Home

TT:CU - Geocomp

image

Contents

1. Calibrate gt Summary 3 Overwrite the Offset value for the load cell with the analog reading value right hand text field from step one Click on the Apply and Ok buttons You should now see in the System Monitor that the vertical load cell is at or very nearly zero NS m Note This zeroing process can be applied to other sensors such as a pressure transducer 3 Q After running a successful test we ran into troubles with the report We were not able to generate a report because all links on the report pull down menu are inactive Are we missing something or is the software not entirely installed Geocomp Corporation 125 Nagog Park Acton MA 01720 Tel 978 635 0012 Fax 978 635 0266 TRIAXIAL CONSOLIDATED UNDRAINED TESTING 2013 Geocomp Corp A Once a test is finished or even while it is running go to the File menu 1 Click on Load this will load the test data on the open window on the desktop 2 Go back to Report You should see now the Graph Settings and Edit menus all activated 3 You can change units and scales and edit the test data points 4 Remember that every time you change or edit something you will need to save the file and load it again 4 Q During the test a controller error message appears on the screen telling me that a limit switch is on what should I do A You will probably need to reposition the LoadTrac ll crossbar so that the platen s motion is in the middle of its rang
2. to start the test A To fix this error you will need to raise both the LoadTrac ll crossbar and platen Lock the piston then raise the crossbar several inches Raise the platen until the displacement sensor reads about 20000 counts Position the crossbar so that the load cell is just above the piston Go through the procedure for starting a test as described in your user s manual It is not a good practice to start a test with the displacement sensor close to its limit You should always start beyond the lower 10 range 20 Q We collected too many data points is there a way to delete some A Yes To delete data go through the following steps 1 Bring down the Report menu 2 Select Edit 3 Select the rows of data you wish to delete by putting the cursor on the first row to be deleted left clicking and then dragging the cursor down to the last row to be deleted 4 Right click on the selected rows You should see a small window with the choices Delete and Insert 5 Click Delete The highlighted rows will be deleted 6 Use Save As to save the file with a new name Always keep the original test file intact 21 Q In the Report Settings window on the General tab page there is a phase computation option What is phase computation What is the purpose of changing this option A The phase computation can be accomplished based on either Geocomp Corporation 125 Nagog Park Acton MA 01720 Tel 978 635 0012 Fax 978 635
3. 0266 TRIAXIAL CONSOLIDATED UNDRAINED TESTING 2013 Geocomp Corp 1 Initial moisture content or 2 Final moisture content and all other parameters back calculated with the volume changes that occurred during the different phases of the test The default is initial moisture content and should be used unless for whatever reason there are suspicions that the initial moisture determination is not reliable 22 Q Why is there a difference between the specified and the applied displacement rate A The difference between the specified displacement rate and the applied one may be due to any of the following 1 Wrong displacement calibration factor Should be around 5x10 5 in count 2 Wrong step factor Should be about 2 1x10 6 in step under Options Hardware Step multiplier 3 Polarity of the displacement sensor Should be unipolar for Novotecnik sensor with square cross section Geocomp Corporation 125 Nagog Park Acton MA 01720 Tel 978 635 0012 Fax 978 635 0266
4. load frame It appears to give readings roughly one half the actual distances double checked that the calibration factor in cnt from the certificate you gave us is in both the load frame and the software factor 3 6498841x10 5 Does this factor seem to be off by a factor of two based on the other similar sensors you have calibrated A The calibration factor is correct The problem you describe can be caused by an incorrect setting for the polarity of the displacement sensor It has to be Unipolar not Bipolar Use the keypad and LoadTrac II LCD see illustration below to make the change as described in the following steps LoadTrac II Rev xx xx xxx 1 Monitor 4 Setup 2 Position 3 Control Use the arrow keys to select option 4 Setup on the main menu LCD screen From the Setup options select option 3 A D Setup From the A D Setup options select option 2 Channel 2 From the Channel 2 options select option 2 Polarity Of the two polarity options select Unipolar Finally turn off LoadTrac ll and then turn it back on for the changes to take effect OY OY On 14 Q Can I use a new calibration factor and apply it to the previous test have already run and get the correct results A Yes you can Open the TT CU program and load the file for the test you had already run You will need to replace the calibration parameters factor and offset that are shown on the Calibration Summary with the new ones There a
5. A and B You plan to run atest on unit A A file for a test run on unit B is a good template for the test but the calibration parameters in it are those for the sensors on unit B You open an ICONP control window and load that file into the window We will call that file Test B Next you open a second ICONP control window and load into it a file for a test that was run on unit A We will call that file Test A Finally you copy the calibration parameters from the Calibration Summary in Test A and paste them into the Calibration Summary in Test A You now have a control program that contains the correct calibration parameters for running a test on unit A but those shown on the Calibration Summary will be different from those on the individual sensor Calibrate windows The parameters are not correct You have two LoadTrac ll units A and B You plan to run atest on unit A A file for a test run on unit B is a good template for the test but the calibration parameters in it are those for the sensors on unit B You open an ICONP control window and load that file into the window We will call that file Test B You decide to calibrate the sensors and use Test B to do it You go through the calibration procedure for each sensor and click the Calibrate button on each Calibrate window But you forget to click the Save button on each window before closing it You now have a control program that has the correct calibration parameters on each Calibrate
6. C instead of the network communication card that we provided Please unplug the cable and plug it into the card The LEDs should now glow a steady green 17 Q How can I print my tables and graphs at the end of the test A To print the table or graph for a completed test follow these steps re Bring down the Report menu Select Table or Graph Click on View at the upper left corner of the window that opens see illustration below then select print wT Next Page Previous Page Print Close 18 Q What are the effects and correlations between the PID values Geocomp Corporation 125 Nagog Park Acton MA 01720 Tel 978 635 0012 Fax 978 635 0266 TRIAXIAL CONSOLIDATED UNDRAINED TESTING 2013 Geocomp Corp A Effects of each of controllers P Gain D Gain and Gain on a closed loop system are summarized in the table shown below CL RESPONSE RISE TIME OVERSHOOT SETTLING TIME S S ERROR P Gain Decrease Increase Small Change Decrease _ D Gain Small Change Decrease Decrease Small Change Note that these correlations may not be exactly accurate because P and Dare dependent of each other In fact changing one of these variables can change the effect of the other two For this reason the table should only be used as a reference when you are determining the values for P and D 19 Q At the start of the test received an error message that the displacement is too low count reading is 6 7
7. TRIAXIAL CONSOLIDATED UNDRAINED TESTING 2013 Geocomp Corp Frequently Asked Questions 1 Q There is no communication between the LoadTrac Il and the PC What is going on A Check the Node IDs LoadTrac ll LoadTrac II Rev XX XX XXX 1D 65 1 Monitor 4 Setup 2 Position 3 Control In the TT CU software under Options gt Hardware gt Setup the Node ID must match the one displayed on the LoadTrac ll control panel shown above Note that the Node ID is the default value If you had set the node ID to a different value because you were controlling more than one LoadTrac ll unit with your computer and then inadvertently pressed the Esc Key at the beginning of a reboot the node ID would have reverted to the default value of 65 2 Q When I view the system before starting the test there are always about 0 005 kN 1 Ib load fluctuations Why There is no contact between the vertical load cell and specimen so why is there a small fluctuation in the load and how can I make it zero A There is always going to be a small load fluctuation of about 0 025 of load cell full capacity which translates into about 0 1 Ib not 1 lb You will need to zero the load cell To do so go through the following steps 1 Open the System Monitor window View gt System and record the analog reading of the load cell when it is at the no load condition when the load cell is not in contact with anything Open the Calibrate Summary window
8. alue shown on the System Monitor screen different from the one shown in the Test Monitor screen A In all Geocomp software the displacement reading is automatically zeroed at the start of atest Therefore the offset value in the calibration summary for the LVDTs is irrelevant Also as a result the System Monitor non zeroed value will show a different value for the displacement from the Test Monitor zeroed value That is normal and expected The reported value should match the Test Monitor value unless further corrections such as machine compressibility are involved 12 Q How do you delete a bad point at the completion of a test A First find out if it is really a bad data point due to an electrical power surge or any other cause If such is the case follow these steps Bring down the Report menu Select Edit Locate the bad point Use the mouse to position the cursor in the first column of the row that you wish to delete Right click on the mouse You should see a small window with the choices Delete and Insert Click Delete The row with the bad point will be deleted Use Save As to save the file with a new name U e wm ND Geocomp Corporation 125 Nagog Park Acton MA 01720 Tel 978 635 0012 Fax 978 635 0266 TRIAXIAL CONSOLIDATED UNDRAINED TESTING 2013 Geocomp Corp Always keep the original test file intact 13 Q used our calibrated gauge blocks to check our displacement sensor on the
9. e It can happen that the platen starts too high up and the upper limit switch is triggered as the test proceeds If this has happened you will see the upper limit switch red LED flashing Follow the steps given below Bring down the View menu and click System to display the System Monitor window Record the Load reading Lock the piston Using the keypad on the LoadTrac ll unit move the platen down Reposition the crossbar to a lower level When you have locked the crossbar at its new position reapply the load from before the error message Unlock the piston Click the Retry button Ov Ul Oo om 5 Q We have a UC test running and an error message that reads Load reading of 65528 is out of range popped up Why does this show up and how do we prevent it A When you receive an error message stating Load reading of 65528 is out of range it means that the load cell sensor has maxed out Your sample strength is stronger than the Capacity of the load cell You will have to use a higher capacity load cell for the type of soil that you are testing The action you need to take depends on how much the sample has strained If the strain is a lot less than strain at failure which depends on the soil type you could restart the test with a higher capacity load cell Be sure that you enter the correct calibration factors for the new load cell If the strain is close to strain at failure you may have to test another sample of the
10. e minimum value or 65535 the maximum value 5 Any unit LoadTrac ll or FlowTrac ll that is not on 10 Q I am running a test Do I need to wait until the end of the test to see the results A You do not need to wait until the end of the test While the test is running 1 Bring down the File menu 2 Select Load to bring the current data into the control program 3 Go tothe Report menu You should now be able to see the partial data up to the point when you did the Load 4 Repeat the above steps as the test progresses Geocomp Corporation 125 Nagog Park Acton MA 01720 Tel 978 635 0012 Fax 978 635 0266 TRIAXIAL CONSOLIDATED UNDRAINED TESTING 2013 Geocomp Corp 11 Q In many of our different test files the calibration values in the Summary Table and the values in each sensor s individual calibration table are not in sync Could you please explain which values the program uses and how to make sure they are correct A When running a test the ICONP software uses only the parameters that are shown in the Calibration Summary A mismatch between these values and those on the Calibrate window for a particular sensor can occur if the Calibrate window values have not been saved by clicking the Save button on that window To determine whether or not the Summary values are correct you need to know how the test was set up The two possibilities are described below The parameters are correct You have two LoadTrac ll units
11. lues set at the factory A The default values may change either after an electrical power problem such a power surge or brown out or due to inadvertent actions by an inexperienced end user You will need to revert back to the internal default values of your system by following these steps 1 Turn off the LoadTrac ll unit 2 Wait about 10 sec 3 Turn it back on and immediately press the ESC key on the keypad to reset everything back to the imbedded controller default values 4 Now go to your LoadTrac ll hardware manual In Section 2 1 4 Setup of the manual you will find a table of default settings for your system Go through each LCD menu and be sure the settings on the menu agree with those in the table If a setting does not agree change it to the one in the manual 5 If the Node ID number on your unit was changed because you are controlling more than one system with your computer set it to the value it was changed to The default value for LoadTrac ll is 65 9 Q Can the software detect wrong values that are manually entered by the end user A Yes the software program detects any erroneous data entry Examples include 1 Negative values for sample dimensions calibration factors and PID control parameters 2 Zero values for sample dimensions calibration factors except for offset value and PID control parameters 3 Wrong Node ID number 4 A malfunctioning sensor that it is giving an analog reading of either 0 th
12. re two ways to do this 1 delete the original values and type the new ones into the text fields or 2 copy and paste the new ones For the second option you will need to open a second copy of ICONP and load the test file that contains the new calibration parameters Save using the Save or Save As option in the TT CU file menu the altered test file When you load that file again the new parameters will have been applied to the processed data Note The raw data and the results of data reduction shown on the report pages will be changed The values you have entered on the Property Pages will not be changed Geocomp Corporation 125 Nagog Park Acton MA 01720 Tel 978 635 0012 Fax 978 635 0266 TRIAXIAL CONSOLIDATED UNDRAINED TESTING 2013 Geocomp Corp 15 Q Is it possible to view the data and graphs while a test is in progress A Yes Go through the following steps while the test is running 1 Bring down the File menu 2 Select Load to bring the current data into the control program 3 Goto the Report menu You should now be able to see the partial data up to the point when you did the Load 4 Repeat the above steps as the test progresses 16 Q The Network LEDs are RED on the front panel and there is no communication between the PC and the frame All of our ID numbers are correct What else should we check A The network communication cable gray cable must be plugged into the Ethernet plug on the back of the P
13. s on the PC screen Assuming that your calibration factors on the Pd are correct or that you have just finished a new calibration you will need to update the calibration parameters on the embedded controller of the LoadTrac lIl unit Going through the following steps will synchronize the engineering readings on the LCD with the PC screen 1 Click Calibrate to bring down the Calibrate menu we TT CU File View Run Calibrate Control Report Options Help moet spon MEE Load Displacement Project Numb Sample Pressure 2 Click the Summary option to open the Calibration Summary window Read Table Test Par Calibration Summary Come Factor 2 7435105e 002 Ib cnt Offset 32778 cnts Date Set 03 AUG 2013 12 07 04 Lio _cercet_ Download _ aov Her 3 Click the Download button This will automatically transfer copy and save the current calibration parameters Factor and Offset into the embedded controller 4 Repeat the above procedure for the other sensors Geocomp Corporation 125 Nagog Park Acton MA 01720 Tel 978 635 0012 Fax 978 635 0266 TRIAXIAL CONSOLIDATED UNDRAINED TESTING 2013 Geocomp Corp You should now see that the PC and LCD screen values match 8 Q After an electrical power problem it seems that the system is not working properly We suspect that the set up values on the embedded controller are not correct How do we revert to the original set up values or default va
14. same material with a higher capacity load cell 6 Q We have several units connected to the same PC We were running only one of the units so we shut off the remaining units Then we got an error message stating that the Geocomp Corporation 125 Nagog Park Acton MA 01720 Tel 978 635 0012 Fax 978 635 0266 TRIAXIAL CONSOLIDATED UNDRAINED TESTING 2013 Geocomp Corp unit was not responding It seems that we lost communication with the unit What is happening A A temporary loss of communication is normal thing you either shut off or boot up another unit connected to the same network Any time a unit connected to the network is powered down or powered up the network goes into a re configuration mode during which no communication is allowed Depending on how many other units are on this process may take some time If you re lucky the Windows software will miss it If you re not so lucky you get the LoadTrac not responding message All you have to do is hit the Retry button and you should be all set 7 Q I noticed that the engineering readings on the LCD screen are different than the ones on the PC screen Are they supposed to be the same Did it affect the results of a test I just ran A First of all be assured that the mismatch of the engineering readings values between the LCD and the PC screens will not affect the results of any test that you have run through the PC software program The test is governed by only the value
15. window and they will be different from those in the Calibration Summary However it is the incorrect Summary values that will be used to run the test If you know or suspect that a test was run using a file with incorrect calibration parameters on the Summary window you can recover from the error Error Recovery Geocomp Corporation 125 Nagog Park Acton MA 01720 Tel 978 635 0012 Fax 978 635 0266 TRIAXIAL CONSOLIDATED UNDRAINED TESTING 2013 Geocomp Corp Open an ICONP control window and load the erroneous test file into it You will need to replace the calibration parameters factor and offset that are shown on the Calibration Summary with correct ones If you are certain that the parameters on the individual Calibrate windows are correct simply click Save on each of those windows If you will have to enter new values manually there are two ways to do this 1 delete the original values and type the new ones into the text fields or 2 copy and paste the new ones For the second option you will need to open a second copy of ICONP and load the test file that contains the correct calibration parameters Finally save the file and reload it The new values will be applied to the processed data Note The raw data and the results of data reduction shown on the report pages will be changed The stress target values that were entered into the Consolidation Table page will not be changed 11 Q Why is the displacement v

Download Pdf Manuals

image

Related Search

Related Contents

Hitachi NR90AA Nail Gun User Manual  Chalet bois en Kit Tao : 70m² - maison bois en kit, Chalet bois en kit  EnGenius EPE-5818af  User manual  裸族のお立ち台 DJクローンプラス USB3.0 & eSATA  Manuale di Installatore ecoflam Condensazione  三脚セット RA-121 / 三脚用雲台セット RA  ROTULO CLASSIC VERSO  i-MRA-User-Manual-REV_E-09.06-14 - Hamilton  Philips PL-L User's Manual  

Copyright © All rights reserved.
Failed to retrieve file