Home
government of india department of space isro satellite centre (isac)
Contents
1. 1 02 NOS ARCHITECTS 2 02 NOS SITE ENGINEERS 01 NO STRUCTURAL DMAN 01 NO ELECTRICAL D MAN 3 The Minimum Service Charges including D A payable per day month for the various categories 1 Technical Personnel Diploma Diploma level Site Engineers Electrical amp Structural Rs 440 Rs 13 200 Draughtsman 2 Technical Personnel BE Architects Rs 733 33 Rs 22 000 SL NO 04 FILE NO ISIR 2010019090 ITEM DESCRIPTION SPACE GRADE BAND PASS FILTERS QUANTITIES SL CENTER QUANTITIES NO FREQUENCY 01 199 58 MHz BPf QUOTE IN SLABS OF 107 20 25 02 10 7 MHz BPf QUOTE SLABS OF 107 20 25 03 121 5MHz BPf QUOTE IN SLABS OF 10 20 25 04 441 64 MHz BPf QUOTE IN SLABS OF 107 20 25 The Filters as a minimum shall meet the following requirements A ELECTRICAL SPECIFICATION l Center Frequency Fo 3 dB Bandwidth Insertion loss Pass band return loss 30dBc Bandwidth Input power Impedance Operating temperature range Package Size Center Frequency Fo 3 dB Bandwidth Insertion loss Pass band return loss 40dBc Bandwidth 199 58MHz 5MHz min 12dB max at Fo I4dB at Fo In Out 15 Max 0 5 Watts max 50 Q 30 C to 60 C Miniature PCB mountable as per attached Figure 1 10 7 MHz 750 KHz min 12dB max at Fo 13dB at Fo In Out 1 5MHz max Input p
2. 14 months from the date of acceptance thereof by the Purchaser who shall state in writing in what respect the stores or any part thereof are faulty If inthe opinion of the Purchaser it becomes necessary to replace or renew any defective stores such replacement or renewal shall be made by the Contractor free of all costs to the Purchaser provided the notice informing the Contractor of the defect is given by the Purchaser in this regard within the said period of 14 months from the date of acceptance thereof d Should the contractor fail to rectify the defects the pur chaser shall have the right to reject or repair or replace at the cost of the contractor the whole or any portion of the defective stores e The decision of the Purchaser not withstanding any prior approval or acceptance or inspection thereof on behalf of the Purchaser as to whether or not the stores supplied by the Contractor are defective or any defect has developed within the said period of 12 months or as to whether the nature of the defects requires renewal or replacement shall be final conclusive and binding on the contractor To fulfil guarantee conditions outlined in clause 20 a to 20 e above the contractor shall at the option of the purchaser furnish a bank guarantee Jas prescribed by the Purchaser Bank Guarantee enclosed from a Bank a
3. 4 1 5 Provision should exist for selecting the channels randomly for acquisition 4 1 6 Following pre acquisition parameters should be user selectable in spreadsheet style setup in all the software packages e Setting up of measurement channels before the start of acquisition process e Manual Input of calibration factor channel sensitivity e Provision should exist for tagging the channel names e Amplitude conversion factor to convert incoming signal voltage to Engineering Unit 4 1 7 Following features should be available with respect to pre acquisition setup e Storing of channel configuration data in file for future recall e Printing of channel parameters e Storing of the setup parameters along with the data after acquisition e Importing of setup parameters from ASCII file 4 1 8 Method of Data Capture Trigger e Through manual command using keyboard mouse e Transient triggering by waiting for a transient impulse to occur before acquiring the data e Positive Negative and Bi polar trigger signal 4 1 9 Time duration of acquisition for throughput at maximum sampling rate on all channels Minimum of 600 seconds SI No Features 4 1 10 Provision should exist for time domain data display of all channels for the purpose of verification prior to acquisition 4 1 11 Following display features should be provided in all the software packages 4 1 11 1 Data of a s
4. The spacecraft components fabricated out of Aluminium alloys and Magnesium alloys are required to be treated with different electro chemical coatings for thermal control application The different electro chemical processes are Anodizing Anodizing amp black dyeing Hard anodizing and Integral Black Anodizing IBA Alloys to be handled Aluminium Alloys Al 1100 1 2024 and Al 6061 Magnesium Alloys AZ31B AND ZK60A Processes to be carried out Aluminium Alloys Anodising Anodising amp Black Dyeing Hard Anodizing Magnesium Alloys Integral Black Anodizing IBA Specifications ALLOY TREATMENT COATING MICRO IR PROCESS THICKNESS HARDNESS EMISSIVITY Alluminium Alloys 1 1100 Anodising 15 5 microns gt 100 VHN gt 0 75 1 6061 15 5 microns 1 2024 11 5 microns 1 1100 Anodising 20 6 microns gt 100 VHN 0 85 0 05 Al 6061 Black Dyeing 20 6 microns 1 2024 11 5 microns 1 1100 Anodising 50 75microns gt 300 VHN gt 0 75 Al 6061 Al 6061 Electroplating 3 5 microns gt 100 VHN lt 0 05 Gold Silver SS Cu Ti Electroplating 3 5 microns gt 100 VHN lt 0 05 Gold Silver Magnesium Alloys AZ31B IBA 3 9microns gt 88 VHN gt 0 90 ZK60A 6 2 Thermal Control Paints Thermal paints are composed of inorganic pigment organic binders amp solvents The thermal paints can be black white and aluminium in colour and electrically conduc
5. 12 ISIP 2010019250 LOW PROFILE WEIGHING SCALE AS PER Rs 227 DOCUMENT 2 1 SL NO 01 TO 05 FOR SUBMISSION OF TENDER 25 APRIL 2011 1600HRS IST OPENING OF TENDER 26 APRIL 2011 AT 1000HRS IST 2 SL NO 06 TO 08 FOR SUBMISSION OF TENDER 28 APRIL 2011 AT 1600HRS IST OPENING OF TENDER 29 APRIL 2011 AT 1000HRS IST 3 SL 09 TO 12 FOR SUBMISSION OF TENDER 02 MAY 2011 1600HRS IST OPENING OF TENDER 03 MAY 2011 1000HRS IST NOTE TWO PART TENDER SYSTEM IS APPLICABLE FOR SL NO 09 10 11 amp 12 ONLY INSTRUCTIONS ARE PART OF THE TENDER DOCUMENTS NOTE 10 11 12 13 14 15 16 Tender documents will be hosted shortly on ISRO Web site of www isro gov in Interested tenderers may at their option download the tender documents from website and submit offers along with prescribed tender cost in form of Bank Draft as per details in the tender notification The Demand Draft should be sent in a separate cover with a covering letter along with the cover containing the quotation Tender fee shall be payable only in the form of bank draft drawn in favour of Accounts Officer ISRO Satellite Centre payable at Bangalore No other mode of payment for tender fee is acceptable Vendors firms name and tender no shall be indicated on the reverse side of the Demand Draft While requesting for tender documents please do not superscribe tender number and due date o
6. In the event that any of the Stores supplied by the Contractor is found defective in material or workmanship otherwise not in conformity with the requirements of the contract specification the purchaser shall either reject the stores or request the contractor in writing to rectify the same The Contractor on receipt of such notification shall either rectify or replace the defec tive stores free of costto the purchaser If the contractor fails to do so the purchaser may at his option either a replace or rectify such defective stores and recover the extra cost so involved from the contractor or b terminate the contract for default as provided under clause 15 above C acquire the defective stores at a reduced price con sidered equitable under the circumstances The provision of this article shall not prejudice the Purchaser s rights under clause 19 18 EXTENSION OF TIME If the completion of supply of stores is delayed due to reasons of force majeure such as acts of God acts of public enemy acts of Government fires floods epide mic quarantine restrictions strikes and freight embar goes the Contractor shall give notice within 15 days to the Purchaser in writing of his claim for an extension of time The purchaser on receipt of such notice after verification if necessary may agree to extend the con
7. 6 4 Heaters 6 5 Tape Heaters 6 6 Temperature Sensors 6 7 Thermal Control Tapes 6 8 Thermal Conductive Grease 6 9 Multi Layer Insulation MLI Blankets 610 Heat Shields Procedures 71 Steps for Electro chemical processes 7 3 Steps for Thermal Control Painting 7 3 Steps for OSR Bonding 7 4 Steps for Foil Heater fixing 7 5 Steps for Tape Heater fixing 7 6 Steps for Thermistor Bonding 77 Steps for PRT Bonding 7 8 Steps for Thermal Control Tape Fixing 7 9 Steps for Thermal Grease Application 7 10 Steps for MLI Blanket Fabrication 7 11 Steps for Heat Shields Fabrication Procedure Materials Consumables Tools and Equipment General safety precautions work instructions 10 0 Manpower Requirement 11 0 Contract period 12 0 Pricing 13 0 Mode of certification for payment 14 0 Instructions to contractors 1 0 INTRODUCTION ISRO Satellite Centre ISAC at Bangalore is developing satellite technology and implementation of satellite systems for scientific technological and application missions Thermal Fabrication Division TFD of Thermal Systems Group TSG of ISAC is engaged in delivering a suitable Thermal Control Subsystem TCS to various satellites so as to maintain and control the temperatures at various locations of the spacecraft It involves fabrication and implementation of various thermal elements like Optical Solar Reflectors OSR Multi Layer Insulation MLI blankets Heaters Thermal tapes Thermistors
8. Input Output interface VGA USB 2 numbers LAN 21 Cross talk gt 80 dB 22 Power supply compatibility 230 V 50 Hz 23 Operating system Windows 2000 amp latest 24 Internatal storage 10 GB 25 Calibratiuon amp Repair support period 10 years Minimum 26 EMC compatibility IEC EN61326 standard equivalent SL NO 09 FILE NO ISGE2010019117 DESCRIPTION OF ITEM 192 CHANNEL ACOUSTIC DATA ACQUISTION SYSTEM QUANTITY 01 NO 8 9 Introduction Instrumentation front end Computer Software 4 1 Basic System Software Features 4 2 Acoustic Response Data Analysis 4 3 Sine Data Acquisition and Analysis 4 4 Transient Data Acquisition and Analysis 4 5 Mathematical Processing Essential Spares Kit Electrical Power Supply amp Operating Environment 6 1 Electrical Supply 6 2 Operating Environment System Demonstration System Acceptance Installation amp Training 10 Warranty and Maintenance 11 General 10 10 11 11 11 11 11 11 12 12 This Page is Intentionally Left Blank Detailed Specification for 192 Channel Acoustic Data Acquisition System 1 Introduction 1 1 1 2 1 3 1 4 1 5 The Acoustic Data Acquisition System will be used for acquiring performing analysis of vibration data obtained during Acoustic Testing of Spacecraft and subsystems The system is required to support 192 channels of voltage and acceleration expand
9. herein after called manufac turing material as the Contractor has specifically produced or acquired for the contract as terminated The purchaser shall pay to the Contractor the contract price for completed stores delivered to and accepted by the purchaser and for manufacturing materials deli vered and accepted 15 4 In the event the purchaser does not terminate the Contract as provided in clause 15 1 the Contractor shall continue the performance of the contract in which case he shall be liable to the purchaser for liquidated damages for delay as set out in clause 19 until the stores are accepted 16 REPLACEMENT If the Stores or any portion thereof is damaged or lost during transit the purchaser shall give notice to the contractor setting forth particulars of such stores damaged or lost during transit The replacement of such stores shall be effected by the contractor within a reasonable time to avoid unnecessary delay in the intended usage of this stores The price of replacement items shall be paid by the purchaser on the basis of original price quoted in the tender or as reasonably worked out from the tender The cost of damages will however be claimed by the purchaser from the insurance company The import License Customs Clearance permit for the replacement will be provided by the Purchaser 17 REJECTION
10. AOCS HEAT SHIELD FABRICATION This involves the cutting of radiation metallic foils such as stainless steel SS titanium amp tantalum materials with scissors to the required geometry fixing of ceramic beads at selected points amp attaching the connecting angles to the outer layer SS with spot welding This activity is carried out at laboratory level 2b AOCS HEAT SHIELD ASSEMBLY This involves the assembly of radiation foils using SS wire and entire assembly is integrated on to the thrusters bracket by means of fastening This is carried out at spacecraft level in clean room 8 0 MATERIALS CONSUMABLES TOOLS AND EQUIPMENT Implementation drawings and thermal control elements shall be supplied along with spacecraft component All the consumables like cleaning solvents wiping materials finger cots etc required for carrying out the work shall be supplied It is the responsibility of the contractor to use them judiciously The tools scissors surgical blades knives etc needed for carrying out the activities shall be supplied The contractor has to account them and return them at the end of the work The equipment required for inspection shall be supplied It is the responsibility of the contractors to return them back in safe working condition 9 0 GENERAL SAFETY PRECAUTIONS WORK INSTRUCTIONS The contractor personnel should strictly adhere to the general work rules procedures and office timings followed at ISAC and kee
11. Bank Guarantee for 7 5 of the value of the service contract The Security Deposit will be released or the Bank Guarantee returned after the Contractor fulfills all the contractual obligations Parallel contracts ISRO ISAC reserves the right to enter into parallel contract s for the same service with one or more other contractors during the currency of the contract General 16 1 The pattern of working followed by ISRO ISAC is as under a Normal working hours are from 8 30 am to 5 00 pm with 30 minutes lunch break b Normal Working days are from Monday through Saturday c However in case of exigencies of work the persons deployed should be ready to work beyond office hours and on holidays as per the requirement of the concerned Project Division Section Heads 16 2 The contract work force should make their own transport arrangement for executing 16 3 the service contract and ISRO ISAC will have no liability for the same The contract work force will not be entitled for the subsidized canteen facilities of ISRO ISAC but can use only the Food Court functioning in the campus 16 4 The certification relating to the skill level of the contract work force should be submitted to the ISRO ISAC Contract Manager who reserves the right to identify the work force for executing the contracted service 16 5 The Contractor should indicate the telephone amp fax numbers both official and residential of the CEO of the company e
12. Diploma Holders Chem 05 NOS Diploma Holder Mechnical _ 3 03 NOS ITI Personnel Electro Plating trade 02 NOS ITI Personnel ELetrical 10 NOS ITI Personnel Fitter The Minimum Service Charges including D A payable per day month for the various categories Skilled Manpower ITI etc Technicians Technical Personnel DME Mechmical Rs 425 Rs 12 750 Technical Personnel Rs 650 Rs 19 500 BE MSc etc SL NO 11 FILE NO ISIP2010019251 DESCRIPTION OF ITEM FORCE TRANSDUCERS AND DIGITAL PRECISION MEASURING AMPLIFIER QUANTITY FORCE TRANSDUCER 20 KN FORCE TRANSDUCER 50 KN DIGITAL PRECISION MEASURING AMPLIFER WITH ACCESSORIES 04 5 04 NOS 01 Specification for Force Transducer Quantity 4 Nos Ne 10 11 12 13 14 15 Nominal rated Force F om Accuracy Class Nominal sensitivity Crnom rel sensitivity deviation de rel tensile compressive force sensitivity diff dza zero signal tolerance rel zero point compensation zero signal return 10 Rel range 0 2 From to From Unchanged mounting position typically b Different mounting positions typically b Rel range of inversion 0 2Fnom Fnom Linearity deviation diin Effect of temperature on sensitivity 10 K By reference to nominal sensitivity TK Effect of temperature on zero signal 10 K By reference to nominal sensitivity TKo Ef
13. RESISTANT TO ELECTRICAL ARC TACKING 21 PROOF OF RADIATION HARDNESS LEVEL ESC PART NUMBER amp LOGO ON THE SPOOL 23 SINGLE LOT DATE CODE 24 DATE CODE LESS THAN TWO YEARS 25 AUTHORISATION LETTER gt HERITAGE IN SUPPLY OF MIL GRADE PARTS Kindly send the duly filled compliance matrix along with the quotation for necessary speedy action otherwise offers may not be considered SL NO 08 FILE NO ISGE2010019275 DESCRIPTION OF ITEM VECTOR NETWORK ANALYSER QUANTITY 01 ONE ONLY SL PARAMETER SPECIFICATION NO 01 Vector Network Analyser 02 Frequency Range 100 MHz to 20 MHz 03 Frequency Resolution 1 Hz 04 Power Output 30 dBm to 5 dBm 05 Power Level Linearity lt 1 dB 06 Power Resolution 0 01 dB 07 Dynamic Range gt 100 dB 08 IF Bandwidth 10 Hz to 35 KHz selectable 09 No Of Ports Two 10 Accuracy of transmission measurement 0 2dB or 2 for 5 dB to 30 dB range 11 Accuracy of reflection measurement 1 dB or lt 6for 15 dB to 25 dB range 12 Frequency accuracy 8x 10 13 Damage input levels Better than 20 dBm 14 Directivity 35 dB 15 Source match 30 dB 16 Load match 35 dB 17 RF connector interface for test ports 3 5mm SMA connectors 50 ohms 18 Display Color display LCCD 19 Calibration Guided TRL TRM 20
14. Rs 12750 Technician ITI Rs 7500 2 Contributions towards PF amp ESI 13 61 amp 4 75 respectively Total 18 36 3 Incidental charges of Contractor As indicated below 4 Service charge Tax Service charge of 10 3 is applicable on sl no 1 to 3 Following shall be included under Incidental charges Break up shall be indicated e Profit Service Charges A reasonable amount towards service rendered shall be indicated Police verification certificate ISAC is a highly protected government place and as such personnel working at ISAC shall have good character amp conduct So Man power supplier shall necessarily obtain a Certificate of Conduct for each of their staff from the Police Authority to the effect that the workers so deputed are free from any sort of crimes etc immediately after placing order e Uniform charges Man power supplier shall provide uniform clothings consisting of half sleeve shirt amp pant to all their employees and instruct all their employees to wear the uniform compulsorily on all working days Soiled amp torn uniforms shall not be worn Note Man power suppliers while submitting the quotations shall strictly consider all the above points Salary structure indicated above is the consolidated monthly salary paid to the contract employees and no other allowances are paid Total amount of sl No 1 to 4 during the period of two years contract shall be equivalent to total amoun
15. are to be carried out at the painting booth situated in TSG of ISAC Bangalore The rigid OSR bonding works on the panels packages are to be carried out in thermal laboratories or spacecraft integration clean rooms ISAC ISITE Bangalore In general the remaining activities namely MLI blanket works Temperature sensors bonding Heater fixing Thermal tapes fixing Thermal grease application etc are to be carried out at thermal laboratories or spacecraft integration clean rooms at ISAC ISITE Bangalore However some times these activities are to be carried out in other units of ISRO i e at Space Application Centre Ahmedabad Satish Dhawan Space Centre Sriharikota Vikram Sarabhai Space Centre Thiruvananthapuram etc Necessary TA DA at the rates applicable to Technicians of ISAC for the persons deputed to other ISRO Centres for Project related activities will be borne by ISAC WORKING HOURS Normally the working hours is restricted to the working hours of ISAC 8 30 AM to 5 00 PM upto 6 days a week basis However contract personnel should be ready to stay beyond office hours Sundays and general holidays if necessary to complete the scheduled activities tests processes In addition if required the contract manpower will be deployed in three shifts of eight hours duration round the clock 6 0 DESCRIPTION OF ELECTRO CHEMICAL PROCESSES AND THERMAL CONTROL ELEMENTS 6 1 ELECTRO CHEMICAL COATINGS ON ALUMINIUM AND MAGNESIUM ALLOYS
16. assembly details including wiring diagrams should be sent wherever necessary in duplicate All documents correspondence should be in English Language only 11 The Purchaser reserves the right to accept or reject the lowest or any other offer in whole or in part without assign ing any reason 12 Iltis expressly agreed that the acceptance of the stores contracted for is subject to final approval in writing by the Purchaser 13 a Part shipment is not allowed unless specifically agreed to by us b As far as possible stores should be despatched by Indian Flagged Vessels Air India or through any Agency nominated by us 14 Inspection Test Certificates should be provided for the goods any inspection by Lloyds or any other testing agency is considered necessary it shall be arranged by Contractors 15 Where erection or assembly or commissioning is a part of the contract is should be done immediately on notification The Contractor shall be responsible for any loss damages sus tained due to delay in fulfilling this responsibility 16 For items having shelf life those with maximum shelf should be supplied if order is placed TERMS AND CONDITIONS 1 DEFINITIONS a The term Purchaser shall mean the President of India or his successors or assigns b The term contractor shall mean the person firm or company with
17. be able to work most of the time in standing posture They must also have the aptitude to follow the prescribed clean room work conditions material equipment handling procedures and any other instructions given to them Based on the past experience and the work the manpower estimation and their qualifications required are given below Electro chemical Works at EC Laboratories in LPSC Campus One engineer with B E Chem or M Sc Chemistry qualification e Two diploma holders Chem e Three ITI personnel Electro plating trade MLI Works OSR Heaters Tapes Painting etc at ISAC Two engineers with B E Mechanical qualification Five Diploma holders Mech Two ITI personnel Electrical Ten ITI personnel Fitter B E and diploma holders shall have the knowledge of Unigraphics UG One of the Mechanical Engineer is required to perform overall supervision of thermal activities and coordination activities in addtion to regular implementation activities On summary the following candidates are required a Engineers BE MSc 3 No b Diploma Holders 7 No Note Since contract manpower will be trained by ISRO for specific skills for meeting high quality requirement the contractor shall ensure that the ISRO trained manpower is available through the period of contract Contractor with ISRO trained manpower should depute the same personnel trained in the previous contracts and shall retain
18. ceramic flatpack The receiver and driver should be from same manufacturer DEVICE QUALITY The devices shall be qualified to the QML V quality level of MIL PRF 38535 All the devices shall undergo Pre cap visual examination on 10096 as per of MIL PRF 38535 QML V ISRO reserves right to participate during precap visual inspection or nominate 3 party for performing Precap Visual inspection Quote separately the cost for performing precap by 3 party Address and details of the 3 party to be provided along with the quote All parts shall be serialized amp screened as per QML V of MIL PRF 38535 D Co O The devices shall meet TID requirements of 50Krad Si minimum Single Event Latch Up LET of minimum 80 MeV mg cm and Single Event Upset LET of minimum 40 MeV mg cm Please quote for TID of 100Krad Si also The devices shall undergo Group A tests on 100 of the lot One sample drawn from the deliverable quantities of each device type shall undergo Destructive Physical Analysis DPA as per the MIL STD 883 Test Method 5009 Quote optionally One three samples from the deliverable quantities of each device type shall undergo life test Quote optionally DATAPACK REQUIREMENTS The following Data shall accompany the devices in soft copy compact disk Certificate of Conformance issued by the manufacturer and the supplier Manufacturer s Precap Visual Inspection report as applicable Screening results by att
19. digit gt 120dB 10 M ohm 1 2 75 1 6 total measurement range 2 11 Points 16 Linearity deviation Referred to full scale value lt 0 0005 17 Influence of a 10 K change in nom Temperature range On the zero point Referred to full scale value lt 0 0002 On sensitivity Referred to full scale value lt 0 0005 18 Short term drift over 5min after2 h warm up max 2 typ 1 ppm 19 Long term drift over 24 h after2 h warm up max 5 typ 2 ppm 20 Nominal temperature range 0 40 C 21 Operating temperature range 0 50 C 22 Storage temperature range 10 60 C 23 Operating voltage mains voltage 230 115 10 50 60 Hz V 24 Power consumption approx 60 VA 25 Weight approx 15 kg 26 Dimensions W x H x D 458 x 171 x 367 mm 27 Connection for Transducers 2 x 8x DB 15S Limit outputs control signal inputs DB 25S Computer interface RS 232 DB 9S Computer interface RS 422 485 DB 9S Computer interface IEEE 488 24 pin cannon Calibration certificate for Amplifier Quantity 1 No 1 DKD Calibration Certificate for voltage ratio according to Standards 100 0 0 10 20 90 100 96 Accessories for Amplifier S No Description Quantity No 01 RS 232 Adapter cable for connection with PC 9 pole D plug 01 socket to 9 pole D plug 3m 02 IEEE488 Bus cable 24 pole standard plug 2m 02 03 Synchroniz
20. required to be involved in ensuring the quality and safety at the site Providing a working mechanism for over all control of construction activities with two Nos of supervisors having Diploma in Civil Engineering Qualification with minimum three years experience in supervision of Civil Engineering works and to assist the Department Engineers for Supervision of total construction works at ISAC and ISITE Campuses or any other work undertaken by C amp MG Preparation of estimates Maintenance of records and other related works as assigned by Department Engineers Supervisors shall also have working computer knowledge for REQUIREMENTS Candidates should have passed Diploma in Civil Engineering from reputed Institutions obtaining 1 class and should have experience in construction industry for minimum of 01 to 02 years Should have knowledge in preparation of estimates for technical and industrial building He should work independently in construction site Also should have knowledge in chain plane table and tacho metry surveing and usage of computers Quantity Unit cost including Service Tax Each 12 Jobs 3 Structural Draughtsman 1 No Draughtsman has to prepare structural drawings based on the architectural drawings and the basic design details provided by the structural engineer by using the softwares like AutoCAD REVIT etc The drawing work involves preparation of foundation drawings details of col
21. the contract Delivery must be completed within the dates specified therein 8 INSPECTION AND ACCEPTANCE TESTS 8 1 The purchaser s representatives shall also be enti tled at all reasonable times during manufacture to inspect examine and test on the Contractor s premises the material and workmanship of all stores to be sup plied under this Contract and if part of the said Stores is being manufactured on other premises the Contractor shall obtain for the Purchaser s representative permis sion to inspect examine and test as if the equipment were being manufactured on the Contractor s premises Such inspection examination and testing shall not release the contractor from the obligations under this contract 8 2 For tests on the premises of the Contractor or of any of his sub contractors the contractor shall provide free of cost assistance labour materials electricity fuel and instruments as may be required or as may be reason ably needed by the Purchaser s representative to carry out the tests efficiently 8 3 When the Stores have passed the specified test the Pur chaser s representative shall furnish a certificate to this effect in writing to the Contractor The Contrac tor shall provide copies of the test certificates to the Purchaser as may be required 9 MODE OF DESPATCH Generally stores should
22. whom or with which the order for the supply of stores is placed and shall be deemed to include the Con tractor s representatives heirs executors and administrators unless excluded by the contract C The term Purchase Order shall mean the communication authorised intimating the acceptance on behalf of the purchaser on the terms and conditions mentioned or referred to in the said communication accepting Tender or offer of the Contractor for supply of stores or plant or machinery or part thereof d The term stores shall mean what the Contractor agrees to supply under the contract as specified in the purchase order PRICES shall be indicated only in PART II Tenders offering firm prices will be preferred Where a price variation clause is insisted upon by a tenderer quotations with a reasonable ceiling should be submitted Such offers should invariably be supported by the base price taken into account at the time of tendering and also the formula for any such variations 3 TERMS OF PAYMENT 3 1 Being a Department of Government of India the normal terms of payment are by Sight Draft However other terms of payment like establishment of Letter of Credit may be considered by the Purchaser on such terms and conditions as may be agreed upon The Sight Draft Letter of Credit will be operative on presentation of
23. will be reimbursed by ISRO ISAC to the Contractor on showing proof of payment made to the Provident Fund Authorities Such reimbursement claim submitted by the Contractor should indicate the details of the work force their EPF A C No their contribution Employer s contribution sought to be reimbursed etc and the EPF Challan amount should tally with the contract wise details as above The EPF Passbook and the Annual PF Statement should be submitted for verification If amp when called for 5 PRICES Being a Service Contract the rates should be quoted with break up strictly complying with the Minimum Wages Act and with the Work Quantification The break up shall indicate the Minimum Wages payable per day month including D A EPF ESI Service Tax etc Proforma as per 1 5 2 Minimum Wages including D A payable day month for the various Categories is mentioned in Appendix I 5 3 Incase of any revision of minimum service charges during the currency of the Contract the service charges payable to such work force would be revised to the Level fixed from that date There will however be no change in the Service charge Profit margin payable to the Service Provider on account of such revision 6 Employee s Provident fund amp ESI Medical Facility 61 The prescribed employer s contribution under the Employee s Provident Fund and Miscellaneous Act 1952 shall be reimbursed by ISRO ISAC
24. ACK for mounting Portable rack on wheels for housing Instrumentation Front end should be supplied 3 Computer SI Features Range value No 3 1 The computer should be a reliable one with following specifications 3 2 Operating Microsoft Windows XP or better or Linux System 3 3 Platform e Intel Core i7 4 core or more 64 bit processor with 3 2GHz clock rate OR Better 8MB level 2 cache or better e 1066MHz system bus or better e Intel Original Chipset e Vendor has to ensure that the computer platform chosen is sufficient to meet the overall functional requirement particularly data throughput of the data acquisition system 3 4 RAM 8GB DDR3 expandable to 16GB 3 5 Hard disk e 250GB or better HDD for Operating System with disk mirroring with boot option from either of the disks 500GB or better HDD for Data with disk mirroring The HDD capacity should meet the storage requirements of specification item 2 16 Disk mirroring with RAID features for both system and data disks SI Features Range value No 3 6 Display e Two numbers of 24 full HD TFT LCD monitors with 1920 x 1080 resolution or better The monitors should be connected in master slave configuration 3 7 DVD R W 20X or better DVD Super Multi double layer drive with DVD Drive and CD read write capability 3 8 Blu Ray R w External Blu Ray R W drive with 20 no of write once bl
25. AGE QUOTE IN SLABS NO Single core wire 01 20 AWG 2 KM 8 10KM 02 22 AWG 2 KM 8KM 10KM 03 24 AWG 2 KM 8KM 10KM 04 26 AWG 10KM 15KM 20 25KM 05 28 AWG 2 KM 5KM 8KM 10KM SPECIFICATION Offered Wires shall be ESCC Qualified radiation cross linked ETFE insulated Wires on silver plated copper QUALITY REQUIREMENTS 1 As per Generic Specification ESCC 3901 012 O1 Q S TEST REQUIREMENTS 1 Final production test Chart Il WIRES SPECIFICATION Insulation material Conductor type Operating temperature Wire gauge Wire color Outer jacket Description Dielectric Breakdown Volume resistivity Dielectric constant Dissipation factor Insulation Resistance Total dose radiation Withstanding capability Radiation Cross linked ETFE Silver Coated Copper 65 C to 200 C Quote for 20 22 24 26 amp 28 AWG Wires White Single wall Hook up 1500Mega Ohms KM 500 Mega Rad Minimum 2 Offer separate quote for LAT II amp LAT III test IV DATA PACKAGE As a minimum the following shall form the date package supplied along with 1 Certificate of conformance 2 Final production test data The wires 3 LAT2 amp LAT3 test is data if the test is ordered V OTHER REQUIREMENTS The manufacturer of the offered product shall be listed certified i
26. I PRICE PART This part should consist of Prices of the unit and total amount for the items offered with break up wherever required Price of option and accessories Installation charges amp Training if not free Where the quotation is on Ex works basis Packing forwarding and inland freight charges if any Price part Part ID thus prepared should be Enveloped separately and superscripted as Price part II Reference No Due date Note 3 Both the envelopes Part 1 and Part II Prepared as above should be placed in another envelope and superscribed as follows Reference No Due date Part 1 amp Part II individually enveloped inside TO THE HEAD PURCHASE AND STORES ISRO SATELLITE CENTRE GOVERNMENT OF INDIA DEPARTMENT OF SPACE AIRPORT ROAD VIMANAPURA POST BANGALORE 560 017 Note 4 The above should reach us on or before the due date and time Note 5 HEAD PURCHASE AND STORES ISRO SATELLITE CENTRE GOVERNMENT OF INDIA DEPARTMENT OF SPACE AIRPORT ROAD VIMANAPURA POST BANGALORE 560 017 RESERVES THE RIGHT OF ACCEPT OR REJECT ANY OF THE QUOTATION IN FULL PART THEREOF WITHOUT ASSIGNING ANY REASONS
27. On behalf of President of India Head Purchase amp Stores ISRO Satellite Centre TENDER NOTICE NO 17 DATED 11 03 2011 GOVERNMENT OF INDIA DEPARTMENT OF SPACE ISRO SATELLITE CENTRE ISAC AIRPORT ROAD VIMANAPURA POST BANGALORE 560 0017 ISAC Bangalore 560 017 invites sealed tenders for the supply of the following items TENDER SL FEE TENDER REFERENCE BRIEF DESCRIPTION QTY INCL OF NO S TAX Rs Ps 01 ISGE 2010 018948 ALUMINIUM ALLOY PLATES AS PER Rs 227 DOCUMENT 02 ISIR 2010 019007 LVDS DEVICES SPACE GRADE AS PER Rs 227 DOCUMENT 03 ISCO 2010019020 PROVIDING TECHNICAL SUPPORT SERVICES FOR AS PER Rs 227 CIVIL WORKS DOCUMENT 04 ISIR 2010019090 SPACE GRADE BAND PASS FILTER AS PER Rs 227 DOCUMENT 05 ISDO 2010019094 PROVIDING MECHANICAL SUPPORT FOR FITTING AS PER Rs 227 TURNING ETC DOCUMENT 06 ISIR 2010019209 SPACE GRADE RAD HARD ANTIFUSE FPGAS AS PER Rs 227 DOCUMENT 07 ISIR 2010019211 RADIATION CROSS LINKED ETFE INSULATED SPACE AS PER Rs 227 GRADE WIRES DOCUMENT 08 ISGE 2010 019275 VECTOR NETWORK ANALYSER 01 NO Rs 227 TWO PART TENDERS 09 ISGE 2010019117 192 CHANNEL ACOUSTIC DATA ACQUISTION 01 NO Rs 227 SYSTEM 10 ISGE 2010019132 THERMAL FABRICATION AND IMPLEMENTATION OF AS PER Rs 227 VARIOUS ELEMENTS DOCUMENT 11 ISIP 2010019251 FORCE TRANSDUCERS AND DIGITAL PRECISION AS PER Rs 227 MEASURING AMPLIFIER DOCUMENT
28. REE YEARS e Warranty period should begin only after installation and commissioning at ISRO ISAC Site e Warranty is ON SITE warranty only 10 2 Cost of post warranty period support for the system should be indicated with year wise breakdown for THREE years after warranty period 10 3 Post sales support operation support and maintenance available locally should be spelt out clearly Availability of the local support will form the basis for technical qualification of the system 10 4 The maintenance agreement should incorporate the following e Supply of updates for Application software and Operating System software as and when they are introduced e Supply of bug fixing versions of the software e Software and hardware should be considered as separate entities while quoting for maintenance and servicing 10 5 The vendor should support spares for 10 years from the date of installation 11 General SI No Features 11 1 The vendor should provide list of installation base systems installed with the same model number and similar configuration as quoted like number of channels and the software packages supported in aerospace industry with contact details that includes contact person s name postal address email address and telephone number It should be noted that this information will be used for evaluation of the quoted system for technical suitability 11 2 Hard copy as we
29. Specification Low Profile Weighing Scale Compliance with Specification N E Par d a Qty 6 Nos To be Specified by vendor Sans pee me Th caput SSS 274 02 Class A 76 20 1 a Calibration S rd ASTM E74 02 Class 376 2004 Class b Uncertainty of applied calibration force as per 2 a 02 Weighing Surface Dimension or Nearest Dimension Refer Fig 1 12 to 16 s ma edn mm w Heig 00 lt Over Surface Dimemion or Neret Dimension eker Pig 0 ES 20 to 25 Length L 500mm to 625mm 167 87 Width W 400mm to 500mm mw T T Standard replaceable rechargeable batteries NiMH Li lon Built in protection safety feature in equipment to avoid overcharge of battery b Battery Capacity 8 12 hrs run time of equipment on single recharge of battery a Computer interface along with necessary interface she 5233 USB and oping soa ACCESSORIES 1 Additional accessories spares such as charger ramp storage case etc operating software are to be listed and quoted separately giving complete tech spec and details 2 Quantity of accessories spares required are to be clearly indicated 3 Operating manual giving operation and calibration procedure maintenance etc is to be supplied IMPORTANT 1 The specifications mentioned above are minimum requirement 2 Calibration certificates are to be supplied along with the equipments 3
30. Specification of batteries or any consumable replaceable parts used are to be clearly stated Weighing Surtace Display Total Capacity 15000 Kg Fig 2 Fig 1 Proposed configuration for the use of LPWS SPECIAL INSTRUCTIONS FOR 2 PART TENDER This should consist of two sections viz a Technical and b Commercial PART I TECHNICAL AND COMMERCIAL PART a Technical This section should consist of e All technical specifications of the items options and accessories offered by you e Relevant leaflets and literature and any other technical matter pertaining to the items offered b Commercial All the commercial points to be indicated other than prices should come in this section for example Delivery terms and delivery period Payment terms our standard Terms i e 100 Payment within 30 days after receipt and Acceptance e Validity period of the offer 120 days required e Warranty Guarantee applicable e Installation details such as installation is done Free of cost or not e If not indicate installation charges indicated in Price part e Whether training is required if so free of cost if not indicate training charges indicated in price part Approximate weight of the consignment Note 1 Part 1 prepared as above should be Enveloped and Superscribed Technical amp Commercial part 1 Reference No Due date Note 2 Part 1 should not contain any price details Contd PART I
31. a analysis The Software module should support data acquisition and analysis of the responses monitored at various locations on the test specimen during swept sine test Simultaneous on line acquisition recording and analysis as per item 4 3 2 below of the time domain data in real time are preferred 4 3 2 The acquisition process should adopt frequency estimation technique where instantaneous frequency information is obtained by counting the number of zero crossings in a frequency reference signal and computing the frequency value or equivalent Amplitude of all the data channels should be obtained by estimating the instantaneous amplitude value of the corresponding channels 4 3 3 Both filtered response the response at the fundamental excitation frequency only with the contributions of other frequencies removed and overall or unfiltered response response over the entire selected frequency range should be computed and stored separately along with the phase information It is preferred to have simultaneous computation of both filtered and unfiltered responses 4 3 4 The phase response of a given channel should be computed with respect to the filtered response of the channel 4 3 5 The bandwidth selected for computation of the filtered response amplitude can be either Proportional Bandwidth Fixed Bandwidth 4 3 6 Provision should exist to concatenate multiple runs of a single test for the p
32. able upto 256 Both software and hardware are required to be highly modular in structure to render the operation and maintenance easier The modularity is required for easy scalability of the system for future requirements The system should have proven heritage with installation base in aerospace industry for similar requirements and applications mainly with data acquisition during dynamic testing of Spacecraft The vendor should provide quote in two parts as per the purchase department tender directives Techno commercial quote and the price bid The Techno commercial quote should consists of the following 1 5 1 The technical quote with detailed list of hardware and software being quoted 1 5 2 Compliance Matrix indicating compliance of the quoted system to the specification Any deviation from the specification to be clearly spelled out in the Compliance Matrix for the specifications The Compliance Matrix should clearly indicate the part numbers required to be supplied by the vendors to meet each specification including those shown as OPTIONAL 1 5 3 The overall system configuration schematic provided with detailed notes 1 5 4 All the technical details with related technical papers catalogues drawings in support of the compliance to the specifications 1 5 5 Unpriced commercial quote with all the commercial terms clearly spelt out This should be identical to the price bid except for the price column which is left bl
33. al rated Force From Accuracy Class Nominal sensitivity Cnom rel sensitivity deviation de rel tensile compressive force sensitivity diff d a zero signal tolerance ds rel zero point compensation zero signal return fo Rel range 0 2 From to Fnom Unchanged mounting position typically bi Different mounting positions typically b Rel range of inversion 0 2Fnom Linearity deviation diin Effect of temperature on sensitivity 10 K By reference to nominal sensitivity TK Effect of temperature on zero signal 10 K By reference to nominal sensitivity TKo Effect of Transverse forces Transverse forces 10 F m do Effect of Eccentricity per mm dg 10 Rel creep over 30 min dar 11 Input resistance R 12 Output resistance R4 13 Isolation resistance Ris 50 kN 00 2 mV V 0 196 0 296 0 596 0 0896 0 0296 0 0396 0 06 0 02 0 01 0 015 0 03 0 01 0 02 5345 ohm 356 0 3 ohm gt 5 10 ohm Reference excitation voltage Urer Operating range of the excitation voltage Nominal temperature range nom Operating temperature range Big Storage temperature range Reference temperature tref Max operational force Limit force Fi Breaking force Fg Static lateral limit force Fo Limit torque MG Nominal displacement Snom Fundamen
34. all bear the Bank Charges payable to his Bankers including the Charges towards advising amendment commis sions 29 TRAINING The Contractor shall if required by the Purchaser provide facilities for the practical training of Pur chaser s engineering or technical personnel from India and for their active association on the manufacturing process throughout the manufacturing period of the contract stores number of such personnel to be mutually agreed upon 30 APPLICABLE LAW The Contract shall be interpreted construed and gov erned by the laws of India ANY OTHER POINTS SIGNATURE OF THE PARTY NAME COMPANY ANNEXURE III ISRO SATELLITE CENTRE SPECIAL INSTRUCTIONS WITH REGARD TO SERVICE CONTRACTS FOR OUT SOURCING Tenderers should read the following instructions carefully and indicate compliance non compliance in their quotation for each point requirement In case the quotation received from any tenderer is silent on any point requirement ISRO ISAC reserves the right to ignore such quotation without any further reference to the tenderer 1 Scope of the Service Contract The Scope of Service contract is as per Annexure I 2 Period of the Service Contract The Service Contract shall be valid for a period of mentioned in Appendix I from the date of issue of the Order or from the date of submissi
35. all the trained personnel and depute the same personnel throughout the contract period of 2 years 11 0 CONTRACT PERIOD Two years from the date of deputing all the personnel after receipt the work order 12 0 PRICING The party should quote for the thermal fabrication amp implementation works mentioned in para 4 0 as per the details given below e Hlectro chemical process e For each small size component e For each medium size component e For each big size component Each square meter of thermal control paint applied Each OSR bonded Each foil heater fixed Each meter length of tape heater fixed Each thermistor PRT bonded Each square meter of thermal control tape fixed Each package component applied with thermal conductive grease applied Each square meter of MLI blankets fabricated and mounted Each AOCS heat shield fabricated and assembled e Each LAM heat shield fabricated and assembled 13 0 Mode of Certification for Payment Based on the work carried out by the contractor s team under each of the work head defined above monthly certification quarterly certification for release of payment will be made 14 0 INSTRUCTIONS TO CONTRACTORS 1 Salary Structure Salaries per month for 26 working days of 8 hours a day assumed to be working for 30 days recommended to the contract employees by ISRO Satellite Centre through Works Contract Order is indicated below Engineer B E Rs 19500 Tech Asst Diploma
36. also procure the Tender documents from Purchase amp Stores Officer Purchase Division ISRO Satellite Centre Airport Road Vimanapura Post Bangalore 560 017 INDIA on payment of Non refundable Tender fee as indicated above on all working days between 1400Hrs to 1600Hrs INSTRUCTIONS TO TENDERERS SUPPLIER S COMMENTS COMPLI 1 Tenderers should submit quotations in duplicate ina sealed envelop superscribing the Tender No and due date of opening and completed in all respects with technical specifications including pamphlets and catalogues 2 A Proforma Invoice may also be given which should contain the following information a The FOB value the C amp F Value for import by Sea Freight Air Freight upto and for air parcel post upto Bangalore 17 should be separately indicated b Agency Commission The amount of commission included in the price and payable to the Indian Agents of the Contractor shall be directly to the Indian Agents by the purchaser in equivalent Indian Rupees on the basis of an invoice from him applying T T buying rate of exchange ruling on the date of placement of the Purchase Order and which shall not be subject to any further exchange variations This payment will be released to the Indian Agents within 30 days from the date of acceptance of goods c The Contractor shall invoice only for the net amount payable to him after deducting the amount o
37. amp PRTs Paints thermal grease etc and carrying out Electro chemical processes on spacecraft components In the following sections of this document the scope of work brief descriptions of the relevant thermal control elements nature of work and quantities of work fabrication and implementation procedures manpower estimations general precautions work instructions etc are explained 2 0 SCOPE OF WORK The various TCS hardware fabrication and implementation works which are to be contracted out consists of mainly the following 1 Electro chemical processes on aluminium alloys and magnesium alloys 2 Thermal painting 3 Rigid Optical Solar Reflectors OSR bonding 4 Foil heaters fixing 5 heaters fixing 6 PRT Thermistors bonding 7 Thermal control tapes fixing 8 Thermal grease application 9 Multi Layer Insulation MLD blankets fabrication and assembly 10 Heat Shields fabrication and assembly 3 0 NATURE OF WORK In general the thermal activities involve preparation of implementation drawings carrying out the thermal fabrication and assembly works as per the procedures and entering the details in log sheets The following gives the brief description of the nature of work for various thermal works 3 1 Electro chemical process It involves carrying out various electro chemical processes on spacecraft components made of aluminium alloys and magnesium alloys in chemical baths 3 2 Thermal pai
38. ank 1 5 6 Any additional hardware software that may be required to meet the optional requirements should be separately quoted 1 6 1 7 1 8 The Price bid should provide cost break up of the major subsystems both hardware and software and of the individual spares of the Data Acquisition System ISRO ISAC reserves the right to include exclude any of the software or hardware modules at the time of ordering It should be noted that functional specifications can override hardware specifications 2 Instrumentation Front End I Features Range value No 2 1 Number of Input 192 expandable upto 256 Channels 2 2 Number of Output 4 Channels 2 3 Input output BNC Connector connectivity to instrumentation front end 2 4 Signal Programmable signal conditioning modules that conditioning support voltage input and IEPE integral electronic piezo electric accelerometers on all channels e Option to select AC DC or IEPE on each channel 2 5 IEPE signal e Compliance voltage 24V nominal conditioning e Current 4mA nominal User selection from 2mA to 10mA preferred 2 6 ADC 24Bit ADC e Individual ADC for each channel e Each input channel should be capable of sampling upto 100kHz and when combined the system should be able to support upto 256 channels with 50KHz sampling rate e Synchronized sampling for all channels 2 7 DAC e Each output ch
39. ank Drive Disk media 3 9 I O ports e USB 2 0 6 no s e Parallel Ports 1 no 3 10 Pointing USB Optical Scroll mouse Device 3 11 Keyboard Full sized keyboard with integral numeric keypad 3 12 Networking e 1Gbps Ethernet LAN LAN speed should sufficiently large enough to support the high data rate described in 2 17 One Additional 1Gbps Ethernet LAN to connect computer to ISRO ISAC network e One 8 12 port 1Gbps network switch 3 13 Printing e 1 No Color Laser jet Printer with built in network port amp USB port and with double side duplex printing capability 3 14 SMPS SMPS of required rating with Hot redundancy 4 Software 4 1 Basic System Software Features SI No Features 4 1 1 The software should cater for acquisition and analysis of vibration data for satellites and their subsystems 4 1 2 Software should support on line acquisition and throughput of time domain data of all the channels with the maximum sampling rate during all modes of test data acquisition using built in throughput disk 4 1 3 The modules for test data analysis should permit on line multi channel real time analysis and display as well as post processing of raw time domain data both in frequency domain and in time domain 4 1 4 The software should be able to display the data of a selected set of channels both in frequency domain and in time domain during acquisition in real time
40. annel should have 24bit DAC 2 8 Anti aliasing Filter On all channels with anti aliasing protection of greater than 70dB 2 9 Maximum input 10Vpk maximum 20V peak to peak bipolar voltage system should be protected for over voltage protection of at least two times the maximum input voltage i e 40V peak to peak 2 10 Input Dynamic 9 or better with a noise floor of 120dB Range 2 11 Input impedance Greater than 1MOhms 2 12 Cross Talk Better than 90dB between channels SI Features Range value 2 13 Common Mode Rejection Ratio CMRR Better than 50dB Synchronization All the responses that are monitored are to be digitized simultaneously with synchronized sampling so as to achieve phase difference of better than 1 0degree between channels upto 10KHz Digital Signal Processor DSP e Dedicated DSPs built in to the Instrumentation Front end for a set of channels for the purpose of on line analysis of acquired time domain data e The quote should include the DSP architecture configuration Throughput Recording e For on line acquisition and storage of Raw time domain data of test of minimum 10 minutes duration with 50KHz sampling rate 24 bit ADC and 256 channels resulting in transfer rate of gt 51 2MB Sec amp storage capacity requirement of 62 GB or more e Redundancy of data storage while carrying out on line acqui
41. ation cable 01 04 Mounting of MS plug on Z4A 08 05 Extension cable for Z4A MS connectors 10m 08 06 Adaptor MS connector to D Sub to connect Amplifier 08 Note 1 All the supplied standard accessories including warranty should be mentioned clearly in quotation ii Test and calibration certificate of the equipments should be supplied iii All hardware and software user manual to be supplied iv The vendor should provide original manufacturer s certificate to be submitted along with quote Also servicing and training to be extended indigenously in India SL NO 12 FILE NO ISIP2010019250 DESCRIPTION OF ITEM LOW PROFILE WEIGHTING SCALE QUANTITY 06 NOS ANNEXURE I Specification Aim The Low Profile Weighing Scale LPWS is required for weighing during its assembly and integration phase to monitor the mass growth Description Low Profile Weighing Scale LPWS is a weighing plate of shallow construction Satellite Assembly Fixture is featured with three wheels 2 fixed and steerable to enable mobility along with satellite Three LPWS are mounted below each of the three wheels of Satellite assembly fixture Fig 2 shows arrangement of scales to be used for measurement of weight considering center of mass of object being weighed The proposed scale need to be of highly accurate and must contain display unit on the weighing plate itself for the quick reading of data Low Profile Weighing Scale
42. be despatched by Indian Flagged Vessel Air India or through any other Agency nominated by the Purchaser copy of the invoice and packing list should be invariably kept inside each of the pack age 10 PORT OF ENTRY Chennai Bangalore 11 PORT CONSIGNEE Stores Officer ISRO Satellite Centre Airport Road 12 ULTIMATE CONSIGNEE Vimanapura Post Bangalore INDIA 13 SHIPPING MARKS The marks onthe shipping documents such as invoice bill of lading and on the packages should be as follows PURCHASE ORDER NO DATE GOVERNMENT OF INDIA DEPARTMENT OF SPACE ISRO SATELLITE CENTRE BANGALORE DESTINATION PORT OF ENTRY 14 INSURANCE OF STORES The purchaser shall be responsible for insuring the stores wherever considered necessary The Contractor shall however be responsible for notifying as per pro forma enclosed to the purchaser or the insurers nominat ed by the purchaser the complete details of the pro posed shipments including the value of each shipment and other relevant data immediately after shipment to enable the purchaser or the insurers to arrange for the is suance of the insurance policy if required The necessi ty or otherwise of insurance will be as indicated in the Purchase Order 15 CONTRACTOR S DEFAULT LIABILITY 15 1 The purchaser may upon written notice of default to the C
43. bmit the same to the ISRO ISAC Any violation in this regard will result in the termination of the Contract without any notice Wage disbursement The tenderer should indicate the mode of wage disbursement to the work force ISRO ISAC generally insists on payment to the work force by cheque The payment of wages to the work force should be made in the presence of Principal Employer or his representative and in our premises on or before 77 of each month The documentary proof of payment of wages to the work force acquittance should invariably be furnished by the Contractor Identity Card The work force of the Contractor should be issued with the Company ID Card a sample copy of which should be furnished to the ISRO ISAC In case ISRO ISAC issues any Access Control System ID card to the work force the expenditure for the same should be borne by the Contractor Submission of claims bills and their settlement The Contractor should submit his bills by the 57 of the succeeding month to the Contract Manager identified by ISRO ISAC along with the following a Proof of payment of the Fixed Monthly Compensation to the work force for the preceding month b Proof of payment of the Employer s share of EPF for the preceding month along with a statement showing the details of all the work force their EPF Account their contribution Employer s contribution sought to be reimbursed etc The EPF Challan amount should tally with the contract
44. cal properties Chemical test for chemical composition b Ultrasonic testing 100 Ultrasonic testing for all plates Note i Number of samples and size of sample for material testing shall be provide by the bidder Sample charge for testing and testing charges shall be quoted separately UTS PROOF YTS HARDNES ETC UTS ULTIMATE TENSILE STRENGTH TTS YIELD TENSILE STRENGTH TERMS amp CONDITIONS D TPI Third Party Inspection agency The supplier shall employ TPI agency like Lloyds BV BEMORE THE VERITES etc ISRO AUTHORISED AGENCIES The charges of TPI agency shall be quoted separately II Scope of TPI agency a Visual and dimensional inspection b Identification of sample material for material testing c Review and approval Signature with stamped of material tests Mechanical amp Chemical tests certificates d Witnessing of 100 ultrasonic testing amp inspection of all plates e Approval Signature with stamped of ultrasonic test certificates for all plates f All inspected plates shall be stamped by TPI agency III Dispatch of item The supplier shall provide the following documents before dispatching the items a Material tests Mechanical amp Chemical certificates duly approved signed amp stamped by TPI agency b Ultrasonic test certificates duly approved signed amp stamped by TPI agency c Inspection release note for dispatch
45. ce is with pressure sensitive adhesive These are available in long strip of 0 5 inch width with different resistances per unit length The required length for obtaining the desired resistance is cut from the spool and implemented after connecting the lead wires They are implemented on tubular and curved surfaces Tape heater segments are fixed on RCS plumblines propellant tanks etc of spacecraft Foil and Tape heaters are used on spacecraft components to raise components temperatures to safe operating limit 6 6 Temperature Sensors PRTs amp Thermistors Temperature sensors such as platinum resistance temperature sensors PRTs and thermistors are used to monitor and control the temperatures of various elements of the spacecrafts They are implemented on FCVs panels electronic packages MLI blankets etc Thermistor is thermally sensitive resistor consists of a small sensing bead and two electrically connected leads Platinum resistance temperature sensor PRT is a pure platinum film etched wire wound element encapsulated in ceramic glass Sensing probe dimensions are 2x5x 15mm 6 7 Thermal Control Tapes It is thin kapton layer with thermal control coating on one side and pressure sensitive adhesive on the other side with release paper Different tapes are used for required optical properties to control the temperature of the spacecraft elements The different thermal control tapes are aluminized Kapton tape black tape OSR tape ger
46. e damages etc 4 Positioning of sensor using kapton tape Bonding of sensor using pyralux dry film adhesive with kapton film at high temperature and high pressure for 15 min A special fixture shall be used while bonding the sensor Checking of sensor for continuity damages etc Application of thermal control tape Tagging of sensor Thermal QA inspection 10 Packing 7 8 STEPS FOR THERMAL CONTROL TAPES FIXING 1 2 3 4 5 6 Preparation of thermal control tape implementation drawing Cleaning of the surface to be mounted with thermal control tapes Removal of release paper from the tape Fixing of tape by applying pressure on the tape using hand fingers Steps b and c are done simultaneously There shall not be any air entrapment between tape and the component surface Thermal QA inspection Packing 7 9 STEPS FOR THERMAL CONDUCTIVE GREASE APPLICATION 1 2 3 4 5 6 7 8 Cleaning of contact surface of the package panel using cotton cloth soaked isopropyl alcohol Marking of the required area to be applied with thermal conductive grease Masking of the other surfaces not to be applied with grease using cello tape and lint free tissue paper Application of 150u 200u thick grease layer using nylon mesh and a wiper Weighing of grease applied on the component Removal of cello tape and lint free tissue paper Removal of excess grease if any after mounting of package on the
47. e Cross spectral density function between any two channels e Auto Correlation of a given channel and cross correlation between any two channels e Coherence function defining the linear dependency between two signals over a given frequency range between any two channels e Octave analysis with option to select Order of analysis from 1 1 Octave to 1 24 octaves or better e Phase spectrum between any two channels e Real and imaginary plot with respect to frequency of a spectral density function for any channel OPTIONAL e Transmissibility FRF amplitude and phase transfer function of a channel with respect to another channel e Along with the display of the plot of the selected channel statistical parameters such as rms maximum and minimum amplitude with frequency etc should be displayed The following analysis features should be supported in off line analysis mode e Integration and Differentiation of a given channel e Nyquist plot between two channels OPTIONAL 4 2 6 Spectral weighting for Acoustic Data Analysis e A weighting Weighting e Weighting etc 4 2 7 Along with the display of the plot of the selected data channel statistical parameters such as Overall Sound Pressure Level maximum and minimum amplitude with frequency etc should be displayed 4 3 Sine Data Acquisition and Analysis SI No Features 4 3 1 The system should support swept sine dat
48. e work needs to be carried out till 9 30 p m and even on Sunday also 2 Scope of the Department The incumbent Contractor will be issued with raw material tools measuring instruments Required machines like drilling milling and lathes component drawings and computer system for creation of the above mentioned jobs 3 Quantity Total No No of Qualification amp PIENO Nature ot work Of Units Persons Experience required 3 1 Part drawing work 650 1 Diploma Mechnical Engineering with experience in AutoCAD 3 2 Fitting work 5 000 2 ITI Fitter with one year experience 3 3 Milling work 10 000 4 ITI Machinist with one year experience 3 4 Turning work 5 000 2 ITI Turner with one year experience 3 5 Technical helper 5 000 2 SSLC Passed For sl no 3 1 one unit of work Making of drawing in Two 4 size sheet For sl no 3 2 to 3 5 one unit of work Two man hours 4 0 Specification For carrying out works at SI No 3 1 Diploma in Mechanical Engineering with experience in Auto CAD 15 necessary Experience in reading understanding the component drawings and mechanical process planning is essential Preparation of part drawing work to be carried out on PC using AUTOCAD supplied by ISAC For carrying out works at SI No 3 2 Knowledge of fitting at ITI level with one year experience is necessary Experience in reading and understanding the component drawings and usage o
49. easurement of electrical resistances of all heater segments and logging them 9 Preliminary QA inspection 10 Interconnection of heater segments by CEFF 11 Lead wires anchoring by kapton tape 12 Application of thermal control tape on the heater 13 Measurement of resistance logging tagging amp powering 14 QA inspection 15 Packing 7 6 STEPS FOR THERMISTORS BONDING ON S c PANELS PACKAGES ETC 1 Preparation of temperature sensor location drawing 2 Cleaning of thermistor mounting surface using cotton cloth soaked with isopropyl alcohol or the recommended solvent some times depainting may have to be done at the sensor location 3 Marking of temp sensor location 4 Checking of sensor for its resistance damages etc 5 Positioning of sensor at the marked location and anchoring it with thin kapton tapes 6 Mixing of adhesive as per the recommended ratio 7 Application of required amount of adhesive covering the bead solder joints and part of the extension leads 8 Application of thermal control tape after curing of adhesive for 24 hrs at room temperature 9 Tagging the sensor 10 Inspection of sensor for its continuity 11 Thermal inspection 12 Packing of the component 7 7 STEPS FOR PLATINUM RESISTANCE TEMP SENSORS BONDING ON MLI BLANKETS 1 Cleaning of PRT mounting surface using cotton cloth soaked with isopropyl alcohol 2 Marking of PRT location 3 Checking of PRT for its resistanc
50. ectric single line schematic drawings electric single line schematic drawings including revising of drawings as and when required preparation of sub station layouts street lighting area lighting transformer yards transformer D4 set layouts with foundation for transformer DG sets cable trenches Also including preparation of detailed drawings of installation of fittings street light panels ceilings etc for installation details drawings of control circuits conduits conduit layouts for internal electrification works All the above jobs have to be done using AutoCAD software getting hard copies of drawings complete as directed by Engineer in charge Electrical REQUIREMENTS Candidates should have passed Diploma in Electrical Engineering from reputed Institutions obtaining 1 class and should have experience of 01 to 02 years in draughting of electrical conduit and layout drawings especially in buildings He should posses knowledge of Auto Cad Rivet softwares He should be independently able to prepare electrical drawings referring to architectural drawings and able to form electrical schemes and sketches furnished by electrical engineers No of drawings per month 2 Nos For One year 1 x 12 x 2 24 drawings Quantity Unit cost including Service Tax Each 24 Drgs APPENDIX 1 to FM018 1 PERIOD OF SERVICE CONTRACT ONE YEAR 2 Skill level required for executing the Service Contract
51. etails of the a party to be provided along with the quote All parts shall be serialized amp screened as per QML V of MIL PRF 38535 The devices shall meet TID requirements of 100Krad Si minimum Single Event Latch Up LET of minimum 80 MeV mg cm and Single Event Upset LET for S module minimum 3 5 MeV mg cm and for C module minimum 14 MeV mg cm The devices shall undergo Group A tests on 100 of the lot One sample drawn from the deliverable quantity shall undergo Destructive Physical Analysis DPA as per the MIL STD 883 Test Method 5009 Quote optionally Three samples shall undergo life test quote optionally DATAPACK REQUIREMENTS The following Data shall accompany the devices in compact disk or soft copy Certificate of Conformance issued by the manufacturer Precap Visual Inspection report Screening results by attributes and variables Technology Conformance Inspection TCI Generic data shall be delivered for the quarter during which these devices are processed Group B C amp E Test reports DPA Test report if ordered Radiation Test report Life test data with samples if ordered OTHER REQUIREMENTS The name of the manufacturer shall be specified as part of the offer Each device type shall be supplied from lots with same date code The devices shall be drawn from lots manufactured within 2 years of the date of shipment Supply of devices from lots older than 2 years from the date of shipment shall be
52. f Agency Commission included in the invoice which would be paid to the Indian Agents directly by the Purchaser However the contractor s invoice should separately reflect the amount of commission payable to his Indian Agent d The earliest delivery period and country of origin of the Stores e Banker s name and address of the contractor f The approximate net and gross weight and dimensions of packages cases g Recommended spares for satisfactory operation for a minimum period of one year h Details of any technical service if required for erection assembly commissioning and demonstration The FOB and C amp F prices quoted should be inclusive of all taxes levies duties arising in the tender s country 4 The offer should be valid for a minimum period of 120 days from the due date of opening of the tender 5 Samples if called for should be sent free of all charges 6 Late tenders will not be considered Quotations by cable fax or telex must be followed by detailed offers to reach within 15 days 7 Offers made by Indian Agents on behalf of their Principals should be supported by the Proforma Invoice of their Principals 8 The details of Import License will be furnished in the Purchase Order 9 The Authority of person signing the tender if called for shall be produced 10 Instruction operation manual containing all
53. f measuring instruments is also essential Fitting operations like Filing Drilling Tapping and Deburring to be carried out on different materials like Aluminum alloys Magnesium alloys MS SS and Titanium alloys with the help of standard fitting tools supplied by ISAC For carrying out works at SI No 3 3 Knowledge of milling at ITI level with one year experience is necessary Experience in operating different types milling machines reading and understanding the component drawings and usage of measuring instruments is also essential Milling operations like Face Milling Side Milling Taper Milling Pocketing Boring and Reaming are to be carried out on different materials like Aluminum alloys Magnesium alloys MS SS and Titanium alloys with the help of HSS and solid carbide cutting tools All the milling operations are to be carried out on HMT FN2V 3V and BFW FU1 5 amp FU2 milling machines supplied by ISAC For carrying out works at 51 3 4 Knowledge of turning at ITI level with one year experience is necessary Experience in operating different types of lathes reading and understanding the component drawings and usage of measuring instruments is also essential Turning operations like Plain turning step turning taper turning internal and External thread like Aluminum alloys Magnesium alloys MS SS and Titanium alloys with the help of HSS and solid carbide cutting tools All the turning operations are to be carried
54. f thick paste on the mounting surfaces of the packages using nylon screen mesh 3 7 Multi Layer Insulation MLI Blankets fabrication amp assembly It involves Velcro tape locations drawings preparation bonding velcro tapes on various spacecraft packages equipment panels which are to be covered with MLI blankets MLI blanket template preparation compiling various layers of the blankets cutting the blankets with scissors amp knives fixing grounding tapes and Kapton adhesive tapes buttons stitching the layers with nylon thread bonding velcro tapes on the blankets and assembling the blankets on the spacecraft 3 8 Heat Shield fabrication amp assembly for AOCS thrusters and LAM It involves drawings preparation fabricating the cone shield with SS Titanium sheets and assembly using ceramic beads SS wires spot welding and final assembly on spacecraft using polyimide spacers amp ceramic washers 4 0 QUANTITY OF WORK for two years SI Item Name Quantity Unit Work Man No contract power in man required hours 1 Electro chemical process for Al Mg Cu Ti SS etc components 1 1 Small components 12000 No Each unit 4900 0 98 like washers fasteners spacers etc 1 2 Medium components 9000 No Each unit 6600 1 32 like brackets mechanism components etc 1 3 Large components 1600 No Each unit 11600 2 32 like boxes modu
55. fect of Transverse forces Transverse forces 10 Fnom do Effect of Eccentricity per mm dg Rel creep over 30 min Input resistance Re Output resistance R Isolation resistance Ri Reference excitation voltage U er Operating range of the excitation voltage 20 kN 00 2 mV V 0 1 0 296 0 596 0 08 0 02 0 03 0 0696 0 0296 0 0196 0 01596 0 0396 0 0196 0 0296 2345 ohm 356 0 3 ohm 55 10 ohm 5 V 0 5 12 V 30 Nominal temperature range Bison Operating temperature range Bic Storage temperature range Reference temperature tref Max operational force Limit force Fi Breaking force Fg Static lateral limit force Fo Limit torque MG Nominal displacement Snom Fundamental resonant frequency fa Weight Rel permissible vibrational stress F Cable length six wire connection Degree of protection to DIN EN60529 10 40 9C 30 85 C 50 85 C 22 C 150 150 250 30 120 N m 0 2 mm 4 1 kHz 1 8 kg 70 16 meters IP 67 Calibration Certificate for 20kN Force Transducers Quantity 4 Nos 1 DKD Calibration Certificate for force acc to ISO 376 up to 25 kN with cable N 8 9 length 16m Type of load Compression single bridge B Specification for Force Transducer Quantity 4 Nos Nomin
56. form 10096 Incoming Inspection amp Data Package review before shipment Report to ISAC all NCR DCN Document Change Notice during procurement testing Please provide the point by point compliance to specification in your quote Quote separately for operating voltage of 5V and 3 3V SL NO 03 FILE NO ISCO2010019020 DESCRIPTION TECHNICAL SUPPORT SERVICES Annexure 1 Scope of Work Architects for planning 2 Nos Architects are required to understand the users requirements for any proposed new project and prepare necessary line sketches broadly indicating the facility requirements like the size of rooms labs facilities along with functional heights etc Broad outlay of specifications to suite the users requirements also need to be specified in the line sketches Once the works are cleared by GCWRC detailed planning need to be taken up to prepare the preliminary architectural drawings indicating all the relevant information through plans sections elevations and also 3D views wherever required All detailed specifications also need to be incorporated to prepare the realistic estimates Once the estimates are approved by the competent authority working architectural drawings need to be prepared for the purpose of construction including necessary site co ordination etc Subsequent to the execution of the work at the site completion drawings also need to be prepared as per the actual details as built Besides all these activ
57. g amp attitude correction These are to be covered with multi layer metallic radiation shields to prevent heat transfer to the adjacent components The heat shield geometry is basically a frustrum of a cone The shield is covered at top for LAM amp open at bottom side and for AOCS thrusters the shields are open at both ends For geostationary spacecrafts one heat shield for LAM 16 heat shields for thrusters amp 4 nos cylindrical heat shields for AY thrusters are used 7 0 PROCEDURES The standard operating procedures process information documents required to carry out the work are available with TSG ISAC and will be made available to the party at the commencement of work The various steps sequences for electro chemical processes MLI blankets fabrication fixing of optical solar reflectors heaters temperature sensors thermal control tapes amp the procedure for application of thermal conductive grease and thermal painting are explained below 7 1 STEPS FOR ELECTRO CHEMICAL PROCESSES a The process sequence for anodising hard anodising of aluminum alloy is as follows 1 2 3 4 5 6 7 8 9 Solvent cleaning Alkaline cleaning and rinsing Alkaline etching and rinsing Masking Anodising Hard anodising and rinsing Sealing Demasking Inspection Packing Process parameters like type of chemicals bath temp current densities and time will vary depending on type anodising b The process sequence for black an
58. he same time the layers should not be held loose After stitching cut the excess thread leaving 2 5 cm from the knot While stitching make sure that excessive wrinkles on the blanket are not formed 6 CUTTING AND EDGE SEALING e Cut the MLI blanket as per the geometrical layout This includes cutting the blanket edges incorporating slits and cut outs e Fix plain Kapton adhesive tapes at the corners of the cut outs and at the end points of the slits on both sides of the blanket Seal the edges and cut outs with self adhesive Kapton tape as per the template drawing 7 BONDING VELCRO TAPES ON MLI BLANKETS e Identify the Loop Velcro tape locations on the bottom cover and Hook Velcro tapes on the top cover Make sure the bonding surface areas on the blanket and Velcro tapes are clean e Place the MLI blanket on the worktable in such a way that the bottom cover of the blanket faces upwards e Apply one coat of adhesive on the rear side of the Loop Velcro tapes with brush and allow it to dry for ten minutes so that the adhesive becomes tacky e Apply one more coat of adhesive on the Loop Velcro tape and stick the Loop Velcro tapes on the bottom cover layer of the MLI blanket e Place aluminium plates over the Loop Velcro tapes and keep dead weights over the aluminium plates and allow the adhesive to cure for 12 hours at room temperature e Remove the dead weights and aluminium plates after 12 hours of curing Reverse the MLI b
59. ials used in the fabrication should be capable of meeting the Outgassing specifications as per ASTM E595 with TML lt 1 amp CVCM 0 196 All the devices shall be serialized and subjected to the following screening tests The test method amp condition shall be as per MIL F 18327F External visual and Mechanical inspection Baking at max rated temperature for 48 Hrs Temperature Cycling at extreme temperature Burn in at rated voltage for 240Hrs rated temperature Seal Electrical testing 9 ambient and temperature extremes including the following a Dielectric withstanding voltage b Insulation resistance c Hlectrical characteristics As per specification Eight samples randomly drawn from the deliverable screened lot shall be subjected to First article inspection Table VI of MIL F 18327F Quote separately for Group I II amp III C DATA PACK REQUIREMENTS Following test data shall be supplied along with the filters 1 Certificate of conformance from the manufacturer amp Supplier 2 Summary sheet of Screening amp First article inspection test giving details of tests performed test conditions date of test no of devices tested passed etc 3 100 Variable data of screening tests and First article inspection test 4 Lifetest amp Internal visual report D OTHER REQUIREMENTS 1 All the devices of each line item shall be from the same lot date code and not older than one year w r t the date of shipment 2 P
60. indicated in the quotation and will require approval of ISAC before shipment Devices shall be packed in ESD safe packs optionally quote for individually vacuum packing The device Leads Body shall be free from any type of oxidation corrosion brown spots etc Only Vendors Suppliers authorized to source above Space Grade components from the Manufacturer will be considered Necessary Certificate from the Manufacturer shall be enclosed along with the offer Alerts Guidelines Software amp Programmer version Applications notes shall be enclosed along with the quotation RESPONSIBILITIES OF THE SUPPLIER The supplier will undertake following additional tasks to ensure that the devices meet the necessary quality requirements Monitor manufacturer wherever and perform Final Customer Source Inspection FCSD ISRO reserves rights to participate during FCSI or nominate qualified agency to perform FCSI Quote separately the cost for performing FCSI by 3rd party Address and details of the 3rd party to be provide along with the quote Perform 100 Incoming Inspection amp Data Package review before shipment Report to ISAC all NCR DCN Document Change Notice during procurement testing Please provide the point by point compliance to specification in your quote SL NO 07 FILE NO ISIR2010019211 ITEM DESCRIPTION RADIATION CROSS LINKED ETFE INSULATED SPACE GRADE WIRES QUANTITIES SL WIRE GU
61. ing the items After receiving the above documents the documents will be reviewed by us Only after satisfactory review amp verification we will provide the dispatch clearance to the supplier for dispatching the items The supplier shall supply the items only after receiving dispatch clearance note from us IV Marking amp Packing Marking of each plate and Packing of plates for dispatch shall be done as per the relevant standard V Payment Only after receipt and acceptance of the items at out end 3 SL NO 02 FILE NO ISIR2010019007 ITEM DESCRIPTION HIGH SPEED DIFFERENTIAL LINE DRIVER AND RECEIVER SL COMPONENT TYPE AND OR QUANTITY REQUIRED IN NO TECHNICALLY SUITABLE SLABS EQUIVALENTS 01 DS90C031 OR UT54LVDS031 OPERATING 1007 150 200 250 VOLTAGE 5 V 02 DS90C032 OR UT54LVDS032 OPERATING 1007 150 2007 250 VOLTAGE 5V 03 DS90LV031 OR UT54LVDS031LV OR 1007 150 200 250 SN55LVDS 31 SP OR RH LVDS31K OPERATING VOLTAGE 3 3V 04 DS90LV032 OR UT54LVDS032LV OR 1007 150 2007 250 SN55LVDS32 33 SP OR RH LVDS 32 K OPERATING VOLTAGE 3 3V NOTE PACKAGE STYLE 16 CERAMIC FLAT PACKS QUOTE FOR ABOVE SPACE GRADE PARTS OF TECHNICALLY SUITABLE EQUIVALENTS RESPECTIVELY AS PER THE SPEC FOR 5 VOLTS AND 3 3 VOLTS SEPERATELY DEVICE DETAILS The Devices shall be of the part numbers as per the list or form fit functional equivalent in 16 pin
62. ingle channel should be displayable with option for peak picking 4 1 11 2 Provision for data display in a single window for comparison either with over plotting or U with tiled display of e Multiple channels of single test i e within the same set of data e Multiple channels data from multiple tests Data of multiple channels of single and multiple tests should be displayable in multiple windows 4 1 11 3 Waterfall display of the selected channel 4 1 11 4 Zooming of a selected band in the graph should be possible 4 1 11 5 Data tracking cursor for identifying graph values should be provided It should be possible to mark multiple peaks using single cursor 4 1 11 6 Manual amp Automatic setting of the range for X and Y axes 4 1 11 7 Option to set Linear logarithmic scale for X and Y axes 4 1 11 8 Option to enable disable grid lines 4 1 11 9 Hard copy printing option for all the above display plots Software should be able to support the general LaserJet printers and in particular the Color LaserJet printer supplied along with the system 4 1 11 10 Facility should be present to save the display plots in PDF format optionally PS format as well as importing them into applications like Microsoft word for report generation purpose e It should be possible to export all plots of a test at once to MS word with optional peak picking for each of the plots 4 1 11 11 Option to list identified points on the graph al
63. ities Architects need to be involved in day to day co ordination with the site Engineers as well as Design Engineers to ensure smooth progress of the work REQUIREMENTS Candidates should have passed B Arch obtaining I class from a reputed institution and have experience in planning of buildings such as Technical facilities Laboratories Office accommodation including workshops and highbays The knowledge in planning of clean rooms R amp D Centres is preferable Candidates should have knowledge of Autocad Autodesk including 3D Max and Revit softwares Candidate shall have registration with India Council of Architecture No of Drawings per month per architect 2 Nos For two architects 2x2 4Nos For One year 4 x 12 Nos 48 drgs Quantity Unit cost including Service Tax Each 48 Drgs 2 Site Engineers 2 Nos They have to study and understand all the architectural structural details along with service drawings and ensure the work is preceded without any hindrance Actual site conditions are to be considered while executing the Job and necessary modified details suggestions are to be obtained from Architects Design Engineers so that construction work is carried out Further they have to monitor the progress of the work as per the targeted schedules so that allotted budget is spent for the work They also need to assist EIC in measuring the works so that regular RA Bills can be prepared Also they are
64. king on the spacecraft e Check for the correct solvent for cleaning the substrates and thermal control elements by verifying the label of the solvent container e Check the expiry date for shelf life of the adhesives solvents and chemicals before use e Use approved laboratory grade solvents for cleaning the substrates e Use approved optical grade isopropyl alcohol for cleaning the thermal control elements e Do not use excessive chemical solvents for cleaning operation Make sure that no solvent seeps inside the packages or panel inserts etc e Check for QA clearance certificates for thermal operations on the packages subsystems etc e Check with the concerned thermal personnel integration personnel before carrying out thermal operations on the spacecraft e Do not lean on the spacecraft or make use of spacecraft for support while working on the spacecraft or near the spacecraft e Watch the surroundings and avoid brisk movements near the spacecraft to avoid injuries entangling with the spacecraft wire harnesses and damaging the spacecraft e Do not enter spacecraft integration clean rooms or clean areas of thermal laboratories if you are suffering from cold or cough 10 0 MANPOWER REQUIREMENT Personnel deputed for carrying out these activities shall be Skilled Trained Personnel with experience of about 5 years in aerospace and allied industries and able to communicate in English and Kannada languages They should
65. l Engineering with experience in AutoCAD 2 02 NOS ITI Fitter with one year experience 04 NOS ITI Machinist with one year experience 02 NOS ITI Turner with one year experience 3 02 NOS SSLC Passed Technical Helper 3 The Minimum Service Charges including D A payable per day month for the various categories 1 Semi Skilled Manpower Rs 225 Rs 6 750 Matric Technical Helper Skilled Manpower ITI 2 etc Fitter Machinist Rs 250 Rs 7 500 Turner 3 Technical Personnel Diploma in Mechanical Engineering with experience in AutoCAD Rs 425 Rs 12 750 SL NO 06 FILE NO ISIR2010019209 ITEM DESCRIPTION SPACE GRADE AND RAD HARD ANTIFUSE FPGAs QUANTITY 1007 125 150 175 200 DEVICE DETAILS The FPGAs shall be ONO antifuse based part number RH1280B of gate density 8000 gates or form fit functional equivalent in 172 pin CQFP package amp electrical spec as per the SMD 5962F9215603QYC NTP os Tu perm 55 2 Qo cU Oy cA DEVICE QUALITY Quote for the following quality levels MIL PRF 38535 QML MIL PRF 38535 QML V PROCESSED All the devices shall undergo Pre cap visual examination on 100 as per of MIL PRF 38535 QML V ISRO reserves right to participate during precap visual inspection or nominate 34 party for performing Precap Visual inspection Quote separately the cost for performing precap by a party Address and d
66. lanket on the table in such a way that the top cover faces upwards e Apply one coat of adhesive on the rear side of the Hook Velcro tapes with brush and allow it to dry for ten minutes so that the adhesive becomes tacky e Apply one more coat of adhesive on the Hook Velcro tape and stick the Hook Velcro tapes on the top cover layer of the MLI blanket e Place aluminium plates over the Hook Velcro tapes and keep dead weights over the aluminium plates and allow the adhesive to cure for 12 hours at room temperature Remove the dead weights and aluminium plates after 12 hours of curing Note The velcro tape bonding procedure curing time and temperature may vary depending upon the adhesive used Follow the specified bonding procedure if any ASSEMBLY The blankets so fabricated are mounted on the spacecraft in clean room 7 11 STEPS FOR HEAT SHIELDS FABRICATION la LAM HEAT SHIELD FABRICATION This involves the cutting of radiation metallic foils of Titanium material with scissors to the required geometry amp fixing of ceramic beads at selected points This activity is carried out at laboratory level 1b LAM HEAT SHIELD ASSEMBLY This involves the assembly of primary shield assembly by means of fastening amp assembly of radiation foils using conical parts with top disc For covering the top disc titanium wire is used and entire assembly is integrated to the LAM deck This is carried out at spacecraft level in clean room 2a
67. les etc 2 Thermal painting 300 m Each sq mtr 14300 2 87 3 OSR bonding 29 400 Each unit 28300 5 67 4 Foil heater fixing 1500 No Each unit 7800 1 58 5 Tape heater fixing 640 m Each mtr 8700 1 73 6 PRT Thermistor bonding 690 Each unit 5800 1 16 7 Thermal control tape 40 m Each sq mtr 2700 0 55 fixing 8 Thermal Grease 330 No Each unit 7500 1 49 application 9 MLI fabrication amp 340 m Each sq mtr 17600 3 53 implementation 10 AOCS Heat shields 218 No Each unit 6200 1 25 fabrication amp Assembly 11 LAM Heat shields 10 No Each unit 2700 0 54 fabrication amp Assembly Total manpower required BE Msc chem one No BE mech 2 No DME chem 2 DME mech 5No ITI electroplating 3 No ITI electrical 2 No ITI fitter 10 No Total 25 No It may be noted that all components or assembled system for any of the above mentioned activities would not be available simultaneously or sequentially They would be available intermittently over a period of two years However it is essential to depute all the personnel as per the manpower estimations mentioned in para 10 0 5 0 PLACE OF WORK AND WORKING HOURS PLACE OF WORK The electro chemical process activities are to be carried out at Electro chemical laboratories of Thermal Systems Group of ISAC The Electro chemical Laboratories are situated in Liquid Systems Propulsion System Centre LPSC campus at Bangalore Thermal painting activities
68. lication of primer on rear side OSRs using brush and allowing them for curing for at least 30 minutes 7 4 7 5 4 Masking of segment of panel as per the supplied autocad generated drawing and priming of the exposed area 5 Preparation of OSR arrays on the jigs as per the drawings 6 Application of adhesive on the panel using screen holder and adhesive wiper and removal of the mask 7 Transfer of OSRs on adhesive layer as per the supplied drawing using vacuum pump and removal of jigs from the panel 8 Curing of adhesive layer at 40 deg C for 2 hours 9 Inspection of bonded OSRs 10 Protective covering for OSRs bonded on the panel STEPS FOR FOIL HEATERS FIXING 1 Prepare the heater implementation drawing 2 Masking of areas as per the supplied drawings before painting OR de painting of areas as per the established procedure and heater implementation drawing 3 Cleaning of heater mounting surface using cotton cloth soaked with isopropyl alcohol or the recommended solvent 4 Application of pressure sensitive adhesive on mounting surface of the heater without leaving air entrapment 5 Checking of heater for its resistance damages etc 6 Fixing of foil heaters as per the location shown in the heater implementation drawing It is the simultaneous operation of removal of silicon coated release sheet from the heater and fixing of heater on the surface Air or foreign material entrapment shall not be there between the comp
69. ll as soft copy of the User Manual and Service Manual for the following should be provided e Operating system e Computer hardware e Instrumentation hardware e Application Software 11 3 The vendor should supply the Application Software and Operating system software in CD DVD media 11 4 Any options and accessories required in the vendor s opinion but not indicated in this specification should be quoted separately 11 5 In case of software licensing clearly spell out the possible options available like dongle based licensing computer mach id based licensing etc SL NO 10 FILE NO ISGE2010019132 DESCRIPTION OF WORK THERMAL FABRICATION AND IMPLEMENTATION OF VARIOUS ELEMENTS STATEMENT OF WORK ON THERMAL FABRICATION AND IMPLEMENTATION ON SATELLITES CONTENTS 1 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 Introduction Scope of Work Nature of Work 3 1 Electro chemical processes 32 Thermal painting 3 3 Rigid Optical Solar Reflectors bonding 3 4 Foil heaters tape heaters and thermal control tapes fixing 3 5 PRTs Thermistors bonding 3 6 Thermal grease application 3 7 Multi Layer Insulation MLD Blankets fabrication amp assembly 38 Heat Shields fabrication amp assembly Quantity of Work Place of Work and working hours Description of Electro chemical process and Thermal Control Elements 6 Electro chemical coatings 6 2 Thermal Control Paints 6 3 Optical Solar Reflectors OSR
70. long with the processed data 4 2 Acoustic Response data Analysis SI No Features 4 2 1 The Software module should support data acquisition and analysis of the responses monitored at various locations on the test specimen during Acoustic test 4 2 2 Real time FFT operation to be performed and displayed to obtain frequency domain transformation of the time domain signal 4 2 3 Following pre acquisition parameters should be user selectable These are in addition to the parameters described above in section 4 1 4 2 3 1 Frequency Range selectable from 0 10Hz to 0 40KHz in discrete steps 4 2 3 2 Sampling rate selectable from 25 to 100KHz in discrete steps 4 2 3 3 Number of spectral lines 100 to 16384 4 2 3 4 Number of averages 1 to 1000 4 2 3 5 Type of Averaging e Linear e Peak Hold Exponential averaging No Averaging 4 2 3 6 FFT overlap definable in percentage from 0 to 90 OPTIONAL 4 2 3 7 Windowing function e Hanning e Keiser Bessel e Rectangular Exponential 4 2 4 Off line analysis of the stored time domain data should be possible In off line analysis it should be possible to perform analysis with frequency range that is lower than the one defined during acquisition 4 2 5 The following analysis features should be possible in both on line and offline e Power Spectral Density function of a given channel
71. manium tape and gold tape 6 8 Thermal Conductive Grease It is smooth extrudable paste used for improving the contact conductance between the packages and panels This is applied for payload packages batteries and heat sinks etc 6 9 Multi Layer Insulation MLD Blankets The MLI blankets are used on the spacecraft to minimize the heat flow to or from the component to reduce the amplitude of temperature fluctuations because of time varying solar radiation fluxes and to minimize the temperature gradients Multi Layer Insulation MLI blankets consist of several layers of low emissive radiation shields separated by thermally low conductive spacers The layers are perforated for evacuation purpose The layers are held together by stitching Teflon buttons with Nylon thread at pre selected locations to avoid relative motion between layers The assembly is installed on the subsystem perpendicular to the heat flow with Velcro fasteners To reduce electro static charge build up on the surfaces of the MLI blankets all the layers of MLI blankets are grounded Due to the complex geometry of the subsystems and large surface areas of the spacecraft panels the blankets are fabricated in number of segments The segments are attached with multiple overlap joints overlap joints and simple butt joints 6 10 Heat Shields Liquid Apogee Motor LAM and Attitude amp Orbit Control System AOCS Thrusters are used in Geostationary spacecrafts for orbit raisin
72. me any question disputes or differences what soever shall arise between the Purchaser and the Con tractor upon or in connection with this contract either party may forthwith give to the other notices in writing of the existence of such question dispute or difference and the same shall be referred to the adjudication of two arbitrators one to be nominated by Purchaser other by a Contractor and in the event of any difference ofand procedure for arbitration of the international Chamber of Commerce at Paris The expenses of the arbitrators and umpire shall be paid as may be determined by them However the venue of such arbitrators should be in India 24 LANGUAGE AND MEASURES All documents pertaining to the contractor including specification schedule notices correspondence Operat ing and maintenance instructions drawings of any other writings shall be written in English language The metric system of measurement shall be used exclusively in this contract 25 INDEMNIT Y The contractor shall warrant and be deemed to have warranted that all Stores supplied against this contract are free and clean of infringement of any Patent copy right or trademark and shall at all times indemnify the Purchaser against all claims which may be made in re spect of the Stores for infringement of any right pro tected by Patent Registrati
73. n ESCC QPL 2 Conditions 3 4 5 6 Date of shipment The wires shall be resistant to electrical are tracking in wet or dry Certificate results showing the radiation withstanding capability ESCC part number amp logo shall be printed on the supporting spool Each line item shall be from a single lot date code Wires offered shall be of date code not older than 2 years from the 7 Party shall provide letter certificate from the manufacturer indicating That the party is an authorized agent distributor for the parts Quoted 8 Party offering the bid shall have experience of supplying the space grade amp military grade parts A reference or proof of the same shall be Provided along with the quotation SI NO SPECIFICATION REMARKS 1 GENERIC SPECIFICATION 2 INSULATION MATERIAL 3 CONDUCTOR TYPE 4 OPERATING TEMPERATURE 5 WIRE GAUGE 6 WIRE COLOR OUTER JACKET de WHETHER SINGLE WALL HOOK UP WIRE 8 DIELECTRIC BREAKDOWN 9 VOLUME RESISTIVITY 10 DIELECTRIC CONSTANT 11 DISSIPATION FACTOR 12 INSULATION RESISTANCE 13 RADIATION CAPABILITY 14 FINAL PRODUCTION TEST CHART II 15 WHETHER LAT II amp III OFFERED 16 CERTIFICATE OF CONFORMANCE 17 DATA PERTAINING TO FINAL PRODUCTION TEST 18 DATA PERTAINING TO LAT2 amp LAT3 19 MANUFACTURER OF THE OFFERED ITEM 59
74. n the envelop Instead indicate Request for Tender Documents Detailed specification terms and conditions are furnished in the tender documents DD should not be dated prior to the date of advertisement intimation website Separate requests and demand drafts shall be sent for each tender document ISAC will not be responsible for non receipt of tender documents offers due to postal delay loss in transit Quotations received without payment of tender fee will be treated as unsolicited Indian agents while quoting on behalf of their principals are requested to provide necessary authorisation letter from their Principals The offer should be valid for the period of Ninety days from the date of opening Quotations received after the due date and time will not be considered While submitting your offer please superscribe tender no and due date on the envelope Addressed to Head Purchase amp Stores ISRO Satellite Centre Airport Road Vimanapura Post Bangalore 560 017 If tender opening date happens to be public holiday tender will be opened on the next working day amp interested Vendors may depute their Representatives to attend the Public Tender Opening Request for the extension of the due date will not be considered Head Purchase and Stores ISAC reserves the right to accept or reject any tenders in part or full without assigning any reasons thereof Tenderers who do not utilise the website shown at clause 01 above can
75. nment SI Features Range value 6 2 1 Operating and storage temperature 10 C to 40 C 6 2 2 Relative Humidity 10 to 90 7 System Demonstration SI No Features 7 1 The vendor should demonstrate complete capabilities of the system at ISRO ISAC Bengaluru in particular the system with at least two chassis configuration to show synchronization Results of this demonstration will form basis for technical qualification of the system 8 System Acceptance SI No Features 8 1 Fully integrated Data Acquisition System should be completely tested prior to dispatch and these test results shall be made available ISRO ISAC may witness the pre shipment acceptance test at their discretion 8 2 The quotation should contain the details of the tests to be conducted at factory and also at ISRO ISAC site along with the report format covering performance specifications 8 3 Mutually agreed acceptance tests carried out at ISRO ISAC site shall form the basis for final acceptance of the system 9 Installation amp Training SI No Features 9 1 Training should be provided for the ISRO ISAC personnel 9 2 The system should be installed at ISRO ISAC and demonstrated for full performance rating of the system 10 Warranty and Maintenance 10 1 e Warranty period for the hardware and software shall be for a minimum period of TH
76. nting It involves preparation of drawings for painting locations on various parts of the spacecraft packages masking and application of black paints and white paints on panels packages antennae reflectors polyimide foils etc using compressed air spray gun Some times chemical etching is to be carried out for the anodic coating on aluminium substrates before masking amp painting 3 3 Rigid Optical Solar Reflectors bonding It involves OSR layout drawings preparation bonding OSR pieces on the equipment panels with adhesive using fixtures and curing the adhesive with Infrared lamps 3 4 Foil heaters Tape heaters and Thermal control tapes fixing It involves sizing of the heater elements and heater circuit design preparation of heater implementation drawings and fixing the heaters The foil and tape heaters are fixed on panels and packages with transfer adhesive Thermal tapes are supplied by the manufacturer with self adhesive backing The tapes are fixed on the panels and packages by removing the release paper and sticking it to the surface 3 5 PRTs and Thermistors bonding It involves preparation temperature sensor location drawings fixing temperature sensors at various locations on the spacecraft packages These temperature sensors are fixed using various one part or two part adhesives or to be fixed with Kapton adhesive tapes etc 3 6 Thermal grease application It involves applying thermal grease which is in the form o
77. odising of aluminum alloy is as follows 1 2 3 4 5 6 7 8 9 Solvent cleaning Alkaline cleaning and rinsing Alkaline etching and rinsing Masking Anodising and rinsing Black dyeing and rinsing Demasking Inspection Packing c The process sequence for Integral black anodising of Magnesium alloys is as follows 1 2 3 4 5 6 7 8 Solvent cleaning Alkaline cleaing and rinsing Acid cleaning and rinsing Masking Integral Black Anodising and rinsing Demasking Inspection Packing Heat treatment in an air circulated oven at 70 C Only for Integral Black Anodized Magnesium alloy components for 2 hours The process parameters should be recorded appropriately in log sheets 7 2 STEPS FOR THERMAL PAINTING 1 2 3 4 5 6 7 8 9 Preparation of drawings for thermal painting packages panels etc Cleaning of the surface of the component thoroughly using organic solvents such as trichloroethylene MEK toluene etc Deanodise the aluminium components as per the established procedure and as per the deanodizing drawings supplied Application of smooth emery on carbon fibre reinforced plastic CFRP components to obtain rough surface if required for thermal paint application Final through cleaning as per step b if emerying is carried out Measuring amp recording of anodic thickness of the components Masking the deanodized and other surfaces which do not
78. on of design of Trade Mark and shall take all risk of accidents of damage which may cause a failure of the supply from whatever cause aris ing and the entire responsibility for the sufficiency of all the means used by him for the fulfillment ofthe contract 26 COUNTER TERMS AND CONDITIONS OF SUPPLIERS Where counter terms and conditions printed or cyclos tyled conditions have been offered by the supplier the same shall not be deemed to have been accepted by the Purchaser unless specific written acceptance there of is obtained 27 SECURITY INTEREST On each item to be delivered under this contract in cluding an item of work in progress in respect of which payments have been made in accordance with the terms of the contract Purchaser shall have a security interest in such items which shall be deemed to be released only at the time when the applicable deliverable item is finally accepted and delivered to the Purchaser in accordance with the terms of the contract Such securi ty interest of the Purchaser shall constitute a prior charge as against any other charge of interest created in respect of such items by any other entity 28 BANK CHARGES While the Purchaser shall bear the bank charges payable to his Banker State Bank of India ISRO Branch Airport Raod Vimanapura Bangalore 560 017 the Contractor sh
79. on of the Police Verification Report of the work force whichever is later However performance of the Service Provider will be reviewed after a period of 3 months from the date of commencement of the Contract by IRSO ISAC If found satisfactory contract will be continued for the remaining period 2 2 Service Contract can be extended by another one year consent 2 3 Each Party shall have the right to terminate the Contract at any time during the currency of the Contract by giving one month s notice to the other Party 3 License under Central State Labour Acts Rules ISRO ISAC will issue necessary certificate in Form V to the successful Tenderer for obtaining the necessary license from the appropriate Labour authorities under the various Central State Labour Acts Rules for deployment of the work force for executing the tendered Service The Contractor should submit a certified copy of such a license within one month from the date of commencement of the Service Contract failing which the Service Contract will be terminated by ISRO ISAC without any further notice 4 Registration under the Employees Provident Funds amp Miscellaneous Provisions Act Rules 4 1 The Tenderer should mention the Registration No under the Employees Provident Funds Act amp Miscellaneous Provisions Act Rules The Tenderer should furnish a copy of the EPF Registration Certificate along with the tender 4 2 Employer s contribution towards EPF
80. onent and heater Heater once fixed shall not be removed and re fixed Hence wrongly fixed heater will become waste Heaters shall be fixed without straining amp disturbing the heating element amp crimped joints of the heater 7 Tagging of heaters 8 Measurement of resistances of all heaters and logging them 9 Preliminary QA inspection 10 Interconnection of heater segments by CEFF ISAC 11 Lead wires anchoring by kapton tape or adhesive 12 Application of thermal control tape on the heater 13 Measurement of eff resistance final tagging amp powering of heater 14 QA inspection 15 Packing STEPS FOR TAPE HEATERS FIXING 1 Preparation of heater implementation drawings forcomponents 2 Cleaning of components using cotton cloth soaked with isopropyl alcohol 3 Fixing of kapton tape on components 4 Checking of heater for its resistance damages etc 5 Fixing of tape heater segment as per the location shown in the drawing It is simultaneous operation of removal silicone coated release sheet wrapping of heater around components in helical fashion and pressing of heater on components 6 Air or foreign material entrapment shall not be there between the component and heater Heater once fixed shall not be removed and re used Hence wrongly fixed heater will become waste Heaters shall be fixed without straining or disturbing the heating elements and crimped joints of the heater 7 Tagging of all heaters 8 M
81. ong with the graph should be available This feature should be supported in hard copy generation also 4 1 12 The software should support export of the data files in the following file formats Universal File Format data set 58 and other data sets Spread sheet format Microsoft Excel e ASCII format SI No Features MATLAB Binary and MATLAB ASCII Importing of data in Universal File Format should be possible 4 1 13 Provision for initial diagnostics of the instrumentation front end in case of any hardware problems 4 1 14 Provision for on site Instrumentation Front end Calibration should be provided with Calibration Software and associated accessories for field calibration as per specification 2 18 4 1 15 Source Control Program to generate sine random burst sine burst random and user defined signals for Modal Testing The software should be able to generate mutually uncorrelated signals for each of the channels Each of the four output channels should be independently programmable 4 1 16 modal analysis software should be able to support 4 1 16 1 MIMO FRF estimation using H1 H2 and Hv Estimators 4 1 16 2 Compute ordinary coherence multiple coherence and virtual coherence for each of the input channels 4 1 16 3 Exporting of the processed data in the formats defined in 4 1 12 for further analysis 4 1 16 4 Recording and storage of the raw time domain data a
82. ontractor terminate the contract in whole or in part in circumstances detailed hereunder a If in the judgment of the Purchaser the Contractor fails to make delivery of stores within the time speci fied in the contract agreement or within the period of which extension has been granted by the Purchaser to the Contractor b If in the judgment of the Purchaser the contractor fails to comply with any of the other provisions of this contract 15 2 In the event of Purchaser terminates the contract in whole or in part as provided in clause 15 1 the Purchaser reserves the right to purchase upon such terms and in a manner as he may deem appropriate stores similar to that terminated and the contractor shall be liable to the purchaser for any additional costs for such similar stores and or for liquidated damages for delay as defined in clause 19 until such reasonable time as may be required for the final supply of stores 15 3 If this contract is terminated as provided in clause 15 1 the purchaser in addition to any other rights provided in this article may require the contractor to transfer title and deliver to the purchaser under any of the following cases in the manner and as direc ted by the purchaser a Any completed stores b Such partially completed stores drawing informa tion and contract right
83. or executing the Service Contract 9 1 9 2 10 11 12 13 12 1 ISRO ISAC has fixed the following skill level as mentioned in Appendix I for the work force of the Contractor for executing the Service Contract Police verification of the character and antecedents of the work force The Contractor would be required to provide verification report from the local Police authorities within one month from the date of receipt of the Letter of Intent duly certifying the verification of Character amp Antecedents for each of the work force engaged by the Contractor for executing the service contract in ISRO ISAC For this purpose if required ISRO ISRO will issue a letter to the concerned Police authority certifying the award of the Service Contract to the Contractor which can be used by the Contractor for expediting the Police verification The Contractor should also verify certify the conduct of the work force at frequent intervals If any of the work force misbehaves or commits any misconduct ISRO ISAC reserves the right to refuse permission to such persons to enter its premises and such work force shall be withdrawn by the Contractor immediately Non Disclosure Agreement The work force engaged by the Contractor for executing the Service Contract in ISRO ISAC should sign a Non Disclosure Agreement It shall be the Contractor s responsibility to get the signature of their work force on the Non Disclosure Agreement and su
84. or sea for space qualified stores The contractors shall be held responsible for all damages due to improper pack ing b The contractor shall ensure that each box unit of shipments eligible and properly marked for correct identification The failure to comply with this re quirement shall make the contractor liable for additionl expenses involved The contractor shall notify the purchaser of the date of shipment from the port of embarkation as well as the expected date of arrival of such shipment at the desig nated port of arrival d The contractor shall give complete shipment information concerning the weight size content of each packages etc e Transhipment of equipment shall not be permitted except with written permission of the Purchaser Apart from the dispatch documents negotiated through Bank the following documents shall also be airmailed to the purchaser within 7 days from the date of shipment by sea and within 3 days in case of air consignments a Commercial Bill of Lading Airway Bill Post parcel Receipt two non negotiable copies b Invoice 3 copies Packing list 3 copies Test Certificate 3 copies Certificate of Origin Contractor shall also ensure that one copy of the pack ing list is enclosed in each case 23 ARBITRATION If any ti
85. oup Ill Continued Salt atmosphere when specified 4 Acceleration when specified Visual and mechanical inspection extemal 1 Resistance to solvents Flammability extemal flame grades 5 7 and 9 only Visual and mechanical inspection 1 Nondestructive tests Number of sample units to be inspected Requirement Test paragraph paragraph 3 20 3 21 3 11 31 33 34 to 343intl 345 3 25 and 3 26 323 3 24 34 33 332344 326 324 2 For grades 4 and 8 the torque test is applicable only to terminals with screw threads 3l Two sample units only 4 When salt atmosphere is specified the six sample units shall be divided into two equal groups Each group shall be inspected independently for moisture resistance and salt atmosphere When these examinations are performed in the foregoing manner separate test data shall be submitted for each group BI Test shall not be performed if the manufacturer provides certification that all extemal materials are fungus resistant SL NO 05 FILE NO ISDD0 2010019094 DESCRIPTION MANNING OF FITTING TURNING MILLING PART DRAWING WORK 1 Scope of work by the Contractor The Contractor has to carry out Fitting part drawing preparation Milling amp Turning of Pre machining jobs at General Fabrication Facility and at Precision Fabrication Facility from 8 30 a m to 5 00 p m from Monday to Saturday and under exigencies th
86. out on HMT LB17 amp LB20 and Geedee Weiler lathes supplied by ISAC For carrying out works at 51 3 5 SSLC with one year experience on shop floor as helper amp he should know about general industrial safety The works involves Cleaning of chips on machines amp cleaning of shop floor Toping up of coolant amp hydraulic oil for machines available at GFF amp PFF Applying amp removing of lacquer on magnesium components Moving of material amp files with in ISAC 5 0 Period of Contract Period of contract is two year and extendable for one more year 6 0 Continuity of work is assured for a period of two year presently This may be extended by another one year 7 0 Quotes to be given on per unit basis irrespective of when the work was carried out working day or Holiday and quotes in any other form will be rejected However works need to be done on daytime 8 0 Itis necessary that all personnel deployed should be provided with Uniform with company logo and proof Proof of payment of PF and ESI should be shown to Contract Manager Also the photocopy of the company s ID issued to all personnel should be made available to Contract Manager Proof regarding payment of salary to all personnel shall be made available to Contract Manager every month APPENDIX 1 to FM018 01 PERIOD OF SERVICE CONTRACT TWO YEARS 02 Skill level required for executing the Service Contract 1 01 NO Diploma In Mechanica
87. ower Impedance Operating temperature range Package Size Center Frequency Fo 3 dB Bandwidth Insertion loss Pass band return loss 30dBc Bandwidth Input power Impedance Operating temperature range Package Size Center Frequency Fo 3 dB Bandwidth Insertion loss Pass band return loss 30dBc Bandwidth 0 5 Watts max 50 Q 309 to 60 C Miniature PCB mountable as per figure 1 121 5 MHz 6MHz min 6dB max at Fo 15dB min at Fo In Out 15MHz max 0 5 Watts max 500 30 C to 60 C Miniature PCB mountable as per figure 1 441 64 MHz 15 MHz min 5dB max at Fo 15dB at Fo In Out t60MHz max Rejection from 520MHz to 800MHz 40dBc min Input power Impedance Operating temperature range Package Size Or 0 5 Watts max 500 309 to 60 C Miniature PCB mountable as per figure 1 smaller Note All pin assignments Input Output and GNDs should be marked on the top of the package B QUALITY REQUIREMENTS Filter shall be Designed constructed and tested based on MIL F 18327F to meet all the above electrical specifications Passive elements used in the fabrication shall be ER Series of MIL with failure rate level R or better OR processed to standard manufacturers internal Hi rel flow with element evaluation to Class K of MIL PRF 38534G The package evaluation shall be performed as per Table C VI of MIL PRF 38534G The mater
88. p cordial relations with ISAC staff during their visit to ISAC The thermal fabrication amp implementation activities involve handling of very thin metallic coated foils metallic coated fragile parts chemicals adhesives etc The thermal control elements and other materials associated with the implementation works are very delicate expensive and prone to be contaminated and damaged if not handled carefully While carrying out the electro chemical operations on spacecraft components if the processes are not carried out carefully the parts may get dissolved or damaged in chemical baths The activities are single shot operations In addition to the handling of thermal control elements the personnel have to handle delicate electronic packages that are sensitive to electro static discharge It is skilled activity and should be done by skilled manpower The following are the general precautions and work instructions to be observed while carrying out the thermal works e Wear clean room garments in thermal laboratories and spacecraft integration clean rooms e Do not touch the components packages and thermal control elements with bare hands Wear lint free gloves or powder free finger cots Use nose and mouth masks while working on rigid OSRs in addition to the hand gloves finger cots Do not shake hands with others after wearing gloves or finger cots e Wear electrical grounding wrist strap while handling the electronic packages and wor
89. panel Logging of all the information Name of the package dimensions of the area applied with grease total weight of grease applied etc 7 10 STEPS FOR MLI BLANKET FABRICATION The MLI blanket fabrication involves the following operations and should be carried out in the order given below 1 VELCRO TAPE BONDING ON PANELS PACKAGES Prepare the Velcro tape locations drawing 3 4 5 Identify and mark the Hook Velcro tape locations on the panels packages as per the drawing Clean the panels packages with isopropyl alcohol Make sure that the bonding surface areas of Velcro tapes are clean Apply one coat of adhesive on the rear side of the Hook Velcro tapes with brush and allow it to dry for ten minutes so that the adhesive becomes tacky Apply one more coat of adhesive on the Hook Velcro tape and stick the Velcro tapes on the panel packages Fix cellophane tapes over velcro tapes to keep the velcro tapes in position and to apply pressure during curing Allow the velcro tapes to cure for 24 hours under room conditions Remove the cellophane tapes and clean the adhesive traces left by the cellophane tapes Prepare the MLI blanket fabrication drawing template ROUGH SIZE BLANKET FABRICATION Spread the insulation blanket layer material rolls Mylar Kapton Polyester net TCC Kapton etc on a large table and cut to the required lengths Inspect the layers for any defects such as aluminium coating degrada
90. pproved by the Purchaser for an amount equivalent to 10 of the value of the contract along with first ship ment documents On the performance and completion of the contract in all respects the Bank Guarantee will be returned to the Contractor without any interest g the replacement stores shall be guaranteed for period of of 12 months from the date of arrival of Stores at Purchaser s site h Even while the 12 month guarantee applies to all stores in case where a greater period is called for by our specifications then such a specification shall apply in such cases the period of 14 months referred to in clause 20 b and c shall be the asked for guarantee period plus two months 21 REQUIREMENT OF ADDITIONAL NUMBERS OF STORES SPARE PARTS ORDERED The contractor shall also undertake the supply of addi tional number Nos of items covered by the order as considered necessary by the Purchaser at a latter date The actual price to be paid shall be mutually agreed to after negotiations 22 PACKING a The contractor wherever applicable shall pack and crate all stores for sea air shipment as applicable in a manner suitable for export to a tropical humid climate in accordance with internationally accepted export practices and in such a manner so as to protect it from damage and deterioration in transit by road rail
91. require thermal painting using paper and paper cello adhesive tapes as per the painting drawings Proper mixing of suitable primer and application of primer on the spacecraft components using spray painting gun in painting booth to the required thickness Measuring amp recording of primer thickness coated on spacecraft components after allowing desired curing 10 Proper mixing of thermal paint and application off the same on the primed spacecraft components in painting booth to achieve the designed paint thickness in 1st coat 11 Measuring amp recording of 1st coat of thermal paint thickness after allowing desired curing 12 Mixing of thermal paint and application of the same on the painted spacecraft components to achieve the desired paint thickness in second final coating 13 Measuring amp recording the paint thickness after the desired curing 14 De masking the painted component and packing the same in polythene sheet NOTE Deanodizing will not be carried out for some components amp direct painting will be carried out For the preparation of black thermal control sheets only one coat of black painting will be carried out on Kapton sheet as per the established procedure 7 3 STEPS FOR OSR BONDING 1 2 3 Preparation of OSR layout drawing Inspection of OSRs for defects like coating degradation substrate warpage or any physical damages Defect free OSRs are to be taken up for primer application App
92. ributes and variables and Group A test data TCI Generic data for the quarter during which these devices are processed Radiation Test report Life test data with samples if ordered DPA test report with samples if ordered OTHER REQUIREMENTS Each device type shall be supplied from lots with same date code The devices shall be drawn from lots manufactured within 2 years of the date of shipment Supply of devices from lots older than 2 years from the date of shipment shall be indicated in the quotation and will require approval of ISAC before shipment Devices shall be packed in ESD safe packs optionally quote for individual vacuum packing The devices shall have gold coated leads and the device body and or leads shall NOT have any black brown red spots Only Vendors Suppliers authorized to source above Space Grade components from the Manufacturer will be considered Necessary authorization Certificate from the Manufacturer shall be enclosed along with the offer RESPONSIBILITIES OF THE SUPPLIER The supplier will undertake following additional tasks to ensure that the devices meet the necessary quality requirements Monitor manufacturer wherever and perform Final Customer Source Inspection FCSI ISRO reserves rights to participate during FCSI or nominate qualified agency to perform FCSI Quote separately the cost for performing FCSI by 3rd party Address and details of the 3rd party to be provide along with the quote Per
93. rovide the electrical and mechanical data sheet of the parts along with the quote Mention the name of the manufacturer in the quote 4 Supplier shall submit a letter from manufacturer stating that they are authorized to supply the product offered 5 Supplier shall have heritage of supplying the MIL Space grade components Proof of the same shall be submitted along with the quotation 6 Mention the availability of generic test data of Group tests Also mention if this data can be shared If yes indicate the date of testing e Please provide point by point compliance to the above requirements Electrical Specifications in your quote Otherwise the offer may not be considered FIGURE 1 DIMENSIONAL DRAWING 0 15 MIN 4X Note All dimensions are in inches ANNEXURE 1 TABLE VI First article inspection Inspection Grades Number of T 3 E zc sample units to be inspected Group Visual and mechanical inspection external 1 X X 3 1 3 3 34 to 3 4 3 indl 3 4 5 3 25 and 3 26 Terminal strength 2 Solderability when specified Resistance to soldering heat when specified Seal Dielectric withstanding voltage Insulation resistance Electrical characteristics Stability at temperature extremes Group ll Life at elevated ambient temperature Group Ill Temperature rise when specified 1 3 See footnotes at end of table TABLE VI First article inspection Continued Gr
94. s Range value 5 1 Computer The computer with all peripherals except Monitor should be supplied as essential spares to ensure 100 uptime in case of failure 5 2 Throughput Additional throughput disk module should be supplied as Disk essential spares to ensure 100 uptime in case of failure 5 3 Instrumentation The cards boards of instrumentation front end that are front end the source of single point failures should be part of the Spares kit In particular at least following cards should be included The Master card or its equivalent that sits in the mainframe and controls the instrumentation front end e Signal conditioning and A D converter card s e Clock synchronization card if any e The interface kit to connect the Computer and the Instrumentation Front end e Power supply module for the instrumentation front end SI No Features Range value This list will be finalized after looking into the configuration proposed by the vendor at the time of ordering 6 Electrical Power Supply amp Operating Environment The supplied hardware should be able to run with the following electrical supply and environmental conditions The vendor should supply the system with India compatible power cords 6 1 Electrical Supply SI No Features Range value 6 1 1 Voltage 220 Volts AC 5 and 10 6 1 2 Frequency 50 Hz 1 5 6 2 Operating Enviro
95. sition and storage either in terms of disk mirroring or providing additional parallel storage media such as Solid state Drives throughput disk module should support data acquisition of SIX tests continuously without transferring data to the back up drive resulting in storage requirement of 350GB e In case of abrupt termination of data recording due to any reason including power off software malfunction instrumentation front end malfunction the raw time domain data stored till that moment should be readable 2 17 Interface to Computer High speed connectivity such as Ethernet or Firewire between the instrumentation frond end and the computer The connectivity should support the high data rate emanating from 50KHz sampling rate 24 bit ADC and 256 channels resulting in transfer rate of 51 2MB Sec or better SI No Features Range value 2 18 Calibration It should be possible to carry out ON SITE Instrumentation front end calibration without the need of support intervention from the vendor e Any H W amp S W accessories for the same shall be provided e Offset removal and gain linearity adjustment for all the input output channels should be provided e In case if any channel fails in calibration the calibration process should continue skipping that particular channel It should be possible to isolate disable the failed channel in further calibration steps 2 19 R
96. stablishment for communication purpose 16 6 If any damage is caused to ISRO ISAC property by any work force of the Contractor or if they sustain any injury due to their negligence the responsibility for the same shall solely rest with the Contractor and an Indemnity Bond to this effect should be executed by the Contractor SPECIAL INSTRUCTIONS TO SERVICE PROVIDER QUOTATION SHOULD BE SUBMITTED FOR NUMBER OF UNIT MAN HOURS OF WORK QUANTIFICATION AS MENTIONED IN THE ANNEXURE THE MINIMUM WAGES AS INDICATED IN THE TABLE SL NO 03 OF APPENDIX I SHALL BE TAKEN INTO CONSIDERATION WHILE COMPUTING THE RATE FOR QUANTIFICATION QUOTATION RECEIVED WITHOUT ADHERENCE TO THE ABOVE STIPULATION WILL NOT BE CONSIDERED SL NO 01 FILE NO ISGE2010018948 ITEM DESCRIPTION ALUMINIUM ALLOY PLATE Description Material grade AL 6061 T651 Finishing Aluminium plate Rolled Forged Aluminium Alloy AL 6061 T651 Standards To be specified by the bidder supplier AMS QQ A 250 11 ASTM B 209 Quantity As given in Table 1 Table 1 SI NO Block Plate size No of Plate 1 600 mm 600 mm 114 3 mm 19 2 700 mm 500 mm 65 mm 11 3 700 mm 700 mm 152 4 mm 03 4 1220 mm 1220 mm 38 1 mm 12 5 600 mm 600 mm 101 6 mm 02 6 2440 mm 1220 mm 12 70 mm 03 7 2440 mm 1220 mm 19 05 mm 03 8 2440 mm 1220 mm 25 40 mm 03 Testings a Material test 1 Mechnical test for the mechni
97. t calculated for the quantum of works contract and these shall be included in the quotation If not the quotation will be rejected Some contract employees during the period of works contract will have to be deputed to other Centres of ISRO for spacecraft launch activities or testing of components etc and the charges TA amp DA for these will be borne by ISAC Contractor shall prepare the daily log of quantity of thermal works carried out by their employees prepare a consolidated sheet of the same for every month which shall be signed amp approved by the focal point and submit the same alongwith bill prepared for the same once in a month to Accounts Officer ISAC for making payment All the work orders or contracts awarded to a new contractor should be initially for a period of three months and extended upto two years subjected to satisfactory performance Contractor should immediately repalce unsatisfactory candidate ISRO would like go through the bio data of proposed man power and have interaction with them before admitting them into our office work APPENDIX 1 to FM018 01 PERIOD OF SERVICE CONTRACT TWO YEARS 2 Skill level required for executing the Service Contract Skill level required for executing the 51 No of work force for executing the 3 Service Contract No Service Contract qualification experience etc 1 01 NO BE Chem MSc Chemistry 02 NOS BE Mechanical 2 02 NOS
98. tal resonant frequency fc Weight Rel permissible vibrational stress F Cable length six wire connection 30 Degree of protection to DIN EN60529 5V 0 5 12 V 10 40 C 30 485 C 50 85 C 22 C 150 150 250 30 350 N m 0 2 mm 4 5 kHz 24 kg 7096 16 meters IP 67 Calibration Certificate for SOkN Force Transducers Quantity 4 Nos 1 DKD Calibration Certificate for force acc to ISO 376 calibration for 50 kN with cable length 2 16m Type of load Compression single bridge 2 DKD Calibration Certificate for force acc to ISO 376 calibration for 30 kN with cable length 2 16m Type of load Compression single bridge Quos Da Fus 10 11 12 13 14 15 C Specification for Digital Precision Measuring Amplifier Quantity 1 No Accuracy class Number of amplifiers Transducers that can be connected Transducer excitation voltage Up Carrier frequency Transducer resistance per amplifier At Ub 2 2 5V 5V At Ub 10 V Transducer cable length Measurement ranges Digital filters upto 16 order Display resolution Common mode rejection Input resistance Sampling range per amplifier Tare range Linearization of transducer characteristic 0 0005 2 2 x 8 SG full bridges 2 5 V 5 V 10 V 225 100 ppm Hz 30 2000 ohm 60 4000 ohm 200m 2 5 mV V 5 mV V 10 mV V 10 0 03 15 steps Hz 21000000
99. the undermentioned documents a Original Bill of Lading Airway Bill b Commercially certified invoices describing the stores delivered quantity unit rate and their total value in triplicate The invoice should indicate the discounts if any and Agency Commis sion separately Packing list showing individual dimensions and weight d Country of origin certificate in duplicate e Test Certificate Declaration by the seller that the contents in each case are less than those entered in the invoices and the quality of the stores are guaranteed as per the specifications asked for by the Purchaser 9 Warrantee and Guarantee Certificate vide clase 20 4 IMPORT LICENCE Reference to Import License No and date and contract number and date shall be prominently indicated in all the documents vide para 3 2 5 DEMURRAGE Supplier shall bear demurrage if any incurred by the Purchaser due to delayed presentation of shipping docu ments as prescribed in para 3 2 to the Bankers within reasonable time say within 10 12 days from the date of bill of lading for sea consignments and within 3 4 days from the date of Airway bill for air consignments 6 ADDRESS OF INDIAN AGENTS 7 GUARANTEED TIME OF DELIVERY The time for and the date of delivery stipulated in the purchase order shall be deemed to be the essence of
100. tion contamination and any physical damages Avoid those areas while cutting Compile the different layers one over the other as per the MLI configuration types Pins and clips may be used to hold the bunch of layers together for storing handling and for further fabrication Label the blankets with their layers configuration type MARKING THE GEOMETRICAL LAYOUT Mark the geometrical layout of the blanket to be fabricated on the bottom cover of the rough size blanket using template or fabrication drawing GROUNDING Identify the electrical grounding point locations on the geometrical layout At the grounding point locations make L type slits in the polyester net layers to facilitate fixing of grounding tape to the MLI layers Fix aluminium grounding tape of one inch width on both sides of the Mylar layers and Kapton layers in a Z fashion continuously to form grounding tab of size one inch by one inch Punch a hole of 4mm diameter in the grounding tab approximately at the centre Insert the brass washers aluminium rivet of 4mm diameter grounding wire with lug and rivet it STITCHING Identify the stitching points as per the MLI blanket template fabrication drawing and stitch the layers with Teflon buttons and nylon thread The Teflon buttons must be placed on either side of the MLI blanket The stitching knot should appear on the bottom cover of the MLI blanket The knot should not compress the blanket layers excessively at t
101. tive or electrically non conductive Thermal paints are applied on the spacecraft components as per the established procedure using compressed air spray paint gun and carried out in filtered air no pump spray painting booth The paint coating shall have uniform appearance uniform paint thickness free from paint defects such as powdery surface runs or sags orange peel interference colours etc 6 3 Optical solar reflectors OSRs Optical solar reflectors are thin delicate and fragile mirrors used for radiating excess heat to the space The material of construction of these OSRs is either glass or fused quartz The mirrors are of 80 micron thick in sizes of 40mm x 40mm and 40mm x 20mm These mirrors are bonded on the spacecraft panels using electrically conductive adhesive 6 4 Foil heaters Foil heaters are thin flexible heating elements consists of an etched foil electrical resistance element laminated between layers of kapton These are in rectangular shape with areas varying from 5 sq cm to 30 sq cm and with resistances varying from 40 ohms to 350 ohms They are fixed on flat or nearly flat surfaces These heaters are fixed on the components like spacecraft panels electronic packages flow control valves FCV using pressure sensitive adhesive 6 5 Tape heaters Tape heaters are heating elements consists of enameled heating elements sandwiched between glass cloth The top surface is provided with aluminium foil and the bottom surfa
102. to the Service Provider On showing proof of its payment to individual account each month 6 2 For such of the workforce deployed by the Service Provider whose total wage is below Rs 10 000 p m the Act 1948 will apply rate of contribution is 6 5 of which 1 75 shall be borne by the workforce concerned and 4 75 shall be reimbursed by ISRO ISAC to the Service Provider as employer s contribution on showing proof of its payment towards each individual for each month 6 3 For such the workforce deployed by the Service Providers whose total wage is above Rs 10 000 p m the ESI Act 1948 is not applicable Such work force shall be covered by a Mediclaim Policy from a Nationalised Insurance Company with a coverage of Rs 2 00 000 per annum The payment of the Monthly premium shall be shared by ISRO ISAC and the workforce in the ratio of 73 08 amp 26 92 respectively rounded off to the nearest rupee The Employers Contribution towards premium amount shall be reimbursed to the Service Provider on showing proof of payment of the total premium each month 6 4 Any failure on the part of the Service Provider in compliance of above facilities would result in cancellation of Work Order or termination of the Contract forthwith 7 Service Tax and other Statutory levies ISRO ISAC shall reimburse the Service Tax and other statutory levies paid by the Contractor against proof of payment 8 Skill level required f
103. tract delivery date as may be reasonable but without prejudice to other terms and conditions of the contract 19 DELAY IN COMPLETION LIQUIDATED DAMAGES If the contractor fails to deliver the Stores within thetime specified in the contract or any extension thereof the purchaser shall recover from the contractor as liquidated damages a sum of one half of one percent 0 5 percent of the contract price of the unde livered stores for each calendar week of delay The total liquidated damages shall not exceed ten percent 10 percent of the contract price of the unit or units so delayed Stores will be deemed to have been delive red only when all its component parts are also deliv ered If certain components are not delivered in time the Stores will be considered as delayed until such time as the missing parts are delivered 20 GUARANTEE AND REPLACEMENT a The contractor shall guarantee that the Stores supplied comply fully with the specification laid down for mate rial workmanship and performance b Fora period of twelve months after the acceptance of the stores if any defects are discovered therein or any defects therein are found to have developed under proper use arising from faulty materials design or workmanship contractor shall remedy such defects at his own cost provided he is called upon to do so within a period of
104. uld be possible 4 5 Mathematical Processing SI No Features 4 5 1 Following operations should be possible on acquired raw time domain data and processed data 4 5 1 1 Data Data arithmetic and between any two selected channels 4 5 1 2 Data Constant arithmetic and for a selected channel with data in real complex magnitude phase format 4 5 1 3 Integration and differentiation of a given channel data 4 5 1 4 Application of trigonometric functions to a given channel data The functions should include sin cos tan arcsin arctan arcos amp their hyperbolic functions 4 5 1 5 Curve fitting operations such as smooth fit and least square polynomial fit Removal of spikes from data 4 5 1 6 Signal manipulation such as Append signal to Dataset Copy whole signal Extract named elements Repair signal Replace signal Include signals to dataset Copy section of signal etc 4 5 1 7 Filtering operations low pass high pass band pass and band stop with Bessel and Butterworth filter characteristics 4 5 2 Ability to add user defined routines using built in programming environment routines developed using MATLAB C C Java programming environments It should be possible to invoke these used defined routines within the acquisition and analysis packages defined above 5 Essential Spares Kit SI No Feature
105. umns footings pedestals tie beam details floor slabs amp beams roof slab and L sections of the beams along with staircase water tank details etc This involves thorough understanding of design requirements so that preliminary sketches can be prepared for the purpose of estimation tendering and working structural drawings for the purpose of execution Draughtsman also need to co ordinate with architects design engineers to obtain the required design details REQUIREMENTS Candidates should have passed Diploma in Civil Engineering from reputed Institutions obtaining 1 class and should have experience of 01 to 02 years in draughting of structural drawings especially in concrete structures He should posses knowledge of Auto Cad Rivet softwares He should be independently able to prepare structural drawings referring to structural sketches furnished by structural engineers No of drawings 2 Nos month For year x 12 x 2 24 drawings The above no of drawings are indicated in schedule Quantity Unit cost including Service Tax Each 24 Drgs Electrical Draughtsman 1 No The Draughtsman job involves incorporation of electrical scheme power point layout indication LDB PDBs MV panel cable routing indication of special earthing system lighting protection system system earthing with all necessary legends and notes and also to prepare tender drawings construction drawings el
106. urpose of display and plotting 4 3 7 Off line analysis of the stored time domain data should be possible In off line analysis it should be possible to perform analysis with frequency range that is lower than the one defined during acquisition 4 3 8 Frequency Range from 5Hz to 20KHz with corresponding sampling rate from 12 5Hz to 100KHz 4 4 Transient Data Acquisition and Analysis SI Features No 4 4 1 The system should support acquisition and processing of transient data as well as to process the data stored in disc both in time and frequency domains 4 4 2 It should be possible to carry out the following operations the time domain signal before computing SRS e Filtering of the signal with low pass band pass filters with user defined cut off frequencies e DC offset removal e Trend removal 4 4 3 Shock Response Spectrum SRS Analysis with following parameters user selectable Damping 1 to 99 e Frequency Range up to 20KHz e Octave analysis Definition o 1 1 Octave o 1 3 Octave o 1 6 Octave o 1 12 Octave o 1 24 Octave 4 4 4 Display of following SRS plots with option of displaying them in a single window either overlapping of the SRS plots or displaying one next to another along with time domain signal e Primary Residual Positive Negative and Maximax SRS 4 4 5 Off line analysis of the stored time domain data sho
107. wise details as above 13 2 14 15 16 c Proof of payment of the Employer s share of the ESI contribution for the preceding month along with a statement showing the details of the work force engaged by the Contractor for the particular contract their Insurance number their contribution Employer s contribution sought be to be reimbursed etc The ESI Challan amount should tally with the amount sought to be reimbursed d In case of any work force not eligible for coverage under the ESI Act Rules proof of payment of Employer s share of the premium for the preceding month for the Medi claim policy along with a statement showing the policy details etc shall be produced for reimbursement Employer s share of premium shall be limited to rates prescribed for ESI i e 4 75 e Proof of remittance of the Service Tax for the preceding month to the Service Tax authorities After necessary certification by the Contract Manager duly approved by the General Manager or Group Director or Deputy Director or the Division Head as the case may be the admissible payment will be released by the Accounts Division within 10 ten days from the date of receipt of the bill from the Contractor Security Deposit Bank Guarantee The Security Deposit payable by the Contractor shall be 7 5 of the value of the service contract and the same shall be recovered in equal installments in the running bills or else the Contractor may furnish a
Download Pdf Manuals
Related Search
Related Contents
Philips 170C7F User Guide Manual Euronda-bedienungsanleitung-eurosonic Notice d`utilisation Qui gouverne ? Configuration de l`entourage des Un homme à la mer - Stefie Shock Capo 1 Intro : Em D Em D Em DB HP Pavilion PE4200N User's Manual Copyright © All rights reserved.
Failed to retrieve file