Home

Pro Home Installation PDF

image

Contents

1. If the loads on Dashboard are negative and there is no Solar generation switch the A amp B CT inputs on the MTU Repeat load tests shown above If you are having issues see theenergydetective com tedprorouter for further assistance Once Setup is complete it is recommended to go to Footprints ADVANCED and select Reset Totals to Zero This will initiate the logging of History When future configuration changes are made verify history is being recorded by viewing the minute graph If real time readings are being reported but history is not recorded in minute graph go to Footprints ADVANCED and select Reset Totals to Zero K CK OK OK OK OK OK OK OK OK OK OK OK OK kK OOK kK OK Ok OK OK OK kK OK OK kK OK OK CK OK OK OOK OK OK OK OOK OK OOK OK K OK Rev 3 5 Page 14 KKK KK KK KK KK KK KK KK KK KK KK K KK KK KK KK KK KK KK K X Appendix A Solar Wind or Auxiliary Generator Installation Addendum Installing the Solar Wind or Auxiliary Generator components Solar for short needs to be completed after the installation instructions have been followed for the installation of MTU 1 beginning on page 6 of this Instruction Guide Assuming that you have successfully installed MTU 1 as detailed above it is time to connect MTU 2 to your Solar system While there are many different variations in Solar connections we are presenting the installation of MTU 2 in the most common scenario Solar panels con
2. INSTALLATION MANUAL TED Pro HOME TED Pro LITE TED The Energy Detective IMPORTANT The installation of your TED Pro Home system is a several step process The Ist step is the installation of the MTU Home After the MTU Home is installed Step 2 is the installation of the ECC and the last Step Footprints software If the equipment is used in a manner not specified by the manufacturer the protection provided by the equipment may be impaired TABLE OF CONTENTS PART INUWOGQUCION 6255086 ash ehe6en eure tape ed Page 2 QUICK Stall 2 acneeesecus pee erseeneees nuns Page 3 Operating Conditions Page 4 Limitations 0 0 0 0 0 ccc eee Page 4 System Components Page 5 PART II SAtely 2 oie oon bene cee Wo eh Sas He bah ee SEES Page 6 PART Ill Installation 0 0 00 0 00 00 Page 7 PART IV TOSUNG 22 ci50ceee s 06 sees hee ndheenees Page 11 PART V Footprints Software Installation Page 12 Appendix Appendix A Wind Solar Installation Page 14 GLOSSARY of TED TERMS Please see the following link for TED Terms and Glossary http www theenergydetective com downloads TEDterms pdf TED K kK kK kK k kK kK OK kK OK OK OK kK kK OK OK kK OK Ok OK OK OK kK kK kK OK kK OK OK OK OK OK OK OK OK OOK K K OK K OK Quick Start IMPORTANT Quick Start instructions are a summary of the main aspects of MTU installation and not to be cons
3. OK OK OK OK OK OK OK OK OK OK OK OK kK OOK Ok OK OK OK CK OK OK kK OK kK OK OK OK OK OK OOK OK OOK CK OK OK OK OK Rev 3 5 Page 12 K OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OOK CK OK OK OK OK OK OK OOK OK OK OK OK OK OK OK OK OOK Ok o Rear LED Link Will blink on power up Will turn solid red when network established Will turn solid green when ECC is linked and receiving data from at least one MTU o Front LED Send Receive Blinks green when receives data from MTU Blinks red when transmits date to MTU In normal operation it will be constantly flashing red and green TEST USING DISPLAY Once installed you should see values for kW demand and per hour on the screen default energy rate is 0 10 per kWh Turn on a known load example 1200w microwave Display should increase by 1 2kW Turn on a known 240V load example an electric oven Display should increase by a few kW If it goes down or only goes up by a few watts then you have one of the CTs reversed Make sure that the red dots are all facing towards the power source TEST USING FOOTPRINTS SOFTWARE NOTE Once the Footprints Dashboard is accessed via one of the methods below the User should review the additional documentation and information under the HELP button or download the User s Manual here http www theenergydetective com prodocs Direct PC Connection For further detailed assistance visit www theenergydetective c
4. OK OK OK OK OK OOK CK OK OK K OK Rev 3 5 Page 10 ook OK ok OK ok OK ok OK ok ok ok ok ok ok ok ok k ok k k OK ok OK ok ok Ok ok Ok Ok ok ok k ok OK ok OK k k k Note 4 If you have solar wind or standby generator you will need an additional MTU if you want to measure Generation Load and Net Utility Please see solar wind section of our website for details Note 5 To install the CT e Open the CT by lifting the locking tab on the side of the CT over the restraining clip e Place the CT over the cable and close the locking tab Insure that it is properly seated and the CT will not open with a gentle pull The CT will likely be loose around the wire this is fine STEP 4 Installing the MTU A Plug the power cord into the MTU B Determine the best location to mount the MTU i Choose a location where it will not interfere with existing equipment or wiring li The MTU may be attached using double sided tape if allowed in your jurisdiction or with sheet metal or machine screws C Arrange and tie wrap all wiring in a neat and tidy manner D Turn on the power NOTE If you have a solar installation see Appendix A LEDs will begin to blink on the MTU Do not close the electrical panel until you have completed the installation of the ECC and verified that correct data is being received from the MTU Close the Electrical Panel only after you have confirmed the correct operation of the TED Pro system STEP 5 Accessing TED FO
5. K CK kK OK OK kK OK OK OK OK OK kK OK kK K OK Copyright 2001 2014 Energy Inc All rights reserved www theenergydetective com TED re KK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OOK OK OK OK OK kK OK OK OK OK OK OK OOK OK OOK OK OK OK OOK OK OK kK K Ok E If there is no spare circuit breaker the black wires can be attached to any 15 20 or 30 Amp single pole circuit breaker in the panel provided that the circuit breaker is approved for 2 conductors and this is acceptable to the authority having jurisdiction in the installation location it is generally acceptable NOTE For optimal PLC Communication the ECC must be plugged into a circuit on the same phase as the black wire on the MTU power cable If your readings display as negative swap A amp B CT inputs on MTU F Connect the white wire from the MTU to the neutral bus on the panel G Do not connect the Power Cable to the MTU until you have the CTs connected STEP 2 Installing and Connecting the Current Transformers CTS A B CAUTION IF THIS IS A COMBINATION PANEL THE LUGS ON THE PRIMARY SIDE OF THE MAIN BREAKER ARE PROBABLY STILL HOT Determine what type of system you have Split single phase 3 wire Common in North America residential and small commercial buildings There will be 2 power wires usually black and red and one neutral wire usually white Voltage from the power wires to neutral will be approximately 120V Voltage from o
6. OTPRINTS Plug Ethernet cable from ECC to router or network drop Most Browsers Internet Explorer Chrome etc will recognize the ECC by typing TED6000 into the address bar and pressing ENTER If this does not open the Footprints page on your Browser go to the TED website to Download and RUN the TED Installation Utility http www theenergydetective com downloads documents This utility will detect TED devices on your Network Select TED6000 when it appears in the window and click LAUNCH IN BROWSER Note For details on Footprints settings download the ECC User s Manual from the TED website http www theenergydetective com downloads ECCUsermanual pdf K CK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK Ok OK OK OK Ok OK OK OK OK OK OK OOK OK OOK OK OOK OK OOK kK OOK OK K OK Copyright 2001 2014 Energy Inc All rights reserved www theenergydetective com TED re x OK K CK OK OK CK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK CK OOK CK OK OK OK OK OK OK OOK OK OOK OK kK OK kK OK OOK X PART IV TESTING THE SYSTEM NOTE TO PROFESSIONAL INSTALLER o Even if the customer chooses to configure the ECC display and network it is extremely important that the installing electrician verify correct operation and measurement prior to leaving the site This can be done with an optional Display or using a laptop computer and Footprints software MTU and ECC are paired at the factory and will begin to communicate on
7. ata Cable F Optional Wireless Display Stand Power Adapter and USNAP Zigbee Wireless Card seated firmly in bottom of ECC G Installation Manual Please Read Carefully If you received the optional Wireless Display lets get the battery charging Plug the power adapter into a wall outlet Connect the power cable to the charging stand Remove battery tab Install Display into charging stand K CK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OOK Ok OK OK OOK kK OK OK OK OK kK OK OK OK OOK OK OK OK OK OK OOK kK OK OK Rev 3 5 Page 6 K OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK CK OK CK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK K OK kK k PART II SAFETY THE INSTALLATION OF TED Is INTENDED FOR PROFESSIONAL ELECTRICIANS OR HIGHLY TECHNICAL HOME OWNERS ONLY This brief manual summarizes the steps necessary to safely install the MTU and Current Transformers CTs For detailed installation and operation of other components and software please refer to the HELP Section of the TED Footprints Software or see Support at www theenergydetective com Every effort has been made in providing for the safe secure installation of TED The installation of TED requires the cover of the main electrical circuit breaker panel to be removed After the circuit breaker panel cover has been removed the potential hazard of shock burn or even electrocution now exists Do not attempt to complete this installation unless you are a
8. e the following link for TED Terms and Glossary http www theenergydetective com downloads TEDterms pdf NOTES K CK OK OK OK OK OK OK OK OK OK OK OK OK kK OOK kK OK Ok OK OK OK kK OK OK kK OK OK CK OK OK OOK OK OK OK OOK OK OOK OK K OK Rev 3 5 ENERGY Inc 648 MARINA DRIVE CHARLESTON SOUTH CAROLINA 29492 843 766 9800 800 959 5833 www theenergydetective com
9. egulations in effect for the installing location Contact your local power authority or local regulator for more information Turn off all power to the circuit breaker panel by turning off the main breaker or main switch Definitions MTU Measuring Transmitting Unit ECC Energy Control Center DISP LCD Display KK KKK KKK KK KKK KKK KKK KK K KK KKK KKK KK K KK K KK KK OK Rev 3 5 Page 8 K OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK CK OK OK OK OK OK OK OOK OK OK OK kK OK OK OK OK OK OK OK OK OOK OK kK k Incaming Power Lines MAX 250V 200A Main Circuit Breaker MAX 200A CT s iN PhaseA 2 Phase B ia EEE iP Neutral Phase Indicator Neutral Bus MTU Measuring Transmitting Unit White EU Connecte Black 15 20 or 30A Circuit Breaker Installation Procedure STEP 1 Installing the MTU Power Cable NOTE Do not connect the Power Cable to the MTU until you have the CTs connected The MTU must sense the CT connections on power up A See NOTE above Turn off power B Remove circuit breaker panel cover C Record the Serial Number of the MTU as shown on the label It consists of six digits in the form 12 34 56 You will need to know this number to connect the MTU to the ECC Network D Connect the black wire from the MTU power cord to a spare 15 20 or 30 Amp single pole circuit breaker in the panel K CK kK kK k OK k OK kK OK OK OK OK kK kK OK kK OK k kK kK k kK OK kK k
10. idered a replacement for the complete Installation Instructions contained in this Manual For MTU power cable connection reference drawing on Page 8 CTs Current Transformers Direction Clip CTs around the conductor for each phase with RED polarity dot facing the utility Loads should be displayed as a positive number on Footprint s Dashboard Solar production should be displayed as a negative value on the Foot prints Dashboard If polarity is incorrect on the Dashboard swap A amp B CT inputs VY on the MTU shown here Data Communication PLC The method of communication is PLC Power Line Carrier If possible plug ECC into a Phase A outlet After the ECC has been configured with MTU ID the PLC Link LEDs should turn solid green within 3 5 minutes It is very important that the Installer MTU Link LED ECC Link LED verify operation before leaving the Du site by checking LINK LEDs and verifying reading on Footprints Dashboard See Page 11 for more diagnostics Accessing TED FOOTPRINTS Plug Ethernet cable from ECC to router or network drop then try this shortcut Type http TED6000 into the address bar and pressing ENTER If this does not open the Footprints page on your Browser go to the TED website to Download and RUN the TED Installation Utility http www theenergydetective com downloads documents This utility will detect TED devices on your Network Select TED6000 when it appears in the wi
11. licensed electrician familiar with the electrical components and operation of the circuit breaker panel Even when the main circuit breaker has been turned to the OFF position certain areas within the circuit breaker panel may still be electrified Do not attempt installation unless you know where these electrified areas are This symbol will be found throughout the instructions where there is a po tential for electric shock burn or even ELECTRICAL electrocution Do not attempt to com HAZARD plete the noted section if you are not an electrician or qualified installer WARNING These servicing instructions are for use by qualified personnel only To reduce the risk of electric shock DO NOT perform any servicing other than that contained in these operational instructions unless you are qualified to do so WARNING The MTU must be connected to a switch or circuit breaker in close proximity to the equipment and within easy reach of the operator It must be marked as the disconnecting device for the MTU WARNING If the equipment is used in a manner not specified in these instructions the protection provided by the equipment may be impaired ENERGY Inc Mopet TED6000 TED Pro This device complies with part 15 of the FCC Rules HOME Operation is subject to the following two conditions TESTED TO COMPLY WITH FC FCC STANDARDS 1 This device may not cause harmful interference FCC Part 15 SubPart B EU EN 61326 1 a
12. nd 2 This device must accept any interference received FOR HOME AND OFFICE USE including interference that may cause undesired operations K CK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK Ok OK OK OK kK OK OK kK OK kK OK OK OK OOK OK OK CK OK OK OK OK K OK Copyright 2001 2014 Energy Inc All rights reserved www theenergydetective com TED re K OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK kK OK OK OK OK OK CK OK OK OK OK OK OK OK OK OOK OK OK CK OOK OK OOK OK K OK PART Ill INSTALLATION BEFORE YOU START e Do not begin installation until you have read the Safety section of this manual e Read all instructions before beginning installation Estimated Installation Time Professional Installer 15 minutes Equipment Needed Flathead screwdriver small and large Phillips screwdriver small and large Flashlight Important Notes For services with Wind Solar or Standby Generator an additional MTU will be required to measure GENERATION and NET All wiring in the United States must be installed in accordance with the latest adopted edition of the National Electrical Code ANSI NFPA 70 NEC and state or local requirements All wiring in Canada must be installed in accordance with the latest adopted edition of the Canadian Electrical Code CSA C22 2 CEC Part I and any provincial or local requirements Wiring in other countries and jurisdictions should be done in accordance with the rules and r
13. ndow and click LAUNCH IN BROWSER Note For details on Footprints settings download the ECC User s Manual from the TED website http www theenergydetective com downloads ECCUsermanual pdf K CK OK OK OK OK OK OK OK OK OK OK OK OK OK OK kK OOK Ok OK OK OK OK OK OK kK OK kK OK OK OK OOK OK OK OK OOK OK OK OK OK OK Rev 3 5 Page 4 KK OK OK OK OK OK OK OK OK OK OK OK OK OK OK CK OK OK OK OK OK OK OOK OK OK OK kK OK OK OK OOK OK OK OK OK OK OOK kK K PART I INTRODUCTION SAFE OPERATING RANGE AND CONDITIONS Oo sida Use Indoor Indoor Outdoor Condition Dry Dry Damp Temperature i 10 40 C 40 C to 50C Relative Humidity lt 80 lt 95 Altitude 3 300M 3 300M Voltage 95 277 VAC 200 500 VAC Maximum Power SW 1 5W Limitations Please note the following limitations e MTU Home and MTU Pro Lite are suitable for use on 50 or 60 Hz services around the world up to 277V phase to neutral e MTU Home and MTU Pro Lite utilize Power Line Communication PLC to transmit Energy data to the ECC If you require Ethernet communication for your application please see specifications for TED Pro MTU at www theenergydetective com e MTU Home and MTU Pro Lite are suitable for use with solar wind generation systems You will need to purchase one additional MTU Home When installed it will tell you Load Gen eration and NET metering e MTU Home and MTU Pro Lite are suitable for use on single phase services up to 400A o For se
14. ne power wire to the other will be double that approximately 240V Install 2 CTs one over each of the power wires and plug into A amp B ports on the MTU i Single phase 2 wire Common in Europe and many other countries There will be one power wire usually black or brown and one neutral wire usually white or blue Install one CT over the power wire and plug into A port on the MTU Single phase derived from 2 phases of a 3 phase system Sometimes called 2 phase Typical in apartment or office buildings common in many countries Same as 3 phase except only 2 of the 3 phases are brought into the building or panel Install 2 CTs one over each of the power wires and plug into A amp C ports on the MTU iv 3 Phase Wye MTU Pro LITE only Install 3 CTs one over each of the power wires and plug into A B amp C ports on the MTU Note 1 The CTs should be installed on the secondary side of the main switch or main circuit breaker however if this is not possible such as in the case of a combination breaker panel then install on the primary side of the main breaker Note 2 The CTs must be installed with the RED polarity dot facing the utility Facing away from the breaker if measuring main service Toward the breaker if measuring generation or a single load Note 3 Do not install the CT over the neutral N grounded conductor K CK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OOK Ok OK OK OK kK OK OK OOK OK OK OK OOK
15. nect to an inverter which changes DC to AC In most cases it will be 120 240V The connection can tie into the main switch Circuit Breaker a transfer switch a junction box a splitter box etc It really doesn t make any difference In the case of an auxiliary generator it will likely tie into a transfer switch because generally speaking a generator is not run in parallel with the utility You will use both CTs if your inverter connects via 240v otherwise if it is 120V you will only use one CT The MTU CTs are connected similarly as connecting MTU 1 See image on Page 8 If possible both MTUs should be powered from the panel on the same circuit or phase as the ECC This will give the cleanest Power Line Carrier signal Try NOT to power the MTU from the inverter as there will be a lot of line noise that could interfere with the signal Generation should display as a negative number Verify RED dots on CTs are facing the Utility or toward the panel if feeding back through the panel to Grid If Generation is showing as a positive number switch the A amp B inputs on the MTU K CK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK Ok OK OK OK Ok kK OK OK OK kK OK OOK OK OK OK OK OK OK OK OOK OK K OK Copyright 2001 2014 Energy Inc All rights reserved www theenergydetective com TED ro K OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK Ok OK OK OK ok OOK CK kK CK OK OK OK kK OOK OK OK OK OOK OK OOK OK K OK Please se
16. om tedprocomputer Connect ECC to installer laptop with Ethernet cable Insure that IP address of Ethernet adapter is set at 192 168 7 1 refer to Appendix A of User s Manual for network support In your web browser type 192 168 7 4 in the address bar Should load footprints software and show power readings on the speedometer of the dashboard If not verify PLC Status LEDs and MTU ID in System Settings Disconnect reconnect MTU from MTU Power Cable Repeat load tests shown above Connection via customer s router if you are owner or have access to customer s network Connect ECC to router with Ethernet cable In your web browser type http TED6000 in the address bar or run Installation Utility to locate TED on the local network To download Installer http www theenergydetective com downloads documents K CK OK OK OK OK OK OK OK OK OK OK OK OOK OK OK OK OK Ok OK OK OK CK OK OK OK CK kK OK OOK OK OK OK kK OK kK OK OOK kK OK OK Copyright 2001 2014 Energy Inc All rights reserved www theenergydetective com TED me K OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK Ok OK OK OK kK OOK OK OK OK kK CK OK OK OK OK OK OK OK OK OOK CK K OK Footprints software should have launched at this point Footprints software should be displaying power readings on the speedometer of the Dashboard If not Verify PLC status LEDs and MTU ID in System Settings Disconnect reconnect MTU from MTU Power Cable
17. power up If not you may need to input the MTU ID in System Setup Refer to website for ECC operation manual ECC To achieve optimum communication between the ECC and MTU Insure that the MTU and ECC are connected to the same phase Plug ECC into suitable outlet Do not choose an outlet that has a lot of electronic or computer equipment plugged into the same outlet Do not plug the ECC into a circuit with a UPS battery backup DISPLAY optional equipment a Wireless Display e Plug power supply into suitable outlet Connect power supply outlet to back of charging stand e Remove battery protection tab from Display e Plug Display into charging stand b Wired Display Refer to Appendix C of ECC User Manual e Remove power from ECC e Plug Display cable into rear of Display e Plug other end of cable into Display port at rear of ECC e After connecting Display insert AC cord into wall outlet to power on the ECC Check operation of Power Line Communication PLC Status LEDs MTU There are two LEDs on the front of MTU o Bottom LED Link Will blink on power up Will turn solid green when linked to ECC Single phase Will turn solid red when linked to ECC Three phase Two phase o Top LED Send Receive Blinks green when receives data from ECC Blinks red when transmits date to ECC In normal operation it will be constantly flashing red and green ECC There are two LEDs on the left side of the ECC K kK OK OK
18. rvices gt 200A optional accessories are required See website for details o Accuracy when used on single phase services is better than 2 e MTU Home is suitable for use on single phase services derived from 3 phase i e apart ments at 208 120V up to 200A MTU Pro LITE is suitable for use on 3 phase wye configuration services up to 200A MTU Home is not suitable for 3 phase services o Accuracy when used on 3 phase services is better than 5 o For 3 phase services you will need to purchase one additional CT o For other 3 phase configurations or higher amperage services see specifications for TED Pro MTU at www theenergydetective com K CK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK Ok OK OK OK Ok OK OK OK OK OK OK OOK OK OOK OK OK CK OOK OK OK CK K OK Copyright 2001 2014 Energy Inc All rights reserved www theenergydetective com TED re K OK OK OK OK OK OK OK OK OK OK OK OK OK OK OOK OK OOK OK OK OK OK kK OK OK OK OK OK OK OK OK OOK OK OOK OK OOK OK OK OK K OK SYSTEM COMPONENTS Unpacking Unpack TED and ensure that all parts are included in the package A One 1 Measuring Transmitting Unit MTU Home B One 1 ECC Energy Control Center C Power Cables for MTU Home and ECC Ethernet Cable D MTU Home will have two 2 Model CT601B Current Transformers CT s MTU Pro LITE will have three 3 Model CT601B Current Transformers CT s E Optional Wired Display and Flat USB3 Type D

Download Pdf Manuals

image

Related Search

Related Contents

(DVR_Scuola Primaria Carlo Collodi_Candelù_13)  Sterling SFC-A 40 Automobile Parts User Manual  REWANET MEGA  PNL-tec EAP55  TermoRace TR. PCS user manual  Toshiba Satellite U945-S4130  Ficha Técnica  User Manual 10.4” POS LCD Monitor  Harbor Freight Tools English Wheel Kit with Stand Product manual  Manuel de l`opérateur v.2 - Canwarn  

Copyright © All rights reserved.
Failed to retrieve file