Home
Project Identity
Contents
1. Smart Charger for Any RC 7 2V 12 V NIMH NiCd Battery Packs Oe ET ee cM MUN eS 006 510_LCD7XL a eae 736 1381 Price S amp H Total ae ae cae 158 64 ESSET en en m oy D io jo e 5 1 1 1 1 CHUN 122RC EA N m i nm CN TMMLF M en co OJ e as Co IL enm k co en em enm A lal m lel I 2 88 J M col ant 9 lel oi EN in em Fa les e gt i e co 1 1 1 RS SSS Se See See 7511314 E 18910 RERUM i RACER aa NENNEN ENS a ee Total 744 84 Remaing Total Hours worked 24 5 Stephanie 12 5 Phil 12
2. in place inside the box as well Once all of the electrical connections were made and all of the internal components were in place the front panel was bonded to the rest of the box The small PCB containing all the connectors and switches for the monitor was secured to the removable top panel The top panel was then secured to the case with small screws Once the case was completely assembled we spent some time filing and shaping the edges of the box and rounding off the corners to improve upon the quality of appearance and the seal at all of the bonding junctions Figure 2 shows the interior of the screen enclosure Figure 2 Inside View of Screen Enclosure and its Wiring The top panel was made removable via four screws to allow access to the battery interior connections and the LCD screen brightness contrast and color controls on the PCB that was attached to the top panel Figure 3 shows the Tamiya clip for charging the battery and the screen enclosure mounting bracket on the back panel of the enclosure Figure 3 Charging Tamiya Clip on Back Panel of Screen Enclosure Future Work Future work will consist of replacing the four access panel screws with raised screws and minor filing of the edges to smooth all corners and places where two pieces of ABS plastic meet We will start to compile the user s manual and the final report for this project as we have basically completed its construction and testing We are also waiting f
3. Project Identity Modified Communication System for Client with Disabilities Week 11 11 5 06 11 11 06 Philip Licitra Stephanie Santos Work Completed This week all of our final necessary tasks were completed We spent a significant amount making our final assembly of the ABS casing for the LCD monitor The pieces were assembled using a cyanoacrylate bonding agent Prior to the attachment of the front panel the monitor screen was secured to the front panel using several metal clips which were bolted to the plastic interior This provided at tight and secure fit for holding the monitor in place All of the wire connections were also made The final circuit design for the entire monitor is shown in Figure 1 6 6 Battery 4 LCD Charger Monitor V Figure 1 Power Switch Schematic The LED will indicate that power is being delivered to the monitor whether it is connected to the DynaVox or not All connections to the power switch were made using secure by removable connectors so that if the client ever desires to remove replace the battery supply they may do so without causing any damage to the switch or the rest of the circuit The battery was secured by placing small ABS pieces securely around it so that it would not slide or shake around the box Enough room was allowed for the removal of the battery if so desired The connector plug for the VGA cable to the monitor was secured
4. Re Test Joystick Re Test Screen Document Pictorally All C Determine Budget Evaluate Design 26 06 days 0 5 days 0 5 days 11 44 days 0 5 days 5 81 days 0 5 days 4 31 days 8 53 days 0 5 days 24 25 days 20 44 days 15 31 days 2 days 8 5 days 19 44 days 3 56 days 2 days 4 31 days 5 38 days 33 06 days 38 05 days 12 days Mon 10 2 06 Fri 12 8 06 Sat 12 9 06 Fri 11 3 06 Sat 12 9 06 Sat 12 9 06 Fri 12 8 06 Sat 12 9 06 Fri 11 10 06 Sat 12 9 06 Wed 8 30 06 Fri 10 13 06 Sat 12 2 06 Tue 11 28 06 Sat 12 2 06 Sat 12 2 06 Wed 8 30 05 Tue 11 28 06 Fri 121 06 Sat 12 9 06 Wed 8 30 05 Wed 8 30 05 Wed 8 30 05 Fri 12 8 06 Fri 12 8 06 Sat 12 9 06 57 Fri 12 5 06 Sat 12 9 06 58 Mon 1 1 07 59 Fri 12 8 06 Tue 12 18 06 63 Fri 12 8 06 Sat 12 9 06 54 Fri 10 27 06 Fri 12 5 06 Mon 1 15 07 69 Fri 12 1 06 Tue 12 18 06 68 Thu 1 25 07 69 Fri 9 8 06 Fri 12 1 06 Fri 12 8 06 Mon 1 1 07 74 Fri 12 8 06 Fri 12 8 06 Fri 9 29 06 Work on Dynavox and Scr 21 days Wed 9 27 06 Wed 11 15 06 Test Joystick 6 63 days Fri10M43 06 Fri 10 27 06 Test Screen 9 44 days Mon10 3006 Thu 11 30 06 80 Table 2 Updated Budget Catalog Description O O O SS ee eee eae 274 251 1 8 Mono Panel Mount Audio Jack 3 Pack XVn eee 310850 ColorGraphic voyageur YGA CompFlash pu aC G 100 SPBK Spec Switch Black oS is RA HAATDR2WR20 ean a ee EMEN Multi Current Universal
5. or some measurements on Franky s wheelchair to be sure that the joystick will mount properly Now that we have reached our project s completion we have made plans to travel to Sea Girt NJ on November 26 to make the installation for our client and to instruct him and his family on how to use the devices make all adjustments and how to install and uninstall the devices for the client s own everyday use Project Review As long as all of the information that was received from our client has been correct the joystick and screen systems should work properly with their existing DynaVox system The joystick and screen can either be implemented together or work separately as to the liking of our client Our timeline is ahead of schedule and we are now under budget due toa shipment of bonding agent that was never received and thus was credited to our account We are 5 16 under our budget of 750 00 Table 1 shows the updated timeline and Table 2 shows our updated budget Table 1 Updated Timeline Start Final Report Finish Final Report Finish Website Start Operator s Manual Finish Operator s Manual Start Final PowerPoint Pre Finish Final PowerPoint Pre Deliver Finished Porject to Prepare for Senior Design Senior Design Day Review NSF Guidelines Be Sure All Papers Meet N Fine Tune Base Unit Be Sure Base Unit is Wate Make All Electrical Connect Trouble Shoot Connections Determine Signal Output Fr Seal All Gaps in Casing
Download Pdf Manuals
Related Search
Related Contents
SBE 9plus Manual Jet dentaire «PRESSION EXPERT» Le prêt à sourire (cmms) - netmain - Intranet Advanced Maintenance Precision Copyright © All rights reserved.
Failed to retrieve file