Home

Quick Installation Guide North America MAN-01-00025

image

Contents

1. MA SolarEdge Quick Installation Guide North America For full installation and safety details you must refer to the SolarEdge Installation Guide Make sure you read fully understand and follow the detailed instructions in the SolarEdge Installation Guide prior to each installation Failure to do so could result in injury or loss of life and damage or destruction of the equipment The images contained in this document are for illustrative purposes only and may vary depending on product models Connecting Power Optimizers to Modules 1 Mount the power optimizers in a shaded location near the PV modules on the structure or racking to which the module is attached using the mounting holes If possible avoid mounting power optimizers in locations where they will be exposed to direct sunlight Make sure that each power optimizer is positioned within reach of each module s cables To allow proper heat dissipation maintain a 1 2 5 cm clearance distance between the power optimizer and other surfaces Mounting bracket 2 Attach each power optimizer to the rack using the 5 16 or 1 4 bolts nuts and washers 3 Use the following methods to ground the power optimizer e For mounting on a grounded metal rail Use the provided 5 16 stainless steel grounding star washer between the railing and the flat side of the mounting bracket The grounding washer should break through the anodize coating of the railing to ensure low resis
2. e 4 on either side e When installing inverters one above of the other at least 16 between inverters e When installing inverters side by side follow these clearance specifications Single Phase Inverters Three Phase Inverters Locations where the yearly average high 6 EEEE EEA temperature is below 25 C 77 F l 8 between inverters Locations where the yearly average high temperature is above 25 C 77 F 16 between inverters The inverter is supplied with one of the following two types of mounting brackets The mounting steps in the next sections refer to these types Type 1 Type 2 E For type 1 e Install the mounting bracket on the wall with the U shaped indentations facing up and the UP marking is correctly oriented lt _ Mounting bracket orientation e Hang the inverter on the bracket r Single phase example e Secure the inverter to the bracket using the two supplied screws Hang here gt Bracket screw solar gF E For type 2 e Install the mounting bracket on the wall 2 oes Mounting with the flat side of the bracket is at the ern FE lie tab bottom a Ge BE e Hang the inverter on the bracket Align the two indentations in the inverter enclosure with the two triangular Indentation mounting tabs of the bracket and lower the inverter until it rests on the bracket evenly e Secure the inverter to the bracket using the two supp
3. ELECTRICAL SHOCK HAZARD Do not touch uninsulated wires when the inverter cover is removed RISQUE D ELECTROCUTION Ne touchez pas les fils non isol s lorsque le couvercle de l onduleur est retir e Use the user buttons to configure the connection Creating an RS485 connection If a revenue grade meter is connected to your inverter it uses the RS485 port and therefore an RS485 communication bus cannot be created 1 2 3 Make sure that the ON OFF switch at the bottom of the inverter is turned OFF and the Safety Switch is turned OFF Remove the seal from one of the openings in communication gland 2 and insert the wire through the opening Pull out the 9 pin RS485 RS232 terminal block connector and loosen the screws of pins B A and G on the left of the RS 485 terminal block a Insert the ends of wires into the G A and B pins Use four or six wire n y S twisted pair cable for this connection You can use any color wire for INN each of the A B and G connections as long as the same color wire is NX used for all A pins the same color for all B pins and the same color for all RS485 2 not in use G pins G A Data B Data For creating an RS485 bus connect all B A and G pins in all inverters T Tighten the terminal block screws and push it firmly all the way into the communication board Terminate the first and last inverters in the chain by switching a termination Dip switch inside the inverter to ON move t
4. OFF 2 Turn ON the AC breaker 3 Move the Safety Switch to the ON position 4 Remove the inverter cover Open the inverter cover s six Allen screws and carefully pull the cover vertically before lowering it WARNING AN ELECTRICAL SHOCK HAZARD Do not touch uninsulated wires when the inverter cover is removed RISQUE D ELECTROCUTION Ne touchez pas les fils non isol s lorsque le couvercle de l onduleur est retir 5 Activate the inverter according to the activation instructions supplied in the inverter package 6 Verify that the inverter is configured to the proper country or grid setting Press the LCD light button until reaching the ID status screen ID ee HEHEHE FH DSP1 2 1 0210 1 0034 cPU 0002 0111 Country USA2 solar JE 7 If required perform the following additional steps before closing the inverter cover e Country settings or inverter configuration using the internal LCD user buttons located just above the LCD and are numbered esc 1 2 3 Enter from left to right Enter the menus by pressing ENTER for five seconds and then inputting the password 12312312 To verify that the country code is set to USA select Country from the main menu press Enter and select USA In the next menu that appears select the desired AC grid configuration e Communication options connection refer to Setting up Communication on page 7 Close the inverter cover by tightening the screws with a torque of 9 0 N m 6 6 Ib ft For prop
5. Keep holding for 5 seconds until the following is displayed Turn the inverter ON within 5 seconds If you wait longer than 5 seconds the inverter exits the pairing mode The following message is displayed indicating that the inverter is performing the pairing Pairing Remaining sec 180 Wait for the completion of the pairing remaining seconds is 0 If pairing fails an error is displayed In this case repeat the pairing steps When pairing succeeds the following message is displayed Pairing Pairing Completed At the end of the pairing process the system will start producing power Verify on the LCD screen that the number next to P_OK equals the number of installed power optimizers It may take up to 20 minutes until all the power optimizers are indicated After you turn ON the inverter ON OFF switch the DC cables carry a high voltage and the power optimizers no longer output a safe 1V output Apr s avoir mis l interrupteur ON OFF de l onduleur monophas sur ON les c bles DC portent une haute tension et les optimiseurs de puissance ne g n rent plus la tension de s curit de 1V After you turn OFF the inverter ON OFF switch wait until the LCD indicates that the DC voltage is safe lt 50V or wait five minutes before opening the cover or disconnecting the strings Apres avoir tourn l interrupteur ON OFF sur OFF attendre jusqu ce que l cran LCD indique que la tension DC est s curis e lt 50V ou attendre cing min
6. er sealing first tighten the corner screws and then the two central screws Make sure the Safety Switch is ON If an additional external DC switch is installed between the power optimizers and the inverter s then turn it ON A message similar to the following appears on the inverter LCD panel Vac V Vdcf v Pac W 240 7 14 41 0 0 P OK 000 000 lt S OK gt OFF 10 Verify that the following information appears on the LCD panel e Vac V Specifies the grid voltage e Vdc V The DC input voltage of the longest string connected to the inverter There should be a safety voltage of 1V for each power optimizer in the string e Pac W AC power production At this stage it should be Ow e P_OK Specifies the number of properly connected power optimizers e OK Indicates the status of the connection to the SolarEdge monitoring portal if connected Before proceeding to the next step make sure that the cover is closed High DC Voltage will be present in the inverter following the next step Avant d entamer la prochaine tape assurez vous que le couvercle est ferm Une tension DC tr s haute sera pr sente durant l tape suivante Pairing Power Optimizers to the Inverter Verify that the ON OFF switch at the bottom of the inverter is OFF Press and hold down the inverter LCD button for about 10 seconds The following message is displayed Keep holding button for pairing release to enter menu Remaining 3 sec
7. h version without terminal blocks on the DC side Connect the DC wires from the PV installation to the DC and DC terminals on the switch according to the labels e Safety switch version with terminal blocks on the DC side Connect the DC wires from the PV installation to the DC and DC terminal blocks CAUTION Ensure that the Plus wire is connected to the Plus terminal and that the Minus wire is connected to the Minus terminal Veillez a ce que le cable Plus soit connect au terminal Plus et que le cable Minus soit connect au terminal Minus 4 if more than two strings are required they can be connected in parallel in an external combiner box before connecting to the switch NOTE Y If more than two strings are connected each should be properly fused on both DC and DC according to NEC690 35 B 5 Ifthe Safety Switch has a pre assembled RGM flip the RGM plate upwards to its original position 6 Close the switch cover Inverter Interfaces The following figure shows the inverter connectors and components located at the bottom of the inverter The ON OFF switch and the LCD light button may vary depending on the inverter model DC conduit entry LCD panel and LEDs ON OFF switch ON OFF LCD light Switch button LCD light button Sealed plug AC conduit entry Communication glands Fan Commissioning and Activating the Installation 1 Verify that the inverter ON OFF switch is
8. he left switch to the top The switch is located on the communication board and is marked SW7 To connect to the SolarEdge monitoring portal designate a single inverter as the connection point between the RS485 bus and the monitoring portal This inverter will serve as the master inverter Connect the master to the SolarEdge monitoring portal via one of the communication options Using the optional ZigBee communication option Refer to the ZigBee kit user manual Refer to the SolarEdge Installation Guide for detailed installation and safety instructions Support and Contact Information If you have technical problems concerning our products please contact us USA and Canada 1 0 877 360 5292 Worldwide 972 0 73 240 3118 Fax 1 0 530 273 2769 Email to support solaredge us
9. lied 5mm screws Bracket screw NOTE When mounting an inverter with Type 2 bracket on an uneven surface you may use spacers washers behind the top mounting hole of the bracket Depending on the angle use the appropriate size and number of spacers so that the bracket is perpendicular to the ground Recommended a stainless steel 3 4 long screw with a 1 4 socket button head two jam nuts and three washers 5 Optionally secure the Safety Switch bracket to the wall e Mark the location of the bracket screw for the Safety Switch and drill the hole e Fasten the bracket using a standard bolt Safety Switch bracket Connecting the Strings and the AC to the Safety Switch An example of the Safety Switch connections is shown below For more information refer to the note in the device and to the SolarEdge Installation Guide DC side conduit staatas aleG HO O OL ai__ A oa y f DC connections AC connections Revenu Grade Meter RGM e D E a RGM plate yea se GBBBB888 JU Safety Switch for single phase inverter 10 11 4kW with built in RGM solar gF Connecting the AC Grid If the Safety Switch has a pre assembled RGM in single phase inverters flip the RGM plate downwards before making the connections WARNING Connect the equipment grounding befo
10. nsert the conductor NOTE Three phase inverters require neutral connection at all times only WYE type grids with neutral connection are supported 3 Verify that there are no unconnected wires Connecting the Strings 1 2 Insert the DC conduit into the DC side knockout that was opened Connect the DC equipment ground conductor to the equipment grounding terminal block NN NOTE Functional Electrical Earthing of DC side negative or positive is prohibited because the inverter has no transformer Earthing of module frames and mounting equipment equipotential bonding is required per NEC solar gF 3 Connect the DC wires and check that they are fully inserted and cannot be pulled out easily If the Safety Switch has a pre assembled RGM in single phase inverters flip the RGM plate before making the connections and then return the plate E Single phase 3 7 6kW inverter Connect the DC wires from the PV installation to the DC and DC terminal blocks according to the labels on the terminals Use a standard straight bladed screwdriver to connect the wires to the spring clamp terminals Refer to the figures above E Single phase 10 11 4kW inverter Connect the DC wires from the PV installation to the DC and DC terminal blocks according to the labels on the terminals Use standard flat blade screwdriver to connect the wires to the spring clamp terminals as shown in the figures above m Three phase inverter e Safety switc
11. ptimizer to the Plus output connector of the string s second power optimizer Connect the rest of the optimizers in the string in the same way 7 KI a 2 Verify proper connection of power optimizers Before the inverter is turned ON each power optimizer produces 1V safety voltage Use a voltmeter to verify it for each string using a voltmeter The voltage on a string is the number of modules z p w y multiplied by 1V with a deviation of 1OmV per module Make sure the modules are exposed to sunlight during this process e The minimum and maximum string length should be according to the power optimizer datasheet e Strings DO NOT have to be of equal length NOTE If several strings are connected in parallel verify voltage for each string separately 8 Optional grounding terminal solar Zefel Installing the Inverter 1 Make sure that the inverter ON OFF switch at the bottom of the inverter is switched OFF before and during the installation and that the AC circuit breaker is OFF 2 Usea5mm Allen key to open the Safety Switch cover screws and remove the cover Loosen these screws 3 Openthe required knockout pair bottom back or sides of the enclosure sized or 1 according to the conduits used in the installation 4 Make sure to leave clearance areas in order to cool the inverter e 8 above e Atleast 4 below leaving sufficient clearance for conduits entering from the bottom
12. re connecting the AC wires to the AC terminal block Veillez a relier le conducteur de PE la terre avant de connecter les fils CA au bornier CA 1 Insert the AC conduit into the AC side knockout that was opened 2 Connect the wires and check that they are fully inserted and cannot be pulled out easily _ Single phase 3 7 6kW inverter Connect the wires to AC DC Safety Switch DC Safety Switch the appropriate terminal blocks according to the labels on the terminal blocks Connect the grounding A f P h ith LAL wire first Use a standard straight bladed screwdriver ie R i EN to connect the wires to the spring clamp terminals ye L Insert the conductor Insert the wire 05 15mm deep Press and rotate with screwdriver E Single phase 10 11 4 kW inverter Connect the wires to the appropriate terminal blocks according to the label on the terminal blocks Connect the grounding wire first Use a Latch 03 16 5mm straight flat blade screwdriver to connect the wires to the terminals Insert the conductor o Three phase inverter e For AC DC Safety Switch Connect the Ground and Neutral wires to the L1 L2 L3 terminal blocks in the AC side of the switch Connect the line wires to the appropriate connectors according to the label located in the switch e For DC Safety Switch Use a standard flat blade screwdriver to connect Press here with a the wires to the spring clamp terminals screwdriver I
13. tive connection Apply torque of 9 5 N m 7 b ft A A sg Mounting bracket e For mounting on rails with sliding nut fasteners or an un grounded structure such as a wooden structure Connect an equipment grounding conductor to the grounding terminal according to the instructions supplied with the grounding terminals grounding terminal kits are available from SolarEdge The grounding terminal accepts a wire size of 6 14 AWG and must be sized for equipment grounding per NEC 250 122 requirements Tighten the screws connecting the power optimizer to the frame and the grounding terminal screw Apply torque of 9 5 N m 7 Ib ft So d 4 To benefit from the physical mapping of the installation in the SolarEdge Monitoring Portal record each power optimizer s serial number and location Peel off its removable barcode sticker and stick it on the mapping template or scan the barcode Input in with the SolarEdge iPhone Site Mapper app Upload the map to the SolarEdge Connect to module website using the site registration form 5 Connect the Plus output connector of the module to the Plus input connector of the power optimizer Output 6 Connect the Minus output connector of the module to the Minus input connector of the power optimizer Connecting Power Optimizers in a String 1 Connect the power optimizer outputs in series Connect the Minus output connector of the string s first power o
14. turned OFF 2 Remove the plastic seal from the large opening that has a cut in communication gland 1 and insert an Ethernet CAT5 6 cable through the opening y cae g A 3 7 c9 cs OLLA FE k ra D Mini USB e Ethernet RJ45 ee T568B Standard T568A Standard White Orange White Green T 568B Standard T 568A Standard 12345678 UIE lt lt NWN WSZ whet ale Plug ai lal ia id an dh idl id ss om O oe O Oo om om 3 Usea pre crimped cable to connect via gland no 1 to the RJ45 plug on the inverter s communication board or if using a spool of cable connect as follows e Insert the cable through gland no 1 e Insert the eight wires into an RJ45 connector as described in the figure above e Use a crimping tool to crimp the connector solar JE e Connect the Ethernet connector to the RJ45 port on the inverter s communication board For the switch router side use a pre crimped cable or use a crimper to prepare an RJ45 communication connector Insert the eight wires into the RJ45 connector maintaining the same color coding and pinout on both sides of the Ethernet cable Connect the cable s RJ45 connector to the RJ45 port of the Ethernet switch or router Inverters are configured by default to LAN If reconfiguration is required e Make sure the ON OFF switch is OFF e Turn ON the AC to the inverter by turning ON the circuit breaker on the main distribution panel AN
15. utes avant d ouvrir le couvercle ou de d connecter les strings solar gF Setting up Communication Two communication glands are used for connection of the various inverter communication options Each gland has three openings The table below describes the functionality of each opening Unused openings should remain sealed Opening Functionality Cable Size diameter 1 PG 16 External antenna cable Two large Ethernet connection 4 5 7 mm CAT5 6 ZigBee CDMA yo ad 2 PG 13 5 All three RS485 power reduction Sanco Cable Specifications E Ethernet e Cable type CAT5 CAT6 Maximum distance between the inverter and the router 100 m 330 ft e Cable type Min 3 wire shielded twisted pair a 4 wire cable may be used e Wire cross section area 0 2 1 mm 24 18 AWG a CAT5 cable may be used e Maximum nodes 32 Maximum distance between first and last devices 1 km 3300 ft NOTE If using a cable longer than 10 m 33 ft in areas where there is a risk of induced voltage surges by lightning it is recommend to use external surge protection devices For details refer to http www solaredge us files pdfs lightning surge protection pdf If grounded metal conduit are used for routing the communication wires there is no need for a lightning protection device Creating an Ethernet LAN connection 1 Make sure that the ON OFF switch at the bottom of the inverter is turned OFF and the Safety Switch is

Download Pdf Manuals

image

Related Search

Related Contents

レガートグランシングルセット  Especificaciones técnicas Removedor  EXAME DE SELEÇÃO - 2014  Replacing an NEC VT560 Projector (03-00060) in a 2000i-DVX  LA-EC37-RD Spring flower -スプリングフラワー  MANUAL DE INSTRUÇÕES  Test de Fertilité Masculine Mode d`emploi  Borgo Bruca Capitolato d`appalto    FRC-1811T SET  

Copyright © All rights reserved.
Failed to retrieve file