1. s lt Stdev Latency ms 1 2 3 Sequence number within a burst Figure 27 74 Since sending one issue takes close to 20ms the whole burst should take nearly 60ms When the sending period goes below this the sender will just be sending new bursts one after the other without respite since it cannot maintain the desired period The total send times for 1000 issues at 20 50 and 100ms were 50 4 51 8 and 101 seconds although the theoretically correct values would have been 20 50 and 100 seconds respectively This indicates that the minimal sending period is around 50ms A burst has size 3 62kKB 186kB and 20 of these per second makes 3720kB per second Since we are using 100Mbps Ethernet it is clear that we did not run out of network bandwidth The limiting factor was the interrupt handling and issue processing The total send times also explain why the minimum maximum and standard deviation values were much lower with a period of 100ms at that rate the publisher was not running in a busy loop so there was no fierce contention over the CPU 7 3 7 3 Latency distribution The latency distribution in Figure 28 has been obtained by sorting the latencies and taking the averages in groups of 300 for the test with the 50ms period This supports the previous conclusions that the issues were sent and received at around the same rate i e there was a steady flow of them from publication to subscrip
2. mm da gt O c a l dst W 5th W 10th IstL 5thL 10th W L oO Max Topic and Node Figure 18 The most important observation that can be made from the chart above is that there were some surprisingly long maximum latencies on the Linux node Looking at the log we can see that the maximum occurs at issue number 4752 for each topic The following excerpt is for the first topic but all topics exhibited similar behaviour If network or clock synchronization problems would be the cause of this we could expect similar results on Windows We can conclude that the event receiver on Linux was not scheduled promptly at this point This is not because there was not enough processor Capacity because this test ran for several minutes publishing at the same rate and otherwise it performed decently We also see that although these components were now run at high priority minus 10 this does not guarantee good scheduling at all times Since the NDDS middleware operates in best effort mode it is hard to believe that it would be responsible for such anomalous behaviour We again make the conclusion that a RTOS with appropriate scheduling is required if the application has hard deadlines Segq 4752 Latency 66 787004ms Segq 4753 Latency 47 472954ms Segq 4754 Latency 40 187001ms Segq 4755 Latency 20 841956ms Seg 4756 Latency 3 614068ms Seq 4757 Latency 0 448942ms Seg 4758 Latency
3. Latency ms O N A DD CO Figure 32 82 8 3 1 5 Comparison of Windows and Linux The Windows node 45 and Linux node 92 both had signal receivers that only subscribed to the topics templ to temp100 Figure 33 shows a comparison of the latencies Receivers on nodes 45 and 92 O O Mean92 Max92 Mean45 Max45 10 eee EEEREN 0 1 13 25 37 49 61 73 85 97 Topics temp1 to temp100 O1 D gt NO Latency ms OO Figure 33 Although the Windows node had a 25 faster CPU and the Linux node had the extra task of publishing 100 issues for the current topics every 100ms we see that the mean values are better on Linux We conclude that Linux handles interrupts more promptly and with less operating system overhead Issue processing is also more efficient since the curve for the Windows machine has a Steeper slope However in this and many other charts we can see that the Linux nodes often get a much higher maximum value The main cause for high maximum values is the scheduler Although these basically run the prioritized round robin algorithm their behaviour is made unpredictable by modifications such as anti starvation and priority boosting mechanisms 8 3 1 6 Start up times The start up times are measured by taking the difference of 2 timestamps one stamp is taken before the subscriptions are created an
4. We have one signal generator on node 199 and receivers on nodes 199 45 and 72 Generator publishes 10000 issues for topic temp1 with period 20ms Total time is 200s All receivers have deadline of 40ms All components have 0 initial delay Receiver s log files have names L1_1_IP txt where IP is 199 45 or 72 7 2 2 2 Minimum maximum and mean latencies Figure 13 shows the minimum maximum and mean latencies for the receivers on each node Minimum maximum and mean latencies 8 000 6 000 4 000 2 000 0 000 Figure 13 Min max and mean We notice that when the sample size is 10000 a maximum of several ms is possible The maximums don t correlate with the speed of the processor or the network connection since the receiver on 199 is on the fastest machine and the data does not pass over the network However 199 is the only node which has both a signal generator and receiver so these two could have competed for processor resources Being of equal priority the generator could have prevented the receiver from getting the CPU immediately after an issue arrived The other values are better understood from the next chart 49 7 2 2 3 Minimum mean and standard deviation Figure 14 shows the minimum mean and stdev curves The data points on the latter are computed by adding the standard deviation to the mean What this means depends on the statistical distribution of the data In any case
5. known bug in the publisher LWang 2002 The Send will always return true If this problem is known to the developers it is possible to use other parts of the API to control reliable delivery Namely a publication listener should be registered This receives events when the queue gets full as well as when the number of issues exceeds a certain level These can be used to control the behaviour of the publications While this bug can be dealt with if it is known coding a workaround at this point would require redesigning the event generator starting from its architecture At this point in the project there is simply no time for this The schedule for the testing effort was already compressed when halfway through the project we were required to make Linux the main testing environment As far as the results here are concerned we can say that the bug has not affected any other tests than those where the cable was pulled out This can be seen from the logs there were no dropped issues This is because the queue size was long enough for the reliable delivery to do its job without running out of queue space However this test and test case 2 5 will not perform as expected Nevertheless in the next section we have the results for this test We believe that they do increase our insight of what is happening even though we could not confirm the expected outcome 7 3 4 3 Effect of pulling out the cable The main difference to the previous te
6. 7 1 2 Evaluating the Performance of the Middleware After presenting the results for the various test cases we would like to make some conclusions about how well the middleware performed Unfortunately it is not possible to answer this simply with some number aS we can do in measuring the top speed of a car or its fuel consumption over 100km The reason for this is that the test application middleware operating system network and computer hardware are all involved in the tests and it is not possible to observe the effect of any one of these alone Our goal in testing is to gain insight into the behaviour of each of these 5 vital elements of any distributed system Then we can make some conclusions about each of them individually and we can identify issues that should be taken into consideration by application developers Only then will it be possible to use the middleware to its best advantage and to satisfactorily deal with any possible limitations In order to gain this kind of insight we have prepared a variety of scenarios By comparing the results of different tests and remembering any differences in the test arrangements we can suggest an explanation as to why changing one thing in the arrangements produced different results For example we can have a generator and receiver component on one node and another identical receiver on another node By comparing the logs of the 2 receivers we can observe how much the network contributed to
7. application component using the Read method or then it receives data from a Listener object using ReadListener The listener is the interface to the middleware services The data that has been most recently read can be written using Write to one or more input ports If the receiver is not running in the same executable component the data is given to the middleware layer using a Sender object and the WriteSender method The container is also responsible for executing the application components As we mentioned in section 1 1 3 application components can form a hierarchy where a higher level component can encapsulate other components Suitable higher level components are selected as executable components and these correspond to the ApplicationComponent in the class diagram They are assigned to an ExecutionThread with the appropriate period This thread performs the I O and algorithm execution for all of these components at the required frequency Application a 0 InputPort ApplicationComp 1 Algorithm i eii OutputPort 0 a x MPRead Inputs aa MVeExecute Y BEE xecute 1 0 F Write Outputs 1 7 a 1 4 Container Execution PortConnector Gander 0 1 Thread i nr E period Bred 1 J4 Read MPRun ReadListener 1 a Listener SwriteSender 0
8. behavior Therefore continuous data distribution places the most stringent requirements on latency 13 and jitter However a slightly e g several ms longer latency is usually acceptable in order to minimize the jitter The delivery should be reliable but missing a delivery is typically better than delaying everything with retransmissions The actual transmission can be done cyclically or when the value changes significantly The latter is preferable if the data structures are large e g 100kB but this requires guaranteed delivery 2 2 2 Event Driven Data Distribution The event driven programming paradigm is a powerful approach for developing automation applications but it requires suitable communication mechanisms Data ports are wired as in continuous data distribution but the transmitted message is an event instead of some signal value An incoming event will trigger the execution of an algorithm that is associated with the input data port This algorithm will usually process some input data this might be carried by the event message or it might be wired to other input ports It is important that all of the input data is coherent e g from the same sweep of an earlier algorithm Whichever way the event driven data distribution mechanism is implemented it should guarantee the coherence of the data Since the execution of the application is controlled by events missing even one of them might have very serious consequence
9. has to wait The existence of other components that compete for the same resources explains why the standard deviations in the scalability test were so much worse than in the functional tests Effect of Load on Event Transmission m 4 7p 3 gt oO MeanS O 2 S 4 m StdevS s 0 O Stdev 1 2 2 o Mean Sequence number in burst Figure 35 8 3 2 3 Effect of Event Bursts on Cyclic Data Transmission In the previous section we looked at how the cyclic data transmission in the background affected the transmission of a burst of events Here we observe the effect of event bursts on cyclic data 85 transmission Figure 36 shows the mean and standard deviation for all topics in the signal receiver on node 45 Remember that the event receiver was on that same node In test case S 1 we had the same Signal receiver on node 45 with no events so we have also plotted the values for that as well MeanS 1 and StdevS 1 Effect of Event Bursts on Cyclic Data Mean AG Stdev 4 Means 1 2 ee otdevs 1 1 14 27_ 40 53 66 79 92 Topic number Figure 36 Again we see little difference in the mean values as this is presumably because the CPU load was not near 100 However the curves are less regular in this test case which is probably because the event and signal components sometimes had to compete for the CPU We can say that
10. s log should contain all messages for those topics that were subscribed to unless the producer dropped a subscriber Some of the first messages might be lost id the connection between the publisher and subscriber was not established before sending began If messages were not received in order this should be reported Components used Event generator and event receiver The generator should have a property burst level B an integer gt 1 This should be implemented so that the component sleeps for a time P where P is the period of the component and then sends a burst of B messages for each event that has been created without sleeping in between With B 1 we have a reliable cyclic signal generator Unless otherwise mentioned the sending and receiving buffers should have space for 5 messages If the sender s queue is full the send will block for one period P The table array in the data type has length O if we do not specify some other value 6 7 2 Reliable cyclic data transfer TC 2 1 Test case id 2 1 Purpose To test the mechanism with 1 generator and one receiver component We use burst level 1 so this will test the reliable delivery of cyclic data Method A generator is started with 10 publications with different topics A receiver is started with such subscription criteria that it will receive all 10 events The generator will send N event messages with a period P B 1 and then it shuts down The receiver will w
11. since an arbitrary number of filterable name value pairs can be used The events and alarms in an automation system can have many fields so that the value of each field is a leaf in a tree like hierarchy The only shortcoming of the structured event is the lack of support for multiple hierarchies 20 4 RTPS 4 1 Introduction The distinguishing characteristic of RTPS is that it provides a practical flexible and efficient publish subscribe communication mechanism Signals alarms notifications and events are identified with unique topic names such as pressure or temp in Figure 5 Every time that a producing component generates a new value for a topic it publishes an issue for that topic The RTPS middleware will then route the issues to all subscribers who have expressed their interest in the topic Publishing has been made as easy as possible A publication is created with a topic name and an object with a suitable data type is associated with it Optional QoS properties can also be specified A new issue is sent simply by calling the send method of the publication this will send the current value in the associated data object At the receiving end a subscription is created for the topic A listener class must also be defined since it will have the routine for processing the received issues Subscriber Subscriber RTPS middleware sends Bsues to the nades that want them Publisher Publisher Figure
12. subscriptions to the temp topics on 127 The highest mean is nearly 11lms and worst standard deviation over 3ms For most control algorithms a latency of 11ms would be acceptable as long as new signals arrive at a fixed rate The jitter of 3ms would probably not cause unstable behaviour from the part of a typical algorithm 8 3 1 4 Comparison of the receivers of the pressure topics The nodes 89 127 and 199 had subscriptions to all of the pressure topics In Figure 32 we have plotted the mean latencies for each topic e g at 56 we have the mean latency for the topic pressure56 which was nearly 4ms on node 199 Since issues are processed as they arrive we would expect that the curves for all of the receivers have the same shape Indeed they are all linear The slope of the curve depends on how slowly issues are processed Slow processing means that issues arriving later have to wait longer so the increase in latency the slope is greater Node 199 has the fastest processor while the CPU on 127 is slowest We observe that the curve for 127 is steepest and the curve for 199 is flattest as was to be expected Node 199 has a vastly superior processor so we might have expected an even greater contrast However the publisher component on 199 must have taken its share of the processing resources Mean latencies for pressure topics 127 199 89 1 12 23 34 45 56 67 78 89 100 Topic number
13. the distribution of values around the mean is not symmetric since latencies are gt Oms If we have a normal distribution 67 of the values are within one standard deviation from the mean Looking at the logs we observe that at least 90 of the points are within one standard deviation These two charts and the logs indicate that there are a few latencies that are much larger than the typical values We can only explain this by the action of the scheduler one of the numerous operating system threads is scheduled in such a way that the subscription is not notified immediately when the data arrives The behaviour of the scheduler and all of the system and user processes follows some intricate and complicated patterns that can hardly be modelled and predicted accurately at least since these are not RTOSes However these results support our belief that latencies cannot be accurately modelled by the same statistical tools as most phenomena We conclude that the application should be designed with firm deadlines i e the deadline should be met nearly always but a failure to do so occasionally will not cause serious damage If this is not acceptable a RTOS which provides guarantees about its scheduling is required Minimum mean and stdev man V gt S c od l Figure 14 Min mean and stdev 7 2 2 4 Other observations The following table shows how long it took after getting the sta
14. 1 Figure 9 Container class diagram To implement this solution the necessary objects must be created and their associations must be established as shown in Figure 9 Then the programmer must create an operating system thread for each ExecutionThread object and give it a suitable priority The application is started when these threads are forked into the Run methods of the appropriate ExecutionThread objects Run has an infinite loop and Figure 10 shows one iteration of the loop 27 Execution Thread ApplicationComponent Algorithm PortConnector ReadListener Write Readinputs gt gt Execute Execute WriteOutputs Read WriteSender Figure 10 One Iteration in ExecutionThread Run First for those PortConnectors that are associated to Listeners any new data from the middleware is read into the connectors buffers with ReadListener Then the buffers current values are written from the port connectors to the input ports Then the application components ReadInput is called which reads the data from the InputPort objects Now each component s Execute can be called and this in turn executes all of the associated algorithms using the recently obtained input data The output ports are then updated
15. 200 77 Current 100ms Figure 29 The basic scalability test configuration Figure 29 shows the basic configuration Next to each publishing node we have the name of the topics that are published as well as the sending period E g node 199 publishes topics templ temp2 temp100 so it will send a total of 100 issues 1 for each topic every 20ms An arrow from node A to node B indicates that B subscribes to all of the topics that B publishes For example 89 subscribes to 200 topics all the pressure and current topics Each signal generator will publish 1000 issues for each topic Clock synchronization components were run at real time priority on Windows and 15 on Linux 0 is default and 20 highest Other test components were run at high priority on Windows and 10 on Linux 78 8 3 Test Cases 8 3 1 Multirate cyclic transfer of measurement data TC S 1 8 3 1 1 Setup Test case id S 1 Purpose Here we test the performance and reliability of data transmission under a typical load data is transmitted cyclically and at several different frequencies In this test case we do not generate any peaks or other problem situations Method Exactly as described in 8 2 2 3 8 3 1 2 Approach In this test we had 300 topics and 1000 issues were published for each topic Each topic was subscribed to by at least one subscription Therefore we cannot present the data in much detail detailed analysis has been car
16. 3 880978ms Seg 4759 Latency 0 482082ms 60 We now plot the data without the maximums in Figure 19 in order to get a better look at the other Statistics Mean stdev and min w 3 E gt 2 z 1 Mean 0 m Stdev Ist W 5th W 10th istL 5thL 10thL g Min W Node and Topic Figure 19 It is clear that the problem explained above has affected the mean and standard deviation values for the subscriptions on the Linux node Only the minimums are unaffected by this and they are better for the Linux receiver since the receiver and generator were on the same node It is interesting to observe that the latencies increase quite linearly as the topic number increases We will offer an explanation in the next subsection 7 3 2 3 Latency distribution Figure 20 has a histogram for the first topic on the Windows receiver On the horizontal axis we have a range of latencies and the column height is the number of issues whose latency was in that range Since the mean for these was 0 66ms and standard deviation 0 1ms there is nothing surprising in the histogram The distribution is fairly regular What cannot be seen from the chart is that the last category gt 0 85ms has a size of 24 and that 13 issues had a latency of over 3ms 61 First topic on Windows 0 55 0 60 0 65 0 70 0 75 0 80 0 85 0 60 0 65 0 70 0 75 0 80 0 85 4 00 Latency range ms Figure 2
17. Finally PortConnector Read is called which reads the OutputPort objects If the output port was wired to a component in the same execution thread the appropriate input port will be updated in the next iteration by PortConnector Write Otherwise the data will be handed over to the middleware with WriteSender The iteration markers indicate that the operation is performed over a collection of objects Nested application components will be executed recursively until an algorithm of a basic application component is reached For components that are running in the same execution thread it is clear from the sequence diagram that all inputs will be from the same sweep of an algorithm For inputs that are received via Listeners we need some way to guarantee that all signals from the same application component will be from the same sweep of the algorithm This is only possible if the Listener knows what component created each signal The solution to this is naming the signals appropriately With NDDS we can add a code for the application component to the topic name If the notification service is used a filterable field can be added for this purpose Since the application components should correspond to some part of the 28 process that is being automated it is appropriate to use the component id in the names of the signals that they create Now we can create a Listener for each application component from which we want data The filter or pat
18. Having control topics that are used to notify publishers when to send is troublesome when there are thousands of publications and subscriptions so some support from the middleware would be useful 95 It seems that creating subscriptions whenever the application needs them and destroying them some time after they have not been needed would be the most practical solution It is desirable that the first issue would arrive within one second of creating the subscription If the number of topics is limited by grouping related signals into data structures this requirement might be met if powerful workstations are used in the control room 10 a oe a E e 10 ll 12 13 14 I3 16 17 18 19 96 References CDostoyevski 1988 Dostoyevski F Karamazovin veljekset Karisto 1988 LIDA 2001 IDA White Paper 18 4 2001 LMetso Metso Automation http www metsoautomation com 17 4 2003 LNTP NTP http www ntp org 28 5 2003 LOHJAAVA OHJAAVA The Application of Java and Internet technologies in a Component Based Control System http www vtt fi tuo projektit ohjaava 5 5 2003 LOHJAAVA 2 OHJAAVA 2 Modern Distribution Solutions in Open Control Systems http www automationit hut fi tutkimus documents Ohjaava eohjaava 2 htm 5 5 2003 LOHJAAVA 212 Tommila T OHJAAVA 212 Automaation uudet hajautusratkaisut ja hajautuksen vaatimukset OHJAAVA project s technical document unpublished 31 3 2003 LOHJAAVA 216 Sierla
19. Resource Broker on each node The IT industry has noticed that this approach is very helpful in a variety of application areas However the basic mechanism is unsuited for process automation for 3 reasons First of all automation applications are modeled by wiring function blocks in order to describe the data flows and the algorithms that process the data Switching to a UML based modeling method would require considerable retraining from the automation engineers We do not see any inherent limitation why object modeling could not be used as well as function blocks but suitable frameworks are needed for this industry These can only be developed by engineers with a solid understanding of object modeling as well as automation systems The second problem is efficiency When algorithms are executed periodically thousands of inputs and outputs must be read and written every second Using RMI for each of these is very time consuming Thirdly RMI will couple clients and servers tightly together limiting the flexibility that is desired from middleware The notification service specification LOMG 2002 is aimed at solving these problems It is a good attempt to implement communication mechanisms such as those described in section 2 with object 17 technology It is unlikely that automation engineers can ignore the advances in the IT field indefinitely indeed many of the most successful inventions such as higher level programming languages ha
20. The Methodology 1 5 1 The Nature of the Task The evaluation of middleware solutions is somewhat different from most software engineering tasks Typical methodologies are aimed at producing an application that satisfies the requirements of some user group Testing projects usually try to verify that an implementation conforms to a specification Here we are evaluating the suitability of existing middleware products given the communication requirements of process automation systems Therefore we do not systematically test whether NDDS satisfies the RTPS specification since RTI must have done that much more thoroughly than is possible within the timetable and goals of OHJAAVA 2 Rather our task is to design and implement a test environment which will exercise the middleware s capabilities in the same way as a real automation system would do Whatever methodology is chosen it must be adapted to the circumstances Before describing the chosen solution we point out the following circumstances Much of the work e g all the design implementation and running of the test components was done by one person so the methodology here should be lightweight The specification design and result documents are used to communicate the progress of the work to others The project already has some conventions about documentation These have in turn been derived from VTT s quality system Each task has a corresponding document and the proj
21. The third issue has again a larger issue than the second This behaviour is consistent throughout the log We believe that this is caused by having a receiver and generator component on the same node on both 72 and 92 since we have not observed this otherwise Whatever intricate pattern the scheduler uses to run the components and handle the interrupts will affect the latencies 7 3 4 Results of test case 2 3 7 3 4 1 Parameters We have an event generator on node 72 and receivers on nodes 45 and 72 Burst level 3 is used Generator publishes 5000 bursts each containing 3 issues for topics in elistl txt with period 20ms Total time is 100s Both subscribers use this pattern Wk PK PM Receiver s log files have names L2_3_IP txt where IP is 45 or 72 Publisher s log file is PL2_3 txt 66 7 3 4 2 Difficulties In this test case we had a situation where issues were lost so the reliability mechanism should have handled the necessary retransmissions In the code we check the return value of the publisher object s Send method If this is false the issue could not be sent because the send queue was full Therefore the application will keep retrying with the same issue in order to achieve successful delivery However the logs for this test showed that issues were lost even by the local subscription although the publisher had never returned false I asked RTI for an explanation and they admitted that there is a
22. a few event bursts 3 events for 10 topics every 20ms do not significantly impair the cyclic data distribution 8 3 3 Fast rate control TC S 3 8 3 3 1 Setup Test case id S 3 Purpose There might be some control loop or other process that needs to communicate faster than the 20ms cycle in S 1 In the functional tests we have observed that it certainly is possible to go below 20ms but we had a light system load Here we have the same arrangements as in S 1 but we also include a signal that is transmitted at a clearly faster rate Method We add the following components to the basic setup A second signal generator on node 72 publishes topic levell at a rate of 3ms 25000 issues are sent A second signal receiver on 45 subscribes to this topic with a deadline 6ms Its log file is LS3_fast txt 86 8 3 3 2 Results for the fast rate publication Looking at these results it must be remembered that the total send time for temp topics was 20s for pressure topics 50s and for current topics 100s Since the node that published levell had a resolution of 1ms the sending period was close to 4ms and the total send time was close to 100s Sending 5000 issues every 4ms takes around 20s and the latencies for later issues of levell drop significantly after this as can be seen from Figure 37 This is the time when the subscriptions to the 100 temp topics get their last issues It is clear that the vol
23. all of the connections are made by calling the member functions of appropriate objects It might be useful to define port and port connector classes Whatever technique is used to establish the connections the division of objects among a container and application components is conceptually meaningful The application objects manage the algorithms and data flows that control the process Higher level application components can encapsulate other components so that every high level component is responsible for managing some part of the process From these executable components can be created The container objects are responsible for executing these application components using a thread with an appropriate cycle time and priority The container also provides communication objects that are used by the application to access the services of the middleware Typically the middleware will provide class libraries from which the appropriate communication objects can be created These libraries might be linked to the application so the container and application objects would be running in the context of the same process The container objects are in turn responsible for accessing the middleware which might have its own objects for handling UDP TCP traffic All of these details are encapsulated by the communication objects in the container In the sections about RTPS and CORBA we will elaborate on how well this architecture can be implemented with existing tec
24. data structure because this will lead to maintenance problems It might not even be desirable to try to provide this functionality in middleware since other design goals might be compromised An application level solution that utilizes appropriate subscription mechanisms and reliable delivery could be the most natural approach In chapter 5 we proposed the container design pattern for this purpose 2 The event subscription mechanisms could be more versatile and we have discussed this in the section for the event notification and acknowledgement services 4 3 3 3 Notifications must be acknowledged at the application level There are many acknowledgement models that should be supported such as one some or all of the receivers of an alarm or notification must send an acknowledgement No middleware standard that we have studied supports this and it might well be the natural solution to build this functionality into system components that manage alarms 9 2 2 QoS Control There is a great volume of traffic in an automation system but there are significant variations in the requirements for latency and determinism Ultimately achieving good performance is neither a matter of minimizing latencies or maximizing throughput but of making sure that the right data arrives at the 94 right destination at the right time It should therefore be possible to prioritize the time critical data This does not only mean that the middleware should
25. different backgrounds they also assume somewhat different ways of modeling the application If developers use middleware that does not support their model the implementers might be forced to break their paradigm This is always error prone and will complicate issues in later phases of the lifecycle If appropriate middleware is available it will be easy to build the components and define their interactions and real time behavior with the implementation level communication mechanisms Modifications and reconfiguration It is not uncommon that an application must be modified to satisfy newly discovered requirements In the case of process automation applications a successful vendor will sell the same components to many customers However this requires much tailoring in each case and modifying either the interface or implementation of existing components is never easy A good automation system will encapsulate all technical details so application components can be modified or moved with no or minimal reconfiguration work Any communication links are based on logical names so the application structure is decoupled from technical details Because of this decoupling it is possible to move existing components to different locations without making modifications Further since communications are defined in terms of process related names the same components can be configured for a different process by supplying the appropriate names as parameters H
26. following subscription pattern mixing unexpected temp This will request all unexpected temperature related events from the mixing process We will also create subscribers so that each subscriber will request some subset of the sources events Method The producer is initialised with a file containing the topic names It will then send bursts of event messages issues at regular intervals for each topic The messages will have sequence numbers from 1 N Consumers will subscribe to a subset of the events and they will check the sequence numbers of the received messages The logs will only list summary data for the latencies If some sequence number was not received or if it came out of order an error statement will be logged If the producer has problems sending its buffers because the old data is not acknowledged soon enough some statement will be recorded in the producer s log If the buffer is full the send should block for one sending period If no space becomes available in the queue during this time the problem should be logged and the same issue sent again If the producer detects that one subscriber is down it Should log this as well The sender may only discard unacknowledged messages after detecting that the subscriber in question is down Otherwise it should keep trying to send the same message again and again 40 Expected outcome The log files of the producer and subscribers should be compared The subscriber
27. in elistl txt with period 20ms Receiver on 45 subscribes to topics with pattern 84 Queue lengths are 5 and table size is 0 All publication s have sendMaxWait 20s i e how long to block the send call if the send queue is full This should prevent sends from failing The reasons for this approach are explained in section 7 3 4 2 of LSierla 2003 B Receiver s log is named LS2_Event txt 8 3 2 2 Effect of Load on Event Transmission This test case is similar to 2 2 The differences are that the system is under a greater load from all of the cyclic data transfer Also the subscription pattern in this case matches all 10 published events while the receiver on 45 for test case 2 2 subscribed to only half of these Since we sent bursts of 3 we again show statistics for the sequence number modulo burst size i e the modulo remainder for the first issue of a burst is 1 and the modulo for the last issue in a burst is 3 Figure 35 shows the mean and standard deviations for the first topic received in the functional test case 2 2 The corresponding statistics for the first topic received in this scalability test MeanS and StdevS are also plotted The means are nearly the same This should be so since the CPU load is far from 100 problems arise when issues are sent by the signal and event generators on node 72 at nearly the same time Or when the signal and event receivers on node 45 both get issues one of them
28. involves the control algorithms for the instruments in that particular process and the data flows between application components The automation system is responsible for executing the application and using the middleware services to establish the communication paths Therefore one version of the automation system can be used in several deliveries of automation applications The application components and large parts of applications are also reused in later projects whenever possible We now describe the role of middleware in some key phases of the lifecycle Only the automation system directly uses middleware services However the demands of the application s lifecycle place requirements on the automation system and it should try to meet these by making good use of the middleware The following phases belong to the application i e a client project We describe the ideal scenario where developers do not encounter technical details and complications This is possible if the automation system provides appropriate services and the system will in turn rely on the middleware to implement these 11 Specification The specification of the application s functionality should be done in terms of design level communication mechanisms Quality of Service QoS requirements are also listed The assumption here is that the automation system will provide corresponding mechanisms These in turn rely on the implementation level mechanism of the middleware
29. is more important than reliability Best effort delivery However there are some situations in which reliable in order delivery of cyclic data is required so we will have a separate test for that in suite 2 where a reliable mechanism is tested Content The value that is sent is not important since process dynamics are not simulated In these tests we send a double timestamp and integer sequence number In suite 2 we will have a test case with a larger amount of data in a single message In general most messages only have a few bytes of data but there might be a need for sending data structures of up to 200KB Communicating parties There can be one or more subscriptions the publication should not need to know how many there are or where they are located If redundancy is desired there can be several publications for the same topic Communication mechanism We use ordinary publish subscribe Performance The main performance issue is the rate at which the data is transmitted For the subscription we will also specify the deadline from the arrival of the previous issue Each subscription will measure the latency of every issue that was received The strictest performance requirements for this mechanism come from process control Measurement and control signals have to be transmitted frequently Cycle times between 5 and 1000ms are common in process automation systems Determinism is also important since jitter will affe
30. latency and jitter 7 1 3 Understanding the Load Finally in order to accurately evaluate performance we need an understanding of the total load on the system We use a switched Ethernet and run no other applications so there is no significant amount of background traffic However it should be remembered that each node synchronizes its clock by sending and receiving 3 UDP packets containing a double timestamp every 200ms Also the application does some processing in taking timestamps and storing results in main memory Very roughly we have observed a 20 30 performance improvement when we stripped all of this away 47 7 1 4 Using Timestamps to measure Latencies We take the sending timestamp just at the last point before the data is given to the middleware on a per issue basis and not before calling the publisher send We take the receiving timestamp as soon as the issue processing routine is invoked 7 1 5 Bugs In general the NDDS middleware kept its promises of providing a convenient and portable data distribution service for an application with components running on different platforms We only discovered 2 bugs in these tests and neither of them will cause significant problems to a developer who is aware of them Section 7 2 3 4 describes some spurious deadline alerts that were received by subscriptions on Windows nodes even though the deadline had not yet expired I also provide a suggestion on how to filter out these
31. of the application components and the architecture of the middleware services We emphasize the communication requirements and will develop tests for these The focus of this thesis is on testing so these requirements are summarized briefly LPeltola 2003 more detailed information is available in LOHJAAVA 212 1 2 1 The Role of Middleware over the Lifecycle The benefits that middleware vendors typically claim for their products usually cover many phases of the lifecycle Indeed in order to reap these benefits the deliverables of one phase should be the expected inputs of the next one Otherwise if conceptual and structural changes are needed the original design principles will be violated and the benefit of quick development cycles will be lost For example it should be possible to implement the design phase entities and communication links in a straightforward way or with automatic code generation The programmer should not be engaged in coding workarounds for technical obstacles and neither should he need to adapt the design according to the constraints of his tools It should be possible to define an architecture that can be modified or extended later without compromising the original design principles or tampering with the implementation of existing components We must distinguish between the lifecycles of automation systems and automation applications With the latter we mean the result of a project that solves a client s problem This
32. of the middleware product Tests will be modelled after the various kinds of communication cases that are found in process automation A communication case involves the transfer of data for a specific purpose such as the continuous transfer of measurement data or the ordering some kind of a report The requirements imposed on the communication mechanism can therefore vary quite a lot among the different communication cases so each case will test some set of features of the middleware Detailed examples communication cases will be found at the end of section 6 The structure of the testing application is a collection of components that generate or receive the data that is exchanged in the various communication cases In this section we describe some components that are found in most automation systems but we are only concerned with their communicational behaviour Control room Signal generator Signal receiver Alarm Alarm receiver generator Application Oar p F Figure 11 An example communication case scenario Figure 11 shows an example scenario where a few of the components in this section are communicating Since we want to test the functionality of the middleware we are interested in the data that is transferred between the components and not process dynamics A unidirectional arrow would imply a one way communication mechanism such as publish subscribe The following is a list
33. one subscription can be used to connect to many event sources a local event triggers sending a message to listeners every incoming message must be treated as an individual the data structure is an event message source timestamp priority etc it must be possible to acknowledge the messages at the application level compare to OPC Alarms amp Events Figure 3 The key communication mechanisms LOHJAAVA 212 2 2 1 Continuous Data Distribution This mechanism is familiar to anyone who has programmed PLCs using function blocks or designed IC circuits A connection is made between the output and input ports of two blocks by wiring them The signal value on both ends of the wire should always be the same When computer technology is used an illusion of wiring is created by having the producer transmit a fresh data value frequently The required frequency depends on the dynamics of the process and the shortest cycles in modern systems are usually around 5 10ms However in automation systems there are many tasks whose period is hundreds of ms several seconds or even minutes In the basic case the wire is connected to one receiver but the continuous data distribution mechanism should be able to handle any number of receivers This mechanism is typically used for the real time control of a process The control algorithms have been designed to operate with a certain period so the untimely delivery of data can result in unstable
34. parameter of a controller This kind of a mechanism is easier to implement because of its simplicity and the looser real time requirements Reliability is desirable though The name or location of the service might not be known at compile time so some of the server components might advertise their interface in some naming or directory service The reply might be asynchronous so a callback routine is invoked when the reply is received Remote read write is a simpler version of request reply since no other functionality is performed beyond writing or reading a parameter The designers might make the assumption that the operation is always successful In the future an exception handling mechanism should be required and many implementations of request reply e g CORBA already provide this Message oriented communication decouples senders and receivers Messages are sent to a mailbox or channel so the sender does not need to know anything about the receivers Receivers will in turn retrieve the messages from a channel or they will filter them with some criteria 2 3 The Structure of the Middleware Services There are two common middleware architectures peer to peer and centralized In the centralized architecture a server keeps track of all the communication links and routes the data and messages to the correct receivers This approach is neither scalable nor efficient because the server will easily become a bottleneck and there is no dir
35. product Therefore the specifications should already use constructs that the automation system provides and the system should in turn provide constructs that application designers need Design The design of the application should correspond to the structure of the process that is being automated LIDA 2001 The application will then be built from components that correspond to certain parts of the process The communication among components should therefore be based on names that correspond to entities in the process such as measurements and control signals Interaction among components is defined solely by these names using some of the design level mechanisms The automation system can easily provide such services if the underlying middleware supports a similar naming model Implementation Implementing an application is easy after it has been designed with the appropriate tools The automation system s components are used to execute the application and establish the communication paths The usefulness of a middleware product is really tested when the time comes to implement a version of the automation system Some vendors even provide tools with automatic code generation for this purpose The cherished design level concepts must be implemented in software e g with components and objects This should be straightforward if the design has been specified with concepts that the middleware supports However since middleware standards have
36. repeatable Every event message should be transferred reliably and with reasonably low latency to all interested parties The middleware should guarantee that all events are delivered A special case of the event transfer is when the events are generated at fixed intervals This will be used to test reliable cyclic transfer of data With acknowledgement services we do not mean protocol level acknowledgements but those that are generated by a human operator Since NDDS has no special functionality to handle this we will not give acknowledgement services any further consideration here Content The data type is a structure with the following fields double timestamp int sequence number and char array table The latter is a variable length array that can be used to adjust the size of the data Typical alarm messages might have a number of other data fields attached to them but their size is usually under 1KB Some are only a few bytes Communicating parties There can be any number of subscribers each with their unique pattern for subscribing to event topics the publications should not need to know how many there are or where they are located Communication mechanism A mechanism that is optimised for reliability rather than very low latency Delivery should be guaranteed and in order The reliable publish subscribe mechanism will be used since it claims to satisfy these requirements Performance Events are not generate
37. so the resulting timestamps will all be synchronized according to the master timer Latencies can then be computed simply as the difference of two timestamps If the latencies for the request and response messages are equal there will be no error Otherwise the round trip times RTT can be used to calculate an upper bound for the error If the synchronization procedure is repeated thousands of times we presume that the error for the minimum RTT is close to O for our purposes In the worst case when the latency for one direction is RTT 2 and we have the most asymmetric scenario the difference between the timestamp B1 and the average of Al and A2 i e the error is RTT RTT 2 We can say that errors in the latencies that we report are typically on the order of 0 1ms and nearly always under 0 2ms However under peak load some errors might have approached lms Although this is not ideal for a general purpose evaluation of the middleware the accuracy is very satisfactory considering the performance requirements of process automation systems We must also account for clocks drift which can be several ms over 10s between two of our nodes Therefore taking averages of many values will easily cause our offset to lag behind the real value We eventually decided to perform the synchronization procedure 3 times every 200ms and took the offset 34 with the smallest error i e the smallest RTT If none of the 3 offsets were satisfactory
38. take some time after the cable has been plugged in Therefore we should connect the generator node to one hub switch and the receiver node that will be unplugged to another so that the two hubs are linked by a cable Pulling out this cable should not cause any computer to disconnect its network interface If this can not be done e g due to lack of resources the arrangements should be documented Expected outcome After the subscriber computer has been disconnected the middleware should use the heartbeat mechanism to detect that a subscription is down Depending on the parameters to this mechanism this will take some time T During this time the sender s queue will fill up and after that new messages cannot be sent The connected subscriber will not receive data after the send queue is full After the time T has passed the sender s queue can be emptied and the connected subscriber will get messages so that it will not miss any of them The disconnected subscriber should start getting messages after it has been plugged back in We can measure with a wrist watch the time for which the subscriber was disconnected Since we know P and B we can calculate approximately how many messages were sent during this time The disconnected subscriber should not have missed much more than these 6 7 5 Increasing the burst level TC 2 4 Test case id 2 4 Purpose In the previous tests B lt 3 Since the send and receive queues have had space
39. the network so this should go at a low priority in order to avoid delaying more time critical data The clients of the file server will usually be system components responsible for running the application components and retrieving their configuration files Signal receiver This component expects to receive a signal with a certain data type The receiver might expect values to arrive at a fixed rate or before some deadline has expired Alarm receiver This component has subscribed to certain alarms for example all of the alarms from some machine whose priorities exceed a certain value A certain kind of data structure containing the alarm and the accompanying data is expected The receiver might send an acknowledgement back to the source of the alarm Database component This component works in conjunction with alarm and signal receivers to store great volumes of process data It also accepts all kinds of requests such as the values of a signal during some time period or all of the alarms with certain properties Process controller This component manages the parameters for a process controller consisting of parts such as PID blocks which can be read or modified by other components e g the control room Control room This component handles all kinds of functions that are required from control room software such as displaying process signals and alarms ordering reports and querying and setting controller parameters The con
40. thesis He will then be in a good position to judge whether or not it will be profitable to proceed to the testing sections Seppo Sierla Espoo 22 5 2003 III Contents POL EW ONC ranen i vars cas E EEE E AE E E Ea IT COMENTS cernir na EE asec Yetten late au occ T E O O AE E NE ORE IT Terms ANG ADDY CVI AIO INS ceirean oa EEE A EEEE E VI 1 PEROG UCU O Mises e EE le catsanres areca a E win decncatecic dels AT ye 1 1 1 Background and StartihNo PON ersaoa NEEN e 1 kkr The Architectore oi at 5 Moe IN OGG a2 a a a a aaae aa ai 1 LL2 The Pu blish S0bscribe Mode lisiero ee a E E T 2 1 1 3 The Container and Application Components sssesesesesessessssseseseesesssesesessesesesesesees 3 LA eS Yo 516 NG 19 kee rename oe ar eee el eS RCN eC ear eRe rom N ee 3 1 2 GO AG E A D IE AE E S eran A mee elt eect otal ea at AE E teat earn T 4 1 2 1 iWhevGoals OF OHJAAVA 2 seieren eire a nE EO EEEE EA Rari ie o aiid siant 4 t22 TheGod othe TNES ourer eia on E EE E E R A 4 1 3 OCODE aaea aaa aaa a a a aa a a a a i dhs 5 1 4 MRICS UCU CLUE OT tE TNES sics eie E E E EE 5 1 5 Tae Methodology zarea A A E TNN 6 BSa MANAURE O ee TA Ksa e toneeceeneancee 6 L52 The Work OWS siiri ta casa E ou euaieued eal elanesa helen aren E eerie A en Goatees 6 LSS The MnD Ore ASKS cctactesec teh tins he thal cae ces tees Rel ah ae eee aa 8 2 Analysis of Communication Requirements ccccccesccssccssccssccsscescceesccesccesccesceesceesceesess
41. to gain a comprehensive understanding of what kind of performance can be expected we will need to look at all of the topics being published This will give us an idea of the average best and worst case performance 79 Figure 30 illustrates the statistics for all of the topics that were subscribed to on node 199 Receivers on node 199 o_ 2 10 A Min o 6 Mean 4 Max pm ae oo a _ __ Stdev 0 1 24 47 70 93 116 139 162 185 Topics Figure 30 There were 200 subscriptions one for every pressure and temp topic For each topic we have plotted the mean minimum and maximum latencies as well as the standard deviations The plot should therefore be discrete but with 200 topics the individual points could not be properly distinguished We are using a continuous plot for the sake of clarity From the logs we can see that all of the pressure topics come first followed by the temp topics so that value 47 on the horizontal axis corresponds to topic pressure47 and 139 to the topic temp39 Notice the very linear increase in latencies for the topics that were grouped under one publisher We have observed and analysed this behaviour in test suite 2 Briefly this is because the issues are sent in the order that the topics were added to the publisher and the receiver s processing capacity is the bottleneck Incoming issues will have to wait for the r
42. txt with period 20ms Total time is 200s Generator on 92 publishes 2000 bursts for topics in elist2 txt with period 100ms Total time is 200s The first subscriber on 45 uses this pattern cooling The second subscriber on 72 7 oressure The third subscriber on 92 a al Aa al ts Receiver s log files have names L2_2_IP txt where IP is 92 or 72 Publisher s log file is PL2_2_IP txt 7 3 3 2 Understanding the effect of bursts In all previous tests we have sent one issue for each topic at regular intervals Now we are sending 3 issues for each topic without pausing in between The following charts show statistics based on dividing the sequence number by the burst size and taking the remainder modulo division If the modulo is 0 the issue was the first in a burst if the modulo is one the issue was the second of a burst and if the modulo is 2 we have an issue that was sent last in a burst Figure 22 shows the latencies for the first topic on the Windows receiver This is the 6 topic sent by the generator Presenting the data in this way reveals a very linear pattern the later issues in a burst have to wait before the first ones are processed From the slope of the curve we notice that the delay for processing each new issue was around 0 5ms in this case 64 First Topic on Windows T 2 E 1 5 e Mean a 1 _s Stdev S 0 5 a Stdev O 1 2 3 Seque
43. 0 The latency distribution in Figure 21 has been derived from the latencies of all 10000 issues after they were sorted in ascending order The first column has the mean of the 1000 smallest latencies the second has the mean for the next 1000 and the last has the mean for the 1000 longest latencies We have displayed values for the 1 5 and 10 topics on the Windows receiver We see that the distribution is very even Even the column that shows the mean of the final 10 is less than 0 3ms greater than the mean This illustrates an observation that is also made by reading through the logs there are a few rare latencies that are much greater than the mean Since these are scattered around the logs and the processor load is very much constant during the tests we attribute these peaks to undeterministic scheduling 62 Latency distribution on Windows 25 E 2 PEPE EE DE o st Topic 415 ETETETT n 5 W e 05 m 10th Topic seai l COR CO o al al dl all 1 2 3 4 5 6 7 8910 Thousands of issues Figure 21 We can clearly see a pattern that we pointed out in the previous chart the latencies increase linearly as the topic number increases We can explain this by observing that the middleware sends issues for the topics in the order that they were read in from the topic name file I e when the publisher s send method is invoked it first send an issue for the publication for topic o
44. 10 2 1 The Role of Middleware over the Lifecycle wo cc cececseececscesecesescnsesecesceseseseseeseseseees 10 2 2 The Communication Mechanishis susipeus raa E E T EATE 12 Zad SC OMUMNUOUS Data DIStriDUONesiessrne on EGEE 12 Zeda SEVEN Driven Data Distr iIDUtION censu e a a oE 13 2 2 3 Event Notification and Acknowledgement Services cccccecscecscscecscecscecscsesceeeeees 13 222A OME INC CHAMISITS x tse4 cuss catch a E EEE E E E ESS 14 2 3 The Structure of the Middleware Services censsesssereseeseeseeseeseresrossrerseseeseresessreresres sers 14 2 CORBA NOUNCIUON SERVICE iedit ei e ied aeo a ea ais 16 3 1 A OdUCE Oeon a E T A ae eamcmee ita 16 3 2 The Notification Service Architecture urnen ona esa a A 17 3 3 TRE COmMmmunmcatiom Mechans esra a a N 18 3d JE ONTAUOUS Gata OISEMIOULIOM essi n a a T a ES 18 Sore EENDEN DAAD AOU ON esaeen a E 18 3 3 3 Event Notification and Acknowledgement Services ccc cececscscscscsccccscscscscscececeees 19 4 RTPS ceee A E REEN EE cancion E tate 20 4 1 IIEPOCUICTION essre aee a a a a Aa 20 4 2 AEE E e a E E a EA AE 20 IV 4 3 THe Communication WICCH AMISH cdsscecsauteetcthcse dbo dnisctelaclssasedeasineuescoseiedednoeiceseosestiecoeees 22 Aad Continuous Data DIStMOULIO iseasi iaeia E e E bat sens A tne veaie 22 Aor Event Driven Data DiStHADUNO Nsara a a E E 23 4 3 3 Event Notification and Acknowledgement Services cccececececscscscscscscscscscscecceces 24 ABA H
45. 5 The publish subscribe principle LRTI 2002 4 2 Architecture RTPS is a protocol specification so it leaves implementers a certain amount of freedom as far as the architecture is concerned LWang 2002 In these cases we describe NDDS the only implementation ZA RTPS uses a pure peer to peer architecture each node has a manager that keeps track of the topics that are published and subscribed to on the different nodes The managers communicate with each other in order to keep this information up to date as publications and subscriptions appear and disappear The manager is run in its own process and it communicates its knowledge to all of the NDDS components that are running on that node Linked into these is all of the functionality needed to send and receive issues with UDP Wang 2002 RTPS has been designed to coexist with other standard Internet technology LIDA 20011 Its purpose is to provide high level communication mechanisms for real time traffic Figure 6 shows the place that RTPS occupies in the OSI model HTTP FTP SNMP and other protocols can be used for the tasks that they are well suited for An API provides access to the communication objects such as publications subscriptions listeners and QoS property objects Application Ethernet Figure 6 The IDA architecture LIDA 2001 The RTPS architecture is similar to our model in section 1 1 The communication objects correspond to the listener and sender in the conta
46. 859300ms Segq 2245 Latency 0 795510ms Seg 2246 Latency 2 074873ms Segq 2247 Latency 3 267846ms The following lines are from the log on 72 for the same topic Seg 946 Latency 1 453042ms Seg 947 Latency 3 772020ms Seg 948 Latency 6 101012ms Seg 949 Latency 43 009996ms Seq Seq Seq Seq Seq Seq Seq Seq Segr Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq Seq 950 Latency 951 missed 961 missed 962 9037 964 969 9067 967 960 VLG Ly LIS2y TLO G7 LEO ay LO D5 DEO Oy K Latency Latency Latency Latency Latency Latency Latency Latency Latency Latency Latency Latency Latency Latency 1188 missed LLOG 11903 LESE LEZ 5 Los LESA LAOS FESO LES AET Lie 4 ZO Oy LASO Aao ly L205 LLO95 ZL 22415 Latency Latency Latency Latency Latency Latency Latency Latency Latency Latency Latency Latency Latency Latency Latency Latency Latency Latency 52 541I018ms W e NY WD O W A 223943ms A Rc rope sore itis O051017ms 280065ms 546067ms 408062ms 823042ms 3 816009ms 6 189942ms 44 47 eF JoJ OMS 39 Fl 22 186950ms 713041ms 623915ms 551020ms IOVIZZMsS ZO 34 20 3U 43 27 29 Zs 756048ms 646
47. 988ms 845098ms 179024ms 353081ms 096987ms 036045ms 978063ms 1 487970ms 3 826022ms 6417 O44 Jin ow LOs 18 749957ms 118050ms 463969ms 6 226063ms 5 55S0Z5ms Del 216998ms Seg 2242 Latency 1046875188487 042480ms Seq 2243 Latency 1046875188484 765381ms Seg 2244 Latency 1046875188478 174438ms Segt e 2245 Latency 8 507967ms Segq 2246 Latency 10 813951ms Segt 2247 Latency 13 261080ms Seg 2248 Latency 2 462029ms Segq 2249 Latency 7 305026ms Seg 2250 Latency 9 616971ms Segs 22517 Latency 2 386954me Missed seq Missed seg CO N O Missed seq Missed seq 9 Missed seq 10 Missed seq 11 Missed seg 12 Missed seg 13 Missed seg 14 Missed seg 15 Missed seg 16 Missed seq 951 Missed seq 952 Missed seq 953 Missed seq 954 Missed seq 955 Missed seq 956 Missed seq 957 Missed seq 958 Missed seq 959 Missed seq 960 Missed seq 961 Missed seq 1188 Missed seq 1248 Missed segq 1305 Missed segq 1359 Missed seq 1530 Missed seq 1584 70 Missed seq 1752 Missed seq 1803 Missed seq 1860 Missed seq 1917 Missed seq 1971 Missed seq 2022 Missed seq 2079 Missed seq 2187 We see some strange behaviour in both logs The receiver on 45 has missed issues 946 2235 because the network connection was broken at this time However both receivers also missed issues 6 16 which shouldn t happe
48. Helsinki University of Technology Information and Computer Systems in Automation Espoo 2003 Report 9 MIDDLEWARE SOLUTIONS FOR AUTOMATION APPLICATIONS CASE RTPS Seppo Sierla TEKNILLINEN KORKEAKOULU TEKNISKA HOGSKOLAN HELSINKI UNIVERSITY OF TECHNOLOGY TECHNISCHE UNIVERSITAT HELSINKI UNIVERSITE DE TECHNOLOGIE D HELSINKI Helsinki University of Technology Information and Computer Systems in Automation Espoo 2003 Report 9 MIDDLEWARE SOLUTIONS FOR AUTOMATION APPLICATIONS CASE RTPS Seppo Sierla Abstract This thesis has been written as a part of a research project whose goal is to define the architecture and communication requirements of next generation process automation systems We focus on defining appropriate communication mechanisms for components that communicate with each other using Ethernet The theoretical part starts by summarizing the communication requirements that have been defined in the research project QHJAAVA 2 Two middleware standards the CORBA Notification Service and RTPS are then described and their usefulness for our purposes is evaluated The practical part contains a description of a testing environment for evaluating a RTPS implementation The test cases are based on communication scenarios that are typically encountered in process automation systems The results are then presented and the impact of all relevant factors is analyzed We conclude that the NDDS implementat
49. N2 lt N3 lt N There is one ordinary subscription Expected outcome The two publications might not start at the same time so we cannot expect the subscription to get issues with sequence numbers always increasing by one Rather we are interested in whether deadlines were missed and if the highest sequence number that was received was N Components used The signal generator should also have a strength parameter 38 6 Event Notification and Acknowledgement Services TS 2 Test Suite id 2 Requirements to be tested Two application level communication mechanisms are commonly associated with alarms and events event driven data distribution and event notification and acknowledgement services We have described these in section 2 Both of these will be implemented with the reliable publish subscribe mechanism so we will only test one of them We have chosen the latter because we want to test NDDS s ability to handle filter based subscriptions No new functionality would be tested if we would design a suite for event driven data distribution A filter subscription is made by requesting all of the notification messages that satisfy the filtering criteria Therefore the name or header of the messages will have to have some filterable fields We describe the scheme that is used in these tests in the basic flow The event messages are generated in bursts The interval between bursts is fixed for each event generator so the tests are
50. REQUCSU REDI aiT a e E a eda hic oe dee ae seks 24 THE Container Design ALLC HM cicscsssien cutter neapiealus TAEAE E EAER 25 Sd CO iaa AEE T 25 5 2 TAE SOW O Biase sina stats Si aE sale Uae AT EEE a E E A A 25 5 3 penei and CONSAN sira a a E T E EE EO 28 TestArrandeme Ni Sienen aan aa a a a T 30 6 1 IFT OCG HNO oree a te ttn Sac create caesasrute ose ace cco minn cana aetatae 30 6 2 FOGG AEE eri seattle les Seaside eh etal oie Secale E O tend ax chien Stele tae tia cote ied cae 30 6 3 PRP IIE ATION SLUCI oraeson halts auaucouslonachtedebdtedooatssnleoness dausoevatseoenbilodoocsieseuacssdauseons 31 6 4 Clock Synchronization E acusanets cde tis somancsieguedact cased evesuelameseets 33 6 5 SUPUCTURE Of TING HOSTS ceictid cnt ncecaresl deat E ceatesld cues colesans eats EA 34 6 6 Continous Data DIstmOutien Ch Sey ccchetccdee i Sat e e aed e E A 34 6 6 1 Basic flow with one subscription and one Publication cece eececeseeceseeceseseeseees 36 6 6 2 Basic situation with one publication and many subscriptions TC 1 1 wo eee 36 6 6 3 Starting a new subscription when the test is running TC 1 2 wo ec eee eeeeeeees 36 6 04 PUDIGanlOn Or NetWork tailure C TE 1 7 Xares N 37 6 6 5 Publications with different properties TC 1 5 sssssssssssssesessesesesesessssesesesesessesess 37 6 7 Event Notification and Acknowledgement Services TS 2 oo ce cecececscecscscscscscscsceccecs 38 GL BaSe TOW oreta e Ee AA r E EEEE NEPE 39 6 7 2 Reliab
51. S OHJAAVA 216 Evaluation of Communication Middleware A General Test Specification OHJAAVA project s technical document unpublished 27 2 2003 LOHJAAVA 2171 Sierla S OHJAAVA 217 Analysis of Middleware Solutions RTPS OHJAAVA project s technical document unpublished 10 2 2003 LOHJAAVA 220 Sierla S Peltola J OHJAAVA 220 Analysis of Middleware Solutions RT CORBA OHJAAVA project s technical document unpublished 12 2 2003 LOHJAAVA 227 Sierla S OHJAAVA 227 Evaluation of Communication Middleware The NDDS Test Specification OHJAAVA project s technical document unpublished 20 2 2003 LOMG Object Management Group www omg org 15 5 2003 LOMG 2002 OMG The Notification Service http www omg org cgi bin doc formal 2002 08 04 21 10 2002 LPeltola 2002 Peltola J Distributed control systems execution environment of a component based automation application Report 6 Laboratory of Information and Computer Systems in Automation Helsinki University of Technology 2002 LPeltola 2003 Peltola J Automaatiojarjestelmien hajautusta palvelevat arkkitehtuurit ALY foorumi Sein joki 15 5 2003 CRaute Raute Precision http www rauteprecision fi 17 4 2003 CRTI 2002 RTI NDDS User s Manual Version 3 0 330 pages February 2002 LVTTJ Valtion tieteellinen tutkimuskeskus http Avwww vtt fi 17 4 2003 CALY lykk t automaatioj rjestelm t Teknologiaohjelma Tekes 2001 2004 http akseli tekes fi Resou
52. ablish the data flow from the sources to the control room application i e how long will it take for us to get the first data for each Signal Method It is realistic to start up the other components and then at run time subscribe to the data that the control room needs We modify S 1 so that node D would be the control room workstation It will have a delay of 10s so that it will start up when the application is running From this point we will measure how long it takes to get the first data for each of the signals 6 8 5 Increasing the load with large data structures TC S 5 Test case id S 5 Purpose The event generator has a variable length array field which can be used to create large packets tens or hundreds of kB We will send a few of these and observe the effect that this has on the transmission of the signal values Method We will add the following components to the configuration in S 1 An event generator is added onto Node B and an event receiver on Node D With some period these will send large data packets from B to D 46 7 Functional Test Results 1 Introduction 7 1 1 Purpose of this Section In this section we describe the exact test arrangements and parameters used to run the tests We do not include all of the results since the log files for this test suite alone have a total of over 100000 lines Here we show summary data as well as any information that was unexpected or otherwise interesting
53. ait for an end signal and then write the results to a log file Expected outcome After receiving the first issue there should be no misses If the network is loaded packet losses can occasionally cause higher latencies If the sending buffers get full so that sending a new message after the required interval is not possible we have a problem with cyclic delivery This can be detected from the log of the generator The event generator will read its list of events from a file elistl txt with the following contents mixing expected value temp 1 5 mixing expected value temp 1 3 mixing expected value pressure 1 4 mixing unexpected fault temp 1 3 mixing unexpected too_large temp 1 3 furnace expected value temp 2 5 furnace expected value temp 2 3 furnace expected value pressure 2 4 furnace unexpected fault temp 2 3 41 furnace unexpected too_large temp 2 3 The receiver will subscribe with the pattern 6 7 3 Several event generators and receivers TC 2 2 Test case id 2 2 Purpose To test the behaviour of several event generators and receivers Method We start 2 event generators and 3 receivers Each generator has 10 unique events and each receiver will subscribe to some subset of the events A moderate burst level of 3 is used One generator uses elist1 txt and the other uses elist2 txt which has the following contents cooling expected value temp 3 5 cooling expected value temp 3 3 cooling expected value press
54. alerts RTI suspected that this might have been caused by the various tasks being scheduled in such a way that they interfere with each other LKindel 2002 Section 7 3 4 2 describes a bug in the API for reliable publishing This was known to RTI and the desired behaviour can be achieved by using other parts of the API LWang 20021 2 Cyclic Transfer of Measurement Data 7 2 1 Nodes and network We refer to each node by the last part of its IP address The following nodes are used Node 45 667MHz 256MB RAM Windows XP Node 72 400MHz 128MB RAM Mandrake 8 2 Linux Node 199 2GHz 512MB RAM Windows XP Nodes 45 and 72 are connected to the same switching router using 100Mbps Ethernet However there was another 100Mbps switch between node 72 and switching router 199 is connected to another switching router at 100 Mbps and these routers which belong to the backbone operate at 1Gbps Time synchronization components run at real time priority Test components on Windows use high priority Components on Linux use default 0 priority After some experiments the test components were given these priorities to prevent problems with system instability and interfering with the clock synchronization In our experience raising the test component priorities does not significantly improve performance mean latencies or jitter when there are no other user apps and the UI is not used 48 7 2 2 Results of test case 1 1 7 2 2 1 Parameters
55. ases that follow are variations of this basic flow 6 6 2 Basic situation with one publication and many subscriptions TC 1 1 Test case id 1 1 This is the basic flow scenario with 3 subscriptions 6 6 3 Starting a new subscription when the test is running TC 1 2 Test case id 1 2 Purpose To check that the middleware notices at run time the appearance of a new subscription to some data for which a subscription already exists Method One publication and subscription are started as in the basic flow scenario After a delay of length D a new subscription is started on a different node The subscription should record the time when it notified the middleware that it is interested in receiving values as well as the time when it got the first value Expected outcome Just as in the basic flow but the second subscription should not have the initial values Deadlines should not be missed after the first issue has been received 37 Components used The signal receiver should take a parameter D which is the delay for which the component waits before creating the subscription All signal receivers should record the time when the subscription was made and the time when the first issue arrived 6 6 4 Publication or network failure TC 1 3 Test case id 1 3 Purpose Sometimes subscriptions might not get fresh data because there is a failure in the publication or the network connecting the publication and subscription The middl
56. blications Each publication has a strength topic so that the subscription can choose issues from the strongest one The persistence of an issue indicates how long the data is valid so during this time period only a new issue with a greater strength will be delivered to the application After the persistence of the last issue has expired any incoming issue will be accepted regardless of its strength 23 deadline timeout ee Y notification minimum separat Notify on arrival Time persistence E Take strongest Take any Time Figure 7 RTPS QoS properties LRTI 2002 4 3 2 Event Driven Data Distribution RTPS also provides a reliable version of publish subscribe This uses send and receive queues acknowledgements and retransmission to guarantee that every issue is delivered to every subscription in the same order as they were sent The mechanism is very similar to how TCP delivers packets but it has been implemented on top of UDP and lets the application programmer set many parameters that control reliability determinism and memory usage Reliable publish subscribe can be used to implement the event driven data distribution mechanism The wiring from an event output port to one or more input blocks can be made conveniently by defining a topic name for this purpose The listener for this topic can trigger any algorithms that process the event The only difficulty here is the integrity of the input signal
57. ccess of the whole thesis depends on timing the progress of each workflow properly For example test specifications are unlikely to be successful if requirements and technology analysis have not been carried out in sufficient detail However there are also circular dependencies experience from implementing and running test components might force us to adjust the test specifications and to update some technology description documents O Requirements Analysis gt A oa oOo S Learning D Specification Workload OO E Implementation Running Il 0 1 2 3 4 9 Iteration Figure 2 The workload On the whole the chart does not have any surprising information Analysis and learning are mainly carried out in the beginning of the project specification activity is heavy during the middle part and implementation and running are left to the later stages of the project However it is evident that no waterfall model has been applied since there is significant overlap in the tasks This was intentional we did not have much experience from similar work so an iterative approach was required the experience from any task could be used by other tasks in subsequent iterations of the same project The low effort for the requirements task is justified since others in the project were respons
58. constrain application developers significantly so it is necessary to have a clear understanding of the potential and limitations of the available alternatives These constraints must be well understood by the designers because otherwise implementers will be forced to break the design In this section we describe CORBA notification service The technology is easily understood by anyone with a background in computer science since it is based on the RMI Remote Method Invocation mechanism Being well known and having numerous successful applications in many different fields CORBA will serve as an introduction and comparison to RTPS which is the main focus of this thesis We assume that readers are familiar with basic CORBA good introductory material and tutorials are available at LOMG The main idea behind RMI is that a distributed application consists of objects that either provide services or use them The services are described with an interface that is similar to a class definition but it is written in IDL and is therefore independent of any programming language Servant objects that implement these interfaces are run on some server node and a globally unique object reference is assigned to each reference Clients can use these references to invoke methods on the servants This is done just like an ordinary method call using a proxy in the client s address space The call and response are routed to the correct recipient by the ORBs Object
59. ct the behaviour of the control algorithms and can decrease the quality of the product In some cases it does not matter if the latencies are even 100ms as long as jitter is kept to a minimum There can easily be hundreds of signals that must be transmitted with this mechanism so the performance requirements should be met even if the volume of traffic is scaled up Apart from process control the continuous mechanism is needed for such tasks as monitoring and diagnostics The performance requirements for these are considerably looser so it would be useful if the middleware could prioritize the more critical data Reliability If the subscription does not receive new data before its deadline expires an error has occurred With this communication mechanism we do not attempt to guarantee that every transfer is successful Redundant publications for the same topic can be used in the event that the primary publication fails When new values are sent periodically losing an issue occasionally is acceptable if the mechanism is optimized for efficiency If new values are transmitted only when the signal changes significantly i e at irregular intervals delivery should be reliable In these tests we send values periodically 36 6 6 1 Basic flow with one subscription and one publication Purpose A topic is defined and issues for it are published cyclically An integer sequence number and a double timestamp are the values that are sen
60. d at a steady rate since we send them in bursts with no delay between issues in a burst The momentarily large volume of data is useful for testing the scalability of the system but it should not prevent reliable delivery 39 It is usually satisfactory that alarm and notification messages are delivered in lt 1s However in problem situations there might be great bursts of these so all of them should be handled reliably in this time The resolution of the timestamps should be around 1ms Reliability There should be some mechanism such as one using acknowledgements and retransmissions to ensure that all messages reach all subscribers even if the network loses some packets If some data cannot be delivered perhaps the network is down for a long time the sender should be informed 6 7 1 Basic flow Purpose We create an event source that produces several unique events These should have a name and some kind of mechanism to organize them into categories With NDDS we use the topic name with fields separated by characters The name has the following fields lt process area gt lt category gt lt type gt lt measurement gt lt id gt e g mixing unexpected too_large temp 13 1 Subscribers should be able to say that they are interested in the events that come from a certain process area or they want all temperature related events or they might want to receive all of the alarms from some machine Consider the
61. d the other when a subscription gets its first issue Figure 34 shows the Start up times for all of the 100 pressure topics on the three nodes that subscribed to them 83 Startup times for pressure topics 4000 T3000 E gt 2000 127 1000 e 0 89 1 12 23 34 45 56 67 78 89 100 Topic number Dela Figure 34 It looks like the NDDS managers on the different nodes communicate information about new topics to managers on other nodes in batches in this case one batch had information for around 30 topics and new batches came at intervals of roughly one second Although the curves are not linear the worst case start up times seem to be proportional to the number of topics From the other logs we see that the average case behaviour is similar to what is indicated by these curves However the worst start up time was 7 3s for topic current100 on node8s9 8 3 2 Alarm bursts TC S 2 8 3 2 1 Setup Test case id S 2 Purpose We generate bursts of alarms as in the functional tests in communication case 2 The purpose here is twofold to observe the effect of the other real time traffic on transmitting the alarms and to observe the effect of a burst of alarms on the cyclic transfer of measurement data Method The following components are added to the basic setup Burst level 3 is used Generator on 72 publishes 7000 bursts each containing 3 issues for topics
62. d to the functional tests Ideally the middleware should prioritise the topics with shorter periods but RTPS does not support this When the load becomes heavy the performance should degrade gracefully It is acceptable if some measurements are missed and latencies increase If this happens during a peak load the production process will still 44 continue with some temporary drop in quality However if the system behaves wildly or crashes we will get serious problems with product quality and the chance for safety problems is greatly increased We also want to see how long it takes for the system to start up Method We start the following components on the nodes A F Node A Signal generator publishes 100 topics templ1 to temp100 with a period of 100ms Node B Signal generator publishes 100 topics pressurel to pressurel00 with a period of 50ms Signal receiver subscribes to all the temp topics with a deadline of 200ms Node C Signal generator publishes 100 topics currentl to current100 with a period of 20ms Signal receiver subscribes to all the pressure topics with a deadline of 100ms Node D Signal receiver subscribes to all the temp pressure and current topics with a deadline of 200ms Node E Signal receiver subscribes to all the current topics with deadline 40 Node F Signal receiver subscribes to all the pressure and current topics with a deadline of 100ms Expected outcome If the nodes
63. dleware The preceding discussion is a good introduction for another powerful capability of middleware oroducts the dynamic reconfiguration of a system while it is running This naturally requires that the system can be reconfigured statically but it is equally important that the middleware will discover any configuration changes and update communication paths in a timely manner In our tests we never noticed that NDDS would have failed in this and the response times were very satisfactory for most applications However in the next section we will describe a scenario encountered in process automation systems that places heavy requirements on the speed of dynamic reconfiguration 9 2 The Special Requirements for Process Automation 9 2 1 The Logical Design of the Application The process automation industry has some unique requirements for the logical design of the application that the middleware must support Much of this has already been discussed in the sections about communication mechanisms In general we and our industrial contacts feel that RTPS is a very promising standard The benefits have already been described at length throughout this thesis so in the conclusion we will focus on potential difficulties 1 Event driven data distribution requires that the integrity of a group of signals must be guaranteed i e they are from the same iteration of the algorithm that produced them Yet it is not possible to group them into a single
64. ds a small delay but it is not a primary cause of jitter These results support our view that to get good performance it is important to focus on the nodes themselves This involves the hardware the OS in particular the scheduler and keeping the CPU load and number of interrupts to a minimum An OS that handles interrupts well is recommended the ordinary Windows and Linux that we use here are not very good in this respect As far as application design is concerned all unnecessary issue processing should be avoided For example transmitting issues also to uninterested parties with multicast does not give additional load to the network but the receiver threads on the receiving nodes must process a great number of interrupts These results warn us that performance might deteriorate rapidly because of this 53 Receiver on node 72 e min _ms mean stdevt 2 3 5 10 20 lt stdev Sending period ms Figure 17 Finally we note that there are no clear trends to be seen when the sending period is decreased The performance did not deteriorate as the period was lowered down to 1ms However with only one topic even this does not cause serious CPU load so we have to perform some scalability tests to get a better understanding of the performance with short cycle times 7 2 3 3 Other observations The following table lists the delays in getting the first issues measured from the point where we mad
65. e the API call to create the subscription We also have the sequence number of the first issue and we can confirm that this number multiplied by the sending period is close to the delay in getting the first issue The Linux that ran the publisher had 1ms timer resolution so the period was in practice nearly lms greater than reported here This looks like the publication is ready to send very quickly but it takes some time for the subscription to be noticed and a data flow to be established The subscription on node 45 appeared at run time and the initial delays for it are lower We presume that much setup work had already been done when the publication and subscription were running on node 72 From the values in the fourth column we conclude that the communication between managers on different nodes is rapid 54 Subscription on 72 Subscription on 45 period ms 1st delay ms lst delay ms 100 326 766 20 426 21 261 From the figures in this report we see no indication that dynamically adding a subscription would cause peak latencies Also the logs do not show any latency peaks at the point where the new subscription appeared 7 2 3 4 Deadlines The Linux node missed one deadline in the test with period 2ms and deadline 4ms The alert came 4 8ms after receiving the issue with sequence number 116 In the test with a period of lms and deadline 2ms 6 deadlines were missed The alerts came between 1 9 and 4 9ms after getting a fr
66. e a new subscription to this topic without modifying any existing functionality Moving the components to different nodes will not require any code changes either Publish subscribe satisfies the real time requirements for continuous data distribution better than any other mechanism that we have studied The design uses UDP to send the issues directly to the subscribing applications and the overhead from any RTPS related processing has been minimized Latencies are typically under 1ms with moderate CPU load and a 10 100Mbps Ethernet No sophisticated algorithms such as sending issues based on some priority or deadline values are used here because they would increase the latencies and CPU load LWang 2003 Figure 7 illustates some of the main QoS properties that can be set using the publish subscribe API LRTI 2002 The leftmost line on both timelines indicates the time point when the last issue was received The upper timeline illustrates the behavior of an ordinary subscription The minimum separation property specifies an interval after receiving an issue when new issues will be discarded This can be used on a subscription that does not want a measurement value every 100ms e g a history database However a new issue is expected to arrive before the deadline has expired Otherwise the application is notified This is the only determinism that RTPS guarantees The lower timeline shows a subscription for a topic with several redundant pu
67. e how well the requirements in section 2 can be satisfied by the notification service Section 4 RTPS describes the RTPS standard as an alternative to the more familiar CORBA Section 5 The Container Design Pattern discusses some of the shortcomings of RTPS and CORBA and proposes an application level solution to them which is based on our architectural vision Section 6 Test Arrangements describes a testing environment which will be used to test RTPS ina number of communication scenarios that are typically encountered in automation systems There are 2 test suites for functional tests which exercise the key communication mechanisms After these there is a scalability test suite which is used to observe how the performance deteriorates as the number of communicating entities and the volume of traffic is increased Section 7 Functional Test Results Presents the results for the functional test suites The impact of the various factors that affect the results is analyzed Section 8 Scalability Test Results presents the results for the scalability test suite Any differences to the functional test results are pointed out and the causes are analyzed Section 9 Conclusions has a discussion about the strengths and weaknesses of RTPS as a general purpose middleware Then some special requirements for process automation systems are reviewed and the strengths and limitations of RTPS with respect to these are described 1 5
68. e other subscriptions on node 45 In all scalability tests we have subscriptions to topics temp1 to temp100 on node 45 We want to see if the fast rate transfer of issues for levell will interfere with the temp topics Figure 38 shows the mean and standard deviation for each of the 100 topics in both the basic configuration S 1 and in this case curves labelled S 3 The different shape of the mean curve is only caused by issues for the 100 topics being sent in a different order We conclude that there was no significant performance drop temp subcriptions on node 45 12 MG MeansS 3 z ____ Stdevs 3 gt 5 Mean Q mw O R Stdev 2 0 So 1 11 21 31 41 51 61 71 81 91 Topic number Figure 38 8 3 4 Dynamic start up time TC S 4 8 3 4 1 Setup Test case id S 4 Purpose Consider the situation where an operator in the control room opens a screen that displays various measurement data We want to know how long it will take to establish the data flow from the sources to the control room application i e how long will it take for us to get the first data for each Signal Method The signal receiver on 127 will have a delay of 10s Otherwise we have the same arrangements as in the basic situation 8 3 4 2 Start up times on node 127 Figure 39 shows the start up times for all of the 300 topics that were subscribed to by the receiver on
69. eate packets of size 62kKB We will send these at a rate that is as great as the middleware can manage when there is no other load The purpose of this test is to see that the performance of the middleware degrades gracefully Method We will add the following components to the configuration in S 1 89 An event generator is added onto Node 72 it sends a burst of 3 issues for each topic in elistl every 50ms A total of 1000 bursts are sent Queue lengths are 5 and table size is 62000 All publication s have sendMaxWait 20s Receiver on 45 subscribes to topics with pattern mixing 1 5 The generator had a wait of over 10s since there were not subscriptions to all topics in elistl For convenience we had a similar delay in starting up the pressure publisher component on node 72 Receiver s log is named LS5_Event txt 8 3 5 2 The Latencies for the large data structures The purpose of this test case is to observe the behaviour that results when the CPU is overloaded From the results in test case 2 6 we concluded that parameterising the event generator in this way will consume all processing resources i e new issues queue up and are sent as fast as possible The queue never gets empty In this section we look at how the reliable publish subscribe mechanism handled the bursts of large issues In test case 2 6 we only had this topic while in S 5 we have all of the usual cyclic data transmission going on in the backgrou
70. eceiver thread to process the previous ones and this wait time increases linearly as new issues arrive the increase is linear when issues arrive at a constant rate and the processing time for one issue is constant We can see that the temp topics the last 100 on the chart have been received more quickly than the pressure topics This is because the publisher component for the temperature data was on the same node Now consider a Figure 31 which shows statistics for all of the 300 topics that were received on the node 127 First we have the 100 pressure topics on the left then the 100 current topics and finally the 100 temp topics e g 253 corresponds to the topic temp53 80 Receivers on node 12 0 Min 60 0 Mean 0 Max Stdev Latency ms NYAN O O O ee ee en ei 1 3 7 73 109 145 181 217 253 289 Topics Figure 31 We can make the following observations The curves are not always linear Here we have an exception to the general behaviour where topics are processed in the order that they were added to the publisher However from the previous chart we inferred that issues for the temp and pressure topics were sent in order so they should also be received in order on every node A closer examination of the receivers on 127 reveals that the nonlinear behaviour only applies to the current topics so there is no contradiction T
71. ect has guidelines for the structure content and format of these documents 1 5 2 The Workflows Nevertheless the methodology that is used here has much in common with the usual ones The work can be divided among workflows that consist of activities An iterative approach was used so that in each iteration work was done in one or more tasks workflows We now describe each workflow this has been written after the results were obtained when we know all the tasks that were actually carried out As we mentioned in the previous section each task apart from learning has a corresponding document whose purpose is to communicate with other participants document the results serve as input for other tasks document any modifications that were made afterwards Requirements analysis The requirements for a middleware standard are based on the logical communication requirements of a process automation system Based on the many different scenarios that we have identified we describe suitable communication mechanisms for each of them The appropriate reliability and QoS requirements are also recorded This work is done together with other researchers and industrial contacts Technology analysis The requirements have been defined from the point of view of the application but some existing standard and product must be eventually used The main goals of the analysis task were to learn the background and intended use of the technol
72. ect communication between the senders and receivers Fault tolerance is also a problem because a failure of the server will bring down the whole system The peer to peer solution is based on having middleware services on every node These maintain up to date information of communicating parties on other nodes and provide direct routing of messages to the receivers A failure of one node will only affect communication links with an endpoint on that node 15 The pure centralized solution is considered unacceptable for automation systems The peer to peer architecture is in many ways ideal but partially centralized solutions can also be considered In either case an API for using the communication mechanisms must be provided This will naturally encapsulate all of the lower level details related to the OS and network stack Therefore it is not important how the mechanisms are implemented The TCP retransmission mechanism and flow control can be used or an implementation could provide its own on top of UDP Some products will rely on IP and Ethernet but there is support for other transports as well Some services are also required It is often necessary to dynamically discover the location and sometimes even the interface of a service Support for redundancy is also useful although there are many redundancy models so the middleware might not provide a suitable one Security issues must be dealt with somehow When the process control le
73. ed for transmitting events The intended receiver can be indicated by a value in one or more fields of the structured event and consumers can filter messages with this value 19 The algorithm that processes the event will usually require the latest values of some input signal and these values must always be from the same sweep of the algorithm that computed them One solution is to include the signals in the structured event but this will lead to complications when there are other consumers that need these signals When new versions of the automation application are developed for new clients the signals that are needed to process the event might be different The structured event is flexible enough to support the dynamic addition of fields for the required signals so maintenance problems can be avoided by sophisticated coding The heavy algorithms in the notification service increase the latencies in event transmission The filtering times are especially unpredictable The OMG is working on a Real Time Notification Service specification to solve this problem 3 3 3 Event Notification and Acknowledgement Services There is no support for acknowledgements but otherwise the notification service is better suited for this mechanism than the previous two The flexibility of the channel can only be appreciated when consumers try to receive events from many suppliers on different nodes The structured event provides good filtering possibilities
74. ent time Whenever there is a deadline alert we compare the difference between the current time and latestFreshData If this is less than the deadline property of the subscription we can ignore the alert by returning from OnIssueReceived immediately Timestamps are taken with an accurate function 7 2 4 Results of test case 1 3 7 2 4 1 Parameters We have one signal generator on node 72 and a receiver on node 45 Generator publishes 10000 issues for topic temp1 with period 20ms Total time is 200s We use values N1 2000 N2 4000 i e issues in this range are not sent Receiver has deadline of 40ms and O initial delay Receiver s log file has name L1_3 txt 7 2 4 2 Results Here are some interesting parts from the log First issue received 379 962152ms after starting up the component Segq 1997 Latency 0 228332ms seq 1998 Latency 0 254062ms Segt 1999 Latency 0 197872ms Segq 2000 missed Segq 4000 missed Seg 4001 Latency 0 357722ms Segq 4002 Latency 0 348140ms Seg 4003 Latency 0 236585ms Seg 4004 Latency 0 21485l1ms Segi 4005 Latency 0 213340ms Seg 4006 Latency 0 206225ms Sequence number of first received issue 20 Tre ims lt Min 01309763 Maxa 0 555934 Means 025 595 Ssrdevs 0 044 771 Deadline missed 124 457124ms after receiving issue with segq 1999 Deadline missed 254 537866ms after receiving issue with segq 1999 Deadline missed 384 839865ms after receivin
75. es which must be prepared to cope with a great number of potential problems Another feature of event notifications is that they must be acknowledged from the application level This will become complicated when there are several receivers Many acknowledgement models exist for example it might be enough for one operator to acknowledge the event or then a response from some or all of the receivers might be required 14 The designer needs a mechanism for event notifications because the event driven data distribution mechanism is lacking in two ways First of all there must be a flexible mechanism for subscribing to a large number of events from many different components For example we might ask for all temperature related alarms from a certain process area that have priority medium or greater Subscribers to the event driven mechanism will specifically name the desired event Secondly if there is inadequate support for application level acknowledgements the system developer will have to handle these by adding much functionality into his design of the automation system 2 2 4 Other Mechanisms We have identified a need for 3 other mechanisms but these are simpler and the requirements related to them are easier to fulfill Therefore we have not developed test for them and will only briefly describe them here Request reply can be used to obtain some data or to start some service A typical use of this would be to read or modify a
76. esh issue No other deadlines were missed on Linux On Windows we only missed one deadline in the tests with sending periods 1ms and 2ms However there were a large number of spurious deadline messages These came before the actual deadline had occurred Here is a small excerpt from the log for the case with a 4ms deadline which illustrates typical results for all of the receivers on Windows for the tests with periods 1 10ms no problems were observed when the sending period was 20ms Deadline missed 1 714743ms after receiving issue with seq 777 Deadline missed 1 858895ms after receiving issue with seq 807 Deadline missed 2 014781ms after receiving issue with seq 837 Deadline missed 2 160609ms after receiving issue with seq 867 Deadline missed 2 445562ms after receiving issue with seq 897 Deadline missed 2 496685ms after receiving issue with seq 927 Deadline missed 2 647542ms after receiving issue with seq 957 Deadline missed 2 840304ms after receiving issue with seq 987 An application might behave erratically if it gets deadline messages prematurely Fortunately it is quite straightforward for the application programmer to filter out the extra deadline alerts in OnIssueReceived This is the routine for handling incoming issues and deadline alerts I would do this as follows 53 The Listener class is given a private member latestFreshData Whenever a fresh issue is received the value of latestFreshData is set to the curr
77. essing would mean that every task even a cyclic one must be triggered by an event In this case our model needs fundamental modifications since we will not be using ExecutionThread objects for periodic tasks However we feel that this design pattern is well suited for realistic applications 30 6 Test Arrangements 6 1 Introduction The purpose of these tests is to determine if a middleware product satisfies the communication requirements of a process automation system We will focus on evaluating the features of the middleware solution so no process will be simulated Consequently the data that is sent does not need to contain meaningful process data we can send information that is useful for testing purposes such as sequence numbers and timestamps This assumption reduces the complexity considerably since there are less dependencies among the communicating entities For example we can just send an alarm when we want to test a feature without first observing the process state since there is no process We will be testing functionality performance reliability and scalability In the first phase we will concentrate on functionality we will also do simple performance testing that is limited to 2 or 3 nodes Later we will test for scalability by running the components on 6 nodes The plans for the first phase should be such that the transition to the scalability test phase can be done by increasing the number of existing components tha
78. ests were defined in terms of components that generate traffic which corresponds to the traffic in an automation system The inputs to this phase are the test specifications from which the requirements for the test components can be identified Success in this phase is not simply achieved by building components with the desired functionality There are many ways to achieve this and they can be quite different in their real time behavior These differences are not always obvious even when good documentation is available so some experimentation with the alternatives was necessary Running the tests and analyzing the results Before the final tests could be run the participating nodes 2 Windows and 4 Mandrake Linux had to be prepared and equipped with the test software When tests were run many MB of raw data was created so this had to be processed and analyzed Although some preprocessing was done in the test components Excel was used for further processing and visualization 1 5 3 The Timing of the Tasks Figure 2 shows how much effort I spent on the different tasks workflows during the 5 iterations We did not have formal iterations with starting and ending dates rather we use iterations to refer to different stages of the project In each iteration work was done for some of the tasks and each task depends on the work done on several other tasks during the previous iterations Since the workflows are dependent on each other the su
79. eware couldn t supply its inout data on time In practice there is no best solution to this and many valid approaches exist Elaborate prioritization schemes try to guarantee that all deadlines are met whenever possible and that the most critical tasks are given priority However these algorithms will be competing for the precious CPU time To minimize the middleware s load on the processor some designs simply use the first come first serve principle Finally it must be remembered that the nature and reliability of the scheduling is ultimately dependent on the underlying operating system 1 2 Goals 1 2 1 The Goals of OHJAAVA 2 The goal of the OHJAAVA 2 project Modern Distribution Solutions in Open Control Systems is to define the technical requirements of a communications layer middleware in a distributed contro system In addition we pursue to gain knowledge about ongoing standardization activities and commercial and open source product offering in the area From the point of view of the requirements discovered in the project we evaluate the middleware standards and technologies available and pick some of them to a more elaborate analysis The most promising ones will be tested in a test bench built to our and VTT s lab environments Potential of the evaluated technologies tor commercial product development will be estimated LOHJAAVA 2 1 2 2 The Goals of the Thesis The goals of the thesis are a subset of the goals o
80. eware should have functionality that enables the subscription to detect this kind of a failure i e alert when fresh values are not received soon enough Method One publication and subscription are started A failure is simulated by having the publication first send the values 1 N1 1 and then just wait instead of sending the values N1 N2 and then send the final values N2 1 N Expected outcome As in the basic flow but instead of having values N1 N2 there should be appropriate error messages Values should be received from N2 onwards with no deadlines missed Components used The cyclic signal generator should take parameters N1 and N2 which is the range of sequence numbers for which no data is sent If these are both zero the feature is not used 6 6 5 Publications with different properties TC 1 5 Test case id 1 5 Purpose Having more than one publication for the same measurement means that some of them are redundant Different technologies have different concepts for redundancy and provide different properties for the designer to configure the main and redundant producers With NDDS publications with the same topic can be used to provide redundancy Each publication has an individual strength parameter which is described in section 4 3 1 Method We have one publication with strength 2 that publishes issues 1 N with the exception of issues N1 N2 The redundant publication with strength 1 publishes values 1 N3 N1 lt
81. f the 2 receivers e max45 a mean45 max72 2 2 5 10 20 s lt mean7 2 Sending period ms Figure 15 We can also speculate why node 72 running Linux has greater maximum latencies The test component on Windows node 45 does have somewhat higher priority but looking at test case 1 1 so does the subscription on node 199 and yet it has the greatest maximum The explanation that fits with the results of test cases 1 1 and 1 2 is that a machine running publishing and receiving components has greater contention for the CPU which results in poorer response for some component Figure 16 gives a detailed look at the results for the subscription on the Windows node The minimum value gives a good idea of the best case performance with ideal scheduling The standard deviation curves show that the jitter is very satisfactory for process automation applications i e a control loop usually works well even with longer latencies as long as new data arrives at a steady rate The jitter is much under lms and typical control loops operate at a much longer period so this is unlikely to cause unstable behaviour in the control algorithm DZ Receiver on node 45 e min m mean a stdev 2 3 5 10 20 lt stdev Sending period ms Figure 16 The corresponding results for node 72 in Figure 17 are very similar We can conclude that the network only ad
82. f the project One of the first tasks of the project is to define requirements for the various application level communication mechanisms that are used by the components of an automation system My contribution to this work is very minor The next task is to gain knowledge about the technologies that can be used for this purpose and to write technology description documents for the most promising ones I am responsible for the RTPS Real Time Publish Subscribe document LOHJAAVA 217 and for a significant part of the Real Time CORBA document LOHJAAVA 2201 My main responsibility in the project is related to the testing of the most promising products The tests are based on a technology independent test specification which describes test arrangements and the test suites LOHJAAVA 2161 The suites in turn are based on the requirements that are captured in the first part of the project The NDDS implementation of RTPS has been selected as the most interesting product that is available for testing and I am fully responsible for testing it The NDDS test specification is derived from the technology independent specification LOHJAAVA 2271 These specifications have provided the requirements for the tests components My task is to design and implement these components and use them to run the specified tests 1 3 Scope The focus of the preceding thesis LPeltola 2002 that was done in the OHJAAVA project was on a single node and the various components runnin
83. first topic is subscribed to Table size is 62000 so the payload in one issue is slightly over 62kB Receiver s log files have names L2_6_X txt Publisher s log file is PL2_6_X txt Where X is 20 50 or 100 depending on the publisher period 7 3 7 2 Statistics Figure 26 displays the main statistics for each of the tests where the sending periods were 20 50 and 100ms 73 Statistics for 62kB issues 140 120 e 100 gt 80 m 20 S 60 o 50 100 40 20 Min Mean Max Stdev Figure 26 On the average sending an issue took slightly over 22ms We observed very little variation among the issues that were sent in one burst This can be seen from Figure 27 where the issues are grouped according to their sequence number in the burst This is from the test that had a 100ms period the others behaved similarly This is a clear difference to the previous results where the latencies increased considerably within a burst We suppose that sending the large issues takes so long that the receiver can handle them as they come so the receiver is no longer a clear bottleneck Sending a burst every 100ms a IO e Max KK Ai i m Mean a Stdev N O O O
84. for 5 messages the middleware should have been able to handle the bursts easily Now we set B gt gt the queue size and observe how often the send gets blocked when sending a burst Method Just like test case 2 1 but with a higher burst level B 30 Expected outcome The components log enough information that tells how often the sender gets blocked The bursts that do not fit in the queue should not prevent the delivery of any messages 6 7 6 Network goes down TC 2 5 Test case id 2 5 Purpose As opposed to test case 2 3 we now have only one generator and one receiver We then disrupt the network connection between them for some time The middleware will eventually notice that there is no subscriber so it will not expect acknowledgements and all sends will be successful When the sending buffers get full some data that the subscriber has not received will be lost In this 43 case it is best to have a greater sending buffer so that temporary network problems will not prevent receivers from getting the messages when the connection is re established Method Just like 2 3 but with only one receiver component The sending buffer should have enough space to accommodate all of the messages that are generated during the 10s downtime Expected outcome All messages should be received although the latencies for some will be approximately equal to the downtime 6 7 7 Large event messages TC 2 6 Test case id 2 6 Purpo
85. g issue with seg 1999 Deadline missed 514 921445ms after receiving issue with seq 1999 56 Deadline missed 615 1618llms after receiving issue with seq 1999 Deadline missed 745 433639ms after receiving issue with seg 1999 Deadline missed 875 511448ms after receiving issue with seq 1999 We see that only the issues 2000 4000 are missed Having the publication stop sending for some time 2000 20ms 40s did not cause any confusion when sending was resumed The best effort mode did not lose any issues nor were the latencies conspicuously high at this point After sending the 1999 issue the subscription will naturally miss a number of deadlines I have copied here the first few alerts from the log The receiver s deadline is 40ms and we get alerts around every 100ms The RTPS specification says that a deadline notification should come within 2 deadline periods 7 2 5 Results of test case 1 5 7 2 5 1 Parameters We have signal generators on nodes 72 and 199 and a receiver on node 45 Generator on 199 has strength 2 It publishes 10000 issues for topic temp1 with period 20ms Total time is 200s We use values N1 2000 N2 4000 Generator on 72 has strength 1 and it publishes 8000 issues for temp1 with period 20ms Receiver has deadline of 40ms All components have 0 initial delay Receiver s log file has name L1_5 txt 7 2 5 2 Results The log has over 10000 lines so here are the interesting parts F
86. g on it This work concentrates on the mechanisms that the components can use to communicate with each other In the OHJAAVA 2 project the necessary mechanisms and their quality of service QoS requirements are analyzed This results in a logical description of the design level mechanisms These must be mapped onto some concrete mechanisms that are provided by some existing standard or product The scope of this thesis is focused on the following tasks Write descriptions of some of the most promising technologies RTPS and RT CORBA Define a technology independent test specification with traceability to the logical communication requirements Implement product specific test specifications and test software Run the tests and analyze the results 1 4 The Structure of the Thesis The thesis consists of a theoretical and a practical part The theoretical part sections 2 5 discusses the communication requirements for modern automation systems and describes 2 existing standards The practical part sections 6 8 has a description for a testing environment that is based on these requirements and an analysis of the results that were obtained in the tests Section 2 Analysis of Communication Requirements describes the communication requirements for modern automation systems and our architectural vision Section 3 CORBA Notification Service describes one promising middleware solution whose background is in the IT industry We describ
87. have decent hardware it should be possible to handle all of the data However the data flows are not even but at 20 50 and 100ms intervals 100 signal values are transmitted These must be processed individually and processing the data takes a longer time than generating it For this reason some of the latencies will be longer than in the functional tests The greater volume of traffic on the network will also increase the probability of collisions and lost data 6 8 2 Alarm bursts TC S 2 Test case id S 2 Purpose We generate bursts of alarms as in the functional tests in communication case 2 The purpose here is twofold to observe the effect of the other real time traffic on transmitting the alarms and to observe the effect of a burst of alarms on the cyclic transfer of measurement data 6 8 3 Fast rate control TC S 3 Test case id S 3 Purpose There might be some control loop or other process that needs to communicate faster than the 20ms cycle in S 1 In the functional tests we have observed that it certainly is possible to go below 20ms but we had a light system load Here we have the same arrangements as in S 1 but we also include a signal that is transmitted at a clearly faster rate 45 6 8 4 Dynamic startup time TC S 4 Test case id S 4 Purpose Consider the situation where an operator in the control room opens a screen that displays various measurement data We want to know how long it will take to est
88. he latencies on 127 running Linux are roughly twice as long as those on 199 running Windows XP However 199 has 4 times more RAM and processor speed than 127 127 has 300 subscriptions where 199 has only 200 but 199 also has a publisher component with the Shortest period 20ms Taking all of these factors into consideration it is difficult to evaluate the performance of the operating systems From the statistics on node 127 and 199 we see that there is a very strong relationship between the mean and maximum values i e the shapes of the curves are very similar This could be taken into consideration when setting limits on a system s average and worst case performance The minimum latencies for 1000 issues should give a good idea of the best case performance We see that the average and best case results are very close to each other The worst case latencies were much higher and we suspect bad scheduling and or the execution of some kernel tasks to be the cause of this Switching to a RTOS should clearly improve the worst case performance The average performance is likely to improve when an OS with good interrupt handling capabilities is chosen Here we are receiving thousands of issues every 8l second and each incoming issue causes an interrupt Windows and standard Linux have a bad reputation for handling interrupts in such quantities Looking through the other logs we see that the worst latencies were incurred by the
89. hnologies 1 1 4 Scheduling A multithreaded design is a natural way to implement this model where application components and middleware entities have been decoupled This is also a powerful tool for controlling the applications real time behavior The threads can be grouped into the following categories Application leve threads transfer data between port connectors and the ports of the application components They will also be used to execute whatever algorithms have been coded into these components A scheduler is responsible for prioritizing these tasks so a thread pool containing threads with different priorities can be used Container level threads are responsible for transmitting data and messages between the application components and the middleware Middleware leve threads route data from senders to listeners These objects might well be located on different nodes so some mechanism such as UDP sockets must be used Splitting the threads into 3 categories is conceptually helpful but it must be remembered that ultimately all of these threads will compete for the same CPU The desired real time behavior can only be achieved by giving each thread an appropriate priority For example if the container and middleware have too great a priority the application level threads might not be executed in time However if all application level threads are given a high priority a critical task might not be able to execute because the middl
90. ible for that However the chart indicates one problem in the project not enough effort was put into requirements analysis early on This made it more difficult to carry out the other tasks the problem is elaborated in the risks section Now that the project is over we can say that the methodology was well chosen Each of the 6 tasks described above were important and a problem in any of them could have prevented us from reaching the goals that were set for this thesis We finally point out that since the chart is based on my working hours most of the effort has been spent on NDDS and some was spent on CORBA CORBA was chosen for testing only in the 4 iteration so there is a significant amount of effort that was spent on analysis learning and specification towards the very end of the project Normally this would be undesirable since the main work of these tasks should be done well before the end of the project 10 2 Analysis of Communication Requirements The starting point for our evaluation of middleware solutions is our architectural vision for next generation automation systems The architecture and communication requirements are described from the perspective of the application designer these requirements have been obtained from discussions with researchers and Finnish companies in the process automation industry We will discuss the role of the middleware platform over the lifecycle of a product the communication requirements
91. ier if the architecture is composed of parts that have well defined responsibilities and interaction mechanisms These parts encapsulate any details about how this functionality is implemented We will use the layered approach here since it is natural to separate the application logic into its own layer The execution logic and middleware interactions are handled by the container layer which is below the application and above the middleware 4 Data should not go via the middleware layer needlessly because this is inefficient 5 2 The Solution Figure 9 shows the container and application layers modeled as packages I am elaborating the design in LPeltola 2002 The application is designed using application components that are similar to function blocks They read data from their input ports execute some algorithms on the data and write the results to output ports This is done cyclically with some period All of the components with the same period can be run in the same thread and can therefore communicate directly with each other Components with different cycle times must always communicate using the middleware However a component is only concerned with accessing its input and output ports and should not worry about how the data gets there The PortConnector in the container layer is responsible for supplying data to input ports and transmitting data from output ports The PortConnector is fed either from an output port of an 26
92. ill configure these differently and run more components on a greater number of nodes to observe how they interfere with each other We will only need to implement some of the components that were described in section 6 3 In the test cases we don t specify any exact values for parameters such as sending rate or packet size These are considered to be parameters of the components and exact values will be given in the test reports The test components have been implemented in such a way that output will be written to a file Any write operation either to the screen or to a file can take a considerable amount of time so any output is stored in memory and written out only after the test has been executed 6 6 Continuous Data Distribution TS 1 Test suite id 1 Requirements to be tested We test a communication mechanism suitable for continuous transmission wiring of data We have tests for multiple consumers and redundant producers We examine the effect of starting or shutting down some of these on the run We observe what happens if consumers do not get new data by the time they expect it We also test system startup will the communication be established automatically and will any of the initial data transmissions be lost We also measure the time it takes to start up the system 35 A measurement is generated frequently either cyclically or when the value changes significantly Consumers are interested in the latest value Low delay
93. iner Above these is the application which uses these to send and receive the data using only logical names The middleware services are provided by the manager as well as the libraries that are linked into the application The only difference is in the use of threads NDDS has receiver and sender threads that handle the UDP communication the middleware services level However the receiver thread also executes the listener s method in the container and can perform application level issue processing The sender thread will send the issues that are given to it at 22 the container level as expected However in the synchronous mode the caller of send a container thread will execute the UDP sending routine These details should be remembered by the designer of the container since they can have an effect on real time behavior 4 3 The Communication Mechanisms 4 3 1 Continuous Data Distribution The publish subscribe mechanism is well suited for continuous data distribution The use of logical topic names makes it easy to deliver data to receivers at different physical locations For example a measurement might be needed by the controller control room and history database but it is enough to oublish it once without knowing anything about receivers Subscriptions can be created for each of the 3 client applications If some new functionality is added later for example a diagnostics service that needs the measurement it is enough to creat
94. ion of RTPS is a very promising middleware solution for process automation systems There is no perfect product that satisfies all of our requirements but good results can be expected from using RTPS if the system designers appreciate the strengths and limitations of the middleware standard Keywords middleware distributed automation system DCS communication requirements RTPS NDDS Helsinki University of Technology Department of Automation and Systems Technology Information and Computer Systems in Automation Republishing of the Master s Thesis Distribution Helsinki University of Technology Department of Automation and Systems Technology Information and Computer Systems in Automation P O Box 5400 FIN 02015 HUT FINLAND Tel 358 9 451 5462 Fax 358 9 451 5394 ISBN 951 22 6604 0 ISSN 1456 0887 Picaset Oy Helsinki 2003 Foreword Forewords are rarely read although it is customary to write them The best foreword that I have seen is in The Karamazov Brothers LDostoyevski 1988 The author points out that there are some very considerate readers who finish a book before forming any opinion about it He then says that it will be quite enough for the reader to work his way through the first part of The Karamazov Brothers gt 400 pages If this will fail to interest him there will be no reason to start the second part For my part will be very satisfied if the reader will scrutinize the first 5 sections of this
95. irst issue received 401 100586ms after starting up the component Segq 1997 Latency 0 163941ms Seq 1998 Latency 0 187682ms Seg 1999 Latency 0 159181ms Segq 2000 missed Segq 2619 missed Seq 2620 latency 0 l73555me Seg 2621 Latency 0 215700ms Segq 2622 Latency 0 214459ms Seg 2623 Latency 0 211578ms Seg 2624 Latency 0 192424ms 57 Seq 3810 Latency 0 20121 2ms Segq 3811 Latency 0 199563ms Seg 3812 Latency 0 216544ms Segq 3813 missed Segq 4000 missed Seg 4001 Latency 0 190609ms Seg 4002 Latency 0 178032ms Seg 4003 Latency 0 162662ms Segt 4004 Latency 0 154275ms Segt 4005 Latency 0 14672 ms Sequence number of first received issue 20 in mss Min 0 114760 Max 0 450069 Mean 0 167632 Stdev 0 027616 No other issues were missed than indicated above Deadline behavior was as in test case 1 3 deadlines were only missed after issue 1999 When the primary publication stops sending at issue 2000 it is not until issue 2620 than we start getting data from the secondary publication that has been running all the time After that we never miss any deadlines Curiously issues 3813 4000 are missed This can be explained by the fact that the secondary publication happened to have aca 5 longer period in practice due to the 1ms timer resolution This means that in the time that the primary publication s loop had gone through 4000 iterations the sec
96. le cyclic data transier TC 2 Toere atea A EE E EAS 40 6 7 3 Several event generators and receivers TC 2 2 ssssssssssssesessesesseseesessesessesesssseess 41 6 7 4 Only one subscriber goes down TC 2 3 ssssssesessesssssesesessesesessesesesesessesesesesessssese 41 6 7 5 Tncreasing the burst level CTC 24 niert n T A vein a soatde ook 42 Grice Network goes down T C 2 5 yersin eee tea EEEE TUTA AO 42 67 7 Large event messages Cl C 226 oases asses a e A AE EA 43 6 8 Scala by TeS e ATOS ea a o NE Ree 43 6 8 1 Multirate cyclic transfer of measurement data TC S 1 ssssssessesessesessesessessssesse 43 Goa Aarm DUREA TE S2 aaia dd cece a T EA 44 oe e Pastor e o E E AE 2523 E E EE ATE TE A E EE TT 44 660 4 Dynamic startup time Ci Css A eaa a n a caw E A a e 45 6 8 5 Increasing the load with large data structures TC S 5 sssssssssssessessessessessesessesses 45 Functional Test RESUS ocenenie E A EE E E 46 7 1 roduc HON ocarina aa a a a e a a a a sues 46 REL PUrDOSEOrtNIS SECOs na E E onesie E E E E E E 46 7 1 2 Evaluating the Performance of the Middleware sessssessessssessssesessesessesessesesseseses 46 Tacs WAGErSLANGING tne Load ceeded eee iets a a E e a 46 10 7 1 4 Using Timestamps to measure Latencles ccccccccscecsncncccccececccccescecsacccceseasecsacecs 47 PMs BUG sein di vnsac a E on waaa nde cad nsw naaie toed ca A anna linn vecan ieat aude taint S 47 72 Cyclic iranster ot Mea
97. ltola 2002 Figure 1 shows the four main elements on each node the middleware services the container the application components and the scheduler 1 1 2 The Publish Subscribe Model The exchange of information is based on the publish subscribe model which is described at length in section 3 of this thesis In short all data transmission in based on the following 2 types of interfaces The listener subscribes to some data and forwards it to all of the registered recipients These might be objects in the same application container or a proxy in the middleware services if the receivers are in a different component or on a different node Senders receive data from the application component or the middleware and forward it to the connected listener The main reason for using senders and listeners is to decouple communicating application components so that technical problems related to distribution are encapsulated and reconfiguration will be easier 1 1 3 The Container and Application Components The figure shows how application components use port connectors to join to the sender and listener interfaces as well as to each other The reason for this is that the communication of automation components is typically modeled by connecting their ports These are design level concepts and they might not have any corresponding element in the actual implementation For example in the case of the middleware standards that are described in this thesis
98. mples of fields that could be useful for application designers Unwanted traffic can be filtered according to the values of certain fields filters can be set at many levels in the notification architecture The event channel 18 objects also have QoS properties that can be used to prioritize the traffic and use the resources in a way that is optimal for the application The notification architecture is typically centralized and we pointed out the problems with this in section 2 However it is possible to start notification services on several nodes or even on each node Clients will still have to resolve the name of the appropriate channel s in order to receive the desired messages so this solution is not as transparent and easy to reconfigure as we would like A good application level framework could provide an acceptable workaround to these problems We will finally evaluate the architecture with respect to the architectural vision described in section 1 1 The event channel and the supplier and consumer proxies belong to the middleware services These are run in the notification service s process which might be on another node The supplier and consumer objects belong to the container and occupy the same address space as the application objects The link between the container and the notification service is established by connecting the supplier and consumer objects to suitable proxies This can be done when the container has obtained
99. n with the reliable mode Also during the time the network was down the receiver on 72 missed a few issues This was accompanied by some rather long latencies e g issue 1188 is missed at a time when latencies between 20 and 50ms are common We now understand that the sender s queue overflowed and that old issues were discarded because the Send return value provided misleading information to the application High latencies on node 72 were observed when the network was down This can be caused by the high priority synchronization algorithm bombarding its UDP socket in a futile attempt to contact the clock server The negative latencies after issue 2236 are caused by the clock synchronization algorithm which took nearly a second to recuperate after its connection to the master clock was restored 7 3 5 Results of test case 2 4 7 3 5 1 Parameters We have one event generator on node 72 and a receiver on node 45 Generator publishes 1000 issues for topics in elistl txt see OHJAAVA 227 with period 100ms Total time is 100s Burst level 30 is used As mentioned before send and receive queue lengths are 5 Subscription pattern is mixing so the first 5 topics should have been subscribed to Receiver s log files have names L2_4 txt Publisher s log file is PL2_4 txt 7 3 5 2 Analyzing the behaviour of a burst We suspect that that a similar pattern with latencies will occur with each burst so we have calculated S
100. nce number in burst Figure 22 Figure 23 shows the same data for the last topic on the Windows receiver the results do not challenge any conclusions that were made before The only difference is that the latencies are systematically higher as is to be expected for topics whose issues are sent last 10th Topic on Windows a e Mean a Stdev N O a Stdev Latency ms 1 2 3 Sequence number in burst Figure 23 65 For the receivers on the Linux nodes we observed similar results but with a few exceptions These can be illustrated by observing the log of the receiver on 72 Remember that it subscribed to all pressure related events and that some of them were generated on the same node 72 and some on the node 92 The following excerpt is from the log for cooling expected value pressure 3 4 a topic published by a generator on node 92 Segt 10 Latency 0 815034ms Segq 11 Latency 0 633955ms Seg 12 Latency 0 658035ms Seg 13 Latency 0 824928ms Segi 14 Latency 0 611901ms Segq 15 Latency 1 331925ms Seg 16 Latency 0 648975ms Segt 17 Latency 0 632882ms Seg 18 Latency 0 676870ms Segq 19 Latency 0 904083ms Seg 20 Latency 0 644088ms Segq 21 Latency 0 664115ms We see that the issues that were first in a burst sequence numbers 10 13 16 19 exhibit a latency that is greater than that for the second issue in the burst
101. ncies of issues later in the burst are sometimes lower than the previous ones At this point we point out that the publisher s log was again empty i e sends were always successful This is unsurprising since the send would have blocked for 100ms before returning an error Now compare the charts for the first and last topics As we have observed before the latencies for the first topics are systematically smaller since their issues are sent first In this test case we observe the same behaviour until the queues fill up After that this effect is not so pronounced since the scheduling is different This is perfectly acceptable the middleware makes no promises about treating one topic in a publication any differently than another We have just made observations about the order in which jobs are processed in practice T2 Latencies for fifth topic e Stdev sa Mean Stdev A gt D k Bir O gt N OO Ff O 4 7 10 13 16 19 22 25 28 Sequence number in burst Figure 25 7 3 6 Results of test case 2 5 This test is omitted for reasons explained in section 7 3 4 2 7 3 7 Results of test case 2 6 7 3 7 1 Parameters We have one event generator on node 72 and a receiver on node 45 Generator publishes 1000 issues for topics in elistl txt with periods 100 50 and 20ms Burst level 3 is used Subscription pattern is mixing 1 5 so only the
102. nd Bursts of large data structures Q9 O a Oo Means 5 gt m StdevS 5 Z S 10 o Mean2 6 S 5 o Stdev2 6 0 1 2 3 Number in burst Figure 40 The reliable mechanism was able to transmit all of the issues despite the load From Figure 40 we see that the mean latencies were slightly higher and jitter was clearly higher in the scalability test Neither was it possible to maintain the 50ms sending period since sending one burst took more than that The performance degradation is therefore graceful as it is caused by the load exceeding the processing capacity There was no unexpected behaviour and all issues were received in order 90 In this light it is not necessary to invest in hardware and network resources in such a way that even the worst case situation will not strain the processing capabilities When the rare worst case peak load is experienced there will just be a slight degradation in QoS which in most processes will only result in a small and temporary drop in quality Often the cost of this is much less than having to invest in resources for handling the worst case 8 3 5 3 The effect on the other topics Now we look at how the transmission of large events affected the cyclic transmission of data The node that published the events also published the pressure topics Figure 41 shows statistics for these topics when the event generator was runni
103. ne then for topic 2 and so on We have also observed that in practice issues nearly always also arrive in this order Since issues for all topics 10 in this case are sent by one publisher send operation it is not possible to process them at once at the sending and receiving ends The ones that are sent later have to wait By measuring the publisher s total send delay and remembering that sending was done synchronously in the calling thread we can conclude that the bottleneck is the NDDS receiver thread This thread is responsible for passing the incoming issues from UDP to the application and executing the OnIssueReceived routine in the application that processes the data In order to confirm this explanation we tried adding some extra processing into the OnIssueReceived routine and observed that the latencies for the later topics again increased linearly 7 3 2 4 Other observations The publishers log was empty i e the publisher did not experience difficulties in sending at this rate The delay in getting the first issue after staring up the components was between 2027 and 2031ms for all the topics on the Linux receiver The Windows receiver recorded values between 2003 and 2006ms 63 7 3 3 Results of test case 2 2 7 3 3 1 Parameters We have event generators on nodes 72 and 92 and receivers on nodes 92 45 and 72 Burst level 3 is used Generator on 72 publishes 10000 bursts each containing 3 issues for topics in elistl
104. ng at the same time S 5 and in the basic case with no events S 1 We show the statistics for the signal receiver on node 89 pressure subscriptions on node 89 OO 25 eee eer ee Means 5 20 i MaxS 5 9 15 l S EELEE StdevS 5 10 _____ MeanS 1 5 MaxS 1 0 SSeS 5S eS Stders 1 1 14 27 40 53 66 79 92 Topic number Figure 41 This graph must be viewed with caution The sender took timestamps just before the data was actually sent so the data might have had to wait a while before this because the event generator was running Otherwise there would presumably be a greater difference between the results of S 1 and S 5 Also neither RTPS nor NDDS specify the order in which issues for the different topics are processed This means that some subscriptions will get better service than others and the behaviour might be different if the test is repeated This could explain the peak in the MaxS 1 curve Having said this the graph shows quite a clear pattern of moderate performance degradation under the peak load in S 5 However even though issues for the pressure topics were sent in the best effort mode none of them were lost 91 8 4 Conclusions The suitability of a middleware product for an automation application cannot be expressed with any simple figure Many different scenarios must be considered since application components have diverse communicati
105. node 127 We again observe the same behaviour as in the basic case subscriptions are started up in 88 groups of around 30 However new groups are started more quickly in the case of S 4 where the subscriptions appeared at run time and the publications were already running From the shape of the curve we are tempted to conclude that the start up times for dynamically appearing subscriptions are also more predictable but we would have to run more tests to be sure Startup times for all topics on 127 _ 6000 1 3 7 73 109 145 181 217 253 289 Topic number Figure 39 In this case it took 3 seconds to get data for all of the 300 subscriptions This time can be decreased by grouping more data points under a single topic Also the CPU on 127 had only 350 MHz so ona typical high end control room workstation we could expect much better results In this light it seems feasible to implement control room software that creates subscriptions to the necessary topics when a screen is changed However this is not the intended way of using NDDS LWang 2002 It is also clear that creating and destroying large numbers subscriptions and communicating the new status to the manager on the publishing node will consume resources 8 3 5 Increasing the load with large data structures TC S 5 8 3 5 1 Setup Test case id 5 Purpose The event generator has a variable length array field which can be used to cr
106. nux machines with very limited memory we sometimes observed long delays ca 15s before the subscriptions started receiving issues The issues that were sent before this were lost Presumably NDDS was sending metatraffic in order to establish the communication links LWang 2002 With some systems designers must have an accurate idea of how long it takes before these links are established so it would then be necessary to understand what is happening and where the bottlenecks are This insight cannot be gained only by debugging the application code but an Ethernet packet sniffer would be useful RTI also sells a product for monitoring the RTPS traffic on the network LWang 2002 RTPS does give the programmer control over a number of QoS properties which can be used to influence the real time behaviour However in our analysis of the test results we had to mention frequently that the outcome will always ultimately depend on how the operating system schedules the various threads of the application and middleware Since we did not use a RTOS we noticed that it is not possible to guarantee a satisfactory upper bound for latencies because even a high priority thread 93 might be kept waiting sometimes When a high level of determinism is required a suitable RTOS must be used Kindel 2002 but the programmer should also understand the scheduling algorithm as well as the responsibilities and interactions of the threads in the application and mid
107. of possible component types Some components such as the database component are included for completeness it will not be necessary to implement all of these for our tests 32 Cyclic signal generator A signal such as a measurement is generated and transmitted at a fixed rate Some parameters would be the rate and the size and type of the data ranging from binary signals to complex data structures Timestamps and other accompanying information might be included The component can also be used to generate several signals depending on what parameters are given Signal generator A signal is transmitted at unpredictable intervals whenever the difference between the current value and previously transmitted value exceeds a certain threshold Depending on the structure of the middleware it can be either the application s or middleware s responsibility to detect the change and transmit the value Alarm generator This sends an alarm with a certain type name and other accompanying data such as severity priority the value of some signals whether or not an acknowledgement is expected etc The Same component can be configured to generate many alarms File server When the system is started and even when it is running files need to be downloaded from a file server These might be executable components configuration files recipes etc A request must specify the correct file name and version number A large volume of data must be sent over
108. ogy describe the available communication mechanisms and QoS properties evaluate standardization interoperability and commercial aspects Learning to use the technology that is to be tested Based on the initial results of technology analysis NDDS and the TAO implementation of CORBA were selected for practical testing At this point only simple demonstrations were built since the goal here was to become familiar with the possibilities of the products before planning any tests in detail At this point it was noticed that clock synchronization must be dealt with before any accurate measurements can be obtained We also identified the OS asa significant cause of unpredictable behavior Our 100Mbps Ethernet performed reliably predictably and efficiently relative to the processing that was done under the Windows and Linux operating systems This knowledge was useful later in focusing the tests Test specification Based on the requirements analysis a general test specification was developed Its goal was to define tests for the key communication mechanisms bearing in mind the QoS requirements Technology dependent specifications were derived from this so that it would be Straightforward to implement the tests The test specifications can be considered successful if they exercise the middleware in realistic situations that cover the most important scenarios that occur in an automation system Designing and implementing the test components The t
109. on needs with varying performance and reliability requirements A realistic system has to handle massive volumes of data so the effect of scaling up the system on each of these scenarios needs to be known For this reason we have tested the middleware in a number of different circumstances that are relevant to process automation systems After reading these results we believe that the reader will have a fairly accurate idea of what kind of performance can be expected Finally we again point out that there is much that RTPS leaves unspecified Especially the order in which publications and subscriptions are serviced usually cannot be reliably predicted at compile time The programmer has limited control over the order in which things are done as NDDS typically operates with the first come first serve principle It is possible to for example individually send issues for all publications synchronously in a certain order However using the middleware in unintended ways is unlikely to yield satisfactory results In the scalability tests we noticed how the results for some topics were much better than others although the application programmer had not prioritized any of them This is why presenting a more limited amount of results would be misleading since we would not know if we are looking at best average or worst case behaviour 92 9 Conclusions 9 1 General Purpose Evaluation Criteria In this section we will review the main goals fo
110. ondary one had only done 3812 The steady flow of fresh data was not interrupted at this point which is confirmed by the fact that we got no deadline notifications after any issue other than 1999 The middleware has behaved according to its specification and this is no problem for cyclic transfer of measurement data If there is some application where it is important to get issues with consecutive sequence numbers the reliable publish subscribe mode should be used Having redundant publications with slightly different cycle times must be taken into consideration 3 Event Notification and Acknowledgement Services 7 3 1 Nodes and Network We refer to each node by the last part of its IP address The following nodes are used Node 45 667MHz 256MB RAM Windows XP Node 72 400MHz 128MB RAM Mandrake 8 2 Linux Node 92 533MHz 64MB RAM Mandrake 8 2 Linux 58 Nodes 92 and 72 are connected to the same 100Mbps switch This switch and node 45 are connected to another switch using LOOMbps Ethernet Time synchronization components run at real time priority Test components on Windows use high priority The environment for running components on Linux is slightly different from the previous section since we have solved some problems The test components are run at a priority of 10 and the code optimization switch O2 has been used at compile time for better performance In our experience raising the test component priorities does not
111. owever the system components can only support this level of flexibility if the underlying middleware has these capabilities 12 2 2 The Communication Mechanisms Figure 3 illustrates the most important mechanisms that will give the best support for designing process automation applications No existing product satisfies these requirements in full we will discuss some of the restrictions in sections 3 and 4 In section 6 there are test suites for exercising these mechanisms At the beginning of each suite we refer to requirements in this section and also summarize the main QoS requirements from LOHJAAVA 2121 CONTINUOUS DATA DISTRIBUTION Wiring from a named source to a named receiver the receiver maintains an up to date copy of the data any data structure can be used gt actual transmission can be done cyclically or when the value changes compare to IEC 61131 3 EVENT DRIVEN DATA DISTRIBUTION Wiring from a named source to a named receiver every sent message is an event which is processed if necessary events can be used to control execution the event might carry data for the algorithm that processes the event any data structure only the event 1 bit or a larger structure compare to IEC 61499 EVENT NOTIFICATION AND ACKNOWLEDGEMENT SERVICES event receiver subscribes to messages according to some filtering criteria
112. process the data in the right order but the work must also be done by a thread with a suitable priority We have already said that the NDDS implementation tries to minimize any overhead caused by the middleware so there are very limited ways for prioritizing any issues over others The advantage of this is that publish subscribe is a very efficient mechanism for data distribution tasks The disadvantage is that time critical data might be needlessly delayed by issues that could wait a whole second For example subscriptions in diagnostics and monitoring components or a history database could be kept waiting so that the signals for the real time control of the process can be delivered before their deadline expires Finally with NDDS it is possible to adjust the relative priorities of the threads involved but it is not possible to prioritize certain topics over any others in this way The designers of the CORBA Notification Service have taken a different approach and so their standard has different advantages and disadvantages LOMG 2002 There are sophisticated algorithms for processing event messages A message can for example have a priority and a deadline The application programmer could request that messages are sent with a first come first serve principle or that the highest priority messages are sent first If the processing capacity is exceeded the deadlines can be used to determine which messages should be discarded Real time CORBA al
113. r middleware products and evaluate NDDS from this perspective These goals are encapsulation of OS and network levels control of real time behaviour dynamic reconfiguration In section 9 2 we will discuss some of the special requirements for process automation The middleware is above the operating system and network layers so the programmer does not need to have any detailed knowledge of these levels Therefore the application is portable and can be easily reconfigured since it depends only on the middleware s API In our experience NDDS lived up to these expectations Scaling up the system by adding new nodes and components or moving components onto different nodes could be done without even recompiling any code Porting components from Windows to Linux was also straightforward First we ran the nddsgen utility that generates C code from our data type definitions that we used to develop the Windows components Then the source code we wrote for the Windows components could be recompiled on Linux without making any changes to the NDDS API calls Unfortunately we are still inclined to believe that high quality real time applications cannot be built without having some knowledge of the inner workings of the operating system and the network Although it was possible to develop the application without fixing any components to physical resources achieving the optimal real time behavior is another thing For example with a group of slow Li
114. rce phx tivi aly2000 en index htx 17 4 2003 Interviews and conversations 1 2 LKindel 2002 Robert Kindel RTI 9 2002 5 2003 LWang 2002 Howard Wang RTI 9 2002 5 2003 HELSINKI UNIVERSITY OF TECHNOLOGY INFORMATION AND COMPUTER SYSTEMS IN AUTOMATION Report 1 Report 2 Report 3 Report 4 Report 5 Report 6 Report 7 Report 8 Report 9 Koskinen K Aarnio P eds Internet Intranet and Multimedia Applications in Automation June 1998 Koskinen K Aarnio P eds PC based Automation Systems and Applications June 1999 Mattila M Prosessilaitteen et tukij rjestelm ohjelmistoarkkitehtuuri ja ohjelmistotekniset ratkaisut March 2000 Stromman M Ohjelmoitavan logiikan ohjelmointi ohjelmistotuotantoprosessina March 2002 Aarnio P Simulation of a hybrid locomotion robot vehicle June 2002 Peltola J Uudet automaatiojarjestelmat komponenttipohjaisen automaatiosovelluksen suoritusymparist6 September 2002 Fortu T Enterprise Resource Planning Integration with Automation Systems September 2002 Mattila M Condition Monitoring of an X ray Analyzer February 2003 Sierla S Middleware Solutions for Automation Applications Case RTPS June 2003 ISBN 951 22 6604 0 ISSN 1456 0887 Picaset Oy Helsinki 2003
115. ried out for the functional tests Here we will display summary data and try to understand what kind of performance and reliability can be expected from a system which is under a realistic load 8 3 1 3 Comparison of 2 signal receivers In this section we compare the statistics for all of the topics that were subscribed to by the receivers on nodes 127 and 199 For each topic that was subscribed to the signal receivers have recorded the minimum maximum and mean latencies as well as the standard deviations Remember that the following topics were published temp to temp100 with period 20ms on node 199 oressurel to pressurel00 with period 50ms on node 72 currentl to current100 with period 100ms on node 92 Before looking at the results it must be remembered that normal operation of NDDS is based on a first come first serve principle LWang 2002 The design goal has been to minimize the overhead caused by middleware processing which means that any certain topics are not prioritized over others Therefore we will observe better latencies for those topics whose issues happened to be processed first The order in which topics are processed is left unspecified although we will make some practical observations about this However since we have grouped all the topics that an application publishes under a single publisher we can never count on any particular topic being serviced before others Therefore in order
116. rity Either all of the issues for a topic are delivered or then none are Otherwise this mechanism has the same shortcomings as have been discussed for its CORBA counterpart There is no support for application level operator acknowledgements 4 3 4 Request Reply Figure 8 illustrates RTPS s Client server mechanism which is a good implementation for request reply Services are identified with service names that correspond to the topic names of publish subscribe It is possible to have several redundant servers with the same service name as illustrated in the figure The application programmer specifies a minimum wait and all responses that are received during this time from any of the servers are kept by the middleware After the minimum wait has expired the middleware delivers the reply with the greatest strength property to the application If no replies were received the first reply that comes after the minimum wait will be delivered immediately If the deadline expires before any replies are received the application is notified In the current version 3 0 of NDDS request and reply messages may get lost but the next version will deliver them reliably Wang 2002 It is therefore possible to build a certain level of determinism reliability and fault tolerance into the application If no response at all error returned Bast response ratumed If no response received during wait first response is retu
117. rned Cliant never notified responses saved tempe Minimurn wait Time ees aps Deadline Client makes call Figure 8 The Request Reply implementation 25 5 The Container Design Pattern 5 1 Goals The reader might not yet be convinced of the usefulness of the container in our architecture However none of the middleware standards that we have studied satisfy all of the requirements that we have mentioned above so an application level solution is required The container design pattern aims to solve the following problems 1 The integrity of data means that an algorithm will always get all of its inputs from the same sweep iteration of the algorithm that produced them The only way to guarantee this with existing middleware is to group all of the signals into one data structure that is always sent as one message This approach is unacceptable because it leads to serious maintenance problems This is perhaps the greatest shortcoming in the products that we have evaluated 2 In our test results we will have to point out frequently that any middleware has to rely on the operating system to schedule its threads Deterministic behavior can therefore only be achieved if it is possible to control the scheduling It should therefore be possible to execute the time critical tasks e g cyclic tasks with high frequency with high priority threads 3 The IT community has discovered that developing complex systems is much eas
118. rt signal to get the first issue All test components wait for the start signal and then create the publications and subscriptions It looks like all components got this done at the same time The publisher sent the first 29 issues although no subscription was ready and this is the expected behaviour since we didn t use a subscription wait 50 Delay in getting 1 issue Sequence number of 1 issue M No deadlines were missed on any node after the first issue was received 7 2 3 Results of test case 1 2 7 2 3 1 Parameters We have one signal generator on node 72 and receivers on nodes 45 and 72 Generator publishes 10000 issues for topic temp1 with period Pms Total time is 200s The test is repeated for values P 20 10 5 3 2 1 All receivers have deadline of 2 Pms Receiver on 72 has 0 initial delay Receiver on node 45 has P seconds delay Receiver s log files have names L1_2_IP_P txt where IP is 45 or 72 7 2 3 2 Latency statistics We first compare the results for the receivers on the 2 nodes in Figure 15 We can see that mean values are very similar On one hand we could expect lower latencies on node 72 since the receiver and publisher are on the same node On the other hand node 72 hosts 2 test components that must share the CPU and the hardware on that node is slower From the results we can conclude that these effects cancel each other resulting in similar mean performance 5l Comparison o
119. s in the worst case some critical task will never be executed since it will wait forever for an event that was lost The mechanism should therefore guarantee the delivery of every event to all receivers Even so application designers would do well to give some thought to the consequences of missing an event because the network might be down for a long time 2 2 5 Event Notification and Acknowledgement Services Although this mechanism is also used to transmit events its nature is different from event driven data distribution The latter is used to control the normal execution of the application In the case of event notifications we are sending alarm and notification messages to all interested receivers These events are generated when the state of a component changes in some significant way Sometimes the messages are only sent to inform an operator or they might be stored in a history database An alarm might force the system to stop its normal operation and embark on a special course of action such as open an emergency valve or stop the process safely The reliable delivery of messages is again required since missing even one alarm can have very serious consequences We can see that there is a separate domain of events that are not involved in controlling the application s normal execution but can nevertheless interfere with it This design approach has proven its usefulness with automation systems since they are large and complex entiti
120. s that the algorithm will use The situation is similar to CORBA the event message can be a data structure that also contains the signals but this leads to maintenance problems An application level solution to the integrity problem is suggested in section 5 The QoS support for event driven data distribution is very adequate On an Ethernet lost issues are very rare so the latencies are similar to ordinary publish subscribe By setting the appropriate publication properties we can enforce strict reliability which guarantees that every single event will be delivered 24 4 3 3 Event Notification and Acknowledgement Services Reliable publish subscribe can also be used for event notifications The relevant features here are the hierarchical structuring of topic names and the filtering of topics A topic name can consist of several fields such as heating pressure too_high sensor3 13 2D Subscriptions can be made by specifying filtering criteria on some or all of the fields The criteria are based on regular expressions A pattern subscription will create subscriptions to all topics that satisfy the filtering criteria The difference between this method and CORBA s structured event is that the latter has a list of filterable name value pairs where filter expressions are based on the value fields NDDS only has a list of filterable names so it is not possible to for example filter issues for a topic according to their priority or seve
121. se To observe how well the middleware handles large event messages does the performance suffer and is reliability compromised Method Just like test case 2 1 but we use burst level 3 and large table lengths so that the message size will be close to the 63kB limit permitted by RTPS Expected outcome No messages should be lost but the latencies might well be longer The sending queue might also fill up 6 8 Scalability Tests TS S Scalability tests will be run with the same components as the functional tests However the number of nodes and components as well as the number of publications and subscriptions in each component will be greater Test case S 1 describes the basic scalability test configuration The other ones are variations of this each variation tries to simulate some situation that might occur in an automation system Even though the volume of traffic has been increased the same QoS requirements apply as in the functional tests Please refer to the requirements listed for test suites 1 and 2 6 8 1 Multirate cyclic transfer of measurement data TC S 1 Test case id S 1 Purpose In functional tests we examined the behaviour of transferring data with a fixed period Although we moved to short periods the volume of traffic and number of participating nodes was small Here we will have three nodes that publish many topics with different periods We want to see how much the performance deteriorates compare
122. significantly improve performance mean latencies or jitter when there are no other user apps and the UI is not used Comparing these results to those in the previous test suite will show that there are no major performance differences This can be explained by the fact that performance will depend mainly on how well the OS schedules processes and handles interrupts Since we have no other user applications running there will not be much difference in this behaviour 7 3 2 Results of test case 2 1 7 3 2 1 Parameters We have one event generator on node 72 and receivers on nodes 45 and 72 Generator publishes 10000 issues for topics in elistl txt see OHJAAVA 227 with period 20ms Total time is 200s Burst level 1 is used so we test reliable cyclic transfer As stated in OHJAAVA 227 send and receive queue lengths are 5 and table array size in the data type is O unless otherwise mentioned Subscription pattern is so all topics should have been subscribed to Receiver s log files have names L2_1_IP txt where IP is 45 or 72 Publisher s log file is PL2_1 txt 7 3 2 2 Mean min max and stdev Figure 18 shows the statistics for the first fifth and tenth topics in elist txt The topics are labelled with the number 1 5 or 10 and W or L depending on whether the receiver was on the Windows or the Linux node 59 Min max mean and stdev O O fj Mean m Stdev O Min NO B
123. so gives a fine level of control for specifying the priorities of the threads that are used to carry out the services These mechanisms provide very interesting possibilities for achieving the desired level of determinism for time critical data The major disadvantage of this approach is that the heavy mechanism is rather inefficient for distributing great quantities of data RTI is working together with the OMG to produce a DDS Data Distribution Service standard and the specification should be published in the summer of 2003 LWang 2002 A publish subscribe mechanism will be used to provide efficient data distribution services Many of the Notification Service s strengths that we have described throughout this thesis will also be found in DDS 9 2 3 Dynamic Configuration Changes We mentioned in section 9 1 that NDDS s ability to handle configuration changes at run time was very acceptable We now describe one important scenario that places heavy requirements on the speed of dynamic reconfiguration In process automation control room software typically needs nearly every topic at some point so it will have hundreds or thousands of subscriptions It is considered essential that data is not transmitted unnecessarily to conserve bandwidth and processor resources on the subscribing node There should be some better way of turning off the subscriptions when they are not needed when the operator opens a different screen than destroying it
124. st case is that the cable was pulled out The effect of this is not obvious from statistics and charts so we will show relevant parts of the logs These excerpts are from the first topic in the log from node 45 the results for the other topics were similar Statistics for topic mixing expected value temp 1 5 First issue received 1991 709982ms after starting up the component Seq Ly Latency 3 842345ms 01 0 260mS 46700ms Segq 2 Latency 4 4 Seg 4 Latency 3 683004ms 4 2 Seq 3 Latency 4 9 469649ms Seq 5 Latency Seq 6 missed Seq 7 missed Seq 8 missed Segq 9 missed Seg 10 missed Seq 11 missed Segq 12 missed Segq 13 missed Seg 14 missed Segq 15 missed Segq 16 missed Seg 17 Latency 4 180390ms Seg 18 Latency 4 308903ms Seg 19 Latency 2 081569ms Segt 20 Latency 3 299750ms Seg 21 Latency 8 863063ms Seg 22 Latency 0 729161ms Seg 943 Latency 0 803651ms Segq 944 Latency 2 178448ms Seg 945 Latency 3 398734ms Segq 946 missed Segq 2235 missed Seq 2236 Latency 1046875188495 188100ms Seq 2237 Latency 1046875188493 828700ms Seq 2238 Latency 1046875188492 561400ms Seg 2239 Latency 1046875188502 334100ms Seq 2240 Latency 1046875188500 988800ms Seq 2241 Latency 1046875188499 764500ms Seq 2242 Latency 1046875188502 303500ms Seq 2243 Latency 1046875188501 043000ms Seq 2244 Latency 1046875188499
125. surement Data ciccvicccieidl ceeindccmriventiciidlhinedemsindeksiihinevn 47 Peed NOGE ANGIE TWO K aessecjescenssanecedanssccuienbusecs onmnadsncsuanacedantsenc ou nhesd ooseacceneneaareseanaiacarma st 47 Teza RESUS OT TSE CASE Gil cay ata ha tat E a anaes aataaaat alan andena a aceauewudas 48 Tea RESM Ol ese Case Ma a etore ac a E A a Ei 50 Ties RESIS TOT TESU Case LoD ine vous aie nal aie Sace sadeen ae uialie tees E 55 Foor REUS OL TOS Case 15 ics ee eae ee a a ce eh a en ac 56 7 3 Event Notification and Acknowledgement Services ccecececsecececscececcesescccsescsesesesees 57 Fask Nodecand NEIWOTK arenie aE tenn sired rats es ai dl ae alae ae ae di oc 57 sD RESU Orte SECIS 2AM ieena eean AO A EAEE EEA EO Eiei 58 Lao REMS OT ELCA E 2 2i Sea a n E EE EEEE ceuulewe selene eaneiececease 63 Poa RESANS OL LOSE CASE 2 ai a aa a 65 Jo IROSUITS OT LOSE CASe 2 A a ae E N E EE 70 Ta REU OF LOSE Case 2 D a E a E A R EO A NE 72 Tor Res oe Ca eA Oa ra E E E E E 72 SCAD ESE RESU Sarata a aa a a a e a misao 75 8 1 roduc ION eaan a baer en A E E A E a a 75 8 2 Scala VESTA FLANGE IICINES surre a ae 75 Sak Nodes and NEIWOFE cetie n a e a E E ESE 75 G22 MMe Basic COMPU Atl Oi scree ea eth dik cheater tee att sees oi eeacas eed sop actos 76 8 3 TES SASS E EE tS AE EEE E I E tanec autateas AE EAE EEEE 78 8 3 1 Multirate cyclic transfer of measurement data TC S 1 sssessesessessesesessesesssssessese 78 Do Aa OUS ECES A eaea TO 83 Oa Fa
126. t were created in the first phase The components should be configurable so the number of communicating entities and their properties can be given as parameters The communication scenarios and traffic patterns are similar to what might be encountered in a small process automation system We are testing the NDDS implementation of RTPS 6 2 Goals Tests will be planned to evaluate the following features of the middleware product Test the key communication mechanisms i e the mechanisms that are most suited for implementing the design level communication mechanisms that we have described in section 2 System startup and configuration changes at run time Name Directory services These allow a component to find out at run time what data and services are available and how they are accessed a true middleware product will hide the actual location from the user In the case of NDDS this functionality should be handled automatically by the managers It will be tested with the pattern subscriptions Scalability number of nodes number of communicating components size of payload frequency of transmission Reliability acknowledgements and retransmission redundancy Jl Performance latencies jitter throughput determinism 6 3 Application Structure In these tests we will have no real process to control and neither will we simulate any process with some kind of a model The purpose is to focus on the features
127. t with each issue There might be several subscriptions to this topic so that same value must be transmitted to all of them The frequency of transmission can be given as a parameter to the test Method The publication and subscription are started The publication sends issues with sequence numbers 1 to N and shuts down The subscription should record what issues are received and take the latencies as the differences of the sender s and receiver s timestamps It will then print a summary of the received data to a file This contains the minimum maximum average and standard deviation of the latencies The smallest and greatest sequence numbers that were received will be recorded We expect to receive messages for all sequence numbers in this range so if this does not happen the sequence numbers that were missed should be recorded Each subscription should also write a special alert if a deadline is missed Expected outcome The output of each subscription might indicate that not all of the issues were received since we are using a best effort mechanism This is acceptable However if deadlines were missed we have an error situation that should be reported Components used The publication is created with a cyclic signal generator component which is given the production rate and N the number of issues to send as parameters The subscription is implemented with a signal receiver which is given a deadline as a parameter The test c
128. tart getting issues 8 2 2 2 Acceptable performance degradation When the load becomes heavy the performance should degrade gracefully It is acceptable if some measurements are missed and latencies increase If such a thing happens during a peak load the production process will still continue with some temporary drop in quality The damage caused by lost or late data is very process dependent for the sake of safety it is considered desirable that a process will remain stable even if it does not get new control signals for some time However if the system behaves wildly or crashes we will get serious problems with product quality and the likelihood for safety problems is greatly increased 8 2 2 3 Setup and configuration Node 92 Signal generator publishes 100 topics currentl to current100 with a period of 100ms Signal receiver subscribes to all the temp topics with deadline 50 Node 72 Signal generator publishes 100 topics pressurel to pressurel00 with a period of 50ms Node 199 Signal generator publishes 100 topics temp1 to temp100 with a period of 20ms Signal receiver subscribes to all the pressure and temp topics with deadline 100 Node 127 Signal receiver subscribes to all the temp pressure and current topics with deadline 200 Node 45 Signal receiver subscribes to all the temp topics with deadline 40 Node 89 Signal receiver subscribes to all the current and pressure topics with deadline
129. tatistics based on the sequence numbers of issues within a burst For the first topic in elist1 this data has been plotted Figure 24 Figure 25 has the corresponding results for the 5 topic 71 Latencies for first topic e Stdev a Stdev Mean a gt am gt 4 oul 1 5 9 13 17 21 25 29 Sequence number in burst Figure 24 At first we observe the same behaviour as when sending with a burst rate of 3 the latencies of subsequent issues in a burst increase almost linearly We explained this with the issues being processed by the receiver more slowly than they could arrive so some of them had to wait in the receive queue Now looking at the results it is important to remember that the length of the sending and receiving queues was 5 When the sender s queue fills up the send will block for 100ms or until there is space in the queue The receive queue also gets full at around the same time since it has the same size This explains the peaks in the 2 charts at the 5 and 6 issues sent because that is the point where the traffic jams It is just like driving in a traffic jam at one point the traffic comes to a halt and then it gradually starts moving again The exact pattern depends on the inner workings of the scheduler and interrupt handler Remember that the sending timestamp is taken just before the issue is actually sent off This explains why the late
130. ter Systems in Automation at the Helsinki University of Technology as a part of the OHJAAVA 2 Modern Distribution Solutions in Open Control Systems research project OHJAAVA 2 belongs to Tekes Intelligent Automation Systems technology program ALY The other participants in the project were VTT Industrial Systems Espoo LVTT as a research partner and the companies Metso Automation Networks Tampere LMetso and Raute Precision Lahti LRaute 1 1 Background and Starting Point 1 1 1 The Architecture of a Single Node In a master s thesis done for the preceding OHJAAVA project LOHJAAVAI the component based architecture of a single node has been described in detail LPeltola 20021 In particular an interface between application components and the middleware has been defined This is an appropriate starting point for this thesis which focuses on the communication of components that have been distributed onto several nodes The architectural model of a single node will serve as the background of this thesis and we will summarize its main elements here LPeltola 2002 The model is not based on any existing middleware Standard rather it has been derived from the requirements of the application i e the automation system Some of the model s characteristics might have to be adjusted when a real system is implemented Scheduler PortConnector Listener j Figure 1 The container architecture LPe
131. tern subscription mechanism will be used to receive some or all of its signals If the signals have a sequence number it will be very easy for the Listener code to enforce the integrity requirement ReadListener will then return signal values from the most recent iteration for which all Signals have been received up to that point 5 3 Benetits and Constraints With respect to our goals the following benefits have been achieved 1 Data integrity is enforced with simple coding in the listener classes The scheme works if the Signals are named as described above and this naming is consistent with the structure of the process 2 If a RTOS is used deterministic scheduling of the algorithms is achieved by running each ExecutionThread object in a thread with a suitable priority Typically we would use higher priorities for those threads with shorter cycle times 3 The container functionality is independent of the application logic so it can be reused by application designers when building solutions for different clients The application design will not be encumbered by any details relating to the execution of the algorithms or implementing the connections for the data flows 4 Components with the same cycle times can be run in the same thread Therefore they can exchange data directly via a port connector so middleware services are not used needlessly For safety and robustness the design forces all communications among components
132. the proxy references from the channel A reference to the channel is found using the naming service when the name of the channel is known Now the container has a consumer and supplier that correspond to the listener and sender in section 1 1 These have methods for sending messages or handling received messages so a simple interface is available to application objects 3 3 The Communication Mechanisms We will now evaluate the suitability of the notification service for implementing the key design level mechanisms in section 2 LPeltola 2003 3 3 1 Continuous data distribution Conceptually the event channel can be used for this quite naturally The suppliers can push data to the channel at the rate that they produce it Consumers can receive any subset of this data by setting the appropriate filters Therefore we have a publish subscribe mechanism that was introduced in 1 1 2 and is explained in more detailed in the section for RTPS As we said OMG has used its RMI mechanism to communicate with the event channel so distributing large quantities of data in this way is inefficient OMG engineers have admitted this and are working on a DDS Data Distribution Service specification which should be published in the summer of 2003 LWang 2002 This is done together with the developers of RTPS so DDS should combine the strengths of the Notification Service and RTPS 3 3 2 Event Driven Data Distribution The Event channel is naturally best suit
133. tion with no major bottlenecks Latency distribution for 50ms period e NN W O 01 O 01 O O1 O ae gt Q c Q ed 14 aul Figure 28 15 8 Scalability Test Results 8 1 Introduction In this section we describe the exact test arrangements and parameters used to run the scalability tests We do not include all of the results since the log files for this test suite alone have a total of over 100000 lines Here we show summary data as well as any information that was unexpected or otherwise interesting We use the same components as in the functional tests The difference is that the number of participating nodes and components as well as the volume of data is much greater In the basic test scenario we generate traffic that is somewhat typical for a process automation system In later test cases we add a few components to observe how the behaviour is affected by components with special communication requirements We will be observing behaviour that is in many ways similar to what has been reported in the functional test results We will not repeat all of those conclusions here rather we will focus on any new insight that is gained from scaling up the tests 8 2 Scalability Test Arrangements 8 2 1 Nodes and Network All of our IP addresses start with 130 233 152 so we will refer to nodes by the last part of their IP address The following nodes have been
134. tre contol TCS 3 aeea a E ERE 85 S54 Dynamic start Uptime TCS As atic cia uk et aaa eat ale acute echoes 87 8 3 5 Increasing the load with large data structures TC S 5 uo ccececececscscscscscscsceeeees 88 8 4 CONCUSSION hcireiee ny te emery erates re ear sient ye Beery aero ere rere een ty Ce Menem E RE e re Berean tere err 91 CONCIS IONS coii dole comeceet oc vn bases atsei na deateumnmeeel E E E 92 9 1 General Purpose Evaluation Criteria sesesseseeseseesessesesresesseseseesesesseeseseeseseeseseeseses 92 9 2 The Special Requirements for Process Automation cccccecesceccecceceseecesenseecceceseuces 93 9 2 1 The Logical Design of the Application s sccinsid escent sicaxer indented becues dueouesid Manearaehoeetias 93 Gee POCONO E nsan E E E E 93 9 237 Dynamic G ntig ration ChaNgeS sohor arn eaa r E E E A 94 RETOrENCE S scien tacescctus as at eet ATEI 96 Terms and Abbreviations API COM CORBA DDS NDDS QoS RMI RTI RTT RTPS TC TS Application Programming Interface Component Object Model Common Object Request Broker Architecture Data Distribution Service Network Data Delivery Service Quality of Service Remote Method Invocation Real Time Innovations Round Trip Time Real Time Publish Subscribe Test Case Test Suite VI 1 Introduction The name of this thesis is Middleware Solutions for Automation Systems Case RTPS The work has been done for the Laboratory for Information and Compu
135. trol room component will make use of the services of many of the components mentioned above such as the signal and alarm receivers so it could be modelled as an aggregation of these 33 6 4 Clock Synchronization Clock synchronization between two machines is dealt with in software by obtaining an offset that expresses the difference between the timers on the 2 machines Figure 12 shows machines A and B To Start the synchronization procedure machine A sends a message containing its timer value Al Machine B receives it and records its own timer value B1 B responds immediately and A receives the response at time A2 Now A can approximately calculate that time B1 corresponds to the average of Al and A2 on A s timer The offset between the timers is then A2 A1 2 B1 This value tells us how much A s timer is in front of B s Since all messages from A include a timestamp we simply subtract the offset value from it in order to obtain a timer value that is synchronized with B s timer Figure 12 The synchronization algorithm A realistic scenario will often have more than 2 nodes so we choose one of them as the master clock node and every other node will have a synchronization client that calculates the offset between its timer and the master s timer Machine B above would therefore be the master node and A would be any node that hosts a synchronization client Now all of the nodes can subtract their offset from the local timestamps
136. ume of incoming data affects the latency and jitter This correlation is further illustrated by the beginning of the graph notice that it takes around 8 seconds before we reach the worst case performance Looking at the logs for the receivers on node 45 we see that around one third of the subscriptions got their first issue in less than 3 seconds after the component was started For the rest there was a delay of 6 8 seconds In 6 seconds 1500 issues and in 8 seconds 2000 issues of levell were sent At this point there is a very obvious increase in the latencies for the temp topics The quick flow of levell issues does seem to slow down the start up of some temp subscriptions In the basic case S 1 the worst start up time was 2 1 seconds and in this case it was 8 1s Latencies for topic level1 Latency ms O A NW FOO N 3366 6731 10096 13461 16826 20191 23556 Sequence number Figure 37 After the temp publications shut down we observe steady behaviour with levell After 50s the oressure publications on the same node that published levell shut down but we see nothing remarkable at this point This might be because the sending end is not the bottleneck as we have seen before However the sender only takes the timestamp right before the packet is sent off so we would not see the effect of congestion on the sending node 87 8 3 3 3 The effect on th
137. ure 3 4 cooling unexpected fault temp 3 3 cooling unexpected too_large temp 3 3 furnace expected value temp 2 8 furnace expected value temp 2 9 furnace expected value pressure 2 14 furnace unexpected fault temp 2 13 furnace unexpected too_large temp 2 13 The first subscriber uses these criteria cooling The second subscriber pressure The third subscriber ey fa ad E Expected outcome The first subscriber should receive the 5 events from the cooling process area The second should receive one pressure related event from cooling and mixing and 2 from the furnace 6 7 4 Only one subscriber goes down TC 2 3 Test case id 2 3 Purpose To test how well the middleware can detect that a subscriber has gone down Missing acknowledgements from such a subscriber should not prevent delivery to other subscribers 42 Method One signal generator with 10 distinct events from elistl txt is started 2 receivers are Started on different nodes and both of them should subscribe to all of the events 10s after one of the subscribers has been started we unplug its network connection and after another 10s we will plug it back in we use a wrist watch The generator parameters N and P should be such that it will continue sending for some time after this Burst level 3 is used Unplugging the Ethernet cable will usually cause the computer to disconnect its network interface so reconnecting the interface might
138. used 45 667MHz 256MB RAM Windows XP 12 400MHz 128MB RAM Mandrake 8 2 Linux 199 2GHz 512MB RAM Windows XP 89 533MHz 128MB RAM Mandrake 8 2 Linux 127 350MHz 128MB RAM Mandrake 8 2 Linux 92 533MHz 64MB RAM Mandrake 8 2 Linux 72 89 92 and 127 are all connected to the same 100Mbps switch This switch and 45 are connected to a switching router with 100Mbps Ethernet 199 is connected to another switching router at 100Mbps Ethernet The switching routers belong to the backbone which operates at 1Gbps 70 8 2 2 The Basic Configuration 8 2 2 1 Purpose Here we describe the basic scalability test configuration The test cases are variations of this each variation tries to simulate some situation that might occur in an automation system In functional tests we examined the behaviour of transferring data with a fixed period Although we moved to short periods the volume of traffic and number of participating nodes was small Here we will have three nodes that publish 100 topics each with different periods We want to see how much the performance deteriorates compared to the functional tests Ideally the middleware should prioritize the topics with shorter periods but NDDS does not support this RTPS is based on a best effort principle which just tries to minimize the latency caused by any middleware processing We also want to see how long it takes for the system to start up i e when do subscriptions s
139. ve already been adopted As the demands for vertical integration grow the benefits of using object technology at the lower levels of plant automation should be obvious 3 2 The Notification Service Architecture With the event service OMG has used its basic RMI mechanism to build higher level communication services The notification service LOMG 2002 has extended this work and provides QoS support using the Real Time CORBA specification She 4 ni leur jih Binalar Oo Pull Supplier Push Supplier Consumer Filter Consumer Filter Proxy Pull Consumer Proxy Push Consumer a Admin Filter Admin Filter Event Channel supplier Admin Supplier Filter supplier Filter Proxy Pull Supplier Proxy Push Supplier Figure 4 The Notification Service architecture LOMG 2002 Figure 4 shows the notification service architecture the horizontal lines separate the middleware services from the container objects The key element is the event channel which decouples suppliers and consumers Peltola 2003 Suppliers can connect to the channel and provide data to it without having any knowledge of the location number or nature of the consumers The consumers in turn connect to a channel and can receive all of the messages that have been supplied to the channel A Structured event data type can be used for messages and much useful information can be stored in its fields For example signal name id priority severity and process area are exa
140. vel is integrated vertically to higher level management systems security risks increase dramatically A security architecture with all the necessary mechanisms is required from a product that will be used for vertical integration Middleware is usually designed to be used with other common Internet technology HTTP based methods enable some data or functionality to be accessed with web browsers FTP can be used for file transfer Common Internet security techniques can be used but this will be much easier if the middleware is designed to work with them Most middleware standards aim at accomplishing some tasks as well as possible Indeed middleware that could be used under any circumstances would not perform optimally in all situations The architecture of the middleware along with the available communication mechanisms will constrain the scope where the middleware should be applied For enterprise wide solutions a well chosen mixture of one or more middleware products and other Internet techniques will be necessary 16 3 CORBA Notification Service 3 1 Introduction Some existing technology must be used to implement the communication mechanisms that were described in section 2 Currently no product offers enough functionality to fully implement all of the desired design level mechanisms The mechanisms that are available depend on the background of the technology and its intended user groups The choice of any middleware product will
141. we used the old one since the value will not become obsolete in 200ms Therefore the algorithm which was run at real time priority performed well unless the CPU was under a peak load for a longer period of time Timestamps were taken using a function that was included in the NDDS libraries this uses the query PerformanceCounter on Windows and getTimeOfDay on Linux Since we take clock drift into account as explained above the accuracy of these functions is very adequate for our purposes There are greater sources of error 6 5 Structure of the Tests In the functional testing phase we want to test the key communication mechanisms that we described in section 2 so we have to choose the most appropriate communication mechanisms that the product offers In section 4 we described the mechanisms of NDDS Continuous data distribution will be tested with best effort publish subscribe and the test cases for this are grouped under test suite 1 Event driven data distribution and event notification and acknowledgement services should be implemented with reliable publish subscribe so we test this in suite 2 Due to a lack of time we are not testing NDDS s request reply mechanism In informal tests we have noticed that it worked as expected and the performance requirements for this mechanism are not very high in automation systems Finally we have a scalability test suite where we use the components from the functional testing phase We w
142. with different cycle times to go via the middleware The design constrains application developers to apply a certain framework However this framework is based on the function block standards so it the natural paradigm Most application designers will be content if they do not need to change their thought models to those that dominate the IT industry Nevertheless their applications can communicate using established IT technology such as CORBA The framework has been developed for cyclic data distribution If we are to use some of the other communication mechanisms that we have described the model can be extended For example if an algorithm generates an alarm or notification message a Sender object can be used to dispatch this as well as any cyclic data Accommodating event driven data distribution into the model will require some more thought In this case an input port can also be an event port that does not receive new data in every iteration PortConnectors will have to distinguish between events and cyclic data so they will write event input ports only when an event is received An incoming signal in these will trigger some algorithm but 29 these are executed by a thread whose priority is different from the cyclic execution thread If necessary there can be several threads with different priorities for processing events Above we have assumed that cyclic processing continues regardless of events Pure event driven proc

Download Pdf Manuals

image

Related Search

Related Contents

Manuale di Istruzioni - Omnik Italy Inverter Fotovoltaico  WSG08POE User Manual  Biologie génique  Franke CS 981 M XS M  RAM-6800-GE-AC - Walker Industrial  Samsung 941MG Benutzerhandbuch  pour - Aerne Menu  MultiFlex PAK Compressor/ Condenser Control  

Copyright © All rights reserved.
Failed to retrieve file