S3300/S3500 Installation Guide

image

Contents

1. e Select Series 8000 www leviton com High Density Meter Leviton Manufacturing Co Inc 5 Figure 2 shows the internal view of the Series 8000 Figure 2 Series 8000 internal view Meter Only Sense Voltage Control Voltage Control Voltage Earth Stud Terminal Block Terminal Block Fuse Jumper Cover 5crew Leviton Manufacturing Co Inc 6 Figure 3 shows the dimensions of the Potential Transformer Series 8000 Meter and CT Termination enclosure Figure 3 Product Dimensions 13 53 343 7 amp 39 L 213 1 ZERO DELTA PT ENCLOSURE 3 50 MIM 7 59 189 8 SHORTIMG OR TERMINATION ENCLOSURE No amp i CREWS l TYPICAL 1258 319 5 Leviton Manufacturing Co Inc 7 Figure 4 shows the a functional Diagram of how all possible components fit together for a 3 phase 3 wire installation Figure 4 Product Dimensions PDTETUETU repel eg R Seog ee e g e P p le lum amm mc Um S GN Jm UE URL AL URL URS UO US pere LI 2 eo he C C9 recie an LAM uu Leviton Manufacturing Co Inc 2 SAFETY PRECAUTIONS Carefully observe these safety instructions A DANGER HAZARD OF ELECTRIC SHOCK EXPLOSION OR ARC FLASH Apply appropriate personal protective equipment PPE and follow safe electrical work practices See NFPA FOE Only qualified electrical workers should install this equipment Such work should be performed only after reading this e
2. 8000 Meters 2 Installing Potential Transformers for Three Phase Service Greater Than 277V 3 Installing the Sense Voltage and Control Voltage Cables in Wye and Delta Services 4 Installing the Current Transformers 5 Connecting the Ethernet Communications 6 Connecting the Modbus RTU Communications 7 Start Up Sequence Leviton Manufacturing Co Inc 11 8 Completing the installation record 3 1 5 Mounting the Series 8000 Meters Figure 5 shows the general mounting layout for metering 120V 208V wye services and Figure 6 shows the general mounting layout for metering 347V 600V wye services 1 Mount the Series 8000 meter and the shorting block enclosure adjacent to the main circuit breaker box using the 1 inch 25 mm 8 screws If mounting the unit on a plasterboard surface use cylinder plugs 2 Remove the front cover from the meter by removing the four screws with a 2 Phillips screwdriver Retain the cover and screws for later re installation 3 Mount the Series 8000 meter on the wall and secure it by inserting a screw in each mounting keyhole and tightening the screws 4 Mount the shorting block enclosure on the wall as shown in Figures 3 and secure it by inserting a screw in each mounting keyhole and tightening the screws In Figure 4 the meter is powered and takes its sense voltage directly from a breaker within the panel Leviton Manufacturing Co Inc 12 Figure 4 120V Mounting Layou
3. eo Password PPP Login M Demand Interval Setup User Name x 2 Password Block Demand Sliding Window Demand Demand Interval in Minutes Y Report CNTP Host Time Server IP Address Unit Type 5312 120 Leviton Manufacturing Co Inc 32 After a few moments the meters found will be listed in a table a Unit Discovery IP Address 192 168 111 47 192 168 111 30 182168 111 58 192 168 111 117 192 168 111 137 192 168 111 134 192 168 111 81 192 168 111 133 192 168 111 160 182168 111 169 192 168 111 73 192 168 111 126 192 168 111 68 192 168 111 131 192 168 111 123 Model Name MAC Address Firmware Build Serial Number Programmable SFG1 SFG2 Status ma H H H HH H H mi T 11 1 1 ees e pr eme s e a e 1 46 1105 0208410501 Prog On Found Doi na D E e S TH Ord S T H H S T HH H rd E T T 8124 277V 3P 08 8124 277 3 F 0212060212 Prog On Found azaan a ma amaaa Pete B o rama ssatmvamos enetava oessa zr ozmen Pegon 5 9 fmi Interface Local Area Connection 3 Refresh Clear ARP for discovery MV Load Config Specify Cancel OK Select the S8000 to be programmed and click OK Leviton Manufacturing Co Inc 33 After a few moments the Configuration Tool will retrieve the existing programming from the meter and display the following screen wA 8000 Con
4. om at L2 OQ L f k L c D 7o Leviton Manufacturing Co Inc 21 For a 277 480V three phase wye panel with the 120V variant of the meter o Connect meter terminal A to the voltage disconnect phase A red wire o Connect meter terminal B to the voltage disconnect phase B black wire o Connect meter terminal C to the voltage disconnect phase C blue wire o Connect meter neutral terminal to neutral bar in the voltage disconnect panel white wire Connect earth wire to earth post using lug provided o From the auxiliary power transformer connect 120V auxiliary power to AUXA and AUXN on the meter see Figure 10 O Figure 10 S8000 meter 277 480V three phase wye service connection Earth AuxA AuxN Phase C red white blue BX cable red Neutral white Sense Voltage Terminal Block J3 0 75 inch 1 9 cm Strain Relief Leviton Manufacturing Co Inc 22 For a 277V 480V three phase wye service panel with the 277V variant of the meter O Q 0 O O O Connect the sense voltage phase A red wire to the step down transformer terminal A Connect sense voltage B to the sense voltage connector J3 phase B black wire Connect sense voltage C to the sense voltage connector J3 phase C blue wire Connect sense voltage N to step down transformer terminal N white wire Connect the earth wire to earth post using lug provided Check the 277V Inpu
5. O wire 14 AWG 1 63 mm2 cable for a single phase wye connected circuits mall flat head screwdriver Leviton Manufacturing Co Inc 10 Crimping tool 2 Phillips screwdriver 18 AWG butt splice connector Wire strippers Oo OQ Oo O Four 1 inch 25 mm 8 mounting screws suitable for selected mounting surface 3 1 2 Site Planning 1 Determine the number of S8000 meters to be installed and ensure adequate space 2 Determine the number of Modbus RTU or Ethernet drops required and ensure they are installed before installing the S8000 meters 3 Determine the number and types of meters or monitors required single phase network or three phase 4 Determine the model number and correct sense voltage based on the voltage label on the top right side of the unit 3 1 3 Access to Power and Lighting The installation site must be supplied with access to the main electrical panel and any sub panels Portable or permanent lighting must be available to provide the installers with a clear view of the equipment and of the installation environment Each installation may vary depending on physical site restrictions 3 1 4 Installation Procedures This section provides information about activities that must be performed to install the Series 8000 meters in a single phase 2 wire single phase 3 wire network or three phase 4 wire application The installation procedures must be performed in the following order 1 Mounting the
6. install the control voltage cable in a 120 208V or 120 240V application HAZARD OF ELECTRIC SHOCK EXPLOSION OR ARC FLASH Apply appropriate personal protective equipment PPE and follow safe electrical work practices See NFPA OE This equipment must only be installed and serviced by qualified electrical personnel Turn off all power supplying this equipment before working on or inside equipment Always use a properly rated voltage sensing device to confirm power is off Replace all devices doors and covers before turning on power to this equipment The meters must be connected to the sense voltage and control voltage through a properly rated voltage disconnect not shown in the wiring diagrams Failure to follow these instructions will result in death or serious injury NOTE If the circuit breaker panel does not designate phase A phase B and phase C feeds make your own designation and use it for the rest of the installation 1 Before connecting the sense voltages turn off the power to the circuit being connected 2 Always use a properly rated voltage sensing device to confirm power is off 3 Connect the sense voltages phase A B C and N leads from the voltage disconnect to the meter as described in Figure 6 on page 14 and Figure 7 on page 15 NOTE The phase wiring sequence A D C between the Series 8000 meter and the panel must match or the measurement readings will be wrong 4 If more than one meter is being ins
7. orteniuan ema a quse irtouuan eM aHa E NE M M UE Ordo neues 30 10 2 Diagnostics JVIOUR scores eo qor eme a Puesta agb e UpPEPUe SD RU a2 UNEPEFU DU RU GPIUEE MATURO PR DP pM aTUER IRR Sp PP RRUSE 30 11 CONFIGURATION TOOL CONFIGURATION ccc ccc III 32 12 CONTACT INFORMATION dotes eer ener een nn nr een ene eee ne 33 IS REGULATORY CONIPEBESING ST 36 Leviton Manufacturing Co Inc 2 1 INTRODUCTION This document describes the Series 8000 including procedures to install and start up the unit and complete the initial configuration e System Description e Pre Installation e Installation Procedures e Start Up Sequence e Fuse Replacement This documentation is intended for those responsible for installing and configuring the Series 8000 meters Installers must be qualified electricians with knowledge of local and national code requirements See Safety Precautions 1 2 Meter Features System Description The Series 8000 meters support e Single phase 2 wire e Single phase 3 wire network e Three phase wye and Delta services Depending on how the meters are installed and configured they can meter 8 12 or 24 individual meter points The Series 8000 meters are designed for residential commercial and industrial use and display the power and consumption readings for each measurement point 1 3 Series 8000 System Specifications The Series 8000 system architecture includes e Single phase 2 wire s
8. LEVITON Series SOOO Multi Point High Density Meter Installation and User s Manual LEVITON Displa lt lt E iis Select Series 8000 www leviton com High Density Meter Version 2 0 UNE TOR K TIT BT CO Jo M M eee 3 L2 Meter Features Ss stem Re r RIL oi esiic oed o e ia 0Uo coda su ie ed Ex cue d uU eOUE cid sun ien odor dorada 3 1 2 Series 8000 System SDECEITCALUOTIS one doo iae g orate o Ue Eh PE adin e Upon euo de Een ba GU de i ia rn 3 PN Up SUM PRECAUTION c n 9 ZA Electrical Safety COMP AN CS wisi secu sent que vue se coreano ves usato snae oves ue coros a eva Eu sq oU Uo Ue UUE 10 SM HOC 1 NE TION e 10 SNB Hr E so sausasse assmeneceatenecaneosesesogsaeteees 10 22 Z IOS Ic T WO coueuiopeua uten Pau Uem REM MEUM UMMM M R UMMEQuU UMS 26 5 Installing the Current TransTormerS sss sese eee eee eee 27 6 Connecting the Ethernet Communications eee eee ee eee eee eee 24 7 Connecting the Modbus RTU Communications esses nnne eene nns 28 A Deque H6 ea arc esteem Ets ME NUES MUT M DUET M UNUM UNS 20 8 1 Manually Testing Communications eeeeeeeessesseseeeee nennen eene nnne nennen nnns 20 MISSIS PMU NET CT m 30 D RR TUET Le cases cen aibnme ata eor eERPre ee v aut roto T PS ense E E SOHO NO I EPIO EDANN BUD MEETS DUAE 30 LSR VIS TE Tea a secandanayieeepesbacgeoucenea seat
9. agnostics mode is displayed then release 2 For communicating via Ethernet press the Display button until Local IP Address appears on the display a If the IP address is 192 168 0 9 the meter has not found a DHCP server As a result the meter will use its default IP configuration and may not be able to report See the Series 8000 meter Configuration Guide for instructions on how to program default IP addresses b If the IP address is not 192 168 0 9 the meter has acquired an IP address from the local network and will be able to report data and synchronize time 3 Press the Display button until the Send command appears on the display 4 Press the center or the right arrow button to manually force the Series 8000 meter to report metering data using the Ethernet connection This clears data from the Series 8000 meter memory and ensures the time 1s set correctly Leviton Manufacturing Co Inc 29 9 Pulse Inputs There are two pulse in terminal blocks in the Series 8000 meter as shown in Figure 2 Each terminal block has a negative terminal pin on the right and a positive terminal pin in the left The pulse inputs are compatible with both dry and solid state form A contacts 10 Hz maximum 20 ms pulse width minimum The inputs are not polarity sensitive to dry relay contacts When the pulsing device provides solid state form A outputs the negative terminal from the source device must be connected to the negative termi
10. el To Series 8000 Leviton Manufacturing Co Inc 14 Mount the potential transformer enclosure between the supply voltage and the Series 8000 meters as shown in Figure 5 Transformer configuration must be YIIY wye wye In Figure 6 the meter is powered from the potential transformers that are fed from a breaker within the 347V 600V panel The CT cable is connected to the shorting enclosure before connecting to the CTs in the panel Figure 6 Typical 3 PH 347V installation Legend 1 Shorting block enclosure Shorting block Breaker panel Current transformer Load breaker Meter breaker Transformer enclosure PowerHawk meter 9 Load 10 Cable 11 Shorting jumper 12 Shorting block 13 DIN rail Shorting block detail Leviton Manufacturing Co Inc 15 3 1 7 Installing the Sense Voltage and Control Voltage Cables in Wye and Delta Services The sense voltage A B C N provides phase voltages for metering The configuration depends on the type of service being metered o See For a single phase panel with the 120V variant of the meter o See For a 120 208V three phase wye panel with the 120V variant of the meter o See For a 240 416V three phase wye panel with the 230 240V variant of the meter o See For a 277 480V three phase wye panel with the 120V variant of the meter o See For a 347 600V or higher three phase wye panel with potential transformers with the 120V variant of the
11. figuration Tool Unit Help Unit Field Configuration Manufacturing Meter Points Circuits Pulse Probes Current IP Address fi 92 168 111 68 MAC Address 9921 86002448 Revision Main Meter 120 w YE PT Ratio fi 000 Default IP Configuration IP Address 92168 09 Netmask 255 255 255 0 Gateway 92168 01 MV DHCP Enabled DNS Primary DNS Secondary Report Intervals Types Reporting Schedule Calculations amp Format BACnet Comms Recording Interval in Minutes 60 X Demand Interval Setup Block Demand Sliding Window Demand Demand Interval in Minutes 6 Modem Phone tt 613 228 9329 Alternate Phone 4 613 229 9329 AT String AT x3 STE 7 B Wait for Dial Tone T gt Host Server IP Address 206 1 31 53 50 Upload Directory download Download Directory upload ETP Login User Name tacta Password Mutt3rdf PPP Loain User Name pwthawk magma ca Password Jy B p6 NTP Host Time Server IP Address 206 1 31 53 50 File loaded successfully Leviton Manufacturing Co Inc Unit Type 8124 27 7 Le 34 12 CONTACT INFORMATION Leviton Manufacturing Co Inc Global Headquarters 201 N Service Rd Melville NY 11747 3138 Tech Line 1 800 824 3005 FAX 1 800 832 9538 Leviton Manufacturing Co Inc Lighting amp Ener
12. gy Solutions 20497 SW Teton Avenue Tualatin OR 97062 Telephone 1 800 736 6682 FAX 503 404 5594 Tech Line 6 00AM 4 00PM P S T Monday Friday 1 800 959 6004 Leviton Manufacturing of Canada Ltd 165 Hymus Boulevard Pointe Claire Quebec H9R 1E9 e Telephone 1 800 469 7890 FAX 1 800 563 1853 Leviton S de R L de C V Lago Tana 43 Mexico DF Mexico CP 11290 e Tel 452 55 5082 1040 www leviton com mx Visit our Website at www leviton com les 2012 Leviton Manufacturing Co Inc All rights reserved Subject to change without notice Leviton Manufacturing Co Inc 35 13 REGULATORY COMPLIANCE The Series 8000 meter must be installed by a certified electrician with knowledge of local safety regulations Initial installation of the unit and any subsequent modification to the unit must be inspected by the local electrical safety authority The Series 8000 meter complies with the standards listed in Table 16 Table 16 Regulatory Compliance Discipline Regulatory and industry standard UL certified to IEC EA UL CSA 61010 1 2 Edition CSA C22 2 No 61010 1 04 Emissions EMC FCC Part 15 Class B ICES 003 EN55022 IEC 6100 4 5 Surge power telephone lines ANSI TIA968 A 2002 Leviton Manufacturing Co Inc 36
13. he product must be UL recognized listed Measurement accuracy ANSI C12 20 Class 0 5 ANSI C12 20 Class 0 5 rd compliant when used with 0 3 IEC 62053 22 Class 0 55 IEC 62053 22 Class 0 55 Ts d Measurement Canada Approved EGO compliant Pulse inputs 1 and 2 Dry form A and solid state form A compatible Dry form A and solid state form A compatible Maximum frequency 10 Hz Maximum frequency 10 Hz Minimum pulse width 20 ms Minimum pulse width 20 ms Non volatle memory storage 120 days in 15 minute intervals 120 days in 15 minute intervals On board Ethernet port 10 100 Mb s 10 100 Mb s On board Modbus serial port RS422 or R5485 19200 9600 Baud RS422 or RS485 19200 9600 Baud Fuse rating F1 North America 120V T125 mA 250V North America 120W T125 mA 250V Intemational 230V T63 mA 250V International 230V T63 mA 250V Operating humidity 5 to 90 non condensing Indoor or enclosed outdoor environment Indoor or enclosed outdoor environment Leviton Manufacturing Co Inc 4 Front Panel Display The Series 8000 meters have the following front panel features Figure 1 shows the Series 8000 front panel LCD displays 2 rows of 16 characters for each of the meter points 8 12 or 24 Display button cycles through the available information for each of the meter points Left and right arrow buttons selects which of the meter points is on the display Figure 1 Series 8000 front panel LEVITON Display
14. ingle phase 3 wire network and three phase compatibility e 120 208V 120 240V and 277 480V configurations and 347 600V with external potential transformers e Upto 8 12 or 24 individual meter points e Local Ethernet configuration interface via PC and web browser e Ethernet ports for remote reporting e Modbus serial port for remote reporting e Serial port for remote display e 2 pulse inputs to connect metering devices Table 1 lists the system specifications of the Series 8000 Leviton Manufacturing Co Inc 3 Table 1 Series 8000 Meter System Specifications Specification Series 8000 Series 8000 Model S8UTS Model SSUWH Dimensions Height 13 125 in 33 5 cm Height 13 125 in 33 5 cm Width 12 in 30 5 cm Width 12 in 30 5 cm Depth 2 125 in 5 5 cm Depth 2 125 in 5 5 cm Sense voltage 100V to 300V 50 60Hz 100V to 300V 50 60Hz 2W N Protective Earth Wye 3W N Protective 2W N Protective Earth Wye 3W N Protective Earth Wye 3W Protective Earth Delta Earth Wye 3W Protective Earth Delta Control voltage and current North America 120V 125 mA 60 Hz North Amenca 120V 125 mA 60 Hz International 230 240V 63 mA 50 60 Hz International 230 240V 63 mA 50 60 Hz Current transformers 0 333 V secondary CT B mA secondary CT ee m Note All CTs used with the product must be UL 200 A primary CT eropa Meter burden 4 04 ohms CT burden 20 ohms Triacta part number 900 313 00 Model 7896 Note All CTs used with t
15. mand Date and time UTC In Diagnostics mode the right and left arrow buttons scroll the display from meter 1 through N When the local IP address 1s shown on the LCD use the right and left arrow buttons to scroll through the following information Remote host server IP address Time server IP address Default IP address Default NetMask Default gateway PPP user name Phone number AT command string Alternate phone number Unit serial number Firmware build number Ethernet port MAC address Firmware revision Potential transformer ratio 11 Configuration Tool Installation Unzip and run the install program provided with the Leviton Configuration Tool application on a Windows laptop or desktop computer 11 1 Network and Meter setup Power up the S8000 from the aux power connector Connect one or more S8000 meters to the same network and the same subnet as the computer that will be running the S8000 Configuration Tool Start the Configuration Tool from the windows start menu or the shortcut on the desktop Login as e UserName Leviton e Password S8000 Leviton Manufacturing Co Inc 31 4 8000 Configuration Tool ld 212i xl Unit Help Unit Field Configuration Manufacturing Meter Points Circuits Pulse Probes Current IP Address m Main Meter 120 WYE MAC Address PT Ratio fi 000 Revision Default IP Configuration IP Address Name a User Name Jlevi
16. meter o See For a three phase Delta panel with the 120V variant of the meter The Series 8000 meters are shipped from the factory with a control voltage jumper that can be used to connect the control voltage input and the sense voltage inputs to provide control voltage to the unit The following procedures explain how to connect the sense voltage inputs for each of the service types For a single phase panel use a 3 wire red black white 14 AWG 1 63 mm2 90 C 194 F cable For a three phase panel use a 4 wire red black blue white 14 AWG 1 63 mm2 90 C 194 F cable For a Delta service use a 3 wire red black blue 14 AWG 1 63 mm2 90 C 194 F cable Metallic flexible armored cable BX cable is recommended for commercial installations as shown in Figure 6 on page 14 The Series 8000 meters must be connected to the sense voltage and control voltage through a properly rated disconnect that disconnects all line and neutral wires so it can be powered down The disconnect must be located within easy reach of the meter operator and must be labeled as such Opening the disconnect or breaker is the disconnect device For multiple Series 8000 meter installations the same disconnect can be used to power all meters and must be labeled for all meters it supplies power to The disconnect device must meet IEC 60947 1 IEC 60947 3 and or comply with the local electrical code Leviton Manufacturing Co Inc 16 To
17. nal of the Series 8000 meter pulse in terminal block 10 Display Navigation The Series 8000 meter has three buttons to control the information presented on the LCD The display has a normal and a diagnostics mode The Series 8000 meter starts in normal mode and enters diagnostics mode when the Display button is pressed and held for 5 seconds To adjust the contrast hold down the Display button and use the right and left arrow buttons to increase and decrease the contrast respectively 10 1 Normal Mode In Normal mode the Display button scrolls through the information for each meter The left and right arrow buttons select the previous or next meter points respectively The following information is available S Real Energy Delivered kWh D Real Energy Received kWh R Real Power Watts Reactive Energy Delivered KVarhD Reactive Energy Received KVarhR Reactive Power Var In Normal mode the right and left arrow buttons scroll the display from meter points 1 to 8 1 to 12 or 1 to 24 depending on your configuration 10 2 Diagnostics Mode Diagnostics mode is accessed by pressing and holding the Display button for 5 seconds In Diagnostics mode pressing the Display button will scroll through the following additional information Send data command CT Primary value and Real Power Watts per phase Voltage per phase Local IP address Leviton Manufacturing Co Inc 30 Reset factory default IP address com
18. ntire set of instructions The equipment must be accessible to authorized personnel only Equipment must be installed in areas where access can be restricted NEVER work alone Before performing visual inspections tests or maintenance of this equipment disconnect all sources of electric power Assume that all circuits are live until they have been completely de energized tested and tagged Pay particular attention to the design of the power system Consider all sources of power including the possibility of backfeeding Turn off all power supplying the meter and the equipment in which It is installed before working on it Always use a properly rated voltage sensing device to confirm that all power is off Before closing all covers and doors carefully inspect the work area for tools and objects that may have been left inside the equipment successful equipment operation requires proper handling installation and operation Neglecting fundamental installation requirements can lead to personal injury as well as damage to electrical equipment or other property NEVER bypass external fusing NEVER short the secondary of a Potential Transformer PT Always short the secondary of a current transformer prior to disconnecting current input loads Failure to follow these instructions will result in death or serious injury Leviton Manufacturing Co Inc 9 2 1 Electrical Safety Compliance e Use the unit only in accordance
19. panel white wire Connect earth wire to earth post using lug provided Install power supply shorting jumpers see Figure 8 O O Figure 8 S8000 meter 120 208V three phase wye service connection Earth Phase C blue Phase B black Shorting Jumper Phase A red Neutral white 0 75 inch 1 9 cm Strain Relief Sense Voltage Terminal Block J3 Leviton Manufacturing Co Inc 19 For a 120 208V three phase wye panel version with no shorting blocks 11 0 in et a So ee eS ee G c c c0 c5 c5 c5 c c Legend 1 Mounting keyhole 2 Cover screw location 3 Electrical distribution panel 4 CT conduit 5 Power conduit Leviton Manufacturing Co Inc 20 For a 240 416V three phase wye panel with the 230 240V variant of the meter O e O O O 0 75 inch 1 9 cm Strain Relief Sense Voltage Terminal Block J3 Connect meter terminal A to the voltage disconnect phase A red wire Connect meter terminal B to the voltage disconnect phase B black wire Connect meter terminal C to the voltage disconnect phase C blue wire Connect meter neutral terminal to neutral bar in the voltage disconnect panel white wire Connect earth wire to earth post using lug provided Install power supply shorting jumpers see Figure 9 Figure 9 Series 8000 meter 240 416V three phase wye service connection Earth Phase C blue Phase B black Shorting Jumper 7
20. ries 8000 SSUTS meter uses split core 0 333V CTs and the Series SSUWH meter uses 100mA CTs only and is typically used where accuracy is important and long secondary CT wiring is required up to 300 feet 91 44 meters Current transformers connect to the Series 8000 meters through the 50 conductor CT able provided with the meter Table 2 describes the CT wire pairs and the cable color scheme for each meter point You can also find this information on the inside of the meter s outer cover Each CT has an X1 positive and X2 neutral wire pair and uses butt splice connectors to attach the CT to a specific meter wire pair The direction of the energy flow is indicated on the CT 6 Connecting the Ethernet Communications When the Ethernet port is used to report data an RJ45 patch cable is required to connect the Ethernet port to the local Ethernet network 1 Route the cable through the slot in the Series 8000 meter enclosure 2 If the local network automatically assigns IP addresses through a DHCP server the Series 8000 meter will be able to report using its factory default IP settings If the local network is configured for static IP addresses refer to the Series 8000 meter Configuration Guide for instructions on how to configure default static IP addresses Leviton Manufacturing Co Inc 27 7 Connecting the Modbus RTU Communications If the Modbus port is used to report data an RS422 RS485 serial cable is required to connect
21. rting Jumper LAL Ladd 0 75 inch 1 9 cm Strain Relief Sense Voltage Terminal Block J3 Leviton Manufacturing Co Inc 25 4 Delta service metering To use the S8000 meter in a Delta service the line to line voltage from the Delta service must be reduced to 120V line to line using appropriate potential transformers Metering a Delta service requires only two potential transformers and only two CTs for phase A and C Using the phase B CT 1s optional For a 3PH Delta panel with the 120V variant of the meter O Q0 O O 0 75 inch 1 9 cm TP Strain Relief Connect meter terminal A to the voltage disconnect phase A red wire Connect meter terminal C to the voltage disconnect phase C blue wire Connect meter neutral terminal to meter terminal B black wire Connect earth wire to earth post using lug provided Install power supply shorting jumpers see Figure 14 Figure 14 Series 8000 meter 3PH Delta service connection Earth Phase C blue Phase B black Shorting Jumper 7 22 m e c M S a co O10 90 AS P Phase A red J3 B to J3 N shorting wire Sense Voltage Terminal Block J3 Leviton Manufacturing Co Inc 26 5 Installing the Current Transformers Both models of Series 8000 meter use current transformers CTs with different secondary outputs The Se
22. t Dimensions and Clearances 11 0 in pe 2 t 27 9cm 15 2cm 5 6312 10 67 in 27 1cm it P 4 if 6 E 4 IE a o EE Pa ee Eee drap n RN Meast Fi q RE r I Legend Mounting keyhole Cover screw location Electrical distribution panel CT conduit Power conduit Shorting block enclosure Shorting jumper Shorting block DIN rail W OOo J C Mn d LM No Leviton Manufacturing Co Inc 13 3 1 6 Installing Potential Transformers for 3PH Service Greater than 277V Potential transformers are required when metering services greater than the rated input of the meter Potential transformers are used to reduce the line to neutral voltage of the service to 120V The accuracy class should be 0 3 or better with a burden rating of 30VA For applications in Canada Measurement Canada approved potential transformers are required Measurement Canada requires an accuracy class of 0 3 or better with a 150V A rating NOTE Potential transformer burden depends on the control voltage source If control voltage is provided separately not derived from the metered voltage t hen lower transformer burden may be acceptable Contact your local Leviton representative for details Potential transformers must be mounted in a listed electrical enclosure as shown in Figure 5 Figure 5 Potential transformer chassis BLUE EARTH From the Breaker Pan
23. t box on the UL label on the Series 8000 chassis see figure 11 Figure 11 277 480V WYE wiring CBAN Leviton Manufacturing Co Inc 23 To convert the 277V Series 8000 to a 120V Series 8000 meter Remove phase A and neutral from the sense voltage input terminal Remove the white jumper connector from J2 Remove step down transformer by removing mounting plate from the meter base See figure below Check the 120V Input power box on the UL label on the Series 8000 chassis see figure 12 O O cQ XX 0 Note Refer to Installation Manual for the 120V wiring options of the Series SOOO to complete the install Figure 12 120 wiring conversion Leviton Manufacturing Co Inc 24 For a 347 600V or higher 3PH wye panel with potential transformers with the 120V variant of the meter O Q O O O O Connect meter terminal A to the voltage disconnect phase A red wire Connect meter terminal B to the voltage disconnect phase B black wire Connect meter terminal C to the voltage disconnect phase C blue wire Connect meter neutral terminal to neutral bar in the voltage disconnect panel white wire Connect earth wire to earth post using lug provided Install power supply shorting jumpers see Figure 13 NOTE For the wiring of the potential transformers see Figure 5 Figure 13 Series 8000 meter 347 600V or higher three phase wye service with potential transformers connection Earth Phase C blue Phase B black Sho
24. talled repeat this procedure for each additional meter Leviton Manufacturing Co Inc 17 For a single phase panel with the 120V variant of the meter o Connect meter terminal A to the voltage disconnect phase A red wire o Connect meter terminal B to the voltage disconnect phase B black wire o Connect meter neutral terminal to neutral bar in the voltage disconnect panel white wire o Connect earth wire to earth post using lug provided Meter terminal C 1s not connected o Install power supply shorting jumpers see Figure 7 O The Series 8000 meters are rated for direct input of 120V to 277V 60Hz phase potential When metering services greater than 120V the meter is powered from a separate 120V instrument transformer Figure 7 Series 8000 meter in a 120 240V single phase connection Earth Phase B black Shorting Jumper EE VE a E amp orem ep J SESI Phase A red e E Neutral white DB EM my 0 75 inch 1 9 cm Strain Relief Sense Voltage Terminal Block J3 Leviton Manufacturing Co Inc 18 For a 120 208V three phase wye panel with the 120V variant of the meter o Connect meter terminal A to the voltage disconnect phase A red wire o Connect meter terminal B to the voltage disconnect phase B black wire o Connect meter terminal C to the voltage disconnect phase C blue wire o Connect meter neutral terminal to neutral bar in the voltage disconnect
25. the Modbus RTU port to the local Modbus network 1 Route the cable through the slot in the Series 8000 meter enclosure 2 Depending on the position of the Series 8000 meter in the Modbus network as shown in Figure 15 set the DIP switches as follows Series 8000 Meters Location Head end Intermediate Tail end 3 Refer to the Series 8000 meter Configuration Guide for instructions on how to configure the baud rate parity settings and Modbus base address for the RS485 RTU communications Figure 15 Modbus wiring diagram Head End Meter Tail End Meter Intermediate Meters Shield Leviton Manufacturing Co Inc 28 8 Start Up Sequence Use the following procedure to start up the Series 8000 meter 1 Ensure that all CT and sense voltage wiring is securely installed 2 Remove all tools from the work area 3 Re install all cover plates and equipment covers 4 Power up the meter The LCD on the front panel of the meter indicates the operating status of the unit as follows a Initial power up message LEVITON b After the internal configuration is complete the display shows default information for the first meter 8 1 Manually Testing Communications This procedure clears the meter memory manually tests the communications from the Series 8000 meter and updates the meter clock To force the meter to send data follow these steps 1 Press and hold the Display button for 5 to 7 seconds until the di
26. ton Gatewy f Password l Cancel DNS Primary DNS Secondary TON T DHCP Enabled LEVI Powered by X TRIACTA Download Directory FTP Login Intervals Types Reporting Schedule Calculations amp Format BACnet Comms UsrName TT P d Recording Interval in Minutes eo ded PPP Login M Demand Interval Setup User Name As R Password Block Demand Sliding Window Demand Demand Interval in Minutes Y 8000 Configuration Tool Login m Report NTP Host Time Server IP Address Unit Type 5312 120 P 11 2 Connecting to the S8000 meter Using the Unit drop down on the applications banner select the list function This will cause the application to search the local subnet for 8000 meters to connect to Unit Help Unit Field Configuration Manufacturing Meter Points Circuits Pulse Probes Current IP Address Main Meter 120V WYE MAC Address PT Ratio fi 000 Revision r Default IP Configuration Modem Phone IP Address Altemate Phone L Netmask AT String a x3 Gateway Wait for Dial Tone T DNS Primary DNS Secondary M Host Server IP Address DHCP Enabled Upload D irectory Download Directory FTP Login Intervals Types Reporting Schedule Calculations amp Format BACnet Comms User Name Recording Interval in Minutes
27. with the electrical power rating e The unit is only to be installed by a qualified electrician e Initial installation of the unit must be inspected by the local electrical Inspection Authority e Install the unit in compliance with the following local and national electrical codes o Canada Canadian Electrical Code Part I CSA C22 1 o United States National Fire Protection Association NFPA 70 US National Electrical Code o Elsewhere International Electrotechnical Commission IEC 364 Part 1 7 e Ensure that the unit is properly earthed e If the equipment is installed or used in a manner other than that specified in this document it may void your warranty or impair the protection of the equipment 3 INSTALLATION This section contains the following installation topics e Pre I nstallation e Installation Procedures e Start Up Sequence 3 1 Pre Installation The pre installation checklist and site planning must be performed before installing the equipment at the site 3 1 1 Pre Installation Checklist The installer must provide the following information tools and equipment before proceeding with the installation Certified current transformers for metering An appropriate 15 Amp maximum circuit breaker or a fused disconnect Switch for the type of panel Current voltage meter to test the phasing of panel RJ45 Ethernet patch cable 4 wire 14 AWG 1 63 mm2 cable for three phase wye connected circuits or 3 O O O O QO

Download Pdf Manuals

image

Related Search

Related Contents

    電源ユニットの着脱方法  平成17年12月15日判決言渡 同日原本領収 裁判所書記官 平成17年(ネ)  ONKYO RBX-500  Bulletin St Gilles M.indd - Saint  7” Portable DVD Player Manual de Usuario  Intimidator Spot LED 350 User Manual Rev. 7  Influenza Report    

Copyright © All rights reserved.
Failed to retrieve file