Home
Freestanding Workstation Jib Cranes User Manual
Contents
1. Air Swivel Optional a Collector Optional Collector Optional V b ptional odo Track rera E Box Track Box Track Festoon Figure Figure 5B Figure 5C Festoon Option Box Track Option Air Festoon Option Figure 6 Collector Detail r r Lese H Figure 7 Air Swivel Detail MAST HOIST INSTALLATION Attach hoist to hoist trolley Use washers hoist mounting to center inside the hoist trolley Reinstall washer on the outside of the hoist trolley both sides before installing or reinstalling cotter pins to secure hoist mounting pin Replace cotter pin s if worn or broken gt Bend cotter pin around mounting pin O1 Recheck for plumb and level Adjust as necessary If your jib crane requires grout at the base plate it shall be grouted at this time DO NOT OPERATE HOIST OR CRANE IF COTTER PINS ARE NOT IN PLACE AND PROPERLY N WARNING BENT OVER ON BOTH SIDES OF THE HOIST TROLLEY CHECK REGULARLY THAT THE PINS ARE IN PLACE AND SECURING THE HOIST THE HOIST TROLLEY SAFETY INSTRUCTIONS A WARNING IDO NOT OPERATE HOIST CRANE IF ISPLIT COTTER PI
2. 14 123 4 41 4 3 1 16 20 111 2 6 30 HEX 3 723 48 1030 FR500 14 12 13 5 3 4 16 123 4 41 4 3 1 16 20 11 1 2 6 30 HEX 4 561 48 1115 500 16 12 8 11 3 4 4 12 3 4 41 4 3 1 16 20 11 1 2 6 30 HEX 1 420 48 570 FR1000 4 8 8 11 3 4 6 12 3 4 41 4 3 1 16 20 11 1 2 6 30 HEX 2 495 48 610 FR1000 6 8 8 11 3 4 8 123 4 41 4 3 1 16 20 11 1 2 6 30 HEX 3 545 48 665 FR1000 8 8 8 9 2 1 8 10 123 4 41 4 3 1 16 20 11 1 2 6 30 HEX 4 750 48 755 FH1000 10 8 9 5 3 4 12 123 4 41 4 3 1 16 20 11 1 2 6 30 HEX 5 935 48 835 FR1000 12 8 9 8 3 4 14 123 4 41 4 4 1 8 20 111 2 6 30 HEX 6 007 48 1008 FR1000 14 8 9 8 3 4 16 123 4 41 4 4 1 8 20 11 1 2 6 30 HEX 6 958 48 1096 FR1000 16 8 10 113 4 4 123 4 41 4 3 1 16 20 11 1 2 6 30 HEX 1 420 48 640 FR1000 4 10 10 11 6 12 3 4 41 4 3 1 16 20 11 1 2 6 30 HEX 2 495 48 675 FR1000 6 10 10 11 34 8 12 3 4 41 4 3 1 16 20 111 2 6 30 HEX 3 545 48 735 FR1000 8 10 1 000 10 11 2 1 8 10 123 4 41 4 3 1 16 20 11 1 2 6 30 HEX 4 750 48 820 FR1000 10 10 11 5 3 4 12 123 4 41 4 13 1 16 20 11 1 2 6 30 HEX 5 935 48 900 FR1000 12 10 11 8 3 4 14 123 4 41 4 4 1 8 20 11 1 2 6 30 HEX 6 007 48 1068 FR1000 14 10 11 8 3 4 16 123 4 41 4 4 1 8 20 11 1 2 6 30 HEX 6 958 48 1139 FR1000 16 10 12 1134 4 123 4 41 4 3 1 16 20 11 1 2 6 30 HEX 1 420 48 705 FR1000 4 12 12 1134 6 12 3 4 41 4 3 1 16 20 11 1 2 6 30 HEX 2 495 48 745 FR1000 6 12 12 1
3. 11 21 4 4 4 4 1250 2 705 6 350 250 10 8 9 3 1 8 12 8 5 8 14 3 8 25 8 18 3 8 10 5 8 6 24 HEX 1 685 36 615 FR250 12 8 9 3 1 8 14 8 5 8 143 8 25 8 18 3 8 10 5 8 6 24 HEX 2 085 36 645 250 14 8 9 3 1 8 16 8 5 8 14 3 8 25 8 18 3 8 10 5 8 6 24 HEX 2 490 36 675 250 16 8 10 5 4 65 8 41 4 21 4 4 4 4 12 50 855 6 285 FR250 4 10 10 9 3 4 6 65 8 41 4 21 4 4 4 4 12 50 1 510 6 350 FR250 6 10 10 9 3 4 8 85 8 41 4 21 4 21 21 21 2 4 1250 2 140 6 410 FR250 8 10 250 10 10 11 3 4 10 8 5 8 41 4 214 21 21 21 2 4 12 50 2 705 6 425 250 10 10 11 3 1 8 12 8 5 8 41 4 25 8 18 3 8 10 5 8 6 24 1 685 36 660 250 12 10 11 3 1 8 14 8 5 8 41 4 25 8 18 3 8 10 5 8 6 24 HEX 2 085 36 690 FR250 14 10 11 3 1 8 16 8 5 8 41 4 25 8 18 3 8 10 5 8 6 24 HEX 2 490 36 720 FR250 16 10 12 5 4 65 8 41 4 21 4 4 4 4 1250 855 6 325 FR250 4 12 12 9 3 4 6 6 5 8 41 4 21 4 4 4 4 12 50 1 510 6 385 250 6 12 12 9 3 4 8 8 5 8 41 4 214 21 2 21 2 4 12 SQ 2 140 6 455 FR250 8 12 12 12 11 3 4 10 8 5 8 41 4 21 4 21 21 21 2 4 12 SQ 2 705 6 480 FR250 10 12 13 3 1 8 12 8 5 8 41 4 25 8 118 3 8 10 5 8 6 24 HEX 1 685 36 705 FR250 12 12 13 3 1 8 14 8 5 8 41 4 25 8 183 8 10 5 8 6 24 2 085 36 735 250 14 12 13 3 1 8 16 123 4 41 4 25 8 20 11 1 2 4 30 HEX 2 490 36 915 FR250 16 12 8 10 3 4 4 8 5 8 41 4 25 8 21 2 21 2 4 12 50 1 685 6 340 500 4
4. 12 50 8 5 4 4 4 4 12 SQ FR150 4 8 8 5 6 65 8 41 4 214 4 4 4 1250 95 6 265 FR150 6 8 8 9 3 4 8 9 4 4 4 6 FR150 8 8 8 8 9 3 4 10 9 4 4 4 12 50 6 150 10 8 8 11 3 4 12 11 4 4 4 12 50 6 150 12 8 9 3 1 8 14 4 4 4 12 SQ 6 FR150 14 8 93 1 8 16 1 1 2 4 12 SQ 6 FR150 16 8 10 5 6 5 8 414 21 4 4 10 5 6 658 414 214 4 4 4 1250 90 6 300 50 6 10 10 9 3 4 8 9 4 4 4 150 8 10 150 10 10 9 3 4 10 4 4 4 12 50 150 10 10 10 11 3 4 12 4 4 4 12 50 150 12 10 11 3 1 8 14 4 4 4 12 50 FR150 14 10 11 83 1 8 16 1 1 4 12 SQ 12 5 65 8 414 214 4 12 5 6 4 4 4 12 SQ FR150 6 12 12 9 3 4 8 4 4 4 12 50 150 8 12 12 12 9 3 4 10 4 4 4 12 SQ 12 11 3 4 12 4 12750 13 3 1 8 14 2 1 2 2 1 2 4 12 SQ 13 3 1 8 8 5 8 14 3 8 2 5 8 2 1 2 13 DIMENSIONS continued 250 500 AND 1 000 LB CAPACITIES 360 ROTATION HT MAX MAST TRACK ANCHOR DEPTH OF UNDER HT pd DIA DEPTH ERE EE BOLT FOUNDATION pa MODEL NO BOOM FT IN IN LOAD LB IN 8 5 4 6 5 8 41 4 21 4 4 4 4 12 SQ 855 6 250 FR250 4 8 8 9 3 4 6 6 5 8 9 21 4 4 4 4 12 SQ 1 510 6 265 FR250 6 8 8 9 3 4 8 6 5 8 9 21 4 4 4 4 12 50 2 140 6 335 FR250 8 8 8 8 11 3 4 10 6 5 8
5. 8 8 10 3 4 6 85 8 41 4 25 8 21 21 21 2 6 1280 2 590 6 370 FR500 6 8 9 1 1 8 8 8 5 8 41 4 25 8 18 3 8 10 5 8 6 24 HEX 1 855 36 505 FR500 8 8 8 9 1 1 8 10 123 4 41 4 25 8 20 11 1 2 6 30 HEX 2 430 36 635 FR500 10 8 9 3 1 8 12 123 4 41 4 25 8 20 11 1 2 6 30 HEX 3 070 48 710 FR500 12 8 9 5 3 4 14 123 4 41 4 3 1 6 20 11 1 2 6 30 HEX 3 723 48 998 FR500 14 8 9 5 3 4 16 123 4 41 4 3 1 16 20 11 1 2 4 30 HEX 4 561 48 1014 500 16 8 10 10 3 4 4 8 5 8 41 4 25 8 21 21 21 2 4 1250 1 685 6 380 500 4 10 10 10 3 4 6 8 5 8 41 4 25 8 21 21 21 2 4 12 50 2 590 6 410 500 6 10 11 1 1 8 8 85 8 41 4 25 8 18 3 8 10 5 8 6 24 1 855 36 550 FR500 8 10 500 10 11 11 8 10 123 4 41 4 25 8 20 111 2 6 30 HEX 2 430 36 635 FR500 10 10 11 3 1 8 12 1123 4 41 4 25 8 20 11 1 2 6 30 HEX 3 070 36 790 500 12 10 11 5 3 4 14 123 4 41 4 3 1 16 20 11 1 2 6 30 HEX 3 723 48 1010 500 14 10 11 5 3 4 16 1123 4 41 4 3 1 6 20 11 1 2 6 30 HEX 4 561 48 1090 FR500 16 10 12 10 3 4 4 8 5 8 41 4 25 8 21 2 21 2 4 12 SQ 1 685 6 430 500 4 12 12 10 3 4 6 8 5 8 41 4 25 8 21 2 21 2 4 12 SQ 2 590 6 460 500 6 12 1311 1 8 8 12 3 4 41 4 25 8 20 11 1 2 6 30 HEX 1 855 36 745 500 8 12 12 13 1 1 8 10 123 4 41 4 25 8 20 11 1 2 6 30 HEX 2 430 36 770 500 10 12 13 3 1 8 12 123 4 41 4 25 8 20 111 2 6 30 HEX 3 070 36 855 500 12 12 13 5 3 4
6. L 1 3 BOOMASSEMBY 2 1 5 5 E 3 1 IREBATWASHER 15 0007 4 1 COITRPN 30053 GREASEFTTING 25 0002 0 50006 7 TRUNNION ROLLER 420008 HEXNUT 1 000 O LOCKWASHER 14 0004 EN 12 0014 0 HOISTTROLEY MASTASSEMBLY O SPACER 060260 Exp NE BE 2 9 2 30 1 TRUNNION ROLLER BRACKET 12 0014 11 MAINTENANCE Once installation is complete the jib crane system should be checked thoroughly for tightness of nuts and bolts In order to maintain efficient operating conditions SPANCO recommends establishing a regular inspecrtion and lubrication schedule Inspection of all parts should be made Loose parts should be adjusted and worn parts should be replaced immediately If a specific usage pattern cannot be determined the crane operator or maintenance engineer should estimate when the crane should be lubricated Generally a jib crane operating 24 hours per day seven days per week requires lubrication once a week A jib crane operating eight hours per day five days per week requires lubrication once every two to three weeks A jib crane operating once or twice a month requires lubrication at least once every six months NOTE The points requiring lubrication are the ma
7. mast and use this point to check the 2 inch dimension for mast plumb Position fixture arm directly over one anchor bolt and measure from the plumb line to the edge of the mast If this measurement is not 2 inches adjust the leveling nut directly below Turn leveling nut up if greater than 2 inches down if less than 2 inches Rotate the fixture arm 180 degrees and recheck mast for plumb Adjust the leveling nuts until you have the same distance on each side of the mast Repeat this operation at each anchor bolt or at 60 degree increments When mast is plumb tighten the locking nuts Note Do not grout until installation of boom is complete When installation of crane is complete and the operation is double checked float grouting compound under base plate and recheck tightness of locking nuts THE BOLT PADS ARE TAC WELDED TO BASE PLATE FOR EASY REMOVAL IN CASE OF SLIGHT MISALIGNMENT OF ANCHOR BOLT GRIND TAC AREA TO REMOVE BOLT PAD OR PADS RESET THE MAST UNIT OVER THE ANCHOR BOLTS AND LEVELING NUTS BE SURE TO PUT THE BOLT PAD OR PADS BACK INTO PLACE BEFORE INSTALLING THE 2ND SET OF NUTS THESE BOLT PADS DO NOT REQUIRE WELDING ONCE THEY ARE REMOVED AND REPLACED MAST INSTALLATION continued Pivot Pin Plumb Fixture Plumb Line Mast Assembly Locking Bolts Leveling Nuts NOTE Foundation and Anchor Bolts by Others Foundation Figure 1 Plumb Fixture View A A 24 or 30 Bolt Circle Base Plate Square
8. 134 8 123 4 41 4 3 1 16 20 11 1 2 6 30 HEX 3 545 48 800 FR1000 8 12 12 13 2 1 8 10 123 4 41 4 3 1 16 20 11 1 2 6 30 HEX 4 750 48 890 FR1000 10 12 13 5 3 4 12 123 4 41 4 3 1 16 20 111 2 6 30 HEX 5 935 48 965 FR1000 12 12 13 8 3 4 14 123 4 41 4 4 1 8 20 11 1 2 6 6 007 48 1147 FR1000 14 12 13 8 3 4 16 123 4 41 4 4 1 8 20 11 1 2 6 30 HEX 6 958 48 1218 FR1000 16 12 14 15 9 SPANCO Inc Toll Free 800 869 2080 604 Hemlock Road Local 610 286 7200 Inc Morgantown PA 19543 Fax 610 286 0085 Promise to perform spanco com FIVE YEAR EQUIPMENT WARRANTY SPANCO offers this Equipment Warranty the Warranty on the following equipment Manually propelled Free Standing and Ceiling Mounted Workstation Bridge Cranes Manually propelled Monorails Manually propelled ALU TRACK Bridge Cranes and Monorails Manually rotated Enclosed Track and Jib Cranes Manually propelled Gantries Manually propelled Articulating Jib Cranes ALL motorized SPANCO products come with a one year warranty on drive components SPANCO warrants the Equipment and wearable end truck and trolley wheels only to be free from defects in material and workmanship for a period of five 5 years or 10 000 hours whichever occurs first commencing on the date of shipment to the first retail purchaser Purchaser This Warranty does not extend to Equipment which has been subject to misuse use in exc
9. Figure 1A Figure 1B ROTATION STOP INSTALLATION INSTRUCTION ROTATION STOP 409 0252 ROTATE JIB TO DESIRED LIMIT OF ROTATION TACK WELD ROTATION STOPS INTO DESIRED LOCATION CHECK FOR DESIRED OPERATION WELD WITH FILLET WELD IF REQUIRED 1 2 NOTES ROTATION STOPS ARE ONLY INTENDED TO LIMIT ROTATION OF THE JIB BOOM BOOM CONTACT OF ROTATION STOPS SHOULD BE AVOIDED ROTATION STOPS SHOULD NEVER BE USED TO DECELERATE STOP REGISTER INDEX OR POSITION A LOAD BOOM INSTALLATION Note Do not install the boom until the mast is installed properly and plumbed 1 Place the bearing cone over the mast pivot pin 2 Assemble the trunnion roller assembly as shown in Figure 2A and attach to mast assembly 3 Carefully lower the boom assembly over the mast pivot pin and onto the bearing 4 Place the washer over the mast pivot pin and insert the cotter pin 5 Check boom for level and adjust trunnion roller assembly to insure that boom is level in all positions Roller must be adjusted to apply pressure to the mast NOTE If boom and or mast is not level the trolley or boom will not stay in position when not in use Re adjust mast or boom for plumb and level is required 6 To compsensate for antipicated deflection it may be necessary to adjust boom with the tip raised a distance equal to half the expected deflection Each jib is designed for a maximum Boom Length inches 150 De
10. Manual No 103 0012 REV 09 12 Promise to perform Installation and Maintenance Manual for SPANCO Freestanding Workstation Jib Cranes ISO 9001 REGISTERED SPANCO Inc TABLE OF CONTENTS sno mus r 3 SITO nena ce 3 5 Manual Rotation Stop Installation rr EAR ESAE 6 Boom IstallatlOl 2 RR cd 6 7 Hoist Trolley and End Stop Installati n u a cr b er 8 Festoon net nta RN ad repa 8 9 Hoist eer errr er as 10 Warning Satety OF Capacity 10 Acceptance TeSt D c H RITT 11 Spare Hes Oo aa d Ra a RA EOD k Qu casta 11 u ubus s 11 D T 12 EE 13 14 Warranty and Service atia FEES 16 FORWARD This manual contains important information to help you install operate maintain and ser
11. NS JARE NOT IN PLACE AND PORPERLY BENT OVER ON BOTH SIDES HOIST TROLLEY BEND COTTER PIN OVER BEFORE USE HOOK MUST BE CENTERED ON TROLLEY PIN PIN S3 0059 Figure 4 Note Some trolley load pins only have one cotter pin COTTER PIN INSTALLATION WARNING SAFETY OR CAPACITY LABELS If at any time these labels are lost stolen removed or become illegible contact SPANCO at 800 869 2080 for free replacements Please order by part number on the label A WARNING PREVENT TROLLEY END TRUCK FROM FALLING OUT OF TRACK DO NOT OPERATE CRANE WITH OUT END STOP BOLTS SECURED ON EACH END OF THE BRIDGE AND RUNNWAY DO NOT IMPACT END STOPS AT HIGH SPEED DO NOT USE END STOPS FOR REPETITIVE BRIDGE IMPACTS DO NOT SKEW BRIDGE IN RUNWAYS Figure 5 DETAIL WARNING LABELS ACCEPTANCE TEST After the jib crane has been installed OSHA requires an acceptance test before operating and also after any modifications This acceptance test should be performed by an authorized dealer or installer SPARE PARTS The following standard bill of materials shall be used as a guide when receiving your workstation jib crane and when ordering spare parts Items listed with an asterisk are specific to your particular model number Specify work order number model number and part number when ordering spare parts BILL OF MATERIALS ITEM QUANTITY DESCRIPTION PARTNO REMARKS
12. ction lengths grout thickness and other onsight variables In all cases the finished installation requirees full contact of the base plate on the foundation All anchor bolts shall have plate washers with standard holes of adequate thickness for oversized base plate holes per AISC requirements Along with plate washers a standard washer shall be used on each anchor bolt MAST INSTALLATION continued IT IS SOLELY THE CUSTOMER S RESPONSIBILITY TO PROVIDE THE PROPER FOUNDATION FOR THE JIB CRANE 50 THERE SHOULD NO DEVIATION FROM THE RECOMMENDED FOUNDATION SIZE OR INSTALLATION RECOMMENDATIONS WITHIOUT FIRST CONSULTING A QUALIFIED PROFESSIONAL 1 After installing the recommended concrete 3 000 PSI foundation reinforcement and anchor bolts minumum 1 inch diameter refer to the dimension sheet of your specific model jib crane Pages 11 12 and Figures 1A or 1B and 2 Install one set of leveling nuts on the anchor bolts with the top surface approximately one inch above the foundation Next place the mast assembly over the anchor bolts resting on leveling nuts Install the second set of nuts with plate washers and flat washers Clamp the plumb fixture a straight and rigid bar level or other custom made bracket to mast cap plate and or pivot pin Note Fixture must be perpendicular to the mast Select a position on the fixture arm 2 inches from the edge of the mast to hang a plumb line Measure 60 inches down from the top of the
13. ess of rated capacity negligent operation use beyond SPANCO s published service factors improper installation or maintenance and does not apply to any Equipment which has been repaired or altered without SPANCO s written authorization Written notice of any claimed defect must be given to SPANCO within thirty 30 days after such defect is discovered SPANCO s obligation and Purchaser s sole remedy under this Warranty is limited to at SPANCO s discretion the replacement or repair of the Equipment at SPANCO s factory or at a location approved by SPANCO Purchaser is responsible for all freight and transportation costs relating to the repair or replacement of the Equipment THE FOREGOING WARRANTY IS EXPRESSLY IN LIEU OF ALL OTHER WARRANTIES WHATSOEVER WHETHER EXPRESS IMPLIED OR STATUTORY SELLER MAKES NO WARRANTY AS TO THE MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE OF THE EQUIPMENT AND MAKES NO OTHER WARRANTY EITHER EXPRESS OR IMPLIED SPANCO shall not be liable under any circumstances for any indirect special or consequential damages including but not limited to lost profits increased operating costs or loss of production This Warranty shall not extend to any components or accessories not manufactured by SPANCO such as casters and Purchaser s remedy for such components and accessories shall be determined by the terms and conditions of any warranty provided by the manufacturer of such components and accessories SERVICE POLICY Ob
14. flection inches Projection V As Required BOOM INSTALLATION continued Cotter d Boom End Stop NNNM Assembly Assembly _ _ n Bearing Serial Location Starting 12 03 Trolley Trunnion Roller Trunnion Roller Bracket Mounting Angle Trunnion Mast Assembly PIE 65 JE Si Elevation View Plan View 96 amp o o Figure 2A Trunnion Roller Assembly Foundation amp Anchor Bolts By Others Figure 2 HOIST TROLLEY AND END STOP INSTALLATION Refer to Figure 3 Note This procedure may differ depending upon the festoon option you choose See Figures 5A 5B and 5C Festoon cahles and trolleys are optional 1 Place end clamp festoon trolleys then hoist trolley on the boom track See Figure 3 2 Secure the end stop bolts and rubber bumper B Install the festoon cable on the festoon trolleys at equal spacing as required FESTOON OPTIONS festooning Standard Cranes 4 Air festoon Figure 5C Flat cable festoon Figure 5A 5 360 degree collector Figure 6 Box track festoon Figure 5B 6 360 degree air swivel Figure 7 Figure 3 BOOM FESTOON DETAIL End Stop Bolt W Lock Nut and Rubber Sleeve For 500 600 amp 700 Series Track End Stop W Lock Nut amp Rubber Bumper End Clamp Trolleys Assembly Flat Cable FESTOON OPTIONS continued
15. in pivot bearing RECOMMENDED LUBRICANTS NLGI No 1 or No 2 greases 12 DIMENSIONS 100 150 LB CAPACITY 360 ROTATION be Span gt o 1 um Track Depth L ad Height Height Diameter Under Boom C B M o Y Depth of Anchor Bolts Are 1 Diameter Foundation Anchor Bolts And Template Supplied E Upon Request Call Factory For Price HEIGHT MAX SPAN MAST TRACK A B C NO OF BASE ANCHOR DEPTH OF WT MODEL LB UNDER HEIGHT FT DIA DEPTH IN IN IN BOLTS STYLE BOLT FOUNDATION LB NO BOOM FT IN IN LOAD LB IN 8 5 4 6 5 8 41 4 21 4 4 4 4 1280 330 6 250 FR100 4 8 8 5 6 65 8 41 4 21 4 4 4 4 12 SQ 595 6 265 FR100 6 8 8 934 658 9 214 4 89 3 4 8 11 3 4 12 11 4 4 12 SQ 1 645 FR100 12 8 8 11 3 4 14 11 4 4 1250 2 055 FR100 14 8 8 11 3 4 16 4 4 12 SQ 2 465 FR100 16 8 10 5 4 4 4 12 SQ FR100 4 10 10 5 6 4 4 12 SQ 585 FR100 6 10 10 9 3 4 8 4 4 100 10 10 9 3 4 10 1250 10 11 3 4 12 12 50 10 11 3 4 14 12 SQ 10411 3 4 16 12 SQ 12 5 4 12 SQ 12 5 6 12 93 4 8 9 12 12 9 3 4 10 4 4 4 12 11 3 4 12 4 4 4 12 50 12 11 3 4 14 4 4 4 12 SQ 12 11 3 4 16 4 4 4
16. tain as much information as possible concerning the problem through personal observation by yourself or other authorized personnel familiar with the job and equipment include model serial and or part numbers voltages speeds and any other special identifying features Be prepared to discuss the situation in detail All authorized labor charges will be based on straight time Hourly rates estimated man hours and not to exceed total dollar amount required for corrections are to be agreed upon before authorization is given There will be no allowances for overtime except in dire emergencies and then only with prior approval A verbal agreement may be reached immediately on both the method of correction and the approximate cost A warranty authorization number will be assigned for the specific incident A confirming written authorization will be forwarded to the distributor The distributor must send an itemized invoice showing our release number or invoice number and warranty authorization number after authorized corrections have been made A credit memo will be issued by accounting after the invoice has been received and approved Warranty charges ARE NOT to be deducted from outstanding open account invoices under any circumstances Any field corrections made prior to an authorization by SPANCO will not be accepted as a warranty charge or the responsibility of SPANCO Any modification to the equipment made without the prior approval of the seller will
17. vice your new workstation jib crane We recommend that you study its contents thoroughly before putting the jib into use We also recommend that you obtain the latest issue of ANSI B30 11 Safety Standard for Monorails and Underhung Cranes and study its contents thoroughly By practicing the recommended maintenance suggestions with proper installation and application of correct operating procedures you will be assured maximum service from your jib crane The jibs described in this manual are intended for indoor service Jib cranes used for outdoor service require special consideration Information in this manual is subject to change without notice THIS EQUIPMENT IS NOT IN ANY WAY DESIGNED FOR A WARNING LIFTING supporting OR TRANSPORTING HUMANS MAST INSTALLATION Refer to Figure 1 Note There are several types of base plate leveling methods to be used 1 No shims or grout on a level and true smooth concrete surface 2 Using shims by others and grout as required to plumb the mast on an irregular concrete surface Be aware that the slighest deviation from level will be magnified by the height of the mast and will result in difficulty leveling the boom 3 A preset leveling plate by others and grout 4 Using leveling nuts by others and grout as requried For purposes of this manual we will describe method four leveling nuts and grout Other methods are similiar and may require special attention to anchor bolt proje
18. void all warranties A verbal authorization for modification may be obtained in which event a warranty authorization number will be assigned for the specific modification A confirming written authorization will be forwarded to the distributor This warranty and service policy will be incorporated as a permanent section of the current price book as issued by SPANCO 16
Download Pdf Manuals
Related Search
Related Contents
Toshiba Satellite C855-S5347 LCD Projector User Manual série R+ - Becker France SEA 5. CONDUCCIÓN DEL TRACTOR MANUEL DE L`UTILISATEUR POUR LES CONSULTANTS Installation Guide/User manual 190C1SB/00 190C1SB/93 Manuel d`utilisation Amphenol DMX-5, M/F, 1m Arena SA-6640S 3U SCSI Hosted RAID Chassis/SATA Copyright © All rights reserved.
Failed to retrieve file