Home
- Creations
Contents
1. GREAT INNOVATION BY SERARIT BUILDING INDUSTRY GROUP ECOLOGICAL COATING THAT REMOVES BAD ODOUR E LEES pet ey yt yl EE ERE seranit seranit ECOLOGICAL ous PRODUCTS seraoxicoat index SeraOxicoat Interior Coating of the Future Features That Make SeraOxicoat Unique _______________________________ User Manual and Technical Specifications SeraOxicoat Ecological Primary Coating Preparation of the Surface Where SeraOxicoat Ecological Primary Coating Will Be Applied Application of SeraOxicoat Ecological Primary Coating SeraOxicoat Ecological Final Coating Problems That May Occur When Applying SeraOxicoat Ecological Primary Coating and Final Coating and Their Solutions Problems That May Arise from SeraOxicoat Ecological Primary Coating Suggestions Storage Conditions 1O 12 14 16 19 For the first time in Turkey and the world an interior coating is eliminating odours such as fried food cigarette toilet paint and medicine which occupy indoors thanks to the special elements it contains Also it prevents mold moisture and bacteria growth What s more it is providing these advantages without pushing the costs Interior Coating of the Future Today from Seranit Developed by the ceramic giant Seranit as a result of R amp D developments that took many years and prod
2. SeraOxicoat Ecological Coating Take a little coating to your shovel from SeraOxicoat Ecological Primary Coating grout SeraOxicoat Ecological Primary Coating mortar on the shovel is applied by pressing from the bottom to the top This operation continues until it fills until coating lath 2 Method SeraOxicoat Ecological Coating grout on coating trowel can be applied by sprinkling on the surface by means of coating shovel This process continues until all the surface fills up Wall surface is filled with both of the methods in a way that the coat exceeds the thickness of ano laths Then surface finish is applied by pressing aluminum knife template to both ano laths bottom up Excessive mortar accumulating on aluminum knife template is taken by means of a trowel and applied to the coat surface in order to fill the gaps After gaps on the coated surface are filled another surface finishing operation is performed This process continues until the ceiling After surface finishing is completed on the whole surface ano laths are removed Emerging gaps after ano laths are removed are filled with SeraOxicoat Ecological Primary Coating Areas where corner profiles had been placed on outer corners of the walls and door and window centers previously are also filled with SeraOxicoat Ecological Primary Coating A leveled gauge can also be used for this operation After Coating on all the surfaces is completed final inner corners are given
3. about how our body can balance its temperature by means of evaporation on our skin In other words sensible apparent temperature During hot weathers since relative humidity is extremely high evaporation on our body slows down and we start to feel distressed Humidity which was balanced before prevents dryness and irritation on the skin as a result of dryness Also breathing is easier in places where dry and hot climates are prevalent Humidity can affect human body adversely especially in hot weathers Extreme perspiration and increase of body temperature leads to exhaustion and slowing down of metabolism Also it causes iron to rust and get irritated Humidity which penetrates through the concrete in a reinforced concrete construction damages iron equipment and cause the static of the building to fail Damp It doesn t have any exact equivalent in Turkish it is generally called rutubet and it means damp The weather of a moist environment is not healthy Mould growth in moist environment is one of the indicators of this In moist environment pests such as allergy and bacteria have an ideal place to reproduce Moisture leads to rheumatic illnesses and respiratory tract illnesses Particularly people with upper respiratory tract can not breathe easily Not being able to breath regularly leads to illnesses easily The fact that a healthy individual who sleeps at a moist environment feel a heartache when he sh
4. 50 SeraOxicoat Ecological Primary Coating and 50 SeraOxicoat Ecological Final Coating and applying this mixture to the rough coating will increase the efficiency of the product STORAGE CONDITIONS SeraOxicoat must be piled up one on the top of the other with maximum 20 bags SeraOxicoat must be consumed within 9 months after it is purchased provided that it is stored in a dry moisture free and closed environment and on a pallet Poor storage conditions or exceeding the life cycle affect the qualities of SeraOxicoat Ecological Coating negatively Notes Price Cost Gypsum Plaster 35 Kg Bag Odor Absorbing Rate incl VAT 8 15 35 kgs 9 5 3 68 of 1 bag per 1cm 8 15 3 68 2 21m Consumption 9 9 5 kgs m2 Satin Finishing Gypsum Plaster 30 Kg Bag Odor Absorbing Rate incl VAT 17 99 Consumption 9 9 5 kgs m 30 kgs 0 9 33 33 of 1 bag 1cm 17 99 233 33 0 54 Notes REATIONS MZ E le Balter eec Elegare ce SERANIT ECOLOGICAL PRODUCTS esorant ft Wseraoxicoat Qroup
5. aring learn from technical specifications You must use potable water for this application After bringing SeraOxicoat Primary Coating s bag to vertical position cut the upper part with a stationary knife Take a handful of coating and add to the water in the coating bowl with sprinkling method Continue sprinkling until SeraOxicoat Ecological Primary Coating cover the whole surface of water Wait until SeraOxicoat Ecological Primary Coating which you sprinkled over the water you determined is infused sufficiently After infusing period of SeraOxicoat Ecological Primary Coating is completed you can proceed to mixing process You can conduct mixing process by means of a low speed mechanical mixer or a trowel Mixing process must continue until the grout is ready for application reaches the required consistency with no lumps in it m aa 32300 IW eet Pr o rh LSU oy 3 Sa lt dd De A E E37 NI re NITE An we t 1 Application of 5 Ecological Primary Coating After SeraOxicoat Primary Coating is prepared install the main frames that will help you control Ecological Primary Coating leveling the wall For this purpose apply the coating mortar by means of a spatula along the direction that you established The space between two anos must not exceed the height of the
6. connect If the wall is not smooth holes on the wall must be filled and applied coat Thickness of rough coat must be at least 1cm Scratching on the Wall Among the reasons why SeraOxicoat Ecological Coating scratch the lower layer during application are accumulation of solid particles when materials are wetted during transportation applying a thin layer of coating disintegration of solid particles from the layer on the sub grade using dirty water and not paying enough attention to cleanliness Special attention must be paid not to let the bags get wet in order to avoid this end You must be about keeping the ground where the coat is mixed and the wall must be cleaned before the coating is applied Coagulation Main reasons why coagulation occurs when material is mixed are the fact that the bowl in which the coat is mixed is not clean use of dirty water and adding SeraOxicoat Ecological Coat after the material is mixed In order to avoid agglomeration the bowl in which the coat is mixed and the water must be clean SeraOxicoat Ecological Coating must not be added after mixing operation is completed and particularly not adding pre soaked and moisturized materials to the mixture 2 pu Shedding Coat chapping on the wall shedding and not adhering to the wall may stem from the fact that coat is applied to the wall with thin layers wall s absorbing water through the wall because of extreme dryness an
7. d late finishing operations If coatinging is performed in hot weathers the wall must be watered before coating operation Because otherwise the wall absorbs the water it needs from SeraOxicoat Ecological Primary Coating If the coat is applied to the wall with thin layers the same shedding phenomenon may be observed Therefore the thickness of the rough coating applied on the surface must be at least 1 cm Bleeding on the Wall it the coat bleeds on the wall probable reasons of this condition are dirty walls and freezing of mixing water since the operation is conducted under ideal temperature values In order to prevent bleeding on the wall the wall must be removed of dust dirt and oil Ambient temperature must be at least 5 C If possible the area where coating is applied must be pre heated Burst The main reasons why coating burst or crack include the fact that the wall is not removed of dust and dirt sufficiently the wall is not wetted before coat operation and the lime contained in the cement lime based liquid under the rough coat is not extinguished completely In order to prevent bursting it is necessary to pay attention to extinguishing the lime contained in the cement lime based coat which is applied prior to SeraOxicoat Ecological Primary Coating and make sure that the wall on which SeraOxicoat Ecological Coating will be applied is removed from dust dirt and the wall will not absorb coat water Blossoming in the Coat Us
8. e woke up is another indicative of the danger of alcohol It is especially difficult for families with babies protect their children from such institutions Removing your living areas from moisture is very significant for you rather than saving your room or nay other property It causes and odor and wetness which penetrates through our wardrobes and damage our clothes It paves the way for moth and bacteria growth in our wardrobes It leads to a pungent stench and wetness in kitchen and bathroom closets In highly moisturized environment allergy leads to the growth of viruses and bacteria and finally rheumatic diseases Odors in living areas such as house and office leads to an unhealthy atmosphere It causes deterioration molding rusting and corrosion in such areas as storage cellar and cupboard Toluene Found in nail varnish and certain paints and spreading to the air when certain petroleum based paraffin candles are a solvent Toluene can damage the nervous system Like many chemicals Toluene also evaporates enters into the lungs and leads to allergy It sometimes even causes headache nausea and even hallucinations Carbon monoxide CO Gas Carbon monoxide gas is a toxic gas which is found in the smoke which occurs when the fuels such as natural gas gas oil gasoline tube gas coal and wood which contain carbon can not burn Since it can not be recognized in any way because of being colorless odorless a
9. eraOxicoat Ecological Coating SeraOxicoat ECOLOGICAL FINAL COATING TECHNICAL SPECIFICATIONS al Water SeraOxicoat Ecological Primary Coating Rate For 4 and 8 kg Response to fire First of all SeraOxicoat Ecological Primary Coating residues and gauge lines are cleaned by means of a spatula a scraping operation is applied SeraOxicoat Ecological Final Coating which is prepared by adding water in specified ratios is taken on the steel trowel The coat on the steel trowel is perfused bottom up creating a thickness of at least 1mm Last finishing touches are made by means of a wide mouth inclined spatula and SeraOxicoat Ecological Final Coating operation finishes If you want to have a smoother surface the wall surface can be sanded with a 0 400 sandpaper Suggestions ele 1 Wear your work uniform Primary Coating Be careful Know the specifics of the surface where SeraOxicoat Ecological Primary Coating will be made Get to learn learning conditions Obtain information about surfaces on which SeraOxicoat Ecological Primary Coating is applied Learn about surface finishing and roughening operations Pay attention to details Make good use of time and material Learn how to mount ano lath Apply Coating to walls and ceiling with SeraOxicoat Ecological Primary Coating Pay attention to protecting the environment Apply SeraOxicoat Ecol
10. eukemia When 0 1 ppm formaldehyde is found in the air it causes watering of eyes coughing difficulty in breathing stertorous respiration skin rash allergic reaction sore throat and nose Depending on the level of influence Causes vomiting and diarrhea Since it leads to sensitivity following influences may lead to more severe reactions to the same dilutions 2 ppm concentration leads to eye irritation in 20 ppm even one influence causes loss of color sight in cornea Influences more than 25 ppm leads much more severe reactions including acute pulmonary edema Ammoniac It is a colorless gas with a pungent stench which makes one s eyes burn and water Humans and animals bodies constantly produce ammoniac as the proteins decompose because of certain chemical reactions This ammoniac is excreted with urine It spreads in the air as animal and plant proteins decay SUGGESTIONS When using SeraOxicoat Ecological Coating don t mix it with any other product or material Use mechanical mixer when preparing the mortar Apply SeraOxicoat Ecological Primary Coating so that it can make a layer of 1 cm After mortar is mixed don t use any SeraOxicoat Ecological Primary Coating or Final Coating to this mixture Average temperature of the environments where the Coating is applied must be at least 5 C Dry and hot surfaces must surely be wetted before application After SeraOxicoat Ecological Primary Coating mixing
11. gauge you will be using It must be approximately between 150 200cm Water gauge straight edg or a string can be used to align both surfaces when coating anos Corner profiles are used on outer corners of walls door and windo transitions These profiles allow for turning these corners in the same amount and smoothly Corner profiles are cut with a profile cutter in required sizes Coating corner profiles are placed to the corners by means of SeraOxicoat Ecological Primary Coating Vertical scale is controlled by means of a water gauge Metric controls must be performed on the parts where door and window framed will be placed You must wait until the mortar which is used for adhering ano lath and corner coating profiles gets a little harder You can make any repair works on the wall surface Cracks and holes must on the wall surface must be filled with SeraOxicoat so that the coat doesn t make any leakage on that area Apart from filling cracks and holes SeraOxicoat Ecological Primary Coating and net operation with a width between 25 30cm must be performed at joint points for different materials for instance concrete brick etc For this purpose SeraOxicoat Ecological Primary Coating is applied to connection points by means of a steel trowel and by paying attention to not exceeding coating thickness Coat mesh is applied over it This application reduces crack risks 1 Method After all these operations you can start rough coating
12. ing dirty water when preparing the coat causes accumulation of blooming In order to avoid this special attention must be paid to using clean water and making sure that all the surface has the same temperature Perspiration on Coating Surface excessive moisture in the environment where these operations are performed causes the coat to perspire If the place where coating is performed must have as much a dry air as it can and if necessary coating is performed where there is little moisture can eliminate perspiration problem Blistering The reasons why the paint applied on the coat blisters are the fact that the wall is not dried completely and dirty It is necessary to make sure that the wall is completely dry before applying painting The dirt and dust on the surface must be cleaned Problems That May Arise From sera Oxic logit Primary Coating Moisture Moisture is the amount of water vapor found in the air In moisture calculations both related humidity and specific humidity Absolute humidity is the amount of moisture in the most volume It is calculated in gram cubic meter Relative humidity is the ratio of the amount of humidity in the hair to the maximum humidity that air is capable of It is estimated as unitary and inversely proportionate to temperature Specific humidity on the other hand is the ratio of water vapor in a gas to the weight of gas Humidity rates broad Coatinged on televisions give us a hint
13. nd without any irritation effect it is known as silent killer This gas which reduces the amount of oxygen in a person s blood causes an unaccountable exhaustion Carbon Dioxide Gas is found in the blood in certain amounts and constitutes one of the buffering systems of our body When it increases in the blood the body produces acidosis when it decreases it produces alkalosis These conditions indirectly affect ion concentration in the body If CO pressure is present in arterial blood up to 120 mm the person may feel headache muscular twitching orientation disorder seeing things which don t really exist somnolence confusion or comma may be suspected Formaldehyde Formaldehyde s influences are felt mostly when it is in gas form and taken into the body by means of perspiration Consumers can be influenced by formaldehyde which spreads from materials cosmetics home furniture s and weaving products Sudden formaldehyde influence may cause death Its threshold is about 1 ppm Since the threshold of sensing formaldehyde can increase depending on the level of exhaustion it is not easy to regard this smell as a warning factor Long term formaldehyde exposure in little doses can cause dyslexia eczema and allergic reactions Formaldehyde is reported to be one of the carcinogen substances It is considered that formaldehyde is associated with nose and lung cancer related to brain cancer and l
14. ogical Wear your work uniform Final Coating Be careful Apply finishing operations on the surface Learn how to prepare SeraOxicoat Ecological Final Coating mortar Check the operating conditions Apply Coating to walls and ceiling with SeraOxicoat Ecological Final Coating Perform compaction and finishing operations Pay attention to details Make good use of time and material Problems That May Occur When Applying SeraOxicoat Ecological Primary Coating and Final Coating and Their solutions Early Freezing If the prepared SeraOxicoat Ecological Coating starts freezing early it means that necessary cleaning conditions are not met specific details about SeraOxicoat Ecological Coating and radio were ignored or you are being involved each other more than you should In order to avoid this we must comply with use instructions and pay attention to amount of water to be added to the mixture Temperatures below 25 C may cause the water to freeze early Cracks i cracks occur after the coat is applied to the wall the wall may have a different absorption capacity Thick amounts of the coat and less amount of it may have been applied due to the fact that the wall was not flat everywhere In order to eliminate such problems the wall must be wetted before and allow the wall absorb water sufficiently In regions where absorbing capacity is generally different coating mesh must be applied on areas where let s say concrete part and brick part
15. ological Primary Coating is applied to the surface simple controls and checks must be conducted in order to increase the quality of work These methods are explained below Manual Control manuat control must be conducted in order to understand whether surface is dusty and dirty or not For achieving 100 productivity it must be applied on more than one point If there is any surface dirt you can clean it with broom and cleaned If it is necessary it is washed and dried out before proceeding to the next stage Inspection Thanks to inspection conditions that affect the adhesion of coating such as cohesive foreign substances dirt carbon deposits grout stains residues of mold board loose and disintegrating parts on the concrete surface cohesive lime and blooming very smooth and tight surfaces are easily detected In such cases cohesive foreign substances loose and disintegrated parts of the concrete are removed and lime and blooming are cleaned with a wire brush Scratch Test Another method for checking coating floor is scratch test This test is conducted with a pointed and hard object scraper trowel etc Meanwhile if parts that exfoliate or rub off are detected the surface is thoroughly cleaned with a wire bush prior to coating operation as a measure Wetness Test For this test clean water is applied to the surface by means of a brush If the water is still dropping from the floor or its color doesn t change from ligh
16. ompletely Smooth and tight surfaces must be roughened in order to increase adherence For instance an indentation application can be performed with a chipping hatchet or lump hummer After this process the brush must be cleaned and wetted In another alternative surface treatment and connecting materials can be used Process Steps Suggestions Obtain information about surfaces on which SeraOxicoat Surface Diagnosis Ecological Primary Coating is applied Be careful Wear your work uniform Check the operating conditions Surface Cleaning Pay attention to details Make good use of time and material Be attentive to protecting environment Surface Finish Clean the dirt burr etc on the surface Roughen up the plane surfaces Be quick and practical Documents such as brochures catalogues etc which contain technical specifications and information on the packaging about SeraOxicoat Ecological Primary Coating must be examined before any operation Special attention must be paid to water and rough coating rates operating times freezing times and consumption rates If you completed all the stages up to this point you can start preparing SeraOxicoat Ecological Coating s grout SeraOxicoat Ecological Coating preparation stages for wall and ceiling surfaces consist of the same process steps First of all wear gloves as a work safety measure Fill the plaste bowl with mixing water in accordance with the amount of grout you are prep
17. t to dark in short period time after a few minutes the surface may be oily or too moist In this case the oil the surface is cleaned and rinsed by means of degreasing substances the level of surface moisture is too high you must wait for the surface to dry Tem peratu re Measu ring Coating application must not be performed at temperatures below 5 C Temperature can be measured with a thermometer If ambient temperature is too low the risk of coating s freezing emerges Preparation of the Surface Where Ecological Primary Coating Will Be Applied Preliminaries After necessary controls and experiments are conducted on the surface on which SeraOxicoat will be applied preliminary works are commenced Before starting application all the burr on concrete and exposed concrete must be cleaned A lump hummer chipping hatchet or a spiral can be used for this application Dust and other substances that prevent adhesion must be cleaned with a brush Surfaces which are cleaned by brushing must be wetted before application This is done by means of a brush Another method is hosing the wall and saturating its water requirement This is especially necessary in extremely hot weathers and for spongy construction materials gas concrete that absorb plenty of water In order to avoid all kind of problems which may prevent SeraOxicoat from adhering to the surface and you must wait for the surface to absorb water c
18. their final shape with a corner trowel A Coating mesh must be used on different material connection points and on areas where possible movement is anticipated Specifications mentioned above can vary depending on construction site conditions and floor properties SeraOxicoat Ecological Primary Coating produces a porous surface due to its chemical structure It is called rough coat for this reason It is necessary to cover the coated surface with 50 SeraOxicoat Ecological Final Coating and 50 SeraOxicoat Ecological Primary Coating in order to have a cleaner surface with elevated properties Doing this will increase the efficiency of the product SeraOxicoat Ecological Final Coating is applied in order to have a smooth surface SeraOxicoat Ecological Final Coating is called fine coat due to this property SeraOxicoat Ecological Final Coating is a correcting coat SeraOxicoat Ecological Mixed Coat after SeraOxicoat Ecological Primary Coating applied to brick concrete exposed concrete gas concrete pumice blocks surfaces when the surface is slightly moist 50 SeraOxicoat Ecological Primary Coating and 50 SeraOxicoat Ecological Final Coating are mixed and brought into a consistency of mortar Coat on the steel trowel is coating on the surface from bottom to up last finishing touches are made and prepared to SeraOxicoat Ecological Final Coating application Note This operation is significant in terms of increasing the properties of S
19. uced with 100 domestic capital SeraOxicoat Ecological Coating is revolutionizing the construction industry and redefining coating with its unique features Since it is produced out of the mixture of completely natural materials SeraOxicoat Ecological Coating is healthy and eco friendly It is a decorative and functional interior coating which provides vast opportunities to architecture When applied correctly and appropriately it can last for centuries without any signs of degenerating Here are some of the features that make SeraOxicoat unique Eliminates unpleasant smells Prevents mold and bacteria growth It consists of the mixture of activated natural elements It ensures the absorption of various chemical gases Increases air quality Balances the moisture balance of the environment Contributes to sound and heat insulation Non combustible Economic Provides processing and repair convenience Easily shaped and installed It is applied to all kinds of structures easily Light weight Interior are cleaner healthier and more comfortable now thanks to SeraOxicoat Ecological Coating seraoxicoat USER MANUAL AND TECHNICAL SPECIFICATIONS kg 52 TECHNICAL SPECIFICATIONS Approximate water SeraOxicoat Ecological Primary Coating Rate Water SeraOxicoat Ecological Primary Coating Rate For 4 and 8 kg Socket star up time Operating time minimum Freezing time minim
20. um Consumptio rate per 1 cm thickness 1500 micron sifted minimum 200 micron sifted minimum Loose unit volume weight Volume weight of tight unit Reponse to fire oeraOxicoat ECOLOGICAL PRIMARY COATING 10 kg SeraOxicoat Ecological Primary Coating 5 6 4 It water 1 kg SeraOxicoat Ecological Primary Coating to 0 5 0 64 It water gt 20 minutes 50 minutes 120 minutes 9 9 5 kg m 99 50 650 750 kg m 800 900 kg m 1 Ecological Primary Coating can be applied to a wide range of elements varying from brick concrete exposed concrete gas concrete pumice concrete elements with either carrier or partition specifications It can not be applied to wood or metal until necessary measures are taken Adherence is significant in terms of surface condition Therefore the surface must surely be controlled You must pay attention to following conditions and take necessary measures when controlling the surface Conditions such as coarse dirt mould growth too plane surfaces lubricated surfaces surfaces on which absorption consistency is not achieved frozen surfaces availability of various surface materials very high moisture rates in the construction extremely Primary surfaces are some of the aspects that contribute surface inconvenience In such cases construction owners or technical authorities must be warned and necessary precautions must be taken Before SeraOxicoat Ec
Download Pdf Manuals
Related Search
Related Contents
LEDI® 1S LEDI® 1S VERSION NTP LEDI® 2S ISOSTEM User Manual Série TF - Manuel d`utilisation High End Systems DL.2 User's Manual Sony VAIO VGN-CR320E User Guide Manual intext:Bedienungsanleitung filetype:pdf Copyright © All rights reserved.
Failed to retrieve file