Commercial GLD5 - Gaia Geothermal
Contents
1. Fig 4 16 Results Panel Contents The third subsection of the report lists the heat pump inlet and outlet temperatures of the circulating fluid The fourth subsection lists the total unit capacity the peak loads and demand of all the equipment and the calculated heat pump and system efficiencies The peak load is the maximum and is determined from whichever time period across all the zones has the highest load The peak demand includes all pumps and external energy requirements including those listed in the Extra kW panel Finally the system flow rate is listed in its own subsection The system flow rate is calculated from the peak load divided by 12 000 Btu ton and then multiplied by the flow rate in gpm ton chosen on the Fluid panel It represents the flow rate from the installation out to the buried pipe system 83 CHAPTER 4 The Borehole Design Module Calculation results for lengths and temperatures are always available in the ev expanded user interface as well as seen in figure 4 17 Calculations can be formed at any time in the expanded user interface as well Lengths Temperatures COOLING HEATING COOLING HEATING Total Length Ft 37325 3 20259 9 Unit Inlet F 85 0 50 0 Borehole Length Ft 373 3 202 6 Unit Outlet F 95 1 43 9 Fig 4 17 Calculation Results in Expanded User Interface Jey Monthly Data Button Results If monthly loads data have been input in the Average Block loads module us
2. Fig 1 4 Horizontal Design Panel List Using these seven panels Results Fluid Soil Piping Configuration Extra kW and Information the user enters the project specific information A more complete description about how to enter data and perform calculations in the Horizontal Design module is provided in Chapter 5 Theoretical Basis The horizontal trench length equations used in the Horizontal Design module are based upon the Carslaw and Jaeger solution for heat transfer from cylinders buried in the earth as described in the single vertical case above Again this method properly models shorter time periods of heat extraction or rejection where the simple line source model fails Since a number of pipes may be buried in close proximity this model must be 17 CHAPTER 1 Ground Loop Design Overview modified to account for all mutual pipe interactions A major benefit derived from using this model besides its ability to accurately assess heat transfer is that both the horizontal and the vertical design modules can operate under the same loads formalism In 1948 Ingersoll and Plass demonstrated that the Kelvin line source theory could be used to estimate the change in temperature of a buried pipe in which heat is being absorbed or rejected Ingersoll and Plass 1948 In a ground coupling system an apparent thermal resistance between the circulating fluid and the undisturbed ground dominates the overall resistance I
3. area the user selects whether the pump should be classified as a water to air or or a water to water pump An example of the pump General panel is shown in the lower right pane of figure 2 2 Capacity Power and Flow Rates The capacity power and flow rate information pertaining to the source side flow for both heating and cooling are entered into the two tabbed panels labeled Cooling and Heating in the Pump Edit pane An example of the Cooling panel is shown below in figure 2 4 The Heating panel follows an identical format although the temperatures will be different pererreersssrrsssrsrrrsssrt General _ Cooling Heating Load Temperatures Load Flows Test Heat Pump Specifications for Cooling SOURCE FLOW RATE 1 FLOW RATE 2 EWT Capacity Power Capacity Power degF MBtufhr kw MBtufhr kw 95 0 115 0 Coefficients Capacity Power Flow Factor 3 b C Calculate Coefficients Fig 2 4 Heat Pump Specifications Cooling As can be seen from the figure the source entering water temperature EWT is listed to the left and the capacity and power requirement of the 30 CHAPTER 2 Adding Editing Heat Pumps unit at different flow rates are listed to the right Once the values are input the coefficients and flow factor can be calculated from the entered data The Calculate Coefficients button turns red when values are changed indicating that new coefficients must be calculated before pro
4. Circuit Head Loss per 100 feet This is the head loss for the particular style of pipe These values are not entered automatically Instead they come from designer s charts A chart in English units is included with Ground Loop Design in the Pipe Tables section The designer must be aware that this value changes with pipe size temperature and flow rate Extra Equivalent Length per Circuit This is an average pipe length value included per circuit to take into account all fittings elbows tees etc It is only necessary for the head loss calculations 116 gt CHAPTER 6 The Surface Water Design Module E Surface Water Design Project 1 Results Fluid Soil Piping Surface Water Extra kw Information a Branches Number of Lines 2 Pipe Size 2in s0mm y Header Length In Water 50 0 ft In Soil 150 0 ft Head Loss per 100 feet Cooling 9 9 ft hd Heating 3 0 Ft hd Circuit Head Loss per 100 feet Number of Lines ED Pipe Size 1in 25mm v Average Branch Length In Water 100 0 ft In Soil ft Head Loss per 100 feet Cooling 7 0 ft hd Heating 28 Fft hd Fig 6 5 Piping Header Panel Contents Header Parameters The Ground Loop Design Surface Water module assumes that a standard supply and return line design will consist of mains followed by a manifold that splits the mains into the headers Headers are generally the first pipes to enter the ground or water They can then
5. which can involve significant variations in equipment loads and operational parameters for each zone in the design The user who may prefer to add his or her specific images or data sheets has the freedom to customize the data reference files In addition the program is optimized for hybrid systems as well as for the addition of boilers and cooling towers to loopfield designs With instant direct metric English unit conversions and foreign language capabilities Ground Loop Design is a truly international program With Ground Loop Design communicating project parameters equipment requirements and loads data with coworkers partners and vendors anywhere in the world is efficient and easy The program provides a framework for international standardization System Requirements for Running Ground Loop Design This section lists the hardware and software requirements for running Ground Loop Design Hardware Requirements A full installation has the following minimum hardware requirements e 256 MB Ram 70 MB hard disk space 140 MB recommended Software Requirements Ground Loop Design has the following software requirements e System running under Windows e Netscape Navigator or Internet Explorer Operating System Requirements Ground Loop Design will operate under Windows 9X ME NT 2000 XP VISTA PREFACE Internet Browser Requirements An Internet browser is required only for viewing the data reference files and not
6. 0 8 a m Noon 0 0 Noon 4 p m D 0 Transfer PEE 0 Calculate Hours 8pm 8a m Annual Equivalent Full Load Hours m Heat Pump Specifications at Design AS and Flow Rate Pump Name IV Custom Pump ETA A Cooling Heating MAT Capacity MBtu Hr 0 0 0 0 ane Power kw 0 00 0 00 EER COP 0 0 0 0 Details Flow Rate gpm 0 0 0 0 Clear Partial Load Factor 0 00 0 00 Flow Rate 3 0 gpmiton Unit Inlet F 85 0 50 0 Fig 3 1 Zone Manager Loads Module Main View The Zone Manager loads module can be opened either from the Loads Menu or by clicking the Zone Manager toolbar button An example of the module opened to the Loads tabbed panel is shown in figure 3 1 The Heat Pumps tabbed panel will be discussed shortly In the Main View Zones in Ground Loop Design are organized in a list on the left side of the Loads tabbed panel Each zone panel contains information relating to the working zone including a zone name the loading information and the information about any heat pumps selected for that zone Selecting a different zone name in the zone list changes the working zone Using the list the designer can bring up and modify any particular zone by clicking on its name An essentially equivalent but more compact summary of the input data can be obtained in the Summary View obtained by clicking on the 39 CHAPTER 3 Loads and Zones Summary View toggle button Different repr
7. 29 Edit Pump Information Control 29 Delete Series Control cece cece eee eee ene enene e 29 General Information 0 0 0 0 e cee ce cee cece nee ee ences sees eee eeeneeeeeee 30 Capacity Power and Flow Rates ccceceecee eee eeeeteeeaeeaenes 30 Load Side Corrections cceceeeceneee cence eneeeneeeeenenene seen ences 31 Load Temperatures Panel 0cccceeeceeceeeeceeeeeene ees 31 Load Flows Panel cecceceeeec eee entee ene eaeeeeneeaenees 32 Testing Input Data 0 c cece cence cence ence eee eeee eee eeee eee eeaenes 33 Exiting the Add Edit Heat Pumps Module 00 cccececeeceec ences eee etee eee eeeeenees 34 Heat Pump File Descriptions io iiaeo nin iy e ae e cece nee e ea E E RE TEREE 35 Adding Pump Sets Obtained from External Sources scccececeeee ences eae eaenneaeaes 35 Chapter 3 Loads and Zones ocooccccoccncoceccncncnnnanononnnnannnnnnannnnnnnna nano OL The Ground Loop Design Loads Model ccecceceecee ent e eee eeeeeensenseeeeneeaeneegs 37 ZONE Biles A A saa devo AA A oneness 38 The Zone Manager Loads Module c0ccccececee cence eee eeeeeene eee eneneeeeeneen ees 38 Managing Zones in the Loads Tabbed Panel ccececeeeeeeeeeneee ee enenees 40 New atid Copy sage ented E EERE NEE 40 Remove and Cleat 0 0 ccc ceee cence cirin Eri EEE EE a 40 Remmi Betis 22 31 odes A A A 40 Summ
8. 415 5 Peak Load kBtu Hr 130 6 Peak Demand k 8 4 Heat Pump EER COP 20 5 System EER COP 14 3 Total Head Loss ft hd 8 6 Header Loss ft hd 5 0 Circuit Loss ft hd 3 6 System Flow Rate gpm Primary Header gpm Branch Header gpm Circuit gpm Fig 6 9 Calculate Panel Contents Lengths _ Temperatures COOLING HEATING COOLING HEATING Total Length Ft 4087 2 8187 8 Unit Inlet F 55 0 36 0 Circuit Length Ft 371 6 545 9 Unit Outlet F 64 4 30 1 Fig 6 10 Results as Displayed in Expanded User Interface 122 CHAPTER 6 The Surface Water Design Module Calculations Calculate Fig 6 11 Calculate Button in Expanded User Interface Reporting Section The surface water report has five sections The first deals with the circuit pipe and includes the total length the length for one circuit the number of circuits and the maximum allowable number of parallel circuits shown in red If the maximum allowable number of parallel circuits exceeds the actual number of circuits the actual number of circuits may be increased in the Piping panel to reduce the individual circuit lengths and thus reduce head losses However this type of reduction is not always necessary or desirable Other ways of increasing the maximum allowable number of parallel circuits include changing the system flow rate or the minimum circuit flow rate for non laminar flow The second section lists different te
9. 53 CHAPTER 3 Loads and Zones Details and Clear The Details and Clear buttons and the Details panel operate in the same way as they do in the Zone Manager Loads module However one difference is that no variation of the load flow rates is permitted in the Details panel Custom Pump Customization Checking the Custom Pump check box allows an override of all automatic pump selection features The user can input any data desired although once again the COP used in the calculations is calculated from the capacity and the power not taken from the text box list Pump Continuous Update Feature The Update Reselect Current Pumps control is called automatically when changes are made to either the inlet source temperature or the system flow rate from within the Zone Manager the Average Block Loads module or the design modules In this way the designer does not have to worry about updating the pumps already matched to zones in Ground Loop Design However the designer must be aware that sometimes this may result in a new pump size assignment due to capacity changes related to variations in temperature or flow If this is problematic custom pumps may be used to lock pump values into a zone However for proper modeling any customized pumps must be edited separately by the designer after the design parameters have been established The Studio Link System The Studio Link system is a powerful feature in Ground Loop Design that gives user
10. After all data has been entered or any changes have been made the user can calculate interim or final results using the Calculate button A sample screen for this panel can be seen in figure 4 16 The Calculate button is also available in the expanded user interface as seen in figure 4 13 In addition when monthly loads have been input into the Average Block loads module a Monthly Data button will be available to calculate monthly inlet temperatures 81 CHAPTER 4 The Borehole Design Module The two lists on the Results panel are for heating and cooling Although all of the numbers shown are valid and respond to changes the side with the longer required length is printed in bold type so that it stands out The longer length determines the installation size and for this reason the shorter length system results lose relevance In fixed length mode since both heating and cooling are of equal length neither side is highlighted The Calculate panel is divided into two sections On the top is the reporting section which presents the calculation results The lower Optional Cooling Tower Boiler section is included to assist in the sizing of a cooling tower and or boiler This is a convenient tool for hybrid type designs which may be desirable when the cooling length exceeds that of heating or when the heating length exceeds that of cooling The cooling tower and boiler options are discussed in more detail below Calcula
11. Agreement CAREFULLY BEFORE USING THE SOFTWARE BY USING THIS SOFTWARE YOU ARE AGREEING TO USE THE SOFTWARE SOLELY IN ACCORDANCE WITH ITS INTENDED USE AND YOU ARE CONSENTING TO BE BOUND BY THIS END USER AGREEMENT IF YOU DO NOT AGREE TO ALL OF THE TERMS OF THIS END USER AGREEMENT PROMPTLY RETURN AND DO NOT USE THE SOFTWARE Single User License Subject to the terms and conditions of this End User Agreement Celsia LLC doing business as Gaia Geothermal Gaia and its suppliers grant to you Customer a non exclusive non transferable dongle based license to use the Ground Loop Design TM software program in object code form and all related materials included herewith including written materials binders and other containers hereinafter the Software on supported operating systems Use Upon a receipt of full payment by Gaia or a Gaia authorized reseller of the applicable license fees Customer will be able to use this Software pursuant to the limitations set forth herein Limitations Customer s full use of this Software is limited to the number of authorized licenses Customer has purchased Customer agrees to use reasonable efforts to protect the Software from any unauthorized use modification reproduction distribution and publication Customer may not transfer any of the rights granted to Customer hereunder unless Customer receives prior written authorization from Gaia and only if Customer transfers all of Customer s r
12. Design Studio desktop The project report contains all the project information and includes the parameters chosen the calculation results and the name of the zone file used Both concise and detailed versions of the report are available Monthly Inlet Temperature Reports Monthly inlet temperature reports can be printed from the Design Studio desktop after calculating inlet temperatures in the borehole design module The reports contain heat transfer power borehole temperature Tf fluid 20 CHAPTER 1 Ground Loop Design Overview temperature exiting water temperature entering water temperature minimum entering water temperature and maximum entering water temperature for each month of the design The four reports include a concise temperature report a detailed temperature report and a report that offers all project parameters loads data and temperature data and a report that offers project parameters and loads data Zone Reports A print button in the loads modules allows the designer to print the loads related information in various formats Because the zones contain information about the zones the loads and the equipment it is often necessary to obtain reports of the information in separate as well as combined documents For example at one time a designer may want to quickly see all of the zones with their loads and corresponding equipment At other times the designer may only need to see a list of the equipment f
13. Other windows may be opened concurrently For example one window may be used to edit or to modify heat pump data another to calculate equivalent full load hours and still others to provide easily accessible graphs or charts that may be required repeatedly through the course of a design Similar design plans can be compared directly or entirely different designs can be created and varied All of the information a designer needs exists in one convenient location within Ground Loop Design Besides opening and closing windows and taking care of file management the studio desktop menu and toolbar include control features which can be applied to more than one different type of project For example the English metric unit conversion tool can convert a single window without affecting the rest of the open windows Project reports can also be printed from the studio desktop Customization Ground Loop Design offers the user a great deal of freedom in how he or she enters and uses information Rather than conforming designs to the software this software package allows some modification and variation in its included features Some of the most common areas of customization in Ground Loop Design include the entry of loads and the selection of equipment Although fully automatic modes are available the user also has the ability to customize or override the automatic features For example detailed load information may be included for precision designs wh
14. Outlet F 95 2 44 0 Fig 5 12 Results Display in Expanded User Interface The two lists on the Results panel are for heating and cooling Although all of the numbers shown are valid and respond to changes the side with the longer required length is printed in bold type so that it stands out The longer length determines the installation size and for this reason the shorter length system results lose relevance The Results panel is divided into two sections On the top is the reporting section which presents the calculation results The lower Optional Cooling Tower Boiler section is included to assist in the sizing of a cooling tower and or boiler This is a convenient tool for hybrid type designs which may be desirable when the cooling length exceeds that of heating or when the heating length 104 CHAPTER 5 The Horizontal Design Module exceeds that of cooling The cooling tower and boiler options are discussed in more detail below Reporting Section The reporting section is further separated into several subsections The first deals with the trenches including the total length the number of trenches and the length for one trench A common way to adjust the trench length to a desired value is to change the trench number on the Configuration panel The associated pipe length both total and for a single trench directly follow the reported trench lengths The pipe lengths are a function of the selected configuration of
15. Pipe Tables button the Pipe Properties tables will open If the user wants to enter an experimentally determined pipe resistance or requires more precise calculations he or she can enter these values directly into the Pipe Resistance text box overriding all pipe resistance calculations The user also selects the U tube configuration and radial pipe placement for the designed installation A single U tube refers to two pipes placed in the bore while a double U tube refers to four pipes placed in the bore The radial pipe placement can be one of the following e Close together 1 8 average distance between the pipes e Average pipes are centered at a point halfway between the wall and the center of the bore e Along outer wall pipes are against the outer wall Illustrations are included to clarify the choices Note The Double U tube configuration at this stage is added more for reference than for practical use Currently the values Ground Loop Design uses are based on experimental data and a new theoretical model accounting for a lower pipe and convective resistance and a larger displacement of the grout Designers should be aware of this fact and remember that a single U tube is the standard option Borehole Diameter and Backfill Grout Information The user can enter the borehole diameter and the grout thermal conductivity directly into their respective text boxes If cuttings are used for the b
16. User Interface 86 CHAPTER 4 The Borehole Design Module Cooling Towers Although typically not recommended because of increased running and maintenance costs the user may elect to add a cooling tower to a cooling dominated geothermal system to reduce the total boring lengths and therefore the total initial installation costs To facilitate this design choice Ground Loop Design offers the cooling tower or hybrid option In any case where the calculated boring lengths for cooling are longer than those for heating the difference in the lengths can be eliminated through the use of a cooling tower tied in parallel to the geothermal ground loop This requires that either the cooling tower capacity is chosen such that both the peak load and the annual load to the ground are balanced or if a full balance is unnecessary a capacity is chosen that allows for downsizing the loop to an acceptable length To aid in the sizing process a Load Balance control is provided in the Optional Cooling Tower section of the Calculate panel Although clicking the slider control can initiate a valid calculation or recalculation the slider control generally is employed after initial calculations have been conducted The Load Balance is a slider based control that represents a percentage of the total cooling load both instantaneous peak and annual For example a 100 Load Balance would be equivalent to saying that the entire cooling load of the system
17. are performed to obtain these values The thermal conductivity in particular has a large effect on the calculated bore length and should be determined with care through in situ tests or comparison with other projects installed in the local vicinity Ground Loop Design does not encourage the use of ex situ data 77 CHAPTER 4 The Borehole Design Module Diffusivity Calculator For the designer s assistance Ground Loop Design includes a Diffusivity Calculator that can be used to determine the actual diffusivity if all the soil parameters are known It requires knowledge of the thermal conductivity the dry specific heat and density and the moisture level in the soil An image of the diffusivity calculator is shown in figure 4 12 Diffusivity Calculator ioj x Thermal Diffusivity Calculator Thermal Diffusivity ft 2 day Thermal Conductivity 1 30 Btu h ft deg F Soil Rock Specific Heat Dry 0 230 Btuf deg F lbm Soil Rock Density Dry 120 0 ibfft 3 Moisture 0 20 200 Close Fig 4 12 Diffusivity Calculator Modeling time Period In Ground Loop Design ten years is used as a standard length of time for the ground temperature to stabilize although longer time periods may be entered if desired When excessive ground water movement is known to occur one year is sometimes used as the modeling time period In this case 1t is assumed that the ground temperature stabilizes in a
18. branch off once more if necessary branch lines For small systems the mains may be the headers and there may not be branches For larger systems there may be many headers and multiple levels of branches In the Piping panel the model employed allows for multiple headers and multiple first level branches off of those headers If further branching is required the head loss calculations will need to be calculated and added separately Their effect on the calculated piping length which cannot be included will depend on their length All headers are assumed to have an identical pipe size and an approximately equivalent flow The same is true for the branch lines If there are no branches the number of branches should be set to zero The Surface Water Design module starts with only a single primary header 117 CHAPTER 6 The Surface Water Design Module Ground Loop Design uses the header information so that the heat transfer losses or gains are taken into account The software then uses this corrected value iteratively to modify the length of the circuit loop piping so that the desired entering water temperature for the heat pumps is provided These calculations depend directly on the header depth surface water and soil temperatures obtained from the Surface Water and Soil panels Additionally the program calculates the average head losses of the system when provided with the head losses per 100 ft for each type of pipe in the sy
19. conductivity and diffusivity for sand clay and different types of rocks can be found in the Soil Properties tables However it is recommended that designers perform soil tests to obtain these values The thermal conductivity in particular has a large effect on the calculated bore length and should be determined with care through in situ tests or comparison with other projects installed in the local vicinity Ground Loop Design does not encourage the use of ex situ data Diffusivity Calculator For the designer s assistance Ground Loop Design includes a Diffusivity Calculator that can be used to determine the actual diffusivity if all pertinent soil parameters including the thermal conductivity the dry specific heat and density and the moisture level in the soil are known EE Diffusivity Calculator 10f xj c Thermal Diffusivity Calculator Thermal Diffusivity ft 2 day Thermal Conductivity 1 30 Btu h ft deg F Soil Rock Specific Heat Dry 0 230 Btuf deg F lbm Soil Rock Density Dry 120 0 lbiftoa Moisture 0 20 200 Close Fig 5 8 Diffusivity Calculator Ground Temperature Corrections at Given Depth In a horizontal configuration the ground temperature around buried pipes can vary significantly simply due to the proximity to the surface To account for this variation at different depths the regional Swing temperature and phase shift are used in a sinusoidal
20. detailed information See Chapter 3 for a discussion of Loads entry Configuration Information pertaining to the trench configuration is in the Configuration panel This includes the trench layout the pipe configuration in the trenches and the modeling time The input screen is shown in figure 5 2 Trench number separation depth and width options also are visible and adjustable in the expanded user interface as seen in figure 5 3 Trench Layout This is the section where the user enters all parameters regarding the physical size and placement of the trenches The number of trenches may be modified at any time using the up down arrows and Separation refers to the center to center distance between adjacent trenches The program assumes all trenches will be equal in separation length depth and width Note that if the selected piping configuration does not fit into the selected trench size the program will automatically adjust the size of the trench to accommodate the selection 93 CHAPTER 5 The Horizontal Design Module A y Horizontal Design Project HorizontalSample Results Fluid Soil Piping Configuration Extra kw Information Trench Layout Number 3 Depth 6 0 ft Separation 20 0 ft Width 6 0 in Pipe Configuration in Trench M Offset O y Total Number of Pipes a to o Vertical Separation Y 24 0 in k x1 Horizontal Separation X 120 in Modeling Time Period Prediction Time 1
21. detailed with loads The concise form includes all of the design parameters but leaves out some of the project information and comments The detailed form includes the information and comments More information on reports can be found in Chapter 7 124 CHAPTER 7 Reports CHAPTER 7 Reports This chapter covers the report creation and printing features of Ground Loop Design It includes both project and zone reports Overview Ground Loop Design includes reporting features These features have been added for professionals who need to keep records of their designs and communicate them to others There are nine different report styles included within the package and this chapter provides an explanation of as well as suggested uses for each type of report The Report Preview Window When a particular report is selected a report preview window opens to show a preview of the report Report preview windows have a zoom feature that allows adjustment of the magnification Additionally reports may be sent to a printer or exported as various file types including text and html Multiple reports may be opened simultaneously even if they originate from the same project Report preview windows do not react directly to metric English unit conversion Instead a report opens with the same units used by its parent design module If another system of units is required the user must first change the unit system of 125 er CHAPTER 7
22. equipment for any given design parameters By including additional data from different source flow rates and or different inlet load temperatures and flow rates higher levels of accuracy are possible The Edit Add Heat Pumps module is covered in detail in Chapter 2 Zones Loads Modules Ground Loop Design employs two different types of load input schemes With the Zone Manager Loads module users can perform a detailed analysis With the Average Block Loads module users can make quick estimates without performing detailed component design work In Premier Version 5 0 users can optionally add monthly loads data to the Average Block Loads and then calculate month by monthly inlet temperatures in a Borehole Design module These stand alone modules are linked to design modules using the Studio Link system Chapter 3 Both modules can import loads data from commercial loads programs and Excel files Zone Manager Loads Module Component style designs often are more appropriate for geothermal installations particularly when equipment is available in various sizes The units can be placed near or within the locations to be conditioned With regard to water source heat pumps it is often much easier to bring water lines to the equipment instead of providing ductwork or long load lines from a centralized source 11 CHAPTER 1 Ground Loop Design Overview When considering geothermal applications the precision of the zone loads model is cruci
23. everything is done properly when Fluid Properties is selected from the Tables menu in the Design Studio Table 6 will appear as a link in the list of available tables By clicking on the link the CaCl2 density image CaCl2Density jpg will appear and can be used as a convenient internal reference 135 CHAPTER 8 Tables and Reference Files Taking Care with Updates Updated versions of Ground Loop Design may have new reference files and new versions of FluidTables html SoilTables html or PipeTables html If this is the case then any custom changes to these files made by the user may be overwritten during a new installation Although the linked files will remain the user is advised to make backup files of all customized reference files before new Ground Loop Design installations or updates Concluding Remarks The reference files in Ground Loop Design are added entirely for the user s convenience Designers should find the customizable geothermal Design Studio an ideal and familiar environment in which they can conduct their work with the highest levels of efficiency and confidence 136
24. for general program operation To access the data reference files at least one of the following browsers is necessary e Netscape Communicator Version 5 0 or later e Internet Explorer Version 5 0 or later Installation Procedure Note If you have problems installing Ground Loop Design please visit the support page at http www gaiageo com or contact your distributor Note that you can also download Ground Loop Design from the internet at http www gaiageo com The downloadable version always will be the most recent release Initial Installation For CD versions of GLD installation should start automatically If not the software may be installed by clicking on the Setup exe file included on the disk The program is set to install in the folder Main Drive Program Files Gaia Geothermal Ground Loop Design Premier If desired the user can specify a different location during the installation sequence Installation of Updated Versions or Re Installation If the user re installs or replaces the software with a more recent version the user either can uninstall the program see Note below or can just update a current version versions subsequent to Version 2 0 To completely remove a version go to the Windows Start Menu gt Settings gt Control Panel gt Add Remove Programs and choose to remove Ground Loop Design After removing the program please conduct the new installation as described above As long as the
25. from the figure both source and load entering water and air temperatures as well as flow rates can be edited directly Clicking the Test button performs the calculation to see what capacity power and EER COP result from the chosen input parameters Average values are used initially but by varying the parameters the designer can see how well the newly created model matches the data set used for data entry 33 CHAPTER 2 Adding Editing Heat Pumps General Cooling Heating Load Temperatures Load Flows Test Test SOURCE LOAD RESULTS EWT Flow EAT WB Flow Capacity Power EER degF gpm degF CFM MBtu hr kW COP 95 0 77 66 2 1140 a34 3 12 URN EAT DB degF 45 0 77 68 0 1140 IVA 258 36 Fig 2 7 Heat Pump Test Panel Often any input errors will be evident immediately from the test by comparing the test results with the input sheet Additionally the user can use this test to make certain that the pump data are accurate over the particular range of temperatures flows etc that he or she typically uses and then modify the data if necessary Exiting the Edit Add Heat Pumps Module After editing or adding heat pumps and calculating all necessary coefficients the user should make sure that the pumps are saved by clicking the Save button on the Pump Series control bar When the pumps are securely saved the Save button will become disabled Clicking the close button in th
26. information from the design module s Information panel The project and designer s names dates client s name and address etc appear here This section is included at the top of every report Concise reports only include the project name and start date Calculation Results This section lists the results of the calculations and essentially is the same information shown on the Calculate panel of the design module The most important results such as the total length of pipe required are highlighted and 126 CHAPTER 7 Reports boxed in order to stand out from the background The report presents results of both the heating and the cooling calculations Input Parameters This section contains all of the parameters entered by the designer during the design process Parameters are placed into sections with names taken directly from the panels in the design modules The filename of the zone file associated with the project is listed under the Loads heading Loads This section contains all of the loads data entered in the Average Block loads module peak loads and monthly loads as well if entered This section is only available in borehole module reports since only the borehole module is capable of calculating monthly inlet temperatures based on the input loads Monthly Inlet Temperatures This section contains a summary section of the average and peak inlet temperatures followed by the month by month temperatures and other asso
27. menu or toolbar and the other is 64 CHAPTER 4 The Borehole Design Module by opening an existing Borehole Design project gld file Files cannot be opened if other modules with the same name are already open As many files can be opened as the system s memory permits FF New Projects New projects may be opened at any time from the Design Studio by choosing New Borehole from either the Design Studio File menu or the toolbar New projects open with standard parameter values that must be edited for new projects The module opens directly into the Information panel through which the designer enters information about the new project In new projects no loads files zon are loaded The user must create a new loads file or open an existing loads file into one of the loads modules Links may be established using the Studio Link system described in Chapter 3 Existing Projects Existing projects may be opened at any time from the Design Studio by choosing Open from the Design Studio File menu or toolbar The file automatically opens into a new Borehole Design Project module If a loads file zon is associated with the loaded project the loads file automatically will be loaded into the appropriate loads module and opened along with the project file However if the associated loads file cannot be found the user will be notified and the automatic file loading will not occur Saving Projects Projects may be sa
28. of Netscape Corporation The Ground Loop Design Premier Version 5 0 User s Manual Originally printed in October 2007 Printed in USA Part No GGENG 1104 Visit our Web site at http Awww gaiageo com Software Versions Available Two versions of Ground Loop Design are available The program always is available for download on the web at www gaiageo com For sales and program upgrade information contact support groundloopdesign com Version features include 4c Sle Feature Els ee 43 Ela ala Design Studio 0 StudioLink System 0 Borehole Module 0 Horizontal Module Surface Water Module Average Block Loads Module 0 Zone Manager Loads Module es Heat Pump Edit Module 0 Preloaded Pump Sets 0 Monthly Temperate Calculations Boiler Tower Hybrids 0 Fixed Length Design Feature Graphing Functions English or metric units 0 English Metric Units Conversion Borehole Data Importer 0 Loads Data Importer Standard Reports Advanced Reports Enhanced Interface Automatic Fluids Data Entry Data Reference Files Customization Interactive Help Multiple Languages Current language versions are listed at www gaiageo com To request a specific language version please contact us at support groundloopdesign com END USER SOFTWARE LICENSE AGREEMENT PLEASE READ THIS END USER SOFTWARE LICENSE AGREEMENT End User
29. of energy from or to the earth at the location of interest For the first model the most complete description of the calculations and input data can be found in Chapter 3 of the book Ground Source Heat Pumps Design of Geothermal Systems for Commercial and Institutional Buildings by S P Kavanaugh and K Rafferty 1997 In extensive tests this model consistently proved to be the most accurate when compared with calibrated data from actual installations Hughes and Shonder 1998 The second model within the Borehole Design module is based on the solution to the purely heat conductive problem in a homogenous medium which was solved by approximating the borehole as a finite line sink Eskilson 1987 The steady state solution relates to the case where heat is extracted continuously from the borehole without ever exhausting the heat source making it a fully renewable source of energy As implemented in Ground Loop Design the difference between the second model and the first is that with the second model it is possible to calculate the evolution of the borehole wall temperature over time when a constant heat extraction rate Q is extracted from the borehole It makes use of a dimensionless G function concept to model the temperature variations taking into account the ratio of the borehole radius and length and the physical layout of the bore field Ground Loop Design also employs its own internal borehole superposition model allowing
30. or her own style the typical operation of the Surface Water Design module would include the following steps 1 Enter Loads and select pump in either the Average Block Loads module or the Zone Manager module Form a link between the loads module and the design module Modify step by step the input parameters listed in each panel Perform initial calculation Modify various parameters and recalculate to determine the effects of the modifications 6 Establish an optimal system e re 111 CHAPTER 6 The Surface Water Design Module 7 Save and or print the project and associated zone file Before You Begin The theoretical model which is based on experimental data and non laminar flow requires a minimum system flow rate of 3 0 gpm ton in the pipes to achieve proper heat transfer Minimum flow rates through the circuit piping also are required to maintain the non laminar flow with different antifreeze solutions Thus there is a limit on the maximum recommended number of parallel circuits required in the system which in turn determines the length of an individual circuit Changing the pipe size requires a change in the minimum required flow rates which can either increase or decrease the maximum recommended number of parallel circuits and their lengths However this also can have substantial effects on the piping head losses which must also be considered in order to reduce the pumping costs To fully optimize a system in the Surface
31. pipe in the trench so the length of trench is always less than the length of pipe when anything other than a single pipe configuration is chosen The following subsection of the report lists the heat pump inlet and outlet temperatures of the circulating fluid The next subsection lists the total unit capacity the peak loads and demand of all the equipment and the calculated heat pump and system efficiencies The peak load is the maximum and is determined from whichever time period across all the zones has the highest load The peak demand includes all pumps and external energy requirements including those listed in the Extra kW panel Finally the system flow rate is listed in its own subsection The system flow rate is calculated from the peak load divided by 12 000 Btu ton and then multiplied by the flow rate in gpm ton chosen on the Fluid panel It represents the flow rate from the installation out to the buried pipe system Optional Cooling Tower and Boiler Section Cooling towers and boilers can be added to designs via the sliders that are located on both the Results panel figure 4 16 and in the expanded interface as seen in figure 5 14 The Cooling Towers and Boilers can be run independently or together in order to balance required lengths or temperatures 0 O So Load Balance Fig 5 14 Cooling Tower and Boiler Controls in Expanded User Interface 105 CHAPTER 5 The Horizontal Design Module Cooling
32. program actually use this data to determine the daily and monthly transfer of energy into the soil This is because the model assumes that there are different resistances associated with the annual monthly and daily pulses of heat being transferred If an installation is not being used at night for example the demand for the 12 hour period might be set to 0 Annual Equivalent Full Load Hours Because complete loads entry could be extensive especially in applications with more than a few zones Ground Loop Design limits the necessary data by compacting all of the monthly loads into a single number the Annual Equivalent Full Load Hours This number effectively represents all of the monthly total loads data MBtu or kWh in terms of the peak demand value MBtu hr or kW The advantage is that a single value is used instead of twelve one for each month of the year The full load hours calculation procedure is straightforward Simply sum the monthly total loads for all of the months Mbtu or kWh and divide by the peak demand MBtu hr or kW The resulting number the annual equivalent full load hours then has the units of hours To put it another way think of the annual 61 CHAPTER 3 Loads and Zones equivalent full load hours as the total number of hours the system would be running in a year if it ran at full capacity the whole time To help with this calculation the program offers the Equivalent Hours Calculator as one of t
33. project file for Ground Loop Design Fig 4 2 Information Panel Contents Extra kW Additional energy that is utilized by the system can be entered in the Extra kW panel The entry boxes are shown in figure 4 3 This panel is included for entire system average efficiency calculations The top entry box Circulation Pumps is for the energy required by the system circulation pumps The middle entry box Optional Cooling Tower is for the energy required by a cooling tower if used The lower entry box Additional Power Requirements is for all other elements besides the heat pump units in the system that may require energy input For example heat recovery units require additional energy that can be recorded in this box so that 1t can be used in the overall calculation of the System EER COP In the Circulation Pumps section the Required Input Power is calculated from the Pump Power required by the pump s for the system in question and the average Pump Motor Efficiency It is not possible to edit the Required Input Power values directly However if the pump motor efficiency is set to 100 the Pump Power and Required Input Power will be the same 67 CHAPTER 4 The Borehole Design Module Borehole Design Project verticalsampleforManual a x Results Fluid Soil U Tube Pattern Extra kW l Information Circulation Pumps Required Input Power 1 8 kW Pump Powe
34. remain the same the calculated length will also remain the same no matter what the representation since the daily and monthly pulses remain unchanged 60 CHAPTER 3 Loads and Zones Review of Loads Entry in Ground Loop Design The loads input methodology in Ground Loop Design is not as complicated as it first may appear to be This system has been chosen for two main reasons First the advanced mathematical model the program employs allows the loads to be broken into hourly pulses throughout the day of peak demand the Design Day which should provide a better overall accuracy in the calculations Second Ground Loop Design uses full load equivalent hours to reduce the total amount of data entry Ground Loop Design also accepts monthly total and peak loads in the average block loads module These data are only necessary for monthly inlet temperature calculations in the borehole design module The mathematical model the program employs for these calculations requires the more detailed monthly loads data Design Day Loads The Design Day heat gains and losses are simply the average hourly peak demands of the installation over the different periods of the day Although the program could include all 24 hours of the day separately it instead uses three 4 hour periods and one 12 hour period to simplify input These average hourly loads can be entered directly into the corresponding entry box The soil resistance models employed by the
35. single year due to the neutralizing effects ofthe ground water movement The modeling time prediction time period can also be viewed and modified in the expanded user interface as seen in figure 4 13 78 er A A CHAPTER 4 The Borehole Design Module Calculations Calculate Prediction Time 15 0 years Fig 4 13 Design Prediction Time in Expanded User Interface Fluid The circulating fluid parameters may be entered in the Fluid panel A sample input screen is shown in figure 4 14 Note that automatic fluid data entry mode is available as an option in this version of Ground Loop Design Design Heat Pump Inlet Fluid Temperatures The heat pump inlet fluid temperatures are included in the Fluid panel The designer can input the desired inlet source temperatures for both heating and cooling here When changes are made to these values the heat pumps in all zones are updated automatically Since the new calculated equipment capacities can lead to changes in selected equipment the designer must be aware of the changes Customized pump values must be manually adjusted The inlet fluid temperatures also can be viewed and modified in the expanded user interface as seen in figure 4 9 above Note inlet temperatures can only be modified in fixed temperature mode Design System Flow Rate The system flow rate per installed ton is included on the Fluid panel This is the system flow rate per ton of peak load not i
36. user does not manually delete folders existing work files pumps and zone files will not be affected The file Pumplist gld in the Ground Loop Design pumps folder will be overwritten upon re installation If the user has added pumps other than those originally included with the program this file should be copied or moved to a backup directory prior to removal and re installation After PREFACE re installation the Pumplist gld file can be returned to the Ground Loop Design Pumps folder or the desired contents can be added to the contents of the new Pumplist gld file using a simple text editor like Notepad exe The format of the file is provided below Pumplist gld Pump List File Number of Manufacturers Integer First Manufacturer Name Text Street Address Text City State Zip Text Country Text Telephone Number Text Number of Different Series for this Manufacturer Integer Example 2 Series 1 Name Text Series 1 filename without hpd extension Text Date Entered Text Example 2001 10 05 Series 2 Name Text Series 2 filename without hpd extension Text Date Entered Text Example 2001 10 06 Second Manufacturer Name Text Street Address Text Alternatively any pump files not included with the setup package may be added from within the program itself using the method described in Chapter 2 under Adding Pump Sets Obtained from External Sources The actual original he
37. vary between zones Again the occupation is unnecessary for a surface water design since long term buildup effects are unimportant Ifa loads module is linked to a Surface Water Design module the days per week will not be visible Pump Matching and Selection Every zone has heat pump equipment associated with it Equipment matching and selection is done within the zone data window in the lower section entitled Heat Pump Specifications at Design Temperature and Flow Rate In this section the designer has three choices when matching a pump to a zone e Automatic selection based on the active heat pump series e Manual selection from a list of all available pumps e Custom input of pump data Once selected the zone retains all of the information associated with the pump chosen This information includes the pump name the number of pumps and the capacity power consumption EER COP flow rate and partial load factor in both cooling and heating modes If obtained from the list of available pumps detailed information is also available including the manufacturer and series name the pump type and the inlet load temperatures Figure 3 6 shows the pump selection section of the zone data window with sample data matched to the loads data of figure 3 4 Several buttons can be found in the pump selection section These include Auto Select Select Details and Clear A checkbox is also included to indicate when 44 CHAPTER 3 Loads
38. would be handled by the cooling tower Conversely a 0 Load Balance would mean that no cooling tower is employed In a typical design it is difficult to predict exactly how much load balance or what size of cooling tower is necessary to match the cooling and heating lengths However using the Load Balance slider control the designer can optimize the system to the lengths desired by directly controlling the amount of cooling load to be handled by the cooling tower In the case where the designer desires the shortest length possible the design requires a perfect balance of the heating and cooling loads to the ground The length from this perfect balance would be the minimum length required to adequately cover the heating load requirement To accomplish this the Load Balance slider needs to be adjusted to the percentage value where the calculated cooling and heating bore lengths are approximately equivalent Note As expected the Long Term Ground Temperature Change for both heating and cooling should be identical in a perfectly balanced system 87 CHAPTER 4 The Borehole Design Module In other cases the designer just may seek a reduction in the total required system length rather than a perfect balance Using the slider control the designer can select the desired length and then note the required cooling tower condenser capacity as calculated by the program Once the required cooling tower capacity is determined the designer can
39. 0 0 years Fig 5 2 Configuration Panel Contents Configuration Trench Number 3 a Separation 200 Ft Depth go Fe Width go in Fig 5 3 Configuration Controls in Expanded User Interface Pipe Configuration in Trench The designer defines the physical arrangement of pipe in the trenches in this section 94 CHAPTER 5 The Horizontal Design Module STRAIGHT PIPE CONFIGURATIONS In the case of the three straight pipe configurations the user also provides the total number of pipes and the horizontal X and vertical Y separation of the pipes in the trench An additional offset meaning a horizontal shift between adjacent vertical layers can be included if desired Single Pipe Vertical Alignment In this arrangement the user creates a single column of pipes The number of pipes chosen defines how many layers will be included Each pipe is separated from its neighbor by the given vertical separation Y starting from the bottom of the trench Ifthe Offset box is checked each pipe layer will be shifted from the pipe layer below by the given horizontal separation X Two Pipe Vertical Alignment In this arrangement the user creates two pipe layers The number of pipes chosen defines how many layers will be included 2 4 6 etc Each vertical layer is separated from the one above or below by the given vertical separation Y If the Offset box is checked each pipe layer will be s
40. 225 e 34 Corrected Temperature F 48 1 76 8 Check Soil Tables Fig 6 6 Soil Panel Contents 119 CHAPTER 6 The Surface Water Design Module Ground Temperature Corrections at Given Depth Depth of Header in Soil This is simply the average depth in the soil between the water s edge and the installation at which the primary header or branches will be buried Soil Type The soil type can have one of three values wet dry or average Ground Loop Design uses this to assign an approximate diffusivity value to the soil used in the temperature model Regional Air Temperature Swing This is the temperature swing for the location of interest It is a measure of the average temperature variation of the region during the warmest and coolest months as compared to the yearly average temperature Regions with temperate climates have a lower temperature swing than regions that have large differences between summer and winter temperatures Coldest Warmest Day in Year These are the actual days of the year on a 365 day scale when the temperature is usually coldest or warmest For example if February 3 is approximately the coldest day of the year the value entered will be 34 31 days in January plus 3 days of February The program uses these days to determine the soil temperature at the given depth at these times of the year Corrected Temperature These are the corrected temperatures at the depth specified calculat
41. 3 Borehole Design Panel List Using these seven panels Results Fluid Soil U Tube Pattern Extra kW and Information the user enters the project specific information After the user enters all parameters the software calculates results based on the input data Within this framework it is straightforward and easy to make changes and conduct new calculations In Version 5 0 the Borehole Design module allows for two types of design methodologies fixed temperature and fixed length designs Fixed temperature designs should be familiar to users that upgraded from earlier versions of GLD Fixed temperature refers to the design process in which 14 CHAPTER 1 Ground Loop Design Overview users specify target inlet temperatures designers set or fix the temperatures themselves and then have the program calculate results such as the required bore length the outlet temperatures and the coefficient of performance COP etc based on the input data With fixed length designs designers specify the required borefield length by inputting the number of boreholes in the design and then defining the borehole length fixing the total design length After entering these data as well as the other design parameters the software calculates results such as the inlet and outlet temperatures and the coefficient of performance COP etc based on the input data The fixed length feature is well suited for designing when land resources are limited whe
42. ER 7 Reports cooling modes For the Borehole Design module the Loads report includes the annual hours and weekly occupation information Names List The Names List is just a list of the full reference names of the different zones combined with the zone number pump name and number of pumps required for the zone It makes a convenient compact link between zone name and number and is especially useful when the project consists of many separate zones Concluding Remarks There is no data in Ground Loop Design that is not expressible in a printed form The designer can organize and share information both during the developmental stages of a project and after the design is complete 129 CHAPTER 8 Tables and Reference Files CHAPTER 8 Tables and Reference Files This chapter covers the tables and reference files of Ground Loop Design It starts with a description of the included files and then explains how the user may add customized files to the existing set Overview Favorite references are like a comfortable pair of worn in sneakers Although this software package provides some useful information in the included tables it may never replace the old standards Rather than trying to impose a particular system onto the users of the software Ground Loop Design employs a technologically sophisticated system that allows the user to customize the reference files as much as he or she desires With this system a new pair of shoes feel
43. Ground Loop Design Geothermal Design Studio User s Manual English Ground Loop Design Premier Version 5 0 for Windows Gala Geothermal www gaiageo com Copyright Notice Ground Loop Design Premier Version 5 0 User s Guide 2007 Celsia LLC All Rights Reserved This guide as well as the software described in it is furnished for information purposes only to licensed users of the Ground Loop Design software product and is furnished on an AS IS basis without any warranties whatsoever express or implied This may be used or copied only in accordance with the terms of the included End User License Agreement The information in this manual is subject to change without notice and should not be construed as a commitment by Gaia Geothermal Gaia Geothermal assumes no responsibility or liability for errors or inaccuracies that may occur in this book Except as permitted by such license no part of this publication may be reproduced stored in a retrieval system or transmitted in any means electronic mechanical recording or otherwise without the prior written consent of Gaia Geothermal Other brand and product names are trademarks or registered trademarks of the respective holders Microsoft Excel Windows Windows 95 Windows 98 Windows NT Windows Explorer Windows ME Windows XP and Windows 2000 are registered trademarks of Microsoft Corporation Netscape Navigator is a registered trademark
44. HAPTER 6 The Surface Water Design Module E Surface Water Design Project SurfaceWaterSample Lengths Temperatures COOLING HEATING COOLING HEATING Total Length Ft 4087 2 8187 8 Unit Inlet F 55 0 36 0 Circuit Length Ft 371 6 545 9 Unit Outlet F 64 2 30 1 Results Fluid Soil Piping Surface Water Extra kW Information Calculate Circuit exer Circuit Parameters C Fixed Temperature Circuit Pipe Size 1in 25mm Inlet Temperatures 55 0 oF 36 0 oF Number of Parallel Circuits Coating 14 Heating 15 Number of Parallel Circuits Circuit Style 11 15 C Coil e Slinky Circuit Style C col E Slinky as Cooling 0 9 ft hd Heating 15 ft hd Extra Equivalent Length per Circuit 33 1 ft Fig 6 1 Expanded User Interface The Surface Water Design module includes several additional features Metric and English unit conversion Printed reports of all input and calculated data Convenient buttons to bring up tables and calculators A Calculate button used to refresh the calculations A system to monitor header and branch piping head losses Opening Projects There are two ways to open Surface Water Design projects One is by using the New Surface Water command from the Design Studio File menu and the other is by opening an existing Surface Water Design project gld file Files cannot be opened if other modules with the same name are already open As many files can be o
45. ING NEGLIGENCE OR OTHERWISE EXCEED THE PRICE PAID BY CUSTOMER THE FOREGOING LIMITATIONS SHALL APPLY EVEN IF THE ABOVE STATED WARRANTY FAILS OF ITS ESSENTIAL PURPOSE BECAUSE SOME STATES OR JURISDICTIONS DO NOT ALLOW LIMITATION OR EXCLUSION OF CONSEQUENTIAL OR INCIDENTAL DAMAGES THE ABOVE LIMITATION MAY NOT APPLY TO CUSTOMER Term and Termination This End User Agreement is effective until terminated Customer s license rights under this End User Agreement will terminate immediately without notice from Gaia if Customer fails to comply with any provision of this End User Agreement Upon termination Customer must destroy all copies of Software and the corresponding keys in its possession or control Compliance With Law Each party agrees to comply with all applicable laws rules and regulations in connection with its activities under this End User Agreement Without limiting the foregoing Customer acknowledges and agrees that the Software including technical data is subject to United States export control laws including the United States Export Administration Act and its associated regulations and may be subject to export or import regulations in other countries Customer agrees to comply strictly with all such regulations and acknowledges that Customer has the responsibility to obtain licenses to export re export or import the Software Restricted Rights The Software shall be classified as commercial computer software as defined in
46. Reports the design module using the Design Studio Units menu and then open a new report Project Reports Project reports may be opened at any time from the Design Studio File menu by selecting Print An option dialog box appears displaying the six types of reports that are available concise detailed input data with loads concise temperature detailed temperature and full project The first two project reports are available in all three design modules Detailed reports contain full project information while concise reports limit the project information and exclude any comments Detailed reports generally require multiple pages while concise reports are designed for single page printouts The other four project reports are associated with monthly inlet temperatures and therefore are available only with the borehole module The user selects a preference and then clicks OK The report does not print automatically but instead creates the report preview window in which the report can be reviewed prior to printing Printing can be done by clicking on the printer icon in the upper left hand corner of the report preview window In general project reports contain several main sections Information Calculation Results Input Parameters Loads borehole only when linked to Average Block module Monthly Inlet Temperatures borehole only when linked to Average Block module e Comments Information This section contains the
47. Towers Although typically not recommended because of increased running and maintenance costs the user may elect to add a cooling tower to a cooling dominated geothermal system to reduce the total boring lengths and therefore the total initial installation costs To facilitate this design choice Ground Loop Design offers the cooling tower or hybrid option In any case where the calculated trench lengths for cooling are longer than those for heating the difference in the lengths can be eliminated through the use of a cooling tower tied in parallel to the geothermal ground loop This requires that either the cooling tower capacity is chosen such that both the peak load and the annual load to the ground are balanced or if a full balance is unnecessary a capacity is chosen that allows for downsizing the loop to an acceptable length To aid in the sizing process a Load Balance control is provided in the Optional Cooling Tower section of the Calculate panel Although clicking the slider control can initiate a valid calculation or recalculation the slider control generally is employed after initial calculations have been conducted The Load Balance is a slider based control that represents a percentage of the total cooling load both instantaneous peak and annual For example a 100 Load Balance would be equivalent to saying that the entire cooling load of the system would be handled by the cooling tower Conversely a 0 Load Balance wou
48. Water Design module the designer thoroughly must understand the relationship between the system flow rate the minimum required flow rates the pipe size the head loss per length of pipe and the preferred number of parallel circuits Ground Loop Design can conveniently make all the appropriate calculations but the designer must first have a grasp of all of the individual inputs required and the relationships among them Finally the surface water designing process actually involves an additional stage of optimization that is not included with the Borehole Design module The Surface Water module includes a piping calculation component to assist the designer in selecting the best pipe sizes and circuit lengths Entering Data into the Tabbed Panels Ground Loop Design s innovative tabbed panel system provides for easy organization of and direct access to the relatively large number of design parameters associated with a particular project This section describes the Surface Water Piping Soil Fluid and Calculate panels The Information and Extra kW panels are identical to those included in the Borehole Design module described in Chapter 4 so the reader is referred there for detailed information See Chapter 3 for a discussion of Loads entry 112 CHAPTER 6 The Surface Water Design Module Surface Water Use the Surface Water panel to enter data related to the body of water being used as the heat transfer medium Figure 6 2 shows the as
49. a eG cohen Getto E gets E e eee ote ee RR 126 Calculation Results 42 aa 126 Input Parameter Soia vices ire E ros 127 A O AR S 127 Monthly Inlet Temperatures cccccceccesseescesseescesceeeceseeeseceeecaeesaecaeesaecneceaeenseeeees 127 COMME Sutra ri Os a 127 LOROS a a tc LZ Detailed Ford 230 03 aici dado Lillo Dodo irradia iio 128 Concise Form is rid 128 Equipment List ira lidia 128 E A Sita A EE AA 128 INET ESA E F EEE ed cieb has E E 129 Concluding Rema ES a e e e a a a a a a a e inea kai 129 Chapter 8 Tables and Data Reference Files ccseseeseeseeees TOO OA A Sieh en a 190 Tables Included with Ground Loop Design cececeeceee eee ee eee ene eee eaeeaeneees 131 Fluid Properties 5 06 ega i te ay ep ee 131 Soil Properties ur o odas 132 Pipe Properties ti 132 CONVE ai A aia 132 Adding Customized Reference Files 02 cece ececeec ence eee e eect eset eae eaeneeaenaenens 133 Original Model sis taa 133 HIME PUS isni poeta vers inn tates es gy eens eens mal lt tes 134 Editing Existing Files ccccccceceeeeceeceeeee eee eeeeeeeeneeeeeaeeaens 134 Making a Table soies naa in 134 Adding a Picture Graph or Figure cceeeeceeeeeeeeeeeeeeeenes 135 Taking Care with Update iii a ideada 136 Concluding Remark Siorino ernia asia es 136 PREFACE PREFACE Before You Begin This chapter describes the typical uses and users of the software It also descr
50. acity and the modified peak loads applied to the loop field are shown on the panel but no other inclusion electrical or fuel costs for the boiler are included in the calculation report The expected heat pump power is also reduced by the same percentage in order to estimate a real system 88 CHAPTER 4 The Borehole Design Module Printing Reports Reports of the active project can be printed at any time from the Design Studio using the toolbar print button or from the File menu gt Print Two project reports and four monthly inlet temperature reports are available In the concise and detailed reports information printed includes all of the input parameters from the design module along with the associated results In the concise and detailed reports the zone and loads information is not included with the report and must be printed separately from the Loads panel The filename of the zon file associated with the project report is also listed on the reports The other four inlet temperature reports offer different combinations of input parameters loads and monthly inlet temperatures that designers can choose among depending on their reporting needs More information on reports can be found in Chapter 7 References Francis E Editor Refrigeration and Air Conditioning 3 Edition Air Conditioning and Refrigeration Institute p 186 Prentice Hall New Jersey 1997 Incropera F and Dewitt D Introduction to Heat Transfer 2 Ed
51. ackfill the average soil conductivity should be entered here Soil Input parameters relating to the soil are located in the Soil panel as shown in figure 4 11 These include the average ground temperature the soil thermal properties and the modeling time period 76 gt CHAPTER 4 The Borehole Design Module Y Borehole Design Project verticalsampleformanual Results Fluid Soil U Tube Pattern Extra kW Information Undisturbed Ground Temperature Ground Temperature 56 0 F Soil Thermal Properties Thermal Conductivity 1 08 Btu h ft F Thermal Diffusivity 0 75 ft 2 day Diffusivity Calculator Check Soil Tables Modeling Time Period Prediction Time 15 0 years Fig 4 11 Soil Panel Contents The undisturbed ground temperature refers to the temperature of the soil below the surface layer where there is no longer a seasonal swing This value may be determined from regional data or by recording the actual stabilized temperature of water circulated through pipe in a test bore The soil thermal properties are a little harder to define and care must be taken to provide accurate values especially for the thermal conductivity The thermal diffusivity relates to the density of the soil and its moisture content Typical values of thermal conductivity and diffusivity for sand clay and different types of rocks can be found in the Soil Properties tables However it is recommended that soil tests
52. actors are provided for variations in the load inlet temperature and flow rate The level of accuracy depends both on the amount of data available and the time the designer wants to invest Note that Ground Loop Design s heat pump module allows for both water to air and water to water pumps Theoretical Basis Capacity and Power Heat pump capacities and power requirements vary smoothly but significantly for differing source inlet temperatures Three points taken along both the capacity vs temperature and power vs temperature curves are fit to a polynomial equation to model these variations The resulting calculated coefficients are then used to generate capacity or power values for any given source inlet temperature The basic polynomial equation used for fitting has the form y at bx cx where a b and c are the three coefficients calculated from the fitting routine For the capacity case y represents the capacity and x is the desired temperature For the power input determination y is the power and x again is the temperature Be aware that these coefficients do change for metric and English units The software stores coefficients for each pump and then uses the coefficients with the source inlet temperatures chosen by the designer to determine the unit capacity and power 25 CHAPTER 2 Adding Editing Heat Pumps Flow Rate To model the effect of the source flow rate on the calculated capacity a
53. al because it relates directly to the extent of external heat exchanger installation Heat exchanger costs impact the overall costs of a project Additionally a unit that is called only when necessary or is well matched to a zone will be more efficient than a larger unit that may cycle more often Inputs for Ground Loop Design s Zone Manager Loads module include peak load information for each of the zones in an installation at different periods during the day These loads data can be matched automatically to heat pumps stored within Ground Loop Design s Heat Pump Database Therefore ideal and rapid sizing is possible As with the Average Block Loads module the annual running time also may be included for a buried heat exchanger This loading information can be simple or complex depending on the level of detail the designer desires To facilitate this model the zones can be viewed either independently or together on the summary panel Average Block Loads Module For quick estimates and general calculations there is no need to do a full zone analysis for a project In these cases designers can quickly enter data and consider approximate designs using the Average Block Loads module The average block model takes peak data from up to four time periods during the peak day and then uses a generalized form of the automatic pump selection sequence to match a particular type of pump to an entire installation For buried heat exchangers the mo
54. although longer or shorter time periods may be entered if desired In the case of horizontal systems a single year or less is often chosen since the interaction with the atmosphere or sunlight generally reduces the long term buildup or reduction of soil temperatures Long term thermal effects are more commonly associated with vertical bores The modeling time prediction time period can also be viewed and modified in the expanded interface as seen in figure 5 5 96 CHAPTER 5 The Horizontal Design Module we Calculate Prediction Time 49 9 years Fig 5 5 Prediction Time Controls in Expanded User Interface Piping The Piping panel contains all the information related to the particular pipe chosen for the buried heat exchanger The program uses information about the pipe size and flow type to determine the associated pipe resistance which ultimately is used in the length calculations The input screen for the piping panel is shown in figure 5 6 Pipe Parameters The pipe characteristics are entered in the Pipe Parameters section They include the pipe resistance the inside and outside pipe diameter and the pipe and flow type As in the Borehole Design module Ground Loop Design calculates the convective resistance using the Dittus Boelter correlation for turbulent flow in a circular tube Incropera and DeWitt 1990 The calculations use average values of the Reynolds number to represent the different types of fl
55. and Performance 108 CHAPTER 6 The Surface Water Design Module CHAPTER 6 The Surface Water Design Module This chapter describes the features and operation of the Surface Water Design module This module is for the design of systems that use bodies of water including ponds rivers lakes oceans etc It is one of the three design modules included with Ground Loop Design Overview As with the Borehole and Horizontal Design modules the calculations made in the Surface Water Design module involve the combination of a large number of input parameters Care must be taken to assure that proper values are verified before use Assuming that reasonable values are provided to the software the software will provide a reasonable result General Features The Surface Water Design module in Ground Loop Design also includes a set of panels grouped by subject through which the designer can enter and edit the input variables in a straightforward and efficient manner For example parameters related to the body of water are listed on the Surface Water panel while piping choices are listed on the Piping panel Everything related to a project is presented simultaneously and easily is accessible throughout the design process In the expanded user interface mode which can be expanded by double clicking on any of the tabs the most commonly modified parameters as well as calculation results are always visible as seen below in figure 6 1 109 C
56. and Zones the pump is a custom pump or a pump not included in Ground Loop Design s internal list of pumps Heat Pump Specifications at Design Temperature and Flow Rate Pump Name Custom Pump nats E Cooling Hed Auto Select Capacity MBtu Hr 46 7 47 6 Power Kw 3 74 3 11 EER COP 125 45 Details Flow Rate gpm 1115 95 Clear Partial Load Factor 0 98 0 80 Fig 3 6 Sample Pump Selection Section with Data Auto Select This option is by far the easiest method of matching a pump to the loads in a particular zone By clicking the Auto Select button Ground Loop Design utilizes the information stored for the active pump series and determines which pump within the list is best suited to the zone in question If the listed pumps are too small for the zone loads the software increases the number of pumps of each size until an acceptable match is achieved The pump selection process uses information from the Zone Manager loads module This includes the chosen inlet source temperature the flow rate the heat pump series and the initial inlet load temperatures The flows and load temperatures can be entered at the bottom of the module and the active heat pump series and load temperatures may be changed on the Heat Pumps tabbed panel Manual Select If an automatically selected heat pump is for any reason undesirable or a different pump series from the same manufacturer or even from a different
57. anded user interface to view a graph of the monthly inlet temperatures as seen in figure 4 20 85 CHAPTER 4 The Borehole Design Module Graph of Results Graph Data ra BWE EE E Y E F VTT E power O ARY Borowa Temperature E Fluid Temperature Tf M Exit WT IV EWT M Minimum EWT Y Maximum EWT Add Title Add Legend Save as Bitmap amp Time Months Print Fig 4 20 Graph of Monthly Inlet Temperatures T g 2 E po a 5 Within the graph the designer can choose which data to view save and or print Options include Q heat transferred to or from the ground power borehole temperature fluid temperature exiting water temperature entering water temperature and minimum and maximum entering water temperatures The designer can also add a title and legend to the graph More than one graph can be open at the same time enabling designers to quickly compare different designs Saved graphs can be found in the Ground Loop Design Graph Images folder Optional Cooling Tower and Boiler Section Cooling towers and boilers can be added to designs via the sliders that are located on both the Results panel figure 4 16 and in the expanded interface as seen in figure 4 21 The Cooling Towers and Boilers can be run independently or together in order to balance required lengths or temperatures Cooling Tower Boiler oe ES ae Load Balance Fig 4 21 Cooling Tower and Boiler Controls in Expanded
58. ary View Toggle Button ce cece cece eee neeeeee eee e en enee 40 Entering Loads aoreet dy ie oE onda ychaties seasons ces geendueeresceseeeetess 41 Design Day Loads cece ese eceeee cence ee eee nets eens eens eee eng i 42 Annual Equivalent Full Load Hours cceceeeeeeeeeeeeeneeeeaees 42 Equivalent Hours Calculator ccc eee ec ence cence nent ee ene ee enaenee 43 Days per Week coi ad bow ve nese sens eto 44 Pump Matching and Selection 0 cece cece enceee eee ecee eee ene ee eeeaeeaenaeaes 44 AULO SCLECEE ooo o5 posdeses eenebne ty Eo a EREE vent ieee wees ett 45 Mantial Selects cui ia eer eens dad 45 RN 46 Cleo tacto 46 Custom Pump Customizati0N ooooocoococoncononncncnnonncnonncnnanannoos 47 Automatic Heat Pump Selection Options for the Entire Zone Set 47 Auto Select All PUmps 0 ccecesec eee eens eeeee eee eee eee eeaenes 47 Update Reselect Current PUMpS 0 cccceceeceeeee eee eneee eee eneees 47 Working Series Selection in the Heat Pumps Tabbed Panel 04 48 Choosing the Active Series cccceececeecec eee eeeeeeneeaeneeneenees 48 Inlet Load Temperatura pata 49 The Average Block Loads Module cccececceceeeecec eee eee eee ee eee eneeeneeenaenens 49 Managing the Average Block Loads 00 cccceeeeceecee eee eee eens ee eaenaeaes 51 NW iaa aran 51 A RRA 51 En
59. at pump data files hpd will not be deleted unless their names are identical to those being installed Thus all data can be recovered even if the previous version of the Pumplist gld file is overwritten However this will either involve editing the Pumplist gld file manually to include the customized data or identifying those files within the program itself In general if there are only a few pump sets to add working within the program may be best If there are many cutting and pasting from the old file using a text editor may prove to be more efficient Remember to modify the number of manufacturers if necessary If the user has created customized heat pump sets it may be wise to make a backup of all data files prior to removal and re installation Additionally customized data reference files should be backed up before any user modified Ground Loop Design menu HTML documents are PREFACE replaced The linked HTML documents themselves will not be overwritten Program Licensing This section describes the USB dongle and license transfer options available in Ground Loop Design Premier Version 5 0 Software License Dongle Your GLD software license is stored on the USB dongle that came with your program This dongle enables you effortlessly to transfer GLD from one computer to another Please be careful not to misplace this dongle Lost dongles can not be replaced without the purchase of a new license If the dongle is not
60. attached to your computer GLD will function as a trial version which is fully functional except for a few design parameters that are locked at certain values When you insert the dongle into a free USB port on your computer for the first time your computer most likely will recognize the dongle and after a few seconds the dongle light will turn on When it turns on your license will activate However if your computer indicates that the dongle is new hardware you have two options for installing the dongle driver How to Install the Dongle Driver Windows Vista XP and Windows 2000 users with internet access If your computer has access to the internet your computer can automatically install the drivers Follow along with the Windows new hardware wizard to install the drivers The process takes a few minutes When the installation is complete the dongle light will turn on All other users Via Windows Explorer navigate to Main Drive Program Files Gaia Geothermal Ground Loop Design Extras In the Extras folder you will find a HASPUserSetup exe program PREFACE Run the program to install the dongle driver When the installation is complete the dongle light will turn on After Dongle Installation is Complete Now that the dongle is installed you can access the full functionality of the GLD version that you purchased If you remove the dongle the program will revert to demo mode If you reattach the dongle the pro
61. ay 01 a June 9 a July o E ee augt MAA ee september A Y 9 october Yf g d 0 November Yf 9 d 0 December FL YL A ie 3 TEA ceed Fig 3 13 Monthly Loads Input Boxes There are three ways to enter the loads data e Manually enter the total and peak cooling and heating loads in the appropriate boxes e Copy and paste from Excel using the Excel icon button See later in this chapter for how to format the Excel file Note that with Version 5 formatting has changed e Import a commercial loads file or excel file using the loads import button see below If necessary hit the zero box at the top of each column to reset all values to 0 In the last row of the peak cooling and peak heating columns there are two input boxes for the number of hours the system is expected to operate at the peak The initial value is set at 3 0 hours and shown in bold face Only the Monthly Data or second model of the Borehole Design module uses this Hours at Peak value in its calculations The other modules and models utilize the 4 or 8 hour time period already fixed in the Design Day Loads section 52 CHAPTER 3 Loads and Zones After entering the loads data hit the Update button to return to the main loads panel screen Notice that the program automatically converts the monthly loads into the design day format following the calculations described on pages 65 66 Pump Selection Although the s
62. based on loads provided by the designer This chapter describes the unique Ground Loop Design loads system and how to enter the loads in both the Zone Manager and the Average Block loads modules Additionally it explains the pump matching capabilities and operation both in automatic and in manual modes At the end of the chapter there is an explanation of how to import external loads files as well as a brief review of the program s loads input methodology The Ground Loop Design Loads Model The intrinsic flexible nature of the Ground Loop Design Geothermal Design Studio appears again in the loads models the software employs the user is not limited to a single style of loads input Similar to the design modules a designer can choose between different types of loads input schemes based on the level of complexity he or she desires and the time he or she wishes to invest These loads modules are then linked to one or more design modules using the Ground Loop Design Studio link system Currently two loads modules are available the Zone Manager Loads module and the Average Block Loads module The Zone Manager Loads module is provided for designers who desire a full analysis capability Loads are input as separate zones and each zone is matched 37 CHAPTER 3 Loads and Zones with a particular pump This mode is more valuable when users require thorough designs The Average Block Loads module offers a rapid system of entering whole sy
63. can lead to changes in selected equipment the designer must be aware of the changes Customized pump values must be adjusted manually Design System Flow Rate The system flow rate per installed ton is included on the Fluid panel This is the system flow rate per ton of peak load not installed capacity This is because it is assumed that all units will not be running at full load simultaneously even in the peak load condition Optimized systems generally operate in the range from 2 5 to 4 0 gpm ton while the ideal system flow rate is somewhere around 3 0 gpm ton Again if the flow rate is changed the selected heat pumps are updated in the loads modules 101 CHAPTER 5 The Horizontal Design Module y Horizontal Design Project HorizontalSample Results Fluid Soil Piping Configuration Extra kw Information Design Heat Pump Inlet Fluid Temperatures Cooling 65 0 F Heating 50 0 F Design System Flow Rate Flow Rate 3 0 gpm ton Solution Properties M Automatic Entry Mode Fluid Type Water Freezing Point y oF 0 0 by Weight Specific Heat Cp 1 00 Btuf F lbm Density rho 62 4 Ibjft 3 Check Fluid Tables Fig 5 9 Fluid Panel Contents Design Method Fixed Temperature Inlet Temperatures 85 0 F SU F Fig 5 10 Inlet Temperatures in Expanded User Interface Solution Properties Solution properties are also included in the Fluid panel These i
64. cause the calculations conducted here involve the combination of a large number of input parameters care must be taken to assure that proper values are verified before use Assuming that reasonable values are provided to the software the software will provide reasonable results General Features To aid in the data entry process the Borehole Design module in Ground Loop Design consists of a set of panels grouped by subject through which the designer can enter and edit the input variables efficiently For example parameters related to the soil are listed on the Soil panel while piping choices are listed on the U tube panel The idea is that everything related to a project is presented simultaneously and is easily accessible at any time during the design process In the expanded user interface mode which can be expanded by double clicking on 63 CHAPTER 4 The Borehole Design Module any of the tabs the most commonly modified parameters as well as calculation results are always visible as seen below in figure 4 1 EI Borehole Design Project 1 Lengths Temperatures COOLING HEATING COOLING HEATING Total Length Ft 9134 0 17444 0 Unit Inlet F 85 0 50 0 Borehole Length Ft 142 7 272 6 Unit Outlet F 93 0 42 0 Results Fluid Soil U Tube Pattern Extra kw Information Calculate COOLING HEATING Monthly Data Total Length ft 9134 0 17444 0 Prediction Time 20 0 years Borehole Number 64 64 Borehole Le
65. ceeding Note If data for only one flow rate are available only the first capacity and power requirement data must be included under the section entitled FLOW RATE 1 The data under FLOW RATE 2 can be left as zeroes and the program will ignore them leaving the flow factor as 1 0 Load Side Corrections Corrections resulting from variations in inlet temperatures and flow rates on the load side can be entered in the Load Temperatures and Load Flows tabbed panels of the Pump Edit pane If these corrections are not added the factors remain at 1 0 and input variations in load temperature or flow rate will have no effect on calculated capacities and or input power Time permitting however it is best to include as much information as possible from what the manufacturer provides Load Temperatures Panel The Loads Temperatures panel is where corrections for variations in the load inlet temperature are input Both the cooling and heating information taken at the average or standard source temperature and flow rate and the average load flow rate are entered on the same panel an example of which is shown in figure 23 The factors shown in figure 2 5 were calculated from a manufacturer s list of capacities provided for the different temperatures using the capacity at the selected temperature as the numerator and the capacity at 67 F for cooling 70 F for heating as the denominator The 67 F 70 F capacity values were those
66. ceneneeneeneenaes 3 Installation procedi iia oh 3 Initial mstallation hour id sheet ees 3 Installation of updated versions or re installation 0ceeeeeees 3 Progtam Licensing 22 cg szednoneges di 5 Software License Dongle cececceceee ec eecec ene eeeeeeneeeeeeeaeas 5 How to Transfer the Program Between Computers 0 00000 6 Chapter 1 Ground Loop Design Overview 0 ss sseeeeeeeeeees 7 General Program Features 0 ccc ccc ece cence cence nent ee ene nen eens enene ee eneeeeneeenaegegs 7 New in Premier Version 5 0 2 0 2 0 0c cceeeec cece cence eee eee ee ceases eneeneneeneenaees 7 The Design Studio ia 8 Customization A A E tau celta Ete O Seal Metric English Units A by ope aware ale deanery 9 International Zation a sia 9 Heat Pump and Zone Loads Models Introduction 00 ceccec cess ceec en enseneeneneaes 10 Heat Pump M d l scoot aia 11 Zones Loads Modules 1c herie Riris iiinn a e i E E 11 Zone Manager Loads Module ccececeecee eee eeeeeeeeeneeaeeaeas 11 Average Block Loads Module c ccccceceeeeeeee ene eeneeaeeaenaens 12 Design Modules sg Qe n eee o Borehole Desion Module e dl eee ess 14 DeSCriptionics lt 85 2c 3508 Meets Sees eae eek A a as 14 TheoreticalBasis ci n oc isds 15 Horizontal Design Module ooooooooccccoconconcnconcnncnnnncncnncnnc nro no nnannanannnos 17 O 17 Theoretical BasiS ui dre 17 S
67. ch eS its tiara Oe 114 Details Reference Only it aaron 114 PIPING Rda 114 Circuit Parma sriraiaie 115 Circuit Pipe izada 115 Number of Parallel Circuiits 0c ceceeceeceeeneeneeeeeenes 116 CONTENTS Circuit Styles cece sine Ah edave A eee He 116 Circuit Head Loss per 100 feet cece cee eeeee eee ee en ees 116 Extra Equivalent Length per Circuit ce ceee sees eens eens 116 Header Parameters 2 242228 ee aia A 117 Number of LIS secede nsee ds 118 Pipe Size A Da ees 118 Header Length Average Branch Length o ooonocncncncncn 118 Head Loss per 100 feet 0 cece cceceeceeeec eee eeeee ene eneees 119 O A A cance ies eetas 119 Ground Temperature Corrections at Given Depth eeeeee es 120 Depth of Header in Soil 0 eee ccc e cece eee eeenene ene eaenens 120 Soil Ty peices dsssdets ds 120 Regional Air Temperature SWIN8 ooooocccccncncncnccnnccncnancs 120 Coldest Warmest Day in Year e cee eee eee eeee ene ees 120 Corrected Temperature ss seneese ss eee eneee ene eaeneenenees 120 PUIG ace A SA AA Scat eee arte he MOR a Pr a ie ee rate 120 RESUS Fg seen ol cite tate Raine clare tester be Di E SNA 121 Reporting Secta isa 123 Printing Repo A NERE OE a a diria 124 Chapter 7 Repo Sica o 12D DU it ADD The Report Preview Window ooreen eiee er eiee cono E r EE nn nn nro nr rn SS es 125 Project Reporta Da id nia 126 AA hath
68. ciated data Comments This section at the end of the report is reserved for any additional information that the designer would like to include with the project Zone Reports Zone or loads reports are printed directly from the Loads modules They include only the project information and data from the zones presented in different formats Five different zone reports exist containing complete or specific information about the zones Zone reports work in conjunction with project reports but are actually a separate entity They are representative of the actual installation rather than the heat exchanger portion of the system Zone delineation loads and equipment are separate from the heat exchanger system It is for this reason that the designer would necessarily want to view and consider this information apart from the specific heat exchanger details For example if the design is a building the zone reports will cover everything within the building while the project report 127 CHAPTER 7 Reports essentially will contain information about everything outside or external to the building A zone report is printed from the Loads panel of the Zone Manager or directly from an Average Block Loads module by clicking the printer button in the controls A dialog window appears giving the designer the list of available report styles After the making a choice click OK to bring up the report window There are five different zon
69. cking on any 90 CHAPTER 5 The Horizontal Design Module of the tabs the most commonly modified parameters as well as calculation results sev are always visible as seen below in figure 5 1 y Horizontal Design Project HorizontalSample_usermanual5 Lengths nemperes COOLING HEATING COOLING HEATING Total Trench Length Ft 4145 9 8177 4 Unit Inlet F 85 0 50 0 Single Trench Length ft 207 3 408 9 Unit Outlet F 95 2 44 0 Results Fluid Soil Piping Configuration Extra kW Information Calculate Trench Layout Prediction Time 490 years NUMBER 20 H Depth Paso 40 ft Separation 10 0 ft Width 24 0 in Fixed Temperature Pipe Configuration in Trench Inlet Temperatures 85 0 E SU F See LU Trench Number 20 2 o c Separation Foo ft z O Depth 240 ft i Total Number of Pipes 3 width 24 0 in 5 Vertical Separation Y 240 in Horizontal Separation X 12 0 Sin Cooling Tower Boiler DO Modeling Time Period o O49 Prediction Time 10 0 years Load Balance Fig 5 1 The Expanded User Interface The Horizontal Design module includes several additional features e Metric and English unit conversion Printed reports of all input data and calculated results Convenient buttons to bring up tables and calculators A Calculate button used to refresh the calculations Boiler and cooling tower hybrids Opening Projects There are two
70. ctor 0 00 0 00 Flow Rate 3 0 gpmjton Unit Inlet F 85 0 50 0 Fig 3 10 Average Block Loads Module M Average Block Loads Untitled zon Monthly Load Data Update po E p Total Peak Total Peak Cancel atu of amp KBtu hr 0 kBtu Dj atun 2 January February March April August September October November December Total o a n 0 A A o A A MS o _ 9 ao 2 IM a Lo EE g E E ME e Hours at Peak Flow Rate 3 0 gpmiton Unit Inlet F Fig 3 11 Monthly Loads Input Boxes in Average Block Module 50 CHAPTER 3 Loads and Zones Managing the Average Block Loads The buttons along the top of the Average Block Loads module are used to work with the single panel of loads information A closer view is shown in figure 3 12 cje lala 2 Fig 3 12 Average Block Loads Module Controls The buttons on the left are zone editing controls and include only New and Clear To the right are the Open and Save buttons for opening and saving the zone files along with the Print button for printing various zone reports The last button on the right is the Import Loads button which is explained towards the end of this chapter Unlike the Zone Manager there are no Auto Select buttons 5 New A new set of loads data may be created initially by clicking the New button Since only one panel is allowed this button becomes
71. d Loop Design Overview both the water and the soil between the installation and the submerged circuits The program combines all factors so that the loop system provides the source inlet temperature at the heat pump requested by the designer Because the circuit layout is of primary importance to the designer concerned with pumping losses the head loss estimation feature for different piping configurations is included in the Surface Water Design module Users can quickly explore different layouts to determine the optimum design in terms of both heat transfer and circulation pump energy losses A description of some of the calculations and the input data can be found in Chapter 7 of the book Ground Source Heat Pumps Design of Geothermal Systems for Commercial and Institutional Buildings by S P Kavanaugh and K Rafferty 1997 Additional Modules Reports Ground Loop Design s Design Studio has the potential for additional modules that may be included in later versions These modules would also be able to take advantage of the Design Studio s heat pump and loads models Ground Loop Design s reporting features allow the designer to make hardcopies of both the data entered and the resulting calculations These reports are design records and are valuable when communicating the design to others involved in the projects Project Reports Every design module has associated project reports which can be printed at any time from the
72. d upon the solution for heat transfer from a cylinder buried in the earth The method was developed and tested by Carslaw and Jaeger Carslaw and Jaeger 1947 The solution yields a temperature difference between the outer cylindrical surface and the undisturbed far field soil temperature Ingersoll suggested using the equation and its solution for the sizing of ground heat exchangers in cases 15 CHAPTER 1 Ground Loop Design Overview where the extraction or rejection occurs in periods of less than six hours where the simple line source model fails Ingersoll 1954 The borehole module s equations include the suggestions of Kavanaugh and Deerman who adjusted the methods of Ingersoll to account for U tube arrangement and hourly heat variations Kavanaugh and Deerman 1991 It also employs the borehole resistance calculation techniques suggested by Remund and Paul to account for pipe placement grout conductivity and borehole size Paul 1997 Additionally the software calculates the amount of energy absorbed by or withdrawn from the ground using the load information collected from the individual zones and their relationship to the equipment selected The calculations find the conditions for long term steady state operation of borehole fields based on the desired heat pump inlet temperatures In order to provide an optimum design and prevent system failure the combination of parameters must allow for proper extraction or dissipation
73. dard header which will most likely come either directly from the installation or from a manifold that comes from the installation main supply and return lines Branches These will be any branches that split from the primary headers Generally they will be smaller in size than the primary header Details Reference Only The surface water details are not used in any calculations They are included for the designer s reference Several different types of water bodies are included but the designer can type anything in the selection box Piping The Piping panel contains all the information related to the circuit piping and the piping selected for the primary header s and up to one level of branching off the primary header s The heat exchanger circuits actually dominate the heat transfer but if the supply and return lines are long or exposed to different design conditions care must be taken with the header heat transfer The input screen for the piping circuit panel is shown in figure 6 3 Figure 6 4 is a view of the piping controls in the expanded user interface Figure 6 5 is the input screen for the piping header panel 114 CHAPTER 6 The Surface Water Design Module E Surface Water Design Project 41 Results Fluid Soil Piping Surface water Extra kW Information Circuit Circuit Parameters Circuit Pipe Size E in 25 mm Number of Parallel Circuits Cooling 11 Circuit Style C Coil Primar
74. del also uses weekly and annual operational time as parameters The hours can be computed from monthly loads data using the Equivalent Hours Calculator Chapter 3 In Ground Loop Design Premier Version 5 0 users have the option of calculating month by month inlet temperatures in the borehole design module Performing these calculations requires detailed monthly loads data and therefore the average block module in version 5 0 now accepts the input of monthly total and peak loads for both heating and cooling Note that these data are necessary for calculating month by month inlet temperatures Loads modules are covered in detail in Chapter 3 12 CHAPTER 1 Ground Loop Design Overview Design Modules The Ground Loop Design Geothermal Design Studio consists of the following three design modules The Borehole Design Module In fixed temperature mode this module models the lengths of bore required for a vertical borehole exchanger system In fixed length mode it models the inlet temperatures for a user defined borehole field length Additionally the borehole design module can model and graph the monthly inlet temperatures for the design if monthly loads data have been input into the Average Block loads module The Horizontal Design Module This module determines the length of piping required for a horizontal slinky exchanger system The Surface Water Design Module This module determines the length of piping required when a c
75. del in the Average Block module is slightly different from the model for the individual zones A single pump type is selected from the Ground Loop Design Heat Pump Database to approximate the average pump characteristics of the installation For example if the designer is planning to use the highest efficiency pumps a pump in a series with a higher coefficient of performance COP might be chosen over a lower efficiency pump If specific pump characteristics are required they can be input directly overriding the automatic functions Two views of the Average Block Loads Module are shown in figures 3 10 and 3 11 Although it resembles a single zone in the Loads tabbed panel of the Zone Manager loads module it has some differences there is a monthly loads button there is no list of zones and the pump matching section has a different format 49 CHAPTER 3 Loads and Zones 4 Average Block Loads Untitled zon Reference Label Design Day Loads Design Day Loads Days Occupied Time of Day Heat Gains Heat Losses per Week kBtujHr kBtu Hr 7 0 8 a m Noon e Transfer Monne 4p m Bp m Calculate Hours Sp m 8am 0 0 00 Monthly Loads anneqyFubtoadtrs o o r Heat Pump Specifications at Design Temperature and Flow Rate IV Custom Pump Pump Name Cooling Heating Capacity kBtu Hr 0 0 0 0 Details Power kw 000 0 00 EER COP e 0 0 Flow Rate gpm 00 0 0 Partial Load Fa
76. disabled after a new set appears It is re enabled when the set is cleared B Clear To delete all of the current information press the Clear button Entering Loads The method of entering loads data into the Average Block is nearly identical to the method used in the Zone Manager There are two main differences The first is that the summed loads values may be larger than the smaller values used in individual zones Refer to the Zone Manager Entering Zones section or the end of this chapter for specific details about the Design Day Loads Annual Equivalent Full Load Hours and Days Occupied per Week sections Note that the Annual Equivalent Full Load Hours can be calculated for the entire installation using the Equivalent Hours Calculator The second difference is that the loads data entry method has been expanded to accept monthly loads data Monthly loads data are necessary for calculating monthly inlet temperatures in the borehole design module Note that adding monthly loads is necessary only if a designer wishes to calculate monthly inlet temperatures for a vertical borehole heat exchanger 51 CHAPTER 3 Loads and Zones Monthly Loads Sev To access the monthly loads data input panel as seen in figure 3 13 click on the Monthly Loads button Monthly Load Data aos ces K eatn _Update Total i a Total ce _ Cancel gen 2 gema 2 geny 0 en 2 muay Ff FG of 9 February 9 9 0 mach Yf 9 d 9 Apri AL ee eee M
77. dow is shown in figure 3 15 and its corresponding loads entry is shown in figure 3 16 Note that in the Average Block loads module imported monthly total and peak data are automatically imported into the monthly loads input boxes as seen in figure 3 13 J Import Loads Import Data Filename Sample gt1 Generated By Trane Trace 700 g Total Peak Monthly kBtu kBtu hr Load Factor January February March April May June July August September October November December Total Max 860778 0 Full Load Hours 1559 hr Modify Fig 3 15 Import Loads Window 57 CHAPTER 3 Loads and Zones Design Day Loads Design Day Loads Days Occupied Time of Day Heat Gains Heat Losses per Week MBtuj Hr MBtusHr 7 0 8 a m Noon 157 2 al 4 ae Noon 4p m 552 1 Transfer 4p m 8p m 157 2 Calculate Hours 8pm 8am 1572 00 Annual Equivalent Full Load Hours 1559 Fig 3 16 Results of Importing The Import Loads window displays the imported data the filename and the name of the program that generated the file Total loads and peak demand data are presented on separate screens for cooling and heating Use the buttons on the bottom of the window to toggle between the two On the right is the monthly partial load factor calculated by Ground Loop Design The data can be modified directly in the Import Loads window or by hitting the Modify button the user can open the file in t
78. e on the Results panel After all data has been entered or any changes have been made the user can calculate interim or final results using the Calculate button The Calculate button is also available in the expanded user interface as see in figure 5 5 A sample screen for the Results panel can be seen in figure 5 11 Results are also displayed in the expanded user interface as see in Figure 5 12 103 CHAPTER 5 The Horizontal Design Module i Borehole Design Project HorizontalSample_1 Results Fluid Soil Piping Configuration Extra kw Information Calculate COOLING HEATING Total Trench Length ft 4145 9 8177 4 Trench Number 20 20 Single Trench Length ft 207 3 408 9 Total Pipe Length ft 12437 6 24532 1 Single Trench Pipe Length ft 621 9 1226 6 Unit Inlet F 85 0 50 0 Unit Outlet F 95 2 44 0 Total Unit Capacity kBtu Hr 469 6 464 7 Peak Load kBtu Hr 342 0 243 0 Peak Demand kw 27 4 18 2 Heat Pump EER COP 12 5 3 9 System EER COP 12 5 3 9 System Flow Rate gpm 85 5 60 8 Optional Cooling Tower Boiler Condenser Capacity kBtu hr Cooling Tower Flow Rate gpm Cooling Range F Annual Operating Hours hrfyr Condenser Capacity kBtu hr oO Fig 5 11 Results Panel Contents Lengths Temperatures AA COOLING HEATING COOLING HEATING Total Trench Length Ft 4145 9 8177 4 Unit Inlet F 85 0 50 0 Single Trench Lenath Ft 207 3 408 9 Unit
79. e reports included with Ground Loop Design Detailed Form Concise Form Equipment List Loads List Names List Detailed Form The Detailed Form zone report is the most detailed zone report It lists all of the information included in every zone along with full explanations of the listed parameters The format is open and easy to read However as with the project reports the detailed form produces a much longer printed report than any of the more compact versions Concise Form The Concise Form zone report contains most of the detail of the long report but it is packed into a smaller space It does not include zone names occupation days detailed pump information manufacturer series and type or full descriptions of the items listed It does however contain important information about the loads and the operational parameters of the equipment matched to those loads Equipment List The Equipment List lists only the equipment associated with each zone It provides detailed pump information including name number manufacturer series and type plus all of the operational data associated with that pump It is an ideal report for engineers or contractors who require equipment lists but do not necessarily need to know further details about the design Loads List The Loads List lists only the loads associated with each zone It provides the design day loads at the different periods during the day in both heating and 128 CHAPT
80. e upper right hand corner of the lower pane closes the Pumps Edit Pane and clicking the close button in the upper right hand corner of the Edit Add Heat Pumps window closes the Edit Add Heat Pumps module Closing without saving edited data will initiate a dialog box that reminds the user to save the data before closing 34 CHAPTER 2 Adding Editing Heat Pumps Heat Pump File Descriptions There are two types of files created by the Edit Add Heat Pumps module The first is the Pumplist gld file which maintains the current master list of manufacturers and the series associated with those manufacturers The Pumplist gld file also includes the filenames without the hpd extension of the heat pump data files associated with the individual series The second type of file is the hpd heat pump data file for each individual series of pumps This file type keeps track of all the data input by the user as well as the pump names and the coefficients calculated within the module Since hpd files cannot be deleted by the program unless they are accidentally overwritten many difficulties usually can be overcome by just adding new pump sets or if necessary editing the Pumplist gld file directly The format of the Pumplist gld file is given in the Preface page 3 Adding Pump Sets Obtained From External Sources To provide the greatest amount of flexibility to the user Ground Loop Design allows the user to obtain heat pump data f
81. ection box that requests direction as to whether to use an existing manufacturer or to create a New Manufacturer After the user makes a selection the panel changes to show information about the manufacturer and series The manufacturer information will be editable if the series belongs to a new manufacturer The Edit Add Heat Pumps module with an open Pump Information panel is shown in figure 2 1 fa Edit Add Heat Pumps m xj New Series 7 Series Name y p Pump Information New Manufacturer Eg Manufacturer Information gt Series Information Manufacturer s Name Series Name Street Filename without extension Ee ee City State Zip Entry Date 7 27 2001 y Country m Phone p Proceed Cancel Fig 2 1 Pump Information Panel 27 AN CHAPTER 2 Adding Editing Heat Pumps After the user enters all the data and clicks the Proceed button all of the information for the series being added will be stored in the Pumplist gld file Note that the information marked with an asterisk must be included before the user is allowed to proceed Editing Pump Data Once the new pump series information is entered or an existing pump series is selected from the upper pane the Pump Edit pane will appear in the lower pane of the Edit Add Pumps module as shown in figure 2 2 There are two sub panes The left sub pane is a list of the pumps a
82. ed automatically from the undisturbed temperature and the other input values provided These values are used in the heat transfer calculation between the header or branch pipes and the soil Fluid The fluid panel is identical to the one described for the Borehole Design module in Chapter 4 except for one addition That addition is the minimum required circuit flow rate in the lower Minimum Circuit Flow Rate and Solution Properties section The added section is shown in figure 6 7 As in the other 120 CHAPTER 6 The Surface Water Design Module modules the inlet temperatures can be viewed and modified from the expanded interface as seen in figure 6 8 m Minimum Circuit Flow Rate gt Cooling 2 8 gpm Heating 42 gpm Fig 6 7 Minimum Circuit Flow Rate Section of the Fluid Panel Ground Loop Design uses this information in conjunction with the system flow rate to establish the maximum number of parallel circuits The flow rates required for non laminar flow for several antifreeze solutions are included as a table in the Fluid Properties set Exact values for a particular mixture may need to be determined independently by the designer Note once again that changes in the inlet source temperature or the system flow rate will cause an automatic update of the selected pumps Design Method Fixed Temperature Inlet Temperatures 55 0 F 36 0 Fig 6 8 Inlet Temperature Controls i
83. election process is identical to selection in the Zone Manager loads module the results are slightly different Figure 3 14 shows the result after selecting a pump and then modifying the partial load factor to 0 9 on the dominant load Heat Gains side Design Day Loads Design Day Loads 7 0 Days Week Time of Day Heat Gains Heat Losses kBtufHr kBtufHr Transfer 8am Noon 0 0 300 0 Noon 4p m 500 0 200 0 _Caleulate Hours 4p m 8p m 200 0 0 0 Monthly Loads 8p m Sam 0 0 00 Annual Egivalent Full Load Hours Heat Pump Specifications at Design Temperature and Flow Rate Custom Pump Pump Name E 048 Cooling Heating Select Capacity kBtu Hr 556 6 566 3 Details Power kW 4445 41 01 Clear EER COP 125 Re Flow Rate gpm 125 0 750 0 90 0 53 Partial Load Factor Fig 3 14 Average Block Loads Pump Selection In this case an average pump was selected for the zone and that pump was given a partial load factor of 1 00 for the dominant cooling side Since the partial load factor the ratio between the peak loads and the total equipment capacity varies depending on designer preference it can have any value of 1 0 or less Additionally the partial load factor will remain constant as the continuous update feature modifies the pump values due to changes in the temperature or the flow rate The partial load factor plays a small role in the heat exchanger length determination calculations
84. equation The program determines the depth of each pipe in the chosen configuration and then calculates the expected temperature at that depth 100 CHAPTER 5 The Horizontal Design Module Regional Air Temperature Swing This is the temperature swing for the location of interest It is a measure of the average temperature variation of the region during the warmest and coolest months as compared to the yearly average temperature Regions with temperate climates have a lower temperature swing than regions that have large differences between summer and winter temperatures Coldest Warmest Day in Year These are the actual days of the year on a 365 day scale when the temperature is usually coldest or warmest For example if February 3 is approximately the coldest day of the year the value entered will be 34 31 days in January plus 3 days of February Fluid The circulating fluid parameters may be entered in the Fluid panel A sample input screen is shown in figure 5 9 In the expanded user interface fluid temperatures can be viewed and modified at any time as seen in figure 5 10 Design Heat Pump Inlet Fluid Temperatures The heat pump inlet fluid temperatures are included in the Fluid panel The designer can input the desired inlet source temperatures for both heating and cooling here When changes are made to these values the heat pumps in all zones are updated automatically Since the new calculated equipment capacities
85. ers can have Ground Loop Design calculate monthly inlet temperatures for a user defined modeling time period see soil tabbed panel and figures 4 11 and 4 13 After hitting the Calculate button users can hit the Monthly Data button in either the standard or the expanded user interface to calculate monthly inlet temperatures Depending on the modeling time period and the computer resources this calculation may take several seconds to complete After the calculation is done maximum entering and exiting fluid temperatures for both the heating and cooling sides are displayed in purple as shown in figures 4 18 and 4 19 Note that the inlet temperatures that result for the monthly data calculations are not always equal to the initial temperatures selected in the fixed temperature mode or calculated in the fixed length mode This is because the program is using the more detailed data set in a stepwise manner to calculate the temperature buildup over time The differences that result are due to differences in the theoretical model methodology sev Additionally after hitting the Monthly Data button the graphing icon button will appear In addition a TempData txt file that contains the temperature data is generated and can be found in the Ground Loop Design folder If necessary data from this file can be imported in Excel Note Monthly data can be calculated for boiler cooling tower systems by first hitting calculate then addi
86. esentations of zone data can also be printed as reports Managing Zones in the Loads Tabbed Panel The buttons along the top of the Zone Manager are used to work with the zones A closer view is shown in figure 3 2 3 smal 2 9 9 Fig 3 2 Zone Manager Control Buttons The five buttons on the left side are zone editing controls and they include New Copy Remove Renumber and Clear A Summary view of all the zones can be obtained by hitting the sixth or Summary View toggle button The next three buttons are the Open and Save buttons for opening and saving the zone files and the Print button for printing various zone reports The next button is the Import Loads button a description of which can be found towards the end of this chapter under Importing Loads Data from External Programs The final two buttons on the far right are for pump selection across the entire set of zones and include Auto Select All and Update Reselect which are discussed in more detail below L New and Copy A new zone may be created at any time from the Loads panel by clicking the New button Identical zones may be created from any existing zone by bringing up that zone s data window and clicking the Copy button EJ Remove and Clear Zones also can be deleted from the list Any zone can be removed from the list by bringing up the zone s data window and pressing the Remove button To delete all of the zones in the list press the Clear but
87. for the system being designed They represent the annual number of hours the system will be running if operating at full load and are a measure of the system running time 42 CHAPTER 3 Loads and Zones This system is used both to limit the amount of data the user must enter and to simplify the calculations It is identical to methods that require input of all the monthly data but more concise since it represents the total energy input to the ground in terms of the peak load Month to month variations are not necessary in the annual monthly daily pulse model used in Ground Loop Design For example if a loading report provides the number of Btus required by this zone each month the hours per month will be obtained by dividing the monthly Btu requirement by the peak Btu h value The resulting number will be the monthly equivalent full load hours To get the annual full load hours the value will need to be obtained for every month that required heating or cooling and then combined to finally get the annual equivalent heating or cooling hours If exact values are not available an estimate should be made with regard to the expected running time of the unit in each particular zone Estimates of time must be reduced of course from actual running time since the annual equivalent full load hours represents the running time if the system were operating continuously at full load which is not generally the case Equivalent Hours Calculat
88. formation related to the project is stored in this panel This primarily includes the names of the project and designer and the dates Reference data concerning the client also can be included on this page so that all relevant project information is in one convenient location In addition to generalized project information specialized comments can be included in the Comments section of the Information panel This area allows the designer to make any notes particular to the specific project that may not necessarily fit under any of the other topics provided All of the data in the information panel is optional but completing the page is recommended for the sake of organization Reports utilize the project information as a way of distinguishing one project from another Except for the dates the information panel input boxes contain only text and any desired format may be used when filling out the form 66 CHAPTER 4 The Borehole Design Module Ei Borehole Design Project verticalsampleforManual 3 x Results Fluid Soil U Tube Pattern Extra kw Information l Project Information Project Name Borehole Design Sample Project Designer Name D B Engineer Date 10 5 2007 Project Start Date 10 5 2007 Client Name ABC Corp 1 Address Line 1 1333 Any St Address Line 2 Suite 2200 City Anytown Phone f555 555 1212 State Fax 555 555 1213 2p Ba Ema Comments This is a sample borehole
89. further modify the various cooling tower parameters to match them to his or her own system The standard equation used in the program Francis 1997 is Condenser Capacity Btu hr Flow Rate gpm x 500 x Temperature Difference F where the 500 is used for pure water and represents a factor derived from Specific Heat of Water 1 0 x 60 min hr x Density 8 33 lb gal 500 Note that Ground Loop Design actually calculates this factor from the input fluid properties on the Fluids panel although pure water is a logical choice for most cooling dominated applications For example if the cooling range is increased above the initial minimum value the capacity of the condenser also is increased reducing the total number of operating hours However in the same case decreasing the required flow rate is another option which would keep the condenser capacity and operating hours unchanged The only limitations are the required temperature difference and the minimum condenser capacity needed to meet the chosen design length With Ground Loop Design users have the flexibility to choose the parameters that fit best in their designs Fev Boilers In Ground Loop Design boilers are similar to cooling towers except that they are added in order to reduce the overall heating load on the system In this case the user may actually reduce the peak and annual heating loads by the flat percentage defined by the slider value The required boiler cap
90. g 3 9 Heat Pumps Tabbed Panel 48 A CHAPTER 3 Loads and Zones It represents the primary heat pump family utilized by the designer for a particular project Although this is the primary series other pumps may still be selected for certain zones using either the Select button or by defining a custom pump To choose a pump series select a manufacturer followed by the desired series of that manufacturer A list of available pumps appears in the list box Inlet Load Temperatures Values for the initial inlet load temperatures for both water to air and water to water pumps may be entered in the appropriate boxes If necessary these values may be changed for individual pumps in the Loads panel For water to air pumps WB refers to Wet Bulb and DB refers to Dry Bulb temperatures Ja The Average Block Loads Module If detailed zone style modeling is unnecessary for an initial calculation or if information is incomplete for a component based design or if the user desires to calculate monthly inlet temperatures for a borehole design the Average Block loads module is a better option than the Zone Manager and in the case of monthly inlet temperatures the only option The required input consists of only a single set of loads which represents the entire installation This single set of loads data optionally can be entered in a new month by month loads screen for inlet temperature calculations The pump matching mo
91. g Tower and Boiler cecceceecee eens eee ene es 86 Printing Reports 4 2202 252 02208 a a 89 Chapter 5 The Horizontal Design Module oocccoccccccronnronon 90 OVEVIE Wat det do dde loci dado E A 90 General Features sic csvset dt tdt calada edehuseeuatede 90 iii CONTENTS Opening Projects o sce E tia 91 New Projects ii a eee 92 Existing Projects iii dah c deed Ar E R E Ra 92 Saving Projects Ayoreo ai tE E ide da 92 Typical Op ration a a als 92 Entering Data into the Tabbed Panels 0 ccc cceec cee ce cence eee eeetteeeee eens eneeaeneees 93 CONPIQUL ALI ON 235s so aes is 93 Trench Layout 3 ies st Saleem thane de 93 Pipe Configuration in Trench ccceceec eee ee eee eeeneee eee een enes 94 Straight Pipe Configurations cccceeceeceeeec eee eeeneeeeneeeeaes 95 Single Pipe Vertical Alignment 95 Two Pipe Vertical Alignment ceceecee eee esre rrer 95 Three Pipe Vertical Alignment 95 Slinky Pipe Configurations cccceceeceeeee eee eeeetee eaten een enes 95 Vertical Slinky ici id 96 Horizontal Slinky ooooococcocconcnconcnnononncnnononnonnnnnnns 96 Modeling Time Period ccceceececeec ene ee eee ene ea enene eae eaenaens 96 PPNO EP BE oP a de ade aan etapa ea ire nici E ance A A cee EU 97 Piping Parameters s h0s cscs a salen an 97 OMA A ya ee aed ete eae Momeedsee eaves 99 Undisturbed Ground Tempera
92. ghts Customer agrees to maintain and reproduce all trademark copyright patent and notices of other proprietary rights on all copies in any form of the Software in the same form and manner that such trademark copyright patent and notices of other rights are included on the Software Except as expressly authorized in this End User Agreement Customer shall not make any copies or duplicates of any Software without the prior written permission of Gaia Customer may make such backup copies of the Software as may be necessary for Customer s lawful use provided Customer affixes to such copies all trademark copyright patent and notices of other proprietary rights that appear on the original Proprietary Rights Customer shall own the physical media on which the Software is recorded but the Software is and will remain the sole and exclusive property of Gaia Gaia s rights under this Section will include but not be limited to i all copies of the Software in whole and in part and ii all Intellectual Property Rights in the Software For purposes herein Intellectual Property Rights means patent rights including patent applications and disclosures copyrights including but not limited to rights in audiovisual works and moral rights trade secret rights rights of priority and any other intellectual property right recognized in any country or jurisdiction in the world Moral Rights means any right to claim authorship to or to objec
93. gram will reactivate again How To Transfer the Program Between Computers The dongle licensing system allows the user to transfer the license from one computer to another If a user decides to transfer Ground Loop Design from one computer to another all he or she has to do is the following e Install Ground Loop Design onto the target computer e After the demo version of the program is running on the new computer attach the dongle and follow the above instructions regarding dongle driver installation CHAPTER 1 Ground Loop Design Overview CHAPTER 1 Ground Loop Design Overview This chapter is an introduction to the Ground Loop Design Premier software package It introduces new features the Design Studio the Heat Pump and Loads Modules the Borehole Horizontal and Surface Water Design Modules the reporting functions and the data reference files There is also an explanation of the theoretical and experimental basis for the program s calculations General Program Features Ground Loop Design Premier is a Geothermal Design Studio that provides the user with a freedom that single purpose software cannot offer The program is modular and permits flexibility in the designing process and customization based on designer preferences Additionally it has an English metric unit conversion option providing applicability to the widest range of equipment and customers Because the software is available in different language
94. gt lt body gt lt html gt PipeTables html edited version 134 CHAPTER 8 Tables and Reference Files Making a Table A new table can be made at any time by creating one as an HTML file The easiest way to do this is to use an HTML editor It is much more difficult to make a table using plain HTML in a text editor Although any name is valid for a table tables can be added to the appropriate group by just extending the naming sequence already being used For example the name PipeTable4 html could be used as the name for a new file Adding a Picture Graph or Figure If an image is stored as either jpg or gif it can be imported into an HTML page The HTML page can be linked directly to the Ground Loop Design reference files As an example let s assume that an engineer scans an image of his favorite density vs percent solute graph for Calcium Chloride and saves it in the Help Files directory as a jpeg image called CaCI2Density jpg A very simple HTML file can be created with a text editor and called FluidTable6 html The entire FluidTable6 html file would be as follows lt html gt lt head gt lt head gt lt body gt lt img SRC CaCl2Density jpg gt lt body gt lt html gt FluidTable6 html Remember the FluidTables html file would have to be edited to include the new link to the FluidTable6 html file similar to the example given in Editing Existing Files above If
95. h black dot represents a borehole 2 Open up a text editor and in the first line of a new text file specify whether the grid file is in metric or English units Since this grid is in meters the first line of the grid file should say Metric 3 In the text file begin listing the boreholes in the grid file as can be seen below Note that the first borehole is at the origin 0 0 Grid file for sample X Y grid Metric 0 0 0 8 0 16 0 24 0 32 0 40 0 48 0 56 0 64 10 0 10 8 etc 72 CHAPTER 4 The Borehole Design Module After a grid file is created it must be saved in the following folder Gaia Geothermal Ground Loop Design Grid Files so that the Ground Loop Design program can find the grid file After creating and saving a grid file load it into the heat exchanger module by first checking the Use External File checkbox and then hitting the Select button to choose the desired file as seen in figure 4 7 ertical Grid Arrangement Borehole Number 16 ES zw Ey WV Use External File Clear Show Filename GridData txt Fig 4 7 Selecting an External Grid File The file name will appear directly below the checkbox In this case the filename is GridData txt When a valid grid file has been selected the number of boreholes in the file is displayed and the standard rows across rows down and borehole separation text boxes become inactive If Ground Loop Design is unable to read t
96. he Equivalent Hours Calculator where the data can be edited as well The user can transfer the modified data into the loads module by pressing the Transfer button When both the Calculator and the Import Loads windows are open the program first will ask the user from which window the Calculator or the Import Loads window he or she wishes to transfer data The program then prompts the user to decide to which loads heating or cooling the data should be transferred Using the Import Loads Command for Excel Data The easiest way to import data from an Excel file is by using the Import Loads command found in the Design Studio Loads menu Select Import Loads and an Import Loads window similar to that in Fig 3 13 will appear Ground Loop Design expects the Excel data to be in the following column order and units Note that Ground Loop Design can accept a maximum of 12 data rows per column Also note that the column order is different from the column order in previous versions of Ground Loop Design Month Total Cooling Peak Cooling Total Heating Peak Heating 1000 BTU 1000 BTU hr 1000 BTU 1000 BTU hr January December To import the Excel data simply highlight the four columns in the Excel spreadsheet and copy them onto the clipboard Ctrl C Note highlight only the numeric data DO NOT highlight the column and row descriptions Then in 58 CHAPTER 3 Loads and Zones the Import Loads window cl
97. he grid file for example if the formatting is incorrect then Ground Loop Design will revert to the standard rectangular grid rows across and rows down Click the Show button to review the selected grid file at any time When a gridfile is selected it is indicated in the expanded user interface as seen in figure 4 8 V Use External File Borehole Number 16 Filename GridData txt Fig 4 8 Use of External File Indicated in Expanded User Interface 73 CHAPTER 4 The Borehole Design Module Boreholes per Parallel Loop The number of boreholes per parallel loop refers to the piping Ge arrangement within the borehole pattern The calculation will give Cer slightly different bore lengths depending on whether one two or more boreholes are included in one parallel circuit Remember that pumping costs will increase as the pipe lengths per parallel circuit become longer sev Fixed Length Mode By selecting fixed length mode the designer can specify the loop field length number of boreholes x length per borehole and have Ground Loop Design calculate the entering water temperatures When in fixed length mode it is important to note that both cooling and heating lengths are identical unlike in the fixed temperature mode where designers specify temperatures and calculate lengths The expanded user interface displays the design mode fixed temperature or fixed length as well as adjustable parameters associated w
98. he standard tools included in the Geothermal Design Studio If the designer knows the monthly total loads and peak demand he or she can simply input them into the boxes provided in the calculator Pressing Calculate then determines the hours according to the summation and division described above When the user presses the Transfer button in any loads module when the calculator is showing the values will be transferred directly into the loads module as previously described Surface Water Design Loads The Surface Water Design Module does not require the loads input detail of the other design modules Since there is no long term build up of heat in the water the only values that are actually required are the peak demand of the installation All other values may be set to zero or included simply for reference 62 CHAPTER 4 The Borehole Design Module CHAPTER 4 The Borehole Design Module This chapter describes the features and operation of the Borehole Design module This module is used in the design of vertical borehole systems It is one of the three design modules included with Ground Loop Design Overview A design is only as good as the quality of the data that goes into it This is certainly the case with the Ground Loop Design Borehole Design module Although Ground Loop Design utilizes the best theoretical models available today the most accurate results will naturally result from the most accurate input parameters Be
99. heat pump and loads modules are closely related users can match heat pumps to the loads automatically or manually An advantage of this design is that the heat pump selection and the loads modules can be connected directly with the various design modules available in the studio Therefore one type of loads and heat pump data can be used for all designs 10 CHAPTER 1 Ground Loop Design Overview Heat Pump Module In Ground Loop Design heat pump data can be entered into a separate module that keeps track of all of the pumps stored in the Ground Loop Design s Heat Pump Database Families of heat pumps from various manufacturers can be added to the existing pump set maintained by the user In this way heat pump data obtained from any source easily can be included within the software to take advantage of the automatic equipment sizing features of Ground Loop Design Recent data from popular heat pump manufacturers is included with Ground Loop Design However any pump set can be added to the list The heat pump model only requires that certain data from heat pump specification sheets or from software provided by the manufacturer be entered into the Edit Add Heat Pumps module The model in Ground Loop Design requires the input of a minimum of six data points for both heating and cooling modes These data points relate capacity and power to the inlet source temperature and are fit using a polynomial line to provide an accurate model for the
100. hifted from the pipe layer below by one half the given horizontal separation X 2 Three Pipe Vertical Alignment In this arrangement the user defines three pipe layers The number of pipes chosen defines how many layers will be included 3 6 9 etc Each vertical layer is separated from the one above or below by the given vertical separation Y If the Offset box is checked every layer will be shifted from the layer below by one half the given horizontal separation X 2 SLINKY PIPE CONFIGURATIONS In the case of the horizontal and vertical slinky configurations the user 95 CHAPTER 5 The Horizontal Design Module Pipe Configuration in Trench ie Loop Pitch P 10 0 in Loop Diameter D 36 0 in c Fig 5 4 Slinky Variables may define the pitch and diameter of the Slinky Because of the limited model employed the pitch must be between 10 and 56 inches and the diameter must be 36 inches See figure 5 4 Vertical Slinky In this arrangement the slinky is placed vertically within a trench and is resting at the bottom The trench may be as narrow as the pipe and soil allow Horizontal Slinky In this arrangement the slinky is placed horizontally at the bottom of the trench The minimum trench width depends on the slinky diameter Modeling time Period In Ground Loop Design ten years is used as a standard length of time for ground temperature stabilization
101. ibes the installation procedure and hardware and software requirements for the Ground Loop Design program Additionally the chapter introduces the licensing system Introduction Typical Uses and Users Ground Loop Design Premier is intended as a Design Studio for professional HVAC designers and engineers working in the area of geothermal applications It is primarily designed for use with light commercial or commercial installations since the calculations take into account long term thermal effects that often determine the necessary design requirements Additionally the loads representation employed in Ground Loop Design s Zone Management system allows for detailed equipment selection and specific load distribution data to maximize calculation accuracy The Premier Version of Ground Loop Design includes three design modules one for vertical borehole one for horizontal and one for surface water pond lake etc installations It also includes two loads modules one for average block loads and one for the more detailed zone model The loads data can be shared between modules using Ground Loop Design s unique linking system In addition loads data from external loads programs as well as from Excel files conveniently can be imported into the loads modules PREFACE Because of the extensive customization and override features included in the software Ground Loop Design is suited ideally for both standard and non standard applications
102. ick on the Excel icon The data will be imported Data can be modified if necessary and transferred into the loads modules following the method described above in Using the Import Button for Commercial Loads Programs Files Note that it is possible to import a single column of data Following the column order listed above put the single column of data in the correct position Fill the remaining columns with zeros and then copy all four columns to the clipboard When Imported Data is Not Detailed Enough How the Program Modifies External Loads Files In the case of a loads program that generates only total monthly loads and peak monthly demand nothing is known about the daily hour by hour transfer of heat to or from the installation This information is important in the Borehole and Horizontal Design modules because the hourly data ultimately determines the contributions to the daily and monthly pulses of heat to the ground Ground Loop Design performs calculations based on daily monthly and annual heat pulses In this type of situation Ground Loop Design will use the peak demand and total monthly loads to determine a monthly partial load factor PLFm for the peak design month where PLFm actual run time per month run time if at full load per month Once the program calculates the PLFm it automatically determines the relationship between off peak period loads and peak period loads to assure that the monthly partial load fact
103. ight 8 p m to 8 a m This method of input not only provides the total load but also identifies when the equipment will be in use for the heat exchanger calculations Design Day Loads Design Day Loads Days Occupied Time of Day Heat Gains Heat Losses per Week MBtu Hr MBtufHr 5 0 8 a m Noon Transfer MEA Tok 4 p m 8 p m Calculate Hours 8 p m 8 a m Annual Equivalent Full Load Hours 1050 Fig 3 4 Sample Loads Input Data If only one peak value during the day is provided to the designer it can be entered into one or several of the time slots depending on how the loads will be expected to change during the course of a day Slightly reduced values can be added for off peak hours if the building still will be in operation but not at full load Insignificant time slots can be left at zero Note If only one peak load value is provided per zone the designer will need to be consistent in placing it in the same time slot for every zone This is because the software loops through all of the zones to determine which time of day has the highest loading requirements prior to performing its calculations If only cooling or only heating loads data are to be used all of the non used slots should remain as zeroes Only the side with the loads provided will be calculated Annual Equivalent Full Load Hours The hours entered into the lower section of figure 3 4 are determined from detailed annual loads data
104. ights granted hereunder without retaining any of the Software or any copies thereof or any rights thereto Except as otherwise expressly provided under this End User Agreement Customer shall have no right and Customer specifically agrees not to i make error corrections to or otherwise modify or adapt the Software nor create derivative works based upon the Software or to permit third parties to do the same or ii copy in whole or in part decompile translate reverse engineer disassemble or otherwise reduce the Software to human readable form Upgrades and Additional Copies For purposes of this End User Agreement Software shall also include and the terms and conditions of this End User Agreement shall apply to any upgrades updates bug fixes or modified versions collectively Upgrades or backup copies of the Software licensed or provided to Customer by Gaia or an authorized distributor for which Customer has paid the applicable license fees and holds the corresponding software keys Notwithstanding the foregoing Customer acknowledges and agrees that Gaia shall have no obligation to provide any Upgrades under this End User Agreement If Upgrades are provided Customer acknowledges and agrees that i Customer has no license or right to use any such additional copies or Upgrades unless Customer at the time of acquiring such copy or Upgrade already holds a valid license to the original Software Notices of Proprietary Ri
105. ign predict how heat pump characteristics will vary with changes in the input design parameters If the designer changes the inlet source or load temperatures or the system flow rate the capacity and power data of the units may also change The easiest and most accurate way of realizing these changes is to employ an internal model which the software uses to update the pump data automatically Using Ground Loop Design the designer can concentrate on the effects of variations without worrying about how the individual pumps in various zones will react to such changes 24 CHAPTER 2 Adding Editing Heat Pumps The heat pump model employed in Ground Loop Design reproduces the complete operational data of any particular unit when supplied with a few representative data points selected from across the range of interest Data for each pump can be entered into the model and grouped together under manufacturer and series headings The data need only be input once and then can be used repeatedly for subsequent modeling sessions Pump data is stored permanently in the pumps directory Many popular pumps from major manufacturers already are included with the program In both heating and cooling modes the minimum data required is the capacity and power variations with source inlet temperature To increase the modeling accuracy these same variations have to be included at a second flow rate Even more accurate results can be obtained if correction f
106. ii a Unit Inlet F 85 0 50 0 Unit Outlet F 95 2 43 7 Inlet Temperatures Has ele se G2 qe Ba Mey 7 de E ali en a 850 F 500 F Total Unit Capacity kBtu Hr 1976 9 1964 5 eak Load kBtu Hr A 4 i Peak Demand kW 130 9 EE Peak Load kBtu Hr 1626 0 1787 0 Heat Pump EER COP 4 Peak Demand kW 130 9 111 6 Sabha E ae Heat Pump EER COP 12 4 4 1 jazian 7 Use External File System EER COP 12 4 47 System Flow Rate gpm 406 5 Borehole Number 180 System Flow Rate gpm 406 5 446 8 Optional Cooling Tower Boiler PE E Optional Cooling Tower Boiler ae ened Sas Re m Cooling Tower Cooling Tower Flow Rate gpm 3 Condenser Capacity kBtu hr 0 0 a Separation 400 ft Hay eparation 0 0 z Cooling Tower Flow Rate gpm Cooling Range F Cooling Range F ioo 3 Annual Operating Hours hrfyr Annual Operating Hours hr yr 2 fy Boiler Capacity MBtu h Boiler Capacity MBtu h COOLING HEATING camu Load Balance oo Fig 1 2 Expanded Interface Borehole Design Module Description The Borehole Design module allows the user to enter various parameters with respect to the desired vertical borehole system Input is arranged in panels corresponding to the type of input as shown in figure 1 3 Key design parameters can be modified quickly in the expanded user interface as well see figure 1 2 above Results Fluid Soil U Tube Pattern Extra kw Information Fig 1
107. ile extremely limited data is enough for rough calculations Additionally if the data are available the designing engineer can enter his or her own pump sets to take full advantage of the automatic selection procedures Also different families of pumps can be used within a single project and even CHAPTER 1 Ground Loop Design Overview individual pumps not included in the pre defined pump sets can be employed as required Another area where customization is possible is in the data reference files which are based on HTML With a simple HTML editor the user can include any tables data pictures graphs charts or any other useful information that meets the user s needs User added files can supplement or replace the data reference files already provided with Ground Loop Design Metric English Units One of the intrinsic features in Ground Loop Design is the English metric unit conversion capability The English metric option can be used not only to compare values but it also can be used to quickly make use of specific equipment or loads data supplied in only one format Because the reports and data reference files automatically recognize the selected units users can obtain different reports and data lists depending on the state of the Design Studio Presentation and comparison of project information between different engineers and designers is now a straightforward process Internationalization The final major feature of Ground Loo
108. iles hpd files from external sources For example a heat pump set may be copied from a fellow designer or even downloaded from a participating heat pump manufacturer s website Since the original Pumplist gld file does not contain a reference to the externally obtained data set it must be added manually The procedure for this is as follows 1 Place the hpd file into the Ground Loop Design pumps folder 2 Add a New Series a If the series belongs to an existing manufacturer choose the appropriate manufacturer b If the series belongs to an unlisted manufacturer choose New Manufacturer from the list 3 Provide the Series Name and Manufacturer Name as required 4 Under Filename type the existing filename of the series to be added Note the existing filename is the hpd file the user just put into the pumps folder in step 1 above 5 Click Proceed Ground Loop Design will open the heat pump file for editing and will include it in its Heat Pump Database Additionally if this is a new manufacturer any included 35 CHAPTER 2 Adding Editing Heat Pumps manufacturer information will become visible for this pump set Since the Pumplist gld file has been modified it will register the new pumps for use in all modules opened afterwards 36 CHAPTER 3 Loads and Zones CHAPTER 3 Loads and Zones All of the calculations performed in Ground Loop Design fundamentally are
109. ir pages The system requires a very basic knowledge of HTML but it offers an extremely flexible system for user customization Detailed information on reference files and sample HTML can be found in Chapter 8 Program Help and Support Ground Loop Design contains a comprehensive searchable database of help topics Access this feature from the Design Studio Help menu Through the Help menu it is also possible to access the latest web resources and updates If these resources do not answer your question please contact your vendor for support References Carslaw H S and Jaeger J C Conduction of Heat in Solids Oxford Claremore Press 1947 Eskilson P Thermal Analysis of Heat Extraction Boreholes Doctoral Thesis University of Lund Department of Mathematical Physics Lund Sweden 1987 Hughes P J and Shonder J A The Evaluation of a 4000 Home Geothermal Heat Pump Retrofit at Fort Polk Louisiana Final Report Oak Ridge National Laboratory TN ORNL CON 460 1998 Ingersoll L R and Plass H J Theory of the ground pipe heat source for the heat pump Heating Piping and Air Conditioning 20 7 July 1948 Ingersoll L R Zobel O J and Ingersoll A C Heat conduction with engineering geological and other applications New York McGraw Hill 1954 Jones F R Closed Loop Geothermal Systems Slinky Installation Guide Rural Electric Research National Rural Electric Cooperative Association Oklahoma State Unive
110. is the head loss for the particular style of pipe These values are not entered automatically Instead they come from designer s charts A chart in English units is included with Ground Loop Design in the Pipe Tables section As mentioned above the designer must be aware that this value changes with pipe size temperature and flow rate Soil The Soil panel is included only for the heat transfer calculations associated with the portion of the header pipe in the soil The model uses the undisturbed ground temperature of the soil as well as several other parameters associated with the installation location to determine the temperature at pipe depth on the coolest and warmest days of the year This temperature then is used to determine how much heat is transferred from the header pipe to the soil or vice versa Once the amount of heat transfer from or to the soil is known the circuit pipe length calculated from the surface water data can be modified to provide fluid with the desired inlet source temperature to the heat pumps The Soil panel input screen is shown in figure 6 6 E Surface Water Design Project 1 Results Fluid Soil Piping Surface Water Extra kW Information Undisturbed Ground Temperature Ground Temperature 62 1 F Ground Temperature Corrections at Given Depth Depth of Header in Soil 40 ft Soil Type Wet Regional Air Temperature Swing 22 0 F Winter Summer Coldest Warmest Day in Year
111. it pipe It does not include any losses for the heat pump equipment which must be considered separately This section is convenient for determining the optimum pumping arrangement for the system 123 CHAPTER 6 The Surface Water Design Module Finally the system flow rate is listed along with the flow rates in the primary and branch headers as well as the flow in the individual circuits The system flow rate is calculated from the peak load divided by 12 000 Btu ton and then multiplied by the system flow rate in gpm ton as given on the Fluid panel The primary header flow rate is calculated from the system flow rate divided by the number of primary headers and the branch flow rate is obtained from the primary header flow rate divided by the number of branches as given on the Piping panel The circuit flow rate is obtained by dividing the system flow rate by the total number of circuits also provided on the Piping panel Printing Reports Reports of the active project can be printed at any time from the Design Studio using the toolbar print button or from the File menu gt Print The information printed includes all of the input parameters from the design module along with the associated results Zone and loads information can be printed separately from the Loads panel The filename of the zon file associated with the project report is also listed on the report Three different project reports are available concise detailed and
112. ith each mode For the fixed temperature mode the entering water temperatures can be adjusted while for the fixed length mode the borehole length can be modified This can be seen in figure 4 9 Fixes per Fixed Length ere e Borehole Length 300 ft Fig 4 9 Design Method in Expanded User Interface U Tube The U Tube panel contains information related to the pipe and bore The main purpose of the panel is to obtain a value for the borehole thermal resistance Calculated according to the method of Paul and Remund Paul 1996 the thermal resistance calculation takes into account the pipe parameters and positioning the borehole diameter and the grout thermal conductivity If desired an experimentally determined value of the borehole resistance also may be entered into the textbox which then overrides all calculations The panel contents are shown in figure 4 10 74 CHAPTER 4 The Borehole Design Module mi Borehole Design Project verticalsampleformanual Results Fluid Soil U Tube Pattern Extra kW Information Calculated Borehole Equivalent Thermal Resistance Borehole Thermal Resistance 0 231 h ft F Btu Pipe Parameters Pipe Resistance 0 104 h ft F Btu Check Pipe Tables Pipe Size 11 in 25 mm Outer Diameter 1 32 in atupe po a Inner Diameter 1 08 in Single Pipe Type SDR11 y C Double Flow Type Turbulent y Radial Pipe Placement Borehole Dia
113. ition p 456 p 98 John Wiley and Sons New York 1990 Paul N The Effect of Grout Thermal Conductivity on Vertical Geothermal Heat Exchanger Design and Performance M S Thesis South Dakota State University 1996 89 CHAPTER 5 The Horizontal Design Module CHAPTER 5 The Horizontal Design Module This chapter describes the features and operation of the Horizontal Design module This module is used in the design of near surface horizontal systems It is one of the three design modules included with Ground Loop Design Overview As with the Borehole and Surface Water Design modules the calculations made in the Horizontal Design module involve the combination of a large number of input parameters Care must be taken to assure that proper values are verified before use Assuming that reasonable values are provided to the software the software will provide a reasonable result General Features The Horizontal Design module in Ground Loop Design also includes a set of panels grouped by subject through which the designer can enter and edit the input variables in a straightforward and efficient manner For example parameters related to trench configuration are listed on the Configuration panel while piping choices are listed on the Piping panel Everything related to a project is presented simultaneously and easily is accessible throughout the design process In the expanded user interface mode which can be expanded by double cli
114. k and changes the Days per Week value to reflect this If other occupation times are desired the values will need to be changed manually to reflect proper distribution over the course of a month PLFm Days per Week 7 days x 4 hr x Peak Demand 8 12am 4 hr x Peak Demand 12 4 4 hr x Peak Demand 4 8 12 hr x Peak Demand 8pm 8am 24 hr x Top Peak Demand 0 448 7 days per Week 7days x 4 hr x 30 MBtu hr 4 hr x Y 4 hr x Y 12 hr x Y 24 hr x 30 MBtu hr or solving for Y Y 30 MBtu hr x 24 hr x 0 448 30 MBtu hr x 4hr 20 hr Y 322 56 MBtu 120 MBtu 20 hr Y 10 128 MBtu hr To preserve the partial load factor when transferring into the Design Day Loads 30 MBtu hr has to be transferred to the noon to four p m block as expected The 10 128 MBtu hr needs to be transferred into each of the other three blocks which represent the other 20 hours of the day Ground Loop Design performs the monthly partial load and the full load hours calculations automatically when it imports a file containing only monthly and peak loads data However if the designer knows more specific details about the installation in question he or she may want to place those loads more precisely in the actual in use periods of the day and consider also the daily occupation of the installation i e not in use on weekends etc However as long as the peak demand and partial monthly load factor
115. ks are broken Link status lights are described in more detail below 55 CHAPTER 3 Loads and Zones ETO Studio Link Status Lights Studio Link status lights are used to indicate when links are made when data transfer occurs and when links are broken They are located in the lower left hand corner of the design modules and the lower right hand corner of the loads modules Bro TO Connection Established First Light from Left The light furthest to the left indicates both whether or not a connection is established and the type of connection Ifthe light is off no connection is established Magenta indicates a link to an Average Block Loads module while light blue indicates a link to a Zone Manager loads module Katt Receiving Data Second Light from Left The second light from the left indicates when the module is receiving data from the other module It is green in color Sending Data Third Light from Left The third light from the left indicates when the module is sending data to the other module It is yellow in color CC Broken Connection Rightmost Light The light on the right turns red whenever a connection is broken It turns off again when connections are reestablished Importing Loads Data From External Programs With Ground Loop Design users easily can import loads data from both commercial loads programs and Excel files directly into the loads modules Import commercial loads programs data by clicking on
116. l Evo4s 2 0 0 0 850 SE 5 2 EVO48 2 28205 8202 S 520 Vso 62 ELO 3 EV048 i SS820S 2020 10500 21250 4736 IL 458 4 EVO30 T LADOS TOROS ADO ee 22m Bl 3 0787 5 EVO48 2 53 30 18 0 21 0 23 0 95 3 6 2 4 5 56 6 GEHA 036 2 42 0 10 0 15 0 18 0 66 0 5 3 3 7 64 Y COOLING HEATING Total Unit Capacity MBtu Hr 469 6 464 7 Peak Load MBtu Hr 342 0 243 0 Peak Demand kW 27 3 17 3 Heat Pump EER COP 12 5 4 2 Peak Load Period Noon 4 p m 8 a m Noon Flow Rate 3 0 gpmiton Unit Inlet F 85 0 50 0 Oooo Fig 3 3 Zone Manager Summary View Entering Loads Loads can be entered directly in the individual zone data windows back in the Main View of the Loads tabbed panel A sample entry is shown in figure 3 4 The Ground Loop Design loads input methodology may be new for some designers Consequently an additional and alternative description of the methodology can be found at the end of this chapter 41 CHAPTER 3 Loads and Zones Design Day Loads According to the model that Ground Loop Design uses average peak load data for every hour of a twenty four hour day can be included if desired However for simplification average peak loads for the design day or the day of heaviest usage in the year for both cooling heat gains and heating heat losses modes of operation can be input for up to four separate times of the day These include morning 8 a m to 12 noon afternoon 12 noon to 4 p m evening 4 p m to 8 p m and n
117. laminar Flow Tables 3 5 included only in English Units Table 3 Head Loss in SDR 11 HDPE Pipe 20 Propylene Glycol Table 4 Head Loss in SDR 11 HDPE Pipe 20 Methanol Table 5 Head Loss in SDR 11 and 17 HDPE Pipe Pure Water Some of these charts could have also been placed with the Pipe Properties tables but because they vary primarily with solution type they were placed here In an ideal world the Fluid Properties tables would include all of the graphs charts and tables for all of the parameters of all possible antifreeze combinations However because these variations are difficult to predict for specific projects only partial information has been included For the most accurate designs designers are encouraged to seek out their own favorite antifreeze combinations and determine the specific heat density and minimum required flow rate for non laminar flow 131 CHAPTER 8 Tables and Reference Files Soil Properties Soil properties refer to any data related to the soil The three reference files are listed below Table 1 Thermal Conductivity and Diffusivity of Sand and Clay Soils Table 2 Thermal Properties of Rocks at 77 F Table 3 Earth Temperatures Soil Swing and Phase Constants for U S Cities The first two Soil Properties tables included with Ground Loop Design provide various soil parameters including ranges for thermal conductivity k and thermal diffusivity a for various types of soils These table
118. ld mean that a cooling tower is not employed In a typical design it is difficult to predict exactly how much load balance or what size of cooling tower is necessary to match the cooling and heating lengths However using the Load Balance slider control the designer can optimize the system to the lengths desired by directly controlling the amount of cooling load to be handled by the cooling tower In the case where the designer desires the shortest length possible the design requires a perfect balance of the heating and cooling loads to the ground The length from this perfect balance would be the minimum length required to adequately cover the heating load requirement To accomplish this the Load Balance slider needs to be adjusted to the percentage value where the calculated cooling and heating bore lengths are approximately equivalent Note As expected the Long Term Ground Temperature Change for both heating and cooling should be identical in a perfectly balanced system In other cases the designer just may seek a reduction in the total required system length rather than a perfect balance Using the slider control the 106 CHAPTER 5 The Horizontal Design Module designer can select the desired length and then note the required cooling tower condenser capacity as calculated by the program Once the required cooling tower capacity is determined the designer can further modify the various cooling tower parameters to match them
119. ll query the user for his or her linking preference Alternative systems for linking exist but they are more indirect For example if only one unlinked design module is present a link may be established from any open loads module since Ground Loop Design automatically recognizes the user s intention If more than one unlinked design module exists however pressing the link button from an active loads module will have no effect The link status lights in the corners of the modules indicate when a link has been formed Colors indicate the type of link Link status lights are described in more detail below 3 Unlinking To break a link between modules simply activate click on the design module to be disconnected and click the Unlink button on the toolbar Equivalently the user can choose Unlink from the Ground Loop Design Loads menu The link will be broken and all related loads information for the design module will be cleared However the information still exists in the loads module and can be recovered by linking again if necessary If only one design module is linked to a particular loads module unlinking from the loads module is also possible If more than one linked design window is open however clicking the unlink button from a loads module will have no effect since Ground Loop Design cannot determine which project should be disconnected The link status lights in the corners of the modules indicate when lin
120. losed loop of pipe inserted into a body of water acts as the heat exchange medium All three modules utilize the same loads module formalism and are linked to loads modules using the Studio Link system All three modules also include a new expanded user interface function as can be seen in figure 1 2 By double clicking on any of the tabbed panels Results Fluid Soil U Tube etc an expanded calculation view appears which enables the designer both to see the calculated results immediately after any parameter has been modified and also to access the parameters that are most commonly adjusted during the design optimization process 13 CHAPTER 1 Ground Loop Design Overview Mi Borehole Design Project GLDv5 Lengths Temperatures COOLING HEATING COOLING HEATING ba Total Length Ft 42240 7 43551 7 Unit Inlet F 85 0 50 0 Al Borehole Design Project GLDv5 Borehole Length Ft 234 7 242 0 Unit Outlet F 95 2 43 7 Results Fluid Soil U Tube Pattern Extra kw Information Results Fluid Soil U Tube Pattern Extra kw Information sais Calculate COOLING HEATING Total Length ft 42240 7 43551 7 _Monthiy Data Total Length ft 42240 7 43551 7 ee bade S ae ab Prediction Time 10 0 years Borehole Number 180 180 B a 4 7 Borehole Length ft 234 7 242 0 Ground Temperature Change F 0 4 0 4 a Ground Temperature Change F 0 4 0 4 Unit Inlet F 85 0 50 0 Fixed Temperature ii F bo
121. lready included in the series The right sub pane is a series of tabbed panels that contain the data for each pump on the list In the case of a new series both the list and the panel section will be empty until a new pump is created The name of the current manufacturer and series are shown in the selection boxes in the upper pane a Edit Add Heat Pumps IOl x Florida Heat Pump GT Series Dora Bl xl i Cooling Heating Load Temperatures Load Flows Pump Details Pump Model GTO36 Pump Type e Water to Air C Water to Water Fig 2 2 Pump Edit Pane Pump Series Controls The Pump Series control buttons shown in figure 2 3 are found above the list and the pump data panels They include the Pump Edit controls New 28 CHAPTER 2 Adding Editing Heat Pumps Copy Remove Reorder and Clear the pump Save control the Edit Pump Information control and the Delete Series control 000009 2x Fig 2 3 Pump Series Controls 5 y Ur 5 Pump Edit Controls The Pump Edit Control buttons are designed to work directly with the pump list New pumps are added by pressing the New button Copies of existing pumps are added with the Copy button Remove is used to remove a pump from the list Reorder is pressed to reorganize the list both alphabetically and numerically Clear is used to delete all pumps from the current list Be careful not to accidentally delete pum
122. manufacturer is required the Se ect button may be used This button allows the designer to choose any of the stored pumps As with the Auto Select button all of the associated fields are calculated automatically once the pump is selected When the Select button is pressed the selection panel appears as shown in figure 3 7 After a pump is chosen pressing Select Pump will place the pump in the zone and automatically calculate all of the associated parameters Cancel will return the user to the main display without changing any pumps 45 CHAPTER 3 Loads and Zones Note Unlike with Auto Select a pump that is manually selected may or may not 4 match the loads in the zone It is the responsibility of the designer to make sure the pumps match the zones Heat Pump Specifications at Design Temperature and Flow Rate Florida Heat Pump WP Series Water to Water y Pump Name WPO36 y Select Pump Cancel Number of Units 1 Eee Fig 3 7 Pump Selection Panel Details Specific details about a given pump may be obtained by clicking the Details button Additionally the details panel is where the designer may vary the loads input temperatures or flows for that particular pump After the user presses the A return button variations in the input load temperature will affect the pump parameters listed on the main pump selection area A sample details panel is shown in figure 3 8 Heat Pump Specifications at Design Tempera
123. meter C Close Together Borehole Diameter 5 50 in m tee Backfill Grout Information T Along Outer Wall Thermal Conductivity 1 08 Btu h ft F ECO Fig 4 10 U Tube Panel Contents Pipe Parameters The pipe parameters are entered in the Pipe Parameters section They include the pipe resistance and pipe outside diameter followed by the configuration and placement of the pipe in the bore Ground Loop Design calculates the convective resistance using the Dittus Boelter correlation for turbulent flow in a circular tube Incropera and DeWitt 1990 The calculations use average values of the Reynolds number to represent the different types of flow with values of Re 1600 3150 or 10000 for laminar transition and turbulent respectively The calculations also use average values of viscosity and the Prandtl number for water taken at a temperature of 70 F Using the standard expression for resistance of a hollow cylinder Incropera and DeWitt 1990 the program can calculate an approximate 75 CHAPTER 4 The Borehole Design Module value for the pipe resistance It assumes HDPE pipe with a conductivity of 0 225 Btu h ft F The pipe resistance varies with the pipe style and flow The user can select the size and type of pipe from the appropriate selection boxes If another pipe diameter is required it can be entered directly into the text boxes as needed Note By pressing the Check
124. minal flow rate and the data is input as percentages of the nominal flow rate A sample Load Flows panel is shown in figure 2 6 To get a capacity factor at a flow rate of 80 percent of nominal for example the capacity of the unit at 80 percent of nominal would be divided by the capacity at the nominal flow rate The procedure is identical for the power factors Data is usually taken at standard source temperatures and flows and at the standard load 32 CHAPTER 2 Adding Editing Heat Pumps temperature Quite often the manufacturer provides lists of these variations that can be input directly Once again a minimum of three points is necessary for the coefficient calculations and 0 buttons are provided for quickly A setting the unused rows to zero Remember boxes must be set to 0 if they are not used General Cooling Heating Load Temperatures Load Flows Test Flow Corrections LOAD Nominal Flow Rate CFM COOLING HEATING of Capacity Power of Capacity Power Nominal Factor Factor Nominal Factor Factor 0 0000001 0 0000001 Calculate Coefficients Fig 2 6 Heat Pump Load Flows Panel Jai Testing Input Data The Test panel is provided as a final check after a pump s data has been input into the Heat Pump module Without testing the data directly there is no way to know if mistakes were made during the input process A sample Test panel is shown in figure 2 7 As can be seen
125. mperature variables The first of these is the approach temperature which is the difference between the pond temperature and the desired inlet source temperature Source inlet and outlet temperatures are the final items in this section Note In surface water heating applications although the solution within the pipe may not freeze the freezing temperature of the body of water is generally 32 F If the heat pump outlet temperature is too far below this value the water may freeze on the pipe greatly reducing its heat transfer characteristics and potentially leading to system failure The designer must always pay attention to the outlet temperature value for this reason As with the Borehole Design module the third section lists the total unit capacity the peak loads and the demand of all the equipment followed by the calculated heat pump and system efficiencies The peak load is the maximum determined from whichever time period across all the zones has the highest load The peak demand includes all pumps and external energy requirements including those listed in the Extra kW panel Care must be exercised when equipment energy requirements listed in the Extra kW panel refer to only heating or only cooling types of equipment In these cases the pump efficiency could be fine but the system efficiency might be incorrect The fourth section lists the total head loss calculation results as well as the individual losses for the header and circu
126. n 1985 in the ASHRAE Design Data Manual for Ground Coupled Heat Pumps Parker et al outlined a method by which this field resistance or soil resistance could be estimated and applied to determine piping and trench length requirements for a buried pipe system In the case of horizontal pipe systems located near the ground surface the mathematics necessitate the inclusion of mirror image pipes into the calculations These mirror image pipes are located the same distance above the surface as the buried pipes are below it In a multiple pipe system the soil temperature in the vicinity of any single pipe is determined by both the undisturbed earth temperature and by the thermal interference from other pipes in the same and in adjacent trenches Parker Bose and McQuiston 1985 The current Horizontal Module effectively employs a combination of the cylindrical model of Carslaw and Jaeger and the multiple pipe methodology of Parker et al Additionally as in the Borehole Module the equations also include modifications suggested by Kavanaugh and Deerman that adjust the methods of Ingersoll to account for physical arrangement and hourly heat variations Kavanaugh and Deerman 1991 However time step based rates of rejection and extraction also previously were discussed in some depth by Parker et al The two Slinky options available on the Configuration panel partially are based on the above formalism Because of the c
127. n Expanded User Interface Results There are several significant differences between the Surface Water Design module s Results panel and the Borehole Design module s Results panel These differences relate to the nature of the calculations as well as to the inclusion of the head loss calculation results Figure 6 9 shows a typical view of the Results panel Figure 6 10 shows the results display in the expanded user interface Figure 6 11 shows the Calculate button in the expanded user interface Again there are two lists shown on the Results panel one for heating and one for cooling Although all of the numbers resulting from both sets of calculations are valid the side with the longer length is printed in bold type so that it stands out The longer length usually determines the installation size and for this reason the 121 CHAPTER 6 The Surface Water Design Module shorter length system results lose relevance However in cases where the cooling and heating lengths are similar care must be taken to assure the safest design E Surface Water Design Project SurfaceWaterSample E Results Fluid Soil Piping Surface Water Extra kw Information Calculate COOLING HEATING Total Length ft 4087 2 8187 8 Circuit Length ft 371 6 545 9 Number of Circuits 11 15 Max Parallel Circuits 11 15 Unit Inlet F 55 0 36 0 Unit Outlet F 64 4 30 1 Approach Temp F 5 9 Total Unit Capacity kBtu Hr
128. n a designer wishes to quickly reverse engineer a system etc Additionally when the borehole design module is linked to an Average Block loads module that has monthly loads data entered the program can calculate and report monthly inlet temperatures for both fixed temperature and fixed length designs A more complete description about how to enter data and perform calculations in the Borehole Design module is provided in Chapter 4 Theoretical Basis To continue providing geothermal system designers with the widest range of flexibility two separate theoretical models now are included within the Ground Loop Design framework The first model and the original one used in all previous versions of the software is based on the cylindrical source model and allows for quick but accurate length or temperature calculations based on limited data input The second is based on a simple line source theory but is more detailed in its ability to generate monthly temperature profiles over time given monthly loads and peak data This second model is popular in some academic and institutional circles and it is now included so that users can directly compare the two models results using an identical input data set Although the outputs of the two models do not always agree they do give the designer more information on which to base a final system design The vertical bore length equations used in the primary model in the Borehole Design module are base
129. n unchanged during the designing process Variations in inlet source or load temperatures or system flow rate will not affect a customized pump s data Automatic Heat Pump Selection Options for the Entire Zone Set Two controls are included with Ground Loop Design that allow for an automatic selection of pumps throughout the entire set of zones This feature is useful when the pump set needs to be compared or changed or when modifications are required throughout the existing set These controls are necessary so that large sets of pumps can be changed or updated without having to step through each individual zone 4 Auto Select All Pumps The Auto Select All Pumps control performs the same function as the Auto Select button in the pump selection section of the zone data window except it performs the selection sequentially through all of the zones It uses the active heat pump series selected on the Heat Pumps tabbed panel Note Auto Select All Pumps will overwrite all currently selected pumps including custom pumps Sl Update Reselect Current Pumps The Update Reselect Current Pumps control reselects the pumps in all zones after determining the current series used in each particular zone For example if most of the pumps belonged to the same water to air series but one was a water to 47 CHAPTER 3 Loads and Zones water pump this control would determine the difference and update the pumps accordingly Note Custom pumps a
130. nclude the specific heat and density of the circulating fluid Also a reference label is included so that the designer knows the percentage of antifreeze and antifreeze type however this reference label is not currently linked to the other input parameters The specific heat and density values of the antifreeze are used for the calculation of the heat pump outlet temperature which in turn is used for the trench length calculation 102 Xp CHAPTER 5 The Horizontal Design Module Additionally the viscosity of the solution may affect the flow type in the pipe which was selected on the Piping panel The designer must be aware of any changes made In automatic entry mode the user first selects the fluid type and then selects the desired freezing temperature Ground Loop Design automatically displays the specific heat and density for the fluid selection In manual entry mode the user manually selects and inputs the specific heat and density for the target solution Note Since solution properties vary considerably and non linearly with type and percentage of additive Ground Loop Design does not include detailed automatic antifreeze information for all conditions Generalized tables of data may be found in the Fluid Properties tables It is recommended that the designer manually enter the desired values in the input text boxes Results All results for both the heating and the cooling calculations can be viewed at any tim
131. nd power data from a second flow rate are used Generally speaking with different flow rates the shape of the capacity and power curves does not change significantly but is shifted up or down by a constant factor This factor is determined for each of the three temperature data points and averaged over those input to obtain the linear flow factor which is shown on the input screen Once the flow factor is determined the linear capacity or power change per flow unit may be calculated The program then calculates a new capacity or power at any specified flow rate using the initial values already known from the stored data If no data points are entered for a second flow rate the flow factor is assumed to be the constant value of 1 0 This means that the capacity and power will not vary with changes in flow rate Considering the size of the variations generally only a few percent this simple model is accurate enough for most pumps A completely accurate model of the flow rate variations for all possible pumps would require significantly more data entry Load Side Corrections The Ground Loop Design Edit Add Heat Pumps module also can include corrections to the capacity or power that result from variations in the load side inlet temperature or flow rate They are entered as correction factors across the desired temperature or flow range The software again uses the polynomial fitting to model these correction factors In these cases a fou
132. ne Accordingly Gaia will be entitled to preliminary and permanent injunctive relief and other equitable relief for any breach of this Section Limited Warranty Gaia warrants that the Software will substantially conform to its published specifications for a period of thirty 30 days from the later of receipt of the Software or receipt of access to the Software Gaia further warrants that the media on which the Software is contained will be free from defects for a period of thirty 30 days from the later of receipt of the Software or receipt of access to the Software This limited warranty extends only to Customer as the original licensee Provided that a Customer has notified Gaia of such substantial non conformance or defect during the applicable warranty period and b Gaia has confirmed such Software or media to be substantially non conforming or defective as Customer s sole and exclusive remedy and Gaia s and its suppliers entire liability under this limited warranty Gaia will at its option repair replace or refund the Software free of charge Except as expressly provided in this End User Agreement the Software is provided AS IS without warranty of any kind Gaia does not warrant that the Software is error free or that Customer will be able to operate the Software without problems or interruptions Gaia reserves the right to charge additional fees for repairs or replacements performed outside of the limited warranty period Thi
133. nformation pertaining to the ground field arrangement is in the Pattern panel This includes the vertical boreholes pattern the borehole separation the optional selection of external grid files the number of boreholes per parallel loop and the fixed borehole length design option The input screen is shown in figure 4 5 Pattern borehole separation and external grid file data also are visible and adjustable in the expanded user interface as seen in figure 4 6 Vertical Grid Arrangement The standard Borehole Design module is configured to accept equally spaced borehole patterns based on an x y coordinate system For rectangular systems users can enter the pattern directly into the rows across and rows down boxes For non rectangular systems see external grid files below Separation between Vertical Bores This value is the center to center distance between adjacent bores For optimal use of space the current calculations allow only one spacing distance between vertical bores in either direction 69 CHAPTER 4 The Borehole Design Module Results Fluid Soil U Tube Pattern Extra kw Information ertical Grid Arrangement Borehole Number Rows Across Rows Down Borehole Separation F Use External File Filename No File Boreholes per Parallel Circuit Bores Per Circuit EE Fixed Length Mode M On off Fig 4 5 Pattern Panel Contents Grid Layout Use External File Borehole Number 30 Row
134. ng the boiler cooling tower and then hitting the Monthly Data button 84 CHAPTER 4 The Borehole Design Module Ey Borehole Design Project verticalsampleformanual Results Fluid Soil U Tube Pattern Extra kw Information Calculate _ Monthly Data lt COOLING HEATING Total Length ft 37325 3 20259 9 Borehole Number 100 100 Borehole Length ft 373 3 202 6 Ground Temperature Change F 1 5 2 7 Unit Inlet F 85 0 91 4 50 0 56 3 Unit Outlet F 95 1 97 2 43 9 55 7 Total Unit Capacity kBtu Hr 1325 0 1409 1 Peak Load kBtu Hr 1325 0 1160 0 Peak Demand k 99 5 83 0 Heat Pump EER COP 13 3 4 1 System EER COP 13 3 4 1 System Flow Rate gpm 290 0 Optional Cooling Tower Boiler Condenser Capacity kBtu hr Cooling Tower Flow Rate gpm A la en Cooling Range F A Boiler Annual Operating Hours hrf yr 0 Boiler Capacity MBtu h PARAS Cooling Tower DO o Load Balance a1 Fig 4 18 Monthly Inlet Temperature Primary Results Lengths me Temperatures Za COOLING HEATING COOLING HEATING Total Length Ft 37325 3 20259 9 Unit Inlet F 85 0 91 4 50 0 56 3 Borehole Lenath Ft 373 3 202 6 Unit Outlet F 95 1 97 2 43 9 55 7 Fig 4 19 Monthly Inlet Temperature Primary Results in Expanded User Interface A The Graph Icon Button After calculating the monthly inlet temperatures the designer can click on the graph button in either the standard or exp
135. ng the existing HTML files with the table lists and making new links The process is simple and requires only a very basic knowledge of HTML Original Model The original model included with Ground Loop Design consists of these files English Metric FluidTables html FluidTablesMetric html FluidTable1 html FluidTable1Metric html FluidTable2 html FluidTable2Metric html FluidTable3 html FluidTable4 html FluidTable5 html SoilTables html SoilTablesMetric html SoilTable1 html SoilTable1Metric html SoilTable2 html SoilTable2Metric html SoilTable3 html SoilTable3Metric html PipeTables html PipeTablesMetric html PipeTable1 html PipeTable1Metric html PipeTable2 html PipeTable2Metric html PipeTable3 html PipeTable3Metric html To add a new file the FluidTables html the SoilTables html or the PipeTables html must be edited The user must create a link in one of the three aforementioned html files to the new file which contains the table graph or image that the user would like to have available in Ground Loop Design Note Ground Loop Design requires the FluidTables html SoilTables html and PipeTables html files and their metric counterparts FluidTablesMetric html SoilTablesMetric html and PipeTablesMetric html as the initial files when opening the associated tables They can be edited but if they are deleted the associated tables cannot be opened at all 133 CHAPTER 8 Tables and Reference Files HTML Files HTML refer
136. ngth ft 142 7 272 6 afer dbo Ground Temperature Change F 0 3 0 2 Fixed Temperature y j Ped tenh Unit Inlet F 85 0 50 0 Tee rencor Unit Outlet F 93 0 42 0 85 0 oF 50 0 oF Total Unit Capacity kBtu Hr 0 0 0 0 Borehole Length 273 Peak Load kBtu Hr 552 1 552 1 ors Peak Demand kW 0 0 0 0 Heat Pump EER COP 0 0 0 0 Use External File System EER COP 0 0 0 0 Borehole Number 64 System Flow Rate gpm 138 0 Rows Across 8 gt A r Optional Cooling Tower Boiler Rows Down 8 E 9 Cooling Tower Separation 350 ft Condenser Capacity kBtu shr Cooling Tower Flow Rate gpm E aa Cooling Range F X Boiler 0 Annual Operating Hours hrfyr EEE Boiler Capacity MBtu h RE NNE 2 Load Balance o 0 Load Balance Fig 4 1 Expanded User Interface The Borehole Design module includes several additional features Metric and English unit conversion Printed reports of all input and calculated data Convenient buttons to bring up tables and calculators A Calculate button used to refresh the calculations A Monthly Data button used to calculate monthly inlet temperatures e A Graphing button used to graph inlet temperature data within the Design Studio e Boiler and cooling tower hybrids Opening Projects There are two ways to open Borehole Design projects One is by using the New Borehole command from the Design Studio File
137. nstalled capacity This is because it is assumed that all units will not be running at full load simultaneously even in the peak load condition 79 CHAPTER 4 The Borehole Design Module E Borehole Design Project verticalsampleformanual Results Fluid soi U Tube Pattern Extra kw Information Design Heat Pump Inlet Fluid Temperatures Cooling 85 0 oF Heating 50 0 oF Design System Flow Rate Flow Rate 3 0 gpmiton Solution Properties MV Automatic Entry Mode Fluid Type 4129 Propylene Glycol Specific Heat Cp 0 99 Btuf F lbm Density rho bs Ib ft 3 Check Fluid Tables Fig 4 14 Fluid Panel Contents Optimized systems generally operate in the range from 2 5 to 4 0 gpm ton while the ideal system flow rate is somewhere around 3 0 gpm ton Again if the flow rate is changed the selected heat pumps are updated in the loads modules Solution Properties Solution properties are also included in the Fluid panel These include the specific heat and density of the circulating fluid Also a reference label is included so that the designer knows the percentage of antifreeze and antifreeze type however this reference label is not currently linked to the other input parameters The specific heat and density values of the antifreeze are used for the calculation of the heat pump outlet temperature which in turn is used for the bore length calculation 80 A Yer CHAPTER 4 The Boreh
138. ntry and pump selection completely separate from the studio s geothermal design modules Now users can work on designs and load inputs at different times and can use the same loads files for various projects styles of project New zone files can be created by clicking the New button in any loads module or by clearing all of the current loads information with the Clear button followed by the New button The designer provides a filename when the zone file is saved Zone files can be opened and saved using the Open and Save buttons on the Loads panel The Zone Manager Loads Module For commercial non centralized installations it is often necessary to divide loads into separate zones that individually are served by specific heat pumps This type 38 CHAPTER 3 Loads and Zones of system has many advantages including lower installation and service costs as well as a highly accurate method of matching the loads to the heat exchanger From the time specific loads data that the user provides Ground Loop Design determines the maximum heating and cooling loads of the entire system and then uses these values to calculate the length of heat exchanger required TEA Zone Manager Heat a Loads SS E Cio D G i a B Sa F 9 Untitled zon 15 x Zone 1 Loads Panel Reference Label Design Day Loads Design Day Loads Days Occupied Time of Day Heat Gains Heat Losses per Week MBtu Hr MBtufHr 7
139. o A O E E 65 Typical Operation as gd 65 Entering Data into the Tabbed Panels 0 ccc cccec ccc ce eee n eee eceeeteneneeeeneeneeeneeens 66 TNF OPINGUON A sb ad E Mae Ube ne ea E EERE EAE b miata HGR Es 66 Extra RW aiee E EEE Seiten a cian ERE E EE tiga EA RE 67 Pump Power Calculator 0c ccececeec eee eneec eee eeeneeneeeeeeentenes 68 LATA aso E Ss le eterna E ai 69 Vertical Grid Arrangement cc cee cece cence nent eee ee ene eaeeaenaens 69 Separation between Vertical BOFr8S ooooooooooocoo ce eeeeeeee ene eneeaens 69 External Gid Piles oi a ie 71 Bores per Parallel LOOp c cccccececeeeeecee eee ene ee ene eee eaeeaengees 74 UT UD A A AA A A sees asiege 74 Pipe Parameters aiii inet 75 Borehole Diameter and Backfill Grout Information 75 O dec 75 Diffusivity Calcula a ent 78 Modeling Time Period 0 0 cceceecece eee ee ee eee ene eenene eee eng enes 78 Elida ad tt cdas 79 Design Heat Pump Inlet Fluid Temperatures ooooooococccncccnccncncnccnnos 79 Design System Flow Rate ccecceceecec eee eee scene eeeeeeeaeeaenes 79 Solution Properties 00 ccececcececee E EREE E E E REE RE 80 Results yere seren AA a Aces 81 Calculate Button ResultS oooooccoccccncccncnccncncnoncncncnonccncnannons 82 Monthly Data Button Results cece cece cence eee eene eee eenennenee 84 The Graph Icon Button ua pid 85 Optional Coolin
140. ole Design Module Additionally the viscosity of the solution may affect the flow type in the pipe which was selected on the U Tube panel The designer must be aware of any changes made In automatic entry mode the user first selects the fluid type and then selects the desired freezing temperature Ground Loop Design automatically displays the specific heat and density for the fluid selection When the automatic entry mode checkbox is marked the program is in automatic entry mode In manual entry mode the user manually selects and inputs the specific heat and density for the target solution as seen in figure 4 15 When the automatic entry mode checkbox is unmarked the program is in manual entry mode Solution Properties Automatic Entry Mode Fluid Type 23 5 Propylene Glycol y Specific Heat Cp 0 96 Btuf F lbm Density rho 64 0 Ibjft 3 Check Fluid Tables Fig 4 15 Manual Entry Mode for Solution Properties Note Since solution properties vary considerably and non linearly with type and percentage of additive Ground Loop Design does not include detailed automatic antifreeze information for all conditions Generalized tables of data may be found in the Fluid Properties tables It is recommended that the designer manually enter the desired values in the input text boxes Results All results for both the heating and the cooling calculations can be viewed at any time on the Results panel
141. omplexity of the solution to the heat transfer equation for coiled loops of pipe the design procedure used for the Slinky options is actually only a theoretical approximation This approximation is recommended in Closed loop Geothermal Systems Slinky Installation Guide and is based on a specific set of tests conducted on 36 diameter Slinky coils Jones 1995 In the approximation the program first calculates the total trench length required for a single U Tube buried at the specified trench depth It then divides the calculated length by 250 ft and multiplies the result by a factor determined from both the run fraction and the Slinky pitch distance between adjoining loops The horizontal Slinky configuration employs the same calculation procedure as that of the vertical However in the case of the horizontal Slinky the U tube depth is lowered such that the average 18 CHAPTER 1 Ground Loop Design Overview depth of the vertical Slinky would be equal to that of a flat horizontal Slinky The pitch and run fraction function is obtained from a two dimensional interpolation over the surface determined from the experimentally determined data points provided in the Slinky manual Surface Water Design Module Description The Surface Water Design module allows the user to enter various parameters concerning the body of water lake pond river etc system As in the Borehole Module inputs are arranged in panels that relate to the
142. ontal Design Module Soil Input parameters relating to the soil are located in the Soil panel as shown in figure 5 7 These include the average ground temperature the soil thermal properties and the ground temperature corrections at a given depth y Horizontal Design Project HorizontalSample Results Fluid Soil Piping Configuration Extra kw Information Undisturbed Ground Temperature Ground Temperature 620 F Ground Temperature Corrections at Given Depth Thermal Conductivity 1 3 Btufth ft F Thermal Diffusivity 0 75 ft 2fday Diffusivity Calculator Check Soil Tables Soil Thermal Properties Regional Air Temperature Swing 230 F Winter Summer Coldest Warmest Day in Year 34 225 Check Swing Temperature Table Fig 5 7 Soil Panel Contents Undisturbed Ground Temperature The undisturbed ground temperature refers to the temperature of the soil below the surface layer where there is no longer a seasonal swing This value may be determined from regional data or by recording the actual stabilized temperature of water circulated through pipe in a test bore Soil Thermal Properties The soil thermal properties are a little harder to define and care must be taken to provide accurate values especially for the thermal conductivity The thermal diffusivity relates to the density of the soil and its moisture 99 CHAPTER 5 The Horizontal Design Module content Typical values of thermal
143. or To aid in this calculation Ground Loop Design includes the Equivalent Hours Calculator found in the Tools menu or obtainable directly by clicking the Calculate Hours button Figure 3 5 shows a view of the Equivalent Hours Calculator f Equivalent Hours Calet zio x Annual Equivalent Full Load Hours Peak Hourly Load MBtu hr Monthly Total Loads MBtu o o o o o o o o 0o 00 o 0 0 0 January February March April May June July August September October November December Full Load Hours hr Close Fig 3 5 Equivalent Hours Calculator 43 A CHAPTER 3 Loads and Zones Remember that although the vertical bore length calculation results are not extremely dependent on the running hours within one zone for multi zone designs the total number of running hours across the zones can certainly affect the required bore length The user should attempt to enter the running hours as accurately as possible Equivalent hours are unnecessary for a surface water design since long term buildup effects are unimportant Ifa loads module is linked to a Surface Water Design module the hours will not be visible Days per Week This value represents the occupation of the installation in days per week The building in the example is only occupied during weekdays so the value 5 0 was entered Decimal values can be used for partial occupations and the amount can
144. or each zone Ground Loop Design offers five different zone report options including A concise zone report A detailed zone report An equipment list report A loads report A zone names report Reports are described in detail in Chapter 7 Data Reference Files To access the data reference files the user must have an internet browser present in the Ground Loop Design enabled computer The program will work without the browser but the data reference files may not be accessible Metric and English reference files are included with Ground Loop Design These files aid in the correct verification and entry of the various parameters The three main topics design aids currently included under the Tables menu in the Design Studio are Fluid Properties Soil Properties and Pipe Properties A convenient Conversions table with metric English conversions in two different formats is included for reference as well Reference files can be opened and left as open windows on the desktop and the user can refer to them as necessary during the design process 21 CHAPTER 1 Ground Loop Design Overview Realizing that designers and engineers have their own preferred resources Ground Loop Design employs the HTML browser model so that the user has ultimate control over the reference files The designer simply creates a basic HTML file containing customized data pictures graphs charts etc and then modifies the included top level HTML files to link to the
145. or matches that of the imported data The program assumes that the peak demand occurs during the top four hour period multiplied by the number of days in the month If the total heat gains or losses provided for the peak month still exceed this value the remainder of the total monthly loads are evenly split between the other time periods in the day making up the remaining 20 hours If not the demands of all other periods are set to 0 The peak and its time block will be used for the daily pulse The monthly pulse utilizes the data in the off peak periods to recalculate the PLFm A sample PLFm calculation is presented below Assume the monthly calculation gives a total monthly load in January of 10000 MBtu kWh and the corresponding peak demand from noon to four p m is 30 MBtu hr kW In this case the monthly partial load factor is PLFm 10000 MBtu 30 MBtu hr 24hr 31 days 0 448 If this value is to be transferred correctly into the Design Day Loads boxes in the loads modules the 0 448 must remain the same Noon to four p m represents four hours out of twenty four in a day Loads not included in that four hour 59 CHAPTER 3 Loads and Zones period must be included in the other twenty hours of the day The following equation is used to determine the relationship between off peak loads and peak loads so that the PLFm is maintained Note that this automatic calculation also assumes that the installation is running 7 days per wee
146. ow with values of Re 1600 3150 and 10000 for laminar transition and turbulent respectively The calculations also use average viscosity values and the Prandtl number for water taken at a temperature of 70 F 97 CHAPTER 5 The Horizontal Design Module A Horizontal Design Project HorizontalSample Results Fluid Soil Piping Configuration Extra kW Information Pipe Parameters Pipe Resistance 0 156 h ft F Btu Pipe Size Lin 25 mm Outer Diameter Maaa in Inner Diameter 108 in Pipe Type sori1 y Flow Type Turbulent Check Pipe Tables Fig 5 6 Piping Panel Contents Using the standard expression for resistance of a hollow cylinder Incropera and DeWitt 1990 the program calculates an approximate value for the pipe resistance It assumes HDPE pipe with a conductivity of 0 225 Btu h ft F The pipe resistance varies with the pipe style and flow The user can select the size and type of pipe from the appropriate selection boxes If another pipe diameter is required it can be entered directly into the text boxes as needed Note By pressing the Check Pipe Tables button the Pipe Properties tables will open If the user wants to enter an experimentally determined pipe resistance or requires more precise calculations he or she can enter these values directly into the Pipe Resistance text box overriding all pipe resistance calculations 98 CHAPTER 5 The Horiz
147. p Design is the international component Because the program is multi language capable users easily can communicate accurate results and design parameters across borders even when the designers are not proficient in the technical language of their foreign counterparts Currently Japanese Chinese Korean Italian Spanish Russian Czech Lithuanian French and Romanian versions are available Figure 1 1 is a screenshot from the Korean version metric CHAPTER 1 Ground Loop Design Overview zt a 5 DOI s 322 SH AZE 5 SSA FAI Zt SAI Zt 5 0 8Al 12Al 12Al 16A _ se 16A 20AI AIZE HIA 20Al 8A ASA Sot SIHA 1050 BM SSS SSH MS SBS Awl A E eaa Ca ee 35 kw SS kw cop SE L min Se Sot Al gt RE 11 4 L min 3 5kw UE BS HM 29 4 10 0 mama UA 4 1242 12 A 12 12 Figure 1 1 Korean Version of Ground Loop Design Heat Pump and Zone Loads Modules Introduction The underlying framework of Ground Loop Design is based on three modules that permit flexibility in the addition and modification of components related to geothermal designs The first is the heat pump module which takes a representative amount of data from the heat pump specifications and then uses it for the automatic pump selection features The second and third are the average block and zone loads modules which provide organized methods for entering the heat gains or losses for an installation Because the
148. pened as the system s memory permits 110 CHAPTER 6 The Surface Water Design Module New Projects New projects may be opened at any time from the Design Studio by choosing New Surface Water from the Design Studio File menu or the toolbar New projects open with standard parameter values that must be edited for new projects In new projects no loads files zon are loaded The user must create a new loads file or open an existing loads file into one of the loads modules Links may be established using the Studio Link system described in Chapter 3 Existing Projects Existing projects may be opened at any time from the Design Studio by choosing Open from the Design Studio File menu or toolbar The file automatically opens into a new Surface Water Design Project module If a loads file zon is associated with the loaded project the loads file will be loaded automatically into the appropriate loads module and opened along with the project file However if the associated loads file cannot be found the user will be notified and the automatic file loading will not occur Saving Projects Projects may be saved at any time using Save or Save As from the Design Studio File menu or by clicking the save button on the toolbar When the user closes the program or module the program automatically asks the user if he or she would like to save the project file Typical Operation Although each user has his
149. ps lm Save Control The Save control button can be used at any time to save the current pump information Es Edit Pump Information Control The Edit Pump Information control button allows the user to edit both the series and the manufacturer information for a given pump Note however that if the manufacturer information is changed it will change for every series connected to that manufacturer Proceed or Cancel will return the user to the Pump Edit Pane x Delete Series Control The Delete Series control button deletes the current series If the series is the only series of a manufacturer the manufacturer also will be deleted automatically Note The actual heat pump file hpd will not be deleted from the pumps directory If necessary the series can be restored by creating a New Series The user need only provide the appropriate manufacturer and series name and use the deleted hpd filename for the pump set Filename Incomplete fields will be recreated from the hpd file If the original file no longer 29 CHAPTER 2 Adding Editing Heat Pumps exists the program creates a new hpd file Incidentally the same system can be used to add new pump sets obtained from external sources as described below General Information The General panel is the first panel a user sees when he or she decides to input data for a new pump It has an input box for the name of the pump and in the Pump Type
150. r coefficient model is used to better model the types of variations that may occur Three to five points are allowed as data input Again if load side correction data are not included there will be no capacity or power variations with load temperature or flow and all correction factors will be 1 0 the standard value The load side temperature range will generally be considerably different for water to air and water to water pumps Ground Loop Design suggests different initial temperature ranges when the user chooses the water to air or the water to water pump type option 26 CHAPTER 2 Adding Editing Heat Pumps Entering Data into the Add Edit Heat Pumps Module The user opens the Edit Add Heat Pumps module from the Design Studio Heat Pumps menu Note that one module can be open at a time When the module opens there are two selection boxes present in the upper pane while no pump data is displayed in the lower pane In the left box the user can choose to select either one of the manufacturers from the list of existing manufacturers or New Series If a manufacturer is selected the associated list of pump series available for that particular manufacturer appears in the box on the right When a series is chosen the data for that series appears in the lower panel Creating a New Series and or Manufacturer If the user chooses New Series from the manufacturer list on the left the lower pane becomes active with another sel
151. r 20 HP Pump Motor Efficiency 85 Optional Cooling Tower Pump Fan Required Input Power 0 2 kW 13 kW Power 0 2 bp 1 5 hp Motor Efficiency 85 o 85 o Additional Power Requirements Additional Power 10 kw Pump Power Calculator Fig 4 3 Extra kW Panel Contents If an optional cooling tower is used for hybrid applications the demands of the pump and fan may be included on this panel The tower pump is selected based on the water flow and the total head these also determine the horsepower The required fan horsepower and motor efficiency may also be entered to include the demand of the fan Generally cooling tower inputs are left at zero initially and then modified once the program suggests the cooling tower size and flow rate The Additional Power may be included as necessary Note To make a kilowatt entry in the Pump Power box switch to metric units enter the kilowatt value and then return to English units Pump Power Calculator If the pump efficiency system flow rate and head loss are known the Pump Power Calculator can be used to determine the pump power An image of the pump power calculator is shown in figure 4 4 68 CHAPTER 4 The Borehole Design Module f Pump Power Calculator lol x Pump Power Required Pump Power hP Pump Head 50 0 ft hd Flow Rate 100 0 gpm Pump Efficiency 80 0 o Fig 4 4 Pump Power Calculator Pattern I
152. re not affected when the Update Reselect Current Pumps control is activated Working Series Selection in the Heat Pumps Tabbed Panel Figure 3 9 Shows the Zone Manager opened to the Heat Pump tabbed panel This panel is used to specify the working series for all of the automatic selection features described for the Loads tabbed panel In the Heat Pump tabbed panel the user simply selects the pump series that he or she intends to use for the matching session The selection may be changed at any time without affecting previously automatically selected units However if the Auto Select All Pumps button on the Loads panel is pressed every zone will be replaced with the current working series Additionally in this panel the user may define an inlet load temperature to be used in any automatic selection Choosing the Active Series The active heat pump series is the series of heat pumps used by the Auto Select features in the Loads panel alla Heat Pumps Loads mHeat Pump Selection And Design Load Temperatures Select Heat Pump Manufacturer And Series Florida Heat Pump y EV Series Pumps Available in this Series Design Heat Pump Inlet Load Temperatures Cooling WB 67 0 degF Heating DB 70 0 deg F Inlet Air Temperatures Water to Air Pumps Entering Water Temperatures Water to Water Pumps Cooling 55 0 degF Heating 100 0 deg F Fi
153. rsity International Ground Source Heat Pump Association and Electric Power Research Institute 1995 Kavanaugh S P and J D Deerman Simulation of vertical U tube ground coupled heat pump system ASHRAE Transactions Volume 97 pages 287 295 1991 22 CHAPTER 1 Ground Loop Design Overview Kavanaugh S P and Rafferty K Ground Source Heat Pumps Design of Geothermal Systems for Commercial and Institutional Buildings ASHRAE 1997 Parker J D Bose J E and McQuiston F C ASHRAE Design Data Manual for Ground Coupled Heat Pumps ASHRAE Research Project RP 366 1985 Paul N The Effect of Grout Thermal Conductivity on Vertical Geothermal Heat Exchanger Design and Performance M S Thesis South Dakota State University 1996 23 CHAPTER 2 Adding Editing Heat Pumps CHAPTER 2 Adding Editing Heat Pumps To effectively use any of the design modules included with Ground Loop Design it is important to understand how the system models heat pump data For the purpose of adding new or editing existing heat pumps to Ground Loop Design s Heat Pump Database the Add Edit Heat Pumps Module is included as a separate module in the Design Studio This chapter describes the theory of the module and gives an example of how to enter heat pump data A more detailed example can be found online and accessed through the Help menu web resources option Heat Pump Model Description For convenience the Loads modules in Ground Loop Des
154. s it is truly international in its ability to traverse national borders as well as language and cultural barriers New in Premier Version 5 0 Ground Loop Design Premier Version 5 0 adds a range of features to the program including e fixed temperature and fixed length design modes in the borehole design module In fixed temperature mode designers specify inlet temperatures and the program calculates bore lengths In fixed length mode designers specify a loopfield length borehole length x number of boreholes and then have the program calculate heating and cooling inlet temperatures CHAPTER 1 Ground Loop Design Overview e month by month inlet temperature calculations and reports so the designer can see how the fluid temperatures vary over the design lifecycle borehole design module only e automatic graphing of monthly temperature and power data borehole design module only e a boiler hybrid feature for even more advanced hybrid designs e a borehole field importer so that GLD can model non rectangular loopfield designs e an enhanced user interface for faster design work e new professional reports The Design Studio The studio is the desktop work area in which the designer conducts his or her project analyses and establishes the basis for designs When additional projects are desired new windows may be opened or existing projects may be loaded The Loads modules hold and display the information for the particular installation
155. s End User Agreement will act as a waiver of such rights If any portion hereof is found to be void or unenforceable the remaining provisions of this End User Agreement shall remain in full force and effect This End User Agreement is the complete and exclusive agreement between the parties with respect to the subject matter hereof superseding and replacing any and all prior agreements communications and understandings both written and oral regarding such subject matter Conventions Used in This Document The following symbols are used in this document to highlight certain information and features included in the User s Guide and Ground Loop Design software program This caution symbol notifies the user that care must be taken at the specified location This star shaped symbol highlights new features in Premier Version 5 0 The round symbol highlights suggestions for using the program more effectively or for improving designs Oe gt CONTENTS Contents Preface Before You BeGIn c ccseccccecceeeeeeeeeeeeeeeeseseeesseeesneeseeeeeees 1 Typical Uses and Users aga ene ete al System Requirements for Tastalling Ground Loop Design TAS 2 Hardware requirements ccsccescesseescesseesceneeeeceseecsecaeecsecesesaececeseceeneeseeeeeeeeeeens 2 Software Tequila es 2 Operating system requirements ooooooonocnconcononnoncononncnnnnannnnnnnnes 2 Internet browser requirements 00 ecece cece cece ec ee
156. s comfortable immediately The reference files included with Ground Loop Design are minimal consisting of a few tables and graphs that should aid in the selection of requested parameters All files are written in open HTML Hypertext Mark up Language files The designer can edit and add to them as he or she desires to create a customized reference library within the Design Studio environment As with the heat pump and loads models the reference files model is another customizable element of the geothermal Design Studio that the user has the option to control 130 CHAPTER 8 Tables and Reference Files Tables Included with Ground Loop Design Several tables are included with Ground Loop Design They are separated into several broad categories from which most questions will arise These include e Fluid Properties e Soil Properties e Pipe Properties e Conversions The first three sections present a menu screen with hyper links to various tables that have been included in the package The fourth section consists of a pair of metric to English units conversion tables that answer most common engineering conversion problems Below is a description of the included files Fluid Properties Fluid properties refer to any data related to the circulation fluid The five Fluid Properties tables in Ground Loop Design are the following Table 1 Densities and Specific Heats of Various Solutions Table 2 Minimum Required Flow Rate for Non
157. s crass E Rows Down 5 Separation 290 FE Fig 4 6 Pattern Data in Expanded User Interface 70 CHAPTER 4 The Borehole Design Module Jar External Grid Files For non rectangular and potentially non equally spaced systems users have the option of creating and then importing an external grid data file that contains the x y coordinates for each borehole in the system User designated grid files must follow this format Sample GridData txt created in text editor Metric 0 0 0 10 10 0 10 10 0 20 20 0 20 20 10 20 20 10 30 0 30 10 30 20 30 30 20 30 10 30 0 30 This sample grid file was manually created in a text editor As can be seen the first line indicates whether a Metric meters or English feet units coordinate plane is specified The next line indicates the x y coordinates of the first borehole The line after that indicated the x y coordinates of the second borehole etc This particular sample has 16 boreholes spaced at 10 meter intervals Below can be found a recommended three step protocol for creating grid files 1 First lay out your proposed borehole field on a x y grid similar to the ones shown Doing so will decrease the chance of errors when creating a grid file 71 CHAPTER 4 The Borehole Design Module Sample X Y grid S19 9W SUL g SJEUIPIOOD A 0 10 20 30 40 50 60 70 80 X Coordinate Plane meters Note that this grid is in meters and that eac
158. s should not be considered accurate for a given location however they should provide the designer with a realistic range within which their own measurement results should fall The third table contains mean earth temperatures and other parameters for U S cities This table particularly may be useful for horizontal designs Pipe Properties Pipe properties refer to any data related to the piping The Pipe Properties tables included with Ground Loop Design are related to either the borehole thermal resistance or the pipe physical data They are listed below Table 1 Thermal Conductivities of Typical Grouts and Backfills Table 2 Pipe and Tube Dimensions Table 3 Required Flow Rates to Achieve 2 ft s SDR11 Pipe The first table provides thermal conductivities for some typical grouts The second lists the physical dimensions inner and outer diameter for common pipe sizes in various types of pipe The third although unnecessary for the associated calculations provides some convenient flow rates required for proper purging of a piping system Conversions The Conversions table has two separate lists of metric to English conversions placed together in one file As already mentioned the user can obtain multipliers 132 CHAPTER 8 Tables and Reference Files for most common metric English unit changes by going through the listed conversions Adding Customized Reference Files The user can create customized reference files by editi
159. s the ability to link or to unlink the loads modules to or from the design modules When a loads module is linked to a Borehole Horizontal or Surface Water Design module all of the data in that loads module is transferred to the design module Once the connection is established the pertinent information is stored within the design module which makes transfers in from or out to the loads module as necessary Since the information is now held in the design module it is possible to add multiple design modules with only a single loads module open When studio links are established the information shown in the loads module will correspond to the active design project As long as a link is active design modules retain information about the type of link and the filename of the associated zone zon file This information is stored 54 CHAPTER 3 Loads and Zones in saved project gld files so that the appropriate loads module can be opened and loaded when a project file is opened 3 Making a Link The most direct method of making a link between a loads and a design module is to open both modules to be linked activate click on the design module and then press the Link button on the toolbar Another option is to choose Link from the Ground Loop Design Loads menu Ifthere is only one type of loads module open a link will be established with that module If more than one type of loads module is open Ground Loop Design wi
160. s to Hypertext Mark up Language It is the language used on web pages and commonly used in software to quickly provide linked information to users HTML files can be created with an HTML editor like those distributed with common browsers or with a simple text editor They must however follow a certain format and have a htm or html extension Editing Existing Files Existing files may be edited by simply opening up the original file into a text editor or HTML editor making changes and then saving the file again For example if a user wishes to add a new pipe table to the list he or she first will create the table 1 e PipeTable4 html and then will add a link to it on the PipeTables html file Additionally if the user wishes to add additional information to an existing table or figure he or she only has to open the appropriate HTML file in a text editor or HTML editor and make and save the desired changes For example if adding a new link PipeTables4 html to the PipeTables html file one might add this new link with the name Table 4 New Pipe Table by typing the new link at the end of the PipeTables html file into a text editor as follows the added section is in bold type lt li gt lt a href PipeTable3 html gt Table 3 Required Flow Rates to Achieve 2ft s SDR 11 Pipe lt a gt lt li gt lt ul gt lt li gt lt a href PipeTable4 html gt Table 4 New Pipe Table lt a gt lt li gt lt ul
161. s warranty does not apply if the Software 1 is licensed for beta evaluation testing or demonstration purposes for which Gaia does not receive a license fee 11 has been altered except by Gaia 111 has not been installed operated repaired or maintained in accordance with instructions supplied by Gaia iv has been subjected to abnormal physical or electrical stress misuse negligence or accident or v is used in ultrahazardous activities The authorized distributors of the Software who are appointed by Gaia are not permitted to alter the terms of this End User Agreement in any manner Disclaimer EXCEPT AS SPECIFIED IN THIS WARRANTY ALL EXPRESS OR IMPLIED CONDITIONS REPRESENTATIONS AND WARRANTIES INCLUDING WITHOUT LIMITATION ANY IMPLIED WARRANTY OR CONDITION OF MERCHANTABILITY FITNESS FOR A PARTICULAR PURPOSE NONINFRINGEMENT SATISFACTORY QUALITY OR ARISING FROM A COURSE OF DEALING USAGE OR TRADE PRACTICE ARE HEREBY EXCLUDED TO THE EXTENT ALLOWED BY APPLICABLE LAW IN NO EVENT WILL GAIA OR ITS SUPPLIERS BE LIABLE FOR ANY LOST REVENUE PROFIT OR DATA OR FOR SPECIAL INDIRECT CONSEQUENTIAL INCIDENTAL OR PUNITIVE DAMAGES HOWEVER CAUSED AND REGARDLESS OF THE THEORY OF LIABILITY ARISING OUT OF THE USE OF OR INABILITY TO USE THE SOFTWARE EVEN IF GAIA OR ITS SUPPLIERS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES IN NO EVENT SHALL GAIA S OR ITS SUPPLIERS TOTAL LIABILITY TO CUSTOMER WHETHER IN CONTRACT TORT INCLUD
162. sociated input screen E Surface Water Design Project 41 Results Fluid Soil Piping Surface Water Extra kW Information Surface Water Temperatures at Average Circuit Pipe Depth Summer 460 F Winter 39 2 F Surface Water Temperatures at Average Header Pipe Depth Primary Summer 70 0 F winter 35 0 F Branches Summer 70 0 F winter 35 0 F Details Reference Only Surface Water Type Pond Surface Area 4000 fto2 Circuit Pipe Depth 12 0 ft Fig 6 2 Surface Water Panel Contents Surface Water Temperatures at Average Circuit Pipe Depth These are the temperatures in the body of water at the depth where the majority of the pipe will reside The Circuit Pipe refers to the main heat exchanger portion of the pipe and does not include the header pipe leading from the surface Temperatures in bodies of water naturally change from summer to winter Both temperatures at the circuit pipe depth should be included in this section Surface Water Temperatures at Average Header Pipe Depth 113 CHAPTER 6 The Surface Water Design Module These are the summer and winter temperatures at the average depth in the body of water where the submerged portion of the header pipes reside Header Pipe refers to the section of pipe leading from the surface to the main heat exchanger circuit portion of the loop Further distinctions are described below Primary Header This is the stan
163. stem These values vary with pipe size antifreeze and flow rate Several graphs are provided with the program to help determine these values for pure water and standard solutions but the designer is ultimately responsible for making sure the appropriate values are entered These head loss calculations also require the one way length of the header which is doubled within the program to account for both the supply and return lines Because the inputs to headers and branches are similar they are described together below Number of Lines This is the number of header or branch lines in the system Pipe Size This is the size of the pipe used in the primary header or branches For pumping reasons the size of the primary header is generally larger than the branch and circuit pipe sizes and branches are generally larger than the circuit pipe size Header Length Average Branch Length This is the designer defined one way length of the pipe from the installation to the water line and then from the water to the circuit pipes Different heat transfer calculations are used for the header pipe buried in the soil and the header pipe submerged in the water If a primary header enters the water it is automatically assumed that the branches have no soil component Likewise if branches enter the soil it is assumed that the primary header has no water component 118 CHAPTER 6 The Surface Water Design Module Head Loss per 100 feet This
164. stems information for users who do not require or desire to input the data for a fully zone divided installation Rather than matching specific pumps to each zone the Average Block Loads module uses a particular user defined style of pump or COP and matches it in an average way to the entire installation Although the input scheme is simpler the design calculations are identical to those of the more complex Zone Manager Loads module In fact on average if identical values could be placed in both the Zone Manager and Average Block loads modules identical calculated bore lengths would result In version 5 0 the Average Block Loads module optionally can accept monthly loads total and peak data When the user inputs these data the program can later calculate the monthly inlet temperatures in the borehole design module Zone Files Zone loads files are stored as zon files in the Ground Loop Design zones directory They have a general format that can be read into any loads module and they can be used simultaneously in different design modules However if this is done it may be wise to save any changes under different filenames Both loads modules are stand alone entities The files are entirely independent of project design files This means that an entire installation loading design can be entered matched with pumps optimized and saved without ever opening a design module This is valuable for users who wish to keep the loads e
165. t to any distortion mutilation or other modification or other derogatory action in relation to a work whether or not such would be prejudicial to the author s reputation and any similar right existing under common or statutory law or any country in the world or under any treaty regardless of whether or not such right is denominated or generally referred to as a moral right Confidential Information Customer agrees that Customer will not disclose or except as expressly permitted in this End User Agreement use any Software or other technical information disclosed to Customer by Gaia Confidential Information and that Customer will take all reasonable measures to maintain the confidentiality of all Confidential Information in Customer s possession or control which will in no event be less than the measures Customer uses to maintain the confidentiality of Customer s own information of equal importance Confidential Information will not include information that i is in or enters the public domain without breach of this End User Agreement ii Customer receives from a third party without restriction on disclosure and without breach of a nondisclosure obligation or iii Customer develops independently which Customer can prove with written evidence Customer acknowledges that the Software is a trade secret of Gaia the disclosure of which would cause substantial harm to Gaia that could not be remedied by the payment of damages alo
166. te Button Results The reporting section is further separated into five subsections The first deals with the bores including the total length the borehole number and the borehole length for one bore A common way to adjust the borehole length to a desired value is to change the borehole number or pattern on the Pattern panel The second subsection presents the long term ground temperature change with respect to the average ground temperature of the installation Remember that only the temperature change listed in bold has any relevance However both temperature changes will be equal if the cooling and heating loads to the ground are equal 82 CHAPTER 4 The Borehole Design Module T Borehole Design Project verticalsampleformanual Results Fluid Soil U Tube Pattern Extra kw Information Calculate COOLING HEATING Total Length ft 37325 3 20259 9 Borehole Number 100 100 Borehole Length ft 373 3 202 6 Ground Temperature Change F 1 5 2 7 Unit Inlet F 85 0 50 0 Unit Outlet F 95 1 43 9 Total Unit Capacity kBtu Hr 1325 0 1409 1 Peak Load kBtu Hr 1325 0 1160 0 Peak Demand k 99 5 83 0 Heat Purnp EER COP 13 3 4 1 System EER COP 13 3 4 1 System Flow Rate gpm 290 0 Optional Cooling Tower Boiler Condenser Capacity kBtu hr Cooling Tower Flow Rate gpm Cooling Range F Annual Operating Hours hr fyr 0 Boiler Capacity MBtuh bas alate Cooling Tower 0 o
167. tering Lord ritos 51 Monthly 0adS vto 52 Pump elote lap rn 53 CONTENTS Details and Cleate ci A A do saved esac ae 54 Custom Pump Customization ccce cece ceee ene eens ea eeaeeaenaes 54 Pump Continuous Update Feature c cece ccc e cece nee e nee e en ene eae ea eee eaenaenaeaenaes 54 The Studio Link System iiis rires niia deen dees esceeseee ue teas decyesebeaa ere eeer ees 54 Making al ii a 55 Uni A e az 55 Studio Link Status LightS oooooooocccocnconcononconccnnnnonnononno nro rra nrnnarrnnnes 56 Importing Loads Data From External Programs csceceeeneneneee eect ea enene teens 56 Using the Import Button for Commercial Loads Program Files 45 57 Using the Import Loads Command for Excel Data ooooocococcccccncncccnccncncnono 58 When Imported Data is Not Detailed Enough o oocoooccccccncccncnccncncncnanccncnos 59 Review of Loads Entry icc secess ec ii 61 Design Day Loads 22s ces i cei eee ieee sey dene ad dd 61 Annual Equivalent Full Loads Hours ccececeec eens ene eneeeeneeaeeaenens 61 Surface Water Loads tenen tet ei e eide neta eee O EE A a 62 Chapter 4 The Borehole Design Module ccocccocococcccccccccnnnrr 63 OVERVIEW ael enaa oia sie chan NN ae aae a e satel E A cheat at 63 General Features nt da dinos 63 Opening Projects dl tac untied 64 New Projects a tetas e Late 65 Existing Projecte dida tad balas ven ltda das 65 Savin
168. the Import button found in both the Average Block and the Zone Manager loads modules and import Excel files data by using the Import Loads command from the Design Studio Loads menu Since calculation programs express results in a number of different ways Ground Loop Design edits the input data so that it matches the Design Day formalism used in the Loads Modules Occasionally however the data from external loads programs do not have the hour by hour level of detail that Ground Loop Design can accept In these cases the designer or Ground Loop Design must make 56 CHAPTER 3 Loads and Zones modifications to the imported data to assure that the proper level of detail is retained In this way the program can be certain to calculate the appropriate heat exchanger size These modifications are explained later 2 Using the Import Button for Commercial Loads Programs Files To import a file from a commercial loads program the user can click on the Import button from any loads module This automatically opens the file dialog box in the zones folder and displays all files that can be imported When the user selects a valid import file the program automatically transfers the data into the current open zone of the active loads module Note that any previously existing loads will be overwritten At the same time the data is transferred into the loads module an Import Loads window is opened showing the imported data in detail This win
169. the applicable provisions of the Federal Acquisition Regulation the FAR and supplements thereto including the Department of Defense DoD FAR Supplement the DFARS The parties acknowledge that the Software was developed entirely at private expense and that no part of the Software was first produced in the performance of a Government contract If the Software is supplied for use by DoD the Software is delivered subject to the terms of this End User Agreement and either i in accordance with DFARS 227 702 1 a and 227 7202 3 a or 11 with restricted rights in accordance with DFARS 252 227 7013 c 1 i OCT 1988 as applicable If the Software is supplied for use by a Federal agency other than DoD the Software is restricted computer software delivered subject to the terms of this End User Agreement and i FAR 12 212 a ii FAR 52 227 19 or iii FAR 52 227 14 ALT IID as applicable General This End User Agreement will bind and inure to the benefit of each party s successors and assigns provided that Customer may not assign or transfer this End User Agreement in whole or in part without Gaia s written consent This End User Agreement shall be governed by and construed in accordance with the laws of the State of California United States of America as if performed wholly within the state and without giving effect to the principles of conflict of law No failure of either party to exercise or enforce any of its rights under thi
170. to his or her own system The standard equation used in the program Francis 1997 is Condenser Capacity Btu hr Flow Rate gpm x 500 x Temperature Difference F where the 500 is used for pure water and represents a factor derived from Specific Heat of Water 1 0 x 60 min hr x Density 8 33 lb gal 500 Note that Ground Loop Design actually calculates this factor from the input fluid properties on the Fluids panel although pure water is a logical choice for most cooling dominated applications For example if the cooling range is increased above the initial minimum value the capacity of the condenser also is increased reducing the total number of operating hours However in the same case decreasing the required flow rate is another option that would keep the condenser capacity and operating hours unchanged The only limitations are the required temperature difference and the minimum condenser capacity needed to meet the chosen design length With Ground Loop Design users have the flexibility to choose the parameters that fit best in their designs er Boilers In Ground Loop Design boilers are similar to cooling towers except that they are added in order to reduce the overall heating load on the system In this case the user may actually reduce the peak and annual heating loads by the flat percentage defined by the slider value The required boiler capacity and the modified peak loads applied to the loop field are sho
171. ton Iie Renumber If several zones are added or removed from the list click the Renumber button to reorganize the zones This button renumbers the existing zones from one starting with the first zone in the current list Bl Summary View Toggle Button 40 CHAPTER 3 Loads and Zones With the Summary View toggle button the user can at any time simultaneously look at the group of zones This view provides lists of the heat pump data in both cooling and heating modes as well as collective information about the set of chosen pumps This information includes the peak loads and when they occur and the total combined capacity the peak demand and the average efficiency of the selected equipment Although individual pumps cannot be added or removed in the Summary View changes made across the entire pump selection are directly observable A sample Summary panel is shown in figure 3 3 Note that more than one type of pump series is listed ma Zone Manager Heat Pumps Loads 5 Ge es a a S a F G BoreholeSample zon Ret Return Design Day Loads MBtu Hr Capacity Power COP 15 x Zone Pump 812 12 4 48 8 8 MBtujHri kw EER PLF 1 EV048 2 62 0 89 0 0 0 0 0 93 5 7 5 12 5 954 2 EVO48 2 56 05 BS 0 0 00 S955 25 12 591 3 EVO48 1 46 0 36 0 21 0 0 0 46 7 3 7 12 5 98 4 EVO30 1 26 0 18 0 15 0 0 0 30 0 2 1 14 3 87 5 EVO48 2 20 0 36 0 90 0 0 0 93 5 7 5 12 5 96 6 GEHA 036 2 62 0 56 0 0 0 0 0 70 4 5 8 12 0 88 Y
172. ture cceceeceeceeeeeee ene eaeaee 99 Soil Thermal Properties cccccececeeeecee eee eeeeeeneeeeneeneeneeas 99 Diffusivity Calculator ccece eee ec eee ee eee eeeeeneeaenes 100 Ground Temperature Corrections at Given Depth ceeeeee es 100 Regional Air Temperature SWIN8 ooooccccccncncncnccnnccncnancs 101 Coldest Warmest Day in Year cceceeceneeeeneee eee ee es 101 PAD eke wise hae EE 101 Design Heat Pump Inlet Fluid Temperatures ceeeeeeeeeeeees 101 Design System Flow Rate cccecceeeceeceecec ences eeeneneeneeneeas 101 Solution Properties sde zee eye rasp diia 102 Calcule iris drid pidi 103 Report ESO atea thes 105 Optional Cooling TOWE eaer Ra A EAS 105 Printing Reports oi trad 108 Chapter 6 The Surface Water Design Module oomcooooooo 109 OVERVIEW o O DI EERE E EEEE oot base 109 Genera Features opan ies eae E eE EE ES a 109 Opening Proein daa 110 New Projets sia ta 111 Existing Projects ui ae 111 SAVING Project isc a ps teas idas totes 111 Typical Oper ii aaa 111 Before You Bein cd ds 112 Entering Data into the Tabbed Panels oooooocoooocnncnnoncnnonnonnoncnnnnn corr ee eae eaenaeges 112 DUTFACE WEE A A a E E i 113 Surface Water Temperatures at Average Circuit Pipe Depth 113 Surface Water Temperatures at Average Header Pipe Depth 113 Primary Header tarado 114 Bran
173. ture and Flow Rate Pump Manufacturer Florida Heat Pump ALE Pump Series EY Series Pump Type Water to Air Nominal Flow CFM Inlet Air Temperatures and Flow Rate Load EAT Cooling WB 67 0 degF Heating DB 70 0 degF Flow Rate Cooling 7600 CFM Heating 7509 CFM Fig 3 8 Pump Details Panel Clear Pressing the Clear button clears the current pump in a zone All values are reset to the initial state allowing the user to reselect or enter a pump for the zone 46 A CHAPTER 3 Loads and Zones Custom Pump Customization If the designer must include a heat pump unit that is not stored in Ground Loop Design s Heat Pump Database he or she may add customized pumps simply by entering values directly into the boxes on the pump selection section of the zone data window When the user does this and overrides the automatic selection features a check appears next to the Custom Pump label indicating that the pump information is from an external source The details section will no longer contain information about the pump manufacturer series or type The calculation portion of Ground Loop Design will require at least the capacity and power data to utilize the pump properly The actual COP used in the calculations is determined from the capacity and the power not the input text box Other information may be added for the designer s reference Note When a custom pump is included its values will remai
174. type of input After the user enters all parameters the software calculates the required pipe length the circuit number the inlet and outlet temperatures and the COP etc based on the design specifications Again within this framework it is straightforward to make changes and recalculate results especially when using the expanded user interface The input information is organized into seven panels shown in figure 1 5 Results Fluid Soil Piping Surface Water Extra kW Information Fig 1 5 Surface Water Design Panel List These seven panels include Results Fluid Soil Piping Surface Water Extra kW and Information The panel names and many of the panel input parameters differ from those of the Borehole Design module A more complete description about how to enter data and perform calculations in the Surface Water Design module is provided in Chapter 6 Theoretical Basis To determine the length of pipe necessary for different surface water systems experiments were conducted for different size pipes in coiled and slinky configurations for both heating and cooling modes Kavanaugh 1997 Ground Loop Design uses a polynomial fit of this experimental data to determine the amount of pipe necessary for different loading conditions Additionally coefficients are used to take into account the effect of the heat transfer in the lengths of the header and the branch piping that are in 19 CHAPTER 1 Groun
175. urface Water Design Modulle cccccssecscesseeseceseeseceeceseceeceeeeeeeeneeseeeeeeneeeneennne es 19 DOSCriptiOns scccisgcescaesseicse heeds aie adGiate aidan sion ones E 19 Theoretical Basis 4 10 d2ocaseuesnescanicee its 19 Additional Modules ii a aiwnien 20 REPO Li lode ladtuiiiah al eeiGeatSaids E ENS 20 Project Reports Lasien ES 20 Monthly Inlet Temperature Reports cccceccecssessecsseeseceeceseceseceeeeaeceeceesereneerees 20 Zone Lords Reports aiii load 21 Data References Files zi Program Help and SUPpoOrt ooooooococoncoconconcnncncnnonnononrnnr nro nro eens teens ease E EE 22 Reference ado a da dd 22 Chapter 2 Adding Editing Heat PUMPS oooocccccccncccnccccnncnoninnnnnncnnan nar 24 Heat Pump Model de iia 24 NS hese eae E EE ose este nde RRM 24 CONTENTS Theoretical Basi ER E Za Capacity and PoWer ccccceec eee ne eee eee eee ee eeseneeeeaenaeneenees 25 Flow Rate isnt he E a 26 Load Side Corrections 0 ccceceeeee senescent neta eeenene eee eeeneneeaeneens 26 Entering Data into the Add Edit Heat Pumps Module ceceeeeeeeneee ee eneneeeees 27 Creating a New Series and or Manufacturet cccccsccesecsecesceseeeeeeeeeeseeteeeeaeeee es 27 Editing Pump Dataset csc cscs shoes r hatte aa 28 Pump Series Controls cccccececcee eens eeeeneee ene E EET E 28 Pump Edit Controls 0 cccccececeeceecec ene eeeeeeneeaeeaeaes 29 Save Control ays ected Ae eee eee
176. used for the inlet source data on the Cooling and Heating tabbed panels described previously Occasionally manufacturers will provide capacity values at the standard temperature with a table of correction factors that can be entered into the Ground Loop Design Load Temperatures panel directly Notice how in figure 2 5 five points of data are included for cooling but only three are included for heating The software requires a minimum of three data points for its coefficient calculation More data may be input if desired However no boxes may be left blank Other temperature and coefficient values must 31 CHAPTER 2 Adding Editing Heat Pumps be set to zero in this case As a convenience 0 buttons are included to quickly set rows to zero General Cooling Heating Load Temperatures Load Flows Test Temperature Corrections LOAD COOLING HEATING EAT WB Capacity Power EAT DB Capacity Power degF Factor Factor degF Factor Factor Calculate Coefficients Fig 2 5 Heat Pump Load Temperatures Panel Note If correction factors are unknown or unnecessary they can all be left at the constant value of 1 0 which is the initial condition that exists when a new pump is first added Load Flows Panel Similar to the Load Temperatures panel the Load Flows panel allows the user to enter corrections for variation in load side flow rates The system used here is different however Every pump is assigned a no
177. users to define the borehole layout in a gridfile import the gridfile into the program and then automatically determine the required G function Because of increased data entry requirements for the monthly and peak loads data in the second model it is only applicable when used in 16 CHAPTER 1 Ground Loop Design Overview conjunction with the Average Block Loads module where only one set of monthly loads data is required per installation Use of the Zone Manager is limited to the original cylindrical source theoretical model The other design modules currently do not make specific use of the monthly loads data except in the reduced equivalent hours form Horizontal Design Module Description The Horizontal Design module similar to the Borehole Design module allows the user to enter parameters necessary to describe a horizontal buried pipe and trench configuration Again the interface is arranged in panels corresponding to the type of input Key design parameters also can be modified quickly in the expanded user interface as well see figure 1 2 above After the user enters all parameters the software calculates results such as the required trench and pipe lengths the inlet and outlet temperatures the coefficient of performance COP etc based on the input data The input information is organized into seven panels as shown in figure 1 4 Results Fiuid Soil Piping Configuration Extra kw Information
178. ved at any time using Save or Save As from the Design Studio File menu or by clicking the save button on the toolbar When the user closes the program or module the program automatically asks the user if he or she wants to save the project and associated loads files Typical Operation Although each user will have his or her own unique style the typical operation of the Borehole Design module would include the following steps 1 Enter Loads and select pump in either the Average Block Loads module or the Zone Manager module 2 Forma link between the loads module and the design module 65 CHAPTER 4 The Borehole Design Module Modify step by step the input parameters listed in each panel Perform initial calculation 5 Modify various parameters and recalculate to determine the effects of the modifications 6 Add an optional boiler cooling tower Establish an optimal system 8 Save and or print the project and associated zone file gt a Entering Data into the Tabbed Panels Ground Loop Design s innovative tabbed panel system provides for easy organization of and direct access to the relatively large number of design parameters associated with a particular project This section describes the Information Extra kW Pattern U Tube Soil Fluid and Results panels See Chapter 3 for a discussion of Loads entry Information The contents of the Information panel are shown in figure 4 2 All of the descriptive in
179. ved at any time using Save or Save As from the Design Studio File menu or by clicking the save button on the toolbar When the user closes the program or module the program automatically asks the user if he or she wants to save the project and associated loads files Typical Operation Although each user will have his or her own unique style the typical operation of the Horizontal Design module would include the following steps 1 Enter Loads and select pumps in either the Average Block Loads module or the Zone Manager module Form a link between the loads module and the design module Modify step by step the input parameters listed in each panel Perform initial calculation Modify various parameters and recalculate to determine the effects of the modifications 6 Add a optional boiler cooling tower A 92 CHAPTER 5 The Horizontal Design Module 7 Establish an optimal system 8 Save and or print the project and associated zone file Entering Data into the Tabbed Panels Ground Loop Design s innovative tabbed panel system provides for easy organization of and direct access to the relatively large number of design parameters associated with a particular project This section describes the Information Extra kW Configuration Piping Soil Fluid and Results panels The Information and Extra kW panels are identical to those included in the Borehole Design module described in Chapter 4 so the reader is referred there for
180. ways to open Horizontal Design projects One is by using the New Horizontal command from the Design Studio File menu or toolbar and the other is by opening an existing Horizontal Design project gld file Files cannot be opened if other modules with the same name are already open As many files can be opened as the system s memory permits 91 CHAPTER 5 The Horizontal Design Module EH New Projects New projects may be opened at any time from the Design Studio by choosing New Horizontal from either the Design Studio File menu or the toolbar New projects open with standard parameter values that must be edited for new projects In new projects no loads files zon are loaded The user must create a new loads file or open an existing loads file into one of the loads modules Links may be established using the Studio Link system described in Chapter 3 Existing Projects Existing projects may be opened at any time from the Design Studio by choosing Open from the Design Studio File menu or toolbar The file automatically opens into a new Horizontal Design Project module If a loads file zon is associated with the loaded project the loads file automatically will be loaded into the appropriate loads module and opened along with the project file However if the associated loads file cannot be found the user will be notified and the automatic file loading will not occur Saving Projects Projects may be sa
181. wn on the panel but no other inclusion electrical or fuel costs for the boiler are included in the calculation report The expected heat pump power is also reduced by the same percentage in order to estimate a real system 107 CHAPTER 5 The Horizontal Design Module Printing Reports Reports of the active project can be printed at any time from the Design Studio using the toolbar print button or from the File menu gt Print The information printed includes all of the input parameters from the design module along with the associated results The zone and loads information is not included with the report and must be printed separately from the Loads panel The filename of the zon file associated with the project report is also listed on the report Two different project reports are available concise and detailed The concise form includes all of the design parameters but omits some of the project information and comments The detailed version includes the project information and comments More information on reports can be found in Chapter 7 References Francis E Editor Refrigeration and Air Conditioning 3 Edition Air Conditioning and Refrigeration Institute p 186 Prentice Hall New Jersey 1997 Incropera F and Dewitt D Introduction to Heat Transfer 2 Edition p 456 p 98 John Wiley and Sons New York 1990 Paul N The Effect of Grout Thermal Conductivity on Vertical Geothermal Heat Exchanger Design
182. y Cooling 0 9 ft hd Extra Equivalent Length per Heating 15 Slinky Heating 15 fthd Circuit 33 1 ft Fig 6 3 Piping Circuit Panel Contents pri Circuit Style Pipe Layout Number of Parallel Circuits C Coil Slinky Pas Fig 6 4 Piping Controls in Circuit Parameters Circuit Pipe Size Expanded User Interface This is the size of the pipe used in the primary heat transfer circuits Although larger pipes offer better heat transfer designers generally prefer smaller sizes 3 4 1 because of ease of handling and lower pipe costs 115 CHAPTER 6 The Surface Water Design Module Number of Parallel Circuits This is the number of parallel circuits required to maintain the required minimum flow rates defined by the designer If the number of circuits entered here is greater than the allowed number of circuits this value will be overwritten automatically with the limiting value when the calculations are performed Even if the circuits are split into equivalent groups for example three groups with ten circuits each the total number of parallel circuits the smallest unit will not change Circuit Style Both loose bundled coils and slinky spread out styles are available If extensive spacers are used in a coil style arrangement the slinky model may provide more accurate results but the loose coil option will provide the more conservative results
Download Pdf Manuals