Home
590G in A4 Catalogue.cdr
Contents
1. RED PHASE INSTRUMENTS 590G V2 CT ERROR TESTER 590G V2 CT ERROR TESTER Since 1999 Red Phase has made a revolutionary CT error tester This new method allowed utilities around the world to test their CT s in an easier and faster way than using traditional methods without jeopardizing accuracy Following feedback from our users our Model 590G V2 CT is the latest version of this successful and well proven CT error tester This new version includes all the advantages of the previous version with additional testing features better accuracy anda smaller size and weight In a world where cost control is gaining importance this CT tester not only lowers testing costs by being simple fool proof and fast It also allows utilities to pursue the very important yet many times forgotten task of testing installed CT s for detecting tampering and minimizing losses due to faulty CT s TEST CAPABILITIES e CT ratio and phase error measurements Analyses if CT complies with regulations e CT 1 6 kHz Admittance test Helps to determine if CT is faulty i e a shorted turn e CT excitation curve knee point test Traditional CT test e Burden Test Helps to check if the burden connected to the CT is higher than its rated burden e CT winding resistance measurements CT polarity measurements e CT live testing With 590F accessory e PT full load simulated tests In combination with model 590D KEY FEATURES e S
2. PRODUCTS 590OF performs live CT ratio test when connected to 590G V2 Battery operated with microprocessor compensation to use over a wide operating range of CTs Typically from 50A to 1500A Supplied with a 100m fiber optic cable 590D1 performs full load inductive PT VT tests when connected to 590G V2 Built with a high power switch mode source for full load performance testing under simulated conditions to 0 1 accuracy Uses 590G microprocessor for testing but includes own microprocessor for monitoring amp control 505B performs live 1 6kHz admittance tests without interruption of the customer s service It is a quick and simple way of checking Cts during a routine kWh meter test CT ratio measurement Turns ratio of secondary to primary winding T Measurement accuracy Ratios 0 5 1 2 5 5 up to 4 000 1 20 000 5 0 02 Ratios 4 000 1 20 000 5 up to 15 000 1 75 000 5 0 03 T Ratio error test accuracy Currents between 5 and 120 rated value 0 02 T Phase error test accuracy Currents between 5 and 120 rated value 1 min 02 1m0 Subject to change without notice Input Power roo to 250 V 50 Hz or 60 Hz or 12V car batery Standby 20 VA esting EA See aro x 330 180 mm 16 x 13 X7 Weight Without accessories or test leads 7 kg 15 4 lb Distributed By
3. ing errors caused either by tampering or equipment failure is an important part of the equation Testing CTs should be a crucial part of utility monitoring In general utilities make in field meter tests especially when meter readings are suspected and forget to test the CTs related to those meters which are as important as the meters Traditional CT testing primary injection has many disadvantages Not only is the equipment bulky heavy expensive and difficult to use itis atime consuming method More than 10 years ago Red Phase Instruments designed the first series of Model 590 to make a major improvement in field testing CTs With the feedback we got from our worldwide customers and following our continuous improvement search this product evolved adding new features and improving existing ones into this latest version Red Phase Instruments 590G V2 is the perfect solution for utilities looking to improve revenues and service quality and at the same time lower costs This state of the art yet proven CT testing system is small light durable robust easy and fast to use with a minimum personnel CONNECTIONS INCLUDED ACCESSORIES e Foam Linedtransit case for protection in transport e 6mTesting leads with banana plugs e Crocodile clamps for primary and secondary connections e Usermanual OPTIONAL ACCESSORIES e Thermal Printer e 590G V2 Calibration Reference CT e Custom Length test leads COMPLEMENTARY
4. mall amp Lightweight 7 Kg yet tough and durable Perfect for field testing and convenient for the workshop e Automatic fast fool proof testing Reduce testing times and personnel thus lower testing costs e Customize your tests Not only you can use the pre recorded standard tests but you can also program 590G V2 to make your own custom made tests e Safe testing Simulation method allows testing at lower voltage levels increasing safety e Up to 0 1 Class CT testing High accuracy allows testing up to 0 1 class CTs e Built in thermal printer For on site results printing over paper or over labels Optional e Big 6 screen Easily see the results in any light condition e Inbuilt memory Store up to 300 test results and download them to your computer or to a USB memory stick e Four terminal test leads accuracy e Automatic CT demagnetizing after testing for superior testing STANDARDS COMPLIANCE 590G V2 will test CTs and comment whether they are complying with International Standards Furthermore you can input your own standards regulation requirements and 590G V2 will make intelligent comments regarding them Some of the pre recorded Standard verifications are but not limited to e IEEE C57 13 1993 Requirements for Instrument Transformers e 1EC 60044 Instrument Transformers RED PHASE INSTRUMENTS 590G V2 CT ERROR gt CT RATIO amp PHASE ERROR TEST Making sure that the CT acc
5. r could be caused either incorrect marking by CT manufacturer or incorrect installation EXCITATION CURVE TEST This is a very traditional test for CTs Although not strictly needed after the 590G V2 tests at the usual 10 test points to make sure the CT error is within limits when connected to a burden within its rating many utilities still like to see an excitation curve The 590G V2 will display and or print with the optional printer accessory the excitation curve of the CT and will give the knee point according to any of the three knee point methods 1 A 10 increase in the exciting voltage results in a 50 increase in exciting current 2 The 35 tangent point 3 The 45 tangent point LIVE RATIO TEST Combined with the Model 590F accessory the 590G V2 performs a live ratio and phase error test with customer load on either LV CTs or HV CTs The 590F uses electronically compensated clipons and fibre optic connection for HV CTs Both LV amp HV kits are available The kit includes a 100m fibre optic cable drum for testing in locations where the HV CT primary is not close to the secondary test point 590F accessory is the perfect solution for fast CT testing where customer supply interruption is not an option RED PHASE INSTRUMENTS 590G V2 CT ERROR TESTER BACKGROUND In an era where costs revenues and service levels are every day more important for utilities worldwide alow cost method to deal with CT meter
6. uracy is within the standard limits is key not only to maximize revenue but also in many places to comply with government regulations and avoid fines The most important measurement is the turns ratio since that typically accounts for 99 5 of the CT ratio accuracy For that reason the 590G V2 measures turns ratio within 0 02 for nearly all common CT ratios The remaining 0 5 of accuracy and all the phase error is accounted for by the 50Hz or 60Hz admittance inherent error of the CT core The accuracy of admittance measurement is not so critical The following graph shows ratio error curves for a 2000 5 class 0 5 CT with exact turns ratio at various burden values The error is due only to admittance In practice the CT will have turns compensation the secondary turns ratio could be 399 1 instead of 400 1 which boosts the current output by 0 25 and makes the error curve fit within the 0 5 limits Percentage of Rated Current 100 200 30VA 20VA 10VA OVA Note that the CT accuracy varies not only with the connected burden but also with the of rated current circulating through its primary Generally the CT ratio and phase errors are calculated at 5 20 100 and 120 primary rated current and 25 and 100 rated burden These test points can easily be changed to suit any utility need or government regulation With traditional primary injection testing can take over 30 minutes for 10 CT test points The 590G V2
7. will do this automatically in around 5 minutes 1 6 KHZ ADMITTANCE TEST The 1 6 kHz admittance of a CT is quite close to the 50 Hz admittance and it can give a good indication of the inherent error of a CT It is also an important as it is considered a blueprint of the CT Once known the 1 6kHz admittance of a specific CT can be used in future to check a CT during routine meter tests even without supply interruption using Red Phase Instruments model 505B live admittance tester It is quick and easy and any loss of revenue due to faults or tampering with the CT is made obvious 590G V2 automatically tests the 1 6 kHz admittance of the CT secondary This can be recorded or compared with a previous measurement of the same CT or with the admittance of similar CTs installed in the system BURDEN TEST As shown in the graph if the VA burden connected to the CT is large it can cause large ratio errors and revenue will be lost This is usually more of a problem with low VA rated CTs say in the 5VA to 15VA range The 590G V2 can quickly measure the burden and make sure it does not exceed the rating Once you have the real burden value for the CT you can also opt to perform a error test to see what errors the CT has at exactly that burden BURDEN TEST CONNECTIONS RED PHASE INSTRUMENTS 590G V2 CT ERROR gt POLARITY MEASUREMENTS 590G V2 will automatically report if there is a polarity errorinthe CT This erro
Download Pdf Manuals
Related Search
Related Contents
Netgear GS716T_GS724T Hardware Installation Guide Network Camera CH-LF3843B User Manual Avaya Integral 5 Easy BNE AR2.X - Vivitek Copyright © All rights reserved.
Failed to retrieve file