1. Use hex key to tighten turn past being finger tight Do not over tighten 9 8 5 Carefully recheck all the connections and bolts When confident everything okay gently and slowly lower the enclosure until it is secure Again it is important to use caution components can be easily broken if care is not taken Turn equipment power back on and reboot computer Log in to software and verify that anodic tool is seen by software in the CONFIG menu previously described Finally insert the red anodic tooling sign on the enclosure cover 9 8 6 When finished processing with the anodic tool replace with default Uni tool inverse of instructions detailed above Do not leave the anodic tool in the chamber 10 0 Troubleshooting Guidelines Known Bugs If the compress air and N gases are not turned off when machine is in idle state it will result in over pressure problem Therefore please make sure that all gasses are turned off after the process is complete Software Problems If the software refuses to cooperate press CTRL ALT DEL to close all programs Log out from Windows NT and log in again Re start the program If the problem persists try to do a hard reboot of the PC system Things To Avoid 1 Avoid using abort command while running recipes The recipe will try to reach the specified parameters fro the step before aborting Pausing and stepping through each step seems to be more effective 2 Ensure that tolerances in recip
2. It is recommended to verify the recipe prior to load This is described in Section IV 9 3 Loading Bonding Pairs 9 3 1 9 3 2 9 3 3 9 3 4 After align the bonding pair on SB6 aligner position the fixture apparatus on the loading arm Click Load on the control center window Wait until the process chamber door opens then push the load arm into the chamber Click Move on control center window and wait until the stage moves up and then release the fixture from loading arm ksbonder 9 4 9 5 9 6 9 7 Chapter 9 2 9 3 5 Pull out the loading arm and click Finish in control center window 9 3 6 Click Start to run the recipe Monitoring the Process 9 4 1 Click on SB6 from the task bar 9 4 2 In this window many parameters are monitored and displayed chuck temperature chamber pressure voltage current and etc 9 4 3 Many parameters can also be monitored in continuously updated plots located on the bottom of the screen 9 4 4 The bonding process is completed after reaching the end point setting This setting will be discussed in details in the recipe Section 9 7 9 4 5 A data file is automatically generated during each execution of a recipe This file can be reviewed from Data icon on navigation bar This data file is also stored on the hard drive under C gt SB6 gt logfiles The file can be also saved on to a floppy disk by click on Copy icon on the screen shown below The data file is only available after
3. Uni tool is the default installed tooling at ksbonder TC TOOL 4 substrate capactity thermal compression bonding Note this tool rarely used since Uni tool performs same function ANODIC TOOL 4 substrate capacity anodic bonding tool Has two concentric sets of electrodes purportedly to enhance bonding rate and bond quality 8 2 Recommended recipe for 4 anodic bonding gt gt gt gt Voltage 800 V Polarity Negative Pressure Purge Atmospheric Temperature 450 C These recommended parameters from results of a series of studies For more details please contact Matt Wasilik Equipment Operation 9 1 Startup Procedures 9 1 1 9 1 2 9 1 3 9 1 4 9 1 5 Enable ksbonder Pull out and turn the compressed air and N2 gas knobs clockwise until gauge needles approximately reach the marked pressure set points The clicking sound is normal Login to the Windows NT environment From the Window desktop click Start gt Programs gt SB6 to start the SB6 main program Login from the navigation bar with your own user name and password 9 2 Downloading Recipe 9 2 1 9 2 2 9 2 3 Click the CONTROL CENTER icon located in the navigation bar Note You will be asked if the fixture is in the chamber Select NO if the chamber is empty Click on Download Recipe button in the control center window Browse through the recipes in the current user directory and select the appropriate recipe for the process
4. Marvell Nanofabrication Laboratory University of California Berkeley Berkeley Microfabrication Laboratory ay Lab Manual HE Marvell NanoLab Member login Lab Manual Contents MercuryWeb Berkeley Microlab Chapter 9 02 Karl Suss SB6 Thermocompression amp Anodic Bonder ksbonder Microlab 1 0 Title Karl Suss Suss MicroTec Bonder User s Manual 2 0 Purpose This document contains information regarding to KSBonder equipment capabilities operation instructions processing parameters and basic theoretical discussions of various bonding process 3 0 Scope 3 1 Overview The KSBonder is a semiautomatic computer controlled stand alone substrate bonder equipped with a vacuum pressure chamber and a loading arm The machine processes aligned and unaligned wafers substrates and chips The alignment accuracy of this tool is listed as being 3 um 3 0 All bonding pair alignment is done on the KSBA6 tool Chapter 9 01 the substrate stacks are mechanically clamped using the transport fixture and then transported and bonded in the SB6 chamber 3 2 Equipment Capabilities gt Vacuum base pressure 5 0E Torr gt Temperature controller limit 500 C gt Bonding Force up to 60 psi 750 Ibs for 4 wafers 3 3 Materials Allowed It is very important to have similar thermal expansion characteristics of the bonding pair gt VLSI materials Silicon PolySilicon Silicon Nitride Silicon Oxide gt Photo resist temperature no
5. e settings are correctly set Do not ignore tolerances as unexpected equipment behavior can result 11 0 Figures amp Schematics 12 0 Appendix
6. en molecules are then diffused into silicon to form a layer of amorphous SiO The setup on KSbonder is shown in Figure 1 There are two ways to orientate the bonding pairs 5 1 With Glass Silicon Configuration Negative Polarity Negative Polarity Electrodes Current Pyrex t direction Silicon Chuck gt Figure 1 5 2 With Silicon Glass Configuration Positive Polarity Positive Polarity Electrodes Silicon Current direction Chuck gt Figure 2 There are some differences between the two setup configurations Negative polarity configuration with Pyrex on top as shown in Figure 1 has a longer bonding time and better bond quality than the configuration shown in Figure 2 Pyrex on bottom positive polarity For more information see Research Report by Ning Chen March 2003 6 0 Safety Use common sense and general caution when approaching and working at the machine Watch out for potential pinch points e g pneumatically actuated door There is no toxic gas used at KSbonder 7 0 Statistical Process Data ksbonder Chapter 9 2 8 0 Available Process Gases Process Notes 8 1 Available Tooling 9 0 8 1 1 UNI TOOL 4 and 6 substrate capacity anodic and thermocompression bonding The Uni tool uses one central electrode for anodic bonding applications This can be contrasted with the Anodic tool which has two concentric sets of electrodes Because of its versatility the
7. higher than 150 C gt Metals Aluminum Gold Gold tin alloys Lead tin alloys Indium Copper gt Glass borofloat Pyrex 7740 Hoyag SD1 or any borosilicate glass with thermal characteristics matched to silicon Quartz gt Also keep in mind the thickness of the wafers you wish to bond If you plan to dice your bonded wafer stack using standard stocked Microlab wafersaw blades you must use wafers such that the final thickness is less than microns Consult Matt Wasilik for this metric v 3 4 Configurations and Components 3 4 1 Windows NT Based Control and Data Acquisition System 3 4 1 1 Each user will have his her personal NT account and SB6 software interface account after passing the qualification exam 3 4 1 2 Each user will have his her personal file directory for recipe and data storage 3 4 2 The Motorized Z drive allows different bonding sequences ksbonder Chapter 9 2 3 4 3 The Compressed air and Nz pressure controllers need to be turned on prior to the process 4 0 Applicable Documents Revision History Research Report on Anodic Bonding by Ning Chen March 2003 5 0 Definitions amp Process Terminology For anodic bonding the working theory states that applying a large voltage potential across the glass wafer complex generates an electric field that drives Na ions into the glass wafer away from the interface region Thus an Na depletion zone is formed leaving oxygen molecules at the interface Oxyg
8. lowing procedure Use the lift mechanism to carefully raise the enclosure Be careful as to not bump or scrape it on any of the components just under the enclosure There is a delicate PCB mounted in the right hand rear corner of the chamber lid surface that can be easily damaged if care not taken 9 8 3 Once the enclosure is lifted use hex key to loosen and remove the bolts one at a time that secure the Uni tool to the chamber Be careful not to drop the bolts Disconnect the 5 ksbonder Chapter 9 2 pneumatic Pa uni tool line and lines 8 1 and 8 2 Disconnect the E1 and E2 electrode connections Disconnect the JBMEM and JBC electronic connectors Once connections are removed the Uni tool may be gently lifted up and out of the chamber this generally requires two persons Uni tool weighs roughly 25 lbs Be careful not to drop the tool or bump scrape it against any other components 9 8 4 Remove the struts that the anodic tool rests upon and re secure to Uni tool Ensure o ring is placed on anodic tool before insertion into chamber Wipe all sealing surfaces clean with IPA and tech wipes Gently place the anodic tool into the chamber Be careful Do not drop the tool into the chamber Note there are alignment marks on tool and chamber to ensure correct orientation Connect the E1 and E2 electrode connections to the anodic tool Install all of the bolts to the anodic tool head They should be tightened in sequence via a star shape
9. on bar has RECIPE option that allows user to create edit existing recipes All recipes for the current user are stored in C sb6 users username current directory not D If the user wishes to copy other user s recipe please do so in the Windows Explorer window and paste it in to the current user recipe directory ksbonder 9 8 Chapter 9 2 Recipes consist of a number of sequential actions executed at specific conditions i e pressure temperature membrane force and voltage Each recipe step consists of several parts To create load a recipe click on RECIPE icon located on the navigation bar To edit existing recipe first highlight the recipe and then click Edit This would bring out a separate recipe screen In this screen each of the steps can be edited In a typical recipe there are eight steps 9 7 1 Bringing tool in contact with bonding pairs 9 7 2 Removing clamps for the bonding pairs 9 7 3 Removing spacers 9 7 4 Bringing the inner circle electrodes in contact with bonding pair to initiate the tacking process 9 7 5 Brief pausing 9 7 6 Actual bonding process 9 7 7 Cooling down to 200 C 9 7 8 Unloading wafers and bring machine to default state Each of the steps can be edited by clicking on the parameter i e pressure temperature and etc For example if the user wishes to change temperature setting for a specific step by double clicking on the temperature window it will bring out a new temperature edi
10. t window shown below In this window the use can set the temperature giving a tolerance ramp up time After changing the parameters click OK to save If the user wishes to apply this setting to other setups just click on Next All Note that tolerance settings in the recipe parameters are critical Be sure to have the appropriate values set Ignoring the tolerance settings can lead to unexpected process behavior The end point setting is available in the actual bonding step There are three different ways to define the end point a Percent of max current b dI dt the slop of current curve c Area under the curve Q total charge Changing Tooling The default tooling configuration at ksbonder is Uni tool That is to say when approaching the machine in a default state the Uni tool will be installed Users are allowed to change to the anodic tooling at ksbonder only when properly trained Note that when the anodic process is finished the Uni tool must be reinstalled by default Anodic tooling install directions follow 9 8 1 Ensure that the chamber is at atmospheric pressure and that the tooling is at room temperature In the ksbonder software enter the CONFIG menu Under the Current Tool name option select anodic tool Then select replace tool option Shut the software down and turn off the computer Press EMO button to turn off all power to the ksbonder 9 8 2 Two persons are generally required for the fol
11. the process is finished Unload and Shutdown Procedure 9 5 1 Wait for the chamber to cool down to 200 C 9 5 2 Click Unload to initiate the unloading process 9 5 3 Once chamber door opens push the load arm into the chamber 9 5 4 Click Move to set the bonding pair fixture on the load arm 9 5 5 Move load arm out of the chamber when prompt to do so Be extra careful when sliding load arm out of chamber The bonded wafer stack is not held in place by clamps during unloading and can easily slide off the fixture if load arm is jerked 9 5 6 Click Finish to close the chamber and allow machine to return to an idle state Temperature would automatically drop down to 100 C Logout the SB6 9 5 7 Shutdown the software 9 5 8 Logout Windows NT environment 9 5 9 Please exit the SB6 software in an as delicate and orthodox fashion as possible i e properly exit and end all programs before signing off Do not Ctrl Alt Del or turn off computer 9 5 10 Turn the compressed air and N2 gas knobs counter clockwise as far as possible Gauge needles should read zero and machine should be silent no clicking This will prevent an over pressure error condition in the chamber Aborting a Process For whatever the reason should the user feel the need to abort a process do not use the Abort command on the control center window The acceptable alternative is to Pause the process and Skip through each of the subsequent steps Recipes The navigati

Download Pdf Manuals

image

Related Search

Related Contents

新製品案内 - ヤマト自動車  Siemens KI20LA50 combi-fridge  Bedienungs- und Wartungsanleitung  Guia_QUÍMICA DOS MECANISMOS DE DEFESA E DE  Troubleshooting - TiVo Central UK    第75回 定時株主総会招集通知  ASSMANN Electronic AK-440107-018-S power cable    補足説明書 - Y!mobile(ワイモバイル)  

Copyright © All rights reserved.
Failed to retrieve file