Home
1. 7 Pin Amphenol Connector & High Temperature Cable
Contents
1. 6 Prepare 1 sections of 15mm heat shrink for ap x m plication Ww T Slide heat shrink over cable A CAUTION Do not apply heat at this time 8 Push 1 sections of 15mm heat shrink over indi vidual conductors A CAUTION Do not apply heat at this time IM 11M12WZ 01 E 9 Push 3 section of 15mm heat shrink over ground wire Example of cable preparation 10 Strip approximately 5mm of insulation from conductors 11 Solder the conductors to the Amphenol con nector Solder joints should be neat clean and not touching each other IM 11M12WZ 01 E 6 Soldering view for WZ cable a CELL B CELL BLACK ope pe ep eem rpe pe sm Ensure notch is in between A amp F on the 7 pin connector Ensure notch is in between A amp C on the 3 pin connector 12 Solder joints should be neat clean and not touching each other A CAUTION Do not apply excessive heat Prolonged exposure to heat gun will cause the shrink tubing to split and fray 13 Slide the heat shrink over the soldered connec tions apply heat and seal the connections IM 11M12WZ 01 E 14 Slide the larger heat shrink tube and apply heat A CAUTION Do not apply excessive heat Prolonged exposure to heat gun will cause the shrink tubing to split and fray 15 Assemble backshell d IM 11M12WZ 01 E 8 Connector amp Backshell Assembly IM 1
2. and fray 10 Slide outer heat shrink into place around con ductors amp contacts Apply heat IM 11M12WZ 01 E 14 11 Slide connector and backshell into place As semble connector as follows 12 Slide flex backshell and flex conduit adapter onto connector assembly 13 Final product z P Flex conduit not shown E IM 11M12WZ 01 E 3 M1234PT A amp M1234PU A Installation Guide Not included with QF option 1 Remove housing cover 2 Disconnect leads 3 Remove cable glands cable and conduit if applicable 4 Route conductors through electrical ports as shown IM 11M12WZ 01 E 16 SL e EQ 3 eS m P wy 4 PN 2 e Yellow 5 Attach leads as shown 6 Replace housing cover and connect QF connectors IM 11M12WZ 01 E
3. 1M12WZ 01 E 2 3 Pin Amphenol Connector amp High Temperature Cable Parts Listing for 3 pin Amphenol Connector _ Amphenol to Conduit Connector 100mm Heat Shrink 15mm Heat Shrink Wire labels Three 3 pin Amphenol Connector Items 1 amp 6 will be installed on the Analyzer side Flexible conduct not shown to be provided by customer Item 7 Item 3 backshell eme Flexible conduct not shown IM 11M12WZ 01 E 10 WZ H Connector Assembly 1 Cut cable to length 2 Slide connector parts over cut cable as shown Flexible conduct not shown to be provided by customer 3 Remove 85mm of outer cable jacket 4 Remove foil shield to outer cable jacket 1 IM 11M12WZ 01 E 11 5 Trim ground wire back to outer cable jacket 6 Strip 5mm of insulation from each conductor 7 Slide heat shrink over cable and conductors A caution Do not apply heat at this time Item 5 IM 11M12WZ 01 E 12 8 Solder conductors to the contacts on the back side of the connector Refer to solder diagram below IM 11M12WZ 01 E 13 Ensure notch is in between A amp C on the 3 pin connector 7 BLACK HEATER 8 CLEAR OR WHITE 9 Slide heat shrink to cover solder connection and contacts Apply heat A caution Do not apply excessive heat Prolonged exposure to heat gun will cause the shrink tubing to split
4. User s Manual Assembly amp Installation Instructions for WZ H Quick Disconnect 3 amp 7 Pin Amphenol Connectors with High Temperature Cables YOKOGAWA 4 1 7 Pin Amphenol Connector amp High Temperature Cable 1 1 Parts 2 1 2 WZ H Connector 3 1 8 Connector amp Backshell Assembly 7 1 4 Firial Assembly catre eee cs 8 3 Pin Amphenol Connector amp High Temperature Cable 2 1 Parts Listirig eee rere oett ne iE 9 2 2 WZ H Connector Assembly 10 M1234PT A amp M1234 PU A Instal lation guide 3 1 Assembly Instructions 15 IM 11M12WZ 01 E 1st Edition 2 1 7 Pin Amphenol Connector amp High Temperature Cable Parts Listing for 7 pin Amphenol Connector a A 9 Flex Conduit Connector S BN HN 7 Seven 7 pin Amphenol 1 Connector Items 1 amp 5 will be installed on the Analyzer side Item 7 Item 6 backshell tem 2 IM 11M12WZ 01 E WZ H Connector Assembly 1 Cut cable length accordingly 2 Slide the components over the cable as shown Flexible conduct not shown to be provided by customer 3 Score the outer cable jacket at 85mm 4 Remove the outer cable insulation to expose the foil shielding IM 11M12WZ 01 E 4 5 Remove foil shield to expose conductors
Download Pdf Manuals
Related Search
Related Contents
670 - Dwyer Instruments, Inc. Instruções de Montagem TowerFeed Service Manual Gebrauchsanweisung Futurelight MH-660 ION Audio DOCUSCAN scanner Généralités OXF-R3 - v3.0 - Complete Instructions de service Panneaux de commande série LT 4XX Tps3 Programmer`s Guide Peter B. Andrews Dan Lewmar_Entretien des winches Copyright © All rights reserved.
Failed to retrieve file