Home
사진 삽입
Contents
1. Glleh FTTH E PON ONT User s Manual Class B This is an electromagnetic wave shielding apparatus for family Broadcasting use as Class B and it is intended to be used usually in families Communication Apparatus and might also be used everywhere and Materials for Business 1 Introduction of product C501H User s Manual It is the device that as for 1 circuit of optical track maximum 32 subscribers may divide and use the data of 1Gbps by utilizing the manual optical distribution device to which the recent E PON technology has been applied It is installed in the apartment or detached house and provides maximum 100Mbps super high speed internet service per subscriber as it is linked to IP terminal device such as PC VoIP telephone and etc of the subscriber C501H supports various functions being compared with the existing Ethernet switch such as quality guarantee function QoS of the service management function to meet rapidly the trouble occurred to the system and the subscriber s circuit security function to keep safely the subscriber s information subscriber management function to keep the user s right against the illegal user such as cracker and etc and others C501H as the o low cost ONT supporting the super high speed internet service supports leach of 10 100base Tx which is GE PON interface subscriber s interface linked to OLT RN 2 Packing matter and confirmation of contents Body Use
2. please recheck the cable linkage status as there is any abnormality in the UTP cable or cable linkage status If all are normally installed you can confirm that the relevant computer is LAN flickering during the data transmission reception S Be careful to optical terminal Never see the optical terminal with eye It may give the big damage to the eye C501H User s Manual 4 System Composition gt Front FTTH ALL Explanation Status that the power is supplied Power PWR Green Status that the power is not supplied Status that PON link is connected Normal Green i i Status that PON link is not connected Optical si gnal is on KT Optical Line Optical signal is off Status that the optical level critical value is exceeded n Status that PON link is connected Status that n the optical level critical value reaches Status that the data is not delivered Internet DATA l i i Status that the data is transmitted received Status that Ethernet link is connected Computer lt a LAN Green Status that Ethernet link is transmitted received Status that Ethernet link is interrupted C501H User s Manual gt Back side SA PWR Ad me Explanation KT optical line SC PC EPON port To keep clean Line Computer LAN Port to be linked to PC by using LAN cable Power jack Power input Terminal to link the power AC220V DC5V adaptor DC5V2A terminal of modem Switch to change the po
3. Service In case it is applicable to the following charged service conditions even within the guarantee period the service charge Repair charge parts fee travel charge will be requested In case the trouble occurs from the careless treatment of the customer Natural disaster Fire salt damage flood thunder stroke earthquake standards fixed as other natural disaster Trouble or damage from the fall and etc during move after installation Trouble occurred from remodeling of the product inside in the user s option In case any trouble occurs as any other person but not A S personnel of this company repairs the product In case any trouble occurs from the abnormality of the using power C501H User s Manual Ca Enquiry relative to Use If you have any inconvenience or enquiry during use please visit the homepage of olleh http www olleh com enquire to the buying place or the adjacent center No 100 without area code
4. r s manual As for the power adaptor it is the item separately supplied by KT and it is not included in the modem composition items C501H User s Manual 3 Cable Connection Instruction Surely confirm if the power of C501H before linking the cable To push and insert one side of SC PC connector of the single mode optical fiber in yellow to the optical terminal of the optical outlet until it makes ratting sound and to push and insert the opposite connector to PON port of C501H until it makes ratting sound To push and insert RJ 45 connector of UTP cable to the computer LAN port of C501H until it makes ratting sound and to push and insert the opposite RJ 45 connector to RJ 45 of LAN card of PC until it makes ratting sound To link the 220V AC input terminal of the power adaptor to the power socket and then after linking the output terminal to DC 5V socket to turn on power LED in front of C501H by turning on the power switch When the optical line is normally linked PON LED in front of C501H will turn on within several seconds If PON LED is red color there is any abnormality in the linkage of the optical line and if it is continuously red or the light is not on through re confirmation after washing it cleanly with the spray type optical terminal cleaner please enquire to the buying place or the adjacent A S center If you turn on the power of PC the computer LAN LED will turn on If the computer LAN does not turn on
5. wer of the modem into Power PWR Power switch on off mode C501H User s Manual 5 Specifications a 180 W x135 D x40 H o 5V 24 0 0 or poweracaptoy Temperature 0 50 C Humidity 20 90 EMI EMC Class B specifications satisfied IEEE802 3ah MPCP OAM Compliant 802 1Q VLAN Per LLID Filtering Classification Supports up to four Logical Link IDs LLID AES 128 Downstream decryption Drying Gasp IEEE802A VLAN IGMP snooping IEEE802 1P packet classification and marking 802 1P a i limiting MAC address MAC address limiting OAM Remote Loopback test Transmission distance 10km Transmission quality Below BER10 10 Above 100Mohm Based on DC 500V C501H User s Manual Product Guarantee Model name C501H Certification number Product number Purchase day Date Guarantee period 2years Name Address Customer Tel number Standards for compensation of consumer s damage The compensation for the consumer s damage will comply with the regulations for compensation of consumer s damage announced by Ministry of Finance and Economy Contents of guarantee This product is the one produced through the strict quality control and inspection course You can receive A S for 2 years after purchase if any abnormality occurs However in case it is applicable to the charged service conditions even with the guarantee period the repair will be made by receiving the service charge Charged
Download Pdf Manuals
Related Search
Related Contents
IceBreaker 4824 - Penguin Computing JVC XV-NA77SL User's Manual ESTACION METEOROLOGICA INALÁMBRICA DE The Source of PowerBuilderTM Information Since 1994 MobileView PENTA Installation Manual Photon Testreport Fronius IG TL 5.0 Copyright © All rights reserved.
Failed to retrieve file