1. Marley NC Fiberglass Cooling Tower User Manual uk 06 1332A Cooling Technologies Balcke Hamon Dry Cooling Marley Note A Warning A Caution Note Contents This manual contains vital information for the proper installation and operation of your cooling tower Carefully read the manual before installation or operation of the tower and follow all instructions Save this manual for future reference Page Tower Shipment 3 uizo dneslg e dust evatececsexisecds 3 Tower Location 4 Tower Assembly nein aai Ea 4 WING 5 Mechanical panaka 7 erroe 7 Tower Maintenance eese nennen nnn nhan nnn 14 Water Treatment and Blowdown eeeeeeeeeeeeeee 15 Schedule of Tower Maintenance sess 16 Seasonal Shutdown INStructiOns cccccceeeeeeeeeeeeeeeeeeeeeeeeeeees 20 Prolonged Shutdown teet seni es 20 Additional Information 21 Troubleshooting 22 The following defined terms are used throughout this manual to bring at tention to the presence of hazards of various risk levels or to important information concerning the life of the product Indicates presence of a hazard which can cause severe personal injury
2. 51 38 25 18 8 C 23 1 18 78 58 38 28 14 C 3 1 1 58 1 05 78 51 38 14 C 3 9 1 98 1 32 98 64 48 Cooling Range Multipliers are based on drift of 0 0296 of the circulating water rate Range Difference between hot water temperature coming to tower and cold water tem perature leaving tower EXAMPLE 44 2 L s circulating rate 10 C cooling range To maintain 4 concentrations the required blowdown is 0 45896 or 00458 times 44 2 L s which is 0 2 L s 15 Note Z Warning 16 Maintenance If tower is operated at 4 concentrations circulating water will contain four times as much dissolved solid as the makeup water assuming none of the solids form scale or are otherwise removed from the system When water treatment chemicals are added they should not be in troduced into the circulating water system via the cold water basin of the cooling tower Water velocities are lowest at that point which results in inadequate mixing Schedule of Tower Maintenance Included with this instruction packet are separate User Manuals on each major operating component of the tower and it is recommended that you read them thoroughly Where discrepancies may exist the separate User Manuals will take precedence The following is recommended as a minimum routine of scheduled main tenance Always shut off electrical power to the tower fan motor prior to performing any inspectio
3. Fan Check and tighten blade and hub fasteners x Check fan blade pitch and tip clearance x Motor Lubricate grease as required R Check mounting bolts for tightness x Operate at least 3 hours a month 3 hours a month 3 hours a month Structure Inspect tighten all fasteners x x Inspect and touch up all metal surfaces x R Refer to Component User Manual Note It is recommended at least weekly that the general operation and condition be observed to any changes in sound or vibration that may signify a need for closer inspection Pay attention 19 20 Maintenance Seasonal Shutdown Instructions When the system is to be shut down for an extended period of time it is recommended that the entire system cooling tower system piping heat exchangers etc be drained Leave the basin drain open During shutdown clean the tower and make any necessary repairs Pay particular attention to mechanical equipment supports and driveshafts Tower Framework Check structural bolted connections and tighten as required Fan Check fan assembly bolting and tighten as required Use torque set tings prescribed on the fan nameplate Refer to fan user manual Electric Motor Clean and lubricate motor at close of each operating season Refer to motor manufacturer s recommendations Check motor anchor bolts and tighten as required Do not start motor before determining that there will be no interfe
4. as 10 20 This is because of the increased density of unheated air flowing through the fan Determi nation of an accurate motor load should await the application of the design heat load A Warning Operation Tower Start Up Among other sources outbreaks of Legionnaires Disease have reportedly been traced to cooling towers Maintenance and water treatment procedures that prevent amplification and dissemination of Legionella and other airborne bacteria should be formulated and implemented BEFORE systems are operated and continued regularly thereafter to avoid the risk of sickness or death Water System 1 New installations should be cleaned and treated with biocides by a water treatment expert before startup Remove any and all accumulated debris from tower Pay particular attention to inside areas of cold water basin entire hot water basin and hot water inlet Make sure that cold water suction screens are clear and properly installed For NC8321 thru NC8324 fill the water system to an approximate depth of 400mm in the depressed section of the cold water basin For NC8325 thru NC8332 fill the water system to an approximate depth of 675mm in the depressed section of the cold water basin This is the recommended operating water level Adjust the float valve so that it is essentially closed at that level Continue filling the system until the water reaches a level approximately 4mm below the lip of the overflow Start your p
5. death or substantial property damage if ignored Indicates presence of a hazard which will or can cause personal injury or property damage if ignored Indicates special instructions on installation operation or maintenance These instructions as well as those offered separately on motors fans bearings float valves etc are intended to assure that the tower serves you properly for the maximum possible time Since the NC Fiberglass warrantability may well depend upon your actions please read these instructions thoroughly prior to operation If you have questions aboutthe operation and or maintenance ofthis tower and you don t find the answers in this manual please contact your Marley sales representative When writing for information or when ordering parts please mention tower serial number shown on the tower s nameplate Preparation Safety First The location and orientation of the cooling tower can affect the safety of those responsible for installing operating or maintaining the tower How ever since SPX Cooling Technologies does not determine the location or orientation of the tower we cannot be responsible for addressing those safety issues that are affected by the tower s location or orientation Tower Shipment NC Fiberglass towers ship by truck unassembled Responsibility for the condition of the tower upon its arrival belongs to the shipper as does the coordination of multiple shipments if required Refer t
6. in bearings Change to proper lubricant See motor manufacturer s instructions One phase open Stop motor and attempt to start it Motor will not stat if single phased Check wiring controls and motor Poor ventilation Clean motor and check ventilation openings Allow ample ventilation around motor Winding fault Check with ohmmeter Bent motor shaft Straighten or replace shaft Insufficient grease Too frequent starting or speed changes Remove plugs and regrease bearings Limit cumulative accelerations time to a total of 30 seconds hour Set on off or speed change set points farther apart Consider installing a Marley VFD drive for fine temperature control Deterioration of grease or foreign material in grease Bearings damaged Flush bearings and relubricate Replace bearings Motor does not come up to speed Wrong motor rotation Voltage too low at motor terminals because of line drop Broken rotor bars Wrong sequence of phases Check transformer and setting of taps Use higher voltage on transformer terminals or reduce loads Increase wire size or reduce inertia Look for cracks near the rings A new rotor may be required Have motor service person check motor Switch any two of the three motor leads 22 Troubleshooting Trouble Cause Remedy Geareducer Noise if equipped Geareducer bearings If new see if noise disappears after one week o
7. with the wet bulb temperature of the air entering the louvered faces of the tower Reduced wet bulb temperatures will result in colder water temperatures However the cold water temperature will not vary to the same extent as the wet bulb For example an 11 C reduction in wet bulb may result in only an 8 C reduction in cold water temperature Water Flow Rate Increasing the water flow rate L s will cause a slight elevation in cold water temperature while reducing the water flow rate will cause the cold water temperature to lower slightly However at a given heat load see formula above L s reductions also cause an increase in the incoming hot water temperature Use care to prevent the hot water from exceeding 46 C in order to prevent damage to the tower components Airflow Rate Reducing airflow through the tower causes the cold water temperature to rise This is the approved method by which to control leaving water temperature If your tower is equipped with a single speed motor the motor may be shut off when the water temperature becomes too cold This will cause the water temperature to rise When the water temperature then becomes too warm for your process the motor can be restarted Note Note Operation When operating in this mode however care must be taken not to exceed a total acceleration time of 30 seconds per hour From a dead stop determine the number of seconds it takes the fan to arrive at full speed
8. Divide this number into 30 to determine the allowable number of starts per hour Considering the normal fan and motor sizes utilized on the NC Fiberglass tower anticipate that ap proximately 4 to 5 starts per hour are allowable If your tower is equipped with a two speed motor greater opportunity for temperature control is afforded you When the water temperature becomes too cold switching the fan to half speed will cause the cold water temperature to rise stabilizing at a temperature a few degrees higher than before With a further reduction in water temperature the fan may be cycled alternately from half speed to off subject to the same constraint of 30 seconds of allowable acceleration time per hour as outlined above If your tower consists of two or more cells cycling of motors may be shared between cells increasing your steps of operation accordingly For greater insight on cold water temperature control please read Marley Technical Report H 001 A Cooling Tower Energy and its Management available from your Marley sales representative or you can download a copy from Marley s website at spxcooling com Freezing Weather Operation During operation in subfreezing weather the opportunity exists for iceto form in the colder regions of the tower Your primary concern is to prevent the formation of destructive ice on the cooling tower fill Your understanding of cold weather operation will be enhanced if you read Marley Technical Re
9. all leads at starter make sure overload and short circuit devices are in proper condition Wrong connections Check motor and control connections against wiring diagrams Low voltage Check nameplate voltage against power supply Check voltage at motor terminals Open circuit in motor winding Check stator windings for open circuits Motor or fan drive stuck Disconnect motor from load and check motor and fan drive for cause of problem Rotor defective Look for broken bars or rings Unusual motor noise Motor running single phase Check motor and attempt to start it Motor will not start if single phased Check wiring controls and motor Motor leads connected incorrectly Check motor connections against wiring diagram on motor Bad bearings Check lubrication Replace bad bearings Electrical unbalance Check voltages and currents of all three lines Correct if required Air gap not uniform Check and correct bracket fits or bearing Rotor unbalance Rebalance Cooling fan hitting end belt guard Reinstall or replace fan Motor runs hot Wrong voltage or unbalanced voltage Check voltage and current of all three lines against nameplate values Wrong motor RPM Check nameplate against power supply Check RPM of motor and drive ratio Bearing overgreased Remove bearing reliefs Run motor up to speed to purge excessive grease Wrong lubricant
10. arts and components is maintained at one or more of the various Marley plants In cases of emergency they can normally be shipped within 24 hours by air freight if necessary However you would obviously benefit from anticipating your need in advance thus avoiding the cost of special handling Be sure to mention your tower serial number from the tower nameplate when ordering parts Periodic Maintenance You may wish to contract with SPX for regularly scheduled visits for the purpose of inspecting and reporting your tower s condition to make recommendations intended to prevent emergencies and to perform maintenance considered outside the norm This service is not intended to replace the important function performed by your maintenance staff Their attention assures the tower s routine operating performance and is invaluable However we recognizes that the unusual manner in which a cooling tower performs its function as well asthe unique forces which act upon it may be considerations which occasionally require the services of an expert technician 21 Troubleshooting Trouble Motor will not start Cause Power not available at motor terminals Remedy Check power at starter Correct any bad connections between the control apparatus and the motor Check starter contacts and control circuit Reset overloads close contacts reset tripped switches or replace failed control switches If power is not on
11. bottom surface of both sheaves at four points The belts are to be located in the inboard set of grooves closest to the bearing Weekly Inspect for bacterial growth and general operation conditions Bacterial growth should be reported to your water treatment expert for immediate attention Observe touch and listen to the tower Become accustomed to its normal appearance sound and level of vibration Abnormal aspects relating to the rotating equipment should be considered reason to shut down the tower until the problem can be located and corrected Observe operation of the motor fan shaft bearing and fan Become familiar with the normal operating temperature of the motor as well as the sight and sound of all components as a whole Monthly Inspect louvers drift eliminators and basin trash screens and remove any debris or scale which may have accumulated Replace any damaged or worn out components Use of high pressure water may dam age the eliminator and louver material Observe operation of the float valve Depress the operating lever to make sure that the valve is operating freely Inspect the suction screen for plug ging Remove any debris that may have accumulated Check for any buildup of silt on the floor of the cold water basin Mentally note the amount if any so future inspections will enable you to determine the rate at which it is forming Every 3 months Lubricate fan shaft bearings While rotating equip ment by hand g
12. ed by use of a moderate pressure water nozzle being careful not to cause physical damage A reliable water treatment program should be installed and maintained Filtration devices may be employed to reduce the suspended solids concentrations thus increasing the effectiveness of the water treatment program Blowdown A cooling tower cools water by continuously causing a portion of it to evaporate Although the water lost by evaporation is replenished by the makeup system it exits the tower as pure water leaving behind its burden of dissolved solids to concentrate in the remaining water Given no means of control this increasing concentration of contaminants can reach a very high level In order to achieve water quality which is acceptable to the cooling tower as well as the remainder of your circulating water system the selected water treatment company must work from a relatively constant level of concentrations This stabilization of contaminant concentrations is usually accomplished by blowdown which is the constant discharge of a portion of the circulating water to waste As a rule acceptable levels on which to base a treatment schedule will be in the range of 2 4 concentrations The following table gives approximate rates of blowdown percent of total water flow rate constantly wasted to achieve those concentrations at various cooling ranges Number of Concentrations 2 5X 3 0X 4 0X 3 C 7 38 25 18 11 08 6 C 1 5 78
13. el therefore your water treatment program must be compatible with zinc In working with your water treatment supplier it is impor tant that you recognize the potential effects on zinc of the specific treatment program you choose Cooling Tower Cleaning Any evaporative type cooling tower must be thoroughly cleaned ona regular basis to minimize the growth of bacteria including Legionella Pneumophila to avoid the risk of sickness or death Service person nel must wear proper personal protective equipment during decon tamination Do NOT attempt any service unless the fan motor is locked out Operators of evaporative cooling equipment such as water cooling tow ers should follow maintenance programs which will reduce to an absolute minimum the opportunity for bacteriological contamination US Public Health Service publications have recommended that good housekeeping procedures be followed such as regular inspections for concentrations of dirt scale and algae periodic flushing and cleaning and the following of acomplete water treatment program including biocidal treatment See Tower Start up instructions on page 8 Maintenance The visual inspection should take place at least once a week during the operating season The periodic flushing and cleaning should be done be fore and after each cooling season but in any event at least twice a year The louvers drift eliminators and easily accessible fill surfaces should be flush
14. er to that drives installation manual Improper use of a VFD may cause damage to equipment or personal injury Failure to correctly install the VFD drive will automatically void all warranties associated with the motor and any equipment that is either electrically or mechanically directly attached to the VFD drive system The length of this warranty avoidance will be contingent on properly installing the VFD system and repairing any damage that may have occurred during its operation SPX Cooling Technologies does not assume responsibility for any technical support or damages for problems associate with non Marley brand VFD systems Changing the operational fan speed from the factory settings could cause the fan to operate in an unstable region which may result in damage to the equipment and possible injury A Warning A Caution Note Installation Mechanical Equipment Always shut off electrical power to the towerfan motorpriorto performing any maintenance on the tower Any electrical switches should be locked out and tagged out to prevent others from turning the power back on If equipped check oil level in accordance with the Geareducer User Manual forthe Geareducer If oil is required fill Geareducerto the proper level with approved lubricant 2 Spin the fan manually to assure that all fan blades properly clear the inside of the fan cylinder Observe the action of the sheaves and belts to be sure that the motor is pr
15. eration and then shut down for a du ration of time and not drained perform one of the two previous biocidal treatment programs directly to the cooling water storage vessel cooling tower sump drain down tank etc without circulating stagnant water over the cooling tower fill or operating the cooling tower fan After biocidal pretreatment has been successfully completed cooling water may be circulated over the tower fill with the fan off When biocidal treatment has been maintained at a satisfactory level for at least six hours the fan may be turned on and the system returned to service Resume the standard water treatment program including biocidal treatment 10 Operation Tower Operation General The cold water temperature obtained from an operating cooling tower will vary with the following influences 1 Heat Load With the fan in full operation if the heat load increases the cold water temperature will rise If the heat load reduces the cold water temperature will reduce Note that the number of degrees range through which the tower cools the water is established by the system heat load and the amount of water being circulated in accordance with the following formula Heat Load kilowatts Range C Liters sec x 4 12 The cooling tower establishes only the cold water temperature attain able under any operating circumstance Air Wet Bulb Temperature Cold water temperature will also vary
16. f operation Drain flush and refill Geareducer oil See Geareducer User Manual If still noisy replace Gears Correct tooth engagement Replace badly worn gears Replace gears with broken or damaged teeth Unusual fan drive vibration Loose bolts and cap screws Tighten all bolts and cap screws on all mechanical equipment and supports Worn fan shaft bearings Check fan shaft endplay Replace bearings as necessary Unbalanced motor Disconnect load and operate motor If motor still vibrates rebalance rotor Worn Geareducer bearings Bent Geareducer shaft Check fan and pinion shaft endplay Replace bearings as necessary Check fan and pinion shaft with dial indicator Replace if necessary Fan noise Impeller rubbing inside of fan cylinder Adjust cylinder to provide blade tip clearance Fan shaft bearing Loose bolts in blade clamps Grease bearings Belt squeal or chirping Belt slipping Adjust belt Scale or foreign substance in circulating water system Insufficient blowdown Water treatment deficiency See Water Treatment section of this manual Consult competent water treating specialist See Water Treatment section of this manual Cold water temperature too warm See Tower Operation Entering wet bulb temperature is above design Check to see if local heat sources are affecting cooling tower See if surrounding structures are causing recirculatio
17. ing cooler weather During cooler weather it is common for the motor to draw 6 to 1096 higher than nameplate amps High amps are common during tower commissioning when the tower is dry and the ambient air temperature is cool Do not start the motor more than six times per hour Short cycling the tower will cause fuses breakers or O L s to operate and will decrease motor life When using a two speed starter e Motor rotation must be the same at slow speed and high speed e Single winding motor requires a starter with a shorting contactor e Two winding motor requires a starter with out a shorting contactor All two speed starters must have a 20 second time delay relay when switching from high speed to low speed Do not start the motor more than six times per hour each low speed start and each high speed start count as one start When using a VFD Before beginning ensure that the motor is rated for Inverter Duty per NEMA MG 1 part 31 e Set the VFD solid state overload protection to 11996 of motor name plate amps and set maximum current parameter in the VFD to motor nameplate amps Maximum current parameter will reduce fan speed and limit amp draw to nameplate amps during cold weather operation If furnished with a mechanical O L set this at 110 over motor name plate amps e Motor rotation must be the same in both VFD mode and By pass mode Note e f cable distance between the VFD and motor is greater
18. n of tower discharge air Discuss remedy with Marley representative Design wet bulb temperature was too low May have to increase cooling tower size Discuss remedy with Marley representative Actual process load greater than design May have to increase cooling tower size Discuss remedy with Marley representative Overpumping Reduce water flow rate over cooling tower to design conditions Cooling tower starved for air Check motor current and voltage to be sure of correct contract horsepower Clean fill and eliminators Check to see if nearby structures or enclosing walls are obstructing normal airflow to cooling tower Discuss remedy with Marley representative Excessive drift exiting cooling tower Distribution basins overflowing Reduce water flow rate over tower to design conditions Be sure hot water basin nozzles are in place and not plugged Faulty drift elimination Check to see that eliminators are clean free of debris and installed correctly Replace damaged or worn out eliminators panels 23 SPX Cooling Technologies Balcke Hamon Dry Cooling Marley spxcooling com Manual uk 06 1332A
19. nimum allowable cold water temperature maintaining thattemperature can be accomplished by fan manipulation as outlined in Item 4 under Tower Operation on page 10 However in towers of more than one cell the limiting temperature established applies to the water temperature of the cell or cells operating at the highest fan speed not necessarily the net cold water temperature produced by the entire tower 2 Ascold air enters the louvers it causes the falling water to be drawn inward toward the center of the tower Thus under fan operation the louvers and lower periphery of the tower structure remain partly dry seeing only random splashing from within the tower plus normal atmospheric moisture from the entering air Such lightly wetted areas are most subject to freezing Although ice is unlikely to cause structural damage to the fill it may build up sufficiently to restrict the free flow of air through the louvers This will have the effect of reducing the tower s thermal performance efficiency When excessive ice forms on the louvers stop the fan for a few minutes With the fan off the increase in the water temperature and the action of the cascading water will reduce the ice buildup on the louvers A Caution Operation Intermittent Freezing Weather Operation If periods of shutdown nights weekends etc occur during freezing weather measures must be taken to prevent the water in the cold water basin and all exposed pipe
20. ns that may involve physical contact with the mechanical or electrical equipment in or on the tower Lock out and tag out any electrical switches to prevent others from turning the power back on Service personnel must wear proper personal protective clothing and equipment Belt Tensioning The belts are adjusted by tensioning bolts which adjust the motor base Check tension frequently during the first 24 48 hours of run in operation To properly adjust the belt tension position the fan motor so that moderate pressure on the belt midway between the sheaves will produce a 13mm deflection Overtensioning shortens belt and bearing life Keep belts free from foreign material which may cause slipping Never apply belt dressing as this will damage the belt and cause early failure A Dodge V Belt Ten sion Tester or similar device is an alternate method for tensioning V belts Check with you local belt supplier Maintenance Sheave Alignment The motor sheave is to be positioned as close as possible to the motor in order to minimize torque on the motor bushings The motor and fan sheaves may have grooves that are not used The bottom surface of the motor and fan sheaves must be aligned within 3mm of each other and level within 72 3mm in 300mm in order to not adversely affect belt and sheave life Alignment can be achieved by placing a straight edge across the top of the sheaves making sure that it is level and measuring down to the
21. o the NC Fiberglass Assembly Manual for instructions Receiving Tower Prior to assembly inspect the shipment for evidence of damage in transit If damage is apparent note the freight bill accordingly This will support your future recovery claim Find and removethe installation instructions and bills of material This infor mation should be kept for future reference and maintenance purposes A Warning Note A Caution A Warning Installation Tower Location Space available around the tower should be as generous as possible to promote ease of maintenance and to permit freedom of airflow into and through the tower If you have questions about the adequacy of the avail able space and the intended configuration of the tower please contact your Marley sales representative for guidance Prepare a stable level support foundation for the tower utilizing weight wind load and dimensional information appearing on appropriate Marley submittal drawings Supports must be level to insure proper operation of the tower The cooling tower must be located at such distance and direction to avoid the possibility of contaminated tower discharge air being drawn into building fresh air intake ducts The purchaser should obtain the services of a Licensed Professional Engineer or Registered Architect to certify that the location of the tower is in compliance with appli cable air pollution fire and clean air codes Tower Assembly You
22. operly aligned with the fan sheave See Belt Tensioning and Sheave Alignment on page 16 and 17 If equipped with Geareducer drive observe the action of the coupling or drive shaft couplings to be sure the motor and Geareducer are properly aligned If necessary correct alignment see Geareducer User Manual 3 Momentarily energize bump the motor and observe rotation of the fan The fan should rotate in a counterclockwise direction when viewed from below If rotation is backwards shut off the fan and reverse two of the three primary leads supplying power to the motor If tower is equipped with a two speed motor check for proper rota tion at both speeds Check also to see that starter is equipped with a 20 second time delay which prevents direct switching from high speed to low speed If the fan is intended to be reversed for deicing purposes make sure that the starter is equipped with a 2 minute time delay between changes of direction These delays will prevent abnormal stress from being applied to the mechanical equipment and the electrical circuit components 5 Run the motor and observe the operation of the mechanical equipment Op eration should be stable 6 If equipped with belt drive checkthe torque on the fan and motor sheave after 10 to 60 hours of operation If the water supply system is not being operated or if there is no heat load on the system motor amps read at this time may indicate an apparent overload of as much
23. port H 003 Operating Cooling Towers in Freezing Weather augmented by the following guidelines Available for download at spxcooling com Slushy transitory ice forms routinely in the colder regions of the fill of low temperature towers and is visible through the tower louvers Such ice normally has no adverse effect on tower operation but its appearance should be a signal to the operator to undertake ice control procedures 11 12 Operation It is the operator s responsibility to prevent the formation of destruc tive hard ice on the cooling tower fill Certain guidelines should be followed 1 Donotallowthetower s leaving watertemperature to drop below a minimum allowable level 2 5 to 5 C established as follows During the coldest days of the first season of operation observe whether any ice is forming on the louver face particularly near the bottom of the louver face If hard ice is present on the louvers an appropriate eleva tion in the allowable cold water temperature is mandatory If the coldest possible water is beneficial to your process ice of a mushy consistency can be tolerated but routine periodic observation is advisable If the minimum allowable cold water temperature is established at or near maximum heat load it should be safe for all operating conditions However if established at reduced load increased heat loads may reintroduce the potential for icing Having established the mi
24. r ence with free rotation of the fan drive The motor should be operated for three hours at least once a month This serves to dry out windings and re lubricate bearing surfaces Refer to Marley Electric Motor User Manual Manual 92 1475 available at spxcooling com At start of new operating season make sure bearings are adequately lubricated before returning motor to service Prolonged Shutdown If shutdown period is longer than seasonal contact your Marley sales representative for additional information Maintenance Additional Services Our interest in your NC Fiberglass cooling tower does not end with the sale We want to make sure that you gain the maximum possible benefit from its purchase Therefore the following services are available which are intended to as sure the maximum possible service life under your operating conditions tailor the operating characteristics to your specific needs and maintain consistent optimum thermal performance capability They are available by contacting your Marley sales representative Replacement Parts With the exception ofthe motor every component of yourtower is designed and manufactured by SPX Cooling Technologies We do this because com mercially available components have not proved capable of withstanding the harsh environment of a cooling tower do they contribute their share to the thermal capability and operating characteristics intended A complete stock of all p
25. r Marley sales engineer is able to provide for the tower assembly by Marley s construction division or through a qualified subcontractor Our subcontractors provide safe efficient assembly which complies with all requirements for warranty protection of your tower by SPX Cooling Tech nologies Refer to the NC Fiberglass Assembly Manual for instructions Before assembly make sure that the tower orientation agrees with your intended piping arrangement Except for horizontal components of top mounted piping and as prescribed on Marley drawings do not support your pipe from the tower or outlet connection support it externally For maintenance safety purposes SPX recommends a lockout type disconnect switch for all mechanical equipment In addition to a disconnect switch the motor should be wired to main power supply through short circuit protection and a magnetic starter with overload protection Installation Motor Wiring Wire motor leads as shown on the motor nameplate matching the supply volt age Do not deviate from the motor nameplate wiring Either of following symbols may be shown on the motor nameplate A A A Y or YY These symbols represent how the motor is constructed on the inside and in no way have anything to do with a Delta or Wye electrical distribution system serving the motor When using a starter e Setmotor overload protection to 11096 of motor nameplate amps This setting allows the fan motor to operate dur
26. rease the bearings until a bead forms around the seals a maximum charge 16mL is recommended Chevron SRI 2 grease is recommended 1 17 Note 18 Maintenance Semi Annually If equipped check the belt tension and condition If equipped check Geareducer oil level Shut down the unit and allow 5 minutes for the oil level to stabilize Add oil if required Clean and disinfect cooling tower with biocides Systems with biofouling high general bacterial counts or positive cultures of legionella may require additional cleaning Refer to Cooling Tower Cleaning section page 14 Consult your water treatment expert as to prudent biological evaluation testing If equipped Geareducer models used on NC Fiberglass cooling tow ers are designed for 5 year oil change intervals To maintain five year change intervals use only oil designed specifically for these Geareducers If after five years turbine type mineral oil is used the oil must be changed semiannually Refer to the Geareducer Manual for oil recommendations and further instructions Annually Relubricate motor according to the manufacturer s instruc tions Check to see that all bolts are tight in the fan and mechanical equipment region including the fan guard Refer to component User Manuals for torque values Inspect the tower thoroughly making maximum use of instructions given in the separate service manuals Check structural bolted connections and tighten as requi
27. red Make preventive maintenance repairs as necessary Every 5 Years If equipped change Geareducer oil Referto the Geareducer User Manual for instructions Maintenance Schedule Maintenance Service Monthly Semi annually Seasonal Startup or Annually Inspect General Condition and Operation x x Observe Operation of Mechanical motor fan and drive mechanism x x Makeup valve if equipped x x Inspect for unusual noise or vibration x x Inspect and Clean Air inlet x x PVC drift eliminators x x Distribution basin nozzles and collection basin x x Fan motor exterior x x Check Collection water basin level x x Blowdown adjust as required x x Geareducer Drive if equipped Check for loose fasteners including oil drain plug x Check for repair oil leaks x x Check oil level x x Change oil R Make sure vent is open x x Check driveshaft or coupling alignment x Check for loose driveshaft or coupling fasteners x Check driveshaft or coupling bushings or flex element for unusual wear x x Lube lines if equipped Check for oil leaks in hoses or fittings x R x Belt drive if equipped Fan shaft bearing lubrication every 3 mo every 3 months every 3 months Check and tighten support fasteners x Check shaft sheave and belt alignment x Check belt tension and condition x x Check sheave bushing fastener torque x
28. than 31m a DV DT output filter is recommended to avoid damage to the motor 31m A Warning A Warning Installation distance is based on our field experience the VFD manufacture may state different distances and distance does vary depending on the VFD manufacture Program the VFD for variable torque output Flux vector and con stant torque modes may damage the gearbox e Donotstart and stop the motor using the safety switch at the motor If the drive is being commanded to run and the load side is cycled ON and OFF with the safety switch this may damage the VFD Using a VFD in cooling applications has advantages over traditional single or two speed motor control A VFD can reduce the cost of electrical en ergy being used and provide better temperature control In addition it reduces the mechanical and electrical stress on the motor and mechanical equipment Electrical savings can be large during periods of low ambient temperature when the cooling requirement can be satisfied at reduced speeds To benefit from these advantages it is important that the drive be installed correctly Marley supplies VFD and VFD controls specifically designed for our cooling products If you have purchased a Marley VFD and or controls package please follow the instructions in the User Manual for that system Most VFD problems can be avoided by purchasing the Marley drive system If you are installing a VFD other than the Marley drive please ref
29. ump s Observe system operation Sincethe water system external to the tower will have been filled only to the level achieved in the cold water basin a certain amount of of the basin water level will occur before water completes the circuit and begins to fall from the fill The amount of initial pump down may be insuf ficient to cause the float valve to open However you can check its operation by pressing down on the operating lever to which the stem of the float valve is attached Continue pump operation for about 15 minutes after which it is rec ommended that the water system be drained flushed and refilled in order to clean the system While operating the pump s and prior to operating the cooling tower fan execute one of the two alternative biocidal treatment programs described in the following Operation e Resume treatment with the biocide which had been used prior to shutdown Utilize the services of the water treatment supplier Maintain the maximum recommended biocide residual for the specific biocide for a sufficient period of time residual and time will vary with the biocide to bring the system under good biological control or e Treat the system with sodium hypochlorite to a level of 4 to 5 mg L free chlorine residual at a pH of 7 0 to 7 6 The chlorine residual must be held at 4 to 5 mg L for six hours measurable with standard commercial water test kits If the cooling tower has been in op
30. work from freezing Several methods are used to combat this Consult your Marley sales representative for more information Unless some means of freeze prevention is incorporated into your system the tower basin and exposed pipework should be drained at the beginning of each wintertime shutdown period It is recommended that you discuss your freeze prevention options with your local Marley sales representative 13 Note A Warning 14 Maintenance Water Treatment and Blowdown Maintaining Water Quality The materials used in an NC Fiberglass tower are selected to offer long corrosion free service in a normal cooling tower environment defined as follows e Circulating water with a pH between 6 5 and 8 a chloride content as NaCl below 500 mg L a sulfate content SO4 below 250 mg L total alkalinity below 500 mg L calcium hardness as CaCO3 above 50 mg L e Chlorine if used shall be added intermittently with a free residual not to exceed 1 mg L maintained for short periods Excessive chlorine levels may deteriorate sealants and other materials of construction e An atmosphere surrounding the tower no worse than moderate industrial where rainfall and fog are no more than slightly acid and they do not contain significant chlorides or hydrogen sulfide H5S Unless you purchased an NC Fiberglass tower with stainless steel structure the structure of your tower consists primarily of galvanized ste

Download Pdf Manuals

image

Related Search

Related Contents

Audiovisuel Pluralisme Et Diversité Manuel de Formation  Li-Ion battery charging requires accurate voltage  Systems Plus™ Programmer/Controller  EC ST10  Instalação de Modem  "user manual"  

Copyright © All rights reserved.
Failed to retrieve file