2014 ISOQAR Report - RPH Manufacturing Ltd
Contents
1. The audit will be conducted at the location s specified within the visit plan Time the audit commenced 09 00 Time the audit was completed 14 30 Report submitted to and accepted by Richard Haim Position in Organisation Managing Director Report prepared by Tracey Oram Lead Auditor Date s of Next Visit 24 04 15 Start Time 08 00 Surveillance visits set at 1 Per year of 1 Days per visit NB If the next visit is a Recertification Visit additional days over and above the surveillance days may be required Please see Audit Plan for details of the next visit The Organisation agrees to comply with ISOQAR s Rules of Registration Enter details in section 2 if days or pattern of days has changed This report is confidential and its distribution will be limited to the audit team client representative and ISOQAR office Cobra Court 1 Blackmore Road Stretford Manchester M32 0QY Tel 0161 865 3699 Fax 0161 865 3685 E mail enquiries isogar com Web www isoqar com Operations throughout the UK and world wide Registered in England No 2637608 rage euro Cert Ref Num 9493 Visit No 3 Date s 25 Apr 14 Attendees Opening Meeting Closing Meeting Name Position Name Position Richard Haim Managing Director Richard Haim Managing Director 1 Audit Conclusion The audit team
2. blocks Calibration date 21 09 11 recal date 21 09 16 Viewed certificate Collegue Gauge Calibration UKAS registration number 4691 Recal date 21 09 16 Equipment Machine Maintenance Each machine has its own sets of files which include User Manual Maintenance Records Extensive records were seen by the 2 following machines Okuma Howa Turning Centre Serial number 00049 Last service carried out 07 07 13 service reference 1851 fitted air assy to aid lubrication to spindle Feb 2013 on service number 1828 spindle replaced Coolant checks were carried out on 23 02 12 outcome to raise concentration satisfactory pH and no growth Hurco BMC 2416 3 axis machine centre Initial service upon installation in 1999 on service sheet no 95428 Viewed most recent service reference 128035 on 04 11 13 which is an annual service carried out on service contract contract reference 1071 dated 15 08 13 Training and Competence Due all business functions being carried out by the Managing Director training records and competence records are not deemed necessary There are documented procedures for induction training WI 6 21 and in house training WI 6 22 should the need arise to employ any additional persons The audit methods used were interviews observation of activities review of hard copy documentation review of documentation retained electronically and a review of records The conclusion is based upon the evidence obtain
3. concludes that the organisation HAS established and maintained its management system in line with the requirements of the standard s and demonstrated to the audit team that it has the ability to systematically achieve the requirements for products and or services within the scope of its activities and in accordance with its policy and objectives The audit team recommends that based on the evidence obtained during this audit that Certification should be Recommended Continued X Deferred until satisfactory corrections corrective action has been completed Non conformances Number of Non conformances raised Major 0 Minor 0 NB Where Non conformances are Raised For Initial Audits Extensions to Scope and Recertification Audits all Non conformances must be closed out before a Certificate is authorised for issue and can only be closed out either by submission of evidence to ISOQAR or a re visit to audit the corrections corrective action see Non conformance section of this report For Surveillance Audits any Non conformance classified as Major can also only be closed out either by submission of evidence to ISOQAR or a re visit to audit the corrections corrective action see Non conformance section of this report NB All Non conformances must be actioned within the agreed timescales Please Note the audit conclusion is provisional and subject to review by ISOQAR s Cer
4. aining etc Also include in this section any additional requirements of the standard sector scheme legislation etc Auditor s Tracey Oram Standard s ISO9001 Evidence Enquiries Quotes and Sales The company generally operates on fixed rolling contracts where the customer will place a contract which details the part numbers and quantities required over the next 12 months along with references to corresponding drawings and part descriptions Viewed a new order for Wessex Lifts who are a long standing customer Order number K44007 date 01 04 14 Items on this order include 3600 off VM30 110 dwg Issue B 1500 off VM110621 dwg issue A and 1818 off VM10 0331 dwg issue A The audit has shown a recent new enquiry has been started with CR Instruments Ltd and this is as a result of some business that was carried out 2 years previously New bespoke boxes to transport and store the parts have been ordered and the MD is currently awaiting drawings from the customer so production can start Currently order number K39020 is being processed for Wessex lifting Due to the size of the business and the current work meaning it is working to maximum capacity there are no day to day enquires or orders to view The company does however hold various marketing items such as brochures and product samples that can be taken out to potential clients The display cases for sample components were designed and made in house to an extre
5. d on 23 07 13 and was attended by R H and D D the agenda covers the points indicated in the management review procedure SP 5 6 Issue 1 April 2011 Management Review is held every 12 months with the agenda including outstanding points raised during the last meeting in this instance there were none Internal Audits Internal Audit s are scheduled over a 12 month period with 8 audits scheduled Audits are carried out by D D The audits for 2011 2012 and 2012 are retained on file and have identified no issued The schedule for 2014 will be issued after today s audit because the client wanted to incorporate any findings from today s audit in the 2014 program The audits are recorded on form 05 issue 1 April 2011 Customer Satisfaction feedback Customer feedback and satisfaction is reviewed as part of the management review Customer satisfaction is perceived through repeat orders and reviewing of customer communications This is a small company with one employee who deals with all customer communications himself The company has recently secured a new contract with CR Instruments as a result of good service provision on previous orders Objectives Targets Improvements Targets and objectives are reviewed during the management review meeting minutes of the previous MR show that targets set have been achieved the objectives for the period of July 13 July 14 are to maintain these at the same level low NCR s and increased Turno
6. ed during the audit The auditor s used standard sampling techniques to obtain this evidence and no guarantee can be given that a different conclusion may have been reached had different samples been taken rage uuro Cert Ref Num 9493 Visit No 3 Date s 25 Apr 14 6 Follow Up of Previous Audit Results Previously raised Improvement Requests Non Conformances have been effectively closed out root YES NO N A N A cause determined and effective actions taken If Yes summarise the evidence seen if No what actions have you taken as a result 7 Recertification Visits complete only at a Recertification Visit Has the review of activities in particular complaints against the client and reports covering the ae YES NO X certification cycle revealed any issues If Yes please provide details 8 Activities planned but not covered on this visit and require planning for the next visit Date Process Department Activity Site Visit etc Auditor 25 04 14 None TO 9 Head Office Locations Branch Offices visited during this audit Date Location Auditor 25 04 14 Head office TO 10 Client Contract Sites Temporary Sites visited during this audit if applicable Date Location amp Activity Audited Auditor 25 04 14 N A TO 11 Locations Branch Offices All permanent Locatio
7. for all aspects of the business and it is clearly apparent that a great deal of pride is taken in all aspects audited OFI although information only equipment is held in a cupboard labelled as such it may be beneficial to add information only labels to individual items of equipment to avoid any confusion rage sure Cert Ref Num 9493 Visit No 3 Date s 25 Apr 14 Auditor to complete 4 Management System Controls i e Management Review Internal Audits Objectives Complaints etc Also include in this section any additional requirements of the standard sector scheme legislation etc Auditor s Tracey Oram Standard s ISO9001 Evidence QMS and Document Control the company quality Manual is currently at Issue 1 dated 08 04 11 The amendment sheet shows that no changes to issue status have been made since the manual was issued All procedures and forms within the manual were seen to be at the same issue level as the manual so there is a consistent issue level throughout meaning good visibility for any changes and issue revisions The Quality Policy is aligned with the Quality Manual and is also set at Issue 1 dated April 2011 It is signed by the Managing Director R H and covers all areas as required by the standard as well as a commitment to Endeavour to deliver a right first time approach to its customers Management Review The last management review meeting was hel
8. ganisation Name 9493 RPH Manufacturing Ltd This plan commences On the date of the first surveillance visit following the initial audit stage 2 or On the date of the Surveillance Audit following the Re Certification Audit At the next surveillance visit if the plan requires amending or to take into account extensions to scope Visit 1 Visit 2 Visit 3 Month and Year 04 15 04 16 04 17 Number of Days 1 1 1 Standards 9001 9001 9001 Area Function Process Activity Site Visits temporary sites etc QMS amp Document Control v v v Management Review Meeting v v v Internal Audits v v v Customer Satisfaction Feedback v v v Objectives Targets amp Improvements v v v Non Conformances Corrective amp Preventative Actions v v v Enquiries Quotes amp Sales v v v Process Control including Purchasing v v v Design amp Development v v v Calibration v v v Equipment Machine Maintenance v v v Training amp Competence v v v Recertification Planning v Head Office Locations Branch Offices Visit Plan Visit 1 Visit 2 Visit 3 Head Office v v v Indicate with a VY when audit of this function planned or when a visit is planned When producing this plan ensure that all clauses of the standard s can be attributed to Area Function Process Activity Site Visits temporary sites and are audited over the 3 year Recertif
9. ication Cycle The clients Locations Branch Offices must also be appropriately sampled over the 3 Year Certification Cycle Plan Produced By Tracey Oram Date 25 04 14 Plan Amended By Date
10. mely high standard Process Control including Purchasing All items under manufacture are accompanied by the relevant job pack This includes a copy of the drawing specification and also the job card Viewed the following jobs in progress Order no K39020 WM100644 Issue C Delivery note ref 981 Op 1 turn complete OP2 mill 3 5 OP3 Drill 2 5 dia hole OP4 remove tooling spigot All stages have been stamped RPH1 inspected Dated 01 03 14 Order number W39020 part number VM500204 dwg issue b Batch off 100 PO number 1813B Delivery note ref 97750 OP1 turn complete Machine number 066 RPH1 inspected Manufacture date 180414 delivery note 1019 Viewed job for HNJ Engineering Ltd order number 0276 part number HNJO 600300 dwg issue Eb machine nut tool qty 100 Turn OP1 machine 067 programme 00013 Turn OP2 machine 067 program 00022 Turn OP3 machine 068 program HNJ6000300 03 Turn OP4 machine 068 program 02 Final inspection is carried out on 100 of all finished items and this indicated by the inspection stamp on the job card Stamp reference is RPH1 All job sheets reference back to the purchase order number of the original raw materials used and the purchase orders were available to view in a dedicated file allowing full traceability It was noted that the raw materials could also be traced back to individual Cast numbers if required Viewed the following purchase order PO number 0276 placed on 29 01 14 for 15 x 45 0
11. mm EN24T from Wessex Materials Ltd Received on delivery note reference 180208 All machines are set up with individual programs which are stored on local memory and these are also backed up on to PC and this is further backed up on to a pen drive which can be taken from the premises if needed Viewed the following programs e LR101427 for HRCO BMC 2416 file reference 01 HD3 Also 2116 Tip blank dated 01 02 1999 stored on Windows G Coder DM01 PF on the Fanuc Symbolic Cap T program Machine parameters are also stored on the PC in the event of battery fail they can be restored fairly quickly and easily with minimal disruption to production Viewed Act 20 18TA 3042135 FS 400 with OT The parameters for this machine are also held on hard copy just in case but the service engineers will also have copies Design and Development The Managing director is currently working on a new product which will hold parallel plates in the correct position and at the correct pressure while machining Each individual component has its own drawing which has been generated in house with part numbers and issue levels Viewed Dwg Ref RPH011 Issue 1 front pad material black acetal finish none Dwg Ref RPH02 Issue 1 Rear pad material white acetal natural Dwg Ref RPH04 Issue 1 Support Pin material Red PVC All drawings and machined samples are retained in clearly labelled plastic bags and held in a special location O
12. nce the product has been though the finalisation and validation process it is hoped that it will be offered to customers A prototype storage case is currently being investigated which will include layered foam to safety hold the parts to avoid any damage Calibration All equipment within the workshop has been issued and labelled with a unique reference number This includes machinery IT equipment and also measuring equipment that requires calibration All measuring equipment is held within the final inspection area and is clearly labelled with an individual ID number which is traceable back to the individual calibration certificate and also a record card which can be used to note any references specific to the piece of equipment Where possible gauges are stored in cupboards to keep them clean and free of any contaminants and also to avoid any damage occurring The information only items are stored in a cupboard which has a sign on the front showing the status of its contents OFI the company may find it beneficial to label each item to show this to avoid any confusion Viewed the following items rage sure Cert Ref Num 9493 Visit No 3 Date s 25 Apr 14 Equipment serial number 279 M10 x 1 50 6H Screw Gauge Calibration Date 24 08 11 Recal date 24 08 16 certificate number 112987 Viewed certificate MP Calibration Services UKAS registration number 0228 Equipment serial number RPH5 imperial gauge
13. ns Branch offices for which certificates are required Check on Business Manager are currentand YES NO YES correctly identified If no correct details are Location Town City Address Standards 12 Registration Marks Use of Registration Mark if used is in accordance with the Rules of Registration YES NO N A YES Brief details of where the UKAS registration Company signage and stationery All correct Mark and ISOQAR Logo is used rages uio Cert Ref Num 9493 Visit No 3 Date s 25 Apr 14 AUDIT PLAN NEXT VISIT Please note that changes to Auditors may be unavoidable due to operational requirements Lead Auditor Tracey Oram Additional Auditors Expert Standard s 9001 Type of Audit ie Surveillance Surveillance Audit Dates 24 04 15 Location s HO Audit Start Time 08 00am Does Client need to confirm site visit with ISOQAR Head Office prior to No next visit YES NO Audit Language if not English Is Recertification Planning Required YES NO No Management Processes Date Time or AM PM or N A Auditor 24 04 15 am Opening meeting and follow up of previous report TO E QMS amp Document Control i ay Management Review Meeting i Internal Audits es es Customer Satisfaction Feedback TO am Objectives Targets amp Improvements 19 am Non Conformances Corrective amp Preventative Actions 19 amn Enquiries Quo
14. rage ture Cert Ref Num 9493 Visit No 3 Date s 25 Apr 14 MANAGEMENT SYSTEM AUDIT REPORT Cert Ref Number 9493 Audit Date s Friday 25 April 2014 Visit Num 3 Standard s audited ISO 9001 2008 Type of audit RECERTIFICATION Organisation RPH Manufacturing Ltd Address 83 Cobham Road Ferndown Industrial Estate Wimborne Dorset BH21 7QD Tel 01202 870999 E Mail rphmanufacturing btconnect com Web Representative s Mr Richard Haim Staff FT 1 PT Locations amp Site s visited SEE SECTIONS 9 amp 10 EAC Code s 17m Lead Auditor Tracey Oram Additional Team Member s Legal Status of Organisation i e Ltd company Partnership etc FP NB if partnership names of partners required Limited Company Scope as it will appear on Design Manufacture and Kanban supply of precision components certificate The objectives of the audit To confirm that the management system conforms with the requirements of the audit standard and also any statutory regulatory and contractual requirements that are applicable To confirm that the organisation has effectively implemented the planned management system To confirm that the management system is meeting its specified objectives Audit scope The audit will evaluate the effectiveness of the processes identified within the visit plan and in line with the 3 year plan
15. tes amp Sales 19 am Process Control including Purchasing 1O am Design amp Development 19 an Calibration to pm Equipment Machine Maintenance 19 pm Training amp Competence i Report writing 19 TO Closing meeting Locations Branch Office Visits Date Time or AM PM Process Aspects Activities etc to be Audited Auditor NA NOTE TO CLIENT No further confirmation or reminders will be issued Failure to honour the date arranged may result in extra charges being incurred by your company as stated in ISOQAR Rules of Registration Cancellation of audit or surveillance dates within 20 working days of the agreed date will result in ISOQAR claiming an extra half day rate levy from the company for each staff day cancelled Note to Auditor rage oure Cert Ref Num 9493 Visit No 3 Date s 25 Apr 14 Refer to 3 year Audit plan and last Audit plan when producing the audit plan for the next visit Ensure that all clients locations branches are visited in accordance with the 3 year audit plan Ensure client fully understands the cancellation policy stated above Ensure that site activities are witnessed as appropriate and in accordance with the 3 Year Audit plan All Management System Elements must be audited once per year as a minimum Review the 3 year audit plan and if appropriate and necessary amend the plan AUDIT PLAN COVERING THE 3 YEAR ASSESSMENT CYCLE Or
16. tification Review Team 2 Significant Organisational Changes also include any changes to surveillance visit patterns e g if additional standards have been added and any additional information Significant changes to the plan for stage 2 or planned arrangements produced at stage 1 No changes to the organisation since the previous audit Do the justified exclusions remain valid YES NO N A If no please give details NA 3 Audit Summary Observations Non conformance Opportunities for Improvement Good Practice etc The company operates from a small industrial workshop located on an industrial estate The primary activity of this business is machining of components and the operation of a KANBAN system The workshop was seen to be kept to an exceptionally high standard with regards to cleanliness order and also the use of visual management techniques such as labelling of all shelves WIP and stock in storage right up to sections of the workshop that have been allocated to certain functions such as Final Inspection All items in storage are stored either in protective packaging or in a manner to avoid any damage or dust contamination Lighting levels in the workshop are of a good standard and supplemented by fluorescent lighting cables safely routed to avoid trip hazards and the use of rubber and fabric matting around the machinery to avoid any slip hazards The business is operated by the Managing Director who is solely responsible
17. ver Non Conformances Corrective Actions Preventive Actions these are reviewed during management review and the minutes show that no non conformances have been raised The Corrective Action Procedure SP 8 52 details the steps to be taken in the event of identification of a problem This set at Issue 1 Dated April 2011 in alignment with the Quality Manual The non conformance issue log shows that one NCR was raised on 19 08 11 this was in relation to some gauges being used to carry out a job not being within the calibration system Root cause time and financial restraints Short term CAR send gauges for calibration long term CAR record card system to be implemented to record all information preventive action to record gauges used on relevant job cards The NCR was closed on 22 09 11 There have been no further NCR s issued since rage tule Cert Ref Num 9493 Visit No 3 Date s 25 Apr 14 The audit methods used were interviews observation of activities review of hard copy documentation review of documentation retained electronically and a review of records The conclusion is based upon the evidence obtained during the audit The auditor s used standard sampling techniques to obtain this evidence and no guarantee can be given that a different conclusion may have been reached had different samples been taken 5 Significant Process Audit Trails followed i e Sales Purchasing Design Production Tr
Download Pdf Manuals
Related Search
Related Contents
Quantum Travan 20 SCSI User's Manual Manual de Instruções Appareillage de moyenne tension jusqu`à 36 kV JVC 1004TNH-II-IM Projection Television User Manual La sécurité des enfants en voiture - Middlesex 取扱説明書 DocuPrint CG835 取扱説明書(サーバー編) Médiathèque numérique, mode d`emploi Copyright © All rights reserved.