1. E Ei n amp Figure 2 3 Location of Recommended Punch Entries CAUTIONS e There are numerous methods for making wire entry holes in the enclosure but it is imperative that no loose material generated during the process remains in the enclosure During installation and cutting the wire holes all equipment mounted inside or on the enclosure shall be protected from loose material e No matter what procedure is used the installer shall verify that the hole cutting process will not damage any of the wiring or components installed inside or on the enclosure i Electro Industries GaugeTech Doc E173701 2 4 The Leader In Power Monitoring and Smart Grid Solutions 2 Installation The two recommended procedures for cutting the wire entry holes are as follows e Use a C frame punch to cut the wire entry holes This type of punch does not require a pilot hole A typical C frame punch is shown below A Figure 2 4 C Frame Punch e Regular punch 1 Place a magnet inside the enclosure where the pilot hole is to be cut and com pletely cover the area with masking tape or other very sticky tape 2 Drill the pilot hole from the outside and do not let the drill pass more th
2. least 2 feet of clearance around the enclosure Carefully remove all packing material from the unit Even though an equipment inspection was made when the equipment was received make another careful inspec tion of the enclosure and the devices inside as packing material is removed Be especially alert for distorted metal loose wires or damaged components This is important because wiring can come loose in shipping and could cause a short circuit or voltage to be on the wrong terminal Please inspect to make sure all the wiring is in the proper place and all connections are tight Refer to figures 2 1 and 2 2 for internal wiring schematics WARNING Extreme care shall be taken when mounting the enclosure and making wire entry holes to prevent metal chips filings and other contaminants from entering the enclosure which may damage the equipment and create a hazardous condition i Electro Industries GaugeTech Doc E173701 2 1 The Leader In Power Monitoring and Smart Grid Solutions 2 Installation AVERTISSEMENT Attention extr me lors de la monture de l enceinte et lors de la mise terre pour pr venir les articules m talliques rem plissage et autre contaminant de l entr e de l enceinte qui peuvent provoquer une condition dangereuse de l quipement Vc namzT BK Neutral Input SHARK Meter Door Box Chasis Chasis Figure 2 1 120V Internal Wiring Schematic i Electro Industries GaugeTe
3. 5 4 The Leader In Power Monitoring and Smart Grid Solutions 6 Ordering Information 6 Ordering Information Shark 50 Meter in Enclosure ENCSHK50 277 V2 485P 1 2 3 4 1 Model ENCSHK50 Shark 50 Meter 2 Voltage 120 120 240 Volts 277 277 Volts 3 V Switch Key Pack see table below 50 Meter Vi v2 V3 Shark Multi V1 plus V2 plus function Power and Energy meter Frequency counters 4 Communication X None 485P RS485 and KYZ Pulse Output Example ENCSHK50 277 V2 485P Shark 50 meter with 277 Volt option with Control Power Transformer V 2 V Switch key and RS485 KYZ Pulse Output Shark 50B Meter in Enclosure ENCSHK50B 277 1 2 1 Model ENCSHK50B Shark amp 50B Meter 2 Voltage 120 120 240 Volts 277 277 Volts 3 Electro Industries GaugeTech Doc The Leader In Power Monitoring and Smart Grid Solutions E173701 6 1 6 Ordering Information Example ENCSHK50B 277 Shark 50B meter with 277 Volt option with Control Power Transformer Shark 100 Meter in Enclosure ENCSHK100 277 60 10 V2 D2 485P 1 2 3 4 5 6 7 1 Model ENCSHK100 Shark 100 Meter 2 Voltage 120 120 240 Volts 277 277 Volts 3 Frequency 50 50 Hz System 60 60 Hz System 4 Current Input 10 5 Amp Secondary 2 1 Amp Secondary 5 V Switch Key Pack see table below Meter V1 v2 V3 Va Shark Multi V1 plu
4. Delta 3 CT Hookup 3 5 4 Operation 4 1 4 1 Overview 4 1 4 2 Troubleshooting 4 1 amp Electro Industries haugeTech Doc E173701 TOC 1 The Leader In Power Monitoring and Smart Grid Solutions Table of Contents 5 Maintenance 5 1 Removing a Meter From Service 5 2 Reinstalling the Meter 6 Ordering Information Electro Industries haugeTech The Leader In Power Monitoring and Smart Grid Solutions Doc E173701 5 1 5 4 TOC 2 1 Introduction 1 Introduction The Self Enclosed Shark amp Meter Assembly lets you expand your switchgear capability without expensive and time consuming redesign Simply mount and wire the enclosure next to your switchgear and you are ready to go with no downtime at all This is an ideal solution for a retrofit when there is no metering compartment avail able The unit comes standard with a NEMA 1 enclosure and is factory wired with the meter installed Standard equipment includes voltage fuses a shorting block for cur rent transformer connections and a control power transformer if used with 277 480 Volt power systems The enclosure can be ordered with any of the following multifunction meters Shark 50 meter Shark 50B meter with native BACnet MS TP Shark 100 meter Shark 100B meter with native BACnet IP protocol or Shark 200 advanced meter with datalogging and extensive I O It is offered in two voltage configurations e 277 Volt enclosure which comes equ
5. not necessary e You must reprogram the meter for a Delta 2 CT hookup Using the meter s faceplate see figure on the right follow this procedure 1 Push the MENU button rSt will be blinking on the top line of the display 2 Press the DOWN ARROW once CFG Configu ration moves to the top of the display DOWN Arrow RIGHT Arrow 3 Press the ENTER button You will see the Configuration menu Srl shown on the right LEE Jr LPE e y 3 Electro Industries GaugeTech Doc E173701 3 5 The Leader In Power Monitoring and Smart Grid Solutions 3 Electrical Wiring 4 Press the DOWN ARROW until you see Cnct then press the ENTER button to go to the Connection setting screen shown on the right 5 The current setting is shown in the second line Press the DOWN ARROW to choose 2 Ct del Delta see the screen on the right 6 Press the MENU button twice You will see the Store Settings screen Stor ALL 7 The screen s default setting is YES To save the settings you ve made press the ENTER button You will see the confirmation screen Stor ALL done and then the meter resets Electro Industries haugeTech The Leader In Power Monitoring and Smart Grid Solutions Doc E173701 w w 3 6 4 Operation 4 Operation 4 1 Overview The 120 240 Volt Self Enclosed Shar
6. 1 4 1 The Leader In Power Monitoring and Smart Grid Solutions 4 Operation This page intentionally left blank Electro Industries haugeTech The Leader In Power Monitoring and Smart Grid Solutions Doc E173701 4 2 5 Maintenance 5 Maintenance The Self Enclosed Shark Meter Assembly is designed to be relatively maintenance free under normal use However because of the variability of application conditions and the importance placed on dependable operation and inspection you should per form maintenance checks on a regularly scheduled basis Visually inspect for loose parts wires and or hardware inspect for discoloration of insulation and damaged or discolored components be alert for accumulation of dirt and or moisture on struc ture check operation of disconnecting means and continuity of fuses where applicable 5 1 Removing a Meter From Service Follow these steps 1 De energize all circuits feeding the case 2 If possible de energize lines that the CT s are on 3 Install 4 shorting screws where shown on the CT connection block instructions follow WARNING If the meter must be removed from service the secondary side of the current transformers MUST be short circuited to prevent a dangerous high voltage condition from appearing across the secondary wires of the current transformer Arcing and damage to personnel and or equipment can occur if the screws provided on the shorting block are
7. CUITS A SHORT CIRCUIT TYPE TERMINAL BLOCK IS PROVIDED FOR THE CURRENT TRANSFORMER CIRCUIT INPUT WIRING SPECIFICATIONS The Leader In Power Monitoring and Smart Grid Solutions i Electro Industries GaugeTech Location Wire Size Screw Size Maximum Torque Shorting Block 16 22 AWG CU 110 32 20 Ibf in 2 3 N m Fuse Block 310 18 AWG CU 10 32 20 Ibf in 2 3 N m Neutral Wire 12 max CU 8 32 6 Ibf in 0 68 N m Earth Ground 10 12 AWG CU 8 32 10 Ibf in 1 2 N m Doc E173701 3 Electrical Wiring 3 1 Wiring Instructions WARNING First connect Earth Ground as shown in the figure below AVERTISSEMENT Branchez d abord la mise la terre comme indiqu dans le dessin ci dessous Inst pte Est Ground Figure 3 1 Earth Ground Connection 3 Electro Industries GaugeTech Doc E173701 3 2 The Leader In Power Monitoring and Smart Grid Solutions 3 Electrical Wiring Electro Industries haugeTech The Leader In Power Monitoring and Smart Grid Solutions Understand the diagram s that pertain to your unit before you begin the field wiring The following figures show the available wiring options Understand your sys tem and use the appropriate figures WARNING CONTROL WIRING MAY HAVE VOLTAGE PRESENT THAT CAN CAUSE SEVERE PERSONAL INJURY OR DEATH DE ENERGIZE ALL CONDUCTORS BEFORE BEGINNING TO PERFORM ANY WIRING ACTIVITY TO OR WITHIN THE SELF ENCLOSED SHARK ASSE
8. LE FOR ANY INDIRECT SPECIAL OR CONSEQUENTIAL DAMAGES ARISING FROM ANY AUTHORIZED OR UNAUTHORIZED USE OF ANY ELECTRO INDUSTRIES GAUGETECH PRODUCT LIABILITY SHALL BE LIMITED TO THE ORIGINAL COST OF THE PRODUCT SOLD i Electro Industries GaugeTech Doc E173701 i The Leader In Power Monitoring and Smart Grid Solutions Use of Product for Protection OUR PRODUCTS ARE NOT TO BE USED FOR PRIMARY OVER CURRENT PROTECTION ANY PROTECTION FEATURE IN OUR PRODUCTS IS TO BE USED FOR ALARM OR SECONDARY PROTECTION ONLY Statement of Calibration Our instruments are inspected and tested in accordance with specifications published by Electro Industries GaugeTech The accuracy and a calibration of our instruments are traceable to the National Institute of Standards and Technology through equipment that is calibrated at planned intervals by comparison to certified standards For optimal performance EIG recommends that any metering device including those manufactured by EIG be verified for accuracy on a yearly interval using NIST trace able accuracy standards Disclaimer The information presented in this publication has been carefully checked for reliabil ity however no responsibility is assumed for inaccuracies The information contained in this document is subject to change without notice Symbols Used in This Manual This warning symbol indicates that the operator must refer to an important explanation in the operating instructi
9. MBLY AVETISSEMENT LE C BLAGE DES COMMANDES PEUT AVOIR UNE TENSION PR SENTE QUI PEUT PROVOQUER DES BLESSURES GRAVES POU LA MORT METTRE HORS TENSION TOUS LES CONDUCTEURS AVANT DE COMMENCER LA R ALISATION D UNE ACTIVIT DE CABLAGE DANS L ENCEINTE DE L ASSEMBLAGE SHARK amp a KOLTA WFUT NEUTRAL E c Vb E INPUT ECE Figure 3 2 Wye Wiring for 120V Model Doc E173701 3 3 3 Electrical Wiring VOLTAGE INPUT JEUTFEL f bo Ye INPUT es Figure 3 3 Wye Wiring for 277V Model Electro Industries haugeTech The Leader In Power Monitoring and Smart Grid Solutions Doc E173701 3 4 3 Electrical Wiring 3 2 3 Wire Delta 3 CT Hookup The enclosure is shipped pre wired for a 4 wire Wye installation with the meter s volt age reference Vref tied to the Neutral input N via a jumper located on the con nector of the meter If the enclosure is to be used on three wire Delta circuits where no neutral exists the jumper on the connector must be moved This requires that the jumper s connection to N must be removed and then moved to Vb to allow the meter s Vref to be common with Vb See the figure below O Meter as Shipped Meter Modified for Delta Figure 3 4 Wiring as Shipped and Modified for Delta e An external wired Neutral connection to the Neutral Terminal is
10. Self Enclosed shark Meter Assembly For Retrofit Meter Solutions E o 9 D _ O 2 Extends Switchgear Capability Installation amp Operation Manual V 1 06 Eliminates Wiring and Installation Errors July 22 2015 Pre Wired and Configured The Leader In Power Monitoring and Smart Grid Solutions G5 Electro Industries haugeTech 1800 Shames Drive Westbury NY 11590 Tel 516 334 0870 Fax 516 338 4741 Email sales electroind com This page intentionally left blank Shark Meter In Enclosure Assembly Installation and Operation Manual Version 1 06 Published by Electro Industries GaugeTech 1800 Shames Drive Westbury NY 11590 All rights reserved No part of this publication may be reproduced or transmitted in any form or by any means electronic or mechanical including photocopying record ing or information storage or retrieval systems or any future forms of duplication for any purpose other than the purchaser s use without the expressed written permission of Electro Industries GaugeTech 2015 Electro Industries GaugeTech Shark is a registered trademark of Electro Industries GaugeTech The distinctive shapes styles and overall appearances of all Shark meters are trademarks of Electro Industries GaugeTech i Electro Industries GaugeTech Doc E173701 The Leader In Power Monitoring and Smart Grid Solutions Customer Service and Support Customer supp
11. an 1 4 into the enclosure 3 Remove the tape magnet and cuttings and punch the hole After wiring and before energizing vacuum the inside of the enclosure to make sure that it is free of foreign material If a vacuum is not available use an alternate method to clean the inside of the enclosure Do not use compressed air or pressurized gas to clean the inside of the enclosure as this may force cuttings into areas that cannot be seen creating a hazardous condition IMPORTANT All wire entry into the enclosure shall be accomplished with the use of recognized fittings or strain reliefs Bare holes shall not be used 3 Electro Industries GaugeTech Doc E173701 2 5 The Leader In Power Monitoring and Smart Grid Solutions 2 Installation 2 2 Installation Refer to the following diagrams for enclosure and mounting dimensions 11 06 10 27 Figure 2 5 Enclosure Front Dimensions i Electro Industries GaugeTech Doc E173701 The Leader In Power Monitoring and Smart Grid Solutions 2 6 2 Installation 8 081 jm Figure 2 6 Enclosure Side Dimensions Electro Industries haugeTech The Leader In Power Monitoring and Smart Grid Solutions Doc E173701 2 7 2 Installation Figure 2 7 Mounting Hole Dimensions Electro Industries hau
12. ch Doc E173701 The Leader In Power Monitoring and Smart Grid Solutions 2 Installation Electro Industries haugeTech BK aLo olo Ta GN WH aHi elo 0 Ia BK bLo De o o Ib 1 GN P WH 7 Hi 3 e ojlo part BK E cLo amp e ojo Ic WH cHie e olo Ic 05A Vc v P ye 05A I N Vb gt fe PUR x U WH 05A T BN L Va LP ve Gra Vre y GN 3A i d BK Sec Pri Lae e X a DEA Gray s d Wn 5 JIA Sr GN GN GNDP D a 2 sila SHARK Meter lt l BL D C Door Box Chasis Chasis Neutral nput Figure 2 2 277V Internal Wiring Schematic The Leader In Power Monitoring and Smart Grid Solutions Doc E173701 2 3 2 Installation 2 1 Recommended Procedures for Wire Entry Hole Cutting The enclosure does not come with wire entry holes punch entries They must be cut in the location you want depending on the installation See Figure 2 3 for the locations that EIG recommends a Le E b be de el H BLTESE WEUT JEUTESL ru a EV 7 22 i b vs eur Ltd ME NAME
13. ents de transformateur de courant sont effectu s AVANT d enlever les vis de circuit puis retourner leur support Voir la section 5 2 4 Remove the 4 fuses from the fuse block 5 Unscrew and disconnect the 6 current leads to the meter 6 Disconnect all connectors to the meter 7 Remove the 4 mounting nuts 8 Remove the meter 3 Electro Industries haugeTech Doc E173701 5 3 The Leader In Power Monitoring and Smart Grid Solutions 5 Maintenance 5 2 Reinstalling the Meter Follow this procedure to reinstall the meter 1 Place meter in cover cutout 2 Tighten the 4 mounting nuts 3 Insert all connectors into the appropriate sockets on the back of the meter 4 Connect the 6 current leads to the meter making sure they are attached in the proper order 5 Install the 4 fuses in the fuse block in their proper location 6 Remove the 4 shorting screws from the CT connection block and return them to their storage positions See the figure below Remove the Ground Screw Last ig and damage tc r equipment can ws provided on the e not installed in ons prior to wires EXTERNAL CT INPUT PT e lc ic Ib ib la lo ews as shown Figure 5 2 Shorting Screws Returned to Their Storage Positions 7 Verify that no foreign material remains inside the enclosure if there is any clean it out 8 Energize all circuits and verify operation 3 Electro Industries haugeTech Doc E173701
14. eration manuals on the enclosed CD for the meter s storage requirements The temperature rating for enclosure storage is 20 to 50 C 1 4 Compliance UL cUL Listed file number E358101 i Electro Industries GaugeTech Doch E173701 1 2 The Leader In Power Monitoring and Smart Grid Solutions 2 Installation 2 Installation WARNING All safety codes safety standards and or regulations shall be strictly observed in the installation operation and maintenance of this device This device shall be installed in an un energized condition and as per the National Electric Code AVERTISSEMENT Tous les codes de s curit normes de s curit et r glement doivent tre suivis strictement pour l installation le fonctionnement et la maintenance de cet appareil Cet appareil doit tre install hors tension conform ment au code lectrique national National Electric Code Choose a mounting location that offers a flat rigid mounting surface capable of supporting the weight of the equipment The unit weighs 25 Ibs 11 4 kg maximum Mount the equipment in a suitable environment These enclosures are designed for NEMA 1 environments and are manufactured of painted steel Check to make certain that there are no pipes wires or other mounting hazards in the immediate mounting area that could create a problem Also make sure you have enough clearance around the enclosure to run wiring to it safely EIG recommends at
15. ese voltages Avertissement tous les codes de s curit normes de s curit et r glements doivent tre suivis strictement dans l installation le fonctionnement et la maintenance de cet appareil Des tensions dangereuses peuvent provoquer la mort ou des blessures graves suivre l installation ad quate le fonctionnement et les proc dures de maintenance pour viter ces tensions Completely read and understand the material presented in this document before attempting installation operation or application of the equipment In addition only qualified persons should be permitted to perform any work associated with the equipment Any wiring instructions presented in this document must be followed precisely Failure to do so could cause permanent equipment damage All possible contingencies that may arise during installation operation or mainte nance and all details and variations of this equipment do not purport to be covered by these instructions If further information is desired by purchaser regarding a particular installation operation or maintenance of particular equipment contact an Electro Industries GaugeTech EIG representative 1 3 Storage Although it has been well packaged this equipment should not be stored outdoors If the equipment is to be stored indoors for any period of time it should be stored with its protective packaging in place Refer to the Shark 50 100 100B and Shark 200 Installation and Op
16. g and Smart Grid Solutions 3 Electrical Wiring 3 Electrical Wiring The Self Enclosed Shark Meter Assembly is factory wired and tested Installation requires solidly mounting the enclosed unit and connecting field wiring This docu ment has diagrams of wiring options Review and understand the appropriate diagrams for the unit you have ordered NOTE Internal fuse block and CT shorting block terminations can accommodate 10 to 14 AWG wire Consult your local and or National Electric Code for external wiring requirements IMPORTANT ALL CONNECTIONS TO THIS PRODUCT ARE TO BE WITH COPPER WIRE ONLY TOUS LES CONNEXIONS CE PRODUIT DOIVENT FAIRE UN FIL DE CUIVRE SEULEMENT Both enclosure models are pre wired and programmed for a three phase four wire Wye system requiring 3 current transformers The enclosures may also be used on three wire network systems two CT s single phase three wire systems two CT s or single phase Neutral two wire systems one CT 120 option only Enclosure models with a 277 in the part number contain a single phase step down control power transformer designed for a primary of 480 VAC and secondary voltage of 120 VAC NOTE The current inputs are only to be connected to external current transformers provided by the installer The CT s shall be Listed to ANSI IEEE C57 13 and rated for the current of the meter used A DISCONNECTING MEANS AND UPSTREAM PROTECTION SHOULD BE INSTALLED FOR ALL CIR
17. geTech The Leader In Power Monitoring and Smart Grid Solutions Doc E173701 p 12 150 A 8 000 AX D 3125 2 8 2 Installation 2 2 1 Installation Steps 1 Install the 4 required mounting bolt anchors Upper Mounting Bolts Figure 2 8 Mounting Bolt Installation Upper Bolts 2 Gently lift the enclosure and guide the top mounting holes over the anchors Install the two bolts but do not tighten them 3 While still supporting the enclosure install the two lower mounting bolts in the lower mounting flange but do not completely tighten them Use shims if required to prevent deformation of the enclosure when tightening the bolts if the mounting surface is distorted 4 Tighten all four mounting bolts after any required shimming is completed See the figure below O ON ES Mounting Ok Bolts 4 Q Figure 2 9 Mounting Bolt Location 3 Electro Industries GaugeTech Doc E173701 2 9 The Leader In Power Monitoring and Smart Grid Solutions 2 Installation 2 3 Door locking Instructions The enclosure has been fitted with means for securing the door so it cannot be opened or tampered with The padlock bracket can be secured in place with a padlock 3 8 inch shackle diameter See the figure below Figure 2 10 Door with Lock Electro Industries haugeTech Doc E173701 The Leader In Power Monitorin
18. ions 6 Ordering Information Frequency 50 50 Hz System 60 60 Hz System Current Input 10 5 Amp Secondary 2 1 Amp Secondary 5 V Switch Key Pack see table below Meter Vi v2 v3 Va V5 V6 Shark Multi V1 plus 2 V2 plus V3 plus V4 plus 3 V5 plus 4 200 function MB data THD Limits and MB data MB data meter logging control logging logging memory functions memory memory and 64 and 512 samples samples cycle wave cycle wave form form recorder recorder 6 Power Supply D2 Universal 90 to 265 VAC 50 60Hz or 100 to 370 VDC 7 and 8 I O Slots 1 and 2 X None INP100S 10 100BaseT Ethernet RO1S 2 Relay outputs 2 Status inputs PO1S 4 Pulse outputs 4 Status inputs 1mAOS 4 Channel Analog output 0 1 bidirectional 20mAOS 4 Channel Analog output 4 20mA FOSTS Fiber Optic Output ST terminated FOVPS Fiber Optic Output Versatile Link terminated INP300S IEC 61850 Protocol Ethernet Example ENCSHK200 277 60 10 V2 D2 INP100S X Shark 200 meter with 277 Volt option with Control Power Transformer 60 Hz System 5 Amp Secondary V 2 V Switch key D2 power supply 10 100BaseT Ether net in Card Slot 1 and no card in Card Slot 2 i Electro Industries haugeTech The Leader In Power Monitoring and Smart Grid Solutions Doc E173701 6 4
19. ipped with a control power transformer e 120 240 Volt enclosure 1 1 Product Handling CAUTION READ AND UNDERSTAND THE INSTRUCTIONS CONTAINED IN THIS DOCUMENT BEFORE ATTEMPTING TO UNPACK INSTALL OPERATE OR MAINTAIN THIS EQUIPMENT Every effort is made to insure that the equipment arrives undamaged and ready to be installed Packing is designed to protect internal components as well as the enclosure Do not remove protective packing until you are ready to install the equipment When you receive the equipment you should inspect the shipping container for any obvious signs of rough handling and or external damage that occurred during trans portation Record any external and internal damage for reporting to the transportation carrier and EIG All claims should be as specific as possible and include general order numbers You will find a plastic bag of instruction booklets and or CDs in the shipping container Store these documents in a safe place 3 Electro Industries GaugeTech Doc E173701 1 1 The Leader In Power Monitoring and Smart Grid Solutions 1 Introduction 1 2 Safety Precautions WARNING All safety codes safety standards and or regulations must be strictly observed in the installation oper ation and maintenance of this device Hazardous voltages that can cause death or severe personal injury are present inside enclosure Follow proper installation operation and maintenance procedures to avoid th
20. k Meter Assembly 120 Model comes equipped with three 10mm x 38mm 600V 100mA fast acting fuses and one 10mm x 38mm 500V 3A Time Delay fuse for the protection of the meter s sense voltage and control power circuits respectively The 277 Volt Self Enclosed Shark Meter Assembly 277 Model comes equipped with three 10mm x 38mm 600V 500mA fast acting fuses and one 10mm x 38mm 500V 3A Time Delay fuse for the protection of the meter s sense voltage and control power circuits respectively A disconnecting means and upstream protection should be installed for all circuits A short circuit type terminal block is provided for the current transformer circuit The terminal blocks for the current circuits are short circuit type Shorting screws are included see instructions in Section 5 1 The temperature rating for enclosure operation is 20 to 50 C Refer to the Shark 100 100B or Shark 200 User manual on the enclosed CD for specific operating instructions for the meter in your enclosure 4 2 Troubleshooting Symptom Extremely inaccurate readings of voltage and or harmonics Perform these two tests 1 With fuses removed from the unit test the fuses with an ohmmeter All of the fuses must show a resistance of 2 Ohms 2 With the unit fully powered measure the voltage on the input side and output side of the fuse The voltages should differ by less than 1 Volt 3 Electro Industries GaugeTech Doch E17370
21. lled in to safely short the secondary of the CT s grad SR CE asa lo Shorting Je E Jem ER ES e 7 CR nl 17 a q Block Screw ledellieii i ize eim9 Location 4 EXTERNAL ET BUT 4 ee ke Hh ke Ie YOLTASE INPUT Dev nd l ve INPUT Figure 5 1 Shorting Block Location i Electro Industries GaugeTech mn red Doct E173701 5 2 The Leader In Power Monitoring and Smart Grid Solutions 5 Maintenance Install the Ground ig and damage t t equipment can Screw ws provided on the e not installed in First bns prior to wires EXTERNAL CT INPUT IC lc Ib Iib lat la ews as shown Figure 5 2 Shorting the CTs WARNING When you re install the meter make sure all CT con nections are made BEFORE removing the shorting screws and then return the screws to their holder See Section 5 2 ATTENTION Lorsque vous r installez le compteur assurez vous que tous les branchem
22. not installed in the correct locations prior to disconnecting any wires AVERTISSEMENT Si le compteur doit tre enlev du service le c t secondaire du transformateur actuel DOIT tre court circuit pour pr venir une condition de haute tension dangereuse d apparaitre dans les c blages secondaires du transformateur actuel La brulure d arc et l endommagement d un quipement ou des blessures sont susceptibles de se produire si les vis fournies sur le court circuit ne sont pas install es dans les emplacements corrects avant de d brancher les c bles The four brass screws that are parked on each corner of the shorting block are used to short the three high sides and one low side of the CT outputs to the brass bar that is across the middle of the shorting block The pre installed jumper connects all lows together 3 Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions Doc E173701 5 1 5 Maintenance The brass screws need to be screwed down until the end of the screw makes contact with the terminal strip below enabling the brass bar to become electrically common with the terminal strip Les vis en laiton doivent tre viss es jusqu ce que la fin de la vis soit en contact avec le bornier en dessous permettant la barre de laiton de devenir commune lectriquement avec le bornier The figures below and on the next page show which terminals holes the screws must be insta
23. ons The word follow ing the symbol indicates the type of warning being given Ce symbole d avertissement indique que l op rateur doit se r f rer une explication importante dans les instructions d utilisation Le mot suivant le symbole indique le type d avertissement ne soit donn CAUTION The instructions given must be followed to prevent damage to equipment Les instructions doivent tre respect es pour viter d endommager l quipement WARNING The instructions given must be followed to prevent serious injury to people Les instructions doivent tre respect es pour d viter de graves blessures aux personnes Electro Industries haugeTech The Leader In Power Monitoring and Smart Grid Solutions Doc E173701 iii This page intentionally left blank Electro Industries haugeTech The Leader In Power Monitoring and Smart Grid Solutions Doc E173701 Table of Contents Table of Contents Customer Service and Support ii Product Warranty ii Use of Product for Protection iii Statement of Calibration iii Disclaimer iii Symbols Used in This Manual iii 1 Introduction 1 1 1 1 Product Handling 1 1 1 2 Safety Precautions 1 2 1 3 Storage 1 2 1 4 Compliance 1 2 2 Installation 2 1 2 1 Recommended Procedures for Wire Entry Hole Cutting 2 4 2 2 Installation 2 6 2 2 1 Installation Steps 2 9 2 3 Door locking Instructions 2 10 3 Electrical Wiring 3 1 3 1 Wiring Instructions 3 2 3 2 3 Wire
24. ort is available 9 00 am to 4 30 pm Eastern Standard Time Monday through Friday Please have the model serial number and a detailed problem descrip tion available If the problem concerns a particular reading please have all meter readings available When returning any merchandise to EIG a return materials authorization number is required For customer or technical assistance repair or calibration phone 516 334 0870 or fax 516 338 4741 Product Warranty Electro Industries GaugeTech warrants all products to be free from defects in material and workmanship for a period of four years from the date of shipment During the warranty period we will at our option either repair or replace any product that proves to be defective To exercise this warranty fax or call our customer support department You will receive prompt assistance and return instructions Send the instrument transporta tion prepaid to EIG at 1800 Shames Drive Westbury NY 11590 Repairs will be made and the instrument will be returned This warranty does not apply to defects resulting from unauthorized modification misuse or use for any reason other than electrical power monitoring The Shark9 Meter in Enclosure assembly is not a user serviceable product THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABIL ITY OR FITNESS FOR A PARTICULAR PURPOSE ELECTRO INDUSTRIES GAUGETECH SHALL NOT BE LIAB
25. s V2 plus V3 plus 100 function Power and DNP 3 0 Limits and meter Frequency and Energy Harmonics counters 6 Power Supply D2 Option Universal 90 to 265 VAC 50 60Hz or 100 to 370 VDC 7 Communication X None 485P RS485 and KYZ Pulse Output INP10 100BaseT Ethernet and KYZ Pulse Output Example ENCSHK100 277 60 10 V2 D2 485P 3 Electro Industries GaugeTech The Leader In Power Monitoring and Smart Grid Solutions Doc E173701 6 2 6 Ordering Information Shark amp 100 meter with 277 Volt option with Control Power Transformer 60 Hz System 5 Amp Secondary V 2 V Switch key D2 power supply and RS485 KYZ Pulse Output Shark 100B Meter in enclosure ENCSHK100B 277 60 10 D2 1 2 3 4 5 1 Model ENCSHK100B Shark 100B Meter 2 Voltage 120 120 240 Volts 277 277 Volts 3 Frequency 50 50 Hz System 60 60 Hz System 4 Current Input 10 5 Amp Secondary 2 1 Amp Secondary 5 Power Supply D2 Universal 90 to 265 VAC 50 60Hz or 100 to 370 VDC Example ENCSHK100B 277 60 10 D2 Shark amp 100B meter with 277 Volt option with Control Power Transformer 60 Hz System 5 Amp Secondary and D2 power supply Shark 200 Meter in enclosure 1 2 3 4 5 6 7 8 1 Model ENCSHK200 Shark 200 Meter 2 Voltage 120 120 240 Volts 277 277 Volts i Electro Industries GaugeTech Doc E173701 The Leader In Power Monitoring and Smart Grid Solut

Download Pdf Manuals

image

Related Search

Related Contents

SERVICE MANUAL  GB H D CZ FIN SK PL RO  ORBIT-6 User manual  Manuel d`utilisation du moniteur LCD  Philips Softone Lustre  Operating Instructions  Camcolvcn GB-NL-FR-ES-D  

Copyright © All rights reserved.
Failed to retrieve file