1. Installing the Inverter solar ft Ee 8 SolarEdge Installation Guide MAN 01 00002 1 6 4 10 cm H SH 4 10 cm fe 20 cm Figure 7 Chassis Clearance Mounting the Inverter CAUTION Make sure that you have read the previous sections in this chapter before starting the mounting process that is described below The Single Phase Inverter installation package provides the Single Phase Inverter and the mounting bracket that is required to connect it to the wall Standard tools not provided can be used during its installation The DCD 1ph US B AC DC Safety Switch has a template with drilling hole locations for the inverter and the switch If a Safety Switch of this type is being used these locations should be marked before installing the inverter Installing the Inverter solarne stating the mener 5 SolarEdge Installation Guide MAN 01 00002 1 6 To mount the Single Phase Inverter 1 Attach the provided bracket to a wall or pole as follows e Ensure that the U shaped part of the bracket is positioned on the top as shown below Figure 8 Positioning the U shaped Part of the Bracket e When mounting on a wall bolt the four outer most holes of the bracket Other holes may be used to stabilize the bracket or when the outer most holes cannot be used e When mounting on a pole bolt the suitable inner holes of the bracket 2 Verify that the bracket is firmly attached to the wall or pole
2. 5 Unscrew the Allen screws on the cover of the chassis on its front and lift the cover up 6 Connecting the AC Wires Strip off the isolation and expose the three wires in the AC cable as follows e Protective Earth PE wire e Neutral N e Line 1 L The lengths of the wires to strip are as follows 0 32 in 8 mm 2 00 ins SO mm H 5 Figure 13 Wire Lengths to Strip Installing the Inverter solar ILE Ef 8 SolarEdge Installation Guide MAN 01 00002 1 6 e Strip 8 mm 0 32 for contact e Individual cable length 50 mm 2 WARNING Make sure to connect the PE ground connector first Veillez relier le conducteur de PE la terre d abord 7 Insert the cable through the AC cable gland on the right and connect the wires to the appropriate terminal connectors Terminal blocks are labeled A through E as shown in Figure 15 Below the terminal blocks on the inverter chassis there is a label shown in Figure 14 which illustrates how to connect the wires when connecting to a 208V 240V grid or 277V grid Be sure to follow these connection instructions to ensure proper connection A TA 208 240 amp Figure 14 Terminal Wires Connection Installing the Inverter solaris SolarEdge Installation Guide MAN 01 00002 1 6 Terminal Connectors Figure 15 AC Terminal Blocks 8 Tighten the screws of each wire terminal according to the following tor
3. Disclaimers solarne mre z SolarEdge Installation Guide MAN 01 00002 1 6 Disclaimers Important Notice Copyright SolarEdge Inc All rights reserved No part of this document may be reproduced stored in a retrieval system or transmitted in any form or by any means electronic mechanical photographic magnetic or otherwise without the prior written permission of SolarEdge Inc This document is solely for the use of SolarEdge customers and employees The material furnished in this document is believed to be accurate and reliable However SolarEdge assumes no responsibility for the use of this material SolarEdge reserves the right to make changes to the material at any time and without notice You may refer to the SolarEdge web site www solaredge com for the most updated version All company and brand products and service names are trademarks or registered trademarks of their respective holders Exclusion of Liability The general terms and conditions of delivery of SolarEdge shall apply The content of these documents is continually reviewed and amended where necessary However discrepancies cannot be excluded No guarantee is made for the completeness of these documents Table of Contents solar Le n SolarEdge Installation Guide MAN 01 00002 1 6 Table of Contents DISCLAIMERS en danses ae dessine es 2 Handling and Safety Instructions sscccccccsssssssssscccccccsssssscccccssecsssscees 6 Support
4. connector of the output wire of the first power optimizer in the string to the Minus connector of the second power optimizer in the string Repeat this step for each power optimizer in the string This procedure is similar to the standard procedure for connecting PV modules WARNING A Make sure that the Plus and the Minus connector cables are firmly and totally inserted Veillez a ce que les cables de connexion Plus et Moins sont ins r s fermement et jusqu au bout TA A Be sure to record power optimizer serial numbers during their installation as this information may be required later for troubleshooting and is necessary for proper physical layout on the monitoring website The SolarEdge Monitoring Portal can be used to access SolarEdge site information as described in the Step 4 Reporting and Monitoring Installation Data section on page 61 Installing the Power Optimizers solar SEE 1 EEEN ag SolarEdge Installation Guide MAN 01 00002 1 6 Verifying Proper Power Optimizer Connection gt To verify proper power optimizer connection Make sure the PV modules are exposed to sunlight during this process Otherwise the power optimizers may not be powered up Verify each string individually before connecting it to the other strings or to the inverter Each power optimizer connected to a PV module initially produces a safe voltage of 1 V A string with properly connected power optimizers should pr
5. 40 to 120 60 FC Temperature Range Higher input DC power may be installed analyze yearly AC performance Power de rating over 120F 50C Refer to Appendix D Inverter Power De rating on page 118 for details Technical Specifications solar LEE ee ttt SolarEdge Installation Guide MAN 01 00002 1 6 Default Trip Limits and Times according to IEEE 1547 OP250 LV OP300 MV and OP400 MV OP400 MV O0 jae Maximum Input Current 10 Yes Nighttime Power Consumption Technical Specifications Solar HE 1e specications 5 SolarEdge Installation Guide MAN 01 00002 1 6 OP250 LV OP300 MV OP400 MV Output During Operation Power Optimizer Connected to Operating Inverter Maximum Output Current Operating Output Voltage Total Maximum String Voltage 500 Vdc Controlled by Inverter US and EU 1 ph Total Maximum String Voltage Controlled by Inverter EU 3 ph Output During Standby Power Optimizer Disconnected from Inverter or Inverter Off Safety Output Voltage per Power 1 Vdc Optimizer PV System Design Minimum Number of Power 8 1 ph system 16 3 ph Optimizers per String 1 or More system Modules per Power Optimizer Maximum Number of Power Module power dependent Optimizers per String 1 or More typically Modules per Power Optimizer 20 25 1 ph system 45 50 3 ph system Parallel Strings of Different Yes Lengths or Orientations Standard Compliance EMC FCC Part15 C
6. MAN 01 00002 1 6 Chapter 4 Commissioning the Installation Commissioning Workflow The following workflow describes how to activate the system commission the installation and verify the proper functioning of the system Step 1 Activating the System page 57 Step 2 Pairing Power Optimizers to the Inverter page 58 Step 3 Verifying Proper Operation page 60 Step 4 Reporting and Monitoring Installation Data page 61 S Keep this manual accessible and preferably near the inverter Commissioning the Installation solar gag cermin ne Male SolarEdge Installation Guide MAN 01 00002 1 6 Step 1 Activating the System This section describes how to perform the initial activation stages of the SolarEdge system These stages are preformed after the inverter and power optimizers have been installed and the power optimizers have been connected to the inverter gt To activate the SolarEdge installation 1 Power OFF the Single Phase Inverter by turning off the ON OFF switch at the bottom of the inverter 2 Turn on the AC at the breakers and at the AC DC safety switch 3 If the site is installed with an external DC switch between the power optimizers and the inverter s then turn it ON A message similar to the following message appears on the inverter s LCD panel Vac v VDc v 230 7 14 1 P OK 000 000 4 Verify that P_OK appears which indicates a connection to the power optimizers and that at least o
7. Two pins numbered 2 and 3 must be connected The two wires must both belong to the same twisted pair which is usually indicated by similarly colored wire In addition a grounding wire that is connected to pin number 6 must also be connected For this purpose you can use any remaining wire of the telephone cable The wiring on the next inverter should be the same a gt SY G 33 Figure 43 Crimping the Wires e Connect the RS485 cable connector to either of the RS485 plugs on boards in the inverter e Connect the other end of the RS485 cable of the first inverter through the gland to the RS485 connector on the board of the next inverter in the chain as described above e You can use both RS485 connectors to wire up to two inverters one to the left and one to the right Setting Up Communication solar TEE a SolarEdge Installation Guide MAN 01 00002 1 6 If the inverter has block terminal connectors then connect as follows e The RS485 RS232 block terminal is already inserted into the inverter when it is delivered Pull this block terminal as shown on the left below Hl i Hin Ji Hl Hl Hl HH ih Hi i HH Figure 44 Removing the RS485 RS232 Block Terminal NOTE Do not insert wires into the connectors labeled RS485 2 Setting Up Communication poten RE 0 Lp Commotion SolarEdge Installation Guide MAN 01 00002 1 6 e Loosen the screws of each of the connectors B A and G on
8. You can toggle between these windows by clicking the LCD light button Initial Inverter Status Window Vac v Vdc v 240 7 3 71 9 P OK X XX YYY Vac v Specifies the AC output voltage in Volts a Vdc v Specifies the DC input voltage in Volts Pac w Specifies the AC output power in Watts P_OK XXX YYY Indicates a functioning DC line communication connection to the SolarEdge power optimizers which indicates that telemetry information was received within the last 10 minutes XXX is the number of paired power optimizers for which telemetries have been received by the inverter in the last two hours YYY is the number of paired power optimizers identified during the most recent pairing process Both XXX and YYY should be the same If they are not it may indicate an access issue or pairing requirement that require your attention S_OK Indicates a functioning connection to the SolarEdge Monitoring Server which was validated during the last two minutes This connection is not mandatory for power generation ON OFF Indicates the position of the inverter ON OFF Switch Inverter User Interface solar ET e SolarEdge Installation Guide MAN 01 00002 1 6 Main Inverter Status Window After you press the inverter s LCD light button to display the window shown above you can press it again to display the Inverter Main Status window This is the most informative window during the normal course of events because i
9. sur l cran LCD coupez le courant CA de l onduleur et attendez cinq minutes pour que les condensateurs d entr e de l onduleur soient d charg s 3 You can now add or remove power optimizers add or remove strings change connections of power optimizers or strings or replace the inverter 4 Perform the Commissioning Workflow as described on page 56 NOTE Y If you are permanantly dismantaling the installation or part of it make sure to use the disposal method dictated by the regulations of the country in which the inverters are installed gt To move one or more power optimizers from one inverter to another in the same site 1 Turn both inverters OFF as described above 2 Connect each power optimizer to the strings of the other inverter 3 Perform the Commissioning Workflow as described on page 56 on the inverter to which a power optimizer was added and only then perform the Commissioning Workflow on the inverter from which a power optimizer was removed CAUTION Commissioning must first be performed on the inverter to which power optimizers were added and only then on the inverter from which power optimizers were removed Otherwise the inverter to which power optimizers were added may be damaged La mise en marche doit se faire d abord avec l onduleur auquel les optimiseurs de puissance ont t rajout es et seulement ensuite avec celui duquel les optimiseurs de puissance ont t enlev es Sin
10. 1 6 Appendix C Power Optimizer Mechanical Specifications About This Appendix This appendix presents the mechanical specifications for the SolarEdge power optimizers Use 5 16 screws and washers to secure the power optimizer units to the racking NOTE Y SolarEdge does not provide the screws nuts or washers because the required sizes and lengths vary for different racks CAUTION Before installing directly on the module or module frame first consult the module manufacturer for information about the proper positioning and its impact on the module warranty Avant d installer directement sur le module ou sur le cadre du module consultez d abord le fabricant pour information sur la meilleure mani re de la positionner et son impact sur la garantie du module Mark all mounting hole locations Each power optimizer must be attached to the rack using both mounting holes aE Drill the holes CAUTION Do not drill through the power optimizer or through the mounting holes The strong vibrations created by the drill can damage the power optimizer Ne pas percer a travers la optimiseur de puissance ou ses trous de fixation Les vibrations qui en r sulteraient peuvent endommager la optimiseur de puissance Power Optimizer Mechanical Specifications poire Phi Mechanica specications SolarEdge Installation Guide MAN 01 00002 1 6 OP250 LV OP300 MV OP400 MV Power Optimizers The following fig
11. ICAUIONS vecscesesesssssccwasesessessssessaenssssustesssssssnaseoteessseensenns LAD OP250 LV OP300 MV OP400 MV Power Optimizers 00000 116 PB250 AOB and PB350 AOB Power Optimizers cccccsssssssssseees 117 Appendix D Inverters Power De rating c 00000 848 118 Appendix E Limited Product Warranty ss 119 solar LEE Handling and Safety Instructions 6 SolarEdge Installation Guide MAN 01 00002 1 6 Handling and Safety Instructions During installation testing and inspection adherence to the following handling and safety instructions is mandatory Safety Symbols The following safety symbols are used throughout this document Familiarize yourself with the symbols and their meaning before installing or operating this instrument AN x Denotes a hazard It calls attention to a procedure that if not correctly performed or adhered to could result in injury or loss of life Do not proceed beyond a warning note until the indicated conditions are fully understood and met D note un risque il attire l attention sur une op ration qui si elle n est pas faite ou suivi correctement pourrait causer des blessures ou un danger de mort Ne pas d passer une telle note avant que les conditions requises soient totallement comprises et accomplies Denotes a hazard It calls attention to a procedure that if not correctly performed or adhered to could result in damage or destruction of t
12. Installing the Inverter solar ILE T SolarEdge Installation Guide MAN 01 00002 1 6 3 Hang the inverter on the bracket using the screws on the inverter s top as shown below def Figure 9 Hanging the Inverter on the Bracket CAUTION Do not rest the connectors at the bottom of the inverter on the ground at any time as it may damage them If you need to rest the chassis on the ground lay it on its back front or side not on its bottom A aucun moment ne posez les connecteurs inf rieurs de l onduleur sur le sol de peur de les endommager Si vous avez besoin de poser le chassis sur le sol couchez le sur son dos sur sa face ou son cot pas sur son bas Installing the Inverter solaraen ore merer zy SolarEdge Installation Guide MAN 01 00002 1 6 4 Let the chassis lay flat against the wall or pole Then screw one screw into the right side and one screw into the left side of the bottom of the bracket The screws go through the outer heat sink fin on either side into the bracket as shown below D T P 2D _ Figure 10 Inserting the Screws into the Bottom Heat Sink Fins Connecting the Inverter Inverter Connection Overview The SolarEdge inverter can be configured in the field for an AC grid including AC voltage and frequency If the inverter s default settings are not suited to the country of the installation site then please refer to page 95 for a description o
13. Monitoring Server via a LAN an external modem connected to an RS232 port an RS485 bus or a ZigBee modem is described in Chapter 6 Setting Up Communication on page 66 Installing the Inverter solar ET a SolarEdge Installation Guide MAN 01 00002 1 6 Closing the Cover gt To close the cover a Shut the chassis cover and secure it by tightening the screws 2 For proper sealing first tighten the corner screws and then the two central screws The recommended order can be seen in the following figure h i s L LAJI 1 t i 6 p 3 h Figure 18 Tightening the Screws Installing the AC DC Safety Switch What is the AC DC Safety Switch The AC DC Safety Switch is a manually operated switch for disconnecting the AC and DC power of a SolarEdge inverter in a SolarEdge power harvesting system The AC DC Safety Switch is installed on the bottom of each inverter AC and DC cables run through it and connect to the inverter The AC DC Safety Switch opens all ungrounded conductors of the circuit to which it is connected in compliance with the National Electric Code and specifically NEC690 35 which addresses ungrounded PV arrays The AC DC Safety Switch is rated to the operating condition of the inverter 32ADC 600VDC and 25 continuous AAC 277 240 208 V AC Two types of switches are available one with part number DCD 1ph US A and the other with part number DCD 1ph US B The specifications for ea
14. OFF Switch Turning this switch ON starts the operation of the power optimizers enables power production and allows the Single Phase Inverter to begin exporting power to the utility grid Turning it OFF reduces the power optimizer voltage to a low safety voltage and inhibits exportation of power When this switch is OFF the inverter control circuitry remains powered up LCD Button Pressing this button lights up the LCD for 30 seconds In addition you can press this button to access configuration menu options as described on page 98 RS232 Connector e Provides a configuration control and management connection to a locally connected PC or laptop or to an external modem for connection to the SolarEdge Monitoring Portal You may refer to the Creating an RS232 UART Connection section on page 69 for a description of how to set up this communication option to the SolarEdge Monitoring server You may refer to the SolarEdge Monitoring Portal User Guide for more information about the monitoring capacities Other Communication Options Ethernet LAN RS485 or ZigBee Three other types of communication options can be used to connect the inverter to the SolarEdge Monitoring Portal They are installed through the three cable glands You may refer to the Chapter 6 Setting Up Communication on page 66 for a description of how to set up these communication options to the SolarEdge Monitoring server S NOTE RS485 connection is not available o
15. and Contact Information ssssssssssssssseesseeessseesee 8 Chapter 1 Introducing the SolarEdge Power Harvesting SY SO ccs sseeccesccuesvesssensctsssazesanccosesasssusciuesisesceses 7 What is the SolarEdge Power Harvesting Solution scssssssssscoees 9 SolarEdge Power Optimizer ss 9 Single Phase Inverter seizes seanscesesasesscinennnsesiannnccesernianibabaniaatananisesetaacteganss 10 SolarEdge Monitoring Portal 11 Installation WOERDIONW 8 hi sde 12 Transport and SIDA 2 13 Single Phase Inverter Transport 13 Single Phase Inverter Storage 13 BGM INE iSi 13 Chapter 2 Installing the Power Optimizers 0004 15 Applicable Notes and Warnings sssccccccsssssssscscccccccsssscsccccsssesssscees 15 Step 1 Mounting the Power OptimMizers cccccccscssssssssssccssccccccccsssees 18 Step 2 Connecting Each PV Module to a Power Optimizer se0 20 OP250 LV OP300 MV and OP400 MV ccccccccceceeeeeeeeeeeeeeeeeeeeeeees 20 PB250 AOB and PB350 AOB cccccccccccceceeeeeeeeeeeeeeeeeeeeeeeeeeseeeeseeess 21 Connecting Power Optimizers ss 22 Step 3 Connecting Power Optimizers in Strings sssssssececcsssssseecsosssssee 23 Verifying Proper Power Optimizer Connection ccccccecccceeceeeeeeeees 24 Step 4 Recording Installation Information 26 Chapter 3 Installing the Inverter ccccsssssssseccceeeees 27 Identifying he V FIOr
16. displays a message when an error occurs This appendix lists the error messages that may appear on the inverter s LCD panel describes their meaning and describes how to troubleshoot each one Each message may comprise up to two lines of 20 characters each The following shows the format of an error message on the inverter LCD panel Error code X X X XXX XK KK KK KX KK KKK KKK KKK XXX KKK KK KKK KKK KKK KKK Each error message 1s displayed for 30 seconds If the error no longer exists the inverter displays the Waking Up message Errors and Troubleshooting SolarEdge Installation Guide MAN 01 00002 1 6 The following table lists the error messages that appear on the inverter and describes how to troubleshoot each one Error LCD Description Troubleshooting Message AC Current The internal hardware If this fault persists Surge that measures AC Check the AC connection to the current has measured inverter substantially high output currents This may occur because of changes in the AC voltage or a switching load near the site Ask the grid operator whether a large surge source or irregular load exists near the site Errors and Troubleshooting SolarEdge Installation Guide MAN 01 00002 1 6 Error LCD Description Troubleshooting Message Ground Ground current surge Ground faults may occur due to Current The internal hardware insufficient insulation to the ground RCD that measures gr
17. following table Ethernet connection CATS 6 or 4 5 7 mm a ooo antenna 16 RS485 and ZigBee antenna Be sure that the communication type in use connects to the appropriate gland Communication Types The following types of communication can be used to transfer the monitored information from the inverter to the SolarEdge Monitoring Server a RS232 UART page 69 This communication option is provided in all inverters by default It is used to connect to any external modem that has an RS232 port Ethernet page 70 Enables the connection of the inverter directly to a LAN E RS485 page 75 Enables the connection of multiple inverters through the same bus such that connecting only one inverter to the Internet is sufficient to provide communication services to all the inverters on the bus NOTE Y RS485 connection is not available on the SE3000 In addition there are three types of wireless communication options that are available and purchased separately They are ZigBee WiFi and GSM Refer to relevant documentation for details about their installation NOTE solar tt Setting Up Communication SolarEdge Installation Guide MAN 01 00002 1 6 Ethernet and RS485 are connected to a connector inside the inverter An inverter communication board has either RJ45 RJ11 connectors or block terminal connectors for communication The following shows the location of the RJ45 RJ11 communication connectors RS485 RJ1
18. later for troubleshooting and is necessary for proper physical layout on the monitoring website The serial number s of the inverter s must be specified in order to open a new site For more information about recording and monitoring installation data see page 61 Installing the Inverter solar ZT a SolarEdge Installation Guide MAN 01 00002 1 6 Chapter 3 Installing the Inverter The Single Phase Inverter can be installed either before or after the PV modules and power optimizers have been installed Identifying the Inverter Refer to the stickers on the side of the inverter that specify its Serial and its Electrical Ratings including its Max Output Power Please provide the serial number when contacting the SolarEdge support line The serial number is also required when requesting to open a new site in the SolarEdge Monitoring Portal Selecting the Mounting Location This process involves attaching the inverter mounting bracket to a wall or pole and then mounting the Single Phase Inverter onto it Chassis Clearance The heat dissipation solution requires the following clearance areas between the Single Phase Inverter chassis and all types of obstructions such as wires and walls 8 20 cm to the top and bottom of the chassis 4 10 cm to the right and left of the chassis NOTE Y If more than one Single Phase Inverter is installed side by side the distances between them must exceed 4 10 cm
19. oe ceccacssestaceceensescsvesscescesesveses E aa 27 Selecting the Mounting LOcation sssccccccssssssssssscccccssssssssccccsscsssscees 27 Chassie CEACE crinca A E E A 2 Mou ntime the Tnyerler ssion E 28 Connect he Inverter scornu 31 Inverter Connection OVERVIEW nn andre red ET ares 31 AC Ords Suppor a a ue 34 Connecting the Single Phase Inverter 35 Table of Contents solar ft 4 SolarEdge Installation Guide MAN 01 00002 1 6 Completing the Single Phase Inverter Installation 4 Installing the AC DC Safety Switch 42 Ground Fault Circuit Interrupter cccccccsssssssssccccccssssssscccccsscsssscees 55 Chapter 4 Commissioning the Installation 000 56 Commissioning WOLKlOW cccrsssssssccscccccccccccccccsssssssssscsssccsscccsssees 56 Step 1 Activating the System 37 Step 2 Pairing Power Optimizers to the Inverter ccceceeeeeeeeeees 58 Step 3 Verifying Proper Operation ss 60 Step 4 Reporting and Monitoring Installation Data 61 Chapter 5 Replacing and Adding System Components 64 Modifying an Existing Installation cccccccsssssssssccccssssssssssccccsssesssscees 64 Chapter 6 Setting Up Communication 06 Communication Dataflow ssseeeccccosceccccccccsecceccccssecccccccssecceccccsssecccccessseeee 66 Connector PATE sc
20. of the inverter to MASTER as described in the Configuring the Inverter Using the LCD Panel and User Buttons section on page 88 e Select the 5 4 2 Slave Detect option to initiate automatic detection of the Slave inverters that are connected to this Master inverter This verifies that they are configured as Slaves e The Master should report the correct number of slaves If it does not verify the connections and terminations as described above Verify the connection of the Master to the SolarEdge Server as described in the Verifying the Connection section below Verifying the Connection gt To verify the connection 1 2 3 Verify that the DC circuit breaker is OFF Verify that the inverter s ON OFF switch is still OFF Turn ON the AC to the inverter by using the circuit breakers on the main circuit board and verify that the AC DC safety switch is ON Wait for the inverter to connect to the SolarEdge Monitoring Server This may take up to two minutes Verify that the LCD panel displays a window similar to the following Setting Up Communication solar ILE EE ga SolarEdge Installation Guide MAN 01 00002 1 6 e S_OK Verify that S_OK appears on the panel to indicate a functioning connection to the SolarEdge Monitoring Server which was validated during the last two minutes NOTE Y If the S_OK indication is not displayed then perform the following Use another method unrelated to the SolarEdge Inve
21. on both DC and DC according to NEC690 35 B NOTE v SolarEdge s fixed input voltage architecture enables the parallel strings to be of different lengths Therefore they do not necessarily need to be connected to an identical number of power optimizers The lengths of the wires to strip are as follows 0 32 in amp mm 2 00 in SO mm H n Figure 29 Wire Lengths to Strip DC e Strip 8 mm 0 32 to enable contact e Each cable length is 50 mm 2 Ensure that the wire is connected to the terminal connector and that the wire is connected to the terminal connector S assurer que le c ble est connect la borne et que le c ble est connect la borne Installing the Inverter solar RE O SolarEdge Installation Guide MAN 01 00002 1 6 3 For the DCD 1ph US A switch tighten the screws of each wire terminal according to the following torque The tightening moment for the terminals is 1 2 1 5 Nm 0 88 1 1 pound foot The DCD Iph US B switch has no tightening screws For the DCD 1ph US B switch push the wire in from the bottom with a flathead screwdriver Closing the AC DC Safety Switch Covers 1 Close the AC DC Safety Switch cover by tightening the three screws 2 Install the decorative plastic cover using the three screws Coo Only in the DCD 1ph US A switch Figure 30 Closing the AC DC Safety Switch Covers You may now continue from Chapter 4 Commissioning the Installation o
22. the inverter specifications because they may differ slightly in different countries Vous devriez galement consulter les sp cifications techniques de l annexe B Sp cifications techniques la page 108 Portez une attention particuli re aux sp cifications de onduleur car elles peuvent varier l g rement selon les pays WARNING It is essential to connect the PE ground wiring before connecting the AC Line and Neutral wires Il est essentiel de connecter le cable PE la terre avant de connecter les lignes AC et Neutre WARNING Grounding of the DC side current carrying conductors is prohibited because the Single Phase Inverter has no transformer Mise la terre du cot des conducteurs de courant CC est interdite car l onduleur monophas n a pas de transformateur NOTES Functional Electrical Earthing of DC side negative or positive is prohibited because the Single Phase Inverter has no transformer Earthing of PV array module frames and mounting equipment equipotential bonding for the PV array modules is acceptable Installing the Inverter solar ZT ree OF SolarEdge Installation Guide MAN 01 00002 1 6 AC Grids Supported The following figures show the AC grids supported by the SolarEdge single phase inverter 240 120 split ph 208 delta 120 WYE De Tee spin phase 240 delta 208 I 208 delta 240 delta 240 delta Ground cornered Grounded cornered 480 delta 277
23. to verify proper installation a technician may want to view the Telemetry window for some time in order to see that all power optimizers report their telemetries Clicking the LCD light button again redisplays the Initial Inverter Status window as described on page 85 ID Status Window After you press the inverter s LCD light button to display the window shown above you can press it again to display the Inverter ID window This window describes the software version and which country for which the inverter is configured Communication Status Window After you press the inverter s LCD light button to display the window shown above you can press it again to display the Inverter Communication Status window This window displays the communication settings Comm RS 232 Status RS 485 lt 000 gt Inverter User Interface solar ILE 88 SolarEdge Installation Guide MAN 01 00002 1 6 IP Status Window After you press the inverter s LCD light button to display the window shown above you can press it again to display the Inverter IP Status window This window describes the Ethernet configuration Configuring the Inverter Using the LCD Panel and User Buttons After installation of the inverter a field technician can verify and perform basic configurations of the inverter This section describes the various LCD messages and possible configurations using the user buttons IMPORTANT NOTE A The inv
24. will Reset all counters Please Select NO 7 Select the 7 Phase Balance option to enable disable the inverter s power balancing option which enables the connection of three single phase inverters to a three phase grid The power balancing feature requires a power balancing hardware add on module that can be acquired at SolarEdge 8 Select the 8 Info option to display the Printed Circuit Board ID and the inverter s firmware version numbers 9 Select the 9 Factory Reset option to perform a general reset of the inverter to its default settings Inverter User Interface solar TRE e SolarEdge Installation Guide MAN 01 00002 1 6 10 Select the 10 Error Log option to display the last five errors 11 Select the 11 Warning Log option to display the last five warnings 12 Select the 12 Date and Time option to set the date and time of the inverter LCD Button Menu Options The LCD button can also be used for communication setup and to display the Error log and Warning Log without having to open the inverter To access the external LCD button menu options press and hold down the LCD button until the following message is displayed Continue to hold down the button to continue the normal pairing function which is displayed and described on page 58 Releasing the button displays the following menu ML Er o be ov De ft SU UE s The options presented in these menus are the same as those described in the Inverter Configur
25. 0US SES000US secooous SET000US Maximum Output Overcurrent 40 A Protection Output Power Factor _ o Utility Monitoring Islanding Protection Country Configurable Thresholds Input Recommended Mar DC Power 10 arso aso eso so sso w p ES ES im pu otage ae ee De pes Maximum Input Source Back feed Current Ground Fault Isolation Detection 600 kQ Sensitivity CEC Weighted Efficiency 7 5 97 208V 97 5 240V 98 277V Additional Features Supported Communication Interfaces RS485 RS232 Ethernet ZigBee optional o Technical Specifications solar ZT 110 SolarEdge Installation Guide MAN 01 00002 1 6 Ff 300008 SE3800US SES000US secooous SE7000US Standard Compliance Safety IL Conforms to UL Std 1741 c us Cert To CSA Std C22 No 107 1 01 Intertek IEC 62103 EN50178 Draft IEC 62109 Grid Connection Standards VDE 0126 1 1 AS 4777 RD 1663 DK 5940 IEEE1547 Emissions FCC part15 class B IEC61000 6 2 IEC61000 6 3 IEC61000 3 11 IEC61000 3 12 Installation Specifications AC Output 34 Conduit DC Input 34 Conduit Bu Dimensions H x W x D 27 5 x 12 5 27 5 x 12 5 x 7 5 540 x 315 x 191 Lu X T1 540 x 315 x 172 Dimensions H x W x D with AC DC 30 5 x 12 5 30 5 x 12 5 x 7 5 775 x 315 x 191 in mm Switch x 11 775 x 315 x 172 Weight with AC DC Switch 48 5 22 521239 Ib kg anime ammGomestn Minimum and Maximum Operating 4 20 40
26. 1 Ethernet RS232 Figure 34 Ethernet and RS485 RJ45 RJ11 Connectors The following shows the location of the block terminal communication connectors RS232 RS485 2 Not Used RS485 1 B A G from left to right ek Ethernet 8 Figure 35 Block Terminal Connectors 8 solar ICE Setting Up Communication Creating an RS232 UART Connection This communication option is provided in all inverters by default It enables you to connect the inverter via modems supplied by SolarEdge You may refer to the SolarEdge website for a list of the types of modems offered which includes GSM and WiFi modems Each modem is provided with its own user manual which should be reviewed NOTE When connecting via RS232 make sure to use a shielded connector so as not to interfere with other devices in the vicinity RS232 Connector Figure 36 RS232 Connector IMPORTANT SAFETY FEATURE 7 The RS232 conector on the bottom of the inverter is safe to touch during normal operation of the Single Phase Inverter solar ZT Setting Up Communication SolarEdge Installation Guide MAN 01 00002 1 6 gt To configure RS232 communication to the SolarEdge Monitoring Server 1 Using the user buttons select the 5 1 2 RS232 option under the Communication Server menu 5 1 as described in the Configuring the Inverter Using the LCD Panel and User Buttons section on page 88 2 Follow the instructions of your Solar
27. CI is required in some countries In these cases the installer must check which type of GFCI is required by the relevant electric code SolarEdge recommends using a type A GFCI The recommended GFCI value is 100mA or 300mA unless a lower value is required by the specific local electric codes In installations where the local electric code requires the use of a lower leakage GFCI the discharge current may trip the GFCI The following steps can be taken in order to avoid this problem 1 It is important to select an appropriate GFCI in order to ensure proper operation of the installation Although the GFCI used in such cases is a 30mA GFCI it may still trip at 1SmA according to IEC 61008 Good quality GFCIs will trip at a higher value 2 Configure the trip current of the inverters internal GFCI to a lower current than the trip current of the external GFCI The internal GFCI may still trip if the current is higher than the allowed current but because the internal inverter GFCI automatically resets when the residual currents are low it does not require a manual reset You may consult with the SolarEdge support center for assistance with this issue 3 Certain PV panels with low capacitance leakage to the frame are preferable Refer to the SolarEdge Application Note GFCI Selection for Single Phase Inverters for a full discussion of the subject Commissioning the Installation solar e AE te instaiaton EE SolarEdge Installation Guide
28. Edge support 45 46 Phase Change the 7 Phase Balance option in Unbalance the Inverter s LCD menu to Disable Technical Specifications solar hE SolarEdge Installation Guide MAN 01 00002 1 6 Appendix B Technical Specifications About This Appendix The table in this appendix provides the technical specifications of the SolarEdge system components Single Phase Inverter FS 3900S SE3800US SES000US secooous SE7000US Rated AC Power Output 3000 3800 5000 5200 208V 5200 208V 6000 240V 6000 240V 6000 277V 7000 277V Maximum AC Power Output 3000 3800 5000 5200 208V 5200 208V 6000 240V 6000 240V 6000 277V 7000 277V AC Output Voltage Minimum 183 208 229 183 208 229 211 240 264 Nominal Maximum 211 240 264 244 277 294 AC Frequency Minimum Nominal 59 3 60 60 5 Maximum a ae Max Output Fault Current and 16 20 20 20 26 20 27 51 20 27 5 20 A Duration 208V Grid ms Max Output Fault Current and 14 20 17 5 20 23 20 27 5 20 27 5 20 A a Duration 240V Grid Max Output Fault Current and 20 20 24 20 28 20 A Duration 277V Grid Max Continuous Output Current 208V Grid Max Continuous Output Current 240V Grid Max Continuous Output Current 277V Grid Technical Specifications solar ZT i 109 SolarEdge Installation Guide MAN 01 00002 1 6 Ff 300008 SE380
29. Edge modem for model specific configuration options 3 Connect the modem to the inverter through the RS232 connector which is the nine pin connector on the bottom of the inverter There is no need to open the inverter cover To verify the connection you may refer to the Verifying the Connection section on page 81 Creating an Ethernet LAN Connection This communication option enables you to use an Ethernet connection to connect the inverter to a LAN SolarEdge Inverter LU WOU SolarEdge Inverter SolarEdge Inverter SolarEdge Inverter uu ee ITE uu PLU ty Ju PLU Ahh b d RE T L r 7 te S tt Router Hub Router Hub Single Inverter Connected Multiple Inverters Connected Figure 37 Example of Ethernet Connection Setting Up Communication solar EE eet SolarEdge Installation Guide MAN 01 00002 1 6 gt Toconnect the Ethernet communication to the SolarEdge Monitoring server 1 Open the cover of the inverter as described in the Opening the Cover section on page 37 2 Using the user buttons choose the 5 1 1 LAN option under the Communication Server menu 5 1 as described in the Configuring the Inverter Using the LCD Panel and User Buttons section on page 88 3 Configure the LAN options under the Communication menu DHCP 5 3 2 and IP 5 3 1 configurations as described in the Configuring the Inverter Using the LCD Panel and User Buttons section on page 88 4 Prep
30. MV PB250 AOB and PB350 AOB models Mark all mounting hole locations Each power optimizer must be attached to the rack using both mounting holes a Drill the holes CAUTION Do not drill through the power optimizer or through the mounting holes The vibrations created by the drill can damage the power optimizer and will void the warranty Ne pas percer a travers la optimiseur de puissance ou ses trous de fixation Les vibrations qui en r sulteraient peuvent endommager la optimiseur de puissance Mount one power optimizer at each location using 5 16 screws and washers Verify that the power optimizer is securely attached solar ZE AN Installing the Power Optimizers SolarEdge Installation Guide MAN 01 00002 1 6 WARNING The metallic enclosure of the power optimizer must have equipment grounding Perform the following in order to properly ground the power optimizer enclosure Grounding of the power optimizer can be performed in either of two ways L enceinte metallique de la optimiseur de puissance doit tre mise a la terre Suivre la proc dure suivante afin de mettre l enceinte de la optimiseur de puissance a la terre convenablement La mise a la terre de la optimiseur de puissance peut s accomplir par l une des deux m thodes suivantes For mounting the power optimizer on a grounded rail use the provided 5 16 stainless steel star washer between the railing and the flat side of the mounting bracket The s
31. RS 485 1 al Y 4 y aay CG cn a aa y a 5 aa we Gi Oi p Figure 45 RS485 RS232 Block Terminal e The RS485 bus uses a four wire telephone cable Insert the cable via one of the small cable glands e Connect wires into the B A and G terminals on RS 485 1 e All B wires on all inverters should be connected e All A wires on all inverters should be connected e All G wires on all inverters should be connected e Do not cross connect B A and G wires Do not insert wires into the connectors labeled RS485 2 Setting Up Communication solar TEE 79 SolarEdge Installation Guide MAN 01 00002 1 6 Connect the other inverters in the chain You can use any color wire to connect between each connector A on one inverter to connector A on the other inverter as long as you use the same color wire The same goes for connecting between G connectors and for connecting between B connectors The following diagram conceptually depicts this connection schema SolarEdge Inverter SolarEdge Inverter SolarEdge Inverter SolarEdge Inverter 3 d d 4 a PL Py Ps OT i CD C0 R5485 1 g R5485 1 e a l c elal e Router Hub Figure 46 Connecting the Inverters in a Chain Reinsert the block terminal into the inverter card solar Setting Up Communication SVOR i le SolarEdge Installation Guide MAN 01 00002 1 6 4 The
32. WYE Figure 11 AC Grids Supported by the SolarEdge Single phase Inverter Installing the Inverter solar ILE c SolarEdge Installation Guide MAN 01 00002 1 6 NOTE Inverters that are maked in the diagram above with two asterisks and that have their Neutral line connected can be set with the Auto Detect Grid option In this case there is no requirement to configure them to a specific grid voltage Inverters that are connected to corner grounded grids must have the L2 terminal connected to the grounded conductor For all other grids L1 and L2 are interchangable NOTE When connecting multiple single phase inverters in an installation connected to a three phase grid phase balancing may be required by the utility or grid operator Phase balancing is supported in the SolarEdge inverters Please refer to the SolarEdge Phase Balancing Manual for more details Connecting the Single Phase Inverter Connectors and Cables The following shows the Single Phase Inverter connectors DC Input RS232 ON OFF Switch LCD Button i AC Output Communication Glands Figure 12 Single Phase Inverter Connectors Installing the Inverter solar ILE e SolarEdge Installation Guide MAN 01 00002 1 6 The following describes each connector the wire requirements and gauge of its associated cable All the Single Phase Inverter connectors are located at the bottom of the inverter as described below ON
33. and boarding costs of SolarEdge service personnel that are incurred for repairs of Products on site as well as costs related to buyer s employees and contractors repair or replacement activities are not covered by the Limited Warranty and unless otherwise agreed in writing in advance by SolarEdge shall be borne by the buyer Warranty Exclusions This Limited Warranty will not apply if a buyer is in default under the General Terms and Conditions or other Agreement governing the purchase of the Product or b the Product or any part thereof is E damaged as a result of misuse abuse accident negligence or failure to maintain the Product E damaged as a result of modifications alterations or attachments thereto which were not pre authorized in writing by SolarEdge E damaged due to the failure to observe the applicable safety regulations governing the proper use of the Product installed or operated not in strict conformance with the Documentation including without limitation not ensuring sufficient ventilation for the Product as described in SolarEdge installation guide E opened modified or disassembled in any way without SolarEdge s prior written consent E used in combination with equipment items or materials not permitted by the Documentation or in violation of local codes and standards Limited Product Warranty solar SEE 121 SolarEdge Installation Guide MAN 01 00002 1 6 E damaged or rendered non functional
34. are to connect the Ethernet cable to the Ethernet connector on board in the inverter as follows e Insert the Ethernet wire via one of the small cable glands on the bottom of the inverter If required remove the existing plug The inverter glands come pre sealed from the factory Removing the sealing is needed to insert the cable CAUTION If a gland is opened and not used then make sure to reseal it Otherwise it may affect the inverter s functionality CAUTION The internal side of the gland includes an o ring which should be used to ensure proper sealing e Remove the cable s external isolation using the crimping tool or cable cutter and expose 8 wires Standard cables have 8 wires 4 twisted pairs For Ethernet communication 4 wires 2 twisted pairs are used 6 Figure 38 Preparing Connector Wiring Setting Up Communication SOIT Se Lp Communication SolarEdge Installation Guide MAN 01 00002 1 6 Only wires numbered 1 2 3 and 6 in the diagram on the left above should be connected To make crimping easier wires numbered 3 6 7 and 8 do not need to be connected 5 An inverter has either RJ45 RJ11 connectors or block terminal connectors for communication If the inverter has RJ45 RJ11 communication connectors then connect as follows e Insert the 4 wires into the RJ45 connector Make sure to use pins 1 2 3 and 6 Figure 39 Inserting Wires into the RJ45 Connector e Use the Ethernet c
35. as a result of power surges lightning fire flood pest damage accident action of third parties or other events beyond SolarEdge s reasonable control or not arising from normal operating conditions or a damaged during or in connection with shipping or transport to or from buyer where buyer arranges such shipping or transport This Limited Warranty does not cover cosmetic or superficial defects dents marks or scratches which do not influence the proper functioning of the Product FOR TRANSACTIONS IN WHICH THE PRODUCTS ARE NOT DEEMED TO BE CONUSMER PRODUCTS PURSUANT TO THE MAGNUSON MOSS WARRANTY ACT THE LIMITED WARRANTIES SET OUT HEREIN ARE IN LIEU OF ANY OTHER WARRANTIES WITH RESPECT TO THE PRODUCTS PURCHASED BY BUYER FROM SOLAREDGE WHETHER EXPRESS OR IMPLIED WRITTEN OR ORAL INCLUDING ANY WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE ALL OF WHICH ARE EXPRESSLY EXCLUDED TO THE FULLEST EXTENT PERMITTED BY APPLICABLE LAW FOR ALL OTHER TRANSACTIONS THE DURATION AND EXTENT OF ANY IMPLIED WARRANTIES IS LIMITED TO THE FULLEST EXTENT ALLOWED BY LAW Claims by buyer that go beyond the warranty terms set out herein including claims for compensation or damages are not covered by the Limited Warranty insofar as SolarEdge is not subject to statutory liability In such cases please contact the company that sold you the Product Eventual claims in accordance with the law on product liability remain unaffected Covera
36. ation Menu Options section on page 95 although they are organized slightly differently When using these menus a short press scrolls down to the next menu option and a long press selects the item You can use the Exit options in these menus to move up one menu level Inverter User Interface solar LEE EE SolarEdge Installation Guide MAN 01 00002 1 6 Configuring the Inverter Using the SolarEdge Configuration Tool Two options are provided for configuring the system Using the LCD panel as described in this guide Using the SolarEdge configuration tool which provides a standard Windows GUI This tool can be accessed by connecting a computer or laptop to the inverter through the RS232 connector a The communication board may also include a mini USB connector If it does you may connect the laptop directly to this connector This tool provides several additional options than are not accessible using the LCD manual such as enabling a firmware upgrade of the inverter and retrieving a list of the serial numbers of the power optimizers connected to the inverter for quickly verifying that all power optimizers have been installed properly You may refer to the SolarEdge Configuration Tool Software Guide Errors and Troubleshooting solarne 25 and Troubleshooting GG SolarEdge Installation Guide MAN 01 00002 1 6 Appendix A Errors and Troubleshooting About This Appendix K The inverter LCD panel
37. ch of these two switches are described on page 52 Both safety switches have similar functionality and installation methods Installing the Inverter solar TRE hone verter SolarEdge Installation Guide MAN 01 00002 1 6 For the sections that follow unless otherwise noted all images of the safety switch are based on the DCD 1ph US B switch Figure 20 DCD 1ph US A Safety Switch Installing the Inverter solar ZT EEE SolarEdge Installation Guide MAN 01 00002 1 6 AC DC Safety Switch Package Contents The following describes the contents of the AC DC Safety Switch package AC DC Safety Switch Front Cover of the AC DC Safety Switch AC DC Safety Switch mounting bracket Paper template with a drawing that indicates the places to drill the mounting holes on the wall Four flat head screws for fastening the AC DC Safety Switch to the wall mounting bracket Two conduit nuts for securing the Safety Switch AC and DC conduits to the inverter Mounting the Switch The AC DC Safety Switch is mounted after the inverter has been mounted as described in the Mounting the Inverter section on page 28 1 Attach the AC DC Safety Switch to its mounting bracket using the four provided flat head mounting screws as shown below AC Conduit Mounting Screws 3 screws used to open the cover Figure 21 Attaching the AC DC Safety Switch to its Mounting Bracket Installing the Inverte
38. csscicssevesJeccessececvasuccsasesaccosnetucdeavadscdedeavaccdeateactcasevaesescnsscasts 66 Communication TY DES sroin 67 Creating an RS232 UART Comnnection sssssssscccccsssssscssscccsseeess 69 Creating an Ethernet LAN Connection sssssessssecsseessseeeeee 70 Creating an RS485 Bus Connection cccccccccssssssssssssssssssccssccccccsccssees 75 VEFIfyIne he Conneccion sssrinin ian annan iaar aaa 1 Troubleshooting COMMUNICATION cccseceececeeeceeceeceeaeeseeeseseeeeeeeess 82 Chapter 7 Inverter User Interface 83 Inverter LCD Panel and LEDS nenceisccceonecsecceneniierernecsas 83 Inverter LCD Panel and User Buttons 0 00 0 ccccccccssssssseeeeseeeeeeeees 84 Configuring the Inverter Using the LCD Panel and User Buttone 88 Inverter Configuration Menu Options cccccccccceccceeeeessseseeeseeeeeeeees 95 LCD Button Menu Options ss 98 Configuring the Inverter Using the SolarEdge Configuration Tool 99 Appendix A Errors and Troubleshooting 100 Appendix B Technical Specifications ss 108 SINGLE PHASE UM V SLCC R osineen a a 108 OP250 LV OP300 MV and OP400 MV ssssssscsssssssssssecssssssecasencsecasencees 111 PB250 AOB and PB350 A OB sssccececccccccosssssssssecececocsosossssssssssccecessssso 113 Table of Contents solar LEE Tete of Contents SolarEdge Installation Guide MAN 01 00002 1 6 Appendix C Power Optimizer Mechanical S DECI
39. cted in subsequent steps to the inverter as shown below DC ee ASS TAPANT EN f gt 9 SSS A ED r a aS q 1 Conduit Nuts Figure 22 Inserting the AC and DC Conduits 6 Secure the two conduit nuts in order to hold both DC and AC conduits in place 7 Screw the bracket to the wall or pole Connecting the Switch to the Inverter gt To connect the AC DC Safety Switch to the inverter 1 Connect the DC as follows e Connect the DC of the inverter input to the red wire e Connect the DC of the inverter input to the black wire 2 Connect the AC as follows B E refer to the inverter AC terminal block labeling shown in Figure 23 A 208 240 277 Figure 23 Inverter AC Terminal Block Label Installing the Inverter sola rite fa E Eee 7 SolarEdge Installation Guide MAN 01 00002 1 6 e Connect the white wire to B in the inverter e Connect the green yellow wire to C in the inverter e Connect the red wire to D in the inverter e Connect the black wire to E in the inverter Tighten the screws of each wire terminal according to the following torque The tightening moment is 1 2 1 5 Nm 0 88 1 1 pound foot Verify that there are no wire strands outside each terminal connector and that the unused ports of the terminals are tightened Close the inverter s cover as described in the Closing the Cover section on page 42 Connecting the Switch to the Externa
40. ctrique provenant de l nergie stock e dans le capaciteur WARNING Before operating the Single Phase Inverter ensure that the system has been grounded properly Avant d utiliser l onduleur monophas assurez vous que le syst me est correctement mis la terre WARNING No user serviceable parts inside This unit must be opened only by qualified service personnel Repairs or testing under power must only be performed by qualified service personnel who are familiar with and qualified to work with this Single Phase Inverter Ne contient aucune pi ce r parable par l utilisateur L unit ne doit tre ouverte que par un technicien qualifi dans le cadre de l installation et de la maintenance Les r parations ou les tests lectriques sous tension ne doivent tre effectu s que par des techniciens qualifi s de SolarEdge poss dant les connaissances et les qualifications n cessaires pour travailler avec cet onduleur monophas WARNING The supplied AC DC Safety Switch meets all requirements for a code compliant installation of this ungrounded system The DC section opens both the positive and negative conductors Le sectionneur CA CC externe inclus repond aux exigences de conformit pour l installation de ce syst me non reli la terre Le coupeur CC ouvre les conducteurs positif et n gatif solar TE Support and Contact Information SolarEdge Installation Guide MAN 01 00002 1 6 WARNING A Thi
41. e meaning it is preparing to produce power The inverter is in Standby mode until enough power is generated The inverter then automatically goes to Production mode and produces power Inverter User Interface solar ET e SolarEdge Installation Guide MAN 01 00002 1 6 e Off The inverter is not producing power This may be during Night mode when the ON OFF switch is OFF or when an error occurs Module Communication Yellow This LED blinks quickly each time monitoring information is received from a power optimizer In addition this LED blinks while the inverter is being shut down Fault Red Indicates that an error has occurred You may refer to the Appendix A Errors and Troubleshooting on page 100 for more information In addition this LED blinks while the inverter is being shut down All LEDs are on while the inverter is being configured using the buttons inside the inverter Inverter LCD Panel and User Buttons The following describes the various stages and times of day that you may use the LCD panel and user buttons Normal operation The LCD panel allows the user to check that the inverter is working properly You may refer to the Normal Operation section on page 84 for a description of this window Use the LCD button to toggle through the informative displays Inverter startup After the inverter is turned on and begins producing power the LCD panel displays the inverter s status in the Main Inverter Statu
42. e solar ICE SolarEdge Installation Guide MAN 01 00002 1 6 5 Use the three right most buttons inside the inverter the UP 1 Down 2 and Enter 3 buttons shown above to type in the following default password 12312312 Inverter passwords are eight digits long each digit being between 1 and 3 The following message is displayed Configure each of these menu options 92 Inverter User Interface solar ze SolarEdge Installation Guide MAN 01 00002 1 6 The following shows a hierarchical tree of the menu options T A Heutrad uw Es IL IL c D 0 L L H unr ation Date and T Inverter User Interface solar ILE n SolarEdge Installation Guide MAN 01 00002 1 6 Each menu option is described below Use the Up and Down buttons inside the inverter to move the asterisk to the relevant menu option and then press the Enter button to select it Use the three rightmost buttons to type in a number if required The figure on the following page shows a hierarchical tree of the menu options for the 5 Communications menu 94 Inverter User Interface solar ze SolarEdge Installation Guide MAN 01 00002 1 6 unica hon Comm E Conf GH R 232 Conf odb us Conf Inverter User Interface solar ILE n SolarEdge Installation Guide MAN 01 00002 1 6 Inverter Configuration Menu Options 1 Select the 1 Country opt
43. e 50V Ne pas ouvrir le couvercle ou les connecteurs DC jusqu ce que la tension soit affich e comme s curis ou jusqu ce que cinq minutes au moins se soient coul es 3 The following configuration procedures are performed with the inverter cover open Open the cover as described in the Opening the Cover section on page 37 NOTE There are two options for configuring the inverter One is performed by pressing the external LCD button which provides access to the most commonly used options If you only want to perform pairing you can do so without opening the inverter cover as described in the LCD Button Menu Options section on page 98 Inverter User Interface solar ET O SolarEdge Installation Guide MAN 01 00002 1 6 Four buttons for controlling the LCD panel menus are then accessible as shown below Esc Up 1 Down 2 Enter 3 Figure 49 LCD Panel Menu Buttons e Esc Goes to the beginning of the currently entered parameter or to the previous menu e Up 1 Goes up one option in a menu e Down 2 Goes down one option in a menu e Enter 3 Confirms the entry or selection of a parameter 4 Press the Enter button for at least five seconds The following message is displayed Please enter Password k k k k k k k k The inverter is now in Setup mode and all its LEDs are lit The inverter automatically exits Setup mode if no buttons are pressed for more than two minutes Inverter User Interfac
44. e as on the inverter You may refer to the Identifying the Inverter section on page 27 for more details The next three numbers represent the firmware versions of various processors NOTE Please have these numbers ready when you contact SolarEdge support Inverter User Interface solar TRE Mere ser merer oz SolarEdge Installation Guide MAN 01 00002 1 6 5 Select the 5 Communication option to define and configure the communication option used by the inverter to communicate with the SolarEdge Monitoring Server e L u B A S O I C S O O C e Select option 5 1 Server to select which communication method is used to communicate between this inverter and the SolarEdge Monitoring Portal e Select options 5 1 1 5 1 2 5 1 3 or 5 1 4 to configure the communication method to the SolarEdge Monitoring Portal Refer to Chapter 6 Setting Up Communication on page 66 for a full description of these communication options You can also select the 5 1 5 None option if no server communication is required NOTE This menu shows only the actual communication options installed in the inverter based on the ordering options selected If a communication option is not installed in the inverter the relevant number does not appear in the menu 6 Select the 6 Counters option to reset all telemetry counters that are displayed in the Energy Meter window which is described in the Energy Meter Window section on page 86 This action
45. e problem persists then Verify that proper ventilation clearance exists around the inverter as described in the Chassis Clearance section on page 27 Make sure that the heat sink fins are clear of dirt and obstacles Check whether the inverter is installed in an area that is too hot Reinstall in a cooler location 24 Faulty Temp Broken or unconnected If the problem persists contact Sensor Temperature sensor SolarEdge support solar ZE Errors and Troubleshooting SolarEdge Installation Guide MAN 01 00002 1 6 105 Error LCD Description Troubleshooting Message PV Isolation fault The If the problem persists Isolation Fault AC Voltage Too High inverter has detected m the PV solar generator is not properly isolated from ground earth The a isolation is checked every time before the inverter starts operation Check the PV installation for isolation problems and ground leakage Only a certified PV installer must fix the faulty string before connecting it to the inverter The AC relay failed If the problem persists during wake up tests m Disconnect inverter from AC grid Contact SolarEdge support If the problem persists contact SolarEdge support during the wake up test phase The monitoring hardware that checks the balance of each phase L1 N and L2 N has exceeded its limit This error is checked only in the USA Grid voltage is above the limit permitted
46. ency is below Consult the grid operator the limit permitted in If you are permitted by the local this country authorities then use the SolarEdge Configuration Tool to change the settings Refer to the SolarEdge Installation Tool User Guide for more detail DC Injection DC feed detected on Ifthe problem persists contact the AC output SolarEdge support Ground Ground current surge Handle this in the same manner as error Current The internal hardware 10 RCD that measures ground fault has measured substantially high ground currents 40 Islanding AC grid voltage When AC voltage returns the inverter malfunctions The should restart after some time time inverter has shut off depends on country grid connection due to islanding codes If the problem persists then consult with the grid operator whether frequent AC disruptions have occurred at the site Errors and Troubleshooting SolarEdge Installation Guide MAN 01 00002 1 6 Error LCD Description Troubleshooting Message AC Voltage Grid voltage is below Handle this in the same manner as error Too Low the limit permitted 32 This error is checked only in the USA Internal HW Internal hardware If the problem persists contact Error error SolarEdge support No Country The inverter is not Select the country as described on Selected configured to any page 95 country SW Error Internal software error If this fault persists contact Solar
47. ere not followed If an error appears then follow the pairing steps again After commissioning succeeds the following message 1s displayed Pairing Pairing Completed 3 Since at this stage the ON OFF switch at the bottom of the inverter is ON the power optimizers start producing power and the inverter starts converting AC WARNING A After you turn ON the ON OFF switch of the Single Phase Inverter the DC cables carry a high voltage and the power optimizers no longer output a safe 1V output Apr s avoir mis l interrupteur ON OFF de l onduleur monophas sur ON les c bles DC portent une haute tension et les optimiseurs de puissance ne g n rent plus la tension de s curit de 1V solar Commissioning the Installation O SolarEdge Installation Guide MAN 01 00002 1 6 If the inverter starts converting after the initial connection to the AC the inverter then goes into Standby mode until enough power is generated the inverter LED flickers green While the inverter is in Standby mode the following message is displayed Waking U P P Remaining 0 51Sec During this time the inverter monitors the grid and verifies correct grid voltage and frequency This message indicates how many seconds remain until the inverter will be in Production mode This amount of time is in accordance with the regulations of each country and is typically between three to five minutes The inverter then automatically goes to Productio
48. erter and its LCD panel start operation after at least one string of power optimizers is exposed to sunlight Until then the inverter is in Night mode and no LCD functions will work The power optimizers do not need to be producing power during this time they are in Safety mode if the ON OFF switch is OFF but at least one string must be connected to the inverter in order to enable its operation NOTE This process can also be performed using the SolarEdge configuration tool by connecting a PC or laptop to the inverter via its RS232 management port This tool is described in the SolarEdge Configuration Tool User Guide Inverter User Interface solar ft e SolarEdge Installation Guide MAN 01 00002 1 6 gt To configure the inverter 1 Verify that the inverter s ON OFF switch is OFF 2 Press the LCD Light button once to turn ON the backlight ARNING AN the inverter worked properly before this action the following message is displayed Si l onduleur fonctionnait proprement avant cette op ration le message suivant est affich Dc VOLTAGE H OT SAFE D 0 HOT DIS coWwWE CT FODC 4 2 0 This message is displayed until the DC is safe The default safety voltage is 50 V Do not open the cover or open DC conectocrs until the voltage is indicated as safe or until at least five minutes have passed Ce message est affich jusqu ce que la tension DC soit s curis e La tension de s curit par d fault est d
49. f how to configure the inverter for the required country With the SolarEdge Configuration Tool you can configure the inverter s AC settings to different settings than those provided by default for the country of the installation site or perform other modifications A full description of the Configuration Tool is provided in the SolarEdge Configuration Tool Software Guide Installing the Inverter solar ILE n SolarEdge Installation Guide MAN 01 00002 1 6 Refer to the following table to determine the correct fuse size to use at the connection point of the Single Phase Inverter to the grid Maximum Output Current SSeS DUES at or Fuse 208 VAC 240 VAC SE3000 SE3800 SE5000 SE6000 SE7000 12 5 A 16 A 21 A 25 25A 20 A 20 A 30 A 35 A or 40 A 35 A or 40 A SES000 185A SE6000 22 SE7000 25A WARNING A For more wiring information you may refer to the Application Note called SolarEdge Recommended AC Wiring which can be accessed from the SolarEdge website Pour plus d informations de c blage vous pouvez vous r f rer a la Note d application appel e SolarEdge Recommended AC Wiring qui peut tre consult e sur le site SolarEdge 277 VAC Installing the Inverter solar ILE EEEE 88 SolarEdge Installation Guide MAN 01 00002 1 6 AN AN AN S WARNING You should also refer to the technical specifications in Appendix B Technical Specifications on page 108 Pay special attention to
50. fichage LCD d crit ci dessus lit OFF Step 2 Pairing Power Optimizers to the Inverter After all connections are made all the power optimizers must be logically paired to their inverter before they can start working with it This step describes how to pair power optimizers to the inverter meaning to assign each inverter to the power optimizers from which it will produce power S NOTE The power optimizer does not start producing power until it is paired with an inverter gt To pair the power optimizers to the inverter 1 Turn the ON OFF switch at the bottom of the inverter to off Press and hold down the inverter s LCD Light button for about 10 seconds The following screen is displayed Commissioning the Installation solar 02272500 he station ES SolarEdge Installation Guide MAN 01 00002 1 6 Continue to hold for five seconds more and you will see this screen 2 Turn on the inverter ON OFF switch at the bottom of the inverter within five seconds If you do not turn ON the inverter ON OFF switch within five seconds the inverter then exits pairing mode The following screen is then displayed indicating that the inverter is performing the process of pairing and is assigning power optimizers to the inverter Pairing Remaining Sec This message displays a countdown of the seconds until it completes the pairing process If pairing fails an error is displayed This error appears only if the above steps w
51. fied the inputs and outputs correctly Do not connect PV modules to power optimizer outputs V rifiez que vous avez identifi les entr es et sorties correctement Ne pas connecter des modules PV aux sorties des optimiseurs de puissance Y The power optimizer has reverse polarity protection Even so you must still verify the correct polarity by checking the PV module s polarity with a voltmeter Some module manufacturers may use connector polarity that is different from that used by SolarEdge power optimizer inputs The input connectors are shown in the figures above The output connectors are in the middle of each side Installing the Power Optimizers Solar game sin he Power pme gt SolarEdge Installation Guide MAN 01 00002 1 6 Step 3 Connecting Power Optimizers In Strings Power optimizers must be connected in series in order to construct strings A IMPORTANT SAFETY FEATURE As long as the power optimizers are unconnected to the inverter and the inverter is OFF the power optimizers will output a safe 1V voltage during installation The full string can be directly connected to the inverter or connected in parallel to other strings and then connected to the inverter You can construct and connect in parallel strings of unequal length meaning the number of power optimizers in each string does not have to be the same The power optimizer output cables are labeled and Connect the Plus
52. ge under the Limited Warranty is subject to buyer complying with the foregoing notification requirements and cooperating with SolarEdge s directions SolarEdge s sole obligation and buyer s exclusive remedy for any defect warranted hereunder is limited to those actions expressly stated above Such actions are final and do not grant any further rights in particular with respect to any claims for compensation Unless otherwise specified in an executed Agreement with SolarEdge the Limited Warranty and related provisions set out herein are subject to SolarEdge s General Terms and Conditions including without limitation the provisions thereof which relate to disclaimer of warranties limitation of liability and governing law and jurisdiction MAN 01 00002 1 6 www solaredge com solar architects of energy LL LILI A N 00002
53. gs The following notes and warnings apply when installing the SolarEdge power optimizers AN WARNING Before performing these steps turn OFF the Single Phase Inverter by turning off the ON OFF switch at the bottom of the inverter All inverters in an installation site must be switched OFF in this manner Avant de faire ces tapes teignez l onduleur monophas en mettant sur OFF l interrupteur ON OFF situ au bas de l onduleur Tous les onduleurs sur un site d installation doivent tre etteints de la m me mani re CAUTION If installing directly on the module or module frame first consult the module manufacturer for guidance regarding location and the impact on the module warranty Pour installation m me le module ou la monture du module consultez d abord le fabricant du module sur la position et son impact sur la garantie du module CAUTION Unused connectors must be sealed with appropriate plugs not provided Leaving connectors exposed may be unsafe or create funcional problems in the installation and will void the warranty Les connecteurs non utilis s doivent tre scell s avec des bouchons non fournis Laisser des connecteurs expos s peut tre dangereux ou peut cr er des probl mes fonctionels lors de l installation et par cons quent ne seront pas couvert par la guarantie Installing the Power Optimizers solar LT IE SolarEdge Installation Guide MAN 01 00002 1 6 CAUTION SolarEdge po
54. gure 17 Wire Lengths to Strip e Strip 8 mm 0 32 to enable contact e Each cable length is 50 mm 2 3 Insert the cable through the DC conduit opening on the left and connect the wires to the appropriate terminal connectors according to the labels on them DC and DC CAUTION Ensure that the wire is connected to the terminal connector and that the wire is connected to the terminal connector Veillez a ce que le cable soit connect au connecteur terminal et que le cable soit connect au connecteur terminal 4 Tighten the screws of each wire terminal according to the following torque The tightening moment for the terminals is 1 2 1 5 Nm 0 88 1 1 pound foot Completing the Single Phase Inverter Installation In most cases the inverter is preconfigured before delivery After completing all connections you must verify that the inverter is configured to the proper country as described on page 95 If not then you must configure the inverter to the site s requirements using the inverter s internal buttons or by using the SolarEdge Configuration Tool connected to an RS232 port For more information you may refer to the Configuring the Inverter Using the LCD Panel and User Buttons section on page 88 If you plan to use the SolarEdge Monitoring Portal to access SolarEdge site information you may need to add a physical connection to the proper communication option Connecting the inverter to the SolarEdge
55. he instrument Do not proceed beyond a caution sign until the indicated conditions are fully understood and met D note un risque il attire l attention sur une op ration qui si elle n est pas faite ou suivi correctement pourrait causer un dommage ou destruction de l quipement Ne pas d passer une telle note avant que les conditions requises soient totallement comprises et accomplies NOTE Denotes additional information about the current subject MPORTANT SAFETY FEATURE Denotes information about safety issues Handling and Safety Instructions solar ZT a_a SolarEdge Installation Guide MAN 01 00002 1 6 Instructions AN gt gt WARNING The cover must only be opened after shutting off the AC DC switch located below the inverter and waiting five minutes This removes both DC and AC voltage from the inverter Do not remove the inverter cover before five minutes have elapsed after disconnecting all sources of power Only use lockable connectors for DC input Otherwise there is a risk of electric shock form energy stored in the capacitor Ne pas ouvrir le couvercle de l onduleur avant d avoir coup l interrupteur CA CC situ en dessous de l onduleur et que cinq minutes ne se soient ecoul es Cela supprime les tensions CC et CA de l onduleur Ne pas ouvrir le couvercle de l onduleur avant que cinq minutes ne se soient ecoul es apr s coupure de toutes les sources de puissance Sinon il y a un risque de choc le
56. hen helps you transmit this collected information to SolarEdge s Monitoring Portal which was described on the previous pages The SolarEdge iPhone Mapping Application can be downloaded from the SolarEdge website Registering Installation Information on the SolarEdge Website Register the site using the registration form available from the following link http www solaredge com groups site registration Fill out all required information in the form which includes information about your installation as well as details about its logical and physical mapping If you wish you can also supply the following information on the form Logical Mapping Showing which power optimizer is located in which string and in which order You can specify the logical mapping of the strings and power optimizers as follows P Inverter_number String_number power optimizer_number For example the third power optimizer connected to a power optimizer in the second string in the 4 inverter in the installation is represented as P 4 2 3 Physical Mapping Showing a physical map a drawing of the location of each power optimizer in the installation Use the SolarEdge Physical Layout Template available on the SolarEdge website or the site mapper mentioned above The logical and physical mapping can be used in the future for debugging a problem using the SolarEdge Monitoring Portal Replacing and Adding System Components solaris cAc AEE Gg SolarEdge Ins
57. ich illustrates how to connect the wires when connecting to a 208V 240V grid or 277V grid Be sure to follow these connection instructions to ensure proper connection 208 240 N 217 Figure 28 AC DC Safety Switch AC Terminal Block Label 3 For the DCD 1ph US A switch tighten the screws of each wire terminal according to the following torque The tightening moment is 1 2 1 5 Nm 0 88 1 1 pound foot The DCD 1ph US B switch has no tightening screws For the DCD 1ph US B switch push the wire in from the bottom with a flathead screwdriver 4 Verify that there are no stray strands outside each terminal connector and that the unused ports of the terminals are tightened Installing the Inverter solar ILE a SolarEdge Installation Guide MAN 01 00002 1 6 Connecting the DC Use any of the DC side conduit inputs Each punch out opening has two sizes 34 and 1 1 Connect the DC connectors from the photovoltaic installation to the DC and DC connectors as shown in Figure 16 Two strings may be connected in parallel to both DC inputs of the inverter They are simply wired together in the terminal block inside 2 Connect the DC equipment grounding to the equipment grounding terminal block If more than two strings are required they can be connected in parallel in an external combiner Box before connecting a unified DC connection to the inverter Q NOTE If more than two strings are connected each should be properly fused
58. in this country Check the grid connection Check the GND wire connection Check the L1 L2 and Neutral wire connections Verify symmetric load between L1 and l2 Consult the local grid authority Turn off the inverters in the site and verify AC grid voltage If the inverter is located far from the connection point to the grid then use a wider gauge AC wire Consult the grid operator If you are permitted by the local authorities then use the SolarEdge Configuration Tool to change the range Refer to the SolarEdge Installation Tool User Guide for mode detail Errors and Troubleshooting SolarEdge Installation Guide MAN 01 00002 1 6 Error LCD Description Troubleshooting Message AC Voltage Grid Voltage is below Consult the grid operator Too Low the limit permitted in If you are permitted by the local this country authorities then use the SolarEdge Configuration Tool to change the settings Refer to the SolarEdge Installation Tool User Guide for more detail AC Voltage Grid voltage is above Handle this in the same manner as Too High the limit permitted in error 31 this country 34 AC Freq Too Grid frequency is above Consult the grid operator i the limit permitted in If you are permitted by the local this country authorities then use the SolarEdge Configuration Tool to change the settings Refer to the SolarEdge Installation Tool User Guide for more detail AC Freq Too Grid frequ
59. ine and indicates the use of a 240V split phase grid or a 240V Delta grid e 208V No Neutral Indicates the use of a 208V grid between LI and L2 with no need for a neutral connection Inverter User Interface solar ET e SolarEdge Installation Guide MAN 01 00002 1 6 240V No Neutral Indicates the use of a 240V grid between L1 and L2 with no need for a neutral connection 277V This setting requires the Neutral line to be connected and indicates the use of a 277V grid 2 Select the 2 Language option to select the language in which the LCD panel should display The inverter may arrive pre configured to the local language 3 Select the 3 Temperature option to select the units in which the temperature is displayed as shown below The display shows either lt C gt or lt F gt according to whether Celsius or Fahrenheit was selected The default is Celsius 4 Select the 4 Display option to display the following three options 4 1 LCD On Time lt 30 gt Specifies the number of seconds that the LCD panel backlight is ON after the LCD light button is pressed lt 30 gt represents the default value of 30 seconds 4 2 TLM On Time lt 15 gt Specifies the number of minutes that the LCD panel backlight is ON while viewing the Telemetry window The default is 15 minutes 4 3 SW Version Displays version information describing various firmware inverter processors as follows ID Displays the inverter ID which should be the sam
60. ion 1 a short description of the defect 11 the Product s serial number and 111 a scanned copy of the purchase receipt or warranty certificate of the applicable Product Upon buyer s notification SolarEdge shall determine whether the reported defect is eligible for coverage under the Limited Warranty The Product s serial number must be legible and properly attached to the Product in order to be eligible for Warranty coverage If SolarEdge determines that the reported defect is not eligible for coverage under the Limited Warranty SolarEdge will notify buyer accordingly and will explain the reason why such coverage is not available If SolarEdge determines that the reported defect is eligible for coverage under the Limited Warranty SolarEdge will notify buyer accordingly and SolarEdge may in its sole discretion take any of the following actions repair the Product at SolarEdge s facilities or on site or issue a credit note for the defective Product in an amount up to its actual value at the time buyer notifies SolarEdge of the defect as determined by SolarEdge for use toward the purchase of a new Product or E provide Buyer with replacement units for the Product Limited Product Warranty solar SEE 120 SolarEdge Installation Guide MAN 01 00002 1 6 SolarEdge will determine whether the Product should be returned to SolarEdge and if SolarEdge so determined the Return Merchandise Authorization RMA Proced
61. ion to specify the country in which the inverter is installed This parameter may arrive pre configured If so verify that it is set to the proper country AN ie inverter must be configured to the proper country in order to ensure that it unctions properly with that country s grids L onduleur doit tre configur pour le pays appropri afin d assurer un fonctionnement convenable avec le r seau de ce pays NOTE Y If an inverter is not configured to any country then it does not turn ON If no country is configured its value is lt NONES gt A list of countries is displayed A near the country indicates that another menu will be displayed after selection The following is an example of the parameters that appear after USA is selected After selecting the country you are asked to confirm your selection in the confirmation screen Toggle to YES and press Enter to confirm If the No Neutral option is not selected you must connect the Neutral line The Neutral line is used to verify the phase balance between LI N and L2 N Auto This setting requires the Neutral line to be connected When this option is selected the inverter automatically detects whether a 208VAC or a 240VAC grid is used Refer to page 34 about which grids can be automatically configured e 208V This setting requires the Neutral line to be connected and indicates the use of a 208V Delta grid e 240V This setting requires the connection of the Neutral l
62. is step is required to verify that the power optimizers will output a safe 1V voltage during installation Avant d effectuer cette tape teignez l onduleur monophas avec le sectionneur ON OFF en bas de l onduleur et avec le sectionneur CA CC Tous les onduleurs d une installation doivent tre teints de cette mani re Cette tape est requise pour v rifier que les optimiseurs de puissance produisent une tension de s curit de 1V pendant l installation OP250 LV OP300 MV and OP400 MV These power optimizers connect to a single PV module via its two inputs a plus and a minus Input Input Output Output Figure 3 OP250 LV OP300 MV and OP400 MV solar ZE Installing the Power Optimizers E SolarEdge Installation Guide MAN 01 00002 1 6 21 PB250 AOB and PB350 AOB These power optimizers connect to a single PV module via its two inputs a plus and a minus Output Figure 4 PB250 AOB and PB350 AOB The following shows the required clearance around the power optimizer T 1 2 5 cm FA EX at Hn IEC n JN Figure 5 Clearance Installing the Power Optimizers solar ZE 1 EEEN 22 SolarEdge Installation Guide MAN 01 00002 1 6 The following shows the required clearance on the top of the power optimizer Figure 6 Clearance Side View Connecting Power Optimizers gt To connect these power optimizers to the PV modules WARNING A Verify that you have identi
63. izers will output a safe 1V voltage during installation IMPORTANT NOTE SolarEdge power optimizers are energized by the PV modules to which they are connected String length must not be less than eight power optimizers or the entire string may shut down Please refer to the power optimizer datasheets for the exact minimum and maximum number of power optimizers permitted in a string NOTE Completely shaded PV modules may cause the affected power optimizers to temporarily shut down This will not affect the performance of the other power optimizers in the string as long as the minimum string length requirement is met when taking into account the lighted panels only If under typical conditions fewer than eight modules will remain unshaded add more PV modules Installing the Power Optimizers solar SEE 1 EEEN 8 SolarEdge Installation Guide MAN 01 00002 1 6 Step 1 Mounting the Power Optimizers A Be sure to record power optimizer serial numbers and locations during their installation as this information may be required later for troubleshooting and is necessary for proper physical layout on the monitoring website Determine the mounting location of each power optimizer The power optimizer should be mounted in a place where it can be mounted securely using both mounting holes It must also be located near enough so that the power optimizer can connect to a single PV module for the OP250 LV OP300 MV OP400
64. l DC and AC Wires Opening the Switch Cover gt To open the AC DC Safety Switch 1 2 Move the switch to the OFF position Loosen the three screws on the front cover of the AC DC Safety Switch as shown below Loosen these screws Figure 24 Opening the AC DC Safety Switch Cover Installing the Inverter solar ET ae SolarEdge Installation Guide MAN 01 00002 1 6 3 Remove the AC DC Safety Switch cover DC Side AC Side Conduits Conduits AC Connections Equipment Grounding Terminal DC Connections AC Connections g Fi E ISG 5 Je INC 7 Figure 26 Inside the DCD 1ph US A AC DC Safety Switch Equipment Grounding Terminal Installing the Inverter solar ft Ee SolarEdge Installation Guide MAN 01 00002 1 6 Connecting the AC Use any of the AC side conduit inputs Each punch out opening has two sizes 34 and 1 1 Strip off the isolation and expose the three wires in the AC cable as follows The lengths of the wires to strip are as follows 0 32 in amp mm 2 O ins SO mm e Figure 27 Wire Lengths to Strip AC e Strip 8 mm 1 3 for contact e Individual cable length 50 mm 2 WARNING Make sure to connect the equipment grounding first Veillez relier le conducteur de PE la terre d abord 2 Connect the wires to the appropriate terminal connectors On the AC DC Switch chassis there is a label shown in Figure 28 wh
65. lass B IEC61000 6 2 IEC61000 6 3 Safety IEC 62103 class IT safety UL1741 UL 94 5 VA UV Resistant Do p Technical Specifications solar ZT ee 113 SolarEdge Installation Guide MAN 01 00002 1 6 OP250 LV OP300 MV OP400 MV Installation Specifications Dimensions W x L x H 120 x 130 x3 7 4 72 x 5 11 x 1 45 in 450 1 0 g 1b Maximum Installation Height 2000m a Output PV Wire 0 95 m 3 ft length 6 mm MC4 Input Connector MC4 MC3 Tyco H S Amphenol H4 Operating Temperature Range 40 65 40 150 IP65 NEMA 4 Relative Humidity 0 100 PB250 AOB and PB350 AOB Input Reverse Polarity Protection Yes Nighttime Power Consumption 0 w Technical Specifications solar IEEE ee 114 SolarEdge Installation Guide MAN 01 00002 1 6 Output During Operation Inverter is Operating Maximum Output Current Operating Output Voltage Total Maximum String Voltage V Controlled by Inverter US and EU 1 ph Total Maximum String Voltage 1000 V Controlled by Inverter EU 3 ph Output During Standby Inverter is Disconnected or Off PV System Design eee a or Orientations Standard Compliance EMC Safety Material WEEE RoHS 149 5 x 142 x 27 2 5 9x5 6x1 1 mm in 800 1 8 g Ib 2000m 40 to 65 40 to 150 CET IP65 Outdoor Use NEMA 3R Relative Humidity 0 100 Power Optimizer Mechanical Specifications SolarEdge Installation Guide MAN 01 00002
66. low gt To connect the RS485 communication bus 1 Open the cover of the inverter as described in the Opening the Cover section on page 37 2 Using the user buttons select the 5 2 3 RS485 option under the Communication Bus menu 5 2 as described in the Configuring the Inverter Using the LCD Panel and User Buttons section on page 88 3 For all slave devices using the user buttons select the 5 1 3 RS485 option under the Communication Server menu 5 1 as described in the Configuring the Inverter Using the LCD Panel and User Buttons section on page 88 Setting Up Communication solar ET 76 SolarEdge Installation Guide MAN 01 00002 1 6 4 An inverter has either RJ45 RJ11 connectors or block terminal connectors for communication If the inverter has RJ45 RJ11 communication connectors then connect as follows e The RS485 bus uses a four wire telephone cable and a six wire RJ11 connecter also known as RJ25 Insert the wire via one of the small cable glands The glands come from the factory pre sealed Removal of the sealing is required in order to insert the cable CAUTION If a gland is opened and not used be sure to reseal it Otherwise it may affect the inverter s functionality Si une glande est ouverte et non utilis e assurez vous de la refermer Sinon cela pourrait affecter la fonctionnalit de l onduleur e After inserting the wire crimp a connector using a standard telephone wire crimper
67. m DE euren 2 fe Nominal AC voltage 277 240 208 Ambient temperature DCD 1ph US A switch 25 to 70 C DCD 1ph US B switch 40 to 65 Installing the Inverter solarne _ staing the Inverter py SolarEdge Installation Guide MAN 01 00002 1 6 9 34 in 237 2 mm _10 28 in 261 mm _ 8 01 in 203 5 mm 3 25 in 82 5 mm Figure 31 DCD 1ph US A Switch Dimensions in Inches and Millimeters Installing the Inverter SolarEdge Installation Guide MAN 01 00002 1 6 220 20mm 8 67in cr g s en i Monte EN 7 N uo 317 00mm 12 48in 213 45mm 8 40in Figure 32 DCD 1ph US B Switch Dimensions in Inches and Millimeters Installing the Inverter solar ILE a SolarEdge Installation Guide MAN 01 00002 1 6 Ground Fault Circuit Interrupter Detection indication and cease power export per NEC 690 35 C All SolarEdge inverters incorporate a certified internal Ground Fault Circuit Interrupter GFCI in order to protect against possible electrocution and fire hazard in case of a malfunction in the PV array cables or inverter D tection indication et arr t de la g n ration d lectricit conform ment la norme NEC 690 35 C Tous les onduleurs SolarEdge integrent un disjoncteur de fuite a la terre protegeant contre les risques d lectrocution et d incendie en cas de dysfonctionnement des panneaux PV des cables ou de l onduleur An external GF
68. miseurs de puissance sont connect es la chaine et que pas un seul module soit connect directement la chaine D brancher les cables qui connectent les optimiseurs de puissance la chaine solar ZE amp 6 Installing the Power Optimizers SolarEdge Installation Guide MAN 01 00002 1 6 Mesurez que la sortie de chaque optimiseur de puissance g n re un seul Volt de tension afin de localiser la optimiseur de puissance qui ne g n re pas la bonne tension Si une optimiseur de puissance d fectueuse est identifi e v rifier ses connections sa polarit le module et la tension Si une optimiseur de puissance d fectueuse ne peut pas tre courtcircuit e ou r par e sautez la optimiseur de puissance et connectez une chaine plus courte Ne pas continuer avant d avoir trouv le probl me et retir la optimiseur de puissance d fectueuse IMPORTANT SAFETY FEATURE After a PV module is connected to the power optimizer the power optimizer outputs a safe voltage of 1 V We suggest verifying this output for the first few power optimizers that you connect in order to verify their proper connection Take note that if you use a tracker the power optimizer will turn ON only if the tracker is tracking the sun and at least 2 W of power are provided by the PV module Step 4 Recording Installation Information Be sure to record power optimizer serial numbers during their installation as this information may be required
69. mizers are delivered by SolarEdge and 11 the installation of the power optimizers provided however that for the power optimizer the Warranty Period shall not exceed the warranty period provided by the applicable module manufacturer Inverters 12 years commencing on the earlier of 1 3 months from the date the Inverters are delivered by SolarEdge and 11 the installation of the Inverters The Limited Warranty does not apply to ancillary equipment and components sold separately from the Products such as for example cables wires and connectors whether supplied by SolarEdge or others The Limited Warranty only applies to the buyer who has purchased the Products from an authorized seller of SolarEdge for use in accordance with their intended purpose The Limited Warranty may be transferred from buyer to any assignee and will remain in effect for the time period remaining under the foregoing warranties provided that the Products are not moved outside its original country of installation and any reinstallation is done in accordance with the installation directions and use guidelines accompany the Products collectively the Documentation If during the applicable Warranty Period buyer discovers any defect in workmanship and materials and seeks to activate the Limited Warranty then buyer shall promptly after such discovery report the defect to SolarEdge by sending an email to support solaredge com with the following informat
70. mpatibilit m canique entre les optimiseurs de puissance SolarEdge et les modules auxquels ils sont connect s il faut Utiliser des connecteurs identiques du m me fabricant et du m me type aussi bien pour les optimiseurs de puissance que pour les modules V rifiez que les connecteurs sont compatibles de la mani re suivante Le fabricant du connecteur doit explicitement v rifier la compatibilit avec le connecteur SolarEdge Un rapport de test de tierce partie doit tre effectu par l un des laboratoires externes indiqu s ci dessous TUV VDE Bureau Veritas UL CSA Intertek qui v rifiera la compatibilit des connecteurs Installing the Power Optimizers solar SEE ee 7 SL gt 6 SolarEdge Installation Guide MAN 01 00002 1 6 NOTE The power optimizer is waterproof when the input and output cable connectors are mated and has no need for shelter Do NOT leave the optimizer exposed to water unless the connectors are mated The power optimizer can be placed in any orientation meaning there is no up side NOTE The power optimizer should be mounted in a location that is either ventilated or that has a free space of air around it for heat dissipation NOTE Mounting brackets are suited to either a flat surface or a pole and can be attached to any surface texture IMPORTANT SAFETY FEATURE As long as the power optimizers are unconnected to the inverter and the inverter is OFF the power optim
71. n page 56 Replacing an Inverter An inverter can be replaced without opening or removing the AC DC Safety Switch as described below Installing the Inverter solar ILE A SolarEdge Installation Guide MAN 01 00002 1 6 1 Turn the inverter s ON OFF switch on the bottom of the inverter to OFF Wait until the LCD indicates that the DC voltage is safe or wait at least five minutes before continuing to the next step Turn the AC DC Safety Switch OFF Open the inverter cover Disconnect the DC and AC wires from the inverter ul A UN Remove the two screws securing the inverter to the mounting bracket and then remove the inverter from the mounting bracket 6 Place the new inverter on the mounting bracket replace the screws securing the inverter to the mounting bracket and install the DC and AC wires as described in this manual You may now continue setting up the new inverter and re pairing the new inverter to the existing power optimizers as described in Chapter 4 Commissioning the Installation on page 56 NOTE If you remove the old inverter and do not immediately install a new one then e Lock the AC DC Safety Switch to the OFF position using a padlock on the switch e Use insulation tape to isolate each of the AC and DC wires e Seal the open conduits using duct tape AC DC Safety Switch Technical Specifications This section provides the technical specifications of the SolarEdge AC DC Safety Switch Se Maximu
72. n mode and produces power the inverter LED is steady green Step 3 Verifying Proper Operation After the proper wake up delay time is over the following message appears on the inverter s LCD panel Vac v Vdc v 230 7 3 71 9 P OK X XX YYY gt To verify proper operation 1 Verify that the inverter LED is steady green 2 Verify that the ON OFF indicator on the LCD panel described above reads ON 3 Verify that P_OK appears to indicate a connection to the power optimizers Also verify that S_OK appears if the inverter is connected to the SolarEdge Monitoring Server Commissioning the Installation solar EE 61 SolarEdge Installation Guide MAN 01 00002 1 6 4 Verify that the total number of power optimizers connected to the inverter appears next to the P_OK indicator on the LCD panel If this number is too low then it may mean that one or more of the power optimizers are not connected properly or the pairing process may have not been completely successful for example due to complete shading of one of the modules or insufficient sunlight during the pairing process NOTE Y It can take up to 15 minutes for all power optimizers to transmit their telemetries and to be counted on the LCD screen 5 Verify that the Vac v on the LCD panel specifies the grid s correct AC output voltage in Volts 6 Verify that the Vdc v on the LCD panel specifies the DC input voltage in Volts which
73. n the SE3000 AC and DC Conduits Conduits must be rainproof if installed outdoors and size 3 4 AC and DC Internal Wiring Each of the AC wires Linel Line2 Neutral and GND and DC wires DC and DC must be a 75 C or higher copper wire with a cross section of AWG10 AWG6 8 16 mm2 Installing the Inverter solar ILE 1f 7 SolarEdge Installation Guide MAN 01 00002 1 6 Connecting the Single Phase Inverter Opening the Cover gt To connect AC wires to internal Single Phase Inverter terminals 1 Turn OFF the AC on the AC wires to be connected to the inverter by disconnecting the circuit breakers on the main circuit board 2 Turn off the ON OFF switch at the bottom of the inverter W Turn off the DC switch on the main circuit board if one exists 4 Ifthe inverter was on prior to disconnecting the switch then wait at least five minutes before opening the cover of the inverter WARNING A Do not open the cover of the Single Phase Inverter before you turn OFF the ON OFF switch at the bottom of the inverter and the AC DC switch of the Safety Disconnect enclosure N ouvrez pas le couvercle de l onduleur monophas avant d avoir mis l interrupteur Marche Arr t sur la position OFF en bas de l onduleur et d avoir coup l interrupteur CA CC de l enceinte du coupeur WARNING Verify that the ON OFF switch at the bottom of the inverter is OFF V rifier que l interrupteur ON OFF au bas de l onduleur est sur OFF
74. ne power optimizer is sending monitoring data The number 0 indicates that no power optimizer has been paired to this inverter If you are re pairing the power optimizers and inverters the number indicates the number of power optimizers that have been paired in the past If P_OK does not appear check the power optimizer strings and DC input connections 5 Ifthe inverter is connected to the SolarEdge Monitoring server verify that S_OK appears This denotes that the connection to the server is successful 6 Verify that the Vac v on the LCD panel specifies the grid s correct AC output voltage in Volts 7 Verify that the Vdc v on the LCD panel specifies the DC input voltage in Volts There should be a safety voltage of 1 V for each power optimizer connected to the inverter S NOTE A measurement error on the inverter LCD of 3 V is OK Commissioning the Installation SolarEdge Installation Guide MAN 01 00002 1 6 NOTE If the LCD panel shows 0 V Verify that the PV modules are are not shaded or otherwise obstructed m Check for proper power optimizer string and DC input connection Verify the correct polarity of the DC input connection 8 Verify that Pac w on the LCD panel specifies 0 as the AC output power in Watts This is because the inverter is still off WARNING Verify that the ON OFF indicator on the LCD panel described above reads OFF V rifiez que l indicateur ON OFF sur le panneau d af
75. nnect more than one inverter to the same hub or to different hubs as required Each inverter sends its monitored data independently to the SolarEdge Monitoring server All connections are initiated from the inverter so that no port forwarding is required 7 Close the inverter cover as described in the Closing the Cover section on page 42 8 Verify the connection as described in the Verifying the Connection section on page 81 Y If your network has a firewall then you may need to configure it to enable the connection to the following address Destination Address prod solaredge com Port 22222 Setting Up Communication solara Se Ub Communication 5 SolarEdge Installation Guide MAN 01 00002 1 6 Creating an RS485 Bus Connection The RS485 option enables you to create a bus of connected inverters consisting of up to 30 Slave inverters and 1 Master inverter Using this option inverters are connected to each other in a chain meaning the first inverter in the chain is connected to the next inverter in the chain via its RS485 connector The first inverter in the chain and the last inverter in the chain must be terminated SolarEdge Inverter SolarEdge Inverter SolarEdge Inverter SolarEdge Inverter ALLER Lu LU PUL LUM Ju LLLA RAJI Lu Jul LULU LI Lu sd oo EN DEN VEN e Router Hub d a i Figure 42 Example of RS485 Bus Connection Each inverter must be connected according to the instructions be
76. ocation of power optimizers This process prepares the SolarEdge Monitoring Portal for receiving up to date information from the installation site and for displaying it in a physical or logical view The inverter may be connected to the SolarEdge Monitoring Server via a LAN or an external modem connected to the RS232 port Alternatively you can connect the inverter to another inverter that is already connected to the server The inverter to inverter connection is made by an RS485 bus or a ZigBee modem This connection enables the inverters to send the latest data collected from the power optimizers and inverters to the SolarEdge Monitoring Server Commissioning the Installation solar ILE OO 8 SolarEdge Installation Guide MAN 01 00002 1 6 If the inverter is properly connected to the internet as described in the Step 3 Verifying Proper Operation section on page 60 then the S_OK appears in the inverter s LCD screen Providing Installation Information lt MPORTANT NOTE A Be sure to record power optimizer serial numbers during their installation as this information may be required later for troubleshooting and is necessary for proper physical layout on the monitoring website iPhone Site Mapper SolarEdge provides an iPhone Site Mapper that helps you collect information about your installation This application leads you through the process of photographing the labels on each inverter and power optimizer It t
77. oduce 1 V per power optimizer in the string For example if 10 power optimizers are connected in a string then 10 V should be produced Use a voltmeter with at least 0 1V measurement accuracy to verify that the total voltage produced is in accordance with the number of power optimizers in the string e If0O V is measured for the string check for a disconnection of the outputs of one of the power optimizers e If the voltage is lower than the quantity of power optimizers for example 9 V when 10 power optimizers are connected verify whether one or more of the power optimizers are not connected meaning they were skipped during the string connection process If they are all connected verify whether one or more of the PV modules is not connected properly to its power optimizer e Ifthe voltage is too high then apply the CAUTION below solar ZE Installing the Power Optimizers SolarEdge Installation Guide MAN 01 00002 1 6 CAUTION If the measured voltage is too high the installation may not have a safe low voltage PROCEED WITH CARE Please note that a deviation of up to 2V for a full string is considered normal A voltage that is higher than the quantity of power optimizers may be caused by one of the following reasons An extra power optimizer is connected in the string The output of a PV module may be connected in the string instead of the output of a power optimizer A malfunction of one of the power o
78. on l onduleur auquel les optimiseurs de puissance ont t rajout es peut tre endommag solar Setting Up Communication SO nn a SolarEdge Installation Guide MAN 01 00002 1 6 Chapter 6 Setting Up Communication Communication Dataflow The SolarEdge site information can be accessed remotely using the SolarEdge Monitoring Portal as described in the SolarEdge Monitoring Portal User Guide In order to transfer monitoring data from a SolarEdge site to the SolarEdge Monitoring Portal a communication connection must be set up as described in this chapter Communication setup is not required for power harvesting and is needed only when using the monitoring portal Power optimizers send information to the SolarEdge Inverter via DC lines No added wires or configurations are required for this purpose The inverter sends this information to the SolarEdge Monitoring Server through the Internet The sections below describe how to set up this connection Connector Panel The connector panel on the inverter appears as shown below RS232 On Off LED DC Input Connector Switch Button AC Output a CD 6S iE m F IN Fe pe oc i f A Pr J Me LO O O 0 COMMILEDCATION iat Communication Glands Figure 33 Connector Panel Setting Up Communication SOIN Se Lp Commurioation 5 SolarEdge Installation Guide MAN 01 00002 1 6 Each communication gland on the panel is numbered as described in the
79. onnection to inverter Ask the grid operator whether a large surge source or irregular load exists near the installation site If the grid does not have problems contact SolarEdge support If this fault persists Check the AC connection to inverter Ask the grid operator whether a large surge source or irregular load exists near the site Verify that the output wire size matches the distance between the inverter and the location of the grid connection Use a larger gauge wire for the AC output Errors and Troubleshooting SolarEdge Installation Guide MAN 01 00002 1 6 Error LCD Description Troubleshooting Message DC Voltage DC overvoltage The The SolarEdge system should normally Too High input DC voltage eliminate DC overvoltage errors When exceeds the maximum DC overvoltage is detected the inverter level that is supported shuts off the power optimizers and restarts the inverter If the problem persists then Turn OFF the ON OFF switch at the bottom of the inverter After at least five minutes the LCD panel should show a low safety voltage equal to 1 V string length Otherwise check which string is malfunctioning and recheck its connections to the inverter Verify that no PV modules are connected directly to the inverter without a power optimizer Recommission all inverters in the site as described in Chapter 4 Commissioning the Installation on page 56 Temperature Over temperature If th
80. ound DO NOT TOUCH UN INSULATED fault has measured WIRES substantially high EXTREME CARE MUST BE ground currents TAKEN WHEN TROUBLESHOOTING THIS ERROR THE RISK OF ELECTROCUTION EXISTS Only a qualified technician should handle this problem and only after taking proper precautions Shut OFF the inverter by turning the ON OFF switch at the bottom of the inverter OFF and disconnecting the AC switch Wait five minutes for the input capacitors to discharge Disconnect the DC inputs For each DC string measure the DC voltage between DC and GND and DC and GND with a 1Kohm resistor in parallel to the volt meter If a voltage higher than 2 V is measured then the fault is in this string Do not connect strings with a grounding fault to the inverter A certified PV installer must fix the faulty string before connecting it to the inverter solar ZE SolarEdge Installation Guide MAN 01 00002 1 6 Errors and Troubleshooting 103 Error LCD Description Troubleshooting Message AC Current Surge AC Voltage Too High AC current surge The internal hardware that measures AC current has measured substantially high output currents This may occur because of changes in the AC voltage or a switching load near the installation site AC voltage surge The internal hardware that measures AC voltage has measured substantially high instantaneous output voltage If this fault persists Check the AC c
81. peratures are always between 25 C and 60 C Equipment List Standard tools can be used during the installation of the SolarEdge system The following is a recommendation of the equipment to be used when installing a SolarEdge system Allen screwdriver for M6 and M5 screw types Flat Head screwdriver E Electrical screwdriver tester Drilling machine and bits suitable for a wall or pole where the inverter mounting bracket is installed Suitable screws for attaching the inverter mounting bracket to a wall 5 16 screws for attaching the power optimizer to the racking Wire cutters Wire strippers E Voltmeter Introducing the SolarEdge Power Harvesting System solar ZT SL SolarEdge Installation Guide MAN 01 00002 1 6 For installing the communication option you may also need the following E For Ethernet RJ45 connectors a For RS485 Four or six wire twisted pair telephone cable An inverter has either RJ45 RJ11 connectors or block terminal connectors for communication To install an inverter with RJ45 RJ11 connectors you also require the following For Ethernet e CAT5 twisted pair Ethernet cable e RJ45 crimping tool E For RS485 e RJ11 six pin connector also known as RJ25 e RJ11 crimping tool Installing the Power Optimizers solar SEE ee it SolarEdge Installation Guide MAN 01 00002 1 6 Chapter 2 Installing the Power Optimizers Applicable Notes and Warnin
82. ptimizers Perform the following if the total string voltage is too high Verify that only power optimizers are connected in the string and that no PV module outputs are connected without a power optimizer Disconnect the wires that connect the power optimizers in the string Measure that there is 1V safety voltage for each individual power optimizer in order to locate the power optimizer that does not output the proper voltage fa malfunctioning power optimizer is located check its connections polarity module and voltage If a malfunction cannot be bypassed or resolved skip the malfunctioning power optimizer thus connecting a shorter string Do not continue before finding the problem and removing the malfunctioning power optimizer Si la tension mesur e est trop lev e l installation pourrait ne pas avoir de basse tension de s curit PROGRESSEZ AVEC PRUDENCE Notez qu une d viation de jusqu 2V pour une chaine complete est consid r e comme normale Une tension qui est sup rieure au nombre de optimiseurs de puissance dans la chaine peut se produire pour les raisons suivantes Une optimiseur de puissance suppl mentaire est connect e dans la chaine La sortie d un module est connect e la chaine au lieu de la sortie d une optimiseur de puissance Une malfonction d une optimiseurs de puissance Proc dez comme suit si la tension de chaine est trop haute V rifier que seulement des opti
83. que The tightening moment is 1 2 1 5 Nm 0 88 1 1 pound foot 9 Verify that there are no strands in each terminal connector and that the unused ports of the terminals are sealed Installing the Inverter solar ET a SolarEdge Installation Guide MAN 01 00002 1 6 Connecting Cables to the Single Phase Inverter Chassis To connect DC cables to the Single Phase Inverter 1 Connect the DC connectors from the photovoltaic installation to the DC and DC connectors as indicated Two strings may be connected in parallel to both DC inputs of the inverter They are simply wired together in the terminal block inside DC N Figure 16 DC Cable Conduit Opening and Terminals 2 Connect the DC equipment grounding to the terminal block directly connected to the chassis with the symbol If more than two strings are required they can be connected in parallel in an external combiner box before connecting a unified DC connection to the inverter Y If more than two strings are connected each should be properly fused on both DC and DC according to NEC690 35 B Due to the SolarEdge architecture the parallel strings may be of different lengths and therefore do not necessarily need to be connected to an identical number of power optimizers Installing the Inverter solar TEE eT SolarEdge Installation Guide MAN 01 00002 1 6 The lengths of the wires to strip are as follows 0 32in 8 mm 2 00 in 50mm H o s Fi
84. r solar ET a SolarEdge Installation Guide MAN 01 00002 1 6 2 To determine the location where to drill the holes for the mounting bracket position the bracket against the wall or pole and push the conduits into the inverter inputs Use a pencil to mark the positions where the bracket will be screwed into the wall or pole Alternatively you can use the supplied paper template to mark the positions of the holes The paper template has a drawing that indicates the positions where to drill Place the top of the paper aligned with the bottom of the inverter mounting bracket If using the DCD 1ph US B Safety Switch the holes were already marked before installing the inverter as described on page 28 NOTES e The conduits hubs and fittings that are used must be suited for field wiring systems e The hubs and other fittings that are used must comply with UL514B e The conduits hubs and fittings that are used must have any one of the following NEMA ratings 3 3R 3RX 3S 3SX 3X 4X 4 6 and 6P fora unit NEMA 3R rating 3 Drill the holes in the marked positions 4 Open the cover of the inverter as described in the Opening the Cover section on page 37 Installing the Inverter solar ft a SolarEdge Installation Guide MAN 01 00002 1 6 5 From the inside of the inverter grab the AC and DC wires extending from the AC DC Safety Switch conduits Make sure that they are inside the inverter so that they can later be conne
85. redge com for more information about this option Introducing the SolarEdge Power Harvesting System solar Jf E SolarEdge Installation Guide MAN 01 00002 1 6 Installation Workflow The following provides an overview of the workflow for installing and setting up a new SolarEdge site Most of these procedures can also be used for adding components to an existing SolarEdge site Connecting Power Optimizers to Panels and to a String Page 15 Recording Power Optimizer Serial Pages 26 and 61 Numbers Installing the Inverter and Connecting the String to the Page 27 Inverter Commissioning and Activating the Page 56 Installation Connecting the Inverter to the Page 66 SolarEdge Monitoring Server Configuring the Inverter Page 88 Introducing the SolarEdge Power Harvesting System solar Hg Aene the SoaEdge Pone Hawesin Sent 4g SolarEdge Installation Guide MAN 01 00002 1 6 Transport and Storage Single Phase Inverter Transport The Single Phase Inverter should be transported in its original packaging facing up and without exposing the Single Phase Inverter to unnecessary shocks If the original package is no longer available a similar box can be used which can withstand the weight of the Single Phase Inverter lt 52 1b 25 kg has a handle system and can be closed fully Single Phase Inverter Storage Store the Single Phase Inverter in a dry place where ambient tem
86. rical connectivity This view enables you to see a logical view of which panels are connected in each string which strings are connected to each inverter and so on Physical Layout Shows a schematic physical layout of the components in the fields meaning inverters clusters strings and panels and their electrical connectivity This view enables you to see a physical bird s eye view of the installation site showing which panels are connected in each string which strings are connected to each inverter and so on This window enables you to View the latest performance of specific components Find underperforming components such as panels by comparing their performance to that of other components of the same type Pinpoint the location of alerted components See how components are connected to each other In order to enable the SolarEdge Monitoring Portal to show the strings and physical location of power optimizers you may first report the physical and logical mapping of the installed power optimizers by mail email or fax to SolarEdge SolarEdge will then upload this information to the SolarEdge Monitoring Server A IMPORTANT NOTE Even if you do not report the physical and logical mapping of the installed power optimizers to SolarEdge the SolarEdge Monitoring Portal will still show the logical layout indicating which power optimizers are connected to which inverters However it will not show strings or the physical l
87. rimper to crimp the wires e Connect the Ethernet connector to the RJ45 plug on board in the inverter as shown in Figure 34 Setting Up Communication solar TEE 1 TETN 8 SolarEdge Installation Guide MAN 01 00002 1 6 If the inverter has block terminal communication connectors then connect as follows e The Ethernet block terminal is already inserted into the inverter when it is delivered Pull off the Ethernet block terminal as shown on the left below Figure 40 Removing the Ethernet Block Terminal e Loosen the screws of connectors 6 3 2 and 9 on the Ethernet block terminal as shown below Connect Only These Figure 41 Ethernet Block Terminal NOIR One to seven connectors can be connected Only 1 2 3 and 6 are mandatory Setting Up Communication solar ET 1 TTEN 74 SolarEdge Installation Guide MAN 01 00002 1 6 e Insert the ends of wires 1 2 3 and 6 into the connectors shown above e Insert the aluminum shield of the wire into the S connector e Close the screws of the Ethernet block terminal e Reinsert the Ethernet block terminal into the inverter card The Ethernet block terminal can only be inserted with the screws facing the wall towards the inverter heat sink NOTE Y Make sure to push in the Ethernet block terminal firmly so that it is inserted as far in as it goes 6 Connect the other end of the Ethernet cable to the Ethernet plug of the Ethernet hub or router You can co
88. rter to check whether the network and modem are operating properly For example connect a laptop to the Ethernet modem and connect to the Internet m Check whether a firewall or another device is blocking transmission Check the configuration of the inverter Troubleshooting Communication gt To troubleshoot a communication problem 1 2 Check that the modem or hub router is functioning properly Check that the connection to the internal connector on the inverter board is performed properly through its gland at its bottom Check that the selected communication option RS232 Ethernet LAN RS485 or ZigBee is configuring properly using the inverter s LCD panel Check whether a firewall or another type of network filter is blocking communication If you are using a ZigBee connection and there is interference on the channel being used then change the channel Inverter User Interface solar EE e SolarEdge Installation Guide MAN 01 00002 1 6 Chapter 7 Inverter User Interface Inverter LCD Panel and LEDs The front of the Single Phase Inverter has a small LCD panel and three LEDs as shown below LCD LEDs LCD Light Button Figure 48 Single Phase Inverter Front The LCD panel has three LED indicators as follows Power Production Green Indicates whether the inverter is producing power or not as follows e On The inverter is producing power e Blinking The inverter is in Standby mod
89. s unit must be connected only to a dedicated AC branch circuit with a maximum Overcurrent Protection Device OCPD of 40 A Cet appareil doit tre connect uniquement un circuit de d rivation d di avec un co fficient TPOC dispositif de protection contre les surintensit s maximal de 40 A Support and Contact Information If you have technical problems concerning our products please contact us USA and Canada 1877 360 5292 Germany 089 45459730 and 089 4161703 39 France 0800917410 Italy 800 784 824 United Kingdom 08002061058 Israel 073 2403118 Australia 1800149229 Rest of World 1 650 319 8843 Fax 972 73 240 3117 Email to E support solaredge com US and Canada support solaredge com all other countries Before contact please gather the following information Inverter and power optimizer type Serial number of the inverter and the power optimizer in question The error indicated on the inverter screen or on the SolarEdge Monitoring Portal System configuration information including the type and number of modules connected and the number and length of strings The communication method to the SolarEdge server The Support 2 8 option on the top right of the SolarEdge Configuration Tool s main window can be used to automatically collect all relevant information to be sent to SolarEdge Professional Services for support This option is described in detail in the SolarEdge Configura
90. s window that shows the total voltage and power as described in the Main Inverter Status Window section on page 86 Inverter shutting down The inverter automatically goes into Night mode and turns off the LCD when it is no longer supplied power by at least one string of minimum length After installation of the inverter The field technician must perform basic configuration of the inverter as described in the Configuring the Inverter Using the LCD Panel and User Buttons section on page 88 Error messages In the event of a problem an error message may be displayed on the LCD panel You may refer to Appendix A Errors and Troubleshooting on page 100 and the Configuring the Inverter Using the LCD Panel section on page 88 for more information Normal Operation Pressing the inverter s LCD light button located on its bottom turns on the LCD s backlight and displays the messages on the LCD panel Inverter User Interface solar TRE verter se MENACE p SolarEdge Installation Guide MAN 01 00002 1 6 The backlight is displayed for 30 seconds This length of time is configurable as described on page 96 The following screens appear one after the other when you press the LCD light button Initial Inverter Status Window below Main Inverter Status Window page 86 Energy Meter Window page 86 Telemetry Window page 86 ID Status Window page 87 Communication Status Window page 87 IP Status Window page 88
91. should be between 250 V and 450 V 7 Verify that Pac w on the LCD Panel specifies the total AC output power produced in Watts NOTE Take note of the serial on the inverter s sticker and on its warranty card This information is used in the SolarEdge Monitoring Portal to identify this inverter and is needed to open a new site in the monitoring portal Congratulations Your SolarEdge power harvesting system is now operational Step 4 Reporting and Monitoring Installation Data The SolarEdge Monitoring Portal enables you to access SolarEdge site information as described in the SolarEdge Monitoring Portal User Guide as well as receive up to date information from the installation site for viewing in a physical or logical view After a site is opened in the SolarEdge Monitoring Server you can access all the monitored data about that site To register a new site fill in the online form at http www solaredge com groups site registration The serial number s of the inverter s must be specified in order to open a new site Commissioning the Installation solar TE Cerise tation pz SolarEdge Installation Guide MAN 01 00002 1 6 The SolarEdge Monitoring Server also enables you to display a logical and physical schematic layout of the installed power optimizers as follows Logical Layout Shows a schematic logical layout of the components in the fields meaning inverters clusters strings and panels and their elect
92. t provides a quick overview of power voltage and temperature as described below Energy Meter Window After you press the inverter s LCD light button to display the window shown above you can press it again to display the Inverter Energy Meter window This window displays the total energy Wh produced during the last day month and year of the inverter as described below NOTE Y The production data is accumulated according to an internal real time clock If the inverter is connected to the SolarEdge Monitoring Server it will automatically set the cloc s time If not you may use the SolarEdge Configuration Tool to set the clock setting Telemetry Window After you press the inverter s LCD light button to display the window shown above you can press it again to display the Inverter Telemetry window This window displays the telemetry of the last power optimizer to report its telemetry to the inverter as described below The display changes as each power optimizer sends its telemetry information Each power optimizer sends its telemetry once within each 15 minute period Inverter User Interface solange Mere ser merece g7 SolarEdge Installation Guide MAN 01 00002 1 6 NOTE Y This window is unique in that its backlight is ON by default for 15 minutes after you press the LCD light button and not 30 seconds like other windows This length of time can be configured as described on page 96 NOTE Y In order
93. tallation Guide MAN 01 00002 1 6 Chapter 5 Replacing and Adding System Components Modifying an Existing Installation This section describes how to modify an existing installation that has been operating properly for a while gt To modify an existing installation 1 Shut down the inverter by turning OFF its ON OFF switch and the DC switch of the main circuit board The inverter goes into Shutdown mode and displays the following message DC VOLTAGE NOT SAFE D O NOT DISCONNECT VDC 72 0 This message is displayed until the DC is safe The default safety voltage is 50 V WARNING AN Do not touch the DC power connections until the DC voltage is at a safe level Doing so may cause personal damage damage to the device and or danger of fire Ne pas touchez les connecteurs de courrant DC jusqu ce que la tension DC soit tomb e un niveau s curis Y touchez pourrait engendrer un dommage aux personnes un dommage l appareil ou un risque d incendie Replacing and Adding System Components solar ILE ET 65 SolarEdge Installation Guide MAN 01 00002 1 6 2 Switch off the AC to the inverter WARNING AN If you cannot see the inverter panel or there is a malfunction indicated on the LCD panel then switch off the AC to the inverter and wait five minutes for the input capacity of the inverter to discharge Si vous ne pouvez pas voir l cran de l onduleur ou si un dysfonctionnement est indiqu
94. tar washer should break through the anodize coating of the railing to ensure low resistive connection Pour le montage de l optimiseur de puissance sur rail mis a la terre utilisez la rondelle toile en acier inoxydable 5 16 fournie entre le rail et le c t de la bretelle de montage non recouverte La rondelle toile doit traverser le rev tement anodis du rail pour assurer une adh sion basse r sistivit For mounting the power optimizer on an un grounded structure such as a wooden structure connect an equipment grounding conductor to the grounding terminal The grounding terminal will accept a wire size of 6 14 AWG and must be sized for equipment per NEC 250 122 Pour le montage de l optimiseur de puissance sur une structure non mise la terre comme une structure en bois connectez un conducteur de mise la terre la borne de mise la terre La borne de mise la terre accepte une taille de fil de 6 14 AWG et doit tre dimensionn pour quipement conforme au NEC 250 122 Installing the Power Optimizers Solar game sin he Power pm 5 SolarEdge Installation Guide MAN 01 00002 1 6 Step 2 Connecting Each PV Module to a Power Optimizer WARNING AN Before performing this step turn OFF the Single Phase Inverter by turning off the ON OFF switch at the bottom of the inverter and the DC switch of the main circuit board All inverters in an installation site should be switched OFF in this manner Th
95. tion Tool Software Guide Introducing the SolarEdge Power Harvesting System o solaris fa E SolarEdge Installation Guide MAN 01 00002 1 6 Chapter 1 Introducing the SolarEdge Power Harvesting System What is the SolarEdge Power Harvesting Solution The SolarEdge power harvesting solution maximizes the power output from any type of solar PV installation while reducing the average cost per watt The sections below describe each of the system s components SolarEdge Power Optimizer SolarEdge power optimizers can be connected to existing PV modules in order to maximize power harvesting by locally performing Maximum Power Point Tracking MPPT at the PV module level The power optimizers keep the string voltage fixed regardless of the length of the string and of the environmental conditions Each SolarEdge power optimizer directly transmits performance data from every PV module over the power line Three types of power optimizers are provided by SolarEdge as follows Module add on solutions connected during installation to one or more PV module P N OP250 LV OP300 MV OP400 MV OP480 IV PB250 AOB and PB350 AOB Module Embedded Solution CSD is supplied embedded into a PV module Introducing the SolarEdge Power Harvesting System SolarEdge Installation Guide MAN 01 00002 1 6 solar ZT You may refer to the SolarEdge power optimizer datasheets in order to determine which power optimizer is most s
96. two inverters at the ends of the chain meaning the first inverter and the last inverter must be terminated by switching a termination dip switch inside the inverter to ON The switch is marked SW6 and it is the switch closest to the ESC button as shown below EO I h TO 0 m Use the left oO AAA A AAA RAR ARR AR G switch OO 7 SA R YOY 1 a o 0 L l i o o 0 o o e n 0 Op s EA O bab CL Figure 47 RS485 Termination Switch NOTE Only the two inverters at the ends of the chain should be terminated for best performance The other inverters in the chain should have the termination switch OFF 5 Choose a single inverter to be the connection point between the RS485 bus and the SolarEdge Monitoring Server 6 Connect the Master as described above to the SolarEdge Monitoring Server via either Ethernet as described in the Creating an Ethernet LAN Connection section on page 70 or RS232 as described in the Creating an RS232 UART Connection section on page 69 Setting Up Communication solange g SolarEdge Installation Guide MAN 01 00002 1 6 Ensure that you select either the Ethernet 5 1 1 or RS232 5 1 2 option under the Communication Server menu 5 1 as described in the Configuring the Inverter Using the LCD Panel and User Buttons section on page 88 e On the Master inverter under the 5 Communication menu configure the 5 4 RS485 option
97. uitable for you requirements Mounting Hole Mounting Hole Figure 1 Add On Box Solution Single Phase Inverter The Single Phase Inverter efficiently converts DC power received from the PV modules into AC power that can be fed into the main circuit board of the site and from there to the grid The inverter also receives the monitoring data from each power optimizer and transmits it to a central server called the Monitoring Server through an Ethernet network to an external modem connection Heat Sink Fins mae j LCD i L le W sram Bottom Figure 2 Single Phase Inverter Introducing the SolarEdge Power Harvesting System solar Le EE tt SolarEdge Installation Guide MAN 01 00002 1 6 Single Phase Inverter Package Contents The following lists the contents of the Single Phase Inverter installation package One SolarEdge Single Phase Inverter One wall mounting bracket Two flat head screws for fastening the inverter to the wall mounting bracket Installation Guide Quick Installation Guide SolarE dge Monitoring Portal The SolarEdge Monitoring Portal enables you to monitor the technical and financial performance of one or more SolarEdge Photovoltaic sites It provides information about present and past performance of each PV module individually and about the system as a whole NOTE Y You may refer to the SolarEdge Monitoring Portal User Guide available on the SolarEdge website at www sola
98. ure set out below will be invoked Where replacement Products are sent SolarEdge generally sends such products within 48 hours The repaired Product or replacement parts or Product as applicable shall continue to be covered under the Limited Warranty for the remainder of the then current Warranty Period for the Product Where the RMA Procedure is invoked by SolarEdge SolarEdge will instruct buyer how to package and ship the Product or part s to the designated location SolarEdge will bear the cost of such shipment upon receipt of the Product or part s SolarEdge will at its expense and sole discretion either repair or replace the Product or part s SolarEdge will deliver the repaired or replaced Product or part s to buyer at buyer s designated location SolarEdge will bear the cost of such shipment SolarEdge may elect to ship replacement Product and or part s prior to receipt of the Product and or part s to be returned to SolarEdge as per the above Where SolarEdge decides to repair the Product or part s warranty coverage includes labor and material costs necessarily incurred to correct the Product defect and where SolarEdge decides to replace the Product or part s to which the Limited Warranty applies warranty coverage includes the cost of the replacement the Product or part s In addition SolarEdge shall bear shipping costs in respect to the foregoing as set out above All other costs including without limitation travel
99. ure shows the mechanical specifications for the OP250 LV OP300 MV OP400 MV power optimizers Figure 50 Power Optimizer Mechanical Specifications Power Optimizer Mechanical Specifications sola r yefe E SE SolarEdge Installation Guide MAN 01 00002 1 6 PB250 AOB and PB350 AOB Power Optimizers The following figure shows the mechanical specifications for the PB250 AOB and PB350 AOB power optimizers Figure 51 PB250 AOB and PB350 AOB Power Optimizer Mechanical Specifications Inverters Power De rating solar SolarEdge Installation Guide MAN 01 00002 1 6 Appendix D Inverters Power De rating SolarEdge s 5kW 6kW and 7kW inverters operate at full power and full currents up to a temperature of 120 F 50 C The inverters may be used above this temperature with reduced ratings The de rating of these inverters when connected to the 208V 240V and 277V grids is shown in the graph below a c en res QO Q pw O Ambient Temperature C Figure 52 Inverter Power De rating Limited Product Warranty solar ET 119 SolarEdge Installation Guide MAN 01 00002 1 6 Appendix E Limited Product Warranty This SolarEdge Limited Warranty covers defects in workmanship and materials of the products for the applicable warranty period set out below Power optimizers 25 years commencing on the earlier of 1 3 months from the date the power opti
100. wer optimizers and inverters use connectors from the following manufacturers m Multi Contact MC4 Amphenol H4 mE Tyco keyed connector Huber Suhner Raddox Installing a SolarEdge system without ensuring compatibility of the module connectors with the optimizer connectors may be unsafe and could cause functionality problems such as ground faults resulting in inverter shut down In order to ensure mechanical compatibility of the SolarEdge optimizers and the modules to which they are connected Use identical connectors from the same manufacturer and of the same type on both the power optimizers and on the modules or Verify that the connectors are compatible in the following way The connector manufacturer should explicitly verify compatibility with the SolarEdge connector and A third party test report by one of the listed external labs TUV VDE Bureau Veritas UL CSA InterTek should be obtained verifying the compatibility of the connectors Les optimiseurs de puissance et onduleurs SolarEdge utilisent des connecteurs des fabricants suivants Multi Contact MC4 Amphenol H4 Tyco connecteur cl Huber suhner Raddox Les connecteurs du module doivent tre m caniquement compatibles avec les optimiseurs de puissance Sinon le systeme SolarEdge install peut tre dangereux ou causer des probl mes fonctionnels tels que les d fauts de terre qui peuvent provoquer un arret de l onduleur Afin d assurer la co

Download Pdf Manuals

image

Related Search

Related Contents

  example manual  Flexionador de formas nominales según su categoría gramatical  表紙、概要、システム構成(~P8)  

Copyright © All rights reserved.
Failed to retrieve file