Home
Manual Enbar 1U3 and 22U3 mobile unit
Contents
1. Always disconnect the power supply first Close the ball valve that regulates the air supply 5 1 Cleaning after use e After the fogging cycle has been completed the solution tank suction pipe excess flow check valve pipes and nozzle are all rinsed with water e Unscrew the solution tank from the unit e Rinse the solution tank o Rinse with warm tap water 40 C until clean e Leave a small amount of clean water to cover the bottom of the solution tank o This will prevent the pipework and other parts from drying out e Put the solution tank back into place on the fogging unit e Fill the rinse water tank with clean water e Clean the fogging unit and the compressor o Use a non abrasive household cleaning agent e Inspect the Enbar for leaks and wear and tear of the tubes and cables e Inspect all guards and or grids e Inspect all couplings bolts and nuts User Guide Enbar 1 U and 22U3 Page 30 of 44 5 2 Compressor maintenance 5 2 1 Draining condensation fluids Drain the pressure vessel after every use e Place a container underneath the drain cock e Open the drain cock e Collect the condensed liquid and treat it as chemical waste it contains oil 5 2 2 Oil level e Check the compressor s oil level The oil level should be between the red dot on the oil level gauge and the bottom of the oil level gauge The red dot indicates the maximum level Refill the oil if necessary see 5 2 3 Use only P
2. NA ee aaa nnee Raden 5 EA SIAC ING Sannes bnn nanne anni en Kd a ag EA AKA 5 12 OCS ennen eneen 6 Le COMMECEON MSLUEUONS oan sarana a kana NANA aa ag A aa A ENAKE GEN NA KN Ka a KA paja a BABA aa naa Na pa nai 6 Lo USS mannendiner sten AB EE A Ba EE BR EN ANARA AG a aaa a KA aa a ag aa naka kaga 6 LAN JANTEN GN USS Pee sadana eh saa D aa b aa deed ada ai aa KAN aa ne akan 6 1 7 Atomization enMirOnMENE reren tenere nnerd bensie 6 LS NRD naa sanga na nia aana aa Ga aa aaa na aa aa a NA ala aan aaa GRA NAK E aa aan nenten sentent E 7 2 DESCHPEON ga tenen eene st KAR Lap Kajar AA NANA aaa NK ANANA 8 2 A PRIN DCO OD CFA O nN net eenma enn NA NANA AA KANE KE SAGE EE a KEDEK aa aka 8 DZ A ennen T EN RE behande ne 9 Zo IVAN SOOM and SIDE nessen NE AE E P A E A 12 D DANG JAGUNG O S ae E E enten 13 3 1 Information about crop protection agents ssssssssssrsrsrersrererrnnnrrrnrnrnrnrnnnrnrnnnrnnnrnenenenene 13 3 2 Summary of safety hazard ICONS s ssssssesessnsrnrrnrsrnnrnrnrsnrrrnrnrsnennnnnrsnnnrnrnrsnennnrnnenenennnnnnn 14 3 3 General safety INStrUEtONS sasananing NA DANA KANEA KA KANAAN RATA KAGAN ANA KAEKA A a Aa ANGE NANA 16 D al INofMatOM aaa aki aaa na eneen NG Ka DAS Ka NGA a a SAKA Ng en 17 3 3 2 Preparing the atomizing solution sus ennvrneenenvenenennenrnnvnrneenenreneneneenenn 18 3 3 3 Testing the INStalAUON sereen Wederden 19 3 34 SWitching OA the MAENE tenere neden deet tkn 20 3 3 5 Using the machine retansnn
3. a MUSE IS arrena aes yartastsvnbsneeiyantsacswncisetyartancincierateaetacs 42 User Guide Enbar 1 U and 22U3 Page 4 of 44 1 Identification This chapter contains a number of general specifications parameters and specifications with regard to the machine s intended operators operating conditions etc 1 1 The Enbar L V M U3 230 V 3 5 W 60 rpm Rinse water tank 111 Compressor o oo G O 40Bar S Maximum pressure 10 Bar Arr REN PO Puska VDL 100 or Shell Corena H100 VDL 100 or Shell Corena H100 is located on the machine near the main box Table 1 Specifications 1 2 The machine The Enbar LVM Low Voltage Mister or simply Enbar is a machine that automatically disperses crop protection agents The Enbar vaporizes the crop protection agents via an air stream after which the vapour remains suspended in the treatment area for some time to ensure an even distribution and good permeation of the vaporized chemical solution into the crop The benefits of the ENBAR L V M e Accurate and effective application of crop protection agents The crop does not become wet Very even distribution across the entire surface Mobile Available in a 400 V and a 230 V version Requires a minimum of labour Leaves practically no residue The machine generally speaking is built up out of a ventilator a nozzle a motor a solution tank a frame a compressor and an oxygen tank The Enbar was developed exclusively for the atomization
4. dial 34 to set the fogging cycle to 1 minute e Press the start button o The Enbar will now run through its full program pre ventilation fogging and rinsing e When the Enbar has completed its program remove the key from the key switch 32 to prevent use by unauthorized persons User Guide Enbar 1 U and 22U3 Page 27 of 44 4 6 Taking the Enbar out of operation A QO D Always wear gloves protective clothing and a full face mask when switching off the Enbar or working on it Always disconnect the power supply first Close the ball valve that regulates the air supply 4 6 1 Switching off the machine Do not enter the area until the Enbar has completed the fogging and post ventilation cycles and the area has been properly aired e Set the pressure switch 9 to 0 OFF by pressing the button 20 e Switch the key switch 32 on the main box to 0 and remove the key from the switch o This is to prevent use by unauthorized persons AN Remove the plug from the wall socket Carefully unscrew and remove the solution tank 13 from the Enbar Rinse the solution tank o Rinse with warm tap water 40 C until clean o The rinse program ensures that the solution tank suction pipe excess flow check valve pipework and nozzle are all rinsed with clean water e Leave a small amount of clean water to cover the bottom of the solution tank o This will prevent the pipework from drying out e Screw the solutio
5. essential to prolonging the Enbar s service life and maintaining the operational security of the compressor User Guide Enbar 1 U and 22U3 Page 34 of 44 7 Malfunctions 1 The compressor No power supply Make sure that the plug is will not start connected to the wall socket Check to see of the power supply is functioning by briefly running the fogging cycle see paragraph 4 5 1 The compressor has already Check the pressure gauge on attained the desired pressure the tank Cut off pressure is approximately 8 5 Bar The pressure switch is not on Turn the switch of the pressure switch 20 first to O and then to I The motor protection has been Check the setting of your shut off due to overload motor protection switch mismatched loads or short and contact your supplier circuiting ere EE supply which the Enbar is connected 2 Compressor The pressure relief valve does Contact your supplier The speed at which the not function properly compressor is operating is too low 3 The ventilator s are not The fuse in the main box is Remove the plug from the functioning properly defective wall socket Replace the fuse If the fuse blows once more contact your supplier The fuse in the box on the Remove the plug from the fogging unit is defective wall socket Replace the fuse in accordance with the instructions in the appendix If the fuse blows once more contact your supplier 4 The foggin
6. of crop protection agents in greenhouses fogging The 22 U3 and 1 U3 types described in this user guide distinguish themselves from other Enbar types U1 and U2 in the sense that this type produces its own compressed air and is mobile According to the Low Voltage Directive the Enbar is a Class I device User Guide Enbar 1 U and 22U3 Page 5 of 44 1 3 Operators It is imperative that all operators using the Enbar read this user quide and inform themselves of the applicable safety precautions before putting the machine into operation All operators must be designated as authorized operators by the company An operator is not necessarily authorized to mix the atomizing agent or modify the settings of and or execute maintenance and repair work on the machine unless this person is at least eighteen years of age Apart from this operators must be certified to mix the atomizing solution through a valid Class III Spraying Certificate Operators must ensure that children or persons under the age of eighteen and persons not wearing adequate protective clothing in such cases when this is required stay out of the direct vicinity of the Enbar Pregnant women should neither operate nor remain in the direct vicinity of the Enbar 1 4 Connection instructions Connect the Enbar to an earthed wall socket protected with a 16A circuit breaker in combination with a 30mA earth leakage circuit breaker The supply voltage of the mobile version of the Enbar
7. operation is as follows the numbers apply to the components in paragraph 2 2 The solution tank 13 is filled with a crop protection agent After the start sign has been given the ventilator 12 will be switched on and the compressor 16 will ensure that the air pressure is brought to and kept at an adequate level At the same time the agitator mixer 6 in the solution tank will start to rotate to keep the crop protection agent dissolved and prevent it from clumping or precipitating The ventilator will now start pre ventilating to start up the air stream in the treatment area Please note that the pre ventilation time can be set There is a nozzle 2 with inputs for liquids and air directly in front of the ventilator outlet Once the atomizing or fogging program starts the air valve will switch and the compressed air will exit the oxygen tank 10 through the nozzle via the pressure regulator 8 This will result in negative pressure in the nozzle the Venturi effect This negative pressure causes the crop protection agent to be sucked up via the filter 4 and the excess flow valve 3 and subsequently vaporized at the nozzle head As the nozzle is located in the air stream of the ventilator the crop protection agent is vaporized in the air stream and dispersed throughout the treatment area The Enbar will continue to atomize the treatment area for the duration of the set time After this the rinse cycle will start automatically The wa
8. the 1 U3 and the 22 U3 is 400 V 1 5 Use The device may be used exclusively for the atomization of suitable crop protection agents 1 6 Unintended use It is not permitted to use the Enbar for atomization with substances other than crop protection agents Use of the Enbar and its solution tank as a storage unit for crop protection agents is prohibited Never mix more atomizing solution than necessary you should make only enough for one application only When the Enbar has completed the atomization and post atomization ventilation process using the relevant crop protection agent the tank must be emptied Collect the atomizing agent in a container and store it in an adequate storage location The Enbar is not suitable for use as a ladder or a stepladder or for any purpose other than atomization 1 7 Atomization environment The consumption of food beverages or tobacco in the direct vicinity of the Enbar is prohibited due to the presence of crop protection agents The space where the Enbar is being used may not be entered when the machine is in operation Make sure that there is sufficient free space on all sides of the machine to avoid any possible safety hazards The ambient temperature must lie between 5 C and 40 C and the relative humidity between 35 and 85 The Enbar is intended for use in a crop growing area User Guide Enbar 1 U and 22U3 Page 6 of 44 1 8 Warranty The warranty is six months commencing on
9. the Enbar to an earthed wall socket Follow all the instructions for connecting the machine Ensure that the wheel blocks are properly in place Place the Enbar on a flat stable surface Ensure that the solution tank has been put into place correctly Make sure that the fans are blowing in a longitudinal direction i e parallel to the aisle User Guide Enbar 1 U and 22U3 Page 20 of 44 3 3 5 Using the machine Make sure that nobody can enter the space where the Enbar is being used Make sure that all windows and doors with outdoor access are closed to ensure that no vapour will escape Thoroughly air the treated area for several hours after use Do not enter the area until the machine has completed the post ventilation cycle and the area has been properly aired Inspect the solution tank to ensure that it is empty and if not empty it Treat the fluid as chemical waste e Remove the plug from the wall socket e Store the Enbar in an area that cannot be accessed by unauthorized persons User Guide Enbar 1 U and 22U3 Page 21 of 44 3 3 7 Maintenance and cleaning of the machine e Ensure that the Enbar is completely empty of all crop protection agents before performing any maintenance or cleaning activities e Always remove the plug from the wall socket before working on the Enbar e Allow the cylinder heads to cool before cleaning them e Wear suitable protective clothing and gloves e Always wash
10. the date of demonstrably taking the machine into commission to which an expiration date applies of two years from the production date In the event that a warranty claim is lodged the relevant parts must be offered to the manufacturer for assessment The warranty will be cancelled if any of the following conditions apply Improper use or assembly Repeatedly ignoring the recommendations issued by the supplier and or manufacturer Repair maintenance or use by unauthorized parties Use of improper connections with regard to power supply or wiring Use of the machine in an unsuitable environment Deliberate damage or modifications to the machine The guarantee terms are in accordance with the Terms and Conditions of the Netherlands Metal Association METAALUNIEVOORWAARDEW in the version dated January 2008 User Guide Enbar 1 U and 22U3 Page 7 of 44 2 Description This chapter briefly explains the operation of the Enbar while the location of the various parts is specified according to a number of schematic drawings 2 1 Principle of operation The Enbar L V M Low Volume Mister is a machine for the treatment of a specific space with vaporized crop protection agents that enables an even distribution and good permeation of the crop protection agents into the crop The machine injects a fluid crop protection agent into an air stream after which the ensuing vapour is dispersed throughout the treatment area The general principle of
11. 1 VAT number NL8000 78 378 B01 info vanderendegroep nl www vanderendegroep nl User Guide Enbar U1 and U2 Pagina 44 van 44
12. AE VAN DER ENDE POMPEN User Guide Enbar LVM Types 1U3 and 22U3 Version 20121206 Preface This user guide has been compiled for users and installers of the Enbar L V M 1 U3 and 22 U3 Please read the entire user guide carefully and keep it in a safe place for future reference In the event of loss or damage of this user guide or a portion thereof a new copy can be requested free of charge from the manufacturer for the entire lifespan of the system The user guide is divided into chapters each of which consists of sections Each of these can in turn be composed of various sub sections The following items will be discussed in succession General information Safety precautions including an explanation of the symbols used Description of the Enbar Installation and assembly Instructions for use Maintenance Repairs and malfunctions Several appendices have been included at the back of the user guide including exploded views of the filter and the nozzle The table of contents provides an overview of where each item can be found in the user guide User Guide Enbar 1 U and 22U3 Page 2 of 44 Table of Contents Ln 2 The table of contents provides an overview of where each item can be found in the user guide 2 Table on COMEN ende eee eee eenen 3 Ee TEN aO Jean aaa aa aaa a aia aa EA Ba a Aa aaa AG SA E aaa Baja E aa an aan aga Dina aaa 5 Lah The END EVN D D gana ga aa kaa anan ala Ga ia NAN ee aa a a
13. anter USS kaarak np kaka LAN Kaga aka ia ana Tan totem a ka ain kawa hats Kak aii aaa ada Ka aaa kanaka a 30 5 2 Compressor TAIN NO sasae ada taati gana NA a pa aga eaaa eternet nennen 31 5 2 1 Draining condensation MUIS wnrssersereverseninversenrnieseenneeaikene lernen 31 Di A WEY Cl aana aaa aa aaa aa aana baa nia aaa eon 31 5 2 3 Refilling and replenishing the oil u ssarsenrssenrseenrvensvnorsverrsenrseenrvernrverssnerses 31 SW MEOS eeens E EE E E E esn neben 32 MIAN OV CMA kasan saen ba b ia enen neden a aa nk kaen Nan bagi ek me a ada NA Ba aa naa a ab a ues Kaga a ak an naak eee 33 OL E gien ede gn 33 zere lel gend gE 33 625 COMPIESSOP aana asana a gag ia betande tente 34 Z Malf URNCUONS sisa san akin aana aa a ennen Aedes 35 Da TENCAS PSCC ON Sastre strays EA KNA Ka Bara Sla ERA NGANA MAK en ga aa NAK ANG 37 User Guide Enbar 1 U and 22U3 Page 3 of 44 6 1 ENDAH MODS ensen NAGA KANAAN ANG A AGA KANAN AKA GENEA eee ee eee ee eee 37 82 COINS GON aas jagaa sasa nan as aana a kaadanan kak E cakes Kaga aa aa eaten seem eae 37 8 3 ENDAr UNIE ennn Kaka EE ANGE NA KAGAN BEG ENE KANEA EKA AE GE a Kn TG DENE GE KE a AEETI KSERA Rani 37 9 Declarauen Ol TOO NA rennen daken deense daken dennen ein I BANG NA BANA 38 ols get en 39 Composition ofthe nor wa saa aaa uang kaa a Ka aa Na aa aaa due NA a naa aa aaa aa a aa aa naa aka 40 Composition of the inlet filter eeen enerenrnernernerserserserversersnrverenrenrververenvens 41 RODNI
14. ays wear gloves protective clothing and a full face mask when working on the Enbar Always disconnect the power supply first Close the ball valve 21 that regulates the air supply Never switch on the ventilator s if the ventilator guard is not in position 6 2 Fogging unit e Disconnect the power supply e Close the ball valve 21 that regulates the air supply e Drain condensed fluid and deaerate the pressure vessel o Puta container underneath the drain cock o Open the drain cock o Leave the drain cock open until barely any air escapes from the drain cock o Shut the drain cock e Clean the ventilator blades o Remove the ventilator guard from the ventilator s o Clean the ventilator blades with soapy water o Put the ventilator guard back into place e Clean the solution tank 6 o Wipe the tank clean with a moist cloth o Rinse it with plenty of clean water o Clean the tank with soapy water if necessary e Inspect the agitator mixer 5 o Switch on the Enbar via the main switch box o Connect the plug to the wall socket The agitator mixer should now being to rotate slowly Ifthe agitator mixer does not function properly contact the supplier o Remove the plug from the wall socket o Switch off the Enbar via the main switch box o Put the solution tank back into place e Clean the filter in the suction line 3 o Take the suction filter apart Use the exploded view in the appendix for reference o Rinse t
15. ct the manufacturer Glaszekeringhouders Open the control unit o Unscrew each of the four corner 4 screws Remove the cover o This is connected to the electronic parts with cables o Do not remove these cables Pull back the tab of the glass fuse holder o The U3 has three glass fuse holders as shown in the diagram below Test the glass fuse or replace immediately o The glass fuse type is rated 4A fast acting Clamp the glass fuse holders shut Screw the cover back into place Legend Glaszekeringhouders Glass fuse holders User Guide Enbar U1 and U2 Pagina 42 van 44 Time diagram Key Start Stop Ventilator uoIgeIJ us A IsOd bBuisuny bulbbo4 UOIJLJIQUDA 31d oO U San se Bs IT Z Pagina 43 van 44 N D g en TA gt Sa Q C Lu 0 5 Kam oO U 5 AE VAN DER ENDE POMPEN The information in this user guide can be qualified as a document compiled in accordance with our best efforts and capabilities and from which no rights can be derived No liability is accepted for printing errors updated technology and modifications with regard to the methods used Neither is liability accepted for consequential damage Van der Ende Pompen B V PO Box 10 2676 ZG Maasdijk Maasambacht 4 2676 CW Maasdijk the Netherlands Telephone 31 0 174 515050 Fak 31 0 174 514848 Rabobank 34 03 41 610 Registered with the Chamber of Commerce in The Hague under No 2723047
16. d associated with electrocution Please observe the necessary Safety precautions whenever you see this icon Face mask When using a product that has this icon always wear a full face mask to prevent the inhalation of hazardous substances via the respiratory system or exposure to these substances via the face Gloves When using a product that has this icon always wear gloves to prevent the exposure to and or spreading of hazardous substances via the hands User Guide Enbar 1 U and 22U3 Page 14 of 44 Overalls When using a product that has this icon always wear a protective overall or other type of protective clothing to prevent the exposure to and or spreading of hazardous substances via the skin User manual Always read the user manual before using a product that displays this icon Hand washing Always wash your hands after using a product that displays this icon Table 5 Relevant safety icons and their meanings User Guide Enbar 1 U and 22U3 Page 15 of 44 3 3 General safety instructions Instructions with regard to the use and preparation of atomizing solutions containing crop protection agents e This machine may be used only for the atomization of suitable crop protection agents e Please inspect the machine for damage and or incompleteness directly upon taking it into receipt You must notify the supplier and or manufacturer immediately of any damage and or inc
17. diagram in paragraph 2 2 4 1 Controls Figure 4 Controls of the Enbar U3 Function Control unit Housing of the controls 30 Pre ventilation cycle settings Setting the pre ventilation cycle dial Start button Starting the pre ventilation cycle Testing the machine with clean water Fogging cycle settings dial Setting the duration of the fogging cycle Stop reset button Stopping and resetting the controls Table 7 Designation of the controls of the Enbar U3 Stopping the machine while a program is running The compressor tank also has an ON OFF switch 9 and an air pressure regulation knob 8 Set times cannot be changed while a program is running after the start button has been pressed A program or cycle can only be interrupted by pressing the stop button Pressing the stop button 35 will cause the Enbar to abort its program or cycle Once the machine has been stopped the duration of the relevant cycle can be modified If the stop button is pressed during the fogging cycle which is in principle not possible since all persons are prohibited from entering the area being treated the time elapsed will be set to zero We therefore do not recommend pressing this button during a cycle and to do so only immediately after you have noticed that a setting is incorrect User Guide Enbar 1 U and 22U3 Page 24 of 44 4 2 Putting the Enbar into operation e Place the Enbar on a flat stable surface Place and aim the Enbar length
18. e key switch 32 to automatic anti clockwise and press the start button 31 e The Enbar will start the pre ventilation cycle and continue with the rest of the program o The fogging cycle will start directly after the pre set pre ventilation cycle has been completed o The light in the start button will blink throughout the pre ventilation cycle e Once the fogging cycle has been completed the Enbar will automatically start the rinse cycle followed by the post ventilation cycle e The duration of the rinse cycle is 10 minutes o The actual rinsing procedure takes 3 minutes o After the rinse cycle the ventilator will run for another 7 minutes e The pressure switch 9 will automatically switch off the compressor e Ensure that the area that was treated is thoroughly aired for several hours User Guide Enbar 1 U and 22U3 Page 26 of 44 4 5 Testing Before testing ensure that every last drop of chemical solution has been atomized and that the Enbar has been rinsed thoroughly Use only clean potable water for testing purposes There are several ways to test the Enbar If you encounter any problems please refer to Chapter 7 or contact the manufacturer 4 5 1 Test atomization Insert the key into the key switch 32 Switch on the pressure switch 9 Open the ball valve 21 between the pressure switch 9 and the pressure regulator 8 Make sure the Enbar is connected to a power supply Check the air pressure in the buffe
19. e nenten 21 3 3 6 After using the machine insnet dmt tkonne nike bidens 21 3 3 7 Maintenance and cleaning of the machine cccseceeseteeeeeseeeeeeeeseeseeeeseeeeeeeeseeensenanes 22 3 4 Summary of remaining riskS aaan eunenenneneenenreneneneenenennenenn enen nnene neme nnn nennen rens 23 Ol gd gn 24 ogg acca anga a E EE nag aa KT aa TE NG a aa E aa a ag ENG a a a d aa aaa aaa a a aa E GN 24 42 PUNO the Enbar into OperatlON tensiden GAK Aa A Nang aa BANGAH a KAN AG deni 25 4 3 Pre ventilation rennende gana Nana Nana enen 25 4 4 Filling and switching on the machine unu sunenvenenrnrenenrenenennennn enen enenennenenen sens 26 h SUING veront entente annette 27 4 5 1 Test atomization tanend menee sina ayaa erbantei mannenstem aiesanenstianearacersiantaeiest 27 4 5 2 Test fogging rinse cycle ananabrenmsiemnehnetensnensnte een makhententdenmn dba dmens 27 Abd POSE TUM Cy Cle norton naa an A Na A BANA nrden nenten berner Driesen 27 4 6 Taking the Enbar out of operation ccccscssccecseseecncanceecneanensousoneaesnsneaesesoneanseeonsansensnes 28 4 6 1 Switching off the machine unu sunrnrnneneneeneneenenvenvnennenenenenenn nnen nee nenenn 28 02 SEOLINIG EAS ENDA zunne enn nennen eene 28 4 7 Restarting the Enbar after an emergency stop or power CUt anneer eenen ennen 29 De MANEN C saanak raaa aia ia ani sik ajan aa a e a aa ka AE stoned NGENER KERE KAE KERA BAE A AA Na EN ab ana Na a Na D ak a 30 Dk Cleaning
20. g cycle does not There is no fluid the suction Remove the tube from the function properly but the unit pipe is clogged or has been pipe Rinse thoroughly or is blowing out air broken off replace tubes and replace them and clean the parts without filing or scouring SE ee replace the gasket Er until clean MM ee replace the seal User Guide Enbar 1 U and 22U3 Page 35 of 44 5 The fogging cycle does not The magnet valve is defective Contact your supplier work and the unit is not blowing out any air The fuse in the switch box is Remove the plug from the defective wall socket before you check the fuse Contact your supplier EE E supply on the tank is shut stop cock for the air supply The dial of the pressure During the fogging cycle turn regulation valve is shut the dial until the pressure gauge of the regulation valve until it reaches 6 Bar Table 8 Possible malfunctions and solutions If you are having the Enbar repaired you must ensure that all tanks have been emptied and thoroughly rinsed User Guide Enbar 1 U and 22U3 Page 36 of 44 8 Technical specifications 8 1 Enbar mobile Model ZU EU Dimensions Table 9 Technical specifications Enbar mobile 8 2 Compressor Voltage Capacity Power supply RPM Compressor oil type Table 10 Technical specifications compressor 8 3 Enbar unit Ventilator s RPM Agitator mixer Voltage Capacity RPM Table 11 Tech
21. he filter Rinse with warm tap water 40 C until clean o Put the filter and any sealing rings O rings back into place in the pipework User Guide Enbar 1 U and 22U3 Page 33 of 44 e Clean the nozzle 1 o Take the nozzle apart Use the exploded view in the appendix for reference o Check the nozzle for wear and tear o Replace the nozzle with the one included in the repair kit or replace the same nozzle e Check the capacity of the nozzle 1 and the flow limiter 2 o Fill the solution tank 6 with 200 cc 200 ml clean water o Test the machine Refer to the instructions in paragraph 4 5 o Use a watch or stopwatch to check the duration of the fogging cycle The tank should be empty in 6 minutes o Ifthe tank empties too quickly the nozzle should be replaced If this happens too Slowly the flow limiter and the nozzle must be cleaned or replaced e Check the fogging unit s rinse cycle o Refer to paragraph 4 5 2 e Clean the machine o Clean the fogging unit and the compressor Use a non abrasive household cleaning agent Inspect the Enbar for leaks and wear and tear of the tubes and cables Inspect all guards and or grids Inspect the couplings bolts and nuts Leave a small amount of clean water to cover the bottom of the solution tank This will prevent the pipework and other parts from drying out O O O 6 3 Compressor Have the compressor checked every year by your service centre or supplier This is
22. ket nozzle nozzle air cap and nozzle ring can be ordered from the manufacturer Out of the parts in this kit only the gasket can be ordered separately The words liquid and air have been engraved in the nozzle casing to designate the inputs for liquids and air respectively The top most bolt to attach the nozzle bracket to the casing is secured with green Loctite and cannot be removed after assembly Legend Nozzle beugel Nozzle bracket Knie inschroef koppeling Male knee connector Nozzle pakking Nozzle gasket Lucht aansluiting air input Wateraansluiting Water input Nozzle huis Nozzle casing Nozzle luchtkapje Nozzle air cap Nozzle reparatieset Nozzle repair kit User Guide Enbar 1 U and 22U3 Page 40 of 44 Composition of the inlet filter Filterhuis nf Afdichtring _ o Filter Afdichtring O Filterhuis Legend Filterhuis Filter body Afdichtring Sealing ring O ring User Guide Enbar Ul and U2 Pagina 41 van 44 Replacing a fuse in the U3 If there is any suspicion of a fuse having been blown in the control unit of the fogging unit this must be tested or replaced immediately Follow the instructions below Before any maintenance work is done on the Enbar make sure that the compressed air ball valve 21 is shut and that the machine is unplugged Make sure that you can perform your work safely and securely In case of doubt consult an expert or conta
23. n tank back into place e Fill the rinse tank No 11 in paragraph 2 2 with clean water e Drain the condensed liquid from the pressure vessel o Puta container underneath the drain cock Please note that the condensed liquid is sprayed from the pressure vessel under a slight pressure o Open the drain cock o Collect the condensed liquid Treat the condensed liquid as chemical waste it contains oil o Shut the drain cock 4 6 2 Storing the Enbar e Store the Enbar where it cannot be accessed by unauthorized persons User Guide Enbar 1 U and 22U3 Page 28 of 44 4 7 Restarting the Enbar after an emergency stop or power cut In the event of a power cut resulting from a power failure or pressing the emergency stop button the Enbar will not resume its program automatically Investigate the cause of the power cut or emergency stop Resolve the cause of the power cut Make sure that nobody is present in the area to be treated Press the start button o The Enbar will now run a 5 minute pre ventilation cycle and resume its program User Guide Enbar 1 U and 22U3 Page 29 of 44 5 Maintenance This chapter describes the maintenance to be carried out on the Enbar All the maintenance tasks described herein may be performed by the operators All other maintenance tasks must be performed by a specialized maintenance professional A QO D Always wear gloves protective clothing and a full face mask when working with the Enbar
24. ng cycle and for 15 minutes after the fogging cycle has stopped User Guide Enbar 1 U and 22U3 Page 25 of 44 4 4 Filling and switching on the machine ee En Always wear gloves protective clothing and a full face mask when preparing the atomizing solution Please note that a spraying licence is required to prepare the atomizing solution e Prepare the atomizing solution o Follow the instructions provided by the supplier of the crop protection agents e Carefully unscrew and remove the solution tank from underneath the Enbar e Fill the solution tank o Use a strainer to fill the solution tank e Put the solution tank back into place o Screw the solution tank tightly shut e Fill the rinse water tank with water e Set the desired pre ventilation cycle using the dial 30 o The minimum duration of the pre ventilation cycle is 5 minutes e Use the dial 34 to set the desired fogging cycle duration o Approximately 1 litre of atomizing solution is atomized per 30 minutes o Always extend the fogging cycle by 15 minutes to ensure that every last bit of the atomizing solution is atomized e Make sure that nobody is present in the area to be treated e Inform the staff whenever you will be using the Enbar to spray crop protection agents e Make sure that nobody can enter the area being treated e Follow the safety instructions outlined in Chapter 3 e Insert the key into the key switch 32 e Switch on the machine by setting th
25. nical specifications Enbar in general CE symbol on the machine near the main box User Guide Enbar 1 U and 22U3 Page 37 of 44 9 Declaration of Conformity EC Declaration of Conformity in accordance with Appendix IIA of the Machine Directive 2006 42 EC We Van der Ende Pompen B V Maasambacht 4 2676 CW Maasdijk The Netherlands declare entirely under our own responsibility that the following machine the Enbar LVM Models U1 U2 1 U3 and 22 U3 to which this statement refers is in conformity with the provisions of the following Directives Machinery Directive 2006 42 EC Low Voltage Directive 2006 95 EC EMC Directive 2004 108 EC and in this case in accordance with the following standards or normative documents N A The Netherlands PJ van der Ende Maasdijk 17 August 2009 User Guide Enbar 1 U and 22U3 Page 38 of 44 Appendices Exploded view nozzle Exploded view fluid filter Replacing a fuse in the U3 Time diagram O O O User Guide Enbar 1 U and 22U3 Page 39 of 44 Composition of the nozzle Nozzle beugel Knie inschroef Knie inschroef koppeling koppeling Wateraansluiting Luchtaansluiting Nozzle huis Nozzle pakking Teflon Nozzle Nozzle reparatieset Nozzle luchtkapje Nozzle ring The nozzle bracket the nozzle casing the nozzle gasket and the male knee connectors can be ordered individually from the manufacturer A Nozzle Repair Kit containing a nozzle gas
26. o compressor on off switch Oil refill openinc Oil level gauge with red dot indicating maximum level Table 4 Parts of the Enbar U3 User Guide Enbar 1 U and 22U3 Page 11 of 44 2 3 Transport and storage Before the Enbar can be moved every last remnant of the chemical solution must be removed from the solution tank The Enbar can be moved after the wheel blocks have been removed The Enbar should only be wheeled across flat stable surfaces to prevent any possibility of the machine tipping over After use the Enbar must be stored in an area that cannot be accessed by unauthorized persons Before storing please ensure that the Enbar has been thoroughly rinsed and cleaned if necessary see paragraph 5 1 Leave enough water in the solution tank to cover the bottom to prevent the pipework and appendages from drying out User Guide Enbar 1 U and 22U3 Page 12 of 44 3 Safety instructions This chapter contains information about how to safely use the Enbar Please read this chapter carefully and inform anyone working in the vicinity of the Enbar of all possible safety hazards and precautions 3 1 Information about crop protection agents The Enbar is used in combination with crop protection agents These are deemed to be hazardous substances and are often toxic irritants and or hazardous to the environment Although the crop protection agents used by the Enbar are diluted it is still essential that appropriate Safety measure
27. ompleteness e Please read the entire user guide carefully before operating the machine e Please note that a spraying licence is required for the preparation of the atomizing solution e Consult the supplier of the crop protection agent for the correct dosages User Guide Enbar 1 U and 22U3 Page 16 of 44 3 3 1 General information e Avoid physical contact with the atomizing solution e Keep pregnant women and children under 18 away from the machine e Clean up any spills immediately e Never mix more atomizing solution than needed e When using the Enbar avoid touching your eyes mouth and nose to the greatest extent possible e Avoid contact with cylinder heads these can be hot during and after use Ensure that all grills and protective covers are securely mounted e Regularly replace gloves protective clothing and full face mask filters e Ensure that everyone operating the Enbar or working in its direct vicinity is properly informed of the safety precautions e Always wash your lower arms and hands with soap and water after using crop protection agents ces DP User Guide Enbar 1 U and 22U3 Page 17 of 44 3 3 2 Preparing the atomizing solution 0 e Wear protective clothing gloves that fit well and a full face mask 5 a Securely close the package after weighing off and or measuring the crop protection agent protection agent e Securely store the package after weighing off and
28. or measuring the crop The solution tank must be put back into place directly after filling it with the solution e Do not eat drink smoke or pick your nose e Always read the label first other than instructions for use labels also provide information concerning the statutory safety precautions risk phrases the R phrases and safety recommendations e Always observe the R phrases on the label e Always wash your lower arms and hands with soap and water after mixing the atomizing solution User Guide Enbar 1 U and 22U3 Page 18 of 44 3 3 3 Testing the installation e Ensure that the solution tank is filled with nothing but clean water Ensure that the wheel blocks are properly in place Place the Enbar on a flat stable surface Ensure that the solution tank has been put into place correctly Remove the key from the key switch after use p e Connect the Enbar to an earthed wall socket User Guide Enbar 1 U and 22U3 Page 19 of 44 3 3 4 Switching on the machine Make sure that nobody is present in the area to be treated Take the necessary precautions to ensure that nobody can enter the treatment area while the Enbar is being operated Inform all employees and other persons in the vicinity that the Enbar will be in use Attach warning signs to the access doors of the area to be treated Make sure that all windows and doors with outdoor access are closed to ensure that no vapour will escape Connect
29. r tank 10 and on the pressure regulator 8 o Consult paragraph 4 2 if necessary e Turn the key clockwise o The Enbar should now start atomizing fogging e Aspring mechanism will ensure that the key automatically returns to the neutral position e After this the machine will stop atomizing e Remove the key from the key switch 32 to prevent use by unauthorized persons 4 5 2 Test fogging rinse cycle Insert the key into the key switch 32 Switch the key to automatic anti clockwise Make sure the Enbar is connected to a power supply Check the air pressure in the buffer tank 10 and on the pressure regulator 8 o Consult paragraph 4 2 if necessary Turn the pre ventilation dial 30 to the Rinse Test position e Turn the dial 34 to set the fogging cycle to 1 minute e Press the start button o The Enbar will now start its program o The pre ventilation cycle will be skipped o After atomizing for 1 minute the Enbar will start the rinse cycle e When the Enbar has completed its program remove the key from the key switch 32 to prevent use by unauthorized persons 4 5 3 Test full cycle Insert the key into the key switch 32 Switch the key to automatic anti clockwise Make sure the Enbar is connected to a power supply Check the air pressure in the buffer tank 10 and on the pressure regulator 8 o Consult paragraph 4 2 if necessary Turn the pre ventilation dial 30 to 5 minutes e Turn the
30. s are taken e Carefully read all labels for the applicable safety precautions e Ask your supplier for advice about the crop protection agents you wish to use Always wear a full face mask and gloves when using crop protection agents diluted as an atomizing solution or otherwise The person mixing the atomizing solution must have a spraying licence Class III 3 For an exhaustive list of the safety precautions associated with the use of the relevant atomizing solution please refer to the label or ask your supplier Please keep in mind that the manufacturer of the Enbar is neither engaged in nor in any case responsible for the storage of the crop protection agents to be used The operator of the Enbar is responsible for ensuring that adequate safety precautions are observed The storage of the substances used does not fall within the scope of responsibility of the manufacturer User Guide Enbar 1 U and 22U3 Page 13 of 44 3 2 Summary of safety hazard Icons There are various safety icons on the Enbar and in this user quide Please refer to the list below for the meaning of these safety and warning icons and symbols mark This icon is used to designate a safety hazard associated with the use of toxic or hazardous substances This icon prescribes the mandatory use of personal protection equipment such as masks or gloves This icon designates a safety hazard associated with hot surfaces This icon designates a safety hazar
31. ter valve will switch to enable the water from the rinse water tank 11 to be vaporized This will rinse the machine until it is clean The rinse cycle takes approximately 3 minutes to complete After rinsing the post ventilation cycle will commence approximately 7 minutes to ensure that any remaining droplets and moisture are dispersed All steps and components are controlled by a PLC Programmable Logic Controller User Guide Enbar 1 U and 22U3 Page 8 of 44 2 2 Parts The diagram below identifies the key components by name and number OOOO OO 000 DOE Figure 1 Parts of the Enbar U3 Control unit Nozzle Excess flow check valve woodpecker Filter Suction tube Agitator mixer V belt V belt o O Junction box with condenser etc Table 2 Parts of the Enbar U3 10 11 12 13 14 15 16 17 26 7 27 User Guide Enbar 1 U and 22U3 Page 9 of 44 een en 7 ka Figure 2 Parts of the Enbar U3 9 Compressor pressure switch Air pressure regulation dial Pressure gauge displays air pressure Compressor ON OFF switch Ball valve between buffer tank and Enbar Pressure gauge displays pressure in buffer tank Table 3 Parts of the Enbar U3 User Guide Enbar 1 U and 22U3 Page 10 of 44 Figure 3 Parts of the Enbar U3 V belt Air filter Oil drain plug Motor overload switch als
32. uska Alteroil VDL 150 This can be obtained from your supplier and or the manufacturer 5 2 3 Refilling and replenishing the oil The oil should be replenished after every 500 operating hours or once every 6 months e Unscrew the oil filler plug 24 from the carter e Place a container underneath the oil drain plug 17 e Open the oil drain plug and collect the oil Treat the used oil as chemical waste e Clean the oil drain plug e Screw the oil drain plug back into the carter e Fill the carter with oil through the fill opening o The maximum level is indicated by the red dot on the oil level gauge o The minimum level is the bottom of the oil level gauge e Screw the oil filler plug 24 back into the carter User Guide Enbar 1 U and 22U3 Page 31 of 44 5 2 Air filters After it has been used five times the Enbar s air filters must be cleaned ee En Always wear gloves protective clothing and a full face mask when cleaning the air filters e Open the air filter body 15 by unscrewing the cover bayonet catch e Blow pressurized air through the filters Please be careful chemical solution particles may be released from the filters Make sure that everyone in the vicinity is wearing personal protective equipment e Put the air filters back e If they are very dirty the air filters must be replaced User Guide Enbar 1 U and 22U3 Page 32 of 44 6 Annual overhaul 6 1 Safety instruction AOO Alw
33. wise to the central aisle o Place and aim the Enbar parallel to the central aisle o Place and aim the Enbar in such a way that the flow of air will move over the central aisle without touching the crop e Block the wheels of the Enbar with the wheel block system e Ensure that the plants to be treated are dry e Inspect the drain cock underneath the compressor tank to make sure that it is shut o If it is open shut it e Shut the ball valve between the buffer tank 10 and the pressure regulator 8 e Connect the Enbar to a wall socket o Ensure that this socket is earthed o Make sure that the wall socket is protected with a 16A circuit breaker in combination with a 30mA earth leakage circuit breaker e Open the ball valve between the buffer tank 10 and the pressure regulator 8 e Wait until the pressure gauge 22 on the buffer tank reaches 8 Bar e Turn the pressure regulator dial 18 until the pressure gauge on the pressure regulator reaches 6 Bar 4 3 Pre ventilation e The ventilator of the Enbar automatically starts the pre ventilation cycle when the Enbar is switched on The minimum duration of the pre ventilation cycles is 5 minutes This can be set using the dial 30 Close all doors and windows with outdoor access Switch on any auxiliary ventilators in the area to be treated Allow the auxiliary ventilators to operate for 30 minutes before the fogging cycle starts Allow the auxiliary ventilators to operate during the foggi
34. your lower arms and hands with soap and water after using crop protection agents User Guide Enbar 1 U and 22U3 Page 22 of 44 3 4 Summary of remaining risks All users of this machine must be aware of the safety risks associated with its operation Although these risks have been limited to the greatest possible extent by the manufacturer failure to follow the instructions or improper use of the machine can result in safety hazards We have provided an overview of the remaining risks and the consequences of ignoring the instructions or improper use of the machine Risk sheet Description of remaining risks No The agents used whether or not in combination with the operation of the machine atomization or fogging are hazardous to the operator As this safety hazard is an integral part of the operation of the machine it cannot be limited any further The Enbar cannot be safely switched off once it has been put into operation The safety hazards associated with this must be prevented by following the various Safety instructions such as meticulous inspection of the area to be treated before the fogging procedure is initiated The solution tank must be put into place correctly to prevent any risk of leakage and or loss of its contents Table 6 List of remaining risks User Guide Enbar 1 U and 22U3 Page 23 of 44 4 Operation This chapter contains the instructions for the proper use of the Enbar The numbers refer to the
Download Pdf Manuals
Related Search
Related Contents
Vi2804 4-Port Extended Ethernet Switch Installation Manual NAC 202 取扱説明書 取扱説明書 - 携帯電話・スマートフォン Copyright © All rights reserved.
Failed to retrieve file