Home

User`s Manual 10KV Digital High Voltage Insulation Tester Model

image

Contents

1. J p a i Test Equipment Depot 99 Washington Street Melrose MA 02176 781 665 1400 800 517 8431 Fax 781 665 0780
2. Test Equipment 99 Washington Street Depot Melrose MA 02176 Phone 781 665 1400 1 800 517 8431 Toll Free 1 800 517 8431 gt Visit us at WWW TestequipmentDepot com Law back to the Extech 380385 Product Page User s Manual EXTECH INSTRUMENTS 10KV Digital High Voltage Insulation Tester Model 380385 oo The ENERSAVE MODE Low Consumption and roducing tho ateerios rn Drmasing tho T button for loss than 3 seconds white starting he tost martin ENANS mei went tumon for more than 3 seconds whia staring tne test ENERSAVE Mode is disatted ihe Instrument Operates Coninousty Up N ease he water or a Introduction Congratulations on your purchase of the Extech High Voltage Insulation Tester This device has four pre set voltage test ranges up to 10kV and measures insulation resistance to 500GQ Other voltage test values can be selected using the 500V step buttons This professional meter with proper care will provide years of safe reliable service Safety 1 Circuits under test must be de energized and isolated before connections are made 2 Circuit connections must not be touched during a test 3 After insulation tests capacitors must be discharged 4 Test leads including alligator clips must be in good working order clean and without broken or cracked insulation a When servicing use only specified replacement parts 6 Environmental conditions Indoor use only Installatio
3. ain The display will prompt the user to connect the leads Connect Leads Press the TEST START STOP button to start testing Press TEST 6 The elapsed test time appears on the upper line right hand side of the display The resistance reading is shown on the upper left hand side of the display The lower line shows the test voltage in bargraph format see diagram at right R 9 998MQ 6 8s 7 The HOLD icon will appear in place of the bargraph o gt BBE lt 500v when the test is complete and the voltage has been discharged WARNING DO NOT REMOVE THE TEST LEADS BEFORE THE HOLD DISPLAY APPEARS 8 The meter automatically discharges the system at the end of the test 9 The meter automatically powers down after 5 minutes The Enersave Mode Enersave mode conserves battery life by performing a relatively short test 10 seconds The Enersave mode is the default test mode To bypass this mode and run a longer test 100 seconds max press and hold the TEST button for 3 seconds when starting a test Bargraph Voltage Display The bargraph represents the voltage present on the test leads as it rises soaks and decays The bargraph appears on the lower left of the dot matrix display during a test Automatic Under Over Range Resistance Detect If the display shows the message LOW MQ the test should be interrupted immediately by pressing the TEST button This message indicates that the insulation under test h
4. as broken down and the meter is trying to inject a high potential onto a short circuit If HIGH appears it is likely that the test configuration is open Check the test set up then test again Elapsed Timer The test duration is indicated on the display This is particularly useful in determining whether an insulating material under test will break down in a given amount of time 5 380385 V1 5 3 04 Manual Test STOP To stop a test in progress press the TEST button The test will immediately end and the system will automatically discharge Automatic Test STOP When in the default Enersave mode the test automatically stops after approx 10 seconds The test automatically stops after approx 100 seconds if the meter is not in the Enersave mode Live Circuit Warning If the test leads are connected to a live circuit approx 500V a warning beeper will sound and the meter will display Live Warning Circuit Live In this case correct the problem and retest Automatic Discharge At the end of a test the meter automatically discharges the high voltage The automatic discharge status is reflected on the display During discharge the beeper will sound and when completely discharged the HOLD icon appears on the display Applications Measuring Power Tools and Small Appliances For small appliances connect the Black EARTH lead to conductors and the Red LINE lead to insulating material For single or
5. double insulated power tools one lead should be connected to the device s chuck blade etc and the other lead to one of the AC power cord conductors test both conductors in turn Refer to the power tool application diagram below e J4 For 2 or 3 prong plugs connect the L 7 4 RED lead to one conductor at a time V Connect the BLACK lead to the chuck Testing Motors AC Motors Disconnect the motor from the line by a Disconnecting the wires from the motor terminals or b Opening the main switch If the main switch is opened and the motor also has a motor starter then the starter must be held in the ON position With the main switch opened the measured resistance will include the resistance of the motor wire and all other components between the motor and the main switch If a weakness is indicated the motor and other components should be checked individually If the motor is disconnected at the motor terminals connect the RED lead to the grounded motor housing and the BLACK lead to one of the motor leads lt lt Connect BLACK lead to the motor leads Connect RED lead to grounded housing 6 380385 V1 5 3 04 DC Motors 1 Disconnect the motor from the line 2 To test the brush rigging field coils and armature connect the RED lead to the grounded motor housing and the BLACK lead to the brush on the commutator 3 Ifthe resistance measurement indicates a weakness raise the brushes off of the comm
6. n category III 300V Pollution degree 2 e Altitude up to 2000 meters e Relative Humidity 80 max Temperature 0 to 40 C International Safety Symbols A Caution refer to this manual before using this meter Dangerous Voltages risk of electric shock E Meter is protected throughout by double or reinforced insulation Maintenance Battery Replacement When REPLACE BATTERY appears on the display replace the eight 1 5V C batteries Ensure that the meter is powered down and that the test leads are not connected Close the instrument cover and turn the instrument upside down Remove the screw located on the bottom of the meter Remove the battery compartment cover OTRS OTE Replace the eight batteries ensuring proper polarity 6 Affix the rear cover and secure the rear screw Cleaning Periodically wipe the case with a dry cloth Do not use solvents or abrasives to clean this instrument 2 380385 V1 5 3 04 Specifications General specifications Display 2 x 20 character alphanumeric multi function dot matrix Range selection 20 ranges in 500V steps with automatic ranging Preset buttons for 1KV 2 5KV 5KV and 10KV Bargraph Displays voltage ramp soak and decay Automatic discharge After automatic amp manual stop or upon completion of test Low battery indicator Replace battery displayed when battery voltage is low Power source Eight 1 5V C cells Batte
7. ry life 40 hrs no load at 10kV Auto Power off After 5 minutes of inactivity Enersave mode Shorter test time to conserve battery life Test Leads Supplied RED length 108 with GREEN guard lead BLACK lead is 42 Operating conditions 32 to 104 F 0 to 40 C lt 80 RH Storage conditions 14 to 140 F 10 to 60 C lt 80 RH Dimensions 13 x 10 2 x 6 3 330 x 260 x 160mm Weight 7 9 Ibs 3 6kg Range Specifications DC Test Resistance Short Circuit Accuracy Resolution Voltages Ranges in GQ Current 0 5KV 25 1KV 50 100mA 1 5KV 75 2KV 100 2 5KV 125 3KV 150 3 5KV 175 120mA 4KV 200 4 5KV 225 5KV 250 3 2d 1MQ 5 5KV 275 6KV 300 6 5KV 325 7KV 350 7 5V 375 170mA 8KV 400 8 5KV 425 9KV 450 9 5KV 475 10KV 500 360mA Note Voltage Regulation is 20 5 unless current limited 3 380385 V1 5 3 04 Meter Description 1 Test lead jacks 2 Dot Matrix Display 3 Keypad 4 Battery compartment on bottom 5 Test lead compartment latch p Preparation Warning Ensure that the circuit under test does not include devices or components that can be damaged by 10KVDC such devices include power factor correction capacitors low voltage mineral insulated cables electronic light dimmers ballasts and starters for fluorescent lamps Connec
8. ting the Test Leads to the meter The Black Earth Red Line and Green Guard test leads connect to the meter directly above the dot matrix display the meter jacks are color coded NOTE The Green Guard lead is attached to the Red lead and should be used refer to applications section next Connecting the Test Leads to the device under test The Black Earth lead is connected to the conductive material The Red Line and Green Guard leads are connected to insulating sheathing and covering material as shown in the following applications section Test Equipment Depot 99 Washington Street Melrose MA 02176 781 665 1400 800 517 8431 Fax 781 665 0780 4 380385 V1 5 3 04 Operation Powering the meter Press the ON button to turn the unit on Press the OFF button to turn the unit off Insulation Resistance Measurements Warning The circuit under test must be completely de energized and isolated before making test connections 1 After turning the unit on the display will prompt the user Select Voltage to select a test voltage diagram at right 250000MQ V 5000V 2 Select the test voltage by pressing one of the preset voltage buttons 1KV 2 5KV 5KV 10KV or by pressing the Voltage Adjust buttons 500 500 to step through the available test voltages in 500V steps 3 The resistance range for the selected voltage is indicated on the dot matrix display as shown above Press the TEST START STOP button ag
9. utator and separately test the armature field coils and brush rigging by connecting one lead to each individually leaving the other connected to the grounded motor housing This also applies to DC Generators Testing Single Conductor Cables Core Insulation Sheath Covering 1 Completely disconnect the cable under test from its source and destination 2 Connect the test leads to the cable as shown at right EARTH GUARD LINE Testing Multi Conductor Cables 1 Completely disconnect the cable under test from its source and destination Refer to the diagrams below for three possible tests GUARD 2 EARTH EARTH LINE 1 LINE GUARD EARTH LINE Testing one conductor to Testing one conductor One conductor to all all of the conductors to earth minus ground Transformer Testing Transformer tests are performed with the transformer completely disconnected from the line and the load Note that the case ground should not be removed The five tests listed below will completely test a single phase transformer Note that at least 1 minute should be allowed i fo between each test j lt gt f 1 High voltage winding to low voltage Conn ctthe gt Comnestthe winding and grouna BLACK lead here RED lead here 2 Low voltage winding to high voltage winding and ground 3 High voltage winding to low voltage winding pictured at right lt gt 4 High voltage winding to ground 5 Low voltage winding to ground

Download Pdf Manuals

image

Related Search

Related Contents

Instructions For Use - Build-It F.R. Core Build-up Material  グリーン調達ガイドライン(第 5 版)    Eocs on blackboard user manual  Trident Aegis  Operating Instructions  524 002 Manuel d`utilisation  LCD TV SERVICE MANUAL  TECHNICAL DATA & SERVICE MANUAL SPLIT SYSTEM AIR  

Copyright © All rights reserved.
Failed to retrieve file