Home

builder 309

image

Contents

1. pol iss kl ue 0 Total station Geosystems BUILDER R100M com u ceowork Total station manual Vertical drive Page key Horizontal drive Battery holder Navigation keys Escape Display light On Off Serial interface RS232 USB Abotron GEV 189 Function keys etca Geosystems y USB memory stick POSE POLE M USB cable port R100M Laser On Off On Off key Total station manual Table of contents 1 7 Connection to PC 1 1 PC setup 1 2 Abotron USB cable driver 1 2a Constrution Data Manager CDM 1 3 Start Cadwork assign functions Set up control line 2 1 Total station installation 2 2 Set up control line 2 3 Set up height 2 4 Work with the reflector Offset total station location 3 1 Total station new location 3 2 Set up using known points Points layout 4 1 Export points from Cadwork 3D 4 2 Layout stored points on site Measure hidden or inaccessible points 5 1 Measure inaccessible points with Measure amp Record Measure without PC 6 1 Save measures in internal memory 6 2 Export measured points in PC 6 3 Save values in text file 6 4 Import points in Cadwork Container contents Total station manual 1 Connection with PC 1 1 PC setup On the following website http www elcovision com e_theoonline html you will be able to download the software Note that THEO online is necessary to load data in rea
2. Theodolib Leica Builder Received Raw Data Baud Data Stop Parity Serial Port como 19200 8 1 gt Unchecked box Leica Builder a ystem of Cc Init SET 135 11n Set Point Number PUT 11 1 in Use internal memory SET 76 0 n Measurements R5232 SET 76 1 n Intepreted Data Laser ON SET 36 1 n Laser OFF SET 36 0 n Measure GET M WI11 WI21 WI22 WI3 _ Angle Measurement GET M WI21 WI22 n Distance measurement GET M WI31 n Canbrmti mi hian No Element selected Select Element to view description al above selection io a oe Transmitting string In the Format Transmitting String window in Current Transmitting String Predefined Strings choose cadwork and confirm with XCoord fReturnz YCoord Return ZCoord Rei O K 1 Predefined Strings for Various Softwares Mre The string will be set to XCoord Enter YCoord Enter ZCoord Enter FR Tokan seperator for contiguou Date The current system date when Time The system time when the me lime ms Ihe system ume with millisccon Pnint_nimher The point number at the meas Distance The measured slope distance DistanceUnit The unit of the slope distance VerticalAngle The measured vertical angle VerticalAngleUnit The unit of the vertical angle HorizontalAngle The measured horizontal angle HorizontalAngleUnit The unit of the horizontal angle XCoord The measured X coordinate XUnit The unit of the X coordi
3. the operator name can also be entered Figure 2 confirm with ok Figure 2 CONFIG THEO PROG DATA Select next character Enter New Job Job Operator Remark Date 05 05 2009 Time 14 08 18 Scroll Letter Number Sign Validate data Total station manual 2 2 Setup control line Select PROG menu Page key ATTENTION Select Application gt As Built 1 Select SETUP Right function key Select Control Line Navigation keys Figure 3 confirm with ok Figure 3 CONFIG THEO DATA Control Line Coordinates Height Arrow represent Y axis in Cadwork 3d Select Anywhere Navigation keys confirm with ok P1 Height Z 0 00 mm PO Total station Shoot the start point of line P1 and measure M R measure and record Figure 4 Hz 0 000 Pi Start point of control line DE P2 Second point of control line If laser is not visible press the middle function key for 3 sec to E p3 Point de d part d cal al W a Offset value for shift Answer NO to message Record to external message b Line value for shift will only apears if the PC and THEO online are connected and in the THEO online window the box Use internal memory is unchecked P1 and P2 define the control line Pl is set at x0 0 y0 0 z0 0 Reflector height Hr Shoot second point of control line P2 and measure using DI With
4. 4 2 Layout stored points on site The result of the traced points can only be accurate if the total station measures constantly and that parameters Reference points are accurate also Set like described in figure 17 in CONFIG the Laser Pointer and Tracking functions on ON Once tracking is turned on the total station measures in real time and displays the Rotation Distance Height values Figure 17 Turn on laser Turn on tracking CONFIG THEO PROG DATA Laser Pointer Tracking b Hz Increment Horizon V Setting Zenith Compensator on CCD Ue O Turn on compensator 4 3 Transfer a list of points using the USB stick Once data are imported in Construction Data Manager as described in 4 1 they will be directly exported However the export function will not be used but rather the Save As function in the File menu The file format to select is GSI and data should be saved on the USB stick in a sub folder called DATA Once the USB stick is plugged to the total station the job can be read in the instrument To access data select DATA Page key then press the left function key IMP EXP select the file to import nd once imported the layout can start 17 Total station manual 5 0 Measure hidden or inaccessible points 5 1 Measure inaccessible points with Measure amp Record Adaptation of the angle on the side Obstacle Combination of MEASURE and RECORD ste
5. also be found on the Leica Geosystems website in the download area 1 2a Install Construction Data Manager CDM Insert the installation DVD Leica BUILDER series Instruments CD and install the Construction Data Manager software Note that the most current version can be found on the Leica Geosystems website in the download area 4 zz uz Total station manual Connect the PC and the total station with USB Abotron GEV 189 download cable Lemo 0 USB USB Abotron download cable Connection port for USB Abotron GEV 189 download cable The red dot on the device should correspond with the one on the cable 1 3 Start Cadwork assign functions Open a new Cadwork 3D file Cadwork Version 17 0 Click on HelpiFunctions F1 F12 Make sure keys are assigned with the following functions F1 Category Total station Add total station Line 3D F2 Category Total station Add total station Node 3D F3 Category Total station Export total station layout 3D _ _ Attention Execute THEO online for the ist time 22 m na 0 same ti Yer Figure 7 es z i THEO online amp THEO online 1 08 ES Send String coord YCoord ZCoord Double click gt en Transmit Points ew Font Number a mur 4 amp de internal memory Theo config 7 3 Open window to format string Select and Test Theodolite and Serial Port Theodolit Leica Builder Recer ad Raw Data Open configuration
6. the Shift function the 0 point key M C of X and Y axis can be changed a b P3 Figure 4 A value can also be entered to shift the control line a and b above image to find point P3 CONFIG THEO PROG DATA Measure Line Start Point Station and Orientation will be changed and set Press YES to confirm Total station manual with this function point 1 of control line is not at Z 0 0 height is 2 3 Setup heig ht defined through a measure Select SETUP Right key Select Height navigation keys Figure 3 confirm with OK Select HTrans Height transfer Right key Figure 5 Figure 5 CONFIG THEO PROG DATA Select Height Point Select NEW PT New point Right key Write HO1 as the point name Navigation keys Figure 6 Figure 6 CONFIG THEO PROG DATA Enter Point Coordinates Scroll to the 3rd line Navigation keys in order to enter the True Line height 1 000 m for example Height is entered using the navigation keys and confirmed with OK Confirm with OK gt Validate data Shoot the True Line and measure point M amp R p gt New Station Height 1 m will be set Explanation In Switzerland maconry is done using a virtual Confirm with YES height at 1 0m This virtual height is called the True Line 10 JJ ml Total station manual From now on Cadwork THEO Online CDM an
7. window COM Baud Data Stop Parity Serial Port COM2 19200 SIE 1 none Leica Builder Set communication parameter as seen in the total station or Construction Data Manager Figure 7B page 6 Setting should be set only once Make sure you always plug the cable to the same port Doing so will prevent the need to re configure the COM Edit communication parameter Figure 7A CONFIG THEO PROG JDATA Laser pointer Tracking Hz Increment V Setting Compensator Total station manual Figure 7B CONFIG THEO PROG DATA Data Output RS232 Baudrate 57600 Databits 8 Parity None Endmark Stopbits Test connection Figure 7 ca Check the box besides Laser THEO online 1 08 x Send String KCoord Roturnt YCoord Icturn ZCoord Rcturn Test 1 Is the connection successful LLU Transmit Pons You should be able to turn On Off the laser 4 S eap Theo config Test 2 Write a number in the field New Point Number and click on If connection is successful the point appears on the total station display PROG tab application As Built New Point Number Make 1 of these 2 tests to check the connection In case of an error please choose another COM in the configuration window In Theo config Make sure the box Mathematical System of Coordinates is not checked Select and Test Theodolite and Serial Port
8. Insert point at the end NewFile Connection Serial Unit Metre o AA 15 Total station manual Send data using the Upload to instrument button In the Pick up a Job type a New Job name Figure 15 dus Pick up aJob for Upload E ea Figure 15 Cancel Click on OK 4 2 Layout stored points on site Select DATA with the Page key and select the imported JOB with the navigation Keys Set up the total station bubble and location thanks toreference points description in point 3 2 Note that reference points can be saved as a different Job It is also possible that reference points are concrete slab corners which are also represented in the cadwork 3D file and available on site Select PROG using the Page key then with the function key APPL and navigation key Layout press OK Using navigation keys select the point you wish to trace Figure 16 CONFIG THEO PROG DATA Rotation direction Layout Turn Pt PT0004 Builder Line 6 137 mit 5 220m Offs 1 474 me 050 30 31 i 5 H 2075 mt 0 725 m Distance with the point Accurate rotation angle Value for the height Using the vertical and horizontal drive adjust the total station precisely Once the instrument is on target press the middle function key MEASURE If the value is slightly off reposition until you get a result within an allowed tolerance 16 Total station manual
9. bal coord and enter values X 0 Y 0 Z 0 to obtain Point 0 Origine Activate the node Point 0 with a left click and select all nodes to be exported with a right click lasso Now press Comma in Cadwork 2d To write a clipboard for the 3D and assign a number Open a Cadwork 3d file and paste 3 all points 20 Total station manual E 2 DG SS z alg Soe Se eet E Seid E E zy EE ESA SS o amp Oe wo eee E E zeczy E yw E E waw Er ENE du fe SIE amp E PSU AW Z SOS Ds om dka w a Some Bobs E ee og a Wg lz 2 E ike E 4 ML Z Eos GAME E e E mo E DER AW a Sle 2 SEL So ete oes E Total station manual E 2 DG SS z alg Soe Se eet E Seid E E zy EE ESA SS o amp Oe wo eee E E zeczy E yw E E waw Er ENE du fe SIE amp E PSU AW Z SOS Ds om dka w a Some Bobs E ee og a Wg lz 2 E ike E 4 ML Z Eos GAME E e E mo E DER AW a Sle 2 SEL So ete oes E Total station manual 7 Container contents A W o Connectionaci Lemo 0 USB Abotron USB Download Cable GEV 189 optional 23 uo Y OM
10. d the total station are ready to use For the points measured to be transfered to Cadwork the Use internal memory box should not be checked Figure 7 page 8 Select APPL Right function key Application on the total station in PROG menu Select As Built and confirm with OK In Cadwork 3D Version 17 press F1 key Select a line color Proceed with available polyline No Now any points can be measured a line will be drawn in Cadwork point after point with the selectes color To exit the function right click Measured points are transfered to the PC through the cable name of points are kept Before measuring it s possible to assign a name to the line or node in Cadwork with key and Enter traced by the total station It is saved in the user attributes 10 P1 start point of line za wa Py da P2 Second point of line Z gt Cor PO y a Z Mig Wa SL big Sa rali atti Mia A a na er pri ia Sy m a Reference point in Cadwork Saga 0 00 m 2 71 at T le a a L P0 Total station location _ N 10m ke UJ PTO001 2 L a dog A a led E a L p 2 4 Working with the reflector In a case of a point that can be hardly measured the use of a reflector is necessary To do this the reflector height should be adapted hr Reflector height To adapt the reflector height 1 Select SETUP Right f
11. e validate with YES Figure 11 CONFIG THEO PROG DATA Plausibility Check Line length Given 6 506 m Line length Meas 6 506 m Difference 0 000 If needed a 3rd point can also be measured The location is then reprocessed using 3 points 13 Total station manual 3 2 Set up using known points Station and Orientation StatAny 002 will be changed and set Confirm with YES Figure 12 CONFIG THEO PROG DATA New station coordinates Station StatAny 002 2 698 m 1 119 m New coordinates of the station are displayed confirm with YES Figure 12 The total station is ready to measure P1 start point of line P2 Second point of line REF PT na wie losy S002 Le lt Corre Spong pe m zj ine to tf Ont we TOI line lt _ REF PT T gt a S003 gt Reference point in Cadwork 0 00 m ai SA nil HA PO First instrument location before relocation L_X410m be E Second instrument location p after relocation Je NRF 14 Total station manual 4 Points layout 4 1 Export points from Cadwork 3D In Cadwork 3D Version 17 assign F3 key to function Total station Export total station layout 3D Now press F3 Export total station layout 3D Type a file name for the new list of nodes in the window that pops up e
12. l time in Cadwork 3Dusing the optional Abotron download cable GEV189 2 Photo Mess Systeme AG Download THEO online Windows Internei Explorer e GED TESE selle Cd Datei Bearbeiten Ansicht Favoriten Extras Y gt gt 45 Favoriten J Photo Mess Systeme AG Download THEO online m E i Seite Sicherheit Extras i a A A Pa GE p S FA ui 7 Deutsche Version lt PHOTO MESS SYSTEME e Tachymetry Hardware Download 2 ELCOVISION 10 me TH EO on ine ELCOVISION 10 Targets ELCOVISION ELSP Light Download THEO online is a program to operate a Leica total station at any seria Windows 2000 NT XP Vista 7 32 and 64 Bit operated PC or kotebd DISTO online PE measurements are automatically formatted and transmitted into any THEO online each measurement of your Leica total station directly into anw WWindo THEO cadtools LLCOVISTON 10 Lens Distortion Product Descriptions as PDF 4 T message tere Speidar Teol AutoCAD cadwork Leica Instrument Z THEO online Send your serial number to theoonlineDelcovision com and you will receive a temporary code valid for 2 days The software can be purchased directly on Elcovision s website 1 2 Abotron GEV189 USB cable driver installation Insert the installation CD provided with the cable and folow instructions USB Download Cable GEV189 Note that the most current driver can
13. nate YCoord The measured Y coordinate YUnit The unit of the Y coordinate y co Total station manual Execute CDM for the ist time Options Communication parameters 4 Construction Data Manager File Edit Im Export Optfns Tools Upload to Instrument Download from nstrument Point ID j East North hu Select instrument type and Connection ES E Builder 300 Serie Select the Instrument and the connection type strument Builder 300 senes Serial cable sd Serial Cable Va USB Cable A E NewFile Settings like total station or THEO online Figure 7B page 9 is Adjust communication Settings Le Es i SeriaNCommunicafions sq ontroll your settings CON Parameters Port comu gt Baud Rate 57600 Parry None Natahate R Datahite Stosz ts ob rs Connection status Ea Cancel lt Back OK Connext on successful A Total station manual 2 Set up control line 2 1 Total station installation Assemble the total station with the tripod and center the bubble Press the red power button for 3 seconds Adjust the electronic bubble Figure 1 once the 3 boxes are checked press OK Figure 1 Select the DATA menu Page key Select JOB Function key Select NEW Right function key Type a new name using navigation keys
14. nternal memory Theo config Installation Setup look at points 2 1 2 3 Now all points that are measured are stored in the total station 6 2 Export measured points on the PC Execute the Construction Data Manager Figure 20 4 Construction Data Manager mil as Figure 20 File Edit Im Export Options Tools East bath Height Descriptor f 0 Pick up a Job for Download o amp 8 JobName FixPaint MeasBlock 1 0 20 2 E 4 DEFAULT 0 1 Y E Z 0 58 4 leci Insert point at the end NewFile Connection Seria Unit Metre Click on Download from instrument Wait until a window with all jobs stored pops up Click on number 61 Figure 20 in order to load points measured in Job 9 Wait until points are loaded Figure 21 6 3 Export values in a text file 4 Construction Data Manager e File Edit Im Export Options Tools Fi gu re 2 1 Upload to Instrument Data Viewer Height Descriptor NewFile changed Connection Sera Unit Metre Make all measures in the internal memory Or unplug the USB cable from the PC Total station manual No X YZ Order of values For nodes name Number Click on Im Export Export TXT File a window pops up and a file name can be entered Continue by clicking on Save 19 Total station manual 6 4 Import points in Cadwork Open a cadwork 2d file Add File Terrain points No X Y Z Add Node Glo
15. p by step The combination of keys Measure amp Record can be used with the reflector for points that are inaccessible When a corner of a building has to be measured for instance Select PROG with the Page key Parameters should be Config lt Measure amp Record MEAS REC gt See figure 18 Step 1 position the reflector at the same distance from the instrument as the corner of the building to be measured The distance from the total station to the corner of the building should however be the same to the reflector Press function key MEASURE to measure distance Step 2 adjust the angle and save it with RECORD The saved result is a distance Step 1 and the angle Step 2 Adjust height Corner unavilable Adjust angle ane Step 2 shoot the virtual point a and press RECORD this way the distance Step 1 and the Step 1 measure the distance direction Step 2 will be sent to MEASURE Cadwork or saved in the total station internal memory Figure 18 CONFIG THEO PROG DATA soma semag AL To measure hidden points Beep Off Step 1 distance Step 2 Auto Off Enable bp direction height rotation Measure amp Record MEAS REC Set on MEAS REC 6 0 Measure without PC 6 1 Save measure in internal memory Figure 19 THEO online1 08 Em Send String XCoordffReturnffYCoordffRaturntfZCoordffReturn New Point Number li ine Transmit Points MV Use i
16. unction key in the PROG menu 2 Select Height Navigation keys Figure 3 confirm with OK 3 Select hr reflector heigh Navigation keys 4 Type value 0 1 m or depending on the configuration 0 4 0 7 1 0 1 3 m 5 Confirm with OK 6 You now see the chosen height confirm again with OK hr 100mm 0 1m 11 Total station manual 3 Offset total station location 3 1 Total station new location When measuring buildings interior and exterior the total station should be moved on several occasions How to do this The following describes how to do it To save points assciated with the internal memory the Use internal memory box should be checked Figure 8 Figure 8 E THEO online 1 08 Send String R XCoord Roturn YCooryYfRoturn 2Coord Roturn Ea The name of the point can be typed here and then APO raros be sent to the total station using the button q e internal memory Theo config Now mark 2 points on the building Reference points using positionning items or while doing the layout during the raising and make sure they are visible Write also the names of the points on the building Using the navigation keys you can modify the name of the points on the total station Figure 9 or on THEO online Figure 8 Measure the 2 points Example V0001 V0002 Both points should be saved in the internal memory To load the 2 reference points in Cadwork also called sec
17. urity points press F2 on the PC to Add total station node 3D select a color and measur points again Attention The Use internal memory box should be unchecked Assign the same names in Cadwork 3D as in the building and the total station It highly recommended depending on the situation of the building site to use more than 2 points Figure 9 Next point to be measured CONFIG THEO As Built Pt PT0004 Line 6 137 m Offs 1 474 m H Coordinates of the last point measured 12 Total station manual 3 2 Set up using known points Relocate the total station to its new location center the bubble Like in point 2 1 Installation Select PROG Page key Select SETUP Function key Select Coordinates Navigation keys Figure 10 confirm with OK Select Anywhere Navigation keys and confirm with OK Figure 10 CONFIG THEO DATA Control line Coordinates Height Do not edit hi Instrument height hr reflector height see Point 2 4 press ok to continue Select the 1st reference point Navigation keys and confirm with OK Measure the ist point VOOO1 while shooting the point on the reference surface Select the second reference point Navigationkeys and confirm with OK Measure the 2nd point the same way V0002 On the Plausibility Check you see the difference between the 2 measures If its within the toleranc
18. x AS 1 and choose a location where to save it Default location is the current folder Select a color to export nodes Type a starting number for the nodes numbering ex migg2 In 3D select all points that have to be exported using the left click exit the function by right click A text file apears txt on the display see figure 13 migg2 txt Editor Figure 13 Datei Bearbeiten Format Ansicht migg2 txt migg2 txt IL 2 3 4 5 6 8 migg2 txt migg2 txt Once the text file is open it can be edited and modified ex Nodes number Leica F oe M pata double click gt Execute Construction Data Manager CDM Figure 14 Mar ager Coordinates order East North In CDM click on Options Settings and make sure values for Settings oa ea coordinates and units are set the same as in Cadwork Coordina mM Unit East North C Millimetre Coordinates East North X Y and unit metre North East Metre Line Offset Metre International Feet decimal W Height US Inch 1 16 MW Descriptor C US Inch decimal C US Feet Inch 1 16 US Feet decimal core Figure 14 4 0 Construction Data Manager o 1 0 mos File Edit Im Export Options Tools Import 3 CSV File Export gt Lorrie d front Instrument E DXF File Point 1D North Height Descriptor To import the text file data click on Import TXT File and select your file j

Download Pdf Manuals

image

Related Search

Related Contents

取扱説明書 - 三菱電機  Manhattan 190039 notebook cooling pad  M-Cab 7070009    Peau chamoisée 3M™ Scotch  MANUEL D`UTILISATION ET D`ENTRETIEN  Mode d`emploi  Manual de usuario Descarga archivo pdf  

Copyright © All rights reserved.
Failed to retrieve file