Home
FEB-24ED Combination Boiler User Manual
Contents
1. 9 fo 1 4 GENERAL INSTALLATION REQUIREMENTS 4 1 RECOMMENDATIONS FOR THE USER This appliance must be installed adjusted or adapt ed for use with another type of gas only by a quali fied and competent person Its quality and a correct installation will ensure that your heater works properly GAS SAFETY INSTALLATION AND USE REGU LATIONS 1998 As amended It is the law that all gas appliances must be installed by a registered person in accordance with the above regulations Failure to install appliances correctly may lead to prosecution Itis in your own interest and that of safety to ensure that the law is complied with In addition to the above regulations this appliance must be installed in accordance with the current IEE Wiring regulations Heath and Safety Document No 635 The Electricity at Work Regulations It should also be in accordance with the relevant rec ommendations in the current editions of all relevant National Standards Your particular attention is drawn to the following standards relevant to an installation in Leisure Accommodation Vehicles BS 5482 part 2 Installations in caravans and non permanent dwellings BS 5482 Part 3 Installations in Boats BSEN721 Leisure accommodation vehicles ventila tion requirements BSEN 1949 Installation of LPG System for Habitational Purposes in Leisure Accommodation Vehicles IMPORTANT Manufa
2. Caution The boiler can produce water at over 70 C when in central heating mode If you run a hot tap when the boiler has been heating the radiators the initial flow through the hot tap could be very hot DO NOT PLACE YOUR HANDS under the tap or use the shower until this initial flow has passed Allow time 30 seconds for the temperature to stabilise after making an adjustment at the tap before making further adjustments APPLIANCE SAFETY LOCK OUT Whenever a malfunction is detected in the boiler the boiler switches off automatical gc ly and the red LED lock out indicator lights up along with the digital display see P19 To reset the boiler turn the left main control knob 3 to the position and go back to the chosen position Some lockout sequences require the sensors to cool to with in normal operating temperatures before the boiler will reset The red indicator light should go out IMPORTANT Whenever the boiler has been left idle for any length of e time or when a new gas bottle is installed propane models the appliance may Switch off due to the presence of air in the pipes In cases such as these repeat the ignition operation until all of the air has been purged from the system FROST PROTECTION Providing the boiler power supply and gas supply is connected the boiler will automatically fire on minimum when near freezing conditions are detected When the temperature in the system reaches 20 C it will Switch off For
3. The temperature of the hot water is governed by both the ambient temperature of the cold water supply and its flow rate through the boiler I E at a flow rate of 10 0L min there will be a maximum rise of 35 C above ambient At a flow rate of 6 8L min there will be a rise of 50 C above ambient the slower the flow rate the greater the temperature rise The flow rate of the hot water is controlled by the hot outlet tap The temperature selector on the boiler is effective only when there is either a low water flow rate or a high ambient water temperature The boiler can theoretically supply more than one outlet simultaneously However in practice the tap which is nearest will receive the most hot water If the shower is in use and a kitchen tap is opened virtually all the hot water will be diverted to the kitchen as it offers the least resistance f an outlet is too restrictive it will slow down the flow rate and increase the temperature For example the shower ensure the head is free from blockages caused by scale Due to the restrictive nature of simple mixer showers it is wise to turn the temperature selector down on the boiler before using the shower If a tap or shower head is too restrictive due to a fault or blockage the flow rate will be reduced to below the rate at which the boiler is able to modulate resulting in a wide swing in temperatures Either fix the restriction or turn the temperature selector on the boiler down
4. such as other flues etc with the exception of doors but not the opening windows thereof The minimum acceptable dimensions from the ter minal to obstructions and ventilation openings is as follows Directly below an opening fixed vent windows etc Adjacent to an opening fixed vent windows etc 300mm 75mm 200mm 75mm 300mm 1500mm Below gutters Below eaves From a vertical drain pipe or soil pipe From an internal or external corner Vertically from a terminal on the same wall Horizontally from a terminal on the 300mm same wall Where the terminal is fitted in a position to which children the elderly or disabled people have access less than 1 5m above steps decking or ground a suitable terminal guard should be fitted In certain weather conditions the terminal may emit a plume of steam 4 4 MINIMUM CLEARANCES Minimum clearances of 5mm to the front and sides of the boiler must be observed However full access from the front in the form of an opening door must be given to allow access to the controls and for serv icing 200mm above the top of the boiler case is required for the flue assembly 150mm is required below the boiler to allow easy access to the gas isolation cock 4 4 VENTILATION REQUIREMENTS The following notes are for general guidance The Morco FEB 24ED is a room sealed appliance and needs no purpose provided combustion air ven tilation f the boiler is to be bui
5. than 13 mm 1 2 in to the top of the bath 14 5 INSTALLATION INSTRUCTIONS 5 1 BOILER PACKAGING The boilers are supplied in different packagings Boiler Flue system separate packaging 5 2 FITTING THE BOILER Decide where the boiler is to be fixed on the wall taking into account the installation requirements detailed in section 4 2 and the clearances and dimen sions described in the the technical data The centres for the hanging strap fixing are 85mm below the top of the boiler casing see fig below The flue pipe centre is 213mm above the hanging strap centres NOTE a fall of about 2 3 should be allowed on the flue pipe to stop water ingress into the boiler A screw fixing should be made on the bottom rail of the boiler to secure it during transport LT AS 5 3 WIRING INSTRUCTIONS Warning observe the usual precautions to ensure that the electricity supply is isolated before com mencing any installation or service work The appliance is fitted with a 3 amp fused 3 pin plug for use with 230 V 50Hz It should be fitted to a shuttered socket outlet complying with BS 1363 WARNING THIS APPLIANCE MUST BE EARTHED ROOM THERMOSTAT This appliance may be used in conjunction with an external room thermostat The voltage between the contacts of the room ther mostat is 24V normally closed Any 24V controls may be used but gold contac
6. INSTRUCTIONS 7 ROUTINE SERVING INSTRUCTIONS 8 TROUBLESHOOTING 9 FAULT CODE TABLE 10 WARRANTY CONDITIONS 10 11 15 17 18 19 20 20 1 USERS INSTRUCTIONS GAS SAFETY INSTALLATION AND USE REGULATIONS 1998 AS AMENDED It is the law that all gas appliances are installed by a registered person in accordance with the above regu lations Failure to install appliances correctly could lead to prosecution It is in your own interest and that of safety to ensure that the law is complied with Read these instructions carefully before attempting to operate the appliance Comply with all applicable warn ings Do not interfere with any sealed components and use the appliance only in accordance with these instructions INTRODUCTION The Fagor FEB 24ED is wall hung room sealed fan assisted microprocessor controlled fully modulating gas combination boiler for providing both central heating and domestic hot water SUPER compact FEB 24ED 1 Pressure gauge 5 Orange light Burner on 2 Heating service and heating temperature selector 6 Red light lock out 3 Main control reset and D H W temperature selector 7 Display between both knobs 4 Clock DOMESTIC HOT WATER SERVICE Turn the left knob 3 in order to turn the boiler on The display will show On indicating that the boiler is ready to supply Domestic Hot Water DHW whenever there is demand
7. must be copper If the appliance is installed in an area where the temporary hardness of the water supply is high say D H W Performance graph 60 C 7 55 l min o e u A B u E 2 o a 4 2 3 4 5 6 7 8 9 10 11 12 13 14 FLOW D H W l min COLD WATER INLET TEMPERATURE 15 C over 150 ppm the fitting of an in line scale inhibitor may be an advantage Devices capable of preventing the flow of expan sion water e g non return valves and or loose jumpered stop cocks should not be fitted unless sep arate arrangements are made for expansion water If a non return valve is fitted in the incoming water supply e g in line with scale inhibitor then a D H W expansion vessel MUST be obtained and fitted For specific information relating to fittings exam ple Shower washing machines etc suitable for connection in the D H W circuit consult the Local Water Undertaking however the following informa tion is given for guidance Domestic hot cold water supply taps and mixing taps All equipment designed for use at mains water pressure is suitable Showers Any mains pressure shower is suitable but if the unit has a loose head which may become immersed in bath water either an anti syphonage device must be fitted or the length of the flexible hose must be reduced so that it cannot fall closer
8. only a limited protection to the boiler pipework and hot and cold pipework inside the holiday home The heating circuit and radiators should contain the correct level of antifreeze to prevent damage during freezing conditions and should not be drained down For the frost feature to work the gas supply must be left on and the electrical power supply wall socket must be connected and switched on the central heating control knob on the boiler must be in the off position Do not rely on the boiler frost protection to prevent freezing of the hot and cold water pipes including those inside the boiler during severe frost conditions it will not ALL FROST DAMAGE IS OUTSIDE OF THE WARRANTY 2 GENERAL SPECIFICATIONS The Fagor FEB 24ED is a wall hung room sealed fan assisted microprocessor controlled fully modu lating gas combination boiler for providing both cen tral heating and domestic hot water It is particularly suitable for Caravan Holiday Home and Park Home use Maximum heat output in either heating or hot water mode is 23 7 kW 80 840 Btu h and priority is always given to the supply of hot water NOTE The central Heating power is factory set at 70 of its maximum The appliance flue is supplied seperately with a con centric air flue duct and wall terminal however addi tional extension kits vertical flue kit are available as optional extras The appliance is intended for use with sealed central heating systems and
9. winter storage see notes at the end of this section NOTE It is still necessary to drain the domestic hot and cold water system ANTI PUMP SEIZURE DEVICE When central heating is not being used but the boiler is in the summer setting for domestic hot water only the pump will automatically run for 30 seconds every 23 hours to prevent it seizing If the appliance has been shut down with the electrical supply switched off for a period this device will not work The pump may be found to have jammed when the appliance is switched back on If so consult your installer or service engi neer NOTE Seized pumps are not covered under warranty PRESSURE GAUGE The pressure gauge should indicate approximately between 0 8 and 1 6 bar If the pressure is seen to decrease over a period of time there is a water leak on the central heating system The boiler is fitted with a safety device to prevent it working below a pressure of 0 8 bar ROUTINE SERVICING To ensure continued safe and efficient operation of the appliance it is recommended that it is checked and serviced as necessary at regular intervals The frequency of servicing will depend upon the particular instal lation conditions and usage but in general once a year should be regarded as a minimum even if only occa sional usage has occurred It is the law that any service work MUST be carried out by a competant gas registered engineer SAFETY It is essential that these instructions are
10. AIL sales morcoproducts co uk WEBSITE www morcoproducts co uk 20 30 11 09 N51J043F3 C451J4304
11. FEB 24ED SUPERCOMPACT USER INSTRUCTIONS AND TECHNICAL INSTRUCTIONS o 4 O BOILER OUTPUT To Domestic Hot Water Minimum 7 6 KW 25 932 26 Btu h EC TYPE EXAMINATION CERTIFICATE Maximum 23 7 KW 80 867 71 Btu h PINOO99BN794 To Central Heating Minimum 7 6 kW 25 932 26 Btu h Maximum 23 7 kW 80 867 71 Btu h 29 Morco House Riverview Road Beverley East Yorkshire HU17 OLD uy ras 5 Morco Products Ltd Tel 01482 325456 Fax 01482 212869 WEBSITE www morcoproducts co uk N Ceraticado Certificate a pe of Boiler TRADE MARK FAGOR FE 24E hot water Fu MORCO Mural Wall hung Mural Wall iung AENO Asociaci n Espafiola de Normalizaci n y Certificaci n CERTIFICADO DE EXAMEN C DE TIPO EC TYPE EXAMINATION CERTIFICATE Certificado a BO SAN ANDRES 18 20500 MONDRAGON Guipuzcoa ESPANA Licensee Como consecuencia de la aplicaci n del art culo 1 del anexo de la Directiva 90 396 CEE se ha ensayado una muestra del producto y ha resultado conforme con las exigencias esenciales de la Directiva Este certificado de conformidad no implica valoraci n del conjunto de los productos fabricados Este certificado ha sido extendido por un organismo notificado a los Estados Miembros y a la Comisi n de las Comunidades Europeas de acuerdo con las disposiciones del art culo 9 de la Directiva sobre los aparatos de gas 90 396 CEE R ELECTROD
12. HANGER INSPECTION AND CLEANING The front of the sealed air box must first be removed 8 screws and care should be taken to avoid dam aging the seal The combustion chamber cover can then be removed 6 screws and gas connections taking care not to damage the delicate insulation material inside Inspect the burner and heat exchanger fins for debris and soot Check also for rubbish below the burner IGNITION AND DETECTION ELEC TRODES With the combustion chamber cover removed check the condition of the electrodes for any sign of wear or damage WATER CIRCUIT CHECKS Inspect the pipe work inside the boiler for leaks Check that the pressure in the system is correct 0 8 to 1 6 bar rises Finally check the filters which is situated in the cold water inlet pipe BURNER PRESSURE This is factory set but should you suspect a problem proceed as follows There is an easily accessible burner pressure nipple on the gas feed pipe between the burner and the modulating gas valve The burner pressure nipple should give a reading of 35 mbar when the boiler is at full power on D H W mode Remove the main cable plug to the gas valve to get a minimum burner pressure reading which should be 4 4 mbar N B There is a logic program built into the central heating enabling it to detect when it is connected to a small system This may pre vent the burner from firing on full max press so ensure burner pressure is only tested in DHW mode F
13. INAL CHECKS Turn all the controls to their max position so that the appliance begins to function Check for gas leaks using a suitable detector Check the boiler functions correctly in both central heating and domestic hot water modes The green light will start flashing when the boiler is firing in either mode Check the amber LED iluminates when a flame is detected in either central heating or domes tic hot water modes Check the correct operation of the gauge The pres sure should increase slightly as the temperature 8 TROUBLESHOOTING COMMON PROBLEMS 1 Hot water temperature at the taps will be reduced as the temperature of the mains cold water supply is colder during the winter period 2 The gas supply to the boiler has run out or is about to run out near empty propane gas bottles will supply enough gas to run low power appliances such as cookers and gas fires but will fail to supply high powered appliances such as the combination boiler 3 During busy periods the mains cold water supply to the boiler may be subjected to variations in pressure this will result in fluctuations in the hot water temperature at the hot water outlet 4 If the mains power supply to the boiler has been interrupted or turned off then the time clock on the boil er must be reset to the correct time if the boiler is to be operated in the timed sequence in central heating mode The FEB 24ED has a self diagnostic system built into its printed circ
14. OMESTICOS S COOP Pg 1 A01 S000 As result of applying the article 1 of the Annex of the 90 396 EEC Directive a sample of the product has been tested and considered in accordance with the essential requirements of the Directive conformity does not imply the assessment of all the products manufactured This certificate has been issued by a notified body ta the Member States and the European Community Commission according to the article 9 of the Gas appliances Directive This certificate of 12H3 2 2H 13 BP GBP 30 LV 112H3 20 28 30 37 NL I3B DP 30 37 PL __ IDE3P 12 13 __ 20 37 20 37 SI SK 12H 2 20 20 37 TIPO DE INSTALACION Mural Wall hung Hi PODER CALORIFICO Type of Installation CALORIFIC VALUE CODIGO EVACUACION FLUE CODES 12 C32 C42 C52 C82 B22 AD1 001633 Fecha de emisi n 2003 10 03 Dase of issue MODELO MODEL SERVICE Calefacci n y ACS Heating and production of sanitary Calefacci n y ACS eating and production of sanitary hot water hot water Fecha de modificaci n 2007 12 19 on SERVICIO Calefacci n y ACS Heating and production of samiary CONTENTS Section 1 USERS INSTRUCTIONS 2 GENERAL SPECIFICATIONS 3 TECHNICAL DATA 4 GENERAL INSTALLATION REQUIREMENTS 5 INSTALLATION INSTRUCTIONS 6 COMMISSIONING
15. ar should be adequate It is the law that any service work must be carried out by acompetent gas registered engineer Before commencing any service operation ISOLATE the mains electric supply and TURN OFF the gas supply at the main service cock Service the appli ance by following the full procedure detailed below MINIMUM CLEARANCE REQUIRED FOR SERVIC ING AND REPLACEMENT OF PARTS Distance at the side The minimum distance necessary for carrying out maintenance operations is 5 mm Distance at the top The minimum distance necessary for carrying out maintenance operations is 200mm Distance at the bottom The minimum distance necessary for carrying out maintenance operations is 250 mm Distance at the front The minimum distance necessary for access during maintenance operations is 250mm although this distance may be reduced to 5 mm as long as a door is installed which can be removed when it comes to carrying out maintenance work FRONT COVER REMOVAL The cover is held in place by four spring clips and can be removed by grasping it at the top and pulling for ward sharply to release Further access can be gained by removing the con trol panel Four screws and moving down the elec tronic box 18 FAN CLEANING Remove the fan 3 screws and using a soft brush remove any build up of debris from the fan blades BURNER AND HEAT EXC
16. cedure ensure that the central heating system and the domestic hot and cold water system have been flushed This will remove contamination which could block the filters fitted to the cold inlet and C H return connections resulting in incorrect functioning of the boiler 6 1 DOMESTIC HOT WATER Turn on the Mains cold water isolation valve Fill and vent the installation by turning on the various hot water taps in the installation Make sure that there are no leaks in the installation 6 2 CENTRAL HEATING CIRCUIT In order for the boiler to function correctly the pres sure in the central heating circuit must be between 0 8 and 1 6 bar when cold Both the boiler and the central heating installation must be purged of any air in the water pipes which may cause noise malfunctions damage to the boiler The boiler is fitted with an automatic air vent always ensure that the vent cap is loose prior to comissioning In order to fill the installation correctly the following sequence must be followed Open one or more radiator bleed vent screws Fill the central heating circuit using the approved method given in section 4 8 Turn off each of the air vents as water starts to appear from them Turn off the filling tap when the pressure gauge exceeds 1 6 bar Turn the main control switch to the winter setting making sure that the pump runs The pump will not run if there is insufficient pressure Vent the central hea
17. ctures instructions must NOT be taken in any way as over riding statutory regula tions 4 2 BOILER LOCATION In positioning the boiler the following limitations MUST be observed The position must allow for a suitable flue termina tion to be made The combination boiler must be installed on a flat vertical wall capable of supporting its weight If the boiler is in a room containing a bath or show er the boiler controls and power supply must be so situated that they can not be touched by the person using the bath or shower Attention is drawn to the current IEE Wiring Regulations and in Scotland the electrical provisions of the Building Regulations applicable in Scotland A compartment used to enclose the appliance MUST be designed and constructed specifically for the purpose An existing cupboard or compartment may be used provided it is modified accordingly 12 Ventilation requirements as stated in this manual must be observed Minimum clearance as stated in the technical data must be observed 4 3 FLUE TERMINAL POSITION The boiler MUST be installed so that the terminal is exposed to the external air It is important that the position of the terminal allows free passage of air across it at all times It is ESSENTIAL TO ENSURE that products of combustion discharging from the terminal cannot re enter the building or vehicle through ventilators windows or other sources of natural air infiltration
18. ection for central heating from between 60 to 85 C Pre set between 40 to 60 C for under floor heating Temperature selection for domestic hot water from between 35 to 60 C Continuous modulation of the gas valve Flame control by ionisation Ignition control Anti frost control in the central heating circuit Anti seizure of the pump 27 Expansion vessel valve 28 Draining valve C H FEB 24ED ELECTRICAL CIRCUIT DIAGRAM ett ai Mains Connection Earth Fan Pump Ignition Burner Solenoid Valve 1 Burner Solenoid Valve 2 Front Panel Control 9 3 Way Valve Micro Switch 10 Air Pressure Switch 11 Room Stat optional 12 Clock Connection 13 Modulating Solenoid Valve 14 Flame Sensor 15 High Limit Stat 16 Hot WaterThermistor 17 Central Heating Thermistor 18 Central Heating Low Pressure Switch 19 External Probe 20 Clock 3 TECHNICAL DATA Model FEB 24ED Category 112H3P Type C12 C32 42 052 C82 B22 kw 23 7 Maximum output Central heating and domestic Btu h 80 840 hot water performances kW 76 Minimum output Btu h 26 151 Nominal central heating and Maximum kW 28 9 domestic hot input Gross Minimum kW 92 Nominal central heating and Maximum kW 26 domestic hot water input Nett Minimum kW 83 Domestic hot water flo
19. er systems 13 Prior to filling the central heating system see sec tion 6 2 It is recommended that where the system is installed in a caravan holiday home subject to non continuous use anti freeze is used 4 8 REQUIREMENTS FOR SEALED WATER SYSTEMS The heating system design should be based on the following information The available pump head is given below Aminimum flow rate corresponding to a heating dif ferential of 20 C must be obtained at all times A heating by pass should be fitted to ensure that the above condition is satisfied If thermostatic radi ator valves are to be installed at least one radiator should be without a thermostatic valve usually the bathroom radiator Asealed system must only be filled by a competent person using an approved filling loop connected between the mains water supply pipe and the central heating return pipe Once filled the loop should be disconnected and left adjacent to the boiler AVAILABLE PUMP FEAD 500 400 1 E 300 1 200 100 1 0 0 200 400 600 800 Flow l h 1000 Pressure mbar by pass closed by pass open The fol lowing paragraphs outline the specifications of the items fitted to the boiler Expansion vessel The following table gives the maximum system vol ume that the integral 7 expansion vessel can sustain under different temperature conditions If the system v
20. erriding the timer mode Middle is timer mode with ON OFF times governed by the time clock Right position is OFF The heating will not work at all regardless of the main boiler control switch except if triggered by the built in frost protec tion thermostat 3 To set on off times move all the white tappets in the outer ring between the required on and off times to the outer position For exam ple if you want the heating to come on at 6am and switch off at 10am move all the tappets outwards between these two times Each tappet represents a quarter of an hour Set as many on off times as required within a 24 hour period N B THE TIME CLOCK MUST BE RESET TO THE CORRECT TIME IF THE POWER SUPPLY TO THE BOILER HAS BEEN INTERRUPTED POWERCUTS SEASONAL TIME ADJUSTMENT RED LIGHT LOCK OUT Should the boiler fail to ignite due to lack of gas or component failure etc It will lockout and the red light will be displayed and the relevant fault code will be shown on the digital display Note To reset turn the left main control knob 3 to off then turn on again If the boiler constantly locks out call your service engineer TURNING THE BOILER OFF Turn the main control switch to the 9 position NOTE In this position the automatic safety devices such as frost protection and anti pump seizure are still operative To shut down completely isolate the mains supply to the boiler GENERAL GUIDANCE NOTES ON HOT WATER DELIVERY
21. for it When a hot tap is opened the boiler automatically fires to deliver hot water and the orange light will come on indicating the burner is on A water temperature of between 35 and 60 C can be selected by turning the domestic hot water temperature regu lating knob The value selected will be shown in the display when it is changed with the knob HOT WATER AND CENTRAL HEATING SERVICE With the main control switch on and the display showing On turn the heating selector knob clockwise from the summer set ting The boiler will fire up automatically when either the time 1 clock room stat or boiler stat calls for central heating or a hot tap LI is opened for hot water If a hot tap is opened the boiler gives pri ority to hot water delivery with the central heating on standby until the tap is closed The temperature of the radiators can be selected between 60 C and 85 C by turning the right knob 2 the value will be shown on the display Note If the boiler has been configured for under floor heating the temperature cannot be altered by the user operating the control knob Only the pre set value set up by the installer will be available USING THE PROGRAMMABLE CLOCK 1 Set the correct time by rotating the minute hand until the arrowhead points at the correct time on the 24 hour dial 2 Check the position of the manual override switch just to the bottom of the clock face This has three positions Left is ON ov
22. he air is expelled 6 6 FINAL CHECKS Re light and test for gas soundness Set the C H and D H W temperature selectors to the required settings Ensure that the time clock and or room stat if fitted are set to the required setting s 6 7 USER S INSTRUCTIONS Upon completion of testing the system the installer should Give the users Instructions to the owner and emphasise their responsibilities under the Gas Safety Installation and Use Regulations 1998 Explain and demonstrate the lighting and shut down procedures Advise the owner on the efficient use of the system including the use and adjustment of all system con trols for both D H W and C H Advise the user of the precautions necessary to prevent damage to the system and to the building in the event of the system remaining inoperative during frost conditions Explain the function of the boiler lock out devices and how to reset it Emphasise that if cut out persists the boiler should be turned off and the installer or service engineer consulted Stress the importance of an annual service by a competent gas registered engineer 7 ROUTINE SERVICING INSTRUCTIONS To ensure continued efficient operation of the appli ance it is recommended that it is checked and serv iced as necessary at regular intervals The frequen cy of servicing will depend upon the particular instal lation conditions and usage but in general once a ye
23. is supplied for use with propane gas The appliance includes the following components Induced draught fan for the extraction of combus tion products and induction of combustion air Modulating gas valve with double safety valves Circulation pump with manual anti seizure device Schematic diagram Hydraulic circuit 1 Expansion vessel 2 Pump with Automatic air bleed 3 Water pressure switch 4 Central heating thermistor Three way valve High limit thermostat Air pressure switch Venturi Fan 10 Sealed air box 11 Copper heat exchanger 12 Combustion chamber 13 Ignition electrode 14 Burner 15 Flame sensing electrode 16 Modulating gas valve 17 Gas inlet 18 D H W Thermistor 19 Hot Water outlet 20 Plate heat exchanger 21 C H flow 23 Cold water inlet 24 C H return 25 Pressure relief valve 26 Automatic By pass Central heating expansion vessel Differential air pressure switch Prevents the boil er firing if there is insufficient air supply due to a fault or blockage Water pressure switch Prevents the boiler firing if there is less than 0 5 bar in the system Thermistors NTC There are two thermistors fitted for automatic control of the domestic hot water and the central heating flow temperature Safety thermostat Shuts down the boiler in the event of overheating Resets after a few minutes cooling Electronic controls incorporating the following fea tures Temperature sel
24. lt into a small cupboard or compartment i e at minimum clearances and over heating can be forseen i e close proximity to a cook ing appliance etc permanent air vents are recom mended for cooling purposes in the cupboard or compartment The following table gives the minimum effective areas of the vents Air from room int Air direct from space outside 13000 mm Position of air vent HIGH LEVEL 7500 mm LOW LEVEL 13000 mm 7500 mm 4 5 ELECTRICITY SUPPLY A 3 amp fused three pin plug for use with 230V 50Hz is supplied fitted to the appliance It should be used with a shuttered socket outlet com plying with BS 1363 THIS APPLIANCE MUST BE EARTHED 4 6 GAS SUPPLY A Propane gas supply at 37m bar is required Ensure the regulator is of sufficient capacity to carry the maximum boiler input plus the demand for any other installed appliances Ensure the connection between the supply bottle and the caravan holiday home or park home is designed so that no pressure drop occurs No more that 3 m of 15mm pipe should be used Where the supply exceeds 3 m the pipe should be suitably sized only reducing to 15mm before the boil er Afull bore isolation cock must be fitted in the sup ply close to the boiler or use morco part number FW0391 The complete installation must be tested for gas soundness 4 7 WATER SYSTEMS GENERAL This appliance is designed for connection to sealed central heating wat
25. n order for the boiler to function correctly and to have a long working life the central heating system must be properly designed making sure that the temper ature difference between the flow and the return will not be greater then 20 C The flue system is a part of the appliance and is approved as such Use only flue systems supplied by Morco witch are approved for use with this boiler The standard flue kit for the FEB 24ED is a 600mm horizontal coaxial air flue kit part number RSF003 as shown below There are various other options available including a vertical flue kit part number RSF040 Please ask for details The horizontal pipe may be cut down to the length required The flue must be fitted with a 2 or 3 down wards incline to prevent any water or condensation from entering in the boiler Where a short run of less than 1 m is used such as in a caravan holiday home the air restrictor ring must be inserted into the boiler flue spigot before fitting the elbow HORIZONTAL FLUE Y 60 100mm COAXIAL 100 Y 60 100 Coaxial pipe 0 5m 1m restrictor gt ring 16 6 COMMISSIONING INSTRUCTIONS Before commissioning the appliance the whole gas installation including the meter if fitted MUST be purged and tested for gas soundness IMPORTANT open all doors and windows extin guish naked lights and DO NOT SMOKE whilst purging the gas line Before commencing the commissioning pro
26. olume exceeds that shown an additional expansion vessel must be fitted and connected to the heating system primary return pipe as close as possible to the appliance If an extra vessel is required ensure that the total capacity of both vessels is adequate If the pressure gauge indicates 2 2 bar or greater when the appliance is at maximum temperature with all radiators in circulation an extra expansion vessel is required 50 100 P Cold pressure bar C System capacity litres Pressure relief valve A pressure relief valve set 3 bar 43 5psi is fitted and a discharge pipe is routed to the outside of the appli ance This discharge pipe should be extended to ter minate safely away from the appliance to a point where a discharge would not cause damage to per sons or property but would be detected The pipe should be able to withstand boiling water be a mini mum of 15mm in diameter and not include any upward pipe runs or horizontal runs prone to freezing 4 9 D H W SYSTEMS Check that mains supply pressure is within the pre scribed limits refer to technical data page 7 If nec essary a pressure reducing valve should be fitted to the mains supply before D H W inlet connection The DHW performance is summarised in the graph The final 1000 mm 40 in of the mains supply pipe to the boiler
27. stat if fitted to max temp Then turn the central heating selector clockwise The boiler will fire up By means of the central heating temperature selector control knob any water temperature of between 60 and 85 C may be seleced The boiler will remain on until the temperature selected on the room thermostat or on the boiler itself is reached NOTE If the boiler has configured for under floor heating then only the temperature entered in the installer menu will be available turning the control knob will have no effect Whenever there is a demand for D H W on the cen tral heating setting the boiler is ready to supply it giv ing priority to the D H W with the central heating on standby until the D H W demand ceases 6 5 4 Turning the boiler off Tum the main control switch to the setting Turn off the gas supply to the boiler 17 6 5 5 Appliance safety lock out If the boiler developes a fault the red LED will ilumi nate and the digital display show the relevant fault code see P19 To restart the boiler Set the main control on the position and then turn it back to the chosen position The red LEDshould go out IMPORTANT Whenever the boiler has been left idle for any length of time or when a new gas bottle is installed propane models the appliance may switch off due to the presence of air in the pipes In cases such as these the main control switch may be turned to position several times until all t
28. strictly followed for the safe and economical operation of this appli ance The appliance is a fan assisted room sealed gas boiler and therefore the flue terminal MUST NOT BE OBSTRUCTED under any circumstances If it is damaged turn off the appliance and consult your installer or service engineer If itis known or suspected that a fault exists on the appliance it MUST NOT be used until the fault has been rectified by a competant gas registered engineer PRECAUTIONS AGAINST FREEZING DURING WINTER STORAGE If the holiday home is to be un occupied during cold periods and whenever there is a threat of freezing the domestic hot and cold water circuit must be drained as follows Turn off the cold water supply Open all hot and cold taps Open all drain plugs in the hot and cold water system Do not drain the central heating circuit which should have been filled with antifreeze If the boiler is installed in a Caravan Holiday Home refer to the user manual for the home for the positions of all drain plugs Note There are no drain plugs fitted to the actual boiler Leave all taps and plugs open until the boiler is next needed for service This will allow any residual water to continue to drain NOTES ON FROST PROTECTION The boiler inbuilt frost protection feature is designed primarily to prevent damage to the heating cir cuit and radiators It will not protect the hot and cold water pipes from freezing under the holiday home and will provide
29. t on burner off F8 Control panel failure F10 Gas valve control circuit failure F11 Domestic hot water thermistor failure F13 Central heating thermistor failure 10 WARRANTY CONDITIONS The boiler is guaranteed against manufacturing defects for a period of one year from the date of first commissioning However the guarantee is subject to proof of commissioning in accordance with the gas safety Instalation and Use act 1998 The guarantee does NOT cover the following issues 1 Frost damage to any part of the boiler containing water during freezing condi tions 2 The removal of sludge or hard water scale due to lack of antifreeze inhibitor or water quality 3 Damage to electronics caused by a defective electrical supply 4 Damage or failure caused by insect contamination or blocked water filters 5 Loss off pressure within the heating system not caused directly by the boiler 6 Incorrect operation of the boiler caused by defective outlets such as thermostat ic mixers or mono block mixer taps 7 Damage caused by unauthaurised modifications to the boiler from original spec ifications For more detailed servicing information workshop manuals technical advice spare parts product training please phone us on 01482 325456 or contact us at the address below MORCO PRODUCTS LTD Morco House Riverview Road Beverley East Yorkshire HU17 OLD TEL 01482 325456 FAX 01482 212869 EM
30. ting circuit once more Then let the pressure in the circuit settle at 1 6 bar If necessary open the pump drain to reduce the pres sure in the system Make sure that there are no leaks in the installation 6 3 GAS CIRCUIT Purge the gas circuit as described above Turn on the gas cock to the installation and check that there are no leaks using leak detection fluid 6 4 SETTINGS Before leaving the factory the boiler is pre set in accordance with the information on the data plate and therefore needs no further adjustment 6 5 INITIAL OPERATION 6 5 1 Preliminary warnings Make sure that the central heating circuit is completely full and vented The pressure gauge should indicate a pressure of between 0 8 and 1 6 bar Make sure that the air intake and the flue outlet are not blocked 6 5 2 Domestic hot water service To turn on the boiler turn the main control switch the green light shows or ON can be seen in the display The boiler is then ready to supply D H W on demand Whenever a hot tap is opened the boiler automatical ly fires up to deliver hot water The temperature selector control should be set at maximum If the ambient water temperature is high as in a hot cli mate then the hot water temperature may be reduced by using this knob 6 5 3 Hot water and central heating service Set the tappets on the time clock to an on position and the main control switch on so the green light is on The room
31. ts are recommended DO NOT under any circumstances use a mains sup ply to the stat as you will damage the P C B Only volt age free switching stats should be used Connection of a room thermostat optional Proceed as follows eUnscrew the screw A as it shows figure 1 open the bottom cover where the connector of the room thermostat is placed e Press out the plastic disc B using a screwdriver to form a hole so you can pass through the wires of the room stat e Replace cover The room thermostat must be installed on a wall which is free from any objects and free from direct contact with either sunlight or draughts Figure 1 External Probe External Probe connection Type 10K 25 C B3435 1 25 85 where available e Press out the plastic disc B using a screwdriver to form a hole so you can pass through the wires of the external probe e Conect the external probe wires to the free holes with red wires in the other side e Configurate the external probe curve in instalation menu 19 External Probe Curves 60 C 60 C 60 C 60 C 60 C 10 5 0 5 10 15 20 5 5 AIR FLUE SYSTEM 76 C 85 C 72 C 78 C 68 C 72 C 64 C 66 C 60 C 60 C T exter C 5 4 WATER AND GAS CONNECTION Connect the boiler up in such a way as to leave the connecting pipes self supporting and free from any stress Check that the gas pipe complies with the require ments of section 4 6 I
32. uit board Should a safety related or various other faults occur then the boiler will failsafe by locking out which is indicated by the red LED on the control panel The fault can be identified by the code in the LED display The electronic failsafe is also backed by a mechanical means of protection should the electronics fail to detect a fault These mechanical forms of protection will protect and ensure the safe shut down of the boiler The software protection built into the P C B will run a system check on components which are essential to the safe operation of the boiler This occurs before any ignition sequence takes place if any component is found to be faulty or out of a predetermined range the boiler will lockout with the fault code displayed on the LED screen FAULT CODES When the Boiler detects a fault you could identify the fault looking at the display of the boiler Each Fault will begin with the F letter and continious with a number For example This is fault 2 F2 Air pressure switch Fan failure NOTE The red LED stays on constantly 19 9 FAULT CODE TABLE CODE FAULT Lack of gas or ignition problems Flame supervision failure Burner on but flame indicator off Minimum burner pressure too low F1 F2 Air pressure switch failure Fan failure F3 Water Pressure below 0 7 bar F4 Hi limit thermostat failure F5 Printed circuit board failure F6 Flame supervision failure indicator ligh
33. w rate at 25 C l min 13 6 Domestic hot water flow rate at 35 C l min 9 7 Nominal D H W flow rate at 34 C l min 10 Minimum flow rate for activating D H W l min 2 Maximum Central heating 2 5 Operating pressure bar Maximum D H W 10 Minimum D H W activation 0 3 Expansion vessel capacity 1 7 i Central heating circui t Radiators 60 85 oo selection range Floor heating 40 60 D H W circuit 35 60 Natural G 20 20 Gas inlet pressure mbar Propane G 31 37 Natural G 20 m3 h 2 75 Gas consumption Hi Propane G 31 kg h 2 04 Electrical supply V Hz 230V 50Hz Max power consumptio n W 120 Height 680 Dimensions mm Width 390 Depth 254 Top 200 td Bottom 150 Minimum clearance mm Sides 5 Front 5 Gas inlet 3 4 BSP Domestic cold water inlet 1 2 BSP D H W outlet 1 2 BSP Central heating flow 3 4 BSP Central heati ng return 3 4 BSP Net weight kg 29 Type of gas Propane G 31 X 92 42 EEC Directive 10 128 85 j 651 DIMENSIONS AND CONNECTIONS DETAILS 1 3 4 BSP Central heating return 2 Mains cable 3 1 2 BSP Domestic cold water inlet 4 3 4 BSP Gas inlet 5 1 2 BSP D H W outlet 6 3 4 BSP Central heating flow 8 Pressure Relief Valve 9 Draining valve for central heating T A Room thermostat connection 390 25 E Se FEN 60 65 S IG ax 498 7 72 72 6 58 65 md 7 CHFLOW DHW GAS DCW CH RETURN INLET 11 100
Download Pdf Manuals
Related Search
Related Contents
Stoelting VB25 Freezer User's Manual 取扱説明書 - 株式会社宝來社 User manual - Supercontrols basicXL BXL-LC10 wall clock Cliente de Monitoramento Bedienungsanleitung deutsch (neu!) Sony Network WALKMAN® NW-E107 R Sony CDX-7520 User's Manual Gebrauchsanweisung KVIE 2529/A Copyright © All rights reserved.
Failed to retrieve file