MAN-104 De-Airing Unit with Electric Pumps

image

Contents

1. the tank B should be dislodged by slapping the sides of the tank until they rise and accumulate under G They may then be removed with pressure in A and momentarily opening valve G It is important that cylinder B is completely filled with de aired water and all air excluded Release pressure from A by switching off compressor unscrew regulator open valve F Close all valves 3 6 Repeat 3 3 to refill cylinder C 3 7 Attach the vacuum hose to F open valves F N L and I and apply vacuum to cylinder A water is drawn from inside the bladder in cylinder B to cylinder A thus drawing de aired water from cylinder C into cylinder B User Manual When the bladder is fully deflated the tank A will again be 90 full of water Close valves F N L and I Remove the vacuum hose from F and release the vacuum in A by opening F Close all valves 3 8 Open valves I and M to drain the water from tank C Close all valves The de airing unit is now fully charged with de aired water and ready for operation User Manual Section 4 operation and Recharging Attach the vacuum hose to valve I Operate the compressor and lower regulator until the desired pressure is reached in A as indicated by the pressure gauge Having calculated the optimum de airing pressures if a vacuum is required on the return side open valve K and operate the vacuum pump until the desired vacuum is reached as indicated by the vacuum gauge Vacuum may be controlled by slightly opening
2. the bleed Valve S under the vacuum gauge Pressurised de aired water from the supply tank B may be introduced into the piezometer terminal panels by opening appropriate valve on the panel During operation of the unit the bladder in tank B should not be allowed to distend to more than three quarters of the volume of the tank At this point it is necessary to recharge with de aired water as follows 4 1 Close terminal panel valves to isolate the manifold manometer from the de airing unit 4 2 Open valves F and I to release the pressure and vacuum from the tanks as indicated by zero readings on the gauges Close all valves 4 3 Drain tank C by opening I and M 4 4 Attach the vacuum hose to I and the de aired water supply to M Operate the Vacuum pump and draw de aired water into C until three quarters full Close valves M and I 4 5 Continue as in Sections 3 6 and 3 7 ensuring that the water in C does not empty while being drawn into B avoid drawing air into B Applying Back Pressure to Return Cylinder C On some occasions it may be necessary to apply a controlled back pressure to the return cylinder to maintain equilibrium of pressure at the piezometer tip when circulating de aired water This procedure is used to minimise the effect of forcing water into the soil surrounding the piezometer To apply the required back pressure to cylinder C close Valves I and R open valves Q and S Adjust pressure applied to cylinder C by operatin
3. the floor near tank C 3 3 Prepare de aired water in the de aired water boiler allowing it to cool See Section 5 and Figure 1 Connect valve S on the boiler to valve M using the red rubber hose Attach the vacuum pump to valve I open valves I and M and release the vacuum from the boiler by opening valve V on the boiler Open valve S on the boiler and by operating the vacuum pump slowly draw the de aired water into cylinder C until it is 90 full Close all valves 3 4 Remove the vacuum hose from G Remove the vacuum pump and open valve I to release the vacuum Open valves G and L attach the vacuum pump to valve G and draw the de aired water from cylinder C into cylinder B by operating the vacuum pump until cylinder C is only 10 full Close all valves To fill cylinder B completely it is necessary to repeat the operation but this time only half filling cylinder C with de aired water When cylinder B is almost full close all valves Remove the vacuum hose from valve G open valve G to release the vacuum and then close 3 5 Switch on the compressor and slowly screw in the lower regulator to bring the pressure in A to 5 10mH20 Open valve N and slowly open valve G thereby inflating the bladder displacing the de aired water in B and forcing out any remaining air If the air were to be removed by applying a vacuum at G there is a risk of damaging the pump by drawing water into it Any bubbles of air that cling to the rubber bladder and walls of
4. AC mains supply having checked the voltage of the unit and the supply switch on at the mains Bring to the boil and allow to boil for fifteen minutes Switch off at the mains supply 6 4 Close valves V and S and replace the central filler cap Allow to cool NOTE With a partial vacuum inside the boiler never open valve S before opening valve V as this will draw air into the de aired water SAFETY REQUIREMENTS The 4 psi Pressure Relief Valve in centre of filler cap must be checked at intervals not exceeding 12 months by a competent person POWER SUPPLY The 110 volt unit requires 110V 60Hz 30 Amps per heater element The 240 volt unit requires 240V 50Hz 15 Amps per heater element The units must always be earthed scil INSTRUMENTS Bell Lane Uckfield East Sussex t 44 0 1825 765044 e info itmsoil com TN22 1QL United Kingdom f 44 0 1825 744398 w www itmsoil com Soil Instruments Ltd Registered in England Number 07960087 Registered Office 5th Floor 24 Old Bond Street London W1S 4AW User Manual 11 Portable High Pressure De Airing Unit Electric Pumps and Manual Pumps Appendix A system Diagram A3 2074 013 aile SOIL INSTRUMENTS LTD Zteded UOHTIELO CAST SUSY TNZ2 LL CNCLANO Te hik ISIS PEEXMA fW 24 4j5 PEEKS COPIED NOR CISCLO lt ED T P Millisard Fo fet DIAD PESO i 241 5420 E0240 N NHOLE OF PART TO AMY THIRD PARTY BE AIRIBEI UB IT MWITH PREHHURE REZIULATE R 12 User M
5. SOil Portable High Pressure De Airing Unit Electric Pumps and Manual Pumps User Manual Man 104 4 0 1 04 08 2014 Phil Day Andy Small Chris Rasmussen Manual No Revision Date Originator Checked Authorised for Issue User Manual Contents Section 1 General Information sesssss Section 2 Positioning Of The Portable De Airing Unit Section 3 Preparation And Setting Up 3 6 Repeat 3 3 to refill cylinder C Section 4 Operation and Recharging Section 5 Calculation of De Airing Pressures Section 6 The De Aired Water Boiler Appendix A System Diagram A3 2074 013 Appendix B 27 Litre De Aired Water Boiler A4 145 00M User Manual Section 1 General Information Refer to Drawing No A3 2074 013 The de airing unit consists essentially of pressure supply and return tanks A B and C and gauges to measure water pressure and vacuum during circulation of de aired water All these components are mounted on a frame or panel complete with valves and connecting pipework Pressure and vacuum pumps are used to operate the equipment Pressure is applied to the de aired water in supply tank B by forcing water from the pressure tank A into the bladder in B Water from the supply tank may then be circulated through the piezometer tubes back to th
6. anual Portable High Pressure De Airing Unit Electric Pumps and Manual Pumps Appendix B 27 Litre De Aired Water Boiler A4 145 00M 1 2 3 4 5 6 A A VALVE S B B FILLER CAP c C IMMERSION HEATER D D lc CABLE TO MAINS SUPPLY THE INFORMATION Ern UN Ou e poA peso Am z cote WS nr Se TR Muword Toa SIRS a 20S NS ANT THAD PARTY force Millword DE ARED WTHQUr THE WRITTEN fe mer WATERBOLER BOL INSTRUMENTS LID saema aeonawn 2 2222 our LI Mo we tea CH Roster Dote d toss a4 n 145 000 1 1 2 3 4 Fe rome EE User Manual 13
7. e return tank C The volume changes measured in both the return and pressure tanks A and C indicate the quantity of water circulated through the system The object is to completely replace the water in the piezometer tubes with freshly de aired water The equipment has been fully tested to the operating pressure and vacuum before despatch However it is possible that movements during transit may disturb the cylinders pipework or valves sufficiently to cause small leaks when the equipment is operated If any leaks are observed during operation they should be eliminated by gently tightening the appropriate component Never modify the arrangement without the full written approval of Soil Instruments as unauthorised modifications may bypass the safety system It is advisable to drain water from the equipment during cold weather to prevent damage to the cylinders due to freezing WARNING If an anti freeze solution is used the system must be flushed with clean water to prevent the bladder from perishing over time WARNING External high pressure gas cylinders must not be connected to this de airing unit User Manual Section 2 Positioning of the Portable De Airing Unit The unit should be positioned on level ground and close to the terminal panels The manifolds on the piezometer terminal panels should be connected to the busbar tee piece connections on the de airing panel Blank off the other side of the tee pieces with the stop end fitt
8. ent pressure to drive water at least as far as the tip before applying a vacuum to other lead as the friction loss in the return tube carrying air is much less than in one carrying water and air will be drawn in through the tip from the fill User Manual Example 1 PIEZOMETRI i d f B N 5 n i T A X U 5mH20 m h Ne a User Manual Where p 2 h u v p 2 10 5 v p 30 v Therefore for v2 0 p 30 mH20 for v 2 5 mH20 p 35 mH20 for v 2 10 mH20 p 40 mH20 Example 2 o oO P J d d PIEZOMETRIC LEVEL 7m h i 4m TIP a M U 4mH20 p 2 h u v p 2 7 4 v p 6 v Therefore for v 0 p 6 mH20 for v 5 mH20 p 1 mH20 for v 10 mH20 p 4 mH20 User Manual 10 Section 6 The De Aired Water Boiler Refer to Drawing No 145 000M Up to 27 litres of the de aired water can be prepared in the boiler at one filling An integral immersion coil heats the water to boiling thus expelling any air or gases in solution By sealing the boiler and allowing it to cool the steam and water vapour above the water condense thus creating a partial vacuum inside the boiler This prevents further solution of air or gases 6 1 Remove the central filler cap using the special double handled spanner provided Open valves V and S 6 2 Pour in clean water to within 100mm of the top 6 3 Connect the electrical cable to a suitable
9. g the top regulator until the required back pressure is obtained On completion of the de airing operation ensure that top regulator is fully unscrewed and valves Q and S are closed User Manual Section 5 Calculation of De Airing Pressures i Consider a piezometer tip in the soil during the de airing process as follows pore pressure in the fill at the tip pressure on the pressure side of the de airing apparatus pressure on the vacuum side of the de airing apparatus h difference in head between the tip and the pressure and vacuum gauges on the de airing apparatus o c II fAB and fBC friction losses in the piezometer tube All pressures are measured with respect to atmospheric pressure For Equilibrium p h u fAB h u fBD lt II Since AB BC and if no water flows in or out of the tip the velocity will be the same throughout the system then fAB fBC p 2 h u v In a piezometer installation h is known v can be maintained at a known value and u for each tip can be estimated using previous pore pressure reading In this way p can be calculated for each piezometer and de airing carried out at the appropriate pressure If the piezometer lies below the readout point the term h the difference in head between the tip and pressure and vacuum gauges on the de airing apparatus changes sign and becomes negative When a piezometer has accumulated a lot of air care should be taken to apply suffici
10. ings provided Place the vacuum pump to the right of the unit the pressure pump to the left hand side The pressure pump Foot Type connects to the Schrader fitting on valve K For standby use in the event of electric power failure User Manual Section 3 Preparation and Setting Up It is essential to operate the valves in the order stated Initially all the valves should be closed 3 1 Close all valves Attach the vacuum pump with the black hose supplied to valve F Open valves F G and N and apply vacuum until the bladder in cylinder B is completely evacuated on solid cylinders this is indicated by an increase in resistance when operating the vacuum pump Close valves F G and N 3 2 Immerse one end of the red rubber tube into a container of clean water and attach the other end to valve K at the base of the pressure tank A Open valves K and F and operate the vacuum pump drawing the water into A When this tank is 90 full close valves K and F Remove the vacuum pump from valve F open valve F to release the vacuum and then close The de airing unit is operated with two electric pumps and a boiler which require an electric supply see separate sheet Drg No A4 145 000M The electric compressor is connected to the pressure regulators via the tee piece between the regulators with the nylon tube provided The electric vacuum pump is connected to either valves F G or H as required during operation The water boiler is positioned on

Download Pdf Manuals

image

Related Search

Related Contents

DIGITAL PRO MIXER DDM4000  Washington Apple Pi Journal, June 1984  Mode d`emploi  STIHL TS 400 Cutquik®  Tides Planner Mode d`emploi  Moen One-Handle Lavatory Faucet User's Manual  Qilive Q.1892  Sustancias peligrosas Clase 1: Explosivos - Medidas de  Breville VFP040 mixer  Toshiba Satellite S55-A5257  

Copyright © All rights reserved.
Failed to retrieve file