Home
Instruction of GoodWe ARCB Device
Contents
1. GOODWE your solar engine Instruction of GoodWe ARCB Device Abstract This Document is a brief instruction of GoodWe ARCB Device which compose of Definition Application Background Function Connection Configuration Definition ARCB means Anti Reserve Current feeding into Grid Box CT Current Transfer Application Background As the requirements of some Countries or its areas the generation of the PV systems can only be used in self use but the reserve current cannot be fed into Grid Now the main solution is to cut off the connection of PV system and the Grid but the owner of the PV station will lost a lot of money Such as a 50kW PV system in Australian if the Loads is 20kW but the system can generate 40kWh per hour now then if we just cut off the connection we will lost 20kWh electrical power Also the owner has to turn on the system manually Then GoodWe designed a ARCB device which can tell the inverters to reduce or increase the generation if needed Function As below picture shows The Loads are supplied by PV station and the Grid then PL Pg Pi If we want to make sure no power fed into Grid caused by too many generation of PV System we just need to make sure there always has power comes from Grid So we can monitor the Pg to tell when the inverter need to reduce generation Where the sun shines there 1S Good We GOODWE POWER SUPPLY TECHNOLOGY CO LTD ADD No 189 Kunlunshan Rd SND Suzhou China T
2. EL 86 512 6239 7998 WEB www goodwe com cn GOODWE your solar engine Connections The picture of the Box IP65 The box will connected with Grid and CT via 1 5 mm cables and connect with inverter and Internet via RS485 cables How to connect oe oo N eT a gt i L1 L2 L3 N need to be connected to the Grid side with 1 5mm cables thus the box and get the Voltage of the Grid The CTs will help the box to get the current coming Where the sun shines there ts GoodWe GOODWE POWER SUPPLY TECHNOLOGY CO LTD ADD No 189 Kunlunshan Rd SND Suzhou China TEL 86 512 6239 7998 WEB www goodwe com cn y O GOODWE lt lt your solar engine 4 4 lt from Grid Then we can get the Power from Grid PL1 P L2 PL3 When you finish the connection the Box will looks like that The cables pass through the waterproof to make sure IP65 Terminal for communication cables There has two waterproof terminals one for inverter another connected with the Router Where the sm shines there ts GoodW e GOODWE POWER SUPPLY TECHNOLOGY CO LTD ADD No 189 Kunlunshan Rd SND Suzhou China TEL 86 512 6239 7998 WEB www goodwe com cn GOODWE your solar engine TO Ts TY NPS am i i N lt 20 The CTs provide Current signal for the Box which has I l RS485 connections as below picture Fig1 Line sequence Connection finished Where the sun
3. shines there ts GoodWe GOODWE POWER SUPPLY TECHNOLOGY CO LTD ADD No 189 Kunlunshan Rd SND Suzhou China TEL 86 512 6239 7998 WEB www goodwe com cn GOODWE your solar engine Configuration EzConfig 1 0 4 Inverter List Action Threshold Leh Installation Capacity ky Set A i Meter Power kh Inverters Power kw Load Power Total Energy kwh Reactive Energy kvarh 2014 08 21 23 03 39 Welcome to use EzConfig 2014 08 21 23 03 44 Ezlogger connection failure Please reconfirm the IP addresses of the computer is 192 168 1 X 0 lt lt 254 and X 200 if ne o This is a special tool for configure the ARCB device We will release the latest version of the user manual and poster for ARCB device at 29th of Aug Where the sun shines there s GoodWe GOODWE POWER SUPPLY TECHNOLOGY CO LTD ADD No 189 Kunlunshan Rd SND Suzhou China TEL 86 512 6239 7998 WEB www goodwe com cn
Download Pdf Manuals
Related Search
Related Contents
Net3 I O Gateway Setup Guide Lenovo 9417-HE2 User's Manual Gigaset A390-A490-A495 AEG CTV 2206 User's Manual SUNSET BOULEVARD, 40 KM MYTHIQUES 400-SP004 振動スピーカー 取扱説明書 2- 保証期間中でも次の場合には有料修理となります。 ー 取扱説明書 Caratteristiche tecniche tagliando C0565rev01 Carta uso mano 80 g DIVAtop 60 C24/32 DIVAtop 60 F24/32 FERdigit 60 C24/32 FERdigit Copyright © All rights reserved.
Failed to retrieve file