BioBarrier® Installation Manual
Contents
1. Pw j i bes i a me f TWI L enor N BLOWER FOR BioBarrier 0 5 Model GAST R4110 2 R3105 12 R2103 R1102 Power 110VAC Model GAST R2103 R11 roe R4110 2 R3105 12 Power 220VAC 10 L1 to P1 L1 to P1 L2to4 5 3 and 2 cap together P2 cap off N to 2 4 P2 5 3 cap together LIMITED WARRANTY Bio Microbics Inc warrants every new residential BioBarrier system against defects in materials and workmanship for a period of two years after installation or three years from the date of shipment subject to the following terms and conditions and commercial BioBarrier HSMBR system for a period of one year after installation or eighteen months from date of shipment whichever occurs first subject to the following terms and conditions During the warranty period if any part is defective or fails to perform as specified when operating at design conditions and if the equipment has been installed and is being operated and maintained in accordance with the written instructions provided by Bio Microbics Inc Bio Microbics Inc will repair or replace at its discretion such defective parts free of charge Defective parts must be returned by owner to Bio Microbics Inc s factory postage paid if so requested The cost of labor and all other expenses resulting from replacement of the defective parts and from installation of parts furnished under this warranty and regular maintenance items such as filters or bulbs shall
2. have an initial two year service agreement included with the system s initial purchase price two service calls per year The NSF service calls ONLY cover NSF certified systems other components of the septic system are NOT covered lf there are any deficiencies in the BioBarrier system s operation or components the service person will notify the owner in writing and detail when these deficiencies can be fixed The company listed on the blower housing or control panel label performs this service During an NSF service call the service company shall inspect the blower for proper operation visually inspect the system s effluent for clarity clean the blower air filter and assure proper function of the control panel If these service calls are not performed on your NSF certified system or not all of the items are checked please call Bio Microbics at 800 753 FAST 3278 or 913 422 0707 For continual service of NSF certified systems beyond the first two years an extended service agreement is available through your local Distributor or current service provider This policy should provide the same services and may include any additional services that are required by local regulation WIRING DIAGRAMS SMALL CONTROL PANEL FOR BioBarrier 0 5 1 5 UNITS ONLY not HSMBR units dV Mon We WAIBACK PANEL J DISCHARGE OPTIONAL POWER IN am STO BLOWER PUMP PUMP gt _ meat 5O MATSTSTATS Jf
3. 220VAC control requires a 20A breaker minimum 28 Make connections inside the control panel as shown in the diagrams included with the panel and at the end of this manual Note that ONLY the BROWN and BLACK wires on the BLUE float are to be connected to the control panel SECURING THE SYSTEM 29 Mount the 3 supplied channel strut pieces and associated hardware in the manhole so that the 4 bracing pipes from Steps 7 amp 9 can be secured to the strut channel Mount the strut end pieces to the tank riser using the supplied Stainless steel anchor bolts or other corrosion proof hardware 30 Use C shaped brackets to fasten the 34 bracing pipes to the strut channel so that the the BioBarrier system is held in place in the tank 31 Backfill the tank per professional judgment requirements BLOWER INSTALLATION A Always have all utility lines and equipment marked by a locating service prior to performing any work All electrical work WARNING a ba shall be properly performed by a qualified electrician per all applicable codes Failure to do so could result in severe bodily injury or death The blower housing should be placed on a concrete slab Both the electrical conduit and air supply line should pass through the concrete slab from below grade The electrical supply conduit should be run from the control panel to the desired blower location A precast concrete slab can be used by drilling the appropriate holes for the air
4. BIO MICROBICS BETTER WATER BETTER WORLD BioBarrier Installation Manual FOR USE WITH NSF ANSI Std 40 Class 245 350 Class R BioBarrier 0 5 1 0 and 1 5 NSF ANSI Std 40 Class 245 350 Class R BioBarrier 0 5 N 1 0 N and 1 5 N non ANSI NSF certified BioBarrier 2 0 2 5 3 0 BioBarrier HSMBR 1 5 3 0 4 5 9 0 BioBarrier Installation Manual 2015 Bio Microbics Inc Revised April 2015 BioBarrier and HSMBR are registered trademarks owned by Bio Microbics Inc Other trademarks used are registered by their respective owners INSTALLATION MANUAL FOR USE WITH NSF ANSI Std 40 Class Std 245 STD 350 Class R BioBarrier 0 5 1 0 and 1 5 BioBarrier 0 5 N 1 0 N and 1 5 N non NSF certified BioBarrier HSMBR 1 5 3 0 4 5 and 9 0 GENERAL INFORMATION The BioBarrier 0 5 0 5 N 1 0 1 0 N 1 5 amp 1 5 N membrane bioreactor wastewater treatment systems are certified by the NSF International American National Standards Institute Organizations to meet NSF ANSI Standard 40 Class 1 certification for single residence wastewater treatment devices NSF ANSI Standard 245 for nitrogen reduction and NSF ANSI Standard 350 Class R for restricted indoor and unrestricted outdoor use such as toilet urinal flushing and surface and subsurface irrigation All BioBarrier products are ETL certified for safety electrical environmental etc If you have questions regarding any Bio Microbics products p
5. RGE PUMP 16 Residential BioBarrier The Discharge Pump pump vent line and discharge tubing MUST be assembled at the job to prevent shipping damage 17 Pump fittings a Screw PVC Tee on to pump intake DO NOT glue Tee to pump intake b Solvent weld short piece of 34 PVC pipe into Tee see picture c Connect and clamp 1 ID x 3 5 L flex tubing to PVC pipe from previous step 16b Firmly tighten the clamp to between 2 10 ft lbs of torque DO NOT crack the PVC pipe d Connect and clamp 12 ID x 10 L flex tubing to the threaded pump discharge Firmly tighten the clamp to between 2 10 ft lbs of torque DO NOT crack the pastic pump nipple e Connect and clamp 1 ID x 3 5 L flex tubing and entire pump assembly to BioBarrier outlet nipple 18 Make connections in the treatment tank manhole for the 5 16 8 mm discharge line from step 9 to exit the tank This exit point MUST NOT be any higher than five feet above the pump It is preferred that this exit point be placed in the manhole access 19 Outside of the treatment tank the discharge may be increased in size Make connections from the treatment tank exit to the final discharge tank method The discharge line MUST NOT increase in elevation in reference to its exit point from the treatment tank 20 Install a vent line on the Discharge Pump by solvent welding 34 PVC pipe to the opposite side of the PVC Tee see 20 in above pictur
6. be borne by the owner This warranty does not cover general system misuse aerator components which have been damaged by flooding or any components that have been disassembled by unauthorized persons improperly installed or damaged due to altered or improper wiring or overload protection This warranty applies only to the treatment plant and does not include any of the house wiring plumbing drainage septic tank or disposal system Bio Microbics Inc reserves the right to revise change or modify the construction and or design of the BioBarrier system or any component part or parts thereof without incurring any obligation to make such changes or modifications in present equipment Bio Microbics Inc is not responsible for consequential or incidental damages of any nature resulting from such things as but not limited to defect in design material or workmanship or delays in delivery replacements or repairs THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES EXPRESSED OR IMPLIED BIO MICROBICS SPECIFICALLY DISCLAIMS ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE NO REPRESENTATIVE OR PERSON IS AUTHORIZED TO GIVE ANY OTHER WARRANTY OR TO ASSUME FOR BIO MICROBICS INC ANY OTHER LIABILITY INCONNECTION WITH THE SALE OF ITS PRODUCTS Contact your local distributor for parts and service SERVICE AFTER THE FIRST TWO YEARS An Extended Service Policy is available and may be purchased through your local Bio Microbics distri
7. butor The extended service policy should provide the same service checks as the initial NSF service policy sludge accumulation levels in the septic and FAST tanks and perform any additional service required by local regulation Extended service on NSF certified systems should be performed twice per year BioBarrier ID Serial Number System Designer Name Designer Phone Health Official Name Health Official Phone Manufacturer Name Bio Microbics Inc Manufacturer Phone 1 800 53 FAST 3278 Installed By Installer Phone eee BIO 1 eq ee ee BETTER WATER BETTER WORLD Maintenance Provider Name 8450 Cole Parkway Shawnee Kansas 66227 USA o 913 422 0707 f 913 422 0808 800 753 3278 FAST Maintenance Provider Phone www biomicrobics com sales biomicrobics com
8. e Vent line must terminate in the access riser for easy use See step 22 21 BioBarrier HSMBR discharge pump MUST be installed in an area that will not allow moisture to get to the motor a Firmly secure the pump so that its torque does not damage the piping b We recommend the use of a vacuum gauge and one way valve on the pump intake The pump has a built in screw for priming the pump however a ball valve on the outlet may be preferred All of these recommended parts can make service easier c Connect the discharge piping from the membrane treatment system to the discharge pumps VENTING 22 The 4 19 mm vent Clean In Place CIP line for the discharge pump connected in step 20 should be terminated with a ball valve in the manhole in a location that is easy to reach Make sure the ball valve is in the CLOSED position until the tank is to be filled with water see FINAL INSPECTION amp STARTUP 23 A treatment tank aeration vent must be installed in the manhole riser This vent must be at least 4 diameter 101 mm and must drain all moisture that will build up in the vent The vent opening must contain at least 7 1 in2 45 8 cm2 open surface area and be properly secured to prevent unauthorized access The vent line MUST NOT allow excess moisture nor back pressure to build up If you have any questions please call Bio Microbics at 800 753 3278 or 913 422 0707 CONTROL PANEL amp FLOATS AX WARNING All electrical
9. e lifting techniques to set module in tank Be sure all lifting equipment is clear of obstructions such as power lines and trees 1 The BioBarrier system should be placed as far toward the outlet end of the treatment tank as possible 2 Before installation may begin check the tank to ensure it is level within 14 6 mm from inlet to outlet and 14 6 mm from side to side to side 3 Install the SaniTEE wastewater screen in the outlet tee of the settling tank compartment see SaniTEE Installation instructions 4 Ifa pump tak is used after the BioBarrier system then this tank must be placed as close to the Ait Line BioBarrier tank as possible 5 Ifthe tank is smaller than the minimum dimensional range specified the BioBarrier system may not operate properly The effluent quality could suffer and may not meet site requirements INITIAL CONN ECTIONS Steps 6 10 are best performed prior to placing the module in the tank 6 Screw the provided 2 PVC MPT x slip fitting into the air line grid 7 Measure the depth of the tank from the bottom to the top of the tank manhole Cut one section of 2 PVC schedule 40 pipe 51 mm for the air line and two sections of schedule 80 34 19 mm for bracing the system to this length 8 Solvent weld the 2 air line to the BioBarrier s air line connection 9 Use the supplied stainless steel bolts and nuts to secure the 34 pipes to the top of the BioBarrier housi
10. lease contact us at 800 753 FAST 3278 or 913 422 0707 e mail onsite biomicrobics com DELIVERY INSPECTION The BioBarrier system has been carefully manufactured checked and tested at the factory before shipment Before and after uncrating the unit check the packaging for signs of shipping damage If there is evidence of damage or abuse notify Bio Microbics Inc at 800 753 3278 or 913 422 0707 THE BIOBARRIER SYSTEM The BioBarrier System is a membrane bioreactor providing primary settling fecal coliform BOD TSS and nitrogen reduction if needed using aeration and anoxic zones and membrane filtration The system is contained in locally supplied tanks either in a two or three compartment tank or multiple tanks with the membrane module always in the last compartment tank of the system The membrane module itself consists of flat sheet membranes arranged in a cartridge A high mixed liquor suspended solids concentration in the aeration zone provides biological treatment and nitrification The final effluent or permeate is pulled out by the permeate pump through the MBR membranes leaving behind large organic and inorganic particles for further digestion or wasting If nitrogen removal is not needed the system BioBarrier 0 5 1 0 and 1 5 consists of a tank with two compartments or two separate tanks The first compartment or tank provides primary treatment sedimentation and separation of floatables and solids and is eq
11. ng at the provided recesses 10 Make the initial discharge line connections by attaching a piece of 5 16 8 mm tubing to the water discharge port of the BioBarrier s pump Make sure this length of tubing is long enough to reach the tank exit once the unit is placed in the tank lt d N d 11 For BioBarrier 0 5 1 0 1 5 ONLY Attach ae gt the 3 schedule 40 or schd 80 pipe for the i vent CIP pipe E discharge pump vent to the supplied discharge i assembly Make sure the piping is long enough to amp ball valve reach into the air space in the tank s manhole Water MUST NEVER enter this vent pipe see step 15 pic lt a x 12 Using the supplied lifting cables lower the a a BioBarrier unit into the treatment tank and postion the _ Pump unit so that it is directly under the manhole AIR LINE 13 In the manhole make connections so that the BioBarrier air line exits the tank for connection to the blower The air line must be firmly secured to the tank to prevent vibrational breakage 14 From the blower run 2 51 mm schedule 40 PVC piping to the connection point at the treatment tank Make sure pipe union is installed as shown and that all connections are permanent This line may not exceed 40 ft 12 m in total length DO NOT use any more than four elbows in this line 15 At the blower use the supplied fittings to connect the inlet filter assembly and initial outlet piping DISCHA
12. ng the tank with water This valve MUST be closed prior to turning the system ON Fill the tank to the normal operating level AT LEAST 2 GALS OF ACTIVATED SLUDGE MUST BE PUT INTO THE BIO BARRIER TANK Fill the tank to the normal operating level Check for leaks in all water tight seals CLOSE THE VENT CIP BALL VALVE Turn on power to the control panel The green light will flash for 5 seconds and then the blower will start Once the blower has started a robust boiling action should be present in the tank The system is now in automatic run mode G Determine if excessive back pressure is present Replace all access covers place hand about 8 inches 20 cm from BioBarrier vent if air flow is felt then excessive back pressure exists and the system s vent must be upgraded H Check for proper alarm function Press the ENTER MANUAL switch The alarm should sound Once this has taken place press the ENTER MANUAL switch again to return the system to automatic running mode Use the YELLOW FLOAT switch to activate the high water alarm of the system Backfill the excavation J Lastly record the BioBarrier unit s serial number in the Service Manual OO mmog NSF INTERNATIONAL am CERTIFIED SYSTEMS SERVICE POLICY 40 class 1 245 350 All NSF National Sanitation Foundation ANSI Standard 40 Class Standard 245 Standard 350 Class R certified wastewater treatment systems BioBarrier 0 5 0 5 N 1 0 1 0 N 1 5 and 1 5 N
13. plicable codes have proper backflow prevention and protection against cross connections and is the responsibility of the local designer installer When the reuse water is used for toilet and urinal flushing additional disinfection should be considered to provide adequate assurance in preventing microorganism growth in the treated reuse water storage tank and as required by applicable codes The reuse tank shall be located after the BioBarrier system This tank shall also incorporate an overflow that allows excess reuse water to be dispersed in a locally approved soil dispersal system or released into a sanitary sewer system A potable water make up system shall also be available to supply water when treated reuse water is not available This potable water make up system shall include a properly designed backflow preventer that meets all applicable codes NSF Standard 350 Class R Unrestricted Outdoor Urban Reuse Water The BioBarrier system has been tested under NSF Standard 350 Class R Residential and is capable of treating residential wastewater for unrestricted outdoor urban water reuse which is acceptable for use in surface and subsurface irrigation including irrigation of edible crops without the edible portion being in direct contact with the treated water A reuse tank may be required if the irrigation system requires it The holding tank and plumbing system for reuse water shall meet all applicable codes have proper backflow prevention and p
14. rotection against cross connections and is the responsibility of the local designer installer Additional disinfection should be considered to provide adequate disinfection to prevent microorganism growth in the treated reuse water storage tank and as required by applicable codes If a reuse tank is required for irrigation it shall be located after the BioBarrier system This tank shall also incorporate an overflow that allows excess reuse water to be dispersed in a locally approved soil dispersal system or released into a sanitary sewer system If a potable water make up system is required for irrigation it shall include a properly designed backflow preventer that meets all applicable codes INSTALLATION PROCEDURE Always have all utility lines and equipment marked by a locating service prior to performing any work Failure to do so AX WARNING could result in severe bodily injury or death AX WARNING Hazards exist in confined spaces such as a septic tank All confined space precautions must be followed if entering a tank Always keep tank openings covered during storage and installation MATERIALS REQUIRED FOR INSTALLATION A Septic tank that meets all applicable requirements and standards B Recognized safe lifting mechanism for treatment module e g a tripod C Non corrosive strut channel or equivalent material that is able to hold down at least 550 pounds 250 kg of buoyant force see step 29 Stainless steel anchor bolt
15. s to secure strut channel to tank riser and blower housing to concrete base Piping for all air and vent lines Check the install procedure all specs and plans to determine what sizes and types of pipe you may need PVC saw Pipe joint lubricant soap PVC primer and glue Concrete base for blower assembly Mounting screws for control panel Electrical conduit fittings and wire for required wiring Hammer Drill and concrete bits m TaS Tron SaniTEE Installation Screen 1 Check the specifications of the BioBarrier unit to determine the required number of SaniTEE screens to be installed 2 A 4 SaniTEE fits in the 4 septic tank outlet tee or sweep Schd 35 40 amp 80 JUST PRIOR to the BioBarrier system The center of the SaniTEE outlet MUST be at least 38 inches 96 5 cm off the bottom of the tank 3 Place the SaniTEE into the outlet tee DO NOT USE GLUE The SaniTEE should fit snugly into the outlet tee 4 OPTIONAL EXTENDING SWAB HANDLES The exterior cleaning swab pipes may be easily extended using 34 schd 80 pipe and matching couplings Cut 34 pipes to the desired length glue and connect each extension pipe to the existing pipes using slip to slip couplings When completed glue the supplied swab handle to each pipe end 5 Reattach the SaniTEE handle with solvent welding to the 4 Schd 80 swab shaft or added extension pipe BioBarrier MODULE INSTALLATION 7 INV TTT Use saf
16. supply line CONNECT BLOWER PIPING a Longest pipe b Elbow c Air filter assembly d Shortest pipe e Reducer bushing USE TEFLON SEALANT TAPE ON ALL PIPE CONNECTIONS 32 Secure blower assembly to base using four 4 14 x 112 self tapping screws supplied w unit Drill screws directly into blower base 33 Connect air line Supplied by contractor from blower outlet to BioBarrier unit from step 2 MODULE INSTALLATION using required piping check unit specs Blower piping to BioBarrier may not exceed 40 ft 12 m total length and use a maximum of 4 elbows ALL CONNECTIONS MUST BE AIR TIGHT AND PERMANENT We recommend the use of a union for easy disconnection of the blower piping Keep all debris out of air line 34 Wire the blower to accept the proper voltage for your specific location according to the diagrams of each blower It is the responsibility of the installer to ensure that the tank will not float due to hydraulic conditions at the site Your local BBOBARRIER Systems distributor may provide installation inspection services If you have questions call Bio Microbics at 1 800 753 3278 913 422 0707 Persons coming in contact with wastewater must immediately wash all exposed areas with disinfecting cleaner and contact your personal physician Failure to do so could result in severe sickness or death BEFORE THE UNIT IS BACKFILLED A Open the vent CIP ball valve from STEP 22 so that air can escape while filli
17. uipped with an outlet screening device called SaniTEE From this screened compartment or tank the wastewater will flow into the second compartment or tank which is the aeration membrane zone A Tank B SaniTEEo C Blower amp Housing D Control Panel E Vent F Float Tree G BioBarrier Reactor H Optional Mixing Pump If nitrogen removal is needed the system The BioBarrier 0 5 N 1 0 N 1 5 N consists of a tank with three compartments or two tanks totaling at least three compartments with exactly two compartments in the second or final tank The first compartment or tank provides primary treatment sedimentation and separation of floatables and solids and is equipped with an outlet screening device called SaniTEE The second and third compartments must be in the same tank and the second compartment is where denitrification takes place under anoxic conditions The third compartment the aeration membrane zone is separated from the anoxic zone by a baffle wall between the two zones to allow nitrified waste to enter into the anoxic area for denitrification NSF Standard 350 Class R Restricted Indoor Urban Reuse Water The BioBarrier system has been tested under NSF Standard 350 Class R Residential and is capable of treating residential wastewater for restricted indoor urban water reuse which is toilet and urinal flushing The system design requires a holding tank and plumbing system for reuse water and shall meet all ap
18. work shall be properly performed by a qualified electrician per all applicable codes Always have all utility lines and equipment marked by a locating service prior to performing any work Failure to do so may result in severe bodily injury or death The BioBarrier control panel and all electrical parts supplied with the BioBarrier system are ETL UL equivalent certified for electrical safety The control panel meets NEMA4X standards for all weather use not explosive or submerged environments 24 Install the floats on a pipe within 24 61 of a BioBarrier membrane BioBarrier 20 HSMBR module DO NOT attach the floats to the aeration piping Attach the Single Stack Double Stack BLUE and YELLOW floats to the float tree at the locations shown The 3 BLUE float switch uses ONLY the brown and black wires The switch MUST be installed no higher than 2 inches 5 cm BELOW the tank s inlet 25 In the treatment tank make connections to facilitate exiting of the wiring from the discharge pump and the float switches If a junction box is used inside the treatment tank manhole waterproof connectors must be used 124 5 49 26 Run these wires to the control panel The float wires MUST be run in separate conduit from any power wires 27 Mount the BioBarrier control panel in a location that is accesible to a service person meets all code requirements and prevents voltage drop The 110VAC panel requires a 15A breaker minimum The
Download Pdf Manuals
Related Search
Related Contents
Primo 60 Oven Assembly and Operation Manual veCAMit Video Gateway IP Camera Led Jarag Beam User Manual Genesis GDP500 Use and Care Manual English - Insignia 一括ダウンロード(6.5MB) 内訳書 Noise Figure Analyzers - Advanced Test Equipment Rentals Philips AMVA LCD monitor, LED backlight 271P4QPJKEB United Direct Marketing User Manual Copyright © All rights reserved.