Home

VendPresExist - AMEC Sakhalin II Vendor Information Website

image

Contents

1. Manufacturers Name amp Part Number illustrated part list 4 ANY PART ANY PROJECT ANYWHERE The process of recognition of source data is shown above The recognition process checks that the Manufacturer name is correctly identified and that the Model reference is correctly valid which confirms the model or type of equipment Once validated to Model level all of the associated model information such as standard IOM documentation drawings certificates relevant parts lists etc are made available for immediate access N Manufacturers Name amp Part Number MODEL Template Technology TEK 00209102 ANY PART ANY PROJECT ANYWHERE As each level of sou
2. Sakhalin Il Phase 2 Project Facilities Design Vendor Data Management Using ShareCat Project Arena Vendor Briefing Existing Purchase Order A if AN e ShareCat Overview e Vendor Information Gathering Process e ShareCat ProjectArena Document Gathering Tool e Switch from eRoom to ShareCat ProjectArena e Questions This presentation is made to describe how the requirements for submitting documentation for the Sakhalin Project using the existing e room facility will be changed to using a tool called ShareCat ProjectArena This tool has been selected because of the efficiencies it introduces into the supply chain information delivery process Once it has been explained how the existing processes will be assisted and how the reduction in information submission and final databook compilation can be supported it will be clear that there are significant benefits to both the project and the vendors which will overcome some of the traditional challenges and costs associated with PO documentation deliverables Slide 3
3. eval Based around SPA s information repository is a set of internet based tools and services that enable projects to make use of the equipment information amp templates within the system SPA contains an updated copy of the project s master tag register to provide a reference base for the vendor to perform their submission processes SPA is also set up for each vendor s PO with a register of all the VDRL deliverables linked to their applicable tags The main objective is to use SPA to fulfil the VDRL requirements through 2 distinct processes The submission and review approval of project specific documents and The submission of equipment source data manufacturer name and part number As both of the above processes are performed SPA will track the action and provide an up to date status on the PO information requirements and their submissions Where the source data is recognised within ShareCat available documentation will be automatically linked and the VDRL requirements automatically satisfied The result of using SPA ensures that the reusable data in ShareCat and the project specific documentation are combined in a way that every participant will find substantially more efficient ShareCat Overview Project ShareCat Any Part Any Project Anywhere H Licence 0914 6 pages A 503 KB H Licence MO914 3 pages A 234 KB ERA Dimensional Drawings
4. ShareCat ProjectArena Document Gathering Tool Slide 18 SHARE atri ANY PART ANY PROJECT ANYWHERE Logon To access the AMEC Sakhalin II Vendor Information Website select the appropriate Installation from the drop down list enter your Username and Password and then click on the Logon button Installation Sakhalin Piltun B Username YENDOR Password aE SPA is entirely web based with easy access from any PC with an internet connection A project based login screen is provided which you will use with your own unique user name and password The logon screen enables a vendor to select which of the two Sakhalin projects Lunskoye or Piltun they wish to submit information against Other useful information such as the Helpdesk contact details project specifications and reference documents are available from the links in the menu box on the left side of the screen Te o Bi Bore Ol Address E http ff sharecat com ProjectDoc Default asp strFunction MainFrame8SID D831D285 amp lngPageTyvpe 1 i gt Go C O SHARE CET 32 ANY PART ANY PROJECT ANYWHERE DOCUMENT PORTAL Show all Document list Show all Refresh Current selection B 001 Condensate Handling Package le a B 001 Condensate Handling Package E H H O Reports Required documents H 4 3 Required documents 1 3 Documents for re submittal 2 Submitted documents 4 23 Approved documents
5. ShareCat Overview ShareCat Project Arena SPA is a complete environment for the gathering collection and assembly of project based vendor information i e data and documents It has been developed over a period of 9 years and contains over 150 man years of equipment information relevant to project activities It has been adopted and used by major companies in the industry such as BP Exxon Mobil Norsk Hydro and Statoil as well as engineering contractors From the Sakhalin Il Project s perspective this system differs from traditional systems with a few key points to note Up to 70 of the vendor documentation volume will be met by standard content from ShareCat The document control facility in the system is automatic The main stream of documentation is paper less SPA and ShareCat are security controlled web based solutions available to all project participants by using the Internet The progressive approval and assembly of VDRL data satisfies final PO data book and Technical Passport requirements and is structured by Tag to satisfy SEIC handover requirements From a Vendor perspective SPA supports a submit once use many philosophy This allows vendors to submit only one set of project specific information for equipment they are supplying and where applicable reference the information many times This reduces the documentation workload considerably and minimises costs Where vendors can provide a Manufacturer Model a
6. For Chemical Seals 5 pages 4 75 kB Dimensional Drawings Models 3051C 3051CG 3051T 3051H 3 pages A 100 KB p nemica Seal Type Flushing ring in 316L with 2 x 1 2 NPT f flushing connection 1 page A 18 KB e EC Type Examination Certificate No BAS97ATEX1089X 4 pages A 233 KB H Licence 0914 pages A 503 kB Supplementary Certificate Bas No Ex 89C2360 5 2 pages A 159 KB Supplementary EC Type Examination Certificate No BAS97ATEX1089X 1 3 pages A 133 KB Supplementary EC Type Examination Certificate No BAS97ATEX1089X 2 3 pages 126 kB PIS ios Examination Certificate No BAS9I7ATEX1089X 3 3 pages A 143 KB 5 e Moda 3051 Digital Pressure Transmitter for Pressure Flow and Level Measurement 42 pages A 5332 KB Cover Page 1 page a Superior Performance 2 pages 45 The Coplanar 222 Platform 1 page A Pathway to the Future 1 page Product Offering 2 pages H Complete Point Solutions 2 pages 4 Options 1 page H Mounting Brackets 2 pages 4 Specifications 6 pages Certifications 1 page i AQ Drawings 8 pages E p Ordering Information 1023 15 pages in UCTION Model 3051 Smart Pressure Transmitter Family 198 pages 27032 KB e Flushing ring 3 class 150 2500 2 x 1 2 NPT f in 55316L duplex 1 page A 11 kB b Chemical Seal Type Flushing ring in 316 L with 2 x 1 2 NPT f flushing connection 1 page A 20 KB us na H Product Manual Mo
7. Once this unique configuration has been identified and cross referenced against one tag within the scope of supply the same configuration can be re used across other tags within the PO which represents significant efficiencies This also ensures elimination of duplicate submissions and their need for engineering review processes apart from functional satisfaction where required SPA Gathering Process Slide 16 requirement y Document requirement y AMEC requirement Approve Reject requirement X Document TER Internet 2 Proj Doc 3 X Ref requirement SHARECENT 3 aa requirement y o li AANA requirement dia a _Aupplier a E 222 o TEK 2 Taking the standard information available from ShareCat through the cross reference X Ref it can be seen that a number of requirements are met due to the equipment information already available This enables an automatic delivery of information with requirement completion in a matter of days or even hours This diagram shows the document submissions against the VMDS requirements and their various states of submission approval and rejection reflected in SPA As noted previously this report is dynamically updates and viewable on line or can be printed for off line reference
8. SPA within the Sakhalin II project In addition to the Helpdesk and this presentation a fully illustrated User Manual is available electronically and is issued as part of the Vendor Purchase Order package Switch from eRoom to ShareCat ProjectArena Switch from eRoom to SPA Slide 31 Welcome Please enter your login name and password for this eRoom Name Vendor Password pe 2 For more information see Logging into eRoom By logging in you agree to the eRoom Terms of Use Copyright 1997 2001 eRoom Technology Inc All rights reserved To access the Amec Sakhalin 11 Vendor Information Website select the appropriate Installation from the drap down list enter your Username and Password and then click on the Lagin button SPA provides a fully secure and controlled environment for managing vendor document and data submissions which is shared between AMEC and the relevant vendor It provides an automated way of managing the electronic files and information requirements that form part of the normal vendor submission process Unlike e room users do not need to worry about what folder to load files from whether to delete files after uploading or what user permissions they have on their PC SPA is completely web based and all of it s file handling and management is performed behind the scenes so users do not n
9. F files multi page for review approval submittals This is an automatically generated mail issued weekly Please contact the AMEC document controller if you have any questions regarding this mail SPA monitors all document amp data requirements against the project schedule and issues automatic e mails on a weekly basis to all participants showing due and overdue documents as well as a forward planning view for all documents due within the next 7 days The schedule information is also available at anytime by accessing SPA s online reports SPA Document Gathering Tool i 18 http fun amesak com SHARE asi ass o a ANY PART ANY PROJECT ANYWHERE Helpdesk Contact Details The Vendor Information Support Team has been set up to help you with any issues you may have in using this Website You can contact them by telephone fax or email using the contact details below Telephone Support 44 0 8707 606684 Operational hours are 08 30 to 17 30 UK time If calling out of hours please leave a message and your contact details and the helodesk will return your call as soon as possible on the next working day Fax Support 44 0 8700 115391 Email helpdesk amesak com As a support to the overall submission and gathering process a full project Helpdesk is available to help vendors with any stage of the process The Helpdesk can be contacted by e mail fax or telephone and will help with any issues related to using
10. del 3051 Smart Pressure Transmitter Family 1195 nana 2111156 KR Shown above is a screenshot of a typical set of manufacturer information available within SPA All of the information has been validated with the manufacturer to ensure its completeness and correctness The information can be easily accessed by any project participant with an internet connection allowing all of the documentation to be seen and used either on screen or downloaded for local handling amp printing A set of quick access thumbnails are shown on the left of the screen and a full index shown on the right Users simple click on either a thumbnail or an index entry to view the appropriate information they need A vendor by just submitting Manufacturers and Part Numbers can effectively deliver all of their standard documentation requirements in a consistent high quality indexed format in a matter of minutes e Vendor Information Gathering Process z gt KN SPA Gathering Process amec D requirement requirement requirement requirement Internet i aad _upplier Supplier Y F O hen ES Slide 8 Existing requirements by Package The vendor s requirement to complete a Vendor Master Data Schedule VMDS based on requisition VDRL listings and timings has already been completed and in fact submissions are in the proce
11. eed to worry about file housekeeping SPA also knows what files or document types are expected from each vendor package and these are automatically shown in each vendors To Do list As with e room users logon to the system and choose which project area they are working on However users do not need to worry about creating folders to store or upload their documents into since this is all managed by SPA Neither do users at remote offices or in the field need to worry about downloading files for viewing as they can just click on a link in SPA and the document will be automatically viewed on screen in a standard format that can be printed or saved locally if required As the document and data requirements in SPA are submitted and achieve their approval the electronic assembly of final data is created Because these files remain in SPA throughout the PO delivery process this can be considered as a progressive compilation of the final databook delivery saving time for both the vendor and AMEC in handling reviews and delivery e Questions
12. ent Internet 1 VMDS 2 Proj Doc SS requirement requirement requirement id aa _ Supplier Supplier In the diagram above vendors are shown submitting their project specific documents against the requirements setup within SPA One of these is at the package level and one of them is at the tag level In delivering these they are registered against specific requirements and placed in an electronic parking place set up for the PO This diagram shows the result of vendors having submitted their project specific requirements into SPA with an automatic e mail notification to AMEC s DCC notifying them that the submissions have occurred and need to be reviewed This automatic e mail replaces the need for transmittals SPA provides online reports that can be accessed at any time by both AMEC and the vendor allowing a view of the status of all of outstanding submission requirements gt Fart SPA Gathering Process amec Slide 11 requirement y Document requirement AMEC requirement Approve Reject requirementX Document Internet 1 VMDS 2 Proj Doc requirement requirement requirement Supplier E Once AMEC has performed their review the approval rejection or comments will be posted back to SPA and their status recorded accordingly An automatic mail notification fro
13. ent belongs to the following category ies Data for health environment and safety e document was uploaded by Please review the document at http www_sharecat com ProjectDoc Default asp strAction Open_Ch 377601_Pkg 7577 as soon as possible This screenshot is an example e mail automatically generated by SPA that is sent to the AMEC DCC as a result of a document submission by a vendor It includes details of who it was submitted by and the date together with an automatic link to SPA that just needs to be clicked to view the documents SPA Document Gathering Tool Slide 25 AlOlx Installation Test Installation Package B 001 Condensate Handling Package Revision c of the following document has been reviewed by all disciplines Document description Environmental Operational considerations Project doc no FR 234 PL 1 Supplier doc no EO1 AA 23C The document belongs to the following category ies Data for health environment and safety The document was uploaded by Name Brian Barton Company Baker Valves E Mail pauldpestille hotmail com hone Approval status Not accepted 1 Status Not accepted Discipline Instrument Name Alan Atkin Email AlanAtkin hotmail com Request date 16 05 2003 13 58 36 Review date 16 05 2003 18 29 40 Comment need additional certification see redline mark up Should submitted documents be rejected and require additional information an automa
14. file can then be used as the submission tool where it is more convenient to deliver multiple tag references on a batch basis rather than individually on line It can also be used for advising new tag numbers within the vendor s scope of supply which are not yet identified in the Master tag list SPA Document Gathering Tool Slide 28 Document has been reviewed Message Plain Text A x Type a question for help Y The following documents are due for submittal Overdue documents Due date 02 11 2001 Package T001 Doc category Dimensional drawing Project doc no test 5 Status code 3 Status text Rejected Code 3 Due date 20 12 2001 Package T001 Doc category General information Project doc ng Status code Status text first revision to be submitted Pue date 14 02 2002 Package T001 Doc category Installation removal instructions Project doc no test 8 Status code 3 Status text Rejected Code 3 Due date 01 03 2003 Package B 001 Doc category Packing preservation and transportation procedure Project doc ng Status code Status text first revision to be submitted Documents that are due within 7 days Due date 23 05 2003 Package B 001 Doc category Data for health environment and safety Project doc no FR 234 PL 1 Status code 3 Status text Not accepted Please submit the listed documents at http www sharecat com It is recommended to use TIF files single page or PD
15. he document being loaded Slide 23 New document Upload file Upload file Browse Required Upload instructions Select the file to upload with the Browse button and press the Finish button Note The Web server will not respond until the file is completely uploaded Notify me by e mail FT When document is received M When document is Imported ready for viewing E mail address gflatektonisk no As a final step in the submission process SPA s provides an automatic file upload capability to browse and find the document file on the vendor s computer networks and load it into the system There is no need to be concerned with managing files in folders or deleting files once uploaded SPA manages all of the housekeeping and file management within the system SPA will also automatically notify the vendor by e mail when the file is received by AMEC and ready for review A complete audit trail is maintained so that the full history of all documents submitted into the project are available for review if required SPA Document Gathering Tool Slide 24 New project document ready for approval Message Plain Text Mi x Type a question for help Y Installation Test Installation Package B 001 Condensate Handling Package Revision c of the following document is due for approval Document description Environmental Operational considerations Project doc no FR 234 PL 1 Supplier doc no e docum
16. in a package and provides a level of detail showing which tags require Manufacturer and Part Number information and those that have already been advised This tag list can also be downloaded as a Microsoft Excel file for local processing if required SPA Document Gathering Tool Slide 27 Microsoft Excel TagList xls wa Eile Edit View Insert Format Tools Data Window Help Acrobat Tektonisk Jose SRY MAS oc Bezras MOB 0 2 Verdana 0 B 7 u SS SH 9 88 SE n E A B E D Tag list for package T003 Compressor List date 05 05 03 19 46 Tag No Info Tag Type Source Manuf Source Variant Manuf Name Type TekNo Req Src 13PT5093 FISHER ROSEMOUNT 3051CG3422alab4h2 FISHER ROSEMOUNT 3051CG TEK 00594740 X 13PT5099 FISHER ROSEMOUNT 3051CD 4 A 2 2 A 1 K B4 I1 L4 M6 FISHER ROSEMOUNT 3051CD TEK 00010906 X 13PT5103 rosemount 3051TG 2 A 2C 2 1 B j1E8 FISHER ROSEMOUNT 3051TG TEK 00612112 X 40PSV6119 rosemount 3051TG 2 A 2C 2 1 B j1E8 FISHER ROSEMOUNT 3051TG TEK 00612112 X 40PSV6120 P AUTRONICA BH 31A EX AUTRONICA BH TEK 00003350 40Z5H5034 PEPPERL FUCHS NJ212 GK N PEPPERL FUCHS NJ212 TEK 00014675 X 40ZSH5035 PEPPERL FUCHS NJ212 GK N PEPPERL FUCHS NJ212 TEK 00014675 X A downloaded example Excel file is shown above The file can be updated and modified as required and then submitted back to SPA against the tag list information requirement This Excel
17. la E E FCTOO1 Test Package for F C T H 1 0100 Field Instrumentation Er R 020 Deck Graney Testa 20 PST 6596 Detail drawing with parts list O a R 011 Deck Cranes Test 2 AAA AS H Q R 012 Deck Cranes Test 3 H Q R 013 Deck Cranes Test 4 H Q T001 Safety Valves H Q T002 Transmitters Data for health environment and safety FR 234 PL 1 23 05 2003 18 29 43 Download 9 TOOS Compressor t Overdue H T1200 Test package t Overdue Documents for re submittal Submitted documents No records found Approved documents 20 PST 6596 Instruction for Installation Operation and Maintenance 20 PST 6596 Certificate Once a vendor has successfully logged into SPA a screen similar to the one shown above will be shown The screen is divided into 2 sides with a tree view on the left and the tree detail on the right hand side By default the left hand window always shows the vendor s To Do list The To Do list contains the current outstanding list of actions required Next to the To Do tab is the Show all tab On selecting this all of the actions required associated with the packages the vendor is responsible for will be shown This is useful to review past activities or check information used previously It includes details of all submitted documents any documents for re submittal and all approved documents Slide 20 To do E current selection Required doc
18. m AMEC to the appropriate vendor takes place following the review process with all parties having a view of the requirements and schedule This will allow the vendor to view comments update and re submit as necessary also providing re submission dates where applicable Again all parties have instant access to SPA s report facilities giving up to date status reports on outstanding submitted or rejected documents with full milestone visibility gt Fart SPA Gathering Process amec Slide 12 requirement y Document requirement requirement requirement X Document Internet 2 Proj Doc 3 X Ref aa a T raso _ Supplier Supplier requirement requirement requirement Following on from the project specific documents vendors are able to submit the source data or Manufacturer and Part Number information against the tags in their scope of supply These Manufacturer Part Numbers are automatically validated through ShareCat s templates and where recognised immediately assigned all of the appropriate standard information against the tag requirements defined within SPA For this reason it is recommended that the source data be submitted before any standard documentation to avoid unnecessary delivery of information
19. nd Part Number SPA can be used to deliver all of the associated standard information automatically from it s existing repository without any additional submission activity by the vendor again saving time and money ART ANY PROJECT ANYWHERE E Contractors a SPA contains an online reference library of re usable standard equipment information named ShareCat This information represents quality assured manufacturer validated part numbers and documents which are available to the project without the need for a vendors specific submission This information typically contains Installation Operations amp Maintenance IOM documentation as well as drawings certificates and other relevant documentation ShareCat also uses a template technology which automatically recognises manufacturer s part numbers and validates them against allowable equipment configurations This ensures that all the correct standard documentation and information is delivered according to a valid manufacturer part number Vendors need only submit a valid model and part number for all of the standard documentation to be made instantly available allowing the vendor to concentrate their efforts on project specific documentation activities rather than the repeated submission of standard information sets Doc upload Tag Part 8 Data ano maint
20. rce data is recognised so varying levels of information become available If the part number quoted is generic and applies to many configurations only the model information will become available describing general characteristics of the equipment type as noted previously Where the part number contains sufficient detail to describe a unique configuration a variant datasheet is automatically generated from ShareCat s database This unique configuration is assigned an internal global identifier TEK number which can be re used across tags in the scope SPA Gathering Process ae Slide 15 Manufacturers Name TekNo TagNo amp Part Number DER 16D HV 063 MODEL 16E HV 003 MODEL 16E HV 009 Q o N Q co Q N 16E HV 018 16E HV 056 16E HV 062 16E HV 063 17A HV 005 17C HV 003 17C HV 017 21C HV 017 27D HV 016 50A HV 027 50A HV 127 62A HV 034 62A HV 044 62C HV 601 62C HV 603 71F HV 003A 71F HV 003B Q o N Q co o N O 0 0 2 O ooo N NN N O OoOO oo co co Q A ee _ O 0 0 0 NM NM NM N drawings Q Oo N Q co o N Q o N Q co Q N Template Technology Q Q O o N N O o co co Q _ SO Q N N Q o N Q co o N illustrated part list Q o N Q co o N Q o N Q co o N Q Q o o N N Q Q co co o Q N N Q o N Q co Q N TEK TEK 00209102 TEK 00209102 SHAREE ST 3 ANY PART ANY PROJECT ANYWHERE
21. ss of being made against this register using the e room concepts Using this approach all the document deliverables are listed at the package level z bard SPA Gathering Process amec Slide 9 requirement requirement requirement requirement Split of certain requirements by Tag or Tag Type Internet requirement requirement requirement Supplier The Sakhalin II project has a requirement for document and information details to be delivered against applicable tags In this respect the existing VMDS will not increase in its delivery requirements but AMEC will re configure it to link document requirements to their relevant tags It is in this area that SPA s automated systems can be used to generate the appropriate document type requirements that are defined for specific tags or tag types This automatic VMDS generation is linked to SPA s document management routines for handling the submission process more efficiently Information requirements can link document categories at both the package level and the tag level Tag related document requirements can apply to all tags in the package e all tags of a given tag type e all tags with a given model or single specific tags z bard SPA Gathering Process amec Slide 10 requirement Document requirement requirement requirement Docum
22. tic e mail as shown above is sent back to the vendor with an explanation of the reason why the document was not accepted who it was rejected by together with their comments This will include a link in SPA to the file which can be used to open the electronic file for full review Slide 26 3 http www sharecat com ProjectDoc Default asp strFunction MainFrame amp SID 91 18BAS5 amp IngPageType 1 ShareCat Any Part Any Proje SHARES ANY PART ANY PROJECT ANYWHERE B 001 Condensate H H FCTOO1 Test Packac H Q 1 0100 Field Instrum H Q R 010 Deck Cranes gs in this p ge H Q R 011 Deck Cranes Ga R 012 Deck Cranes Fisher 305106 2 2 2 2 a 1 a FISHER ROSEMOUNT 3051CG rexcoo022775 H Q T001 Safety Valves Gy 1002 Transmitters RE EAS A ah aca ae E H Q TI200 Test package PEPPERL FUCHS JNI212 GK N PEPPERL FUCHS frek 00014675 E EA Re EA D You can enter modify either source manuf variant OR Tek no If you modify both Tek no will take presedence Tek no can be entered as text e g TEK 00012345 or number e g 12345 MX Click here to download list as Excel file For the delivery of source data such as Manufacturer and Part No vendors are able to view all of the tags in their scope of supply through SPA Vendors are only able to see details of tags and packages that they alone are responsible for The example above shows the list of tags with
23. u can select more than one category for this document by holding down the Ctrl button while you select from the list Previous Next Next a project specific document category list is presented allowing the selection of type of document being submitted If the document covers more than one category multiple document types can be selected to suit the information content SPA Document Gathering Tool m FCTOO1 Test Package for F C T 1 3 T002 Transmitters 3 3 T003 Compressor 3 Required documents E 40ZSH5035 gj 40Psv6119 m 40PSv6120 49 Documents for re submittal H Q T1200 Test package Slide 22 New document Link document to equipment Current manufacturer FISHER ROSEMOUNT Select equipment type to link document to Tag no EZ Search for and select equipment Please use the search function to find equipment of the given type Search Hint use to find all items e o E 40PSV6119 Pre selected document links Please use corresponding X button to remove a link Teg no p A Selected document links Please use corresponding X button to remove a link Tag no 13pT5099 x Tag no s3prs103 x Where the document submission is to be linked to a tag SPA allows you to enter the specific information required and automatically presents you with a list of tags that are applicable to your scope of supply Single or multiple tags can be selected and these will be automatically linked to t
24. uments lt TODOS Comp H T002 Transmitters EE T003 Compressor New document Document information Ha Required documents H E3 Rejected documents Document title General Arrangement Required Current revision Read only Current rev date Read only New revision oz Required New rev date 25 10 01 Required Format dd mrn yy Cory is optional Once the PO Package has been identified against which documents are to be submitted a series of automatic simple steps or wizard will help guide the vendor in selecting amp submitting documents These steps include creating a new document with project document number and title selecting one or more VDRL codes for the document linking the document to tags where applicable uploading a file containing the document Once document submission is complete the the document requirement is automatically removed from the To do list and placed in the Submitted documents folder ready for AMEC to review Shown above is the first step in the Upload documents wizard where the vendor enters the document title and revision information SPA Document Gathering Tool Slide 21 T002 Transmitters EM T003 Compressor 1 3 Required documents A01 Vendor Master Data Schedule VMOS H Rejected documents Category A01 Vendor Master Data Schedule VMDS Required CO5 Mechanical Seal Detail Drawings C06 Panel Cabinet Layouts Yo

Download Pdf Manuals

image

Related Search

Related Contents

Manual de instrucciones  取扱説明書  Gasoline Engine Tachometer SE-1520  Samsung SAMSUNG WB2000 Uporabniški priročnik  CR 3  Grace Design m103  Télécharger - La Société française de médecine thermale  

Copyright © All rights reserved.
Failed to retrieve file