Home

Zhangjiagang Great-Trust New Energy Co., Ltd. 1kw Wind Turbine

image

Contents

1. Blades bolt M6 55 1 9 tail 1 10 Tail board 1 11 Tail spin 1 12 tail nuts and bolts 1 13 M16 60 flange bolts 4 optional 14 M16 60 flange nuts 4 optional 15 controller inverters 1 optional 16 tower 1 optional 12 17 battery 1 optional 18 installation guide 1 Part7 Quality Guarantee 1 The company guarantees customers that generator is of excellent quality function is good the body is complete rigorously checked before delivery 2 The wind turbine should be maintained by professional person regularly the problems resulted from irregular maintain ance or without maintain ance are not to be covered by the warranty 2 We provide 1 year s warranty for wind generator since the date of sale damages occurred in the following situation dismantle optionally by yourself or seriously violate operation not according to instructions use are not covered by warranty in such case cost to be charged when repair at our designated shop 3 We offer maintain ance and repair then products warranty expires at cost 4 The documents are as a product warranty certificate please keep it properly User information table Sales company Purchase company Purchase time Contact person SBBH Contact Model Zip code Maintenance records Date Maintenance species Summary SMT rework 13 Pa
2. connected with the positive electrode of last battery and negative terminal with negative electrode on the first battery 3 Connect the three wires of wind turbine correspondingly with the wind turbine terminals on the controller 4 Please be noted that the input voltage of inverter should equate with the batteries voltage in series 5 It is prohibited to run the wind turbine without load to avoid blades damage when high speed rotation Part 5 Maintenance and Attentions 1 wind turbine is generally worked in windy areas please check it 3 months after installation fasten bolts nuts check whether the tower shaking lasso loose if anything amiss please solve it immediately 2 please check wind turbine right before or after storm if anything amiss it is advised to lay 11 down slowly wind turbine to do inspection or repair If inspection needs to be done on the tower make sure wind turbine have been short before and election climb up 3 The free maintenance batteries should be kept externally clear circuited and protection measures taken 4 Do not disassemble the equipment by yourself Please contact sales department when the equipment is out of order Part6 Packing list Serial Item Quantity Remarks 1 generator 1 2 Main shaft nut M24 1 3 Flat washer elastic washer 1 4 hub 1 5 blades 3 6 Blades bolt M10 50 12 Refer to pic 2 1 7 dome 1 8
3. maintenance and repair 3 precise injection molding blades together with the optimized design of aerodynamic contour and structure the blades have such advantages high utilization of wind energy which contributes to the annual energy output 4 the generators adopting patented permanent magnet rotor alternator with a special kind of stator design efficiently decrease resistance torque Meanwhile it makes the wind turbines match the generators quite well and increase its reliability 1000W wind turbine spec Rated power W 1000 Rated voltage V 48 Wheel diameter m 2 3 Start up wind speed m s 2 5 Rated wind speed m s 10 Survival wind speed m s 35 TOP NG kg 37 Body material Casting aluminum Blades material Nylon fiber generator Three phase ac permanent magnet generator Blades number 3 protection Electronic magnet tail furling lubrication Lubrication grease Working temperture 40 C 80 C Tower height m 6 Tower type Guyed tower Part 3 Product Structure and Features The wind turbine consist of wind wheel generator set generator and swivel tail guyed tower controller inverter maintainence free lead acid battery 1 Wind wheel 3 blades wheel Laminar flow type high lift drag ratio good performance Nylon fiber blades using precision injection strong toughness and perfect dynamic nature 2 generator and swivel are designed in
4. sharp end upward pic2 5 8 Pull the steel lasso through the holes on the upper tower pic 2 6 the left and right lasso connected to the side anchors with Turnbuckle the back lasso fixed with the back anchor with the same length as left and right lasso please make sure the three lasso does not wrap together the front lasso fixed with front anchor after the tower hoisted vertically 9 Check the tension of lasso adjust its tension by rotating the Turnbuckles to make sure tower not bent when too tight or shake when too loose 4 3 battery installation and connection 1 The battery should be placed in a dry ventilated place a wood stand is suggested to hold batteries controller and inverters 2 Connect batteries in series connect the positive electrode of the first battery to the negative electrode of the second batteries same is to be followed with other batteries 3 Lubricate all the terminals with grease or other anti corrosion materials install fuse on 10 the positive terminals of batteries and keep the cables between controller and batteries within 3m to avoid possible electronic magnet interference 4 4 Connection of controller and inverter 1 the controller should be placed in dry well ventilated place moisture and dust proofed inverter shell should be kept grounded and more than 1 5 meters away from the batteries to avoid acid gas pollution 2 The positive terminal of battery indicator on the controller should be
5. Zhangjiagang Great Trust New Energy Co Ltd 1kw Wind Turbine user s manual Company profile Our company is a high tech corporation which has formed a system that incorporates research production and sales Possessing many professional technicians advanced equipment and detection methods our company has formed a service system that combines design manufacture installment the debugging marketing and after sale service Moreover our products are warmly received worldwide The wind turbine series that we have developed have an independent power supply system which enable it run under all kinds of weather and make it an ideal solution for yachts families observatories communication station roads landscape spots etc Distinguished Users We are very glad that you choose our company s products and feel sure that you will find the convenience that our products bring to you and the joy of promoting the policy of low carbon and environmental protection Please do not forget to read the User Installation Manual before installing of the products Catalogue Part1 Safety Warning and Attentions 0 Part2 Product Description 0 0 sc0ssssessensseenseensenns sae Part3 Product Structure and FeatureS 0 0 20 0 Part4 The Wind Turbine Installation Steps 4 1 tower base anchors making and insta
6. a complete body a close compact structure which enhances toughness reduce weight of the generator set and thus make it rotate more easily and safely 3 Tail using molding spined with swivel shaft tail furls to protect wind turbine in strong wind 4 controller converts ac current produced by wind turbine to be dc current to charge battery 5 Battery lead acid maintenance free battery Part 4 The Wind Turbine Installation Steps Wind turbine should be installed on a pole as high as possible and be clear of obstacles refer to pic 1 1 to capture big wind turbine The soil condition should be taken into consideration those conditions are not recommended sand land ruggy places or places vulnerable to climate The distance from the wind generator to the battery is suggested to be as short as possible to save cables and lessen power losses over transmission if long distance can not be avoided please choose thick standard cables 4 1 tower base anchors making and installation 1 layout of tower base and anchor pic 1 2 Attention the connection line from anchor A to B should be parallel to the connection line of the two pin holes on the base which is to ensure the tension of lasso balanced and adjustable and keep the anchors and tower base of same height otherwise the tension of lasso might be too loose or too tight tower might be bent or down Pic 1 1 2 Dig holes for cement block following the layout the center holes edge len
7. d You can arrange the facilities according to national standards or you may arrange them according to the local environment and soil condition Table 1 is for reference 5 When assembling the Wind turbine All the parts should be fastened with fasteners specified in table2 Table 1 rl HAR t MM gt ZAZ M gt ERR Ko OK AR aa eE i ae 100 250 500 FN Aw tem 4S 7 3 220 50 50 50x540x4 TARZ 4p EP K E A 20 2 75 4 151 a7 2 Seo ISE E 8 i 2 2 SeA SLO t62 gt Sie 01 251 sae oS en He gt 510 5 26 2 6 65 16 6 33 2 RE pa R 6 92 1 4 6 SM _SM_ a4 ra Boe ee te 25 4 ia 10 7 5 5 29 132 265 sx S 3 58 8 95 179 P das 7S 3 3 73 982e 18 6 H 5M Table2 ay tightening Executive Serial Fasteners spec quantity remarks p torque N M standard Bolts f 1 n M10 50 12 gt 41 blades Lock nut 2 pee lll SMA 1 gt 156 shaft 3 Tail bolts M8 45 4 219 4 Tail nut M8 4 219 5 Flange nuts M16 60 4 2116 Tail b M16 17 6 ail board 6 1 zite nut 0 6 Before hoisting the wind turbines the end which should be connected with controller of the tower lead should be cut away the insulating layer for 10mm or so Then screw the three exposed leads shot circuit together 7 Before the connection between the wind turbi
8. gth is suggested to be 0 7m depth 0 8m and holes for the anchors edge length is suggested to be 0 6m depth 0 8m 3 Pour cement block and mix it with some stell bar and 4 anchor bolts please make sure the base hole align with the anchor bolts 4 The 4 ring shape anchor installed toward tower base adjust the distance of 4 anchor from the center of tower base to make even distance 5 Fix the tower base on the concrete block with bolts RE Rtas raw 4 2 assembling of wind turbine and tower 1 First put the bottom section of tower into the tower base then thrust the pin shafts into the spin holes on the tower base 2 Connect the middle and upper section of tower orderly then place it onto a wood stand 3 Pull the cables of wind generator through the tower pipe and led out from the hole on the bottom section of tower 4 Fasten the tower flange and the wind turbine flange with bolts please make sure the wind generator is placed in a proper position to make easy blades installation 5 Blades installation put the windward side upward pic 2 1 screw the bolt not to screw it tight adjust the blades ends distance to be balanced then screw tight bolts make sure L1 L2 L3 allowance within 5mm please refer to pic 2 2 Pic 2 1 Pic 2 2 6 Install the blades flange onto the generator shaft then covered with dome 7 Tail installation the side with buffering rightward pic 2 3 the tail board fix on the left of tail pic2 4 with the
9. llation 4 2 assembling of wind turbine and tower 4 3 battery installation and connection 4 4connection of controller and inverter Part 5 Maintenance and Attentions 2 0 Part 6 Packing List 0 0 20ss0ssensennsensenncensenscnnsensenne Part 7 Quality Guarantee 2 20 2 s20 2n enn en sens enennennencnnn Part 8 Maintenance Records Table A For correct installation and use of this equipment please read carefully the safety warning Part1 Safety Warning and Attentions and attention and strictly follow the instructions Basic requirements eDo not disassemble the equipment by yourself Please contact the specified maintenance department when the equipment is out of order eWithout authority no company or individual are allowed to change the equipment structure safety and performance design eplease obey local laws and regulations when using this product Assembling requirements 1 Before the assembly of the wind generator or in the process of maintenance please be sure to read the users manual first 2 Please don t install the wind turbines in rainy days or when the wind scale is at Level 3 or above 3 After opening the package it is advised to short circuit the three leads of the wind turbines the exposed copper parts should be screwed together 4 Before the installation of the wind turbine lightning grounding must be prepare
10. ne flange and the tower flange please connect the three leads of the wind turbine to the three leads of the tower accordingly When using the hinge method every pair of wires should be no less than 30mm in length and be wrapped with Acetate cloth tape for three layers then sheathed with spun glass paint tube With this method connect the three pairs of wires attention the joint of the wires can t bear the weight of the tower leads directly so wires 100mm downward from the joint should be wrapped with adhesive tape and then stuffed into the steel pipe After that wind turbine flange and tower flange can be connected 8 During the installation it is prohibited to revolve the rotor blades roughly the ends of wind turbine leads or the tower leads are short circuited at this moment Only after all the installation and the examination is finished and the security of the erection crew is guaranteed it is allowed to dismantle short circuited leads and then connect with controller and battery before running Attention Battery should be connected with controller before wind turbine connected with controller If above stated instruction are not followed when assembling and installing the wind turbines we are sorry that any problem or failure resulted are not to be covered by warranty Part2 Product Description 1 low start up speed high wind energy utilization beautiful appearance low vibration 2 Human friendly design easy installation
11. rt 8 Maintenance Records table Time after maintenance f Items SMT rework Date installation First time 3 months 204 time 6months 3 time 1 year Check blades and 4th time 2 year main shaft bolt wind generator and 5th time 3 year tower see if loose or any damage check 3 year and 6 the tail spin and 6 time months connectors see if any friction damages 7 time 4 year check and see if anything amiss on the 8t time tyan ande wind generator and PONG tower accessories 9th time 5 year 5 year and 6 10th time months 11th time 6 year 14 6 year and 6 12nd time months 13th time 7 year l 7 year and 6 14th time months 15th time 8 year l 8 year and 6 16th time month 17th time 9 year l 9 year and 6 18th time months 19th time 10 year A whole compete inspection and repair should be made and records remade again 15

Download Pdf Manuals

image

Related Search

Related Contents

Réalisation du calcul d`un assemblage goujon-bride    Samsung C100R Kasutusjuhend  Toshiba BDX3400KU User Guide Manual - DVDPlayer  Laboratory Fume Hood  町議会議員14名決定 東日本大震災への町の取り組み  

Copyright © All rights reserved.
Failed to retrieve file