NC 8400 steel cooling tower

image

Contents

1. Unusual Fan Drive Loose bolts and cap screws Tighten all bolts and cap screws on all mechanical equipment and supports Unbalanced drive shaft or worn couplings Make sure motor and Geareducer shafts are in proper alignment and match marks properly matched Repair or replace worn couplings Rebalance drive shaft by adding or removing weights from balancing cap screws See Drive Shaft Service Manual Make certain all blades are as far from center of fan as safety Vibration Fan devices permit All blades must be pitched the same See Fan Service Manual Clean off deposit build up on blades Worn Geareducer bearings Check fan and pinion shaft endplay Replace bearings as necessary Unb l ri ed motor Disconnect load and operate motor If motor still vibrates rebalance rotor Bent Geareducer shaft Check fan and pinion shaft with dial indicator Replace if necessary Fan Noise Blade rubbing inside of fan cylinder Adjust cylinder to provide blade tip clearance Loose bolts in blade clamps Check and tighten if necessary Scale or foreign substance in circulating water system Insufficient blowdown See Water Treatment section of this manual Water treatment deficiency Consult competent water treating specialist See Water Treatment section of this manual Cold Water Temperature Too Warm See Tower Operation Entering wet bulb temp is above design Check to see if local heat sources
2. Geareducer models used on NC cooling towers are designed for 5 year oil change intervals To maintain five year change intervals use only oil designed specifically for these Geareducers If after five years turbine type mineral oil is used the oil must be changed semiannually Refer to the Geareducer Manual for oil recommenda tions and further instructions Annually Inspect the tower thoroughly making maximum use of instructions given in the separate service manuals Check structural bolted connections and tighten as required Make preventive maintenance repairs as necessary La 25 A Warning 26 maintenance Relubricate motor according to the manufacturer s instructions Refer to the Motor Re lubrication Instructions of this manual for towers equipped with the motor outside the plenum area Check to see that all bolts are tight in the fan and mechanical equipment region including the fan cylinder and fan guard Refer to Component User Manuals for torque values Every 5 Years If equipped change Geareducer oil Refer to the Geareducer User Manual for instructions Motor Relubrication Instructions Motor located outside plenum option Open and lock out disconnect switch to make certain motor cannot be started 1 Remove guard as shown Opposite end motor bearing is accessible from outside the tower 2 Remove grease fill and relief plugs at both shaft extension end and opposite end bearings and remove hardened gr
3. If equipped check oil level in accordance with the Geareducer User Manual for the Geareducer Although the Geareducer was filled to the proper level at the factory tipping during shipment and hoisting may have caused some loss of oil If oil is required fill Geareducer to the proper level with approved lubricant See Geareducer User Manual Check oil level at the Geareducer or dipstick standpipe located on fan deck if so equipped to confirm that the proper level is indicated Install fan guard according to the installation drawing shipped with the tower NC8401 through NC8403 models include a single piece fan guard NC8405 through NC8414 models include a two piece fan guard Models with extended velocity recovery cylinders do not have fan guards Improper installation of the fan guard will destroy the structural integrity of the fan guard Failure of the fan guard could allow op erating or maintenance personnel to fall into the rotating fan Spin the fan manually to assure that all fan blades properly clear the inside of the fan cylinder Observe the action of the coupling or drive shaft couplings to be sure that the motor and Geareducer are properly aligned If necessary correct the alignment in accordance with the included manual For Power Belt Drive equipped models observe the action of the sheaves and belts to be sure that the motor is properly aligned with the fan sheave See the Belt Tensioning and Sheave Alignment section
4. Range F The cooling tower establishes only the cold water temperature attainable under any operating circumstance Air wet bulb temperature Cold water temperature will also vary with the wet bulb temperature of the air entering the louvered faces of the tower Reduced wet bulb temperatures will result in colder water temperatures However the cold water temperature will not vary to the same extent as the wet bulb For example a 20 F reduction in wet bulb may result in only a 15 F reduction in cold water temperature Water flow rate Increasing the water flow rate GPM will cause a slight elevation in cold water temperature while reducing the water flow rate will cause the cold water temperature to decrease slightly However at a given heat load see formula above water flow reductions also cause an increase in the incoming hot water temperature Use care to prevent the hot water from exceeding 125 F in order to prevent damage to the tower components mi 15 Note Note 16 operation Air flow rate Reducing air flow through the tower causes the cold water temperature to rise This is the approved method by which to control leaving water temperature If your tower is equipped with a single speed motor the motor may be shut off when the water temperature becomes too cold This will cause the water temperature to rise When the water temperature then becomes too warm for your process the motor can be restart
5. A A A Y or YY These symbols represent how the motor is constructed on the inside and in no way have anything to do with a Delta or Wye electrical distribution system serving the motor When using a starter Set motor overload protection to 110 of motor nameplate amps This setting allows the fan motor to operate during cooler weather During cooler weather it is common for the motor to draw 6 to 10 higher than nameplate amps High amps are common during tower commissioning when the tower is dry and the ambient air temperature is cool Do not start the motor more than four to five times per hour Short cycling the tower will cause fuses breakers or O L s to operate and will decrease motor life When using a two speed starter Motor rotation must be the same at slow speed and high speed Single winding motor requires a starter with a shorting contactor Two winding motor requires a starter with out a shorting contactor All two speed starters must have a 20 second time delay relay when switching from high speed to low speed Do not start the motor more than four to five times per hour each low speed start and each high speed start count as one start When using a VFD Before beginning ensure that the motor is rated for Inverter Duty per NEMA MG 1 part 31 Set the VFD solid state overload protection to 119 of motor name plate amps and set maximum current parameter in the VFD to motor nameplat
6. 4 to 5 ppm free chlorine residual at a pH of 7 0 to 7 6 The chlorine residual must be held at 4 to 5 ppm for six hours measurable with standard commercial water test kits If the cooling tower has been in operation and then shut down for a duration of time and not drained perform one of the two previous biocidal treatment programs directly to the cooling water storage vessel cooling tower sump drain down tank etc without circulating stagnant water over the cooling tower fill or operating the cooling tower fan operation After biocidal pretreatment has been successfully completed cooling water may be circulated over the tower fill with the fan off When biocidal treatment has been maintained at a satisfactory level for at least six hours the fan may be turned on and the system returned to service Resume the standard water treatment program including biocidal treatment Tower Operation General The cold water temperature obtained from an operating cooling tower will vary with the following influences 1 Heat load With the fan in full operation if the heat load increases the cold water temperature will rise If the heat load reduces the cold water temperature will reduce Note that the number of degrees range through which the tower cools the water is established by the system heat load and the amount of water being circulated in accordance with the following formula Heat Load Btu hr GPM x 500
7. Check fan blade pitch and tip clearance x Check fan cylinder for loose fasteners R x Motor Lubricate grease as required R Check mounting bolts for tightness x Operate at least 3 hours a month 3 hours a month 3 hours a month Basin Heater if equipped Check for proper operation of temp low water level sensor x Inspect clean buildup of contaminant from sensor x x Structure Inspect tighten all fasteners x x Inspect and touch up all metal surfaces x R Refer to Component User Manual Note It is recommended at least weekly that the general operation and condition be observed Pay attention to any changes in sound or vibration that may signify a need for closer inspection 29 troubleshooting Trouble Cause Remedy Motor Will Not Start Power not available at motor terminals Check power at starter Correct any bad connections between the control apparatus and the motor e Check starter contacts and control circuit Reset overloads close contacts reset tripped switches or replace failed control switches If power is not on all leads at starter make sure overload and short circuit devices are in proper condition Wrong connections Check motor and control connections against wiring diagrams Low voltage Check nameplate voltage against power supply Check voltage at motor terminals Open circuit in motor winding Check stator winding
8. adjust them to equalize hot water depth in the distribution basins after reach ing design water flow rate Each basin should have from 3 to 5 water depth with uniform depth from basin to basin Fix valves in this position with the locking bar when depth is correct Failure to tighten the locking bar after valve adjustment may result in damage to the valve If the tower is equipped with the Marley internal piping option the basins are self balancing and this step is not necessary Uniform distribution depth of 3 to 512 is essential to efficient tower op eration Contact your Marley sales representative if you are considering a permanent change in circulating water flow rate that would prevent operation within these limits 6 Continue pump operation for about 15 minutes after which it is recom mended that the water system be drained flushed and refilled 7 While operating the condensing water pump s and prior to operating the cooling tower fan execute one of the two alternative biocidal treatment programs described in the following Resume treatment with the biocide which had been used prior to shut down Utilize the services of the water treatment supplier Maintain the maximum recommended biocide residual for the specific biocide for a sufficient period of time residual and time will vary with the biocide to bring the system under good biological control or Treat the system with sodium hypochlorite to a level of
9. at 4 concentrations circulating water will contain four times as much dissolved solid as the makeup water assuming none of the solids form scale or are otherwise removed from the system When water treatment chemicals are added they should not be in troduced into the circulating water system via the cold water basin of the cooling tower Water velocities are lowest at that point which results in inadequate mixing Belt Tensioning The belt tension is adjusted by loosening the 8 bolts that secure the motor mount frame to the belt drive frame then loosen the retaining nuts on the two threaded rods and turn the threaded rods to apply proper tension Apply the same quantity of turns to each threaded rod to insure that the tensioning frame remains parallel to the mechanical support beams Retighten hardware Ideal tension is the lowest tension at which the belt will not slip under peak load conditions Check tension frequently during the first 24 48 hours of run in operation Overtensioning shortens belt and bearing life Keep belts free from foreign material which may cause slipping Never apply belt dressing as this will damage the belt and cause early failure A Dodge V Belt Tension Tester is an alternate method for tensioning V belts Check with you local belt supplier Bushing Fastener Torque Values maintenance Sheave Alignment The motor sheave is to be positioned as close as possible to the motor in order to minimize t
10. is included in the document package along with bills of material If you have purchased an option and can t find the appropriate installation drawing contact your local Marley sales representative before proceeding In addition to these specific documents SPX pub lishes numerous technical reports including more detailed information on a variety of cooling tower operation and service topics Your Marley sales representative will be happy to give you copies of these reports at no charge For complete parts and service assistance con tact the Marley sales representative in your area If you need help locating the office nearest you please phone 913 664 7400 or check the internet at spxcooling com
11. ladder to enter or exit the access doors may result in a fall Included with this instruction packet are separate Service Manuals on each major operating component of the tower and it is recommended that you read them thoroughly Where discrepancies may exist the separate Service Manuals will take precedence The following is recommended as a minimum routine of scheduled mainte nance Always shut off electrical power to the tower fan motor prior to performing any inspections that may involve physical contact with the mechanical or electrical equipment in or on the tower Lock out and tag out any electrical switches to prevent others from turning the power back on Service personnel must wear proper personal protective clothing and equipment Weekly Inspect for bacterial growth and general operation conditions Bacte rial growth should be reported to your water treatment expert for immediate attention Monthly Weekly at start up Observe touch and listen to the tower Become accustomed to its normal appearance sound and level of vibration Abnormal aspects relating to the rotating equipment should be considered reason to shut down the tower until the problem can be located and corrected Observe operation of the motor coupling or drive shaft Geareducer and Note maintenance fan Become familiar with the normal operating temperature of the motor as well as the sight and sound of all components as a whole If equip
12. through NC8414 models Repeat steps 4 through 7 for any remaining cells Attach your cold water supply piping to the cold water basin outlet connec tion in accordance with drawing instructions utilizing gaskets provided Do not support your pipe from the tower or outlet connection support it externally Normally one of the following three outlet arrangements is provided Case face connection This is a factory installed galvanized pipe nipple extending horizontally from the side of the cold water basin It is both beveled for welding and grooved for a mechanical coupling Ifa weld connection is used it is recommended that the weld area be protected against corrosion Cold galvanizing is suggested applied according to the manufacturer s instructions Bottom outlet connection This is a factory installed circular opening in the cold water basin floor of one or more cells An appropriately sized circular opening has been provided to accept a 125 ANSI B16 1 flat face flange connection Side outlet sump connection Unless otherwise specified sumps are manufactured of heavy duty FRP fiber reinforced polyester construction Because of their size they are attached upside down in the basin to pre vent damage in shipment They must be inserted into the square opening prepared in the floor of the cold water basin of one or more cells sealed against leakage and attached by machine bolts according to the installa tion drawin
13. upon it may be considerations which occasionally require the services of an expert technician maintenance schedule Maintenance Service Monthly Semi annually Seasonal Startup or Annually Inspect General Condition and Operation x x Observe Operation of Mechanical motor fan and drive mechanism x x Makeup valve if equipped x x Inspect for unusual noise or vibration x x Inspect and Clean Air inlet x x PVC drift eliminators x x Distribution basin nozzles and collection basin x x Fan motor exterior x x Check Collection water basin level x x Blowdown adjust as required x x Geareducer Drive if equipped Check for loose fasteners including oil drain plug x Check for repair oil leaks x x Check oil level x x Change oil R Make sure vent is open x x Check driveshaft or coupling alignment x Check for loose driveshaft or coupling fasteners x Check driveshaft or coupling bushings or flex element for unusual wear x x Lube lines if equipped Check for oil leaks in hoses or fittings x R x Belt drive if equipped Fan shaft bearing lubrication every 3 mo every 3 months every 3 months Check and tighten support fasteners x Check shaft sheave and belt alignment x Check belt tension and condition x x Check sheave bushing fastener torque x Fan Check and tighten blade and hub fasteners R x
14. NC 8400 steel cooling tower INSTALLATION OPERATION MAINTENANCE gt Marley Note A Warning A Caution Note contents This manual contains vital information forthe proper installation and operation of your cooling tower Carefully read the manual before installation or operation of the tower and follow all instructions Save this manual for future reference Tower LOCATON ergenin ipana en danced iE Da ATA a EAE 5 Tower Shipment asirese REAA EE RaR ERAR ARAARA 5 Receiving TOW 6P suisia a a 5 Hoisting TOWS innara a 5 Tower INSTA NON natania aeai aE aa aa TEA 6 Towar Stre UDr Aaa ASEA i NE a a 13 Tower Operaties naaa S 15 Wintertime Operation cecsesssecssseesessesessessesessenssnensesesteassneneeseseeeseeneeseseeteaneneeseass 17 Water Treatment and BIOWGOWD ssssesesteeeteseseeeseseeaeeeseeasaeeteneseeeeteseaeeteteataens 19 Cooling Tower Cleaning sessssesssseerreesssruenreovsueeeesvsurneesuunnenreoennuereeovsnuneorsssnerrenss 21 Schedule of Tower Maintenance csescseseseeeseeseeseeteeesseeeteeeseetetesssnenseeataneneaees 24 Motor Relubrication INStructions ecsesseseseesseeeeeeeeeseeteeeseseeaseseesaeesseenseeeteaes 26 Seasonal Shutdown INStructions 0 ceseseecseseeeeseeeseseesseeseeeeseesseeeeeeeseeeeseeneeeeaes 27 Prolonged SHUTAOWN cc sccscaccsssccsssssaesessesssesuesnsesessnsussnssancacsteeasanesansnceseravaseravane 28 Maintenance Schedule sisne a N 29 Troubleshoot aa 30 Additiona
15. are affecting tower See if surrounding structures are causing recirculation of tower discharge air Discuss remedy with Marley representative Design wet bulb temp was too low May have to increase tower size Discuss remedy with Marley representative Actual process load greater than design May have to increase tower size Discuss remedy with Marley representative Overpumping Reduce water flow rate over tower to design conditions Tower starved for air Check motor current and voltage to be sure of correct contract horsepower Re pitch fan blades if necessary Clean louvers fill and eliminators Check to see if nearby structures or enclosing walls are obstructing normal airflow to tower Discuss remedy with Marley representative Excessive Drift Exiting Tower Distribution basins overflowing Reduce water flow rate over tower to design conditions Be sure hot water basin nozzles are in place and not plugged Faulty drift elimination Check to see that integral fill louvers and eliminators are clean free of debris and installed correctly If drift eliminators are separate from fill make sure they are correctly installed in place Clean if necessary Replace damaged or worn out components 31 SIP gt lt WHERE IDEAS MEET INDUSTRY Increased load requirements NC towers are designed so that cells of either equal or unequal capacity can be added in the future This allows you to comp
16. arley flow control valve connections option Marley flow control valves two per cell are designed to 1 take the place of the standard elbows normally required for inlet connection and 2 provide means of regulating flow to both sides of the tower Remove the center inlet flume assembly to gain access for attachment of valves Refer to NC Field Installation Manual Assembly Instructions shipped with tower Valves provide a vertical face for attachment of your standard 125 flange Side inlet connection option A pipe stub is provided in the casing wall above the access door for connection to the external piping by means of the rubber coupling provided Bottom inlet connection option An appropriately sized hole and bolt circle one per cell is provided in the floor of the cold water basin Bolt circle is designed to accept a standard 125 flat face flange 12 Wire motor in accordance with wiring diagram For maintenance safety purposes SPX recommends a lockout type disconnect switch for all mechanical equipment In addition to a disconnect switch the motor should be wired to main power supply through short circuit protection and a magnetic starter with overload protection Note Note Note installation Motor Wiring Wire motor leads as shown on the motor nameplate matching the supply voltage Do not deviate from the motor nameplate wiring Either of following symbols may be shown on the motor nameplate
17. ay assist you in addressing some of these personnel safety concerns including a handrail system around the perimeter of the fan deck with either one or two ladders for access to the deck ladder extensions used where the base of the tower is elevated safety cages for fan deck ladders external lube lines fan cylinder extensions flow control balancing valves fan barrier access door platform motor located outside the tower external motor access platform Tower Location Space available around the tower should be as generous as possible to pro mote ease of maintenance and to permit freedom of airflow into and through the tower If you have questions about the adequacy of the available space and the intended configuration of the tower please contact your Marley sales representative for guidance Prepare a stable level support foundation for the tower utilizing weight wind load and dimensional information appearing on appropriate Marley submittal drawings Supports must be level to insure proper operation of the tower The cooling tower must be located at such distance and direction to avoid the possibility of contaminated tower discharge air being drawn into building fresh air intake ducts The purchaser should ob tain the services of a Licensed Professional Engineer or Registered Architect to certify that the location of the tower is in compliance with applicable air pollution fire a
18. be approved by SPX Cooling Technologies A Caution A Warning A Warning operation Intermittent Wintertime Operation If periods of shutdown nights weekends etc occur during freezing weather measures must be taken to prevent the water in the cold water basin and all exposed piping both internally and externally from freezing Several methods are used to combat this including automatic water basin heater systems available from Marley field installation of heat tracing of piping both internally and externally field modification to provide a weep hole by drilling a 3 6 hole in PVC piping 7 up from the base of the flange of the internal riser The hole should be plugged with a 1 4 tap screw with sealing washer For steel piping drill a 134 diameter hole 2 up from the base of the flange of the internal riser and tap for a 4 20 bolt with sealing washer that will be used as a plug See figures below for drilling details Normally weep holes are plugged during tower operation and plugs removed during downtime in freezing temperatures To leave the hole unplugged during operation drill a 6 hole at an upward angle that will allow the water flow to drain downward into the basin DRILL FOR PLUGGING HOLES TAP SCREW ORBOLT Unless some means of freeze prevention is incorporated into your system the tower basin and exposed pipework should be drained at the beginning of each wintertime shutdow
19. ce unless the fan motor is locked out Operators of evaporative cooling equipment such as water cooling towers should follow maintenance programs which will reduce to an absolute minimum the opportunity for bacteriological contamination Public Health Service officials have recommended that good housekeeping procedures be followed such as regular inspections for concentrations of dirt scale and algae periodic flushing and cleaning and the following of a complete water treatment program including biocidal treatment The visual inspection should take place at least once a week during the operat ing season The periodic flushing and cleaning should be done before and after each cooling season but in any event at least twice a year The louvers drift eliminators and easily accessible fill surfaces should be flushed by use of a moderate pressure water nozzle being careful not to cause physical damage A reliable water treatment program should be installed and maintained Filtra tion devices may be employed to reduce the suspended solids concentrations thus increasing the effectiveness of the water treatment program See Tower Startup section of this manual Blowdown Acooling tower cools water by continuously causing a portion of it to evaporate Although the water lost by evaporation is replenished by the makeup system it exits the tower as pure water leaving behind its burden of dissolved solids to concentrate in the remainin
20. d and the tower basin flange NC8411 through NC8414 models only Before setting top module in place on bottom module clean any debris from the underside of the top module fill skid and beams and from the top of the bottom module and remove shipping cover from bottom of top module replace fasteners at side of module to preventleaks Place top module on the top peripheral bearing surface factory installed gasket of bottom module aligning mating holes as it is set in place Make sure that the orientation of the top module agrees with your intended piping arrangement Sections are 180 reversible with respect to each other Attach top module to bottom module with fasteners provided according to NC Field Installation Manual Assembly Instructions If tower purchased is one fan cell only ignore steps 4 through 8 4 If collection basins are to be equalized by the use of Marley standard flumes unbolt the coverplate from the basin of the cell just installed The coverplate is located in the center of the basin side Unbolt temporary coverplate from the basin of the 2nd cell and set 2nd cell or bottom module of 2nd cell in place Align anchor bolt holes and flume openings in basin sides Install flume according to Field Installation Manual instructions It is important that the cells be firmly anchored before the flume is attached to the 2nd cell A Caution installation Repeat steps 2 and 3 for 2nd top section on NC8411
21. dard case face outlet connection vent accumulated air from the top of the suction hood by removing one or both tap screws provided at that location Replace these tap screws when venting is complete On certain models the top of the suction hood for 14 diameter side suctions is 1 4 above the top of the overflow In those situations it is necessary to block the overflow and continue filling the basin to the level where the aforementioned tap screws are submerged before venting 4 Completely open all hot water flow control valves Start your pump s and observe system operation Since the water system external to the tower will have been filled only to the level achieved in the cold water basin a certain amount of pump down of the basin water level will occur before water completes the circuit and begins to fall from the fill The amount of initial pump down may be insufficient to cause the float valve to open However you can check its operation by pressing down on the operating lever to mim which the stem of the float valve is attached 13 installation Some trial and error adjustment of the float valve may be required to balance the makeup water with tower operation Ideally the float valve setting will be such that no water is wasted through the overflow at pump shutdown However the water level after pump start up must be deep enough to assure positive pump suction 5 If the tower is equipped with flow control valves
22. e amps Maximum current parameter will reduce fan speed and limit amp draw to nameplate amps during cold weather opera tion If furnished with a mechanical O L set this at 110 over motor nameplate amps i A Warning A Warning 10 installation Motor rotation must be the same in both VFD mode and By pass mode If cable distance between the VFD and motor is greater than 100 feet a DV DT output filter is recommended to avoid damage to the motor 100 feet distance is based on our field experience the VFD manufac ture may state different distances and distance does vary depending on the VFD manufacture Program the VFD for variable torque output Flux vector and constant torque modes may damage the gearbox Do not start and stop the motor using the safety switch at the motor If the drive is being commanded to run and the load side is cycled ON and OFF with the safety switch this may damage the VFD Using a VFD in cooling applications has advantages over traditional single or two speed motor control A VFD can reduce the cost of electrical energy being used and provide better temperature control In addition it reduces the mechanical and electrical stress on the motor and mechanical equipment Electrical savings can be large during periods of low ambient temperature when the cooling requirement can be satisfied at reduced speeds To benefit from these advantages it is important that the drive be installed correctly Mar
23. e safe for all operating conditions Having established the minimum allowable cold water temperature maintain ing that temperature can be accomplished by fan manipulation as outlined in Item 4 under Tower Operation However in towers of more than one cell where fans are manipulated sequentially please realize that the water temperature will be significantly lower in the cell or cells operating at the highest fan speed than the net cold water temperature produced by the mi A Warning 18 operation entire tower would indicate Wintertime operation of multicell towers at low cold water temperature levels requires that the operator be especially watchful 2 Ascold air enters the louvers it causes the water flowing over the fill to be drawn inward toward the center of the tower Thus under fan operation the louvers and lower periphery of the tower structure remain partly dry see ing only random splashing from within the tower plus normal atmospheric moisture from the entering air Such lightly wetted areas are most subject to freezing Therefore if excessive ice forms on the louvers stop the fan for a few minutes With the fan off the water flow will increase in the vicinity of the louvers and reduce the ice buildup 3 Under extended extreme cold conditions it may be necessary to operate the fan in reverse This forces warm air out through the louvers melting any accumulated ice adequate heat load must be available Re
24. ease using clean wire MOTOR STEEL SIDE CASING GREASE FILL PLUG ATTACHMENT SCREW GUARD GREASE RELIEF PLUG 3 Insert grease fittings in grease fill openings and add grease until grease is forced out through relief openings 4 Replace fill plugs and operate mechanical equipment 30 minutes to one hour to purge excess grease at grease relief opening Note maintenance 5 Reinstall grease relief plugs and reinstall guard 6 Resume normal tower operation Seasonal Shutdown Instructions When the system is to be shut down for an extended period of time it is recommended that the entire system cooling tower system piping heat exchangers etc be drained Leave the basin drains open During shutdown clean the tower see Warning on cooling tower cleaning in the Maintenance section of this manual and make any necessary repairs Pay particular attention to mechanical equipment supports and coupling or drive shafts Following each year s shutdown and cleaning inspect the tower s metal surfaces for evidence of the need to apply a protective coating Do not misinterpret grime and transient rust from the piping system as a need to have the tower painted If relatively bright metal can be exposed by cleaning consider that the galvanizing has remained effective Unless there is evidence of a generalized failure of the galvanizing localized touch up should be all that is required To the extent that the galvani
25. ed Fan cycling limits Considering the normal fan and motor sizes utilized on NC towers anticipate that approximately 4 to 5 starts per hour are allowable If your tower is equipped with a two speed motor you will enjoy greater op portunity for temperature control When the water temperature becomes too cold switching the fan to half speed will cause the cold water temperature to rise stabilizing at a temperature a few degrees higher than before With a further reduction in water temperature the fan may be cycled alternately from half speed to off Do not start the motor more than four to five times per hour each low speed start and each high speed start count as one start If your tower consists of two or more cells cycling of motors may be shared between cells increasing your steps of operation accordingly Multicell towers equipped with two speed motors will maximize energy savings and minimize sound levels if fans are staged so that all fans are brought up to low speed before any fan goes to high speed For greater insight on cold water temperature control please read Cooling Tower Energy and its Management Technical Report H 001 A available on our website Note A Caution operation Wintertime Operation The Marley fill system used in NC cooling towers has air entrance louvers that are molded as an integral part of the fill This feature makes these towers very forgiving of cold weather operation ev
26. en at the low temperature and reduced load conditions encountered in free cooling and other low temperature applica tions Nevertheless during operation in subfreezing weather the opportunity exists for ice to form in the colder regions of the tower Slushy transitory ice forms routinely in the colder regions of the fill of low temperature towers and is visible through the tower louvers Such ice normally has no adverse effect on tower operation but its appearance should be a signal to the operator to undertake ice control procedures Itis the operator s responsibility to prevent the formation of destruc tive hard ice on the cooling tower fill Certain guidelines should be followed 1 Do not allow the tower s leaving water temperature to drop below a mini mum allowable level say 36 F to 40 F If such low temperature operation is necessary or beneficial to your process establish the minimum allowable level as follows During the coldest days of the first winter of operation observe whether any ice is forming on the louver face particularly near the bottom part of the louver face If hard ice is present on the louvers you must increase the allowable cold water temperature If the coldest possible water is beneficial to your process ice of a mushy consistency can be tolerated but routine periodic observation is advisable Ifthe minimum allowable cold water temperature is established at or near minimum heat load it should b
27. ensate for the load increases that normally occur with the replacement or addition of production equipment and still retain continuity with respect to your cooling tower system Tower rebuilding SPX Cooling Technologies routinely rebuilds and upgrades cooling towers of all materials and manufacture If your tower ever reaches the limit of its service life we recommend that you investigate the cost of rebuilding before you routinely order a new replacement tower Each NC tower includes a document package containing general orientation drawings NC Field Installation Manual Assembly Instruc tions and tower component manuals These documents contain important information relating to safe installation and operation of the cooling tower Field installation is al ways required for fan guards piping inlets and SPX COOLING TECHNOLOGIES INC 7401 W 129 STREET OVERLAND PARK KANSAS 66213 USA P 913 664 7400 F 913 664 7439 spxcooling spx com In the interest of technological progress all products are subject to design and or material change without notice ISSUED 08 2012 MO09 1150B COPYRIGHT 2012 SPX Corporation additional information piping outlets Some optional accessories such as valves handrails ladders and safety cages may also require field installation If installation details are not covered in the NC Field Installa tion Manual a separate installation drawing or manual for each purchased option
28. g included An appropriately sized circular opening in the vertical face of the sump has been provided to accept a 125 ANSI B16 1 flat face flange connection Attach makeup water supply piping to appropriately sized float valve con nection located in cold water basin side wall Install the drain and overflow according to the NC Field Installation Manual Assembly Instructions If you wish to pipe overflow and drain water to a remote discharge point make those connections at this time also Attach your warm water return piping to the inlet connections of the tower Ua Note A Caution A Warning installation Fasteners and components provided by others that are to be at tached to the tower must be compatible with the cooling tower materials i e fasteners in a stainless steel cold water basin must be stainless steel Except for the horizontal components of top mounted piping and as prescribed on Marley drawings do not support your pipe from the tower or inlet connection support it externally Normally one of the following four inlet arrangements is provided Standard distribution basin connections These are circular openings two per cell in the top deck of the tower near the air inlet face provided to accept standard 125 flat face flanges Remove the center section of the inlet flume assembly to gain access to attach inlet fasteners Refer to NC Field Installation Manual shipped with tower M
29. g water Given no means of control this increasing concentration of contaminants can reach a very high level In order to achieve water quality which is acceptable to the cooling tower as well as the remainder of your circulating water system the selected water treatment company must work from a relatively constant level of concentra tions This stabilization of contaminant concentrations is usually accomplished by blowdown which is the constant discharge of a portion of the circulating water to waste As a rule acceptable levels on which to base a treatment schedule will be in the range of 2 4 concentrations The following table shows mia 21 Note 22 maintenance the minimum amount of blowdown percent of flow required to maintain different concentrations with various cooling ranges Cooling Range Number of Concentrations 1 5X 2 0X 2 5X 3 0X 4 0X 5 0X 6 0X 5 F 18 38 25 18 11 08 06 10 F 1 58 18 51 38 25 18 14 15 F 2 38 1 18 78 58 38 28 22 20 F 3 18 1 58 1 05 78 51 38 30 25 F 3 98 1 98 1 32 98 64 A8 38 Multipliers are based on drift of 0 02 of the circulating water rate Range Difference between hot water temperature coming to tower and cold water tem perature leaving tower EXAMPLE 700 GPM circulating rate 18 F cooling range To maintain 4 concentrations the required blowdown is 0 458 or 00458 times 700 GPM which is 3 2 GPM If tower is operated
30. hoisting clips for all other models are located at the top of the tower A Hoisting Installation label which has hoisting dimensional information is located on the side casing near the tower cen terline Remove tower from the carrier and hoist into place according to the instructions on the label Hoisting clips are provided for ease of unloading and positioning tower For overhead lifts or where additional safety is required safety slings should also be placed under the tower Under no circumstances should you combine the top and bottom modules of modular models and attempt to hoist them at the same time by utilizing the hoisting clips alone Note Note installation Tower Installation These installation instructions are intended to help you prepare before your tower arrives If discrepancies exist between these instructions and those shipped with the tower the instructions shipped with the tower will govern Prior to placement of the tower confirm that the supporting platform is level and that the anchor bolt holes are correctly located in accordance with Marley drawings Place tower or bottom module of NC8411 through NC8414 models on your prepared supports aligning anchor bolt holes with those in your supporting steel Make sure that the orientation agrees with your intended piping arrangement Attach tower to supporting steel with four diameter bolts and flat washers by others Position flat washers between the bolt hea
31. l IMTOrmMaAtiOT scssaissescacecesescasetzessciscsess sncssansa sasstseecivescideinanstaes Iar ia ei aE 32 The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the product Indicates presence of a hazard which can cause severe personal injury death or substantial property damage if ignored Indicates presence of a hazard which will or can cause personal injury or property damage if ignored Indicates special instructions on installation operation or main tenance which are important but not related to personal injury hazards A Warning preparation The Marley NC cooling tower purchased for this installation represents the cur rent state of the art in crossflow induced draft cooling tower design Thermally and operationally it is the most efficient cooling tower of its class These instructions as well as those offered separately on motors fans Geare ducers couplings drive shafts float valves etc are intended to assure that the tower serves you properly for the maximum possible time Since product warrantability may well depend upon your actions please read these instruc tions thoroughly prior to operation If you have questions about the operation and or maintenance of this tower and you don t find the answers in this manual please contact your Marley sales representative When writing f
32. ley supplies VFD and VFD controls specifically designed for our cool ing products If you have purchased a Marley VFD and or controls package please follow the instructions in the User Manual for that system Most VFD problems can be avoided by purchasing the Marley drive system If you are installing a VFD other than the Marley drive please refer to that drives instal lation manual Improper use of a VFD may cause damage to equipment or personal injury Failure to correctly install the VFD drive will automatically void all warranties associated with the motor and any equipment that is either electrically or mechanically directly attached to the VFD drive system The length of this warranty avoidance will be contingent on properly installing the VFD system and repairing any damage that may have occurred during its operation SPX Cool ing Technologies does not assume responsibility for any technical support or damages for problems associate with non Marley brand VFD systems Changing the operational fan speed from the factory settings could cause the fan to operate in an unstable region which may result in damage to the equipment and possible injury A Warning A Warning A Caution installation Mechanical Equipment Always shut off electrical power to the tower fan motor prior to performing any maintenance on the tower Any electrical switches should be locked out and tagged out to prevent others from turning the power back on
33. motor Poor ventilation Clean motor and check ventilation openings Allow ample ventilation around motor Winding fault Check with Ohmmeter Bent motor shaft Straighten or replace shaft Insufficient grease Remove plugs and regrease bearings Too frequent starting or speed changes Limit cumulative acceleration time to a total of 30 seconds hr Set on off or speed change set points farther apart Consider installing a Marley VFD drive for fine temperature control Deterioration of grease or foreign material in grease Bearings damaged Flush bearings and relubricate Replace bearings Motor Does Not Come Up To Speed Voltage too low at motor terminals because of line drop Check transformer and setting of taps Use higher voltage on transformer terminals or reduce loads Increase wire size or reduce inertia Broken Rotor bars Look for cracks near the rings A new rotor may be required Have motor service person check motor Wrong Rotation Motor Wrong sequence of phases Switch any two of the three motor leads 30 troubleshooting Trouble Cause Remedy Geareducer Noise Geareducer bearings If new see if noise disappears after one week of operation Drain flush and refill Geareducer See Geareducer Service Manual If still noisy replace Gears Correct tooth engagement Replace badly worn gears Replace gears with broken or damaged teeth
34. n period If tower basin is drained verify that all basin heaters have been shut off either by automatic cutoff or disconnect switch It is recommended that you discuss your freeze prevention options with your local Marley sales representative Note 20 operation Water Treatment and Blowdown Maintaining Water Quality The steel used in NC towers has been galvanized with a heavy zinc coating averaging 2 0 mils in thickness The NC stainless steel option is even more corrosion resistant than galvanized steel in certain environments Other ma terials used PVC fill drift eliminators and louvers aluminum fans cast iron Geareducer etc are selected to offer maximum service life in a normal cooling tower environment defined as follows Circulating water with a pH between 6 5 and 8 a chloride content as NaCl below 500 ppm a sulfate content SO below 250 ppm total alkalinity as CaCO below 500 ppm calcium hardness as CaCO above 50 ppm a maximum inlet water temperature not to exceed 125 F no significant con tamination with unusual chemicals or foreign substances and adequate water treatment to minimize scaling Startup Conditions The water conditions during the initial tower operation are crucial in preventing premature corrosion of galvanized steel white rust For at least the first eight weeks of operation pH should be controlled between 6 5 and 8 0 with hardness and alkalinity levels between 100 a
35. nd 300 ppm expressed as CaCOz Chlorine if used shall be added intermittently with a free residual not to exceed 1 ppm maintained for short periods Excessive chlorine levels may deteriorate sealants and other materials of construction An atmosphere surrounding the tower no worse than moderate industrial where rainfall and fog are no more than slightly acid and they do not contain significant chlorides or hydrogen sulfide H2S Many proprietary chemicals exist for control of scale corrosion and biologi cal growth and should be used prudently Also combinations of chemicals may cause reactions which reduce treatment effectiveness and certain chemicals such as surfactants biodispersants and antifoams may increase drift rate Unless you purchased a stainless steel NC the structure of your NC tower consists primarily of galvanized steel therefore your water treatment program must be compatible with zinc In working with your water treatment supplier it is important that you recognize the potential effects on zinc of the specific treatment program you choose A Warning maintenance Cooling Tower Cleaning Any evaporative type cooling tower must be thoroughly cleaned on a regular basis to minimize the growth of bacteria including Legio nella Pneumophila to avoid the risk of sickness or death Service personnel must wear proper personal protective equipment during decontamination Do NOT attempt any servi
36. nd clean air codes A Caution A Warning receiving and hoisting Tower Shipment Unless otherwise specified NC towers ship by truck on flat bed trailers which lets you receive hoist and install the tower in one continuous operation Single cell towers ship on one truck Multicell towers depending on their size may require more than one truck Responsibility for the condition of the tower upon its arrival belongs to the trucker as does the coordination of multiple shipments if required Receiving Tower Prior to unloading the tower from the delivering carrier inspect the shipment for evidence of damage in transit If damage is apparent note the freight bill accordingly This will support your future recovery claim Find and remove the installation instruction drawings and bills of material located in a plastic tote in the cold water basin This information should be kept for future reference and maintenance purposes Hoisting Tower NC8411 through NC841 4 models consist of two modules per cell The upper module includes hoisting clips at the top of the module The hoisting clips on the lower module are located near the bottom on the sides of the cold water basin All other models ship in a single module NC upper and lower modules must be hoisted and set separately Do not preassemble modules prior to hoisting The hoisting clips for NC8409 are located near the bottom of the tower on the cold water basin sides The
37. of this manual It is essential that the fan guard be installed in accordance with the Field Installation Manual shipped with the tower A Caution Note 12 installation 4 Momentarily bump energize the motor and observe rotation of the fan The fan should rotate in a counterclockwise direction when viewed from below If rotation is backwards shut off the fan and reverse two of the three primary leads supplying power to the motor If tower is equipped with a two speed motor check for proper rota tion at both speeds Check also to see that starter is equipped witha 20 second time delay which prevents direct switching from high speed to low speed If the fan is intended to be reversed for deicing purposes make sure that the starter is equipped with a 2 minute time delay between changes of direction These delays will prevent abnormal stress from being applied to the mechanical equipment and the electrical circuit components 5 Run the motor and observe the operation of the mechanical equipment Opera tion should be stable and there should be no evidence of oil leakage 6 If equipped with belt drive check the torque on the fan and motor sheave after 10 to 60 hours of operation See Bushing Fastener Torque Values of the Belt Tensioning and Sheave Alignment section of this manual If the water supply system is not being operated or if there is no heat load onthe system motor amps read at this time may indicate an apparent o
38. ooling tower on the market we want to make sure that you gain the maximum possible benefit from its purchase Therefore the following services are available which are intended to assure the maximum possible service life under your operating conditions tailor the operating characteristics to your specific needs and maintain consistently optimum thermal performance capability They are available by contacting your Marley sales representative Replacement parts A complete stock of parts and components is maintained at one or more of the various Marley plants In cases of emergency they can normally be shipped within 24 hours by air freight if necessary However you would obviously benefit from anticipating your need in advance thus avoiding the cost of special handling Be sure to mention your tower serial number from the tower nameplate when ordering parts Periodic maintenance You may wish to contract with SPX for regularly scheduled visits for the purpose of inspecting and reporting your tower s condition to make recommendations intended to prevent emergencies and to perform maintenance considered outside the norm This service is not intended to replace the important function performed by your maintenance staff Their attention assures the tower s routine operating performance and is invaluable However we recognize the unusual manner in which a cooling tower performs its function as well as the unique forces which act
39. or information or when ordering parts please mention tower serial number shown on the nameplate located on the access door Safety First The location and orientation of the cooling tower can affect the safety of those responsible for installing operating or maintaining the tower However since SPX Cooling Technologies does not determine the location or orientation of the tower we cannot be responsible for addressing those safety issues that are affected by the tower s location or orientation The following safety issues should be considered by those respon sible for designing the tower installation access to and from the fan deck access to and from maintenance access doors the possible need for ladders either portable or permanent to gain access to the fan deck or maintenance access doors the possible need for handrails around the fan deck the possible need for external access platforms potential access problems due to obstructions surrounding the tower lockout of mechanical equipment the possible need for safety cages around ladders the need to avoid exposing maintenance personnel to the poten tially unsafe environment inside the tower A Warning preparation Those are onlysome of the safety issues that may arise in the design process SPX stronglyrecommends thatyou consult a safety engineer to be sure that all safety considerations have been addressed Several options are available that m
40. orque on the motor bushings The motor and fan sheaves may have grooves that are not used The bottom surface of the motor and fan sheaves must be aligned within of each other and level within 14 in 12 in order to not adversely affect belt and sheave life Alignment can be achieved by placing a straight edge across the sheaves making sure that it is level and measuring down to the bottom surface of both sheaves at four points The belt is to be located in the lowest set of grooves FAN SHAFT THREADED ROD SHEAVE STRAIGHT EDGE Torque Bushing Fastener Size hae ft SH a 20 a 20 SD VY 20 SK e 18 SF 16 E 2 13 F Ae 12 65 88 23 A Warning A Warning 24 maintenance Schedule of Tower Maintenance Some maintenance procedures may require maintenance personnel to enter the tower Each cased face of the tower has a door for access to the interior of the tower The NC8401 and NC8402 have a 30 wide by 33 high door All other models have a 30 wide by 48 high door The optional fan deck ladder is designed and intended solely for personnel to gain access to the fan deck The fan deck ladder should not be used to enter or exit the access doors located on the cased face of the tower unless the optional access door platform is provided The purchaser or owner is responsible for providing a safe method for entering or exiting the access door Use of the fan deck
41. ped check for Geareducer oil leaks Check the Geareducer as well as any optional oil lines to external oil dipstick sight glass Inspect louvers drift eliminators and basin trash screens and remove any debris or scale which may have accumulated Replace any damaged or worn out components Use of high pressure water may damage the eliminator and louver material Observe operation of the float valve Depress the operating lever to make sure that the valve is operating freely Inspect the suction screen for plugging Remove any debris that may have accumulated Check for any buildup of silt on the floor of the cold water basin Mentally make note of the amount if any so future inspections will enable you to determine the rate at which it is forming Every 3 months If equipped lubricate fan shaft bearings While rotating equipment by hand grease the bearings until a bead forms around the seals Mobil SHC 460 grease is recommended Semi Annually If equipped check the belt tension and condition If equipped check Geareducer oil level Shut down the unit and allow 5 min utes for the oil level to stabilize Add oil if required Clean and disinfect cooling tower with biocides Systems with biofouling high general bacterial counts or positive cultures of legionella may require addi tional cleaning Refer to Cooling Tower Cleaning section of this manual Consult your water treatment expert as to prudent biological evaluation testing
42. s for open circuits Motor or fan drive stuck Disconnect motor from load and check motor and Geareducer for cause of problem Rotor defectve Look for broken bars or rings Unusual Motor Noise Motor running single phase Stop motor and attempt to start it Motor will not start if single phased Check wiring controls and motor Motor leads connected incorrectly Check motor connections against wiring diagram on motor Bad bearings Check lubrication Replace bad bearings Electrical unbalance Check voltages and currents of all three lines Correct if required Air gap not uniform Check and correct bracket fits or bearing Rotor unbalance Rebalance Cooling fan hitting end bell guard Reinstall or replace fan Motor Runs Hot Wrong voltage or unbalanced voltage Check voltage and current of all three lines against nameplate values Overload Check fan blade pitch See Fan Service Manual Check for drag in fan drive train as from damaged bearings Wrong motor RPM Check nameplate against power supply Check RPM of motor and gear ratio Bearings overgreased Remove grease reliefs Run motor up to speed to purge excessive grease Wrong lubricant in bearings Change to proper lubricant See motor manufacturer s instructions One phase open Stop motor and attempt to start it Motor will not start if single phased Check wiring controls and
43. verload of as much as 10 20 This is because of the increased density of unheated air flowing through the fan Deter mination of an accurate motor load should await the application of the design heat load A Warning Note installation Tower Start Up Among other sources outbreaks of Legionnaires Disease have reportedly been traced to cooling towers Maintenance and water treatment procedures that prevent amplification and dissemination of Legionella and other airborne bacteria should be formulated and implemented BEFORE systems are operated and continued regularly thereafter to avoid the risk of sickness or death Water System 1 New installations should be cleaned and treated with biocides by a water treatment expert before startup 2 Remove any and all accumulated debris from tower Pay particular atten tion to inside areas of cold water basin hot water basins louvers and drift eliminators Make sure that cold water outlet screens are clear and properly installed 3 Fill the water system to an approximate depth of 7 in the depressed area of the cold water basin at the center of the tower For models NC8407 through NC8414 fill the water system to an approximate depth of 8 This is the recommended operating water level Adjust the float valve so that it is 75 open at that level Continue filling the system until the water reaches a level approximately below the lip of the overflow If tower is equipped with a stan
44. versal of fan should only be done at half speed or less Reverse operation of the fan should be used sparingly and should only be used to control ice not to prevent it Reverse fan operation should not need to exceed 1 or 2 minutes Monitoring is required to determine the time required to melt accumulated ice Operating the fan in reverse at half speed for prolonged periods during subfreezing weather can cause severe damage to fans and fan cylinders Ice can accumulate inside fan cylinders at fan blade plane of rotation and fan blade tips will eventually strike this ring of ice damaging the fan blades or cylinder Ice can also accumulate on fan blades and be thrown off damaging fan cylinder or blades Allow a minimum of 10 minute delay between reverse operation and forward operation during subfreezing weather to permit ice to dissipate from fan blades and fan cylinders See Fan Drive Caution Note inthe Mechanical Equipment Installation section of this manual 4 With no heat load on the circulating water icing cannot be controlled effectively by air control during freezing weather Towers must not be operated with reduced water rate and or no heat load during freezing weather If the circulating water system cannot be shut down water returning from the process should be made to bypass the tower If a bypass is used all water must be bypassed without modulation If the water bypass is directly into the tower s cold water basin its design must
45. zing zinc coating still exists paint will not adhere to it readily Contact the manufacturer of the coating you intend to use for instructions Tower framework Check structural bolted connections and tighten as required Fans Check fan assembly bolting and tighten as required Use torque values prescribed in the Fan User Manual Fans shaft bearings If equipped lubricate fan shaft bearings at close of each operating season as described in the Maintenance section of this manual Electric motors Clean and lubricate motor at close of each operating season refer to motor manufacturer s recommendations Check motor anchor bolts and tighten as required 27 A Caution 28 maintenance Do not start motor before determining that there will be no interfer ence with free rotation of the fan drive The motor should be operated for three hours at least once a month This serves to dry out windings and re lubricate bearing surfaces refer to Marley Electric Motor User Manual Manual 92 1475 At start of new operating season make sure bearings are adequately lubricated before returning motor to service Prolonged Shutdown If shutdown period is longer than seasonal contact your Marley sales repre sentative for additional information SPX Cooling Technologies Services Our interest in your NC cooling tower does not end with the sale Having conceived designed and manufactured the most reliable and longest lasting c

Download Pdf Manuals

image

Related Search

Related Contents

the JFY Solar Dog User Manual  StorageTek Dual 8 Gb FC Dual GbE ExpressModule HBA de QLogic  Sony Ericsson TT4031 (SE-GM29) Network Card User Manual  Autronica Autroprime User guide  Progress Lighting P7008-30EBS Installation Guide  Using the Personal LCD Display  INFORMACIÓN IMPORTANTE Televisor LED de 42 pulg  DERMADEEPRF  

Copyright © All rights reserved.
Failed to retrieve file