Home

RCS Start Up Requirements

image

Contents

1. SERVICE INSTRUCTION Ransburg ce ay SERVICE INSTRUCTION RCS 2 START UP REQUIREMENTS Inspector s Initials For Ransburg Technical Service Call 800 233 3366 Before Start Up Site Inspection RCS 2 control panel installed in a convenient location located in a suitable environment See manual for more details Pe Make sure that the customer s main disconnect is off a RCS 2 Users Parts Maintenance and Troubleshooting Manuals available Customer specific installation drawings available LN 9407 00 ee Required power available 120 VAC 60 Hz at 20 amps max Ss Required fluid at 40 psi filtered to 20 Microns A10948 Required air available 90 psi min 150 psi max filtered at 20 micron i eed Record serial numbers of Channel and Interface modules along with Amplifier Motor Eo F LN 9408 06 aa Dip switch settings verified on Channel and Interface modules es Le All power and E stop switches in the off position EE PLC key switch in the off position A11095 Se Check all paint solvent and air lines for correct terminations Reference www ransburg com a Check incoming voltage for correct termination point for service manual information en Check all I O terminations for proper connections ens Remove fuses of main console and amplifier panel ad Verify proper grounding requirements for all panels installed ae Start Up Requirements od Turn on customer s main disconnect and verify 120 VAC 60Hz 10 Amps at custo
2. mer source es Verify 120 VAC 60 Hz at control console LL Turn power off at customer s main disconnect replace fuses in main console and amplifier panel Turn disconnect power back on verify correct voltage at main console and amplifier panel en Verify and establish parameter settings on screens of main console gs Verify calibration and functionality of all transducers i Verify calibration and functionality of Flow sensor Turn on main air and verify pressure and flow requirements a Turn on main solvent and ensure pressure and flow requirements a Validate a flush or purge routine and optimize Le Turn on material supply and ensure pressure and flow requirements Lg Validate a load or fill routine and optimize a Validate run or painting operation as per customer s configuration fl Customer training NOTE Additional information regarding applicator and or its capability can be found in the corresponding service manual For Spare Part Information reference the applicator service manual Always use genuine Ransburg replacement parts to assure maximum uptime with applicator Facility Representative Date Ransburg Representative Date Manufacturing 1910 North Wayne Street Angola Indiana 46703 9100 Telephone 260 665 8800 Fax 260 665 8516 www ransburg com Technical Service Assistance Telephone 800 233 3366 Fax 419 470 2071 Technical Support Representative will direct you to the approp
3. riate telephone number for ordering Spare Parts 2013 Ransburg All rights reserved IS 9001 Form No SI 08 16 1 Models and specifications subject to change without notice Qn x Litho in U S A

Download Pdf Manuals

image

Related Search

Related Contents

ATLANTIC WELDER RH  Baumatic B600MC Technical Drawing  SALSA CHINA AGRIDULCE SAUCE CHINOISE CHINESE  eServices Manual - Beacon Health Strategies, LLC.  Télécharger  Samsung BX2231 Uporabniški priročnik  2・3段駐車装置パークエース安全利用ガイド  AOC L26W898 User's Manual  

Copyright © All rights reserved.
Failed to retrieve file