Home
Installation / Instalación / Installation
Contents
1. Tablero de control y distribuci n estaci n de carga para veh culo el ctrico EV230WS Instalaci n Station de recharge pour v hicules lectriques EV230WS Installation Installation Turn off power feeding branch circuit before installing the electric vehicle charging station Use a properly rated voltage sensing device to confirm power is off Preparation Power Requirements Input Voltage 208 240 Vac See Figure 4 on page 4 Input Current 30 A Frequency 60 Hz Feeder Circuit Breaker two pole 40 A NOTE A ground fault circuit interruptor GFCI circuit breaker will override the automatic reset function built into the charging station NOTE Use AWG 8 copper or aluminum wire rated 90 degrees C or higher 1 Install the branch circuit as required by local electrical codes 2 Remove the two screws located at the bottom of the unit that secure the cover to the unit 3 Remove the cover from the charging station and set it aside See Figure1 A 4 Remove the appropriate knockouts in top or back of the enclosure required for installation of cable clamps or conduit To remove the knockouts see Figure 1 B Remove small knockout first Instalaci n Desconecte la alimentaci n del circuito derivado antes de instalar la estaci n de carga del veh culo el ctrico Utilice un dispositivo detector de tensi n nominal adecuado para confirmar la desenergizaci n del equipo Preparaci n Requisitos de
2. xico S A de C V Calz J Rojo G mez 1121 A Col Gpe del Moral 09300 M xico D F Tel 55 5804 5000 www schneider electric com mx Mise sous tension de la station de recharge 1 Mettre sous tension le disjoncteur de d rivation qui alimente la station de recharge 2 la mise sous tension le voyant d tat brillera vert Voir la figure 6 Status indicator Indicador de estado Voyant d tat REMARQUE Se reporter au guide de Putilisateur HRB36117 pour le fonctionnement et le d pannage Seul un personnel qualifi doit effectuer l installation Putilisation l entretien et la maintenance du mat riel lectrique Schneider Electric n assume aucune responsabilit des cons quences ventuelles d coulant de l utilisation de cette documentation Schneider Electric Canada Inc 5985 McLaughlin Road Mississauga ON L5R 1B8 Canada 1 800 565 6699 www schneider electric ca O 2012 Schneider Electric All Rights Reserved Reservados todos los derechos Tous droits r serv s
3. O POR CALENTAMIENTO E INCENDIO Observe los requisitos de par de apriete especificados en la etiqueta del portafusibles y en la cubierta trasera El incumplimiento de estas instrucciones puede causar la muerte lesiones serias o da o al equipo DOMMAGE CAUS PAR LA CHALEUR ET LE FEU Observez les exigences de couple de serrage sp cifi es sur l tiquette du porte fusible et l arri re du couvercle Si cette directive n est pas respect e cela peut entra ner la mort des blessures graves ou des dommages mat riels Wiring 1 Wire the dedicated branch circuit to the charging station as shown See Figure 3 2 Tighten wire binding screws See torque values on fuse holder label and back of cover Replace cover 4 Re install screws at bottom of cover Figure Figura Figure 3 Alambrado 1 Conecte los cables del interruptor autom tico derivado dedicado a la estaci n de carga como se ilustra Vea la figura 3 2 Apriete los tornillos de sujeci n de cables Los valores de par de apriete se encuentra en la etiqueta del portafusibles y en la parte trasera de la cubierta 3 Vuelva a colocar la cubierta 4 Instale tornillos en la parte inferior de la cubierta Ground L1 L2 Grounding bar Barra de tierra 8 Barre de m l t 809 Ca blage 1 C bler le circuit de d rivation d di la station de recharge comme illustr Voir la f
4. hay indicaci n de otro da o No cambie el conector del veh culo el ctrico e Siga las instrucciones de conexi n de los cables como se ha marcado en el interior del equipo Aseg rese de que no se exceda la gama de temperatura ambiente especificada en la placa de datos del producto e Siga las instrucciones de puesta a tierra detalladas en la p gina 4 e Para uso en interiores solamente con veh culos el ctricos que no requieran ventilaci n Este equipo contiene piezas que pueden producir arqueo o chispas que no deben ser expuestas a vapor inflamable Este equipo deber colocarse por lo menos 460 mm 18 pulgadas por encima del piso No utilice ni modifique este dispositivo para ser port til Este dispositivo debe usarse nicamente como equipo montado permanentemente El incumplimiento de estas instrucciones podr causar la muerte o lesiones serias Directives de s curit importantes Introduction La station de recharge pour v hicules lectriques VE est con ue pour tre employ e uniquement avec un v hicule lectrique ayant la comptabilit SAE J1772 Pr cautions NGER RISQUE D LECTROCUTION D EXPLOSION OU D CLAIR D ARC e Lire toutes les directives avant d utiliser ce produit Portez un quipement de protection personnelle PP appropri et observez les m thodes de travail lectrique s curitaire Voir NFPA 70E e Seul un personnel qualifi doit effectuer l i
5. 2 Mount on stud using either two center holes A or four outer holes B See Figure 5 3 Coil the cable around the cable holder and plug the connector into the dock NOTE To avoid damage always coil the cable and connector on the cable holder when not in use Figure Figura Figure 5 Solid Neutral Neutro s lido Neutre direct Ground Tierra Terre Montaje del portacables 1 Instale el portacables debajo o junto a la estaci n de carga NOTA La parte inferior del portacables deber montarse de manera que el conector se encuentre entre 460 mm 18 pulgadas y 1 200 mm 48 pulgadas del piso 2 M ntelo en la madera empleando dos agujeros intermedios A o cuatro agujeros exteriores B Vea la figura 5 3 Enrolle el cable alrededor del portacables y enchufe el conector en la estaci n de servicio NOTA Para no da ar el cable y conector enr llelos siempre en el portacables cuando no los est usando Cable Holder Portacables Porte c ble Montage d un porte c ble 1 Installer le porte c ble sous la station de recharge ou pr s de celle ci REMARQUE Le bas du porte fusible doit tre mont de sorte que le connecteur se trouve plac entre 460 mm 18 po et 1200 mm 48 po du sol 2 Monter sur un colombage en utilisant soit les deux trous centraux A soit les quatre trous lat raux B Voir la figure 5 3 Enrouler le c ble sur le porte c ble et branc
6. Bolet n de instrucciones Instruction Bulletin Directives d utilisation X Electric Vehicle Charging Station EV230WS Installation Tablero de control y distribuci n estaci n de carga para veh culo el ctrico EV230WS Instalaci n HRB38095 08 2012 Station de recharge pour v hicules lectriques EV230WS Installation Retain for future use Conservar para uso futuro conserver pour usage ult rieur Important Safety Instructions Introduction The Electric Vehicle EV Charging Station is designed to be used only with an SAE 31772 compatible electric vehicle Precautions A HAZARD OF ELECTRIC SHOCK EXPLOSION OR ARC FLASH Read all instructions before using this product Apply appropriate personal protective equipment PPE and follow safe electrical work practices See NFPA 70E This equipment must only be installed and serviced by qualified electrical personnel e Turn off all power supplying this equipment before working on or inside equipment Always use a properly rated voltage sensing device to confirm power is off Do not use this product if the enclosure is broken cracked open or shows any other indication of damage Do not change electric vehicle connector e Follow wiring instructions as marked on the inside of the equipment Ensure that the ambient temperature rating printed on the product nameplate is not exceeded e Follow grounding instructions
7. ge Mounting Configurations Configuraciones de montaje Configurations de montage Electric Vehicle Charging Station EV230WS Installation Tablero de control y distribuci n estaci n de carga para veh culo el ctrico EV230WS Instalaci n Station de recharge pour v hicules lectriques EV230WS Installation Grounding This product must be connected to a grounded metal permanent wiring system or an equipment grounding conductor must be run with the circuit conductors and connected to the equipment grounding terminal or lead on the product Conexi n a tierra Este producto deber estar conectado a un sistema de alambrado permanente puesto a tierra en metal o un conductor de conexi n a tierra del equipo debe ser tendido con los conductores del circuito y conectado a la terminal de puesta a tierra del equipo o a un conductor en el producto HRB38095 08 2012 Mise la terre Ce produit doit tre raccord un syst me de c blage permanent mis la terre en m tal ou un conducteur de m a l t de l appareil doit tre achemin avec les conducteurs du circuit et raccord la borne de m l t de l appareil ou un fil conducteur sur le produit A WARNING ADVERTENCIA AVERTISSEMENT HEAT AND FIRE DAMAGE Follow the torque requirements specified on the fuse holder label and back cover Failure to follow these instructions can result in death serious injury or equipment damage DA
8. ge 4 Courant d entr e 30 A Fr quence 60 Hz Disjoncteur d alimentation bipolaire 40 A REMARQUE Un disjoncteur de circuit sur d faut la terre ICDT GFCI supplantera la fonction automatique de r armement du int gr e dans la station de recharge REMARQUE Utiliser du fil de calibre 8 AWG en cuivre ou aluminium class 90 degr s C ou plus 1 Installer le circuit de d rivation comme requis par les codes d lectricit locaux 2 Enlever les deux vis situ es au bas de Punit et qui retiennent le couvercle de Punit 3 Retirer le couvercle de la station de recharge et le mettre de c t Voir la figure 1 A 4 Retirer les d bouchures appropri es sur le dessus ou l arri re du coffret n cessaires pour l installation des serre c bles ou du conduit Pour retirer les d bouchures voir la figure 1 B Retirer les petites d bouchures en premier 2 2012 Schneider Electric All Rights Reserved Reservados todos los derechos Tous droits r serv s HRB38095 08 2012 Figure Figura Figure 1 Electric Vehicle Charging Station EV230WS Installation Tablero de control y distribuci n estaci n de carga para veh culo el ctrico EV230WS Instalaci n Station de recharge pour v hicules lectriques EV230WS Installation couvercle et des d bouchures B 5 Mount the electric vehicle charging station so that bottom of box is at least eighteen inches from the floor Woode
9. given on page 4 For indoor use only with Electric Vehicles where ventilation is not required This equipment has arcing or sparking parts that must not be exposed to flammable vapors This equipment must be located at least 18 inches 460 mm above the floor Do not use or modify this device to be portable This device is to be used as permanently mounted equipment only Failure to follow these instructions will result in death or serious injury Instrucciones de seguridad importantes Introducci n La estaci n de carga para veh culo el ctrico EV ha sido dise ada para usarse nicamente con un veh culo el ctrico compatible con las especificaciones de la norma SAE J1772 Precauciones DANGER PELIGRO D PELIGRO DE DESCARGA EL CTRICA EXPLOSI N O DESTELLO POR ARQUEO Aseg rese de leer todas las instrucciones de este producto antes de usarlo e Utilice equipo de protecci n personal EPP apropiado y siga las pr cticas de seguridad el ctrica establecidas por su Compa a consulte la norma 70E de NFPA y NOM 029 STPS Solamente el personal el ctrico especializado deber instalar y prestar servicio de mantenimiento a este equipo e Desenergice el equipo antes de realizar cualquier trabajo en l Siempre utilice un dispositivo detector de tensi n nominal adecuado para confirmar la desenergizaci n del equipo No utilice este producto si el gabinete est roto quebrado abierto o
10. her le connecteur la station d accueil REMARQUE Pour viter un endommagement toujours enrouler le c ble et le connecteur sur le porte c ble quand l appareil n est pas utilis 2012 Schneider Electric All Rights Reserved Reservados todos los derechos Tous droits r serv s Electric Vehicle Charging Station EV230WS Installation Tablero de control y distribuci n estaci n de carga para veh culo el ctrico EV230WS Instalaci n Station de recharge pour v hicules lectriques EV230WS Installation A DANGER PELIGRO DANGER HAZARD OF ELECTRIC SHOCK EXPLOSION OR ARC FLASH Replace all devices doors and covers before turning on power to this equipment Do not use this product if there is any damage to the Electric Vehicle cable Failure to follow these instructions will result in death or serious injury PELIGRO DE DESCARGA EL CTRICA EXPLOSI N O DESTELLO POR ARQUEO Vuelva a colocar todos los dispositivos las puertas y las cubiertas antes de volver a energizar el equipo e No utilice este producto si est da ado el cable del veh culo el ctrico El incumplimiento de estas instrucciones podr causar la muerte o lesiones serias HRB38095 08 2012 RISQUE D LECTROCUTION D EXPLOSION OU D CLAIR D ARC e Replacez tous les dispositifs les portes et les couvercles avant de mettre l appareil sous tension e Nutilisez pas ce produit si le c ble du v hicule lectrique semble endom
11. igure 3 2 Serrer les vis de fixation des fils Voir les valeurs de couple de serrage sur l tiquette du porte fusible et l arri re du couvercle Replacer le couvercle 4 Installer vis au bas du couvercle Charging Station Wiring Alambrado de la estaci n de carga C blage de la station de recharge DN AC c a CA f Phase Fase Phase 4 2012 Schneider Electric All Rights Reserved Reservados todos los derechos Tous droits r serv s HRB38095 08 2012 Electric Vehicle Charging Station EV230WS Installation Tablero de control y distribuci n estaci n de carga para veh culo el ctrico EV230WS Instalaci n Station de recharge pour v hicules lectriques EV230WS Installation Figure Figura Figure 4 Wiring Diagram Diagrama de alambrado Sch ma de c blage 120 208 240 V Source Fuente Source N L1 L2 4 ON Overcurrent Protection gt 120v 4 Device Dispositivo de protecci n Charging Station contra sobrecorrientes Estaci n de carga para d 120V Dispositif de protection veh culo el ctrico contre les surintensit s Station de recharge pour v hicules gt 208 240 V lt lectriques Cable Holder Mounting 1 Install the cable holder below or next to the charging station NOTE The bottom of the cable holder should be mounted so that the connector is stored between eighteen inches 460 mm and forty eight inches 1200 mm from the floor
12. la alimentaci n Tensi n de entrada 208 240 V vea la figura 4 en la p gina 4 Corriente de entrada 30 A Frecuencia 60 Hz Interruptor autom tico alimentador dos polos 40 A NOTA Un interruptor autom tico con GFCI anular la funci n autom tica de restablecimiento del incorporada en la estaci n de carga NOTA Utilice conductores de cobre o aluminio de 8 37 mm 8 AWG adecuados para 90 C o temperaturas m s altas 1 Instale el circuito derivado seg n las especificaciones de los c digos el ctricos locales 2 Extraiga los dos tornillos situados en la parte inferior de la unidad que sujetan la cubierta a la unidad 3 Desmonte la cubierta de la estaci n de carga y p ngala a un lado Vea la figura 1 A 4 Retire los discos desprendibles apropiados situados en la parte superior o trasera del gabinete necesarios para la instalaci n de las abrazaderas para cables o el tubo conduit Para retirar los discos desprendibles consulte la figura 1 B Retire primero los discos desprendibles peque os HRB38095 08 2012 Installation Couper toute alimentation vers le circuit de d rivation avant d installer la station de recharge pour v hicules lectriques Utiliser un dispositif de d tection de tension valeur nominale appropri e pour vous assurer que l alimentation est coup e Pr paration Exigences d alimentation Tension d entr e 208 240 V voir la figure 4 la pa
13. mag Si ces directives ne sont pas respect es cela entra nera la mort ou des blessures graves Energizing the Charging Station 1 Turn on the branch circuit breaker that feeds the charging station 2 When energized the status indicator will glow green See Figure 6 Figure Figura Figure 6 Status Indicator Indicador de estado Voyant d tat NOTE Refer to User Manual HRB36117 for Operation and Troubleshooting Electrical equipment should be installed operated serviced and maintained only by qualified personnel No responsibility is assumed by Schneider Electric for any consequences arising out of the use of this material Schneider Electric USA Inc 1601 Mercer Road Lexington KY 40511 USA 1 888 SquareD 1 888 778 2733 www schneider electric us Energizaci n de la estaci n de carga 1 Energice el interruptor autom tico derivado que alimenta a la estaci n de carga 2 Cuando est energizada el indicador de estado estar iluminado en verde Vea la figura 6 NOTA Consulte el manual de usuario HRB36117 para obtener informaci n sobre su funcionamiento y diagn stico de problemas Solamente el personal especializado deber instalar hacer funcionar y prestar servicios de mantenimiento al equipo el ctrico Schneider Electric no asume responsabilidad alguna por las consecuencias emergentes de la utilizaci n de este material Importado en M xico por Schneider Electric M
14. n stud wall mounting use two screws top and bottom See Figure 2 A Drywall mounting use four drywall anchors and screws to mount See Figure 2 B NOTE Be certain that no wires are pinched by mounting hardware Figure Figura Figure 2 O 2012 Schneider Electric All Rights Reserved Reservados todos los derechos Tous droits r serv s 5 Monte la estaci n de carga del veh culo el ctrico de manera que la parte inferior de la caja se encuentre por lo menos 460 mm 18 pulg del piso Montaje en la pared en las vigas de madera emplee dos tornillos en las partes superior e inferior Vea la figura 2 A Montaje en la pared de yeso emplee cuatro sujetadores para pared de yeso y tornillos Vea la figura 2 B NOTA Aseg rese de no pellizcar los cables al instalar los herrajes Cover and Knockout Removal Desmontaje de la cubierta y de los discos desprendibles Retrait du 5 Monter la station de recharge pour v hicules lectriques de sorte que le bas du coffret soit au moins 460 mm 18 po du sol Montage mural sur un montant en bois utiliser deux vis une en haut et une en bas Voir la figure 2 A Montage sur une cloison s che utiliser quatre ancres et vis pour cloison s che Voir la figure 2 B REMARQUE S assurer qu aucun fil ne soit pinc par la quincaillerie de monta
15. nstallation et l entretien de cet appareil Coupez l alimentation de l appareil avant d y travailler Utilisez toujours un dispositif de d tection de tension ayant une valeur nominale appropri e pour vous assurer que l alimentation est coup e e N utilisez pas ce produit si le coffret est bris fissur ouvert ou montre d autres signes d endommagement Ne changez pas le connecteur du v hicule lectrique e Suivre les directives de c blage telles que marqu es sur l int rieur de l appareil S assurer que la valeur nominale de la temp rature ambiante imprim e sur la plaque signal tique ne soit pas d pass e e Suivre les directives de mise la terre donn es la page 4 e Pour utilisation l int rieur seulement avec les v hicules lectriques pour lesquels une ventilation n est pas requise Cet appareil contient des pi ces produisant des arcs ou des tincelles qui ne doivent pas tre expos es des vapeurs inflammables Cet appareil doit tre plac au moins 460 mm 18 pouces au dessus du sol e N utilisez pas ou ne modifiez pas ce dispositif pour le rendre portable Ce dispositif doit seulement tre utilis en tant qu appareil mont de fa on permanente Si ces directives ne sont pas respect es cela entra nera la mort ou des blessures graves Installation Instalaci n Installation Schneider ES Electric Electric Vehicle Charging Station EV230WS Installation