Home
Instructions for filing application - Warehousing & Logistics Policy
Contents
1. 10 11 12 13 Instruction for filing online application Under M P Warehousing And Logistic Policy 2012 In browser type http www mpwlp2012 com Alternatively In browser type http www mpwarehousing com then Click on link Online Application Download User s Manual from download link Enable pop ups in browser setting Register you as organization individual to use application as described in Chapter 2 of user manual Login as described in Chapter 3 of user manual User can file multiple application for different location or for same location from one registration You need not to register again for different locations or for same location User has option to SAVE application for subsequent changes or directly SUBMIT application APPLICATION ONCE SUBMITTED CAN NOT BE EDITED Submit application after filling requisite details as described in Chapter 4 of user manual Please ensure you have clicked on submit button If you have clicked on save button then application is pending at your end for submission so gt Relogin gt Select radio button Edit gt If you wish you can make changes also gt Click on Submit button On submission you will receive a confirmation mail with date time stamping Quote the application number for all future correspondence After Submission of application make payment of requisite fees within 5 working days as described in Chapter 5 of user manual MPWLC will not be responsible for
2. any delay in the payment If application has been rejected due to non payment within stipulated date applicant can apply afresh till last date of application filing On receipt of e mail for acceptance of application submit duly signed hard copies of all the documents as mentioned in the e mail Please update the status of submission of documents on the website 14 15 16 I7 18 Once documents are submitted these will be verified by district level committee and any shortcomings in the documents shall be notified through mail If documents are found ok then you will receive a mail for site inspection mentioning date and time Arrange for site inspection on the designated date If site is found to be satisfactory along with document verification an acceptance letter shall be issued You will be required to sign an agreement with the district level committee within stipulated period You will be required to start construction after signing agreement and complete within 12 or 18 months depending on capacity of warehouse from the date of signing agreement Once the construction of warehouse is over you will need to update status on website so that inspection could be done and subsidy under the policy could be released Please_read_the M P Warehousing And Logistic Policy 2012 carefully Above instructions have been_given_ in brief to facilitate submission of online application only
Download Pdf Manuals
Related Search
Related Contents
Video Camera Recorder Instrucciones para firma de una solicitud: Operating Instructions F1DL102U - UK User Manual Copyright © All rights reserved.
Failed to retrieve file