Home
S2150 A-AMM-AMT CLASSIC
Contents
1. electrical switchboard Call our after sale service for assistance 1f necessary 5 3 Evolution possible The S 2150 type AMM can easily be modified into S 2150 AMT without modifying the water connections Just ask for the transformation set AMM AMT R f 0012200203 HBStoppil a at 5 4 Pump kit connection If you ordered a pump kit you have The pump The control box The pipes connection kit Open the box and connect to plug 4 and 5 in the electronic box 5 5 Wiring instructions The internal connections between the printed circuit board and the other electrical parts of the S 2150 are shown in figure 13 The GND terminal should be connected to the base of the dosing valve together with the earth terminal of the power chord H m FLOW METER OFF THERMISTANCE ELECTROVALVE o L N L PUMP S CONTACT CONTROL ON n 1 phase de 100 240 V ca 50 60 hertz n 2 neutral n 3 earth n 4 contact pump control n 5 dry contact pump control sec 4 amp 5 during batch n 6 Electrovalve in STOPPIL box n 7 Electrovalve in STOPPIL box n s Counting system and electronic sensor in STOPPIL box 24V cc n 9 Counting signal n 10 Counting electronic sensor in STOPPIL box O V cc n 11 outside control ON OFF 24V cc n 12 Stop control n 13 Start control n 14 temperature sensor n 15 Temperature sensor n 16 Earth plug OV EH ERStoppil mm rom TECHNICAL SPECIFICATIONS Technical specific
2. WEBStoppil Wt anification CLASSIC S 2150 A AMM AMT Watermixing and measurement appliance toppi EE E E E a E E a USER S MANUAL HBStoppil HAE Contents IPC NES EG RDS da a a 3 1 GENERA DESCRIPTIONS a ee sasuke vase 4 2 UNDACRINGO PIDE ONE ae oem 5 3 INSTALCING LEE ONE a a DUREE 5 ES E aes oanient eemaaes J 3 2 Hints for wall mounting the S 215022 ae sa e ai ae 6 TOPERA TINO THE S2130 amet omaLncaaan ds E RENER E bans condi Esbatu de sad 6 RS CS OC SO Suu cadre weer en eee cewe ayer 6 4 2 Adjusting the batch quantity eee ren rer erre rrenan aaa 6 A Seine Me Daten tempera U a sn ea a ee 0 6 Ack Star ie Me WAC ee a e O Ae eira seamen soe ao a 7 A LUS GA AOL 3 De DiC PE S E EEEE EEEN 7 AO Canceling the DATE ana dan nee se de dass RENTRER esa ii 7 SOS OA SO 0 7 4 8 Calibration of the batch according to the pressure conditions of water inlet 7 5 S2150 TECHNICAL INSTRUCTIONS 228 2 8 Doll TEICCIIO MIC OX 1 canacsoc pas erences ener amen PRO 8 as AZAR LDO LAS Nae ee 8 3 9 Possible MOG IMC ATOM asse raias na ae de ara dar ai Des 8 De Ponp SECONDE CON paces nas ed asia sagas naneenessaccaceneaneueessseencsesactasentas 9 Seo VV i MS RICOS separe os ca pasa cuss eaeencencn ss E 9 TECHNIC AL SPC A TIONS aa ec ce 10 WARRANT ergs atte cpt ante E a aaa a EE E EE ta 10 Stoppil Pre IMPORTANT SAFEGUARDS Prior to connecting
3. operation big digits for showing temperature in red and water quantity in blue RANGE CLASSIC S 2150 AMT S 2150 AMM S 2150 A HBStoppil He 2 PRESENTATION OF THE UNIT Be careful when opening the box Do not open the box with a sharp object because this might damage the unit Plan the location of the unit in advance Make sure that there is enough room for installing the water supplies and a power socket is nearby The box should contain the following items e 52150 water mixing and measurement appliance o l hydraulic box including valve turbine counting system temperature sensor mixing faucet for AMM and AMT model filter and valve 1 for A model and 2 for AMM and AMT models o I electronic control box that has to be installed on the right side of the hydraulic box e 2 5 metre plastic hose pipe If any of these items is missing please contact your local supplier immediately 3 INSTALLING THE S 2150 The S 2150 water mixing and measurement appliance is supplied with connection sets consisting of water filters and shut off valves The final installation should be carried out by a local plumber A single phase main earthed wall socket 3 pins should be preferably mounted within meter from the unit depending on local regulations Disconnecting the power plug should be made possible for maintenance purposes Connect the power plug after the machine has been completely installed 3 1 Fit
4. the unit flush the cold and hot water pipes thoroughly This prevents particles from damaging the unit For the pipe connections use PTFE sealing tape The maximum temperature of the hot water supply should never exceed 60 C Both valves of hot and cold water should always be open closing the cold water valve may cause damage as a possible result of overheating Frost can damage the unit Never open the electronic box when the meter is on Switch the power OFF Never use the meter when it is open Take the meter away from heating source Never switch any electrical elements on the electro valve The signal is programmed only for the valve Any other element could cause injury to the electronic card Use the signal on plug 4 and 5 contact 8A 230 V Note Read this user s guide carefully before installing and using the unit EH pEaStoppil mm Sieppi 1 GENERAL DESCRIPTION The S 2150 water dosing and mixing appliance is designed to meet the requirements of small and medium sized bakeries The S 2150 incorporates the latest technology developments for accurate temperature sensing and precise water metering Any selected temperature between 1 and 45 C can be achieved at the required quantity under certain conditions The industrial thermostat is specially designed to handle chilled water and can deliver accurate temperatures below 12 Centigrade when connected to a waterchiller The S 2150 is specially designed for ease of
5. ations water pressure Water inlet diameter 2 x 16 18 mm min Electrical requirements 100 240 VCA 50 60 Hz Dimensions w x h x d 340 x 450 x 260 mm without joining appliances Warranty 2 years up from invoice date See our general sales conditions 10 WESStoppil mr P ification Bureaux et usine Parc d activit s du Gasset 2 rue des Terres Fortes CHANTELOUP en Brie Adresse postale 77602 MARNE LA VALLEE Cedex 3 FRANCE Tel 33 0 1 6031 5555 Fax 33 0 160315550 STOPPIL SA au capital de 402 600 Siret 732 062 971 00039 NAF 2829B Site Internet http www stoppil fr e mail stoppil stoppil fr 11
6. batch after the Start button is pushed Example The quantity display reads 341 2 L and the thermostatic mixing valve is set at 25 C After pushing Start 341 2 L of mixed warm and tap water will be dosed at 25 C 4 5 Interrupting the batch Push the Stop or Reset button After the batch has been started and the S 2150 is dosing the batch can be paused by pushing Stop The dosing light will flash until the batch is restarted by pushing Start stopped by pushing Stop 4 6 Cancelling the batch Push Stop or Reset once followed by the Reset button If a mistake has been made while setting the quantity of the batch the faulty setting can be erased by pushing Reset once While dosing it is possible to stop the batch by pushing the Stop button which pauses the batch followed by Reset to clear the quantity setting 4 7 Switching off the S 2150 Push the Standby button When finished working with the S 2150 it can be switched off by pushing the Standby button The S 2150 uses less power while it is still at your disposal 4 8 Calibration of the batch according to the pressure conditions of water inlet The STOPPIL water meter was calibrated and tested in factory to give you a great accuracy 0 5 According to the parameters of pressure and the piping of your installation you can notice a constant difference repeated on several batches We recommend you to make the control over 5 liters mini 10 lite
7. neral control keys p toppil anification 4 1 Switching on the S 2150 Check main power supply and water inlets and push Standby After the three pin plug is plugged into the earthed wall socket and the water supplies have been connected to the inlets the S 2150 is ready for operation 4 2 Adjusting the batch quantity Press RESET to start from OOO and or press the volume control keys to display the batch requested Display 1 10 litre 4 3 Setting the batch temperature AMM model at the beginning of the batch modify the temperature with the mixing faucet according to the temperature on the display If the temperatures of the hot and cold water change during the batch you have to adjust the temperature manually HBStoppil Hide AMT model Set the thermostat knob of the thermostatic mixing valve on the required temperature The special thermostatic mixing valve controls the temperature automatically The scaling on the operation panel of the 2150 shows the temperature the thermostat can be adjusted to Please note that the thermostat can only mix a temperature that is set between the water inlet temperature of the 2 inlets Example If the tap water has a temperature of 3 C and the warm water inlet has a temperature of 45 C the thermostat mixing capacity lies between 3 and 45 C 4 4 Starting the batch Push the Start button After the quantity and the temperature have been set the S 2150 will start the
8. rs would be better and with a balance wpe Stoppil E anification Proceed as follows Select the batch 10 00 requested batch Tare weight of the recipient Batch Measure weighed batch 5 Display of the existing coefficient To show the existing coefficient press STOP and by maintaining the support on STOP press STANDBY during 3 4 seconds The coefficient appears in blue and COR in red 6 Calculation of the new coefficient Coefficient read x wished batch divided by weighed batch rectified coefficient 7 Show the new coefficient 8 Press STOP to validate 9 EX batch 10 00 Read Coefficient 0 984 Weighed batch 10 030 Rectified coefficient 0 984 x 10 00 10 030 0 981 oe US 1 Noted the normal precision of S 2150 is 0 5 it means for 10 00 liters 30 g If you are in this range do not modify the coefficient It is absolutely necessary that the batch is constant in its error to modify the coef 5 S 2150 TECHNICAL INSTRUCTIONS 5 1 Functions included in the electronic box contact pump control for the water chiller the coil of the contact must be switch on plug 4 and 5 remote ON OFF controller option supplied with 5 meters link 0 5 diameter ON OFF and 2 contacts 5 2 Maintenance The S2150 water meter offers a great reliability In case of maintenance all spares can easily be removed connection can be checked electro valve sensor and counter are directly connected to the
9. ting The thermostatic mixing valve of the S 2150 1s especially designed to handle chilled water AMT model Important the minimum water pressure required is bar because of the anti lid return If connected to an existing chiller a pump after the chiller A contact to connect the pump to the chiller is already included on the 2150 water chiller The 3 4 inlet ports are marked blue for the cold water inlet and red for the warm water inlet To connect these 2 inlets a PTFE sealing tape should be used For optimal performance the distance of hot and chilled water supply to the S 2150 should be as short as possible It 1s highly recommended to insolate the hot and especially the chilled water supply To avoid sediment of lime scale the hot water temperature should be around 45 50 C and should never exceed 60 C sStoppil WE anification 3 2 Advises for wall mounting the unit The S 2150 should be mounted to a wall or a frame that is free from vibrations Mounting stainless steel straps provided at the back of the appliance for this purpose The distance between the holes of the mounting straps is shown in figure 3 and 3bis The cover does not have to be removed from the unit when mounting it to the wall 4 OPERATING THE S 2150 This part of the manual explains how to operate the S 2150 In figure 4 the front panel is drawn and the buttons used to operate the S 2150 are described Volume Volume keys Temperature Ge
Download Pdf Manuals
Related Search
Related Contents
Black & Decker CC1000 User's Manual カワイデジタルピアノ CA97/CA67 取扱説明書 (M)SDS - 純正化学株式会社 製品検索・MSDS検索 SitePlayer Software Manual MANUALE DELL`OPERATORE SS-76 MF GPRS Buffer Copyright © All rights reserved.
Failed to retrieve file