screw short Wall Fixing Screw long Flat Washer
8. ounting Bracket to the wall ensuring the slot is facing downwards Fit the Flat Washer supplied inside the Bracket see Figure 3 on page 6 and attach to the wall with either a Wall Fixing Screw supplied or a suitable wall fixing plug Attach one of the Adhesive Dots supplied to the back of each of the remaining three Mounting Brackets and remove the protective paper backing Insert the remaining three Mounting Brackets into the frame mounting legs Ensure the rectangular fixing slot in each Mounting Bracket faces downwards Fit the Towel Rail frame leg onto the Cable Mounting Bracket already screwed to the wall ensuring the Supply Cable Grommet engages firmly into the Mounting Bracket If necessary use a level to align the Towel Rail in the desired position before pressing firmly against the frame to adhere the remaining three Mounting Brackets to the wall Pull the Towel Rail frame away leaving the Mounting Brackets attached to the wall Attach the remaining three Mounting Brackets to the wall using the three Wall Fixing Screws supplied Refit the Towel Rail frame over the Mounting Brackets and lock in place with the four Leg Fixing Screws supplied Either connect the supply cord to a socket outlet or if installed in a bathroom have an authorised person connect the supply cord to a switched permanent connection unit SKOPE Heated Ladder Towel Rail 8 Bar Concealed Supply Cord The supply cord can be conceale
9. re attaching the two top Adhesive Dot Mounting Brackets to the wall ai remove the paper backing from the adhesive dot on each of the optional Spacers Then press the Spacer firmly and centrally on to the top Mounting Bracket see Figure 7 2 Continue with installation as per Top Mounting Bracket Visible Supply Cord steps 3 to 9 Figure 7 on page 7 Attaching Optional Spacer 10 LTR8 Series SKOPE Heated Ladder Towel Rail 8 Bar 3 Specifications IC 4 Gris Wattage 75 80 W 60 65 W 55 60 W Electrical Supply 230 240 V a c 50 Hz Insulation Class Class Il Double Insulated Wiring 900mm 2 core supply cord and plug The plug may be removed for connection to permanent wiring When ordering the supply cord entry must be specified either on the left or right hand side Controls No controls provided Designed for continuous operation Construction Ingress Protection Rating IPX7 protection against temporary immersion Finish Chrome plated frame and wall mounting brackets and white supply cord and plug Table 2 Specifications Copyright O 2009 SKOPE Industries Limited SKOPE Industries Limited reserve the right to alter specifications without notice LTR8 Series 1 1 SKOPE Heated Ladder Towel Rail 8 Bar 4 Operation Your SKOPE Heated Ladder Towel Rail costs approximately the same to run as a 100 Watt light bulb It will take approximately 45 minutes to reach normal operating temperature and if
Download Pdf Manuals
Related Search
Related Contents
Télécharger le document File Makita UH550D Instruction manual JAD960H EasyEntry Mode d´emploi 取扱説明書 WorkHorse Monitor ADCP User's Guide カタログPDF Copyright © All rights reserved.
Failed to retrieve file