Home
51938 TECSPEC
Contents
1. Compliance Sr Minimum Specifications Functionalities Capabilities Y N Details PCB based Unshielded Twisted Pair Category 6 Copper Telecommunication Outlet Connector I O Modular conforming to 1 TIA EIA 568 C 2 and ISO IEC11801 3 Modular Jack 750 Mating cycles Wire terminal accessories 200 termination cycles Integrated bend limiting strain relief unit for cable entry Support cable pair termination process on the jacks at 90 degree angle Should have mechanism to maintain quality of the termination ir respective of the skill level of the termination staff Housing Polyphenylene oxide 94V 0 rated 110 Block polycarbonate 94V 0 rated Jack Contacts Beryllium copper plated with 1 27 mm 000050 thick gold in localized area and 3 81 mm 000150 minimum thick tin lead in solder area over 1 27 mm 000050 minimum thick nickel under plate Wiring Blocks Polycarbonate 94V 0 rated Approvals a UL Listed CSA Approved Performance Characteristics to be provided with bid Attenuation NEXT PS NEXT FEXT and Return Loss 14 Make of the offered product Item No 21 amp 22 UTP Patch Panel Compliance Y N Details Minimum Specifications Functionalities Capabilities Modular Patch Panel compatible with CAT 5e amp CAT 6 having Rear Cable Manager Panels should accommodate 12 24 CAT 5e Cat6 jacks in 1U and have a proper shallow angle to minimize interferenc
2. Authentication Protocols to support EAP TLS TTLS PAP and MD5 _ 13 Should be compatible and interoperability supporting current and future i network configurations 14 Should seamlessly integrate with the switching solution proposed for AAA soyam vian seaten er amne ieer petes Should support Dynamic Statistics and reports to track View all the authentication requests track the duration of user connection with Radius accounting 16 Provide high level visibility to Administrators to track who logged onto or disconnected from the RADIUS server network Should support IPv6 from day 1 o The Radius server should be proposed in high available mode with no single point of failure In case of the primary server failure the secondary server should seamlessly take over with zero network disruption a 19 The RADIUS server solution should be preferably from the same Active switching vendor In case vendors proposing for 3rd party Radius server solution other than proven OpenSource software products they shall provide all the interop reports certified by both the RADIUS server vendor and Active switching vendor on seamless interoperability 2 i ss 20 In case of 3rd party Radius solution other than proven OpenSource software products the OEM should have local presence in India and also should authorize the bidder for supplying the product to NPCIL 21 The Radius server solution proposed should have been integrated wit
3. Page 32 of 32
4. 9 5 um 0 6 um 1 2 3 4 5 6 Oj j N Cladding Diameter 125 0 um 1 um Page 24 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL 1 Core Concentricity error max 0 6 um 12 Cladding Non circularity max 1 0 13 Cable cut off wave length max 1260 nm 14 Chromatic Dispersion 1310 nm lt 3 5 ps nm Km 1S 1550 nm lt 18 0 ps nm Km Macrobend loss at Radius 30mm with 100 turns at 1625 nm max 16 0 1 dB 7 Attenuation coefficient Max at 1310 1625 nm gt _ 0 4 dB Km 18 Max at 1383 nm 3 nm gt _ 0 4 dB Km 19 Max at 1550 nm gt _ 0 3 dB Km DO Mechanical Attributes D1 Tensile Rating 1250N Maximum Crush Resistance 3000 N Environmental Attributes Operating Temperature 20 C to 70 C Induced attenuation at 1310 and 1550 60 Degree C to 85 Degree C lt 0 05db Km Item No 55 Documentation The successful bidder shall provide comprehensive documentation for the Communications Network solution including the network NMS services and processes as outlined in the other sections of this document as required for the ongoing engineering operation maintenance and upgrade of the system All technical descriptions operations and installation manuals shall be provided in the English language
5. 41 The proposed switch shall be full Layer 3 switch with routing 42 Shallsupport IPv6 RIPng Page 14 of 32 1 6 2 1 2 2 2 3 2 4 N ui 2 C 3 1 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL 4 3 Shall support OSPFv2 or higher version o S SVL 5 1 VTP GVRP or Equivalent S S 5 2 LLDP or equivalent o S 6 Security s S o 6 1 Private VLAN Guest VLAN oS S 6 2 IEEE8021X ooo S 6 3 Access control lists s G O e O O 6 5 Dynamic ARP Inspection DHCP snooping inspection 6 6 DynamicVlANassignment oS d 6 7 MAC Based Authentication oS S o 6 8 BPDU Guard Root Guard SSS S 6 10 6 13 6 14 Should support min 1024 ACL s in hardware 7 Quality of service o S 7 1 Policy base QOS based o S 8 IPv6 Features Features should be available from day 1 J 8 1 DHCP Relay ver 6 S S 8 2 8 3 8 4 9 1 sFlow or equivalent oo G 9 2 SNMP3 o S 9 3 Port Mirroring ooo S o 9 4 Open standard CL ooo 9 5 as Out of band Ethernet management port Po 9 7 Console management port o 10 Compliances s G 10 1 ROHS compliant is must Po 10 2 10 3 Product certification to meet the relevant IEC EN CISPR FCC standards on EMI EMC by UL cUL TUV IPv6 features shall be certified by TEC IPv6 Ready Logo UNH IOL USGv6 Make amp Model of the offered product Item No 8 a
6. groups 54 _ Loop Protection and Loop Detection 5 5 HSRP VRRP or Equivalent technology 6 Routing Should support static and RIP routes is 62 Ravareshouecpopesedbythesuice nf hardware should be proposed by the bidder Should support static IPv4 and IPv6 routes dynamic routing IPv4 amp IPv6 protocols like RIPng OSPFv3 BGP4 64 should support ming 000Pvaroutes o 6 5 Should support min 8 000 IPv6 routes 7 IPv6 Features Features should be available from day 1 J 7 4 IPv4 and IPv6 Dual host Stack 7 2 IPv6 Management via Ping Trace Route Telnetand SSH J 7 3 Static Unicast Routes for IPv6 oS o y DNS Extensions to support IPv6 PO An Architecture for IPv6 Unicast Address Allocation PO Page 12 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL 7 6 Neighbor Discoveryforipve 77 icmpve o o 78 Transmission of IPv6 Packets over Ethernet Networks 79 IPv6 Router Alert Option SS S O 7 10 Connection of IPv6 Domains via IPv4 Clouds 7 11 IPv6 Addressing Architecture 7 12 Internet Control Message Protocol ICMPv6 J o 7 13 IPv6toIPv4tunnelins S o 7 14 DHCP V6 SNMP v6 Telnet and SSH on IPv6 8 Multicast Support o S 81 IGMPSnooping S S 8 2 MLD Snooping vtand v2 8 3 Internet Group Management Protocol v2 v3 84 PIM SMv4andve a 9
7. 17 9 12 15U Wall Mount Network Rack Compliance Sr Minimum Specifications Functionalities Capabilities Y N Details 1 Glass Door with lock amp key 1Ph 230V 16A 2U standard rack mount power distribution unit with 6 X Indian Round Pin 5 15A Inlet Plug type 16A Indian Round 2 Pin 16A MCB PDU Rating 3 6KVA 3 Horizontal Cable Organizer 1U Loop Fan 90CFM Mounting Hardware CR Pack of 20 Make of the offered product Item No 18 CAT6 UTP Cable Sr Minimum Specifications Functionalities Capabilities weak 1 Cat 6 UTP cable must fully conform to ANSI TIA EIA 568 C 2 l Transmission UL Listed Pair Separator Star filler No bisector tape Technical Specifications Conductor Solid Bare Copper 23 AWG Conductor Diameter at least 0 574 mm Insulation PE 11 Average Thickness 0 23 mm 0 03mm Min Point Thickness 0 18mm 13 Insulation Diameter 1 04mm 0 05mm Twisting Lay length 30 mm Underneath 15 Filler PE 16 Jacket PVC with FR rated 17 Average Thickness of Jacket 0 5 mm 0 05 mm 18 Minimum point Thickness 0 46 mm 19 Outer Diameter 6 1 mm t 0 15 mm 20 Make of the offered product Page 20 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL Item No 20 UTP Information Outlets
8. FCC standards on EMI EMC by UL cUL TUV IPv6 features shall be certified by TEC IPv6 Ready Logo UNH IOL ta USGv6 Make amp Model of the offered product Item No 2 Distribution Switches Technical Specifications via Stackable Layer 3 Gigabit Fully manageable Switch with minimum 24 nos of 10 100 1000 RJ 45 Copper Minimum 2 SFP ports and 2 SFP COMBO ports In each switch 2 nos of 10G port should be populated from day 1 Should support core to distribution Active Active Clustering VSS or equivalent technology for high availability and quick resiliency 1 2 The proposed VSS technology should support high availability for both 1 3 Layer 2 and Layer 3 applications between core amp distribution switches Shall be loaded with internal redundant power supply Lt Stacking bandwidth shall be minimum 48 Gbps Pog Switch shall be scalable to support 2 x 40G QSFP ports Performance 1 1 Forwarding Rate Min 180 Mpps or better Switching Fabric Min 240 Gbps or better packets Details sizes Details Switch should support non stop Routing and non stop Forwarding features to ensure no drop in performance during link failover with core switches Resiliency in the Core 10G ring as per the IEEE 802 17 RPR ERPS or Furnish equivalent technology providing the convergence time as per the Details standards specified above 3 2 3 3 3 4 leeeso2apesrP S o E 3 5 IEEE802 1QMSTP__ S o E a Routing o o E
9. Labeling amp numbering of IOs including existing LAN points 5 4 Rack installation 5 3 1 5 3 2 5 3 3 5 3 4 5 3 5 Replacement of existing Racks or new installation of 9U 12U 15U racks wherever applicable Proper cleaning of existing racks and proper painting of walls if required before installation of new components Labeling amp numbering of racks Extension of Power supply connection from nearby power source if required Proper closure of open entry areas with steel mesh cement etc to avoid rodent entry 5 5 Active Component installation 5 4 1 5 4 2 Ensure latest patch updation for all active components before installation Prepare the detailed implementation scheme in consultation with NPCIL representative 5 4 3 Create subnets VLANs security zones radius configuration ACLs NMS Page 28 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at 8 9 Kaiga Site of NPCIL configurations IPv6 implementation etc 5 4 4 Prepare performance monitoring scheme monitor the performance of the individual component subnet and total network as a whole for minimum period of one week and submit the report Carryout the analysis and implement required performance tuning plan Documents 6 1 Operation and Maintenance Manual The Successful bidder has to supply operating and maintenance manual for all types
10. PDF formats Other soft copy documentation such as reports schedules and charts are to be provided in one or more of the following formats unless otherwise agreed by KGS 1 4 Microsoft Word for Windows DOCX Microsoft PowerPoint PPT Microsoft Excel XLS Microsoft Project Microsoft Visio Adobe Portable Document Format PDF gt OoO A090 Item No 56 Installation and Commissioning amp Training The plant site of Kaiga is constructed with high quality construction material and heavy concrete structures Bidder may conduct survey of locations wherever the installation of racks laying of cables etc required and may execute complete study to quantify the quantum of job amp complexity involved before submission of proposal The supplier shall be responsible for installation and commissioning of laying of cables switches and all accessories Supplier shall ensure that trained and qualified personnel are involved in installation and commissioning Personnel engaged in the installation and commissioning work will have to follow the security procedures controlling entry and movement These personnel have to strictly follow the safety regulation industrial safety of site In such a matter purchaser s instruction wherever given will be binding Training The supplier shall provide two sessions of training modules with minimum one week duration to purchaser s engineers and staff 8 10 employees One session of training
11. of switches 6 2 Technical description All the technical details of the switches has to be provided in details 6 3 It may include technical data sheets system architecture parts catalogue etc Troubleshooting and Maintenance Instructions The detailed troubleshooting methods routine and periodic maintenance procedures Manufacturers operating and maintenance manual and one soft copy in PDF of MS word for each type of switches shall be supplied to the purchaser INSPECTION AND TESTING 7 1 Trial Run testing After the successful installation and commissioning of all the network 7 2 7 3 switches the overall Local area network at Kaiga should function satisfactorily and as per the requirement of purchaser Trial Run should be carried out for seven days after the successful installation and commissioning of all the network switches Test Reports Copies of the inspection and test reports signed by the authorized representative of the supplier shall be submitted to purchaser Network Auditing The contractor has to perform the auditing of the entire network to determine the overall network capability right from the Input of the main primary switch to the outlets desktops with the aid of specific auditing devices This auditing is to be done after the network and the computers are put to normal operation and auditing is to be carried out for about one week period to find out the average performance The auditing results are to be su
12. should be of Dimensions 19 Width x 1U Height Should be able accept SC Duplex SC Simplex LC Duplex and MTRJ Adaptors Should have snap in sub modules with six single fiber or 3 dual fiber Should have a fiber management system molded in to the unit structure to effectively route fibers from an incoming cable through to the connector interface Should have knockouts at the rear to enable termination of loose tube or tight buffered cables as well as blown fiber tubes Should be made up of preferably non metallic Polycarbonate ABS non corrosive material Should have the option of accommodating at least 6 nos of splice protection sleeve each can accommodate 4 connectors Should be slide able and should have tamper proof positive locking mechanism by means of clips supplied as standard with each unit Make of the offered product Item 56 12 Core Outdoor OFC Cable Minimum Specifications Functionalities Capabilities Compliance Details 12 core Single Mode Corrugated Steel tape Armor Loose tube Fully water blocked core E glass Yarns Outdoor fiber cable fully conforming to ITU TG 652 D And OR IEC 60793 2 50 C1 3 standard Cable Attributes Number of Cores 6 12 Armor Corrugated Steel Tape Armor Cable Diameter 10 5 mm 1 0 mm Sheath Thickness _ 2 0 mm Operating Wavelength at 1310 nm and 1550 nm Fiber Attributes Mode Field Diameter at wavelength 1310 nm 8 6
13. tx E5 1 No Rack 6U amp 9U 6 9U Glass door 25 Nos Installation Requirements 5 1 Optic Cable Laying 5 1 1 5 1 2 5 1 3 Excavation of trenches up to Depth 92 Cm amp reinstatement as per construction Practice amp specifications having mixed soil i e combination of Ordinary soil Soft rock and Hard rock Backfilling and dressing of the trench Laying with leveling amp fixing of GI Pipes HDPE pipes in the trench including transportation wherever required Mounting of OFC markers for easy identification of the route of fiber 5 2 OFC Termination 5 1 1 5 1 2 5 1 3 Termination of Single mode Fiber cores Termination of all Multimode Fiber segments of existing OFC MM backbone Splicing of fiber cores SM MM wherever required 5 3 UTP laying and related jobs 5 2 1 5 2 2 5 2 3 5 2 4 5 2 5 5 2 6 5 2 7 Laying of CAT 6 UTP cable to end user location wherever required Bidder shall arrange all necessary sundry items like screws guttas etc for laying amp fixing of Casing amp Cables Laying of 2 uplinks of CAT 6 for Switch to Switch Uplinks Installation Replacement of existing UTP patch panel amp termination if required Neat arrangement of cables using tags amp cable managers UTP patch panel to switch connection inside rack with 3feet patch cords in 4 sets of colors for proper identification Providing and use of unique color for patch cord for uplink
14. will be conducted prior to deployment of proposed active components and one will be conducted after commissioning of the LAN project Supplier shall provide all the facilities and documents or manuals for training Hands on training on all major features of the supplied switches shall be included in the training program Page 26 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL The training should cover a Configuration of CORE switches b Configuration of IPv6 for layer 2 Layer 3 switches c Active Active Failover Convergence d NAC RADIUS Dynamic VLAN and Authentication e Dual stacking tunneling of IPV4 and IPV6 f VLAN creation g Port mapping and traffic segregation h NMS amp Network Monitoring and management i Troubleshooting j Overall administration of switches Item No 57 Warranty The network switches shall carry a comprehensive on site maintenance warranty of 3 three years from the date of commissioning Option for additional 24 months warranty with cost breakup with payment terms should be mandatorily specified NPCIL reserves the right to exercise the additional warranty option Documentary proof regarding back to back agreement with OEM for support of the all active components during the period shall be submitted The scope of warranty shall include replacement of the defective part breakdown main
15. work before preparing the detailed workout plan of the network Any type of tools measuring test equipment or other items things such as welding cutting machines grinders fork lifter safety belt ropes rags cleaning agents heaters Laborers assistance supports etc required for execution of this work will not be provided by KGS and Contractor has to arrange at his own cost and risk Accommodation Contractor shall make his own arrangement for conveyance boarding lodging of their staff without any extra charges to the corporation However local i e Mallapur residential colony accommodation for staff stationed at KGS during the period of the contract may be provided on chargeable basis subject to the availability of the room as per the station policy Transportation NPCIL will provide to and fro transport facility for the Service Engineers between Mallapur Township and Kaiga Site subject to availability on chargeable basis Approximate to amp fro charge per person per day is Rs 40 and subjected to revision from time to time Insurance All the personnel employed for the contract shall be covered by ESI scheme or group insurance or individual workman compensation policy During the work at KGS tenderer and all his staff should adhere to the safety amp security guidelines and regulations followed at KGS site Any neglect or failure on the part of the contractor in obtaining necessary and reliable information upon the fo
16. 1 802 1x support 9 2 Dynamic VANS e y 19 3 Private VLAN Guest VLAN 9 4 BPDUProtection oS G y 35 STPRootGuard oo o d 9 6 DHCP snooping ooo G 9 7__ Should support MAC address filtering and MAC limiting features os The switch should support detection of Denial of Service DoS an attack 99 Radius Accountins S S O 9 10 Should support min 4000 ACUsinhardware 10 Quality of Service __ S o 10 1 Policy based QoS features o o 10 2 Control plane traffic prioritization 10 3 8QoS queues per port oS o O 10 4 WRED SDWRR or equivalent queuing technology 11 Management o o ann Oo 11 3 Portmirroring o S 11 4 sFlow or equivalent oS S 11 5 SecuredShell S S Optical Digital Diagnostics Monitoring DDM in accordance to the open standard specification SFF 8472 or equivalent 11 7 __ Industry Standard CU Firmware upgradation comprehensive configuration and management activities of the proposed switch shall be available thru a centralized NMS removable device similar platform NTP and Syslog Ooo 11 10 The switching engine shall have minimum 2GB RAM o E Page 13 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL Electrical Approvals and Compliances PO Restrictions on Hazardous Substances ROHS Compliance et 12 2 Product certification to meet the relevant IEC EN CISPR
17. 23 24 25 26 UTP Patch cable Compliance Minimum Specifications Functionalities Capabilities Y N Details 1 2 5 amp 10 Meter Cat6 Patch cords must conform to ANSI TIA EIA 568 C 5 Transmission Performance Specifications for 4 pair 100W Category 6 Patch chord should be moulded boot type Patch chord should have Pair separator Star filler No bisector tape Jacket should be PVC Should have boot to protect the locking latch on the RJ45 plug Should be available in different colors Operating life Minimum 750 insertion cycles Contact material Copper alloy Contact plating 50u Gold 100p Nickel 1m Patch cable Colors Min 4 colors White Blue Grey Yellow Red Green 2 5 10m patch cable color Grey blue Make of the offered product Page 22 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL Item No 27 OFC Patch Cable SM Compliance Sr Minimum Specifications Functionalities Capabilities Y N Details 1 Length shall be 3 meters 2 All patch cords shall conform to EIA TIA 568C 3 and ISO IEC 11801 3 Shall be Duplex Single Mode Fiber Optic Patch Cords OS2 9u Shall support network line speeds up to 10 Gbps Shall have SC Connector jacks at one end and LC connector on the other end All patch cords shall be facto
18. Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and Commissioning LAN at Kaiga Site of NPCIL NPCIL PROPRIETARY This document is the property of the Nuclear Power Corporation of India Ltd No exploitation or transfer of any information contained herein is permitted in the absence of an agreement with NPCIL and neither the document nor any information contained herein may be released without the written consent of NPCIL NOT FOR PUBLICATION PRESENTATION OUTSIDE NPCIL Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL 1 Introduction background amp Scope of work About present Network LAN facility at KGS site consists of 3 sub networks catering to KGS 1 amp 2 KGS 3 amp 4 and Township KGS 1 amp 2 LAN was established way back in 2001 2002 with Multi Mode fiber back bone and CAT5e UTP cabling for edge devices Majority of active components are of Enterasys make with one core switch Matrix E5 and 24 port manageable switches VH series Few D link make switches are also being used LAN facility at KGS 3 amp 4 was established in 2006 2007 with single mode fiber back bone and CAT 6 UTP cabling for distribution Active components are of Nortel make with one core switch ML 8606 and manageable edge switches 5520 series Scope Scope of work comprises of Supply Implementation an
19. Documentation shall include but not be limited to the following system architecture diagrams functional and schematic Network and system diagrams detailed technical specifications commissioning forms with specifications equipment and system acceptance test procedures and test results operation and maintenance manuals system description and operational and maintenance manuals for any 3 party hardware software incorporated into the system as installed drawings interface diagrams system and rack cabinet layout diagrams ATT aw hamo AO Page 25 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL l spare parts lists m configuration procedures Unless stated otherwise within the Agreement the Supplier shall provide TWO printed sets and two soft copies of all written documents The structure and content of the documents to be prepared shall be the Supplier s responsibility provided they meet KGS 1 4 s minimum requirements as described in this document The filing and storage requirements shall be defined and agreed between the parties Soft copy technical documentation shall be provided in one or more of the following formats unless otherwise agreed by KGS 1 4 a Microsoft Word for Windows DOCX Adobe Portable Document Format PDF C Drawings included separately in the Technical Documentation in AutoCAD VISIO
20. EE 802 1x should seamlessly integrate with the proposed RADIUS server solution Item No 12 NMS Software ii se Technical Specification for Network Management Software a Automatic topology discovery and creation of network maps for Layer 3 a Page 16 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL and Layer 2 network All the available VLANS Lo Should have high level Network Inventory polling capability for IP Network nodes All available line cards Modules ports Physical links VLAN interfaces and all the other SNMP capable devices in the network 3 Should have powerful administration control 4 Detailed performance monitoring and management 5 Should have extensive fault management capabilities with Real time a 6 Creation and management of security and QoS policies fo ooo 7 Scheduled Device configuration back up and restore functionality O a and Isolation omma a e aa o e minimum 100 devices from day 1 and scalable to 500 devices DE E configuration roll out management re same task Should have extensive Event notification capability Po The NMS solution should be preferably from the same Active switching vendor in case vendors proposing for 3rd party NMS solution should provide all the interop reports certified by both the NMS vendor and Active switching vendor on seamles
21. P flood control protection against ARP poisoning etc based on the acceptability to meet NPCIL requirements Page 2 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL 1 3 All necessary accessories equipment and furnishings including conduit horizontal cabling wall outlets patch cables floor outlets floor boxes furniture outlets backbone cabling equipment racks modular angled patch panels labels and labeling equipment 1 4 Re termination of existing Single Multi mode fiber re location of cable racks to nearby best suited location if necessary for make use of existing Multi mode fiber backbone 1 5 Supply of equipment racks including all PDUs fans brush plates and cable management base plates glands and all associated sundry equipment 1 6 Connecting with 4 different colors of patch cables inside the racks from patch panel to switches for easy identification amp management 1 7 Ensuring proper closing of all opening in racks to avoid rodent entry inside the enclosure with proper cementation 1 8 Inspection and tests to meet the requirement of NPCIL set forth in this specification Details of Testing and Acceptance criteria are narrated in the end of this document 1 9 Buyback of 48 Nos of existing Enterasys D link switches and racks as detailed in Annexure The vendor shall quote the price for buyback of switche
22. bmitted to KGS as a part of documentation Items to maintained at site as standby for replacement during warranty period 1 Access switch 2 Nos 2 Fiber Tran receiver Transition 2 Nos 3 Power Unit of Distribution switches RPS 2 Nos Payment Terms Refer GCC for terms and conditions 10 Preferred completion time including delivery period Five months from the date of Purchase order Bidder should clearly mention the plan of action with detailed milestone chart 11 Testing and Acceptance Criteria Page 29 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL Page 30 of 32 sl Test Description Results Y N 1 Demonstration of following features at Kaiga site 2 Core switch High Availability amp resiliency features of a Core Switches b Links between core amp Distribution switches 3 IPv6 Features Management 4 802 1x amp RADIUS based authentication 5 RPS features 6 VLAN amp Dynamic VLAN configuration 7 Loop detection and prevention 8 Distribution High availability features of links between core amp switch distribution at distribution switch level 9 One test IPv6 Features Management per model 10 802 1x amp radius based authentication 11 RPS feature 12 VLAN amp Dynamic VLAN configuration 13 Loop detect
23. cs section For radiation safety permits and Industrial safety section for Industrial safety permits wherever applicable and as instructed by Engineer in Charge Wherever required the contractor should obtain permission from civil department before breaking the roads walls lawns false ceilings etc and should be restored at his cost to the satisfaction of the Engineer in charge Wherever fire barriers are involved in the cable route they are to be opened and restored as per the guidelines issued by KGS Industrial Safety Section A point to point compliance with respect to all the points of this specification indicating details of deviation if any as mentioned in Sr No 4 Specification section of this document shall be submitted Page 10 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL 4 Technical Specifications Item No 1 Core Switches Compliance Main Features jse Main features Y N Core switches shall be chassis based with minimum 3 free payload slots after loading the required modules amp ports mentioned in the tender Both core switches shall be identical model OS o Should support active active high availability features with sub Furnish Details second convergence All distribution switches shall be physically connected to both the core switches and failure of any one core switch shall not aff
24. d commissioning of Fault Tolerant manageable resilient and high speed network with support for site redundancy and future scalability to 40G as a replacement amp upgradation for existing LAN network located in various buildings at Kaiga plant site with replacement of old active network device and support of the network during the currency of the contract The contractor s scope of work is to provide a solution with responsibility for fully provisioning the Network infrastructure and IT Cabling services including detailed design supply installation configuration testing commissioning and extending warranty support during the defects liability period for the following elements and services 1 1 Implementation of Fault Tolerant amp High Speed Network 1 1 1 Supply of core switches distribution switches and access switches 1 1 2 Supply and laying of Passive Components like OFC cables Optical Fiber SM MM components CAT6 cable etc with all accessories 1 1 3 Supply of equipments as detailed in bill of quantities line item and any other component required for the functioning of the switches as per specification 1 1 4 Configuration of Core in high availability mode with long distance VSS of minimum 1Km and quick resiliency 1 2 Carrying out study of existing IP scheme and suggest and implement best of industry practices including Dynamic VLAN DHCP trusted server solution Network Authentication using 802 1x Security features like AR
25. d out shall be as per approval of the Engineer in charge and shall be as pre detailed method of execution adopted by the contractor as per activity schedule The activities shall be carefully planned so that there is least disturbance to the live IT services ACTIVITY SCHEDULE The contractor shall submit to the Engineer in charge a detailed activity schedule showing the probable dates of commencement and completion of the work considering the total working period in which the work is scheduled to be completed and the programme shall be adhered to Every tenderer should submit along with his tender a brief proposal containing the methodology for execution of work Security Rules The contractor shall be solely responsible for the safe custody and security of the material issued to them for the subject work and for their own material and equipments For station security the work site is a restricted area and contractor will have to comply with all the rules and regulations made by the competent authority from time to time regarding entry conduct and exit of personnel vehicles materials and other matters related to secrecy and security Page 9 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at 3 32 3 33 Kaiga Site of NPCIL Work permits Contractor has to obtain work permit from the control room For main Plant related areas Health Physi
26. e rejected Bidders upon notification from NPCIL KAIGA should be able to show a PoC complying the technical requirements specified in the RFP all the required hardware and software should be organized by the bidder OEM The scope of work involves 3 major parts viz Part A Supply of Active Components Part B Supply of Passive Components Part C installation jobs Serial Nos 1 to 13 are Supply of active components Part A Serial Nos 14 to 28 amp 61 are supply of passive components Part B and Serial Nos 39 to 55 amp 62 to 64 are execution jobs Part C The bidder must quote for complete scope of work Offers not covering complete scope of work will not be accepted The BOM for Part A Active components are based on generic requirement Bidder should carry out detailed analysis and include all the components cables any other items required to implement the solution as a whole to meet the design requirements All such items may be clearly indicated and included in the offer No claim for any additional item shall be entertained Quantities mentioned under execution jobs Part C are estimated quantities for guidance and the billing will be done on actuals Probable variation to a maximum of 20 is to be provisioned The bidder has to execute the project by his own strengths and manpower and it should not be outsourced to any 3rd party vendor except for petty works like digging drilling etc The entire network Switches shall be from t
27. e with cabinet doors Should be Angular type and suit for Open amp close Racks Should Supports Gigabit Ethernet up to 250MHz Should offer modular panels offer complete flexibility and high 5 port density 6 Panel should have Expansive cable management and labeling l facilities Should support for both shielded and unshielded solution and 7 i Fully interoperable and backwards compatible 3 Supply of around 800 nos of CAT5e keystone jacks and 450 nos of CAT6 keystone jacks for populating the UTP patch panels Page 21 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL Mechanical Characteristics Plastic housing Polycarbonate UL94V 0 rated or equivalent Operating Life Minimum 750 insertion cycles Contact material Copper Alloy Contact plating 50u Gold 100y Nickel Contact Force 100g minimum Plug retention Force 11 Ib minimum 9 11 13 15 18 Plastic housing Polycarbonate UL94V 0 rated or equivalent 19 21 23 Operating life Minimum 200 re terminations Contact Material Copper Alloy Contact Force 100g minimum Wire Accommodation 22 24 AWG solid Electrical Characteristics Interface Resistance 20M Milliohms Insulation resistance gt 100 Mega ohms Make of the offered product Item No 19
28. ect normal operation and transparent to end users 0 5 Core switch should support implementation of security features like NAC RADIUS authentication Dynamic VLAN etc All switches shall be manageable using centralized management software NMS or similar solution for easy field replacement of any failed units at Core Distribution and Access layers Port Density Chassis based core switch with following minimum Nos of Ports 12 10 G SFP ports 12 1G SFP SM MMF 24 1G TX Ports The switch shall be scalable to support minimum 30 Nos of 10G ports and 7 Nos of 40G ports Core Switch should have minimum 3 spare slots excluding Primary and Redundant Supervisory Engine slots for support of 1G amp 10G and future scalability to 40G Modules and quick resiliency Shall support sub second convergence core convergence time etc Considering future scalability and investment protection the proposed Core switch shall be scalable to support 10 Nos of 40G in non blocking amp wire speed architecture without replacing the switch The active active links between the 2 Chassis should be minimum of 20 Gbps 2 10G bandwidth All the required modules other related cards shall be loaded ee The proposed clustering technology should support high availability otter 2andiogrss oe onnenmetey Performance Extensive wire speed traffic classification for ACLs and QoS fel Supports 9KB Jumbo frame size ed Page 11 of 32 F
29. ence in India for the last 5 years Copy of any one of the certificates RBI registration Company incorporations IT returns Certificate from Bank shall be submitted with the bid 2 2 The OEM should have local TAC Technical assistance center Support Center based in India for offering post sales technical support NPCIL team may decide to visit the TAC support center during the evaluation of the bids Address and contact details of TAC center shall be submitted along with bid 2 3 Experience of having successfully completed LAN implementation projects involving supply and installation of Active amp passive components during last 7 years ending last day of month previous to the one in which applications are invited should be either of the following a Three similar completed works costing not less than the amount equal to 30 of the bid amount OR b Two similar completed works costing not less than the amount equal to 50 of the bid amount OR c One similar completed work costing not less than the amount equal to 80 of the bid amount Page 6 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL 3 General Information and Conditions 3 1 3 2 3 3 3 4 3 5 3 6 3 7 3 8 3 9 3 10 3 11 3 12 3 13 3 14 3 15 The contractor s scope of work is to provide a complete solution with responsibility f
30. h the same switching OEM in India preferably in leading business or research institute enterprises and reference in this regard should be submitted with appropriate credentials Make amp Model of the offered product Item No 14 42U Floor Standing Rack Compliance Minimum Specifications Functionalities Capabilities Y N Details Casters Set of 4 Tp3 Levelers 19 Adopter kit Loops Minimum depth of the rack should be 1200 mm and width 605 mm 4 Split Rear Doors 5 Perforated Door front amp back with minimum 75 perforation 6 2 Side Panels Vented 7 Mechanical Lock Single Point Common Key 8 2 Nos of Zero U Vertical Mount Power Distribution unit each with Page 18 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL minimum 8 Sockets 9 2 Horizontal Cable Organizer 1U Channel On Front Fan Module 4 Fan Tower Mount 360CFM Sliding shelf and Keyboard shelf Mounting Hardware CR Pack of 20 Should be compatible to mount standard Rack servers 14 Shall have inbuilt compatible retractable keyboard amp LED monitor 15 Make of the offered product Page 19 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL Item Nos 15 16 amp
31. he same Original Equipment Manufacturer All pluggable SFP and SFP modules shall also be from same OEM All passive components viz cables jack panel fiber patch panel patch chords etc shall be preferably from single OEM Bidder should necessarily quote for the optional items which may be ordered based on NPCIL requirement Optional items shall not be considered for deriving the lowest eligible bid CLI Command Line Interface commands for all across the proposed switches shall be Page 7 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at 3 16 3 17 3 18 3 19 3 20 3 21 3 22 3 23 3 24 3 25 3 26 Kaiga Site of NPCIL same Bidder should keep ONE Project Manager on site during the entire project implementation time and should prepare all documents drawings up to date and finally should submit the documentation in duplicate to NPCIL Any requirement of shifting moving the KGS materials furniture etc during the execution of the work shall be performed by the contractor himself at his own cost and risk and shall be restored to its original condition to the satisfaction of the Engineer in charge of the work and the custodian agency of the property as soon as the work in the respective area is completed Bidders are advised to visit the site and survey to get acquainted with the actual layout of the site nature and quantum of
32. ing the execution of the work prior permission from the respective section head concerned officer shall be obtained reasonably in advance before commencement of the work in the respective section s area INSPECTION OF SITES The department has made available the various data in this tender document so as to enable the contractor to get an idea of work as well as working conditions The bid shall not be deemed to have been based only on such data but the contractor shall be responsible for his own assessment and interpretation thereof The contractor shall also be deemed to have inspected and examined the site and its surroundings and information available in connection therewith and to have satisfied himself fully before submitting his offer as to the hydro graphic and climate conditions the extent and nature of work and materials and equipments necessary for the completion of works the means of access to the site and the accommodation he may require and in general shall be deemed to have obtained all necessary information on the subjects related to work to take risk contingencies and all other such circumstances into consideration which may influence or affect his offer 240 V AC single phase electric supply from the existing facility at site shall be available for the work free of cost Any additional requirement arises shall be met by the tenderer at his own cost amp risk ORDERS OF WORKS The order in which the works are to be carrie
33. ion and prevention 14 Access 802 1x amp radius based authentication switch 15 One test IPv6 Features Management per model 16 VLAN amp Dynamic VLAN configuration 17 Loop detection and prevention 18 Radius High availability feature of systems amp databases Server 19 Support for IPv6 feature in Radius server 20 Setup for user amp password Dynamic VLAN static MAC 21 NMS Demonstration of NMS features Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL a Configuration of VLAN b Monitoring c Report generation 22 OFC Shall maintain Symmetric core connection between two termination end terminations Each terminated fiber cores will be tested for connectivity 23 UTP Random testing based on submitted UTP test report 24 Racks Visual inspection of following a Labelling of Racks amp patch panel b Systematic cabling c Systematic closure of rack opening to avoid rodent entry 25 Others Following documents are acceptable for those parameters parameters which are not possible to test and of Switches demonstrate at Kaiga site amp a Data sheets of the product Softwares b User Manuals product manuals 12 Supporting Documents and URL reference to web site of OEM The bidder shall provide details of URL links of all documents listed If the OEM ha
34. itches shall be rack mountable Page 4 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL 1 16 Applicable standards specifications and drawing Following standards are needed to be followed in conjunction with this specification Applicable standards IEEE standard criteria for Local area network and Metropolitan area network IEEE 802 RFC standard criteria for internet and networking protocols Drawing Typical Layout of proposed Kaiga LAN is attached along with this document Material processes workmanship a Material and Processes Material processes and standard parts which are required for the fulfillments of this specification shall be of very good quality and in accordance with the high grade practice pertinent to manufacture of this type of equipments i e switches OFC Cables UTP Cables Racks etc Workmanship The workmanship shall be in accordance with the high grade practices and quality to ensure the satisfactory operation and mean time between failures MTBF of all active components shall be greater than 75000 hrs Page 5 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL 2 Vendor Qualification requirements 2 1 The OEM of offered Active components should be an established vendor with pres
35. mp 9 Edge Access Switches Technical Specification Po P E Compliance a Hardware Specifications Y N Details Page 15 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL Gigabit fully manageable and rack mountable switch with 12 or 24 10 100 1000 Tx with Min 2 SFP COMBO ports with support for populating 1G SMF MMF optical modules Performance Specifications Po m ae Minimum switching capacity with wire speed non blocking performance should be as follows 24 Gbps for 12 port switches 48 Gbps for 24 Port switches Min 35 Mpps Switching throughput or better for 24 port switches and Furnish Details 20 Mpps for 12 port switches VLAN VTP GVRP or Equivalent LLDP Private VLANs Guest VLANs Port Loop Detection MAC based VLANs Dynamic MAC based VLAN activation s2 _ sFlow or equivalent SCS SCSSCSCSCCCCS s3 uop up MeD SOS sa Support for Syslog Sewer SOSCSS o Certifications SSCS a1 ROHS Complianceismust_ __ SCSCSCSS 9 2 Product certification to meet the relevant IEC EN CISPR FCC standards on EMI EMC by UL cUL TUV IPv6 features shall be certified by TEC IPv6 Ready Logo UNH IOL i USGv6 Pd Make amp Model of the offered product i 2 2 3 1 4 1 4 2 5 1 5 2 5 3 5 4 5 5 6 1 7 7 1 7 2 8 1 Dynamic ARP inspection and DHCP snooping inspection IE
36. onvergence high speed backbone etc The proposed LAN shall withstand failure of LAN resources of any single CORE switch in the LAN with implementation of VSS or equivalent technology The proposed LAN shall be based on 3 tier architecture model with CORE Distribution and Access Layer switches Connectivity between CORE to distribution switches shall be in 20Gbps using 2 10G and scalable to 40 Gbps Each distribution switch shall connect to CORE in 10G in high available mode with VSS Virtual Switch Stack or equivalent technology Active components of the new LAN shall be 100 IPv6 and 802 1x compliant The networking solution shall be configured for security features like protection against ARP attacks DHCP trusted server Dynamic VLAN allocation from RADIUS etc In the proposed solution Access to network shall only be allowed after Authentication from all end devices The main CORE switches shall be located in the KGS Administration Building One core switch may be shifted to alternate Data center in future if NPCIL opts for it Hence long haul VSS or equivalent with minimum 1Km distance between COREs shall be supported in the proposed solution 1 15 10 The diagram provided shows the physical layout of the various building in the campus and not to scale Hence it may be used only to determine relative position of the building areas and not for distances amp dimensions 1 15 11 All components like Patch Panel LIUs and Sw
37. or fully provisioning the Network infrastructure and services including supply installation configuration testing training commissioning and warranty support during the defects liability period for the elements and services The above work amp installation is to be done at KAIGA GENERATING STATION Kaiga P O Uttara Kannada District Karnataka situated approximately 55 Kms from Karwar The compliance statement for Active components and security solution technical specification listed herewith must be provided on the respective OEM s letter heads along with the Manufacturer Authorization letter to each System Integrator bidder whom they are supporting All Active components shall be certified for OEM support for minimum 7 years from date of supply For all the products product launch date and End of support dates should be clearly specified in the format given in this document Sr No 13 and the documentary proof shall be submitted Certificate from OEM of Active components to be submitted The Data sheets reference documents and technical documents for primary components should be available on the main global website of the respective switching OEM manufacturer and the URL links to the respective documentation should be provided in the compliance statement as detailed in this document Sr No 12 Any document which is not available on Primary Global website of the OEM would be treated as invalid document and such offers are liable to b
38. regoing or any other matters affecting the contract shall not relieve him from risks or liabilities or the entire responsibility from completion of the work at the schedule rates and in compliance of scope of work No verbal agreements or influence from conversation with any officer either before during or after the execution of the contract agreement shall in any way affect or modify any of the terms or obligations here in contained Precautionary measures 3 26 1 The contractor shall take all precautionary measures not to damage any electric poles cables water supply or sewage pipelines and any structure which are close to work site or come in the way during mobilizing the machines etc If any damage occurs the same shall have to be rectified and made good by the contractor at his own cost 3 26 2 The contractor shall make necessary paths diversion approaches as required for plying of vehicles machinery etc at his own cost 3 26 3 During the execution of the work to prevent the damage to the KGS materials equipments from the dust debris originated from drilling puncturing Page 8 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at 3 27 3 28 3 29 3 30 3 31 Kaiga Site of NPCIL hammering or similar activities contractor shall provide adequate covering protection using PVC tarpaulin sheets at his own cost 3 26 4 Dur
39. ry terminated and packed Shall be RoHS Compliant Shall be Low Smoke amp Zero Halogen Shall have minimum 20 Year Extended Product Warranty and 9 system warranty 10 Make of the offered product 5 Item No 28 OFC Patch Cable MM Minimum Specifications Functionalities Capabilities e e ie Fiber Optic Patch Cable SC LC 3 Mtrs Long Multimode 62 5 125 or 50 125 Micro Length shall be 3 meters All patch cords shall conform to EIA TIA 568C 3 and ISO IEC 11801 f Shall be Duplex Single Mode Fiber Optic Patch Cords OS2 9u Shall have SC Connector jacks at one end and LC connector on the 6 other end 7 All patch cords shall be factory terminated and packed Shall be ROHS Compliant Shall be Low Smoke amp Zero Halogen Shall have minimum 20 Year Extended Product Warranty and system 10 warranty 11 Make of the offered product W o0 Page 23 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL Item No 29 30 31 OFC Patch panel Compliance Y N Sr Minimum Specifications Functionalities Capabilities i P EEY Details Fiber LIU 6 12 24 48 port Single Mode Multimode Loaded with Splice tray and adapter 1 2 Must conform to EN50173 and ISO IEC 11801 operating standard 3 6 12 24 48 Port Rack Mount Fiber Patch panel
40. s amp racks The buyback amount will not be considered for deriving the lowest bid and NPCIL reserves the right to exercise or not to exercise the buyback option 1 10 Part replacement and breakdown maintenance of the system during the warranty period shall be carried out without any additional charges 1 11 Parking of ready to use switches spares to be maintained at KGS plant site during warranty period as per the details given in the end of this document 1 12 Training of NPCIL technical personnel Note Bidder has to submit detailed proposed plan amp design document showing implementation of all features meeting NPCIL requirement The document should contain details of products datasheets and implementation plan without which the tender shall be rejected Page 3 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL 1 15Implementation Criteria 1 15 1 1 15 2 1 15 3 1 15 4 1 15 5 1 15 6 1 15 7 1 15 8 1 15 9 A brief draft design has been attached along with this document for the reference of the tenderer However tenderer may consider this as a guideline and carry out detailed study prepare the implementation plan and provide the items that are meeting minimum specifications mentioned in the tender The proposed LAN shall incorporate features like fault tolerance resiliency sub second network c
41. s hosted region wise websites the bidder shall furnish details of URL hosted in primary site and also in regional website NOTE The bidder shall upload only datasheets Other product related documents and manuals need not to be uploaded in the Tendering site Sr Item URL link in OEM s Global Web Site 1 Core Switch Product Manual 2 Core Switch Latency Data 3 Core Switch User Manuals 4 Core Switch VSS Implementation manual 5 Core Switch Configuration Setup Manuals 6 Distribution Switch Product amp user Manuals Distribution Switch high Available implementation user manuals Distribution Switch Latency data documents o N 9 Access Layer Switch Product manuals 10 Access Layer Switch Latency data documents 11 RADIUS Solution Configuration amp user manuals 12 RADIUS Solution AAA User manuals 13 NMS Product Manual 14 NMS User Manual 15 Active components Certification UL cUL TUV Page 31 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL 13 Active Components Launch Date amp other info Bidder should furnish following details Make amp Year conan ed osacy Sr Type Launch Model Launch of Life support Version BE Core 1 2 Distribution Switch 3 Access Layer Switch 4 RADIUS 5 NMS
42. s interoperability 14 All the required Software licenses for the NMS solution should be proposed by the bidder Make amp Model of the offered product Item No 13 RADIUS Authentication Server Compliance E3 Technical Specification for RADIUS AAA Server Y N Details External RADIUS servers shall work in high available cluster mode with N 1 high availability with no single point of failure All necessary Furnish hardware and software should be supplied by the bidder Each Details Server Device shall have minimum redundancy features like RPS RAID etc Details of proposed hardware and software should be clearly specified All hardware devices should be rack mountable with necessary kits 3 Support for 802 1X Based Device Authentication _ 4 Support for MAC Based Authentication o To 5 Captive portal Access S o 6 Support for Certificate based authentication Sooo 7 Native Data base must support minimum 1600 end points scalable to 3000 end points Page 17 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL Should support Encryption based on Digital Signature algorithm or P ekksentuncorstennpionpooni 9 Should be on Unix Linux BSD based o oo 10 Standards based and vendor agnostic interfacing seamlessly with T a i 11 Should Adhere strictly to Radius AAA open standards o 12
43. tenance etc during this period The faulty units shall be replaced repaired free of cost at site by the supplier Response Time during warranty period Response time means the time taken to restore network back to original condition by replacing the defective equipment with new one from the principal or with a standby as substitute from the vendor a Response time for all network active components shall be 48 hours b Response time for software related and passive complaints shall be 48 hours Preventive Maintenance a Minimum one yearly visit by the expert service engineer as part of PM and any number of visits in case of break down calls within specified response time defined Review the status of IOS OS security patches other updates loaded in the active components and if any modification required shall be carry out This shall be carried out by a professional from the principal Item No 58 59 60 amp 61 List of Switches amp racks for buy back on as is where is basis Page 27 of 32 Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL Make Model No Type of switch No of Ports Qty Enterasys D VH 2402S D link L2 Manageable Link A Models a g a NOS Linksys Cisco 12 24 3 Nos Enterasys Core switch E5 6 1 Gbps Tx Manageable L3 6 1 Gbps SX LX Dual RPS 8 100 Mbps MTRJ 48 100 Mbps
44. urnish details Should support Active Active Clustering VSS or equivalent like supported 1 3 technology for high availability long distance VSS of minimum 1Km distance between Annexure 1 INDENT NO 51938 Scope Specifications Terms amp Conditions for Supply Implementation and commissioning LAN at Kaiga Site of NPCIL Switching fabric shall be Min 1 92 Tbps with wire speed non blocking bandwidth for all packet sizes Switching fabric shall provide minimum 160 Gbps switching bandwidth between its inter slot modules Switching fabric shall provide wire speed non blocking bandwidth 2 6 a for minimum 12 ports of 10G ports Furnish Latency Latency should be less than 15 Micro seconds for 1G and 10G 64 data of 1G 10G byte packets and 40G Furnish Details Full environmental monitoring of PSUs fans temperature and internal voltages with SNMP traps to alert network managers in case of any failure ey rr performance for Layer 2 and layer 3 o fes O SS 31 Redundant hot swappable PSUs with N 1 redundancy 4 General Standards 41 IEEE 802 1Q Virtual LANs oo G 42 VTP GVRP or Equivalent technology o 43 RADIUS G 44 IEEE 802 1p Priority Taggins 45 DiffServ Architecture 46 DHCP 47 VLAN Qin Q scalable o o S Resiliency 51 Femnelenctechnoogy a or equivalent technology providing sub second convergence time 5 2 STP RSTP MSTP 802 15 5 3 Link Aggregation 802 3ad
Download Pdf Manuals
Related Search
Related Contents
Manual de Instruções JVC RC-BX330SL User's Manual IJ-21K取扱説明書(PDF形式) estudio de mercado APC CTFRP User's Manual en avec le S D 0 - Saint-Vincent-de Copyright © All rights reserved.
Failed to retrieve file