Home
User Manual Parizzi Screen
Contents
1. The alignment must take place with a great care Align the awning with help of a measuring tape and the guide rail attachments brackets that the following terms are kept in mind The concept of the guide rail attachments brackets is to relocate the entire awning forward backward or sideways so that all distances can be cor rected if necessary Only when the awning is aligned properly the side rails can be tightened firmly Adjustment and verification of the correct right angle Measure both diagonal measurements D with help of a measuring tape and verify their conformity tolerance 5 mm Adjustment and verification of the parallelism Measure the distance P at least on the three different places of the awning with a measur ing tape This distance always has to be the same and has to be equal the depth of the awning at the time of the order Adjustment and verification of the axial play Please make sure that the Axial play of the spacing tubes 24 are kept at least approx 1 5 mm apart along the entire sequence please see also drawing in chapter 5 In case a re adjustment becomes necessary the Axial play can be corrected by moving the guide rail 10 Pre winding of the tension spring To ensure tension of the fabric cover once extended a tension spring has to be mounted This spring is located inside the front winding profile 6 and is attached to a fabric tension adjuster which requires a pre winding For this
2. bit of prestidigitation is required when fitting the three axles at the same time When retracting the awning the fabric support tube needs to be in Caution the center of the awning Never move the fabric support tube by hand since the carriers will otherwise jam Page 04 Push bearing pins 5 2 of the fabric support tube 5 into the individual in drill hole left right of the fabric support tube carrier 5 1 please see also the drawing in chapter 3 Fit the fabric support tube in a position that the visible sheet metal screws point towards the roller tube box and the short steel cables point up The eyelets on each end of the steel cable need to be connected with the M6 x 8 mm hexa gon bolts 5 3 to the fabric support tube carrier 03 2003 8 2 9 1 9 2 9 3 The fabric support tube always has to be fitted with the narrow Caution side up and never flat The factory pre set adjustment screws are not to be changed Fixed fabric support tube This fabric support tube is equipped with a standard attachment on each end With this standard attachment the fabric support tube will be clamped underneath the guide rails in the center of the awning Alignment of the awning Dear installer Please note that after the conclusion of the so far described assembling information it is imperative that you adjust and verify the right angle and parallelism of the guide rails of the sun room awning PARIZZ SCREEN Caution
3. increase once the awning extends 10 2 Pre winding of awnings with a projection of 4 to 6 meter Projections of more than 4 meter require a pre stretching of the spring at designated place which is subject to the awning depth please see table Projection a incm Stretching distance I of the front winding profile 400 480 cm 60 cm 430 460 cm 100 cm 460 500 cm 130 cm 500 540 cm 170 cm 540 570 cm 200 cm 570 600 cm 240 cm a in 13 1 13 L 245mm 21 6 To pre wind the fabric tension adjuster the front winding profile 6 needs to be moved out according to the table I from the roller tube housing Since the cover will now be at this point subject to considerable sagging it has to be first rolled back onto the front winding pro file 6 and next as described in chapter 10 1 pre winded Please do only stretch the spring until the seams on the edges of the cover are relatively taut Please note that the fabric dip in the center of the awning can be Caution never completely eliminated Therefore do not overstretch the fabric cover since it could cause unnecessary stress to the tubular motor in extreme cases above the permissible maximum torque By extending the front winding profile the fabric tension will now be increased until its maximum projection When retracting the awning the same fabric tension will be provided until the awning is fu
4. After the assembly the support ing tape needs to be removed Roller tube 3 and front winding profile 6 as specified in chapter 4 need now to be con nected to the left guide rail 10 Thereto the roller tube 3 needs first to be pushed completely and all the way to the stop with the guide rails already attached tubular motor 14 onto to the roller tubes bearing 16 The fabric s turnbuckle pin 22 now has to snap into the drill hole of the front profile carrier please see also the drawing in chapter 3 5 Preparation for the assembling of the right guide rail The gudgeon 23 of the assembling accessories kit needs to now to be placed into the right front profile carrier 21 and in a position where the milled part of the gudgeon can be safely secured with the clamping screw 25 and has to be tightened firmly Now place the supplied spacing tube 24 over the gudgeon 6 Assembling of the roller tube and front winding profile onto the right guide rail To ensure the same positioning of the roller tube and front winding profile on both guide rails prior to installation the right guide rails gear wheel needs to be positioned analogical to the left gear wheel 13 as specified in chapter 4 Thereto the already assembled right guide rail 4 needs to be pushed completely onto the roller tube 3 respectively front winding profile 6 so that the right roller
5. VIVAISUNSCREENS Parizzi Screen Sunroof System User Manual and Installation Instructions Introduction Please read carefully the enclosed assembling instruction for your sunroom awning PARIZZI SCREEN and familiarize yourself upfront with this type of awning Please read the chapter SAFETY imperatively before using the awning for the first time and pay close attention to this caution symbol since it does not only concern your safety but also provides important information for the usage of this awning Please follow this instruction for your own safety and in order to avoid possible injuries If you carefully follow this assembly instruction you will be able to operate your sunroom awning PARIZZI SCREEN in a reliable condition In addition you will find information on function handling and troubleshooting in case a problem might occur SAFETY Safety guidelines are respectively pointed out in this assembly instruction each time a hazard might be possible Please pay close attention and follow these guidelines accordingly and with extra caution In addition to these safety guidelines other laws or regulation might be appli cable and have to be considered It is the operators responsibility to use this awning only if safe and in proper condition A qualified electrician in compliance with the regulations should only perform the required electrical connections Prior to opening the electrical equipment the power supply needs t
6. exits of the switching elements have to be in neutral position when not in operating mode Other electrical devices i e lamps or relays are not permitted to be connected to the same drive Drives with electronic switch off devices can be connected parallel i e coupled units There fore the maximum rated load of all controlling devices i e timer switch sun or wind control is subject to be minded When wiring the motor cable please assure that a later jamming of Caution the cable through movements of the awning can be prevented Sharp edges which might interfere with the cable need to be cov 03 2003 ered with tape Ensure that the connections are facing upwards to wards the motor to avoid water seepage Prior to installation of the electrical pare connections please see opposite oo wiring diagram the pre setting of the electronic switch off devices accord ing to the enclosed programming in structions has to be completed For this purpose connect the motor cable with help of wire connectors and color matching order to the pro grammable tester cable This tester cable can only be used for the time of the testing period and never for the end use After completion of the programming the awning should be fully extended and retracted several times to ensure M Motor E Electronic T Single switch proper function In case the motor Motor cable 4 x shuts down the motors build in shut sw blac
7. hments brackets Depending on the projection of the awning 2 to 4 guide rail attachments 8 per side rail are included The attachments need to be carefully aligned and positioned on the structure for example D followed by a firm tightening of the bolts but do not tight yet all the way D1 please refer to the following drawing a max 500 max 6000 MAK S0D 2 Assembling of the left guide rail motor drive The next step is the mounting of the left guide rail onto the already fixed guide rail attach ment 8 The right guide rail and both guide rail covers will follow at a later stage First the rail plate 8 2 can be shifted if necessary within the main plate 8 1 Afterwards the left factory pre mounted guide rail 10 has to be fastened with the help of the rail claws 8 5 as shown in the drawing At this time the M6 nuts 8 4 should not yet constantly tight ened to their bolts 8 3 03 2003 Page 01 3 Assembling of the tubular motor First the tubular motor needs to be installed onto the left guide rail 10 Remove the tape which was provided as a transportation lock from the tubular motor 14 Now push the motor power cable 19 through the drill hole in the roller tube free end bush ing with pin 16 and continue to push so it can slide smoothly into the back part of the cas sette box 26 please see also chapter 7 and 15 Next push the square adaptor end 15 all the way until it stops i
8. k down device has been activated br brown which means its thermal protection bl blue guarantees maximum safety After a gn ge green yellow cool down period of approx 15 20 minutes the motor will be ready again to start up VIVAISUNSCREENS Page 09
9. lly retracted inside the roller tube housing 11 Assembling of the front winding profile cover To protect the fabric T from soiling and to maintain a clean appearance of the awning a cover profile will be installed to the front winding profile 6 The two supplied cover profiles and the four counter sunk bolts M6 x 25 mm are needed First push the cover profile bracket 11 into the slot in each end of the cover profile 9 please see also drawing in chapter 3 The mounting of the cover profile on the front of the front winding profile carrier 21 will be accomplished by screwing on the two cover profile brackets 11 with the four supplied Page 06 03 2003 12 13 counter sunk bolts 11 1 Please note that the water drip edge 9 2 needs to point up wards For this application an Allen wrench SW 4 with round head is needed Assembling of the guide rail hoods and end caps To close an open gap between the guide rails and the fabric clip on the guide rail hoods on both guide rails To attach both supplied guide rail hoods 7 a few taps with a rubber hammer are recom mended please underlay a piece of wood for protection to clip on the guide rail hoods to the top of the guide rails 4 and 10 To mount the roller tube housing end caps 2 and 20 to the roller tube housing use each of the supplied counter sunk bolts M6 x 16 mm 2 1 and 20 1 please see also drawing in chapter 3 After completion of the sunroom aw
10. ning please assure to install Caution the round rubber sealing strip between the roller tube housing front profile and the roller tube housing back profile to protect the awning from water Failing to install the rubber sealing strip can result in permarment water stains on the awning fabric Maintenance and repair During maintenance and repair work to the sunroom awning PARIZZI SCREEN the awning may not be operated Disconnect the power supply and secure against unauthorized re connection On awnings without an electrical power separation an existing wind sensor must be blocked by lashing and the controls needs be switched to manually The following maintenance work is to be accomplished once annually Cleaning of the guide rails from possible dirt i e leaves Lubrication of the guide rails with Silicon spray Light greasing of the spring connector on the back of the fabric support tube with graphite consisting grease Cleaning of the water spouts on the bottom side of the guide rails and the roller tube cover profile Spacer bracket installation optional accessories In cases where it might be necessary to elevate the awning from the roof structure i e vents standard spacer brackets can be mounted to the rafters These pre mounted spacer brackets are available in different length The installation of an awning is only possible with spacer brackets of the same length For the installation on rafters the spacer bracke
11. nto the motors 14 milling groove of the roller tubes free end bushing 16 and pull the motor cable flat Finally the locking mechanism needs to be tightened firmly with the M4 oval head screw 16 1 The motor power connection cable has to be pulled completely Caution though the roller tubes free end bushing It is critical that there is no loop between the motor and the free end bushing and the safety bushing needs to be placed as specified in chapter 7 4 Assembling of the roller tube and front winding profile onto the left guide rail Now it is time to assemble the roller tube and the front winding profile as well as the fabric concealing roller support if available please see also chapter 8 The fabric twin sleeve has been factory pre assembled In order to mount the front profile 6 evenly to the guide rails the front profile carrier 21 has to be through rotating of the gear wheel 13 placed within a distance of approx 245 mm to the wheel hub In this position the groove 13 1 of the gear wheel has to point up wards please see also the drawing in chapter 10 2 Depending on the depth of the awning the front winding profile 6 needs to be pre covered with enough amount of fabric T The right amount of fabric can be found out with help of a piece of supporting tape K for assembly purposes During this assembly process the dis Page 02 03 2003 tance between the roller tubes need to be approx 250 mm
12. o be turned off and secured against unauthorized restart and to ensure the unit is without power DANGER When working with electrical components the accident prevention regulations are subject to follow SCOPE OF DELIVER Visible damages on the packaging are required to be recorded on the delivery papers The transportation agent will not recognize later complaints Please ensure the completeness of the awning accessories prior to installation as indicated on the included delivery note Right guide rail Left guide rail including motor drive Roller tube housing back profile Optional coupled roller tube cover profile Roller tube housing front profile Roller Front bar dual wrapped Front bar cover Guide rail hoods left and right End caps left and right Fabric support tube depending on the size of the awning Assembling accessories kit enclosed in bag Installation of this unit If this awning will be mounted on i e timber constructions or other structures which tend to work we recommend to mount aluminum crossbars prior to the installation of the sunroom awning PARIZZI SCREEN and install the awning on top of the crossbars for example the weight of the entire unit with the dimensions width x depth 4 60 meter x 5 50 meter equals approx 112 kg Caution In order to ensure sufficient drainage the unit needs to be installed with a minimum inclination of at least 10 1 Assembling of the guide rail attac
13. purpose described moving directions of the awning can be achieved with a programmable tester cable please see also chapter 15 10 1 Pre winding of an awning with a 4 00 meter projection 03 2003 Page 05 Up to 4 meter projection a constant stretching of the fabric tension adjuster takes place which guarantees that the awning cover will be taut at its largest extension To pre wind the fabric tension adjuster the front winding profile 6 needs to be extended about 30 cm from the roller tube housing The two long M 6 screws 6 2 supplied in the accessory kit serve as a pre stretching assistance They are needed for pre stretching and have to be placed alternately into the accessible drill holes 6 1 of the fabric tension adjuster gudgeon in order to turn the tension spring towards the direction of the awnings extension and thereby stretch the tension spring please see also drawing in chapter 3 Simultaneously the awning cover will be stretched tautly onto the front winding profile 6 In order to maintain the setting of the adjustment spring now set the stretching screw 23 in the front winding profile carrier 21 by using a5 mm allen wrench and screw it against the straight positioned clamp surface of the fabric tension adjuster gudgeon Since the gudgeon has four of these clamp surfaces the spring can be stretched in each case for 90 Please do only stretch the spring until the cover is tight since the tension will automatically
14. the rear cassette box profile 26 Now push the two fixing poles 29 into the groove 28 1 of the roller tube cover profile please see also the drawing in chapter 3 The fitting of the assembled parts into the awning will be as described in chapter 7 the same as for the assembling of the rear cassette box profile 26 To attach the roller tube cover profile 28 to the guide rails raise the profile a bit and push one fixing pole 29 at a time to the left and the other one to the right into the drill hole of the positioning log 30 Next bend the dowel pins 29 1 down and secure each fixing pole by screwing a M6 x 10 grub screw 30 1 into the positioning log which prevents the slipping 30 29 1 28 1 Assembling of the fabric support tube depends on the size of the awning Larger awnings are fitted with a fabric support tube factory supplied to prevent the sagging of the fabric The fabric support tube can be optionally equipped as either a fix or a wheeled fea ture 8 1 Wheeled fabric support tube For the assembling of the fabric support tube 5 there are already pre installed fabric sup port tube carriers inside the guide rails A coupling mechanism connects the fabric support tube carrier to the front profile carrier 21 so that the fabric support carrier will automatically extend to the center of the guide rail Already at this point and as described in chapter 4 the fabric support tube needs to be in position A
15. ts need to be dis assembled For disassembling of the spacer brackets first remove the bolts 8 3 from guide claws Remove the rail claws 8 5 including the rail plate 8 2 Now remove the flat M10 nut 8 6 with the u washer SW 17 Remove top rail guide 8 9 Lift spacer tube 8 7 including M10 tension screw 8 8 out of the bottom main plate 8 1 Screw on bottom main plate 8 1 as described in chapter 2 to the rafter D Important hereby is the usage of solid and suitable countersunk screw Now spacer brackets must be re assembled in reverse order Therefore all pieces must be aligned with help of the flat M10 nut 8 6 and tightened with the use of the u washer As already described in chapter 2 align the guide rails 10 and 4 on top main plate and clamp down with help of the rail claws 8 5 03 2003 Page 07 Page 09 03 2003 15 Electrical installation The installation of the electrical connections for the sunroom awning PARIZZI SCREEN can only be performed by a certified electrician please see the chapter on SAFETY By installing the awning drive motorization an all contacts disconnec tion from the power supply must be provided within at least a 3 mm con tact opening per pole according to VDE 700 All switching elements used are required to be either mechanically or electrically lockable have to have designated zero position and are not permitted to receive their N supply through the drive The
16. tube bearing is fully covered and the gudgeon 23 snaps entirely into to the drill hole of the front winding profile In this position install the right guide rail please see also chapter 2 7 Assembling of the roller tube housing For the assembling of the roller tube housing the already up to this stage assembled awning needs to moved away from the rear house wall for approx 50 mm Place the rear cassette box profile 26 onto the guide rails and as shown in chapter 3 con nect the profile with the two supplied M6 x 16 mm counter sunk bolts 26 1 Thereby pull 03 2003 Page 03 7 1 the motor power cable 19 flat and with no loop though the rubber grommet 18 Type HO5VV 4 x 1 5 mm Do not jam the motor power cable Caution The safety bushing 17 on the motor cable has to be telescoped into the guide rail 10 until the bushing is all the way covered by the rear cassette box profile so that a damaging of the cable from the gear wheel 13 can be prevented Place the front cassette box profile 1 into the rear cassette box profile 26 and screw firmly with the two supplied M6 x 16 mm counter sunk bolts 1 1 Now the awning can posi tioned back to the rear house wall Roller tube cover profile optional The option of the roller tube cover encloses the roller tube from the bottom 3 To prepare for the fitting first connect the roller tube cover profile 28 with the PVC hinge profile 27 to
Download Pdf Manuals
Related Search
Related Contents
Peavey MA 675 / 6150 User's Manual Satellite/Satellite Pro U200 K165 平成3年仙審第22号 漁船第二十康榮丸機関損傷事件 言渡年月日 平成 User Manual - HDL Automation "取扱説明書" User-Manual - FTP Directory Listing IQANsoftware G4 ed0825 HistoryList Guide Anti Gaspillage - Environnement Copyright © All rights reserved.
Failed to retrieve file