Home

Rail kit instructions are shipped with the appliance and can also be

image

Contents

1. SUPERSERVER 1027R N3RF USER S MANUAL 2 5 Installing the System into a Rack This section provides information on installing the SC116 chassis into a rack unit with the rails provided There are a variety of rack units on the market which may mean the assembly procedure will differ slightly You should also refer to the installation instructions that came with the rack unit you are using NOTE This rail will fit a rack between 26 and 33 5 deep Identifying the Sections of the Rack Rails The chassis package includes two quick release rack rail assemblies in the rack mounting kit Each assembly consists of two sections an inner fixed chassis rail that secures directly to the server chassis and an outer fixed rack rail that secures directly to the rack itself Figure 2 1 Identifying the Sections of the Rack Rails Inner Rail Extensions Inner Rails 2 4 Chapter 2 Server Installation Inner Rails The SC116 chassis includes a set of inner rails in two sections inner rails and inner rail extensions The inner rails are pre attached and do not interfere with normal use of the chassis if you decide not to use a server rack Attach the inner rail extension to stabilize the chassis within the rack Installing the Inner Rails Figure 2 2 1 Place the inner rail extensions on the side of the chassis aligning the hooks of the chassis with the rail extension holes Make sure the extension faces outward just like the pre at
2. he front of the out rails on the rack Slide the chassis rails into the rack rails keeping the pressure even on both sides you may have to depress the locking tabs when inserting When the server has been pushed completely into the rack you should hear the locking tabs click into position Optional Insert and tighten the thumbscrews that hold the front of the server to the rack Figure 2 5 Installing the Server into a Rack 2 8 Chapter 2 Server Installation Installing the Server into a Telco Rack To install the chassis into a Telco or post style rack use two L shaped brackets on either side of the chassis four total First determine how far follow the server will extend out the front of the rack Larger chassis should be positioned to balance the weight between front and back If a bezel is included on your server remove it Then attach the two front brackets to each side of the chassis then the two rear brackets positioned with just enough space to accommodate the width of the telco rack Finish by sliding the chassis into the rack and tightening the brackets to the rack Figure 2 6 Installing the Server into a Telco Rack Note The figure above is for illustration purposes only Always install servers to the bottom of the rack first 2 9
3. tached inner rail 2 Slide the extension toward the front of the chassis 3 Secure the chassis with two screws as illustrated 4 Repeat steps 1 3 for the other inner rail extension Figure 2 2 Installing Chassis Rails 2 5 SUPERSERVER 1027R N3RF USER S MANUAL Outer Rails Installing the Outer Rails to the Rack Figures 2 3 and 2 4 1 Attach the shorter outer rail to the outside of the longer outer rail You must align the pins with the slides Both bracket ends must face the same direction 2 Adjust both the shorter and longer rails to the proper distance so that the rail fits snugly into the rack 3 Secure the long bracket to the front side of the outer rail with two M5 screws and the short bracket to the rear side of the outer rail with three M5 screws 4 Repeat steps 1 4 for the left outer rail Figure 2 3 Assembling the Outer Rails Secure to the Front of the Rack Secure to the Attach Outer Rails Rear of the Rack Together 2 6 Chapter 2 Server Installation Figure 2 4 Installing the Outer Rails to the Rack 2 7 SUPERSERVER 1027R N3RF USER S MANUAL Installing the Chassis into a Rack Figure 2 5 ls Confirm that chassis includes the inner rails and inner rail extensions Alsoconfirm that the outer rails are installed on the rack Align the chassis inner rails with t

Download Pdf Manuals

image

Related Search

Related Contents

HERMA Neon labels A4 63.5x29.6 mm luminous yellow paper matt 540 pcs.    特集 - 国民生活センター  Micro VoIP 200 User Manual  e? Have you checked your lift before use?  NABCEP Study Guide - Brooks Engineering  Quick Start Recording Audio in GarageBand  FX3G Users Manual - Hardware Edi  USER´S MANUAL  TotaLift Operator`s Manual  

Copyright © All rights reserved.
Failed to retrieve file