Home

SuperLift Contractor (PN 33547)

image

Contents

1. 52992 or l TT 52992 52993 or or 52993 52994 or or 52994 FP y 52995 or 52995 Part No 33547 Genie Superlift Contractor 21 3 Serial Plate Operator s Manual First Edition Ninth Printing Transport and Lifting Instructions Observe and Obey MI The transport vehicle must be parked on a level surface MI The transport vehicle must be secured to prevent rolling while the machine is being loaded M Be sure the vehicle capacity loading surfaces and chains or straps are sufficient to withstand the machine weight See the serial plate for machine weight M The machine must be secured to the transport vehicle with chains or straps of ample load capacity Loading the Machine Be sure to remove the load handling attachment from the machine and place the stabilizers in the stored position 1 Fully lower the carriage to lock for transport 2 Rotate the carriage hold down bar over the carriage 3 Raise the carriage until it contacts the carriage hold downbar 4 Adjust the loading wheels to the desired position Be sure the pin is properly inserted 5 Lock th
2. 52995 Serial Plate or 52993 or 52994 or 52995 Part No 33547 Genie Superlift Contractor Operator s Manual First Edition Ninth Printing gt AL III E DECALS Inspection for Decals with Symbols Determine whether the decals on your machine have words or symbols Use the appropriate inspection to verify that all decals are legible and in place Part No Description Quantity Part No Description Quantity 52984 Cosmetic Superlift Contractor Logo 2 97532 Caution Bodily Injury Hazard 1 52992 Cosmetic SLC 6 2 97539 Danger Electrocution 2 52993 Cosmetic SLC 12 2 97541 Label Use This Winch 1 52994 Cosmetic SLC 18 2 97543 Warning Load Center Chart 1 52995 Cosmetic SLC 24 2 97545 Warning Lock Brake 1 82487 Label Read The Manual 1 97546 Notice Two Speed Shift 1 82964 Warning No Riders 1 20 Genie Superlift Contractor Part No 33547 First Edition Ninth Printing Operator s Manual DECALS 82487 82964 52984 Shading indicates decal is on the other side of the machine 97539 52984 97532 82487 82964 97543 ace M 97541 CTH CEL Serial label 2 Je 97545 97546 r
3. 3 Always perform function tests prior to use 4 Inspect the workplace 5 Only use the machine as it was intended Fundamentals The Operating Instructions section provides instructions for each aspect of machine operation It is the operator s responsibility to follow all the safety rules and instructions in the operator s manual Using the machine for anything other than lifting material is unsafe If more than one operator is expected to use a machine at different times in the same work shift each operator is expected to follow all safety rules and instructions in the operator s manual That means every new operator should perform a pre operation inspection function tests and a workplace inspection before using the machine 14 Genie Superlift Contractor Part No 33547 First Edition Ninth Printing Operator s Manual Setup Select an area that is firm level and free of obstructions Follow the Setup procedures in the Function Tests section Raising and Lowering Load 1 Center the load on the load handling attachment See Load Capacity Charts section 2 Make sure the load is properly secured to the load handling attachment 3 Raise the load by firmly grasping the winch handles and rotating them toward the mast Do not allow the cable to wind unevenly onto the drum 4 Lower the load by firmly grasping the winch handles and rotating them away from the mast After lowering to the desired positi
4. Genie Operators Manual First Edition Ninth Printing Part No 33547 Superlift Contractor Operator s Manual First Edition Ninth Printing sss Important Read understand and obey these safety rules and operating instructions before operating this machine Only trained and authorized personnel shall be permitted to operate this machine This manual should be considered a permanent part of your machine and should remain with the machine at all times If you have any questions call Genie Industries Contents Page Safety zaa Ea Bend a Paka 1 LSGONA E sielawa E E 6 Pre operation Inspection eesssesesssrrresserernreeerrsnnns 7 FUNGLUON LESS cenina A AAAA 9 Workplace Inspection eueeeee aaa aaaaaaaaaacea 13 Operating Instructions 2 eeeaa aaa aaa aa ananaacccea 14 Load Capacity Charts eeeeaeeasaaa aaa aaaaaaacnae 16 B j CEO 18 Transport and Lifting Instructions 1 1 1 22 SpECIICALIO S aaa i AO RZA da 23 Contact US Copyright 1995 by Genie Industries m First Edition Ninth Printing February 2009 Internet http www genielift com HE i Genie and Superlift Contractor are mail tech nieind com i ar e mail tec pub ge eind co registered trademarks of Genie Industries in the U S A and many other countries ga Printed on recycled paper Printed in U S A Genie Superlift C
5. 36 cm load center 295 kg 295 kg 295 kg 295 kg Note see Load Capacity Charts section for load capacities at other load centers Net Weight 166 Ibs 204 Ibs 307 Ibs 374 Ibs 75 kg 93 kg 139 kg 170 kg Airborne Noise Emissions by Machinery 85 dB 85 dB 85 dB 85 dB Maximum sound level at normal operating workstations A weighted Load Handling Attachments Length Width Depth Net Weight Standard Forks 28 in 23 in 21 2 in 26 5 Ibs 71 1 cm 58 4 cm 6 4 cm 12 kg Adjustable Forks 271 2 in 111 2 to 30 in 21 2 in 52 5 lbs 69 9 cm 29 2 to 76 2 cm 6 4 cm 23 8 kg Boom 44 in 1 5 in 6 in 34 5 Ibs 1 4m 3 8 cm 15 2 cm 15 6 kg Pipe Cradle 271 2 in 241 2 in 6 in 10 Ibs 69 9 cm 62 2 cm 15 2 cm 4 5 kg Load Platform 27 5 in 23 in 2 5 in 26 Ibs 69 9 cm 58 4 cm 6 4 cm 12 kg Fork Extensions each 30 in 2 in 3 in 4 5 lbs 76 2 cm 5 1 cm 7 6 cm 2 kg Dimensions SLC 6 SLC 12 SLC 18 SLC 24 Standard Forks forks down 5 ft 8 in 11ft2 in 16 ft 9 in 22 ft 3 in 1 73 m 3 40 m 5 11m 6 78 m forks up 7ft5in 12 ft 11 in 18 ft 6 in 24 ft O in 2 26 m 3 94 m 5 64 m 7 32 m Adjustable Forks forks down 5 ft 8 in 11ft2 in 16 ft 9 in 22 ft 3 in 1 73 m 3 40 m 5 11m 6 78 m forks up 7ft5in 12 ft 11 in 18 ft 6 in 24 ft 0 in 2 26 m 3 94 m 5 64 m 7 32 m Boom 6 ft 8 in 12 ft 2 in 17ft9 in 23 ft 3 in 2 03 m 3 71m 5 41 m 7 09 m Part No 33547 Genie Superlift Contractor 23 Genie North America Phone 425 881 1800 Toll Free USA and Canada 800 536 1800 Fax 425 883 3475 Genie Australia Pty Lt
6. Avoid hazardous situations 2 Always perform a pre operation inspection Know and understand the pre operation inspection before going on to the next section 3 Always perform function tests prior to use 4 Inspect the workplace 5 Only use the machine as it was intended Fundamentals The pre operation inspection is a visual inspection performed by the operator prior to each work shift This inspection is designed to discover if anything is apparently wrong with a machine before the operator tests it Refer to the list on the next page and check each of the items If damage or any unauthorized variation from factory delivered condition is discovered the machine must be tagged and removed from service Repairs to the machine may only be made by a qualified service technician according to the manufacturer s specifications After repairs are completed the operator must perform a pre operation inspection again before going on to the function tests Part No 33547 Genie Superlift Contractor Operator s Manual First Edition Ninth Printing PRE OPERATIONINSPECTION Pre operation Inspection Ii Be sure that the operators manual is complete legible and in the storage container located on the machine 11 Be sure that all decals are legible and in place See Decals section Check the following components or areas for damage improperly installed or missing parts and unauthorized modifications 1 Winc
7. You learn and practice the principles of safe machine operation contained in this operator s manual 1 Avoid hazardous situations 2 Always perform a pre operation inspection 3 Always perform function tests prior to use 4 Inspectthe workplace Know and understand the workplace inspection before going on to the next section 5 Only use the machine as it was intended Fundamentals The workplace inspection helps the operator determine if the workplace is suitable for safe machine operation It should be performed by the operator prior to moving the machine to the workplace It is the operator s responsibility to read and remember the workplace hazards then watch for and avoid them while moving setting up and operating the machine drop offs or holes bumps and floor obstructions debris overhead obstructions and high voltage conductors hazardous locations sloped surfaces unstable or slippery surfaces inadequate surface support to withstand all load forces imposed by the machine wind and weather conditions all other possible unsafe conditions Part No 33547 Genie Superlift Contractor 13 Operator s Manual First Edition Ninth Printing Operating Instructions Do Not Operate Unless M You learn and practice the principles of safe machine operation contained in this operator s manual 1 Avoid hazardous situations 2 Always perform a pre operation inspection
8. be aware of strong or gusty winds Do not use the machine as a ground for welding Part No 33547 Genie Superlift Contractor 3 Operator s Manual First Edition Ninth Printing SAFETY RULES Crushing Hazards Keep hands and fingers away from folding legs and other potential pinch points Do not raise if the load is not properly centered on the load handling attachment Do not raise unless the load is properly secured to the load handling attachment u Do not stand under or allow personnel under the machine when the load is raised Do not lower the load unless the area below is clear of personnel and obstructions Do not stand under the load The safety brake system if equipped will allow the load to drop 1 to 3 feet 30 to 91 cm before locking the columns Maintain a firm grasp on the stabilizer when the lock plates are released The stabilizer will drop Maintain a firm grasp on the leg when the retaining pin is removed The leg will drop Maintain a firm grasp on the winch handles until the brake is locked The brake is locked when the load will not cause the winch handles to turn Damaged Machine Hazards A Do not use a damaged or malfunctioning machine 5 Do not use a machine with a worn frayed kinked or damaged cable H Do not use a machine with less than four wraps of cable on the winch drum when the carriage is fully lowered Conducta thorough pre operation inspection pri
9. ic down mast O HE Winn Result The winch IR should operate sho ldoperate Gat smoothly free of p Gy hesitation or bindin smoothly free of RA 9 hesitation or binding up r a 3 Lower the carriage by firmly grasping the winch handles and rotating them away from the mast i ae E E A by J After lowering to the desired position turn the AE Z rotatina themawavirom ihe winch handles toward the mast raise the load ToS y Vidura to set the brake mast After lowering to the desired position turn the winch handles toward the mast raise the Result The winch should operate smoothly free load 1 4 turn to set the brake DEES taOmor Bnd Result The winch should operate smoothly free of hesitation or binding 5 Shift the winch to the fast speed and repeat steps 3 and 4 Test Mast Sequencing 1 Install a load handling attachment 2 Raise the carriage to full height by firmly grasping the winch handles and rotating them towards the mast Result The carriage should raise to the top of the front mast section followed in consecutive order by each mast section 3 Fully lower the carriage After lowering to the desired position turn the winch handles toward the mast raise the load 1 4 turn to set the brake 12 Genie Superlift Contractor Part No 33547 First Edition Ninth Printing Operator s Manual Workplace Inspection Be aware of and avoid the following hazardous situations Do Not Operate Unless M
10. achine is ona firm level surface NN Prior to use check the work area for drop offs holes bumps debris unstable or slippery surfaces or other possible hazardous conditions Do not raise the load unless the leg retainer pins are properly inserted through the leg and the base Do not remove the leg retainer pins while the machine is loaded and or raised Do not raise the load unless the load handling a attachment is properly secured to the machine Do not use blocks to level the machine Do not move the machine with a raised load except for minor positioning Do not operate the machine in strong or gusty winds Increasing the load surface area will decrease machine stability in windy conditions P c x 4 FP i ma CY d i pi _ Do not leave a load raised when windy conditions may occur unless the machine s are properly guy wired Do not exceed the rated load capacity See Load Capacity Charts section Avoid debris and uneven surfaces while rolling a machine with the legs folded up Do not replace machine parts critical to stability or structure with items of different weight or specification Do not cause a horizontal force or side load to the machine by raising or lowering a fixed or overhanging load 2 Genie Superlift Contractor Part No 33547 First Edition Ninth Printing Operator s Manual Do not place ladders or scaffolding against any part of the mac
11. d Phone 61 7 3375 1660 Fax 617 3375 1002 Genie Scandinavia Phone 46 31575100 Fax 446 31579020 Genie China Phone 86 21 53852570 Fax 86 21 53852569 Genie France Phone 33 0 2 37 26 09 99 Fax 33 0 2 37 26 09 98 Genie Malaysia Phone 65 98 480 775 Fax 65 67 533 544 Genie Iberica Phone 34 93 579 5042 Fax 34 93579 5059 Genie Germany Phone 49 0 4202 88520 Fax 49 0 4202 8852 20 Genie J apan Phone 81 3 3453 6082 Fax 81 3 3453 6083 Genie Korea Phone 82 25 587 267 Fax 82 25 583 910 Genie U K Phone 44 0 1476 584333 Fax 44 0 1476 584334 Genie Brasil Phone 455 11 41 665 755 Fax 55 11 41 665 754 Genie Mexico City Phone 52 55 5666 5242 Fax 52 55 5666 3241 Genie Holland Phone 31 183 581 102 Fax 31 183 581 566
12. e must never be used If malfunctions are discovered the machine must be tagged and removed from service Repairs to the machine may only be made by a qualified service technician according to the manufacturer s specifications After repairs are completed the operator must perform a pre operation inspection and function tests again before putting the machine into service Part No 33547 Genie Superlift Contractor Operator s Manual First Edition Ninth Printing FUNCTION TESTS Function Tests 1 Select a test area that is firm level and free of obstruciions Setup Machines Without Stabilizers 1 Remove the leg retainer pin and lower the leg to the down position Insert the pin through the leg and base Machines With Stabilizers 1 Push down to release the stabilizer lock plates and lower the stabilizers until the casters are in full contact with the ground Be sure the stabilizers are locked in the down position 2 Remove the leg retainer pin and lower the leg to the down position Insert the pin through the leg and base Load Handling Attachments Standard Forks and Standard Fork Options 1 Place the forks inside the carriage 2 Insert the retaining pin Load Platform with Standard Forks 1 Place the load platform securely on the standard forks Pipe Cradle 1 Attach the pipe cradles to the forks Be sure the fasteners are tightened Fork Extension 1 Slide each extension tube onto the
13. e rear base casters m 6 Place the machine against the vehicle Use proper lifting techniques to load the machine into the transport vehicle Be sure to check that the carriage is locked in the lowered position 7 Use a minimum of 1 chain or strap to secure the machine to the truckbed Place the chain or strap over the mast Placing the chain or strap over the legs can damage the legs FA s 8 To unload follow the loading instructions in reverse order Loading Machine with a Crane Be sure to place the legs and stabilizers in the stored position Be sure to inspect the machine and remove any loose or unsecured items Use the lifting bracket on the top of the rear mast column Always place the lifting hook through the lifting bracket so that it points away from the machine 22 Genie Superlift Contractor Part No 33547 First Edition Ninth Printing Operator s Manual Specifications Model SLC 6 SLC 12 SLC 18 SLC 24 Height Stowed 86 in 86 in 86 in 86 in 2 2 m 2 2 m 2 2 m 2 2 m Width 3112 in 3112 in 3112 in 3112 in 80 cm 80 cm 80 cm 80 cm Width stabilizers lowered if equipped 66 in 66 in 66 in 66 in 1 7m 1 7m 1 7m 1 7m Length Stowed 34 in 34 in 34 in 34 in 86 4 cm 86 4 cm 86 4 cm 86 4 cm Length Operating 59 in 63 in 73 in 81 in 1 5m 1 6m 1 8m 2m Ground 2 in 2 in 2 in 2 in Clearance 50 8 mm 50 8 mm 50 8 mm 50 8 mm Load Capacity 650 Ibs 650 Ibs 650 Ibs 650 Ibs at 14 inch
14. fork 2 Adjust to the desired position and insert the retaining pins 10 Genie Superlift Contractor Part No 33547 First Edition Ninth Printing Operator s Manual Adjustable Fork and Adjustable Fork Options 1 Place the forks inside the carriage 2 Insert the retaining pin U 3 Adjust the forks to the desired width and be sure the snap pins are properly inserted Load Platform with Adjustable Forks 1 Adjust the forks to a width of 23 inches 58 4 cm 2 Place the load platform on the adjustable forks Pipe Cradle 1 Attach the pipe cradles to the forks Be sure the fasteners are tightened FUNCTION TESTS Fork Extension 1 Slide each extension tube onto the fork 2 Adjust to the desired position and insert the retaining pins Standard Boom 1 Place the boom inside the carriage 2 Insert the retaining pin 3 Attach the lifting shackle at the desired hole on the boom Part No 33547 Genie Superlift Contractor 11 Operator s Manual First Edition Ninth Printing FUNCTION TESTS Test One Speed Winch Operation 1 Install a load handling attachment Test Two Speed Winch Operation Install a load handling attachment 2 Raise the carriage by 2 Shift the winch to the slow speed firmly grasping the winchhandles an 3 Raise the carriage by firmly grasping the winch handles and rotating rotating them towards theimitowards the the mast
15. h and related components Li Base components Li Legs LG Stabilizers and latch plates if equipped i Mast columns U Carriage hold down bar LU Cable anchor m Cable and pulleys i Wheels and casters 1 Loadhandling attachments E E Nuts bolts and other fasteners Cable kinks frays abrasions Check the entire machine for 1 Dentsordamage Corrosion or oxidation U Cracks in welds or structural components 1 Be sure that all structural and other critical components are present and all associated fasteners and pins are in place and properly tightened I Be sure there is a minimum of 4 wraps of cable around the winch drum when the carriage is fully lowered 8 Genie Superlift Contractor Part No 33547 First Edition Ninth Printing Operator s Manual Do Not Operate Unless MI You learn and practice the principles of safe machine operation contained in this operator s manual 1 Avoid hazardous situations 2 Alwaysperform apre operation inspection 3 Always perform function tests prior to use Know and understand the function tests before going on to the next section 4 Inspect the workplace 5 Only use the machine as it was intended Function Tests Fundamentals The function tests are designed to discover any malfunctions before the machine is put into service The operator must follow the step by step instructions to test all machine functions A malfunctioning machin
16. hine re Do not use the machine on a moving or mobile surface or vehicle Collision Hazards Use common sense and planning when transporting the machine on an incline or slope Check the work area for overhead obstructions or other possible hazards Do not tilt the machine back unless the area is clear of personnel and obstructions Do not load for transport unless the machine and vehicle are on a level surface Use proper lifting techniques to load the machine Lifting Hazards Use proper lifting techniques to load or tip the machine Use proper lifting techniques when installing or removing the load handling attachments SAFETY RULES Electrocution Hazards L WY a Keep away from the machine if it contacts energized power lines Personnel must not touch or operate the machine until power lines are shut off This machine is not electrically insulated and will not provide protection from contact with or proximity to electrical current Maintain safe distances away from electrical power lines and apparatus in accordance with applicable governmental regulations and the following chart Voltage Minimum Safe Approach Distance Phase to Phase Feet Meters 0 to 300V Avoid Contact 300V to 50KV 10 3 1 50KV to 200KV 15 4 6 200KV to 350KV 20 6 1 350KV to 500KV 25 7 6 500KV to 750KV 35 10 7 750KV to 1000KV 45 13 7 Allow for mast movement and electrical line sway or sag and
17. lifting the weight at l he i he forks MI Verify that the load you wish to raise does not ne eave ene ta exceed the maximum load for your load center 4 Place the load so that it rests on the forks as See Load Capacity Chart section close to the carriage as possible AWARNING Tip over hazard Raising a load 5 Position the load so that the load center is within that exceeds the machine s the load center zone capacity may result in death or l A 6 Secure the load to the forks serious injury MI A load center is defined as the balancing point center of gravity of a load and must be center zone may result in death or az serious injury l J i positioned within the load center zone Iml Tip over hazard Failure to position AWARNING the load center within the load d l 3 fad gt Load Center i Zo o S I 8 A Vv See the chart on the next page for maximum load centers for standard forks and adjustable forks 16 Genie Superlift Contractor Part No 33547 First Edition Ninth Printing Operator s Manual LOAD CAPACITY CHARTS Boom Maximum Load Centers measure from the front of the carriage Load Positioning Instructions TZT TROPY R ORCE FI Standard Forks 24in 61 cm 1 Determine the weight of the load and the location of its load center Adjustable F
18. on turn the winch handles toward the mast raise the load 1 4 turn to set the brake OPERATING INSTRUCTIONS Moving Machine with a Load It is best to move the machine on the worksite with no load Moving a raised load should be restricted to positioning for loading and unloading If it is necessary to move the machine with a raised load understand and obey the following safety rules Make sure the area is level and clear of obstructions Make sure the load is centered on the load handling attachment Make sure the load is secured to the load handling attachment Avoid sudden starts and stops Travel with the load in the lowest possible position Keep personnel away from the machine and load After Each Use To prepare the machine for storage follow the Setup procedure in reverse order Select a safe storage location firm level surface weather protected clear of obstruction and traffic Part No 33547 Genie Superlift Contractor 15 Operator s Manual First Edition Ninth Printing Load Capacity Charts Forks Load Positioning Instructions 1 Determine the weight of the load and the location of its load center Observe and Obey 2 Measure to the load center from the side of the load that will be closest to the carriage M Failure to properly position the load may resultin 3 Refer to the chart on the next page to determine death or serious injury if the machine is capable of
19. ontractor Part No 33547 First Edition Ninth Printing Operator s Manual Safety Rules Warning Failure to obey the instructions and safety rules in this manual may result in death or serious injury Do Not Operate Unless M You learn and practice the principles of safe machine operation contained in this operator s manual 1 Avoid hazardous situations Know and understand the safety rules before going on to the next section 2 Always perform apre operation inspection 3 Always perform the function tests prior to use 4 Inspect the workplace 5 Only use the machine as it was intended M You read understand and obey the manufacturer s instructions and safety rules safety and operator s manuals and machine decals M You read understand and obey employer s safety rules and worksite regulations M You read understand and obey all applicable governmental regulations MI You are properly trained to safely operate the machine Part No 33547 Genie Superlift Contractor 1 Operator s Manual First Edition Ninth Printing SAFETY RULES Fall Hazards Do not use as a personnel lifting platform or step Do not stand on the load handling attachments Do not climb on the mast Tip over Hazards Do not raise the load unless the stabilizers if equipped and legs have been fully lowered and locked and the casters are in full contact with the ground Do not raise the load unless the m
20. or to each use Be sure all decals are in place and legible Be sure the operator s manual is complete legible and in the storage container located on the machine Maintain proper lubrication on the winch See Genie Superlift Contractor Parts and Service Manual for details Do not allow oil or grease on braking surfaces Do not use any type of lubrication on the column surfaces Bodily Injury Hazard Do not grasp the cable Improper Use Hazard Never leave a machine unattended with a load Unauthorized personnel may attempt to operate the machine without proper instruction creating an unsafe condition 4 Genie Superlift Contractor Part No 33547 First Edition Ninth Printing Operator s Manual Z YTY T SAFETY RULES Decal Legend Genie product decals use symbols color coding and signal words to identify the following Safety alert symbol used to alert personnel to potential personal injury hazards Obey all safety messages that follow this symbol to avoid possible injury or death Red used to indicate the ADANGER presence of an imminently hazardous situation which if not avoided will result in death or serious injury AWARNING Orange used to indicate the presence of a potentially A hazardous situation which if not avoided could result in death or serious injury gt Yellow with safety alert symbol ACAUTION used to indicate the presence of a A potentially hazardous situation
21. orks 24 in 61 cm 2 Refer to the chart below to determine if the Boom 42in 107cm machine is capable of lifting the weight at the Load Platform 24 in 61 cm location on the boom Pipe Cradle 18 in 46 cm 3 Secure the load to the lifting shackle on the l boom Fork Extensions 42 in 107 cm gt measure to the load center 18 in 24 in 32 in 42 in 46 cm 61 cm 81 cm 107 cm Load Capacity Chart Load Center inches 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 cm 36 41 46 51 56 61 66 71 76 81 86 91 97 102 107 Model SLC 6 lbs 650 610 565 515 470 425 385 350 315 285 260 235 215 195 180 kg 295 277 256 234 213 193 175 159 143 129 118 107 98 89 82 SLC 12 lbs 650 610 565 515 470 425 385 350 315 285 260 235 215 195 180 kg 295 277 256 234 213 193 175 159 143 129 118 107 98 89 82 SLC 18 lbs 650 610 565 515 470 425 385 345 310 275 250 225 200 180 160 kg 295 277 256 234 213 193 175 157 141 125 113 102 91 82 73 SLC 24 lbsj 650 610 565 515 470 425 385 345 310 275 250 225 200 180 160 kg 295 277 256 234 213 193 175 157 141 125 113 102 91 82 73 Part No 33547 Genie Superlift Contractor 17 Operator s Manual First Edition Ninth Printing Decals Inspection for Decals with Words Determine whether the decals on your machine have words or symbols Use the appropriate inspection to verify that all decals are legible and in place Part No Description Quantity Part No Description Quantity 31072 Label Ope
22. rator s Manual Container 1 40513 Warning Machine Safety amp Setup 32687 Warning Standard Forks Safety Setup 1 tale Serle NUMPEr One 2287 52675 Caution Damaged Machine Hazard 1 32714 Warning Adjustable Forks Safety Setup 1 32716 Notice Boom Setup 1 52984 Cosmetic Superlift Contractor Logo 2 32717 Warning Boom Safety 1 Beggs OOMEGA oles 32770 Notice Two Speed Shift Instructions 1 PPR OOE SAL 2 32775 Warning Fall Hazard Load Platform 1 2 994 _ Cosmetic SLO 18 32885 Warning Silent Winch p e oe RE 2 32938 _ Label Use This Winch 1 97529 Caution Bodily Injury Hazard 1 32939 Warning Brake Lock 1 97547 Danger Electrocution Hazard 2 33468 Warning No Riders 1 33545 Warning Machine Safety amp Setup before serial number 9596 5288 1 18 Genie Superlift Contractor Part No 33547 First Edition Ninth Printing Operator s Manual DECALS OO assist twa 97529 32938 33454 Australia models only i 7 ae 52984 Shading indicates decal is on the other side of the machine 97547 52984 97529 40513 or 33454 Serial Plate 32938 32885 32939 32770 52675 31072 eRe FO 52992 52992 or S 52993 or 52994 or
23. which if not avoided may cause minor or moderate injury Yellow without safety alert CAUTION symbol used to indicate the presence of a potentially hazardous situation which if not avoided may result in property damage Green used to indicate operation or maintenance information Part No 33547 Genie Superlift Contractor 5 Operator s Manual First Edition Ninth Printing Legend 3 WY 1 Winch 10 Boom 19 Stabilizer caster 2 Lifting bracket 11 Shackle 20 Base 3 Cable 12 Forkextension 21 Stabilizerbrace 4 Mast 13 Pipe cradle 22 Base swivel lock caster with 5 Carriage 14 Leg swivel caster brake 6 Standard forks 15 Leg 23 Transport wheel 7 Loadhandling attachment 16 Hold downbar 24 Mast brace retaining pin 17 Legretaining pin 25 Loading wheels steer 8 Adjustable forks 18 Stabilizer if equipped AE 9 Snappin 6 Genie Superlift Contractor Part No 33547 First Edition Ninth Printing Operator s Manual Pre operation Inspection Do Not Operate Unless M You learn and practice the principles of safe machine operation contained in this operator s manual 1

Download Pdf Manuals

image

Related Search

Related Contents

  Wiley 3ds Max 2008 Bible  Viewsonic VFA724W-10 digital photo frame  M&V Plan - NYSERDA DG/CHP Integrated Data System  

Copyright © All rights reserved.
Failed to retrieve file