Home

Gamma Grapher 2012 Quick setup guide

image

Contents

1. de Gamma Grapher 2012 Quick setup gu A self test is performed note that in certain condition the temperature sensor may display a failed status this is normal If there is a failed line the page will wait for the user to press a next button otherwise it is automatically cleared First power up is NE E A i SA A If the SD card is correctly inserted the startup ea ds screen should be displayed Geo you have the special customized Hazmat version O S Y zaf SE Page 2 Connect the MCA to the probe A TU SS 2 ar To activate the menu press this area Set the high voltage parameters Page 3 Set the HV value Page 4 Activate the high voltage The high voltage will now slowly increase to reach the target value This can take up to 40 seconds to match the value Page 5 i Congratulations Your GG2012 should now see your first spectrum E CH u I zum IC Apne feel ell TI A D 123 DBcps 1 the cps average since the power on 2 the cps average on the last 10 seconds 3 the counts on the selected channel 4 the FWHM 5 the alarm level 6 the highest count on the screen 7 the compensated dose in uR h 8 a blinking indicator when the software is OK 9 the temperature blue coldest green actual red hottest C Celsius F Fahrenheit 10 power load for the HV 11 target HV value 12 measured HV value 13 instant uncorrected
2. CPS 1 and 2 values are dead time corrected 14 the selected channel 15 the efficiency of the channel used for the dose 16 the voltage control manu auto temperature compensation off 17 the time since the last spectrum clear 18 the sliding scale indicator 19 the isotope energies indicator 20 the number of lines for the isotope Page 6 Page 7

Download Pdf Manuals

image

Related Search

Related Contents

UNDERWATER VIEWING SYSTEM USER MANUAL  Notice d`installation - Thema AS Condens Notices d  KOHLER K-4067-0 Installation Guide    Vernier Rotary Motion Sensor  

Copyright © All rights reserved.
Failed to retrieve file