RigMaster Service Manual-120 Volt Generator

image

Contents

1. Dangerous AC voltages are present when the generator is running Ensure care is taken not to ground wires when testing Copyright RigMaster Power by Mobile Thermo Systems Inc 09 28 09 RigMaster Power Service and Repair Manual Document S931009 9 3 Testing the Generator 1 Using a digital multi meter test both block heater and bunk outlets Position the test leads between hot and neutral prongs of the plug Voltage should be no lower than 110 V AC 2 Using a volt meter capable of measuring frequency in Hz Position the test leads across the hot and neutral of the block heater circuit and measure the frequency e The output should be 61 5 Hz with a 1500 watt load 3 If the above measurements are incorrect see adjusting the Engine Idle in section S9 4 Copyright RigMaster Power by Mobile Thermo Systems Inc 09 28 09 RigMaster Power Service and Repair Manual Document S941009 9 4 Adjusting the Engine Idle In order for the generator to produce the 6kW at 60 Hz the generator must rotate at 3600 RPM The proper method for setting this speed is to use a Hertz Hz meter to measure the alternating currents frequency Measure the output at the receptacle by inserting the test leads into the hot and neutral openings Ideally the generator should be tested under partial load 1500W plugged into the block heater Set the frequency with this load to 61 5 Hz by adjusting the engine idle See figure 9 5 Throttle Control Assembly L
2. Serpentine Drive System A Rear Engine Mount Plate o B Generator C Bolt iM D Flat Washer L Ss E Rear Side of RigMaster Unit F Bolt Assembly G Nylon Nut Figure 9 2 gt C Figure 9 3 Legend A 1 B N A C Bolts 3 8 16 X 1 12 4 D 8 E N A F N A G Nylon Lock Nut 3 8 16 4 Copyright RigMaster Power by Mobile Thermo Systems Inc 09 28 09 RigMaster Power Service and Repair Manual Document S911009 V Belt Drive System lt lt Towards Engine Figure 9 4 Legend Hold Down Block 3 8 16 threaded hole Generator Mounting Flange Hold Down Bolts 3 8 16x 1 Hardened Flat Washers Lock Washer 3 8 6kW 120V Generator Flat Washers 3 8 Lock Nut 3 8 16 Adjuster Lock Nuts 1 4 20 Generator Adjuster Eye Bolt Generator Mounting Plate AG I O NM oou D gt Z FADES Ba E ee ad E US Copyright RigMaster Power by Mobile Thermo Systems Inc 09 28 09 RigMaster Power Service and Repair Manual Document S921009 9 2 Generator Removal and Installation Removing the Generator V Belt 1 Remove the tape re tape the wire nuts when replacing the wire nuts 2 Disconnect the 2 120V power cables from the generator See generator electrical schematic Remove cables from connection box and secure Loosen adjusting bolts Loosening the two 2 1 4 hex nuts evenly until the belt is slack then remove both adjusting nuts ae NOT
3. failure If there is line power from the T1 and T3 to their respective breakers but no power on the load side the breaker has either failed or requires that it is reset The breakers do not require any power to be reset If there is limited voltage to the breakers from leads T1 and T3 ensure that the RPM of the engine has not come out of adjustment The generator should produce a hertz frequency of 61 5Hz while under a 1500 watt load If the generator produces less than this Hertz frequency regardless of the voltage reading the idle of the engine should be adjusted accordingly If the hertz frequency is correct remove the neutral line wire nut and measure the voltage across red lead T1 and white lead T2 and between the brown lead T3 and the blue lead T4 there should be a minimum voltage of 1 5 volts If the reading is less than 1 5 Volts the Capacitor may need to be flashed Please see S9 6 for more information on this procedure NOTE Step 8 should be performed if the generator produces low voltage under minimal load conditions 9 If the equipment has been stored or allowed to get damp or dirty the insulation resistance of the windings should be checked see S9 6 Copyright RigMaster Power by Mobile Thermo Systems Inc 09 28 09 RigMaster Power Service and Repair Manual Document S961009 9 6 120 Volt Generator Service Procedures DIAGNOSTIC TOOLS e Megger Tester 500V minimum capability for testing field windings e Elec
4. E To adjust the generator belt tension loosen the generator tie down bolts that go through the four slots in the generator plate 6 Slide forward towards and remove generator belt 7 Remove generator from the mounting plate Upon reinstallation thoroughly clean rear mounting feet and the corresponding mating surface Apply a coat of high tack gasket maker to the two 2 rear mounting feet of the generator and co responding tie down blocks Re tape wire nuts to prevent the wire nuts from loosening In order for the generator to produce the 6kW at 60 Hz the generator must rotate at 3600 RPM The proper method for setting this speed is to use a multi meter equipped with Hz or frequency capabilities Measure the output at the receptacle by inserting the test leads into the line and neutral openings With no load on the generator and at approximately 70 F ambient temperature the Hz should be 61 5 Hz minimum Ideally the generator should be tested und er partial load such as with the block heater plugged in and set the speed to 60 5 Hz NOTE The use of a corrosion inhibitor is recommended on all electrical connections Ensure all electrical connectors are tapped up securely to prevent loose connections under vibration Copyright RigMaster Power by Mobile Thermo Systems Inc 09 28 09 RigMaster Power Service and Repair Manual Document S921009 Removing the Generator Serpentine Belt Remove the front aluminum cover Remove back genera
5. RigMaster Power Service and Repair Manual Document S901009 e The following procedures present hazards which can result in injury or death Only persons qualified to carry out electrical and mechanical servicing should undertake this work e Always disconnect the APU s power supply battery cables prior to performing service work e Always wear safety goggles when cleaning the generator 9 0 Generator Electrical System Specifications GENERATOR SPECIFICATIONS Generator Markon Model BL 105B Output 6kW 120 Volts AC 60Hz Figure 9 1 The RigMaster APU powers an independent 120 Volt alternating current generator The output frequency is approximately 60 Hz load factor dependent Under zero load the generator will produce approximately 125 to 130 volts The generator must spin at the correct speed 3600 rpm in order for it to output within the acceptable range The engine rpm is tuned such that the generator produces approximately 61 5 Hz under 1500 Watts of AC load The engine rom should be set using an digital volt meter with the capability to measure frequency across the hot and neutral wires NOTE The engine rom must NOT be set using an engine tachometer as the 120V generator will not produce the proper output voltage or frequency using this method Copyright RigMaster Power by Mobile Thermo Systems Inc 09 28 09 RigMaster Power Service and Repair Manual Document S911009 9 1 Generator Mounting Diagrams
6. and push it on gently with a padded dead blow mallet Bolt the alignment tool to the fly wheel and align the pulley with the tool following the procedure in Section S3 4 Tighten the grub screw use Loc tite to ensure the grub screw does not become loose over time Copyright RigMaster Power by Mobile Thermo Systems Inc 09 28 09 RigMaster Power Service and Repair Manual Document S991009 S9 9 120 Volt Cables and Outlets In a typical installation there is a 120 Volt 20 Amp Ground Fault Circuit Interrupter GFCI type outlet in the sleeper The cable is not shown Figure 9 12 The block heater extension cable is supplied with orange wire loom from the factory It is required that all cables and hoses are loomed prior to installation to prevent rub through and subsequent product failures Figure 9 13 Copyright RigMaster Power by Mobile Thermo Systems Inc 09 28 09
7. ing the Capacitor 40ufd RP7 023 To check the capacitor first remove the end cover disconnect the leads to the capacitor and with a suitable meter check the level of capacitance across the terminals on top of the capacitor from terminal A to terminal B Figure 9 7 This should read 40uF 5 i e between 38uF and 42uF if the capacitor is outside these limits it should be replaced Removal and Installation of the Capacitor Before removing the capacitor please short it by crossing Terminal A to Terminal B to remove any residual voltage see Figure 9 8 Remove the capacitor and refit new one do not over tighten the bottom fixing nut Reconnect the capacitor leads to the original position fit end cover and test generator Insulation and Resistance Check See figure 9 8 1 On BL models before carrying out this test disconnect the capacitor The check should be carried out the stator windings between each winding group and the generator frame and between the rotor windings and rotor core using a 500 volt tester or similar instrument 4 3 a Stator Leads Stator Windings Rotor Windings 40ufd Capacitor Figure 9 8 3 The resistance value obtained should be at least one megohm one million Ohms Q 4 Ifthe resistance is less than one megohm the windings should be cleaned of dirt by blowing with compressed air and dried out in a warm atmosphere See section 2 12 for more information on this procedure 5 If m
8. oisture is present within the generator the resistance values may be rechecked periodically until this value is obtained Copyright RigMaster Power by Mobile Thermo Systems Inc 09 28 09 RigMaster Power Service and Repair Manual Document S971009 9 7 Generator Wiring Electrical Schematics Junction Box Wiring Schematic Vibrations can cause wire nuts to become loose or fall off When wiring the generator it is important to use electrical tape to fully secure the wire nuts Figure 9 9 LEGEND 20 Amp Breakers Small Wire Nut Twist On Large Wire Nut Twist On 120 Volt Electrical Cables Wiring from Generator Green Wires Grounded Using Existing Junction Box Mounting Bolt Breaker Interconnect Wire Bridge T M O O w gt Cabin amp Block Heater Electrical Cords e Two Green Wires to Ground F e Two Black Wires One to Each Breaker B Black Wires from the Sleeper or Block Heater Cords can be connected to either breaker e Two White Wires to the White Tag U2 and Blue Tag U6 C Copyright RigMaster Power by Mobile Thermo Systems Inc 09 28 09 RigMaster Power Service and Repair Manual Document S981009 S9 8 Installation of the 120 Volt Generator Pulley Figure 9 10 Figure 9 11 To install the generator pulley you need to use an alignment tool Serpentine drive pulleys require that they be aligned very accurately to prevent any damage to the belt or to the belt driven components Install the pulley
9. ow Idle Throttle Screw ADJUST TO GENERATOR OUTPUT High Idle Throttle Limit Screw FACTORY SET DO NOT ADJUST Figure 9 5 NOTE The high idle throttle screw has a plastic cap that is installed at the factory after adjustment Copyright RigMaster Power by Mobile Thermo Systems Inc 09 28 09 RigMaster Power Service and Repair Manual Document S951009 9 5 120 Volt Generator Diagnostics Procedures Please read and understand this entire section prior to performing any work on the 120V generator If the following tests fail to identify the cause of the generator failure breaker capacitor field windings outlet wiring the generator may need to be replaced 1 2 3 If there is no power to the outlet reset breakers on the generator For the Ground Fault Interrupter receptacle try to reset the breaker on the outlet before those on the generator See that the generator belt is in place and properly tensioned 1 8 to 1 4 deflection If breaker reset does not restore power to the receptacle remove generator cover and junction box lid and see that there are no loose or broken connections Pull back the rubber boot and test for 120V line power from the red lead T1 to neutral white lead T2 and brown lead T3 to neutral blue line T4 engine must be running with the air conditioning system OFF If there is continuous power through each breaker but no power to the outlets the cable and outlets may be the cause of the
10. tor cover using 7 16 socket wrench 7 bolts Remove the bottom plate using 7 16 socket 12 bolts Remove the serpentine belt following the procedures in S2 4 Remove the junction box lid and remove the tape and wire nuts Disconnect safety cover switch quick disconnect and remove right side panel using 7 16 socket wrench 4 bolts Disconnect the 2 120V power cables from the junction box and remove the cables from the bulkhead 8 Loosen and remove the 4 mounting bolts 9 Remove generator from the engine mounting plate 10 Remove the generator pulley with the woodruff key oA ey N Installing the Generator 1 7A 3 T 8 9 Place generator on engine mount plate Install 4 mounting bolts and hardware and torque to 80 Ibs ft Install the power cords routing them back through the bulkhead connectors to the junction box connectors Wire the generator box using the wire nut connectors and secure with electrical tape See 10 6 for electrical diagram Install the junction box lid and screw Re install the right side panel using 7 16 socket wrench 4 bolts and re connect the safety cover switch Install the generator pulley and perform the pulley alignment procedure See section 83 4 Install the serpentine belt See S2 4 Install the bottom plate using 7 16 socket 12 bolts 10 Re install back generator cover using 7 16 socket wrench 7 bolts 11 Re install the front cover 12 Test generator See S9 3
11. trical Test Meter s capable of measuring Volts V AC Frequency Hertz Hz and Capacitance in micro Farads uF for testing voltage generator RPM and Capacitance Capacitor Flashing NOTE The capacitor is non polar until charged To determine the polarity of a used capacitor test the Voltage between post A and post B see figure 9 6 If the voltage reading is a positive number the red test lead represents the positive terminal If the voltage reading is a negative number the red lead represents the negative terminal Figure 9 7 shows that the terminals may be positive or negative depending on how they were initially charged When flashing the capacitor determine the polarity before applying battery voltage Capacitor Location Capacitor Terminal A Capacitor Terminal B If the voltage is below 1 5 volts or there is no voltage reconnect the capacitor leads to the original position A 12 volt battery should then be instantaneously flashed that is connected for only one second across the capacitor The auxiliary leads must still be connected to the capacitor Run the generator and the output voltage should then build up to normal off load voltage of 130 volts AC 61 5 Hz Copyright RigMaster Power by Mobile Thermo Systems Inc 09 28 09 RigMaster Power Service and Repair Manual Document S961009 For further information see Installation Service and Maintenance manual supplied with 120V Generator Test

Download Pdf Manuals

image

Related Search

Related Contents

Sprout® - PS Audio  151(無料)  Nilfisk SW 650 - AZ Reinigungstechnik.de  取扱説明書  Garden Safe HG-10424X-5 Instructions / Assembly  Fisher-Price N8904 Instruction Sheet  食の未来に 新しい種を蒔こう  

Copyright © All rights reserved.
Failed to retrieve file