1. 112 19 2 02 UNSUITABLE MATERIAL 112 19 2 03 5 113 10 204 lt 113 19 2 05 DEFICIENCY MATERIAL neat ewe 113 19 2 06 113 19 2 07 SUBGRADE PREPARATION COMPACTION csssscscsssesesssesesesececscsesascsesacseseseeeeeesesesaes 114 19 2 08 MEASUREMENT ha sollte 115 1922209 vaca 116 19 3 TRENCH AND STRUCTURE EXCAVATION BACKFILL AND SURFACE 117 19 301 GENERAL 25 testes cine cen 117 19 3 02 TRENCH AND STRUCTURE EXCAVATION cscscsssssscscscsesssscsesesesecacsesssacsesaacseseeeeecaesenaes 117 19 3 03 TRENCH AND STRUCTURE BACKFILL AND COMPACTION 118 19 3 03 TRENCH BACKEILE cis 118 19 3 03 A 1 INITIAL BACKFILL
2. 56 7 9 PAYMENT OF 56 1 10 gt 57 SANITARY 2 Materia 57 7 12 SAFETY PROVISIONS FIRST AID INJURY ILLNESS PREVENTION PROGRAM 57 7 13 WORKER PROTECTION FROM TOXIC OR EXPLOSIVE GASES CONFINED SPACES ENTRY 58 7 14 TRENCHES AND EXCAVATIONS HAZARDOUS 2 2 2 59 7 14 1 TRENCHES AND EXCAVATIONS 4 FEET OR LESS IN DEPTH BELOW THE SURFACE 59 7 14 2 TRENCHES AND EXCAVATIONS GREATER THAN 4 FEET IN DEPTH HAZARDOUS WASTE 59 7 15 WORKER PROTECTION FROM CAVING GROUND IN 60 City of Clovis Standard Specifications 2009 iii 16 INJURY DAMAGE TO PERSONS OR 422 17 PUBLIC CONVENIENGE a 1 gt V 19 PATENTS n a er e 7 20 PROPERTY RIGHTS OF MATERIALS oiiire
3. 269 SECTION 85 RAISED PAVEMENT MARKERS 270 85 1 GENERAL 270 SECTION 86 TRAFFIC SIGNALS AND INTERSECTION SAFETY LIGHTING 271 O62 GENERAL 271 96 2 271 lt 2 E E E 271 86 4 REGULATIONS CODES AND PERMITS 271 86 5 EQUIPMENT LIST AND DRAWINGS 271 86 6 ORDER OF WORK nish Hh nin 272 86 7 WARRANTIES GUARANTEES AND INSTRUCTION SHEETS 22 444 4 4 272 86 8 MAINTAINING EXISTING AND TEMPORARY ELECTRICAL 5 273 86 9 SCHEDULING OF WORK 273 86 10 SAFETY PRECAUTIONS tala end 273 86 11 EXCAVATING AND 274 86 12 REMOVING AND REPLACING IMPROVEMENTS 14 4 274 86 139 FOUNDATIONS faving dsl uu 274 86 14 STANDARDS STEEL PEDESTALS AND 5 6 275 ea vais tah
4. 10 2 PAYMENT SECTION 11 MOBILIZATION 7 7 ND Raced aaa occ Ue ea deo toed Does neater 12 2 TRAFFIC AONE EEE A EE E A 12 2 01 TRAFFIC CONTROL PLAN NOTIFICATIONS 0660 12 2 02 CONTRACTOR S 8 000 0 12 20 3 cea totes nates ca E 12 2 04 ROAD 50 22 004 406000 00 12 2 05 DEFICIENCIES cccccescssccecseccesccscecccesscnsecareesecaceencaecacesaseesensecarseseaecaeeeaecaeenateereaesanees 12 3 CONSTRUCTION AREA TRAFFIC CONTROL 000 City of Clovis Standard Specifications 2009 12 3 01 TRAFFIC CONTROL 0 020 00000000011 a 90 12 4 MEASUREMENT AND PAYMENT 90 SECTION 13 BLANK 92 SECTION 14 BLANK 92 SECTION 15 REMOVING EXISTING FACILITIES 93 1 524 GENERALS seeds ead ole tates 93 15 101 DESCRIPTION
5. 200 67 6 TRACER WIRE INSTALLATION ccccccecsecscsssercesesessercesecarversesesersvaceaeecauvarenaesaueerenaevaneerseateas 201 67 7 THRUST BLOCK VALVE BOX 1 2 201 67 8 WATER SERVICE 5 0 201 67 9 HYDROSTATIC PRESSURE 5 2 60660 0 201 67 10 MEASUREMENT 201 67 11 201 City of Clovis Standard Specifications 2009 ix SECTION 68 JACKING PIPE 203 68 1 GENERAL 203 68 2 MATERIALS 203 68 21 STEEL CASING PIPE iieii 203 68 2 2 CASING SPACERS 203 59 28 CASING END a ai a aat 204 68 2 4 REINFORCED CONCRETE PIPE 204 68 3 TUNNEL SAFETY 204 68 4 EXCAVATING JACKING AND RECEIVING 205 68 5
6. 194 66 12 HYDROSTATIC PRESSURE 002 0 0 0 600 00 196 66 13 MEASUREMENT c cccceccoscosccesseccesecceecceaecacecascnsesareescvaesaesenceaesaaeeaseaesnaesaseeseaceesevaceacees 197 66 14 197 SECTION 67 RECYCLED WATER DISTRIBUTION SYSTEMS 199 67 1 GENERAL eee ete Sain ag 199 6722 MATERIALS ag dace 199 67 2 1 PVC PIPE AND FITTINGS FOR RECYCLED WATER 8 02 199 67 2 2 DUCTILE IRON PIPE AND FITTINGS FOR RECYCLED WATER 8 199 67 2 3 THRUST BLOCKS VALVES VALVE BOXES 1 2 0 0 16 199 67 2 4 RECYCLED WATER 020 6 6 200 67 2 5 NUTS BOLTS SCREWS FASTENERS OTHER SERVICE 5 200 67 2 6 TRAGER WIRE dems tad who Coops sald eters Sold wea 200 67 3 TRENCHING EXCAVATION BACKFILL COMPACTION AND SURFACE RESTORATION 200 67 4 ALIGNMENT CHANGES SEPARATION CRITERIA csssescssesesseecsceacsseecacsacaseeseesatsacaseesesaeats 200 67 5 INSTALLATION OF RECYCLED WATER MAINS FITTINGS AND
7. a 106 1 66 PAYMENT E 106 SECTION 17 WATER USE 107 1751 DESCRIP MON ratarea 107 17 1 CITY WATER ERIM seca edad i adn 107 NONPO RABE WATER eae nso teh tee acne AA nscale 107 17 2 25256 a an 108 aA 108 17 4 Ae 108 SECTION 18 DUST PALLIATIVE 109 City of Clovis Standard Specifications 2009 SECTION 19 EARTHWORK 110 19 15 eee 110 19 1010 DESCRIPTION aE i 110 19 1 02 PROTECTION OF PROPERTY 111 19 103 GRADE TOLERANCES E 111 19 1 04 REMOVAL AND DISPOSAL OF BURIED MAN MADE OBJECTS 111 19 2 ROADWAY EXCAVATION 112 19 2 017 6
8. 35 SECTION 6 CONTROL OF MATERIALS 38 6 1 SOURCE OF SUPPLY AND QUALITY OF MATERIALS 222222 4 40 4 441 38 6 2 STORAGE AND PROTECTION OF MATERIALS 2 2 2 2 1 38 6 3 DEFECTIVE MATERIAL sits wien 38 6 4 TRADE NAMES OR EQUAL aa P a a 39 6 5 CERTIFICATES OF COMPLIANCE 39 6 6 FOREIGN MATERIAL S 55 4 A athe 39 6 7 40 6 8 SAMPLES AND TESTS incandescent 40 629 COMPACTION Ad nn en AG ae 42 6 10 GUARANTEE OF MATERIALS maian a e i e a aa a iaa aa aah diaaa 42 6 11 SALVAGE QF MATERIALS a o e A e EA 42 6 12 MATERIALS HAULING mnsan a oa 42 SECTION 7 LEGAL RELATIONS AND RESPONSIBILITY 43 4 1 LAWS TOBE OBSERVED red Nea aides ee Atanas ed uae 43 2 LABOR CODE REQUIREMENTS 2 43 2 A HOURS OF LABORii ck niin aed laa iets 43 2 B PREVAILING WAGE wt thee Meni het ee ae i dla 43 7 2 C
9. The concrete pump pad shall Class 2 min 3 1 2 in thick and surround the entire mechanical package all piping and appurtenances by a minimum of 12 inches in both length and width 24 Operations and Maintenance Manuals Within ten calendar days prior to completion of the construction the Contractor shall prepare and deliver to the City all required and necessary descriptive material in complete detail and sufficient quantity properly prepared in two individually bound sets of Operating and Maintenance Manuals These manuals shall describe the material installed and shall be in sufficient detail to permit operating personnel to understand operate and maintain all equipment Spare part s lists and related manufacturer identification shall be included for each installed equipment item Each complete bound manual shall also contain the following information a Index sheet stating Contractor s address and telephone number duration of guarantee period and list of equipment with names and addresses of local manufacturer representatives City of Clovis Standard Specifications 2009 153 b Complete operating and maintenance instructions all major equipment 25 The Contractor shall be responsible for correct procedures in loading unloading stacking transporting and handling all materials to be used in the system The Contractor shall avoid rough handling which could affect the useful life of equipmen
10. 7 21 AMENDMENTS 5 7 22 VERBAL STATEMENTS NOT BINDING 2 t 29 GUARANTEE ieee SECTION 8 PROGRESS AND PROSECUTION 8 1 SEQUENCE AND PROGRESS OF THE 8 2 lt 8 3 90 8 4 PRECONSTRUCTION CONFERENCE 0 4 4 40400000 8 5 CONSTRUCTION SCHEDULE 8 6 BEGINNING OF WORK 8 7 NOTICE RESIDENTS 8 8 8 9 2 8 1 05RIGAT OF WAY DELAYS 8 11 TEMPORARY SUSPENSION OF 8 12 USE OF COMPLETED PORTIONS CITY S RIGHT 8 13 TE
11. 213 215 13 1 TOLERANCES e A 215 1328 215 9 BACK FILLING 216 3 10 MEASUREMENT 216 73 14 PAYMENT 216 SECTION 74 THROUGH 79 BLANK 217 SECTION 80 CHAIN LINK FENCE GATES TIMBER BARRICADES 218 80 1 GENERAL oe abba soci ote Mini deed theses Mite 218 80 2 MATERIAL Acne an ata 218 80 271 FENCE GATE POSTS aipat RA 218 80 2 2 EXTENSION ARMS TENSION WIRE WIRE 219 80 2 3265 6 obits sitet elas 220 80 2 4 220 90 25 220 80 3 CLEARING AND RUBBING Gansta 220 80 4 EXCAVATION AND PREPARATION OF SUBGRADE 220 80 5 CONSTRUCTION
12. 5 iced Mabel cect 205 68 6 GRADE TOLERANCE 207 68 7 FRAC OUT CONTINGENCY PLAN 207 68 8 BACKFILL COMPACTION RESTORATION OF 20 208 68 9 5 208 O8 10 RAYMEN Te 208 SECTION 69 BLANK 209 SECTION 70 MISCELLANEOUS STREET IMPROVEMENTS 210 GENERAL cadet 210 70 2 SURVEY a 210 70 3 ADJUSTING EXISTING FACILITIES TO FINISH 00 210 70 4 MEASUREMENT AND PAYMENT 210 SECTION 71 BLANK 212 SECTION 72 BLANK 212 SECTION 73 CONCRETE CURBS SIDEWALKS SURFACE IMPROVEMENTS 213 73 1 GENERAL 213 73 2 PORTLAND CEMENT CONCRETE 213 13 9 RENFORCEMENT aana ta 213 73 4 SUBGRADE PREPARATIONS 213 13 5 CONSTRUCTION i A ce Ce
13. 93 15 1 02 56 93 15 1 02 TRAFFIC SIGNAL DETECTION LOOPS c cscsssssscscscsessssesesesesececsesesecsessseesesesececsenenees 93 15 2 MISCELLANEOUS FACILITIES 93 15 201 DESCRIPTION 22955 93 15 2 02 REMOVAL METHODS 93 15 2 94 15 2 02 OBLITERATING ROADS DETOURS c csssssscscscsesesecsesesesecacsesesacsesavacsesesececsesenaes 94 15 2 02 C TRAFFIC STRIPES AND PAVEMENT 8 2 0 1 94 15 2 02 D PAVEMENT MARKERS 96 15 2 02 E TRAFFIC te ata AU etal Wan aka ele eS 96 15 2 03 lt Aaa T ea eG a ia AG each 96 15 2 04 5 ta seed eaves 96 15 2405 RECONSTRUCTION Sth iat telah ah luau DAL 97 15 2 05 A FRAMES COVERS GRATES AND MANHOLES 2 1 4241 40 2 1 6 0 868180000000 98 52068 FENCES te
14. 22 4 264 83 19 MEASUREMENT AND PAYMENT 2 264 SECTION 84 TRAFFIC STRIPES SIGNS AND PAVEMENT MARKINGS 265 AR ee ele eed ead 265 94 2 65 265 84 2 1 THERMOPLASTIC MATERIALS 265 84 2 2 E EE Adee and dee teen 265 84 2 2 WATERBORNE PAINT z 265 84 2 2 SOLVENT BORNE 9 7 9 266 84 23 GLASS BEADS ices 266 94 2 TIRAFFICISIGNS teed Nested aaa headers 267 84 2 5 SIGN MOUNTING 267 94 2 65 6 eae tae ol colorants is igen a 267 84 3 REMOVAL OF EXISTING 267 84 4 APPLICATION 267 84 5 APPLICATION OF THERMOPLASTIC MATERIAL PAINT AND 5 267 84 6 TRAFFIC SIGN 268 94 7 269 94 8 PAYMENT mra
15. A cd et conti ae CURL candice Mala 99 15 2 05 EXTENDING an has 99 1522 OO MEASUREMENT eA 99 15 2 07 ie el eA ie A Ate a 99 15 3 REMOVING CONCRE TE 100 15 0 01 DESCRIPTION 100 15 8 02 REMOVAL METHODS 101 15 3 03 101 15 3 04 PAYMENT ssi Si deste nw Sed heer deve oe 102 15 4 BRIDGE CONCRETE CULVERT REMOVAL 102 1224 01 DESCRIPTION hd 102 18 402 REMOVAL METHODS aetna dee Maat Aes 102 15 4 03 MEASUREMENT AND PAYMENT 103 SECTION 16 CLEARING AND GRUBBING 104 26 41 DESCRIPTION Mikes 104 16 2 PRESERVATION ak into 104 1652 104 16 4 REMOVAL AND DISPOSAL OF 155 4 4 21 201 106 16 5 MEASURE MENU
16. n A a aa a Omen anne tet 1 18 FINISH GRADE anaa 1 19 GRADING PLANE 1520 INSPECTOR 1 21 TERRY 1 22 LEGANHOLDAY n a 1 23 L NE AND GRADE harei 1 24 LIQUIDATED DAMAGES 1 25 MANUAL UNIFORM TRAFFIC CONTROL DEVICES TED 1 MDG PERMIT EAE 1428 PROPOSAL 1532 1 33 PROPOSAL GUARANTY 1 34 RIGHT
17. 144 20 6 03 144 OG IBALL beets Sunda a nn act buds 144 20 6 04 TREE 00 000 144 20 6 05 STAKING AND 0 4 6 145 20 6 00 MUL OH NG 145 20 6 07 RESPONSIBILITY 2 000 0 145 20 6 08 MEASUREMENT PAYMENT 0 000 145 2O0 FAGEEANUP 145 20 8 MAINTENANCE 0 60 145 20 9 0 E E 146 20 10 MEASUREMENT AND 000 147 SECTION 21 LANDSCAPE IRRIGATION SYSTEMS 148 21 12 GENERAL teed be a 148 21 2 DESIGN io eval SSA 148 2123 PERMITS ASAE aac ee I Gg 149 21 4 SPECIALIZED INSPECTION c ccccescecesessescesccrsesseacceecrsvaceveusercaesarsersuacerserevaneeeseuvarenaesanes 149 2 V DAMATERIALS en oe et 150 21 6 TRENCHING AND
18. not permitted 84 2 6 Sign Posts All posts for traffic signs shall be 2 inch square x 12 gauge galvanized steel with holes punched on all four sides for the entire length of the post 84 3 Removal Of Existing Markings Removal of existing striping or pavement markings shall comply with Section 15 2 02 C Traffic Stripes and Pavement Markings and the directions of the Engineer 84 4 Application Equipment Application equipment for paint shall comply with Section 84 3 04 Application Equipment of the State Standard Specifications 84 5 Application Of Thermoplastic Material Paint And Beads Preparation of surfaces and application of thermoplastic material and beads shall comply with the requirements of Section 84 2 04 Application of the State Standard Specifications except as amended by these Standard Specifications Pedestrian Crosswalks shall be installed using extruded type Alkyd Binder Thermoplastic material applied at a thickness of 125 mils 15 mils Beads for thermoplastic material shall be 25 30 of the material before application and applied to the extruded material immediately after application Preparation of surfaces and application of paint and beads shall conform to the requirements of Section 84 3 05 Application of the State Standard Specifications and as amended by these Standard Specifications Tolerances and appearance shall conform to the requirements of Section 84 1 03 Toler
19. 4 4 4 289 86 33 REMOVING ELECTRICAL 3 289 86 34 REINSTALLING REMOVED ELECTRICAL 289 86 35 STOCKPILING SALVAGED ELECTRICAL EQUIPMENT 289 86 36 RED LIGHT ENFORCEMENT 8 04 4 00000000 289 86 37 9 5 289 86 38 LOOP DETECTOR INSTALLATION PROCEDURE 2004000000 000 291 86 39 SAWCUT LOOP DETECTOR 5 292 86 40 PVC Loop DETECTOR SLOT PATCHING 292 86 41 MAGNETIC DETECTOR INSTALLATION PROCEDURE 293 86 42 MAGNETIC DETECTOR 6 294 86 43 SOLID STATE TRAFFIC ACTUATED 5 294 86 44 e 295 86 45 298 86 46 MODULATED LIGHT SIGNAL DETECTION 5 5 298 86 47 VIDEO VEHICLE 304 86 48 AUXILIARY POWER 5 5 308 86 49 MEASUREMENT AND PAYMENT 0 440000 313 SECTION 87 BLANK 314 SECTION 88 ENGINEERING FABRICS 315 SECTION 89 BL
20. a aaa 221 80 6 MEASUREMENT 222 90 7 222 City of Clovis Standard Specifications 2009 SECTION 81 CONCRETE MASONRY WALL FENCE 224 61 7 GENERAL 224 8122 MATERIALS eee cedar AG 224 81 3 CLEARING AND GRUBBING diaid iada iiad 225 81 4 EXCAVATION AND SUBGRADE PREPARATION 225 81 5 25 225 81 6 226 8127 PAYMENT 25205 226 SECTION 82 FIBER OPTIC FACILITIES 228 82 1 GENERAL Mind 228 82 2 EQUIPMENT LIST AND DRAWINGS 228 82 3 REGULATIONS AND CODES 228 82 4 A Madeira shan 228 82 5 Mandi a
21. A signal indication and a call indication each for Class and for Class 11 signals The signal indication denotes that a signal above the threshold level has been received A call indication denotes that a steady validly coded signal has been received These two indications be accomplished with a single indication lamp signal being denoted by a flashing indication and call with a steady indication 5 Cabinet Wiring The Model 332 cabinet has provisions for connections between the optical detectors the discriminator module and the model 170 controller unit City of Clovis Standard Specifications 2009 302 Wiring for a Model 332 cabinet shall conform to the following a Slots 12 and 13 of input file J have each been wired to accept a 2 channel module b Field wiring for the primary detectors except 24 volt DC power shall terminate on either terminal board TB 9 in the controller cabinet or 6 position terminal board to be added by Contractor depending cabinet configuration Where TB 9 is used position assignments shall be as follows Position Assignment 4 Channel A detector input 1st module Slot J 12 5 Channel B detector input 1st module Slot J 12 7 Channel A detector input 2nd module Slot J 13 8 Channel B detector input 2nd module Slot J 13 The Contractor shall add a 6 position terminal board to any 336 cabinet s Connection of auxiliary inputs shall require the installation of a
22. 0 6 190 66 2 9 COPPER 2 0404000000 190 66 2 10 OTHER SERVICE MATERIAL 0 0 4 190 66 2 11 NUTS BOLTS SCREWS AND 5 190 6622212 TRACER WIRE Aeran 190 66 3 TRENCHING AND 6 190 66 4 ALIGNMENT CHANGES SEPARATION 0 190 66 5 INSTALLATION OF WATER MAINS FITTINGS AND 8 2 2 191 66 6 TRACER WIRE INSTALLATION c ccccceccecscsssesceeecereescesecarsesceaesersvacsteseavauenaesausersnaeeaneerseaseas 193 66 7 THRUST BLOCKS eet on tae 193 66 8 VALVE BOX 0 0 66 193 66 9 WATER SERVICE 5 66 194 66 10 BACKFILL COMPACTION AND SURFACE 194 66 11 STERILIZATION OF WATER
23. Electrical outlets to be furnished at picnic areas as a part of a lighting project or to be installed at the base of light poles are to be hot at all times No more than two duplex outlet receptacles are to be on a single 20 amp circuit Each of the above as well as any other components of the electrical lighting system are to have individual labeled circuit breakers i e irrigation controller is not to share a breaker with security lighting Layout The Contractor shall be responsible for layout of proposed lighting facilities at the site and any minor adjustments required due to differences between the site and drawings Any such deviations in layout shall be within the intent of the original drawings and shall be approved by the Engineer The City will indicate the proposed precise location of the electrical service panels Grades Before starting work on the system the Contractor shall carefully check all grades to ensure the work above and below ground may safely proceed and keep within the specified material depths or finish elevations If part of an overall landscaping project work shall be coordinated so that all electrical facilities will be placed at the depth surface elevation and location specified for the finished condition General Installation Any equipment installed by the Contractor and deemed to be for the use of the City shall be so installed to be readily accessible and quickly operable Two keys for lockable eq
24. In addition the Contractor shall keep the City Fire Department Police Department and ambulance companies informed at all times as to the exact location and progress of the work and shall notify them immediately of any streets closed to traffic or impassable for fire fighting or other safety equipment In accordance with Section 8 7 Notice to Residents residents along the work area shall be provided passage as far as practicable as determined by the Engineer Convenient access to driveways houses and businesses along the road street alley or other work area shall be maintained temporary trench crossings shall be provided and maintained in good condition as required to provide said access All costs for providing all noticing specified herein shall be included in the cost of providing traffic control 12 2 02 Contractor s Operations The Contractor shall so conduct his operations as to cause the least possible obstruction and inconvenience to public traffic and abutting property owners or tenants and he shall have under construction no greater length or amount of work than he can prosecute properly with due regard to the rights and safety of the public Unless otherwise provided by the Contract Specifications or approved by the Engineer all traffic shall be permitted to pass through the work City of Clovis Standard Specifications 2009 88 Contractor shall provide such flagmen and furnish and maintain su
25. WAY 1 35 ROADBED 1 30 ROADWAY E REARS 1 37 SHOULDERS nu 1538 SPECIAL PROVISIONS 1 39 SPECIFICATIONS 1 40 STANDARD DRAWINGS 1 41 STANDARD 1 425 STATE A A ae 1 438 50 5 Ra le Ni oa va ine Os Ald dD BRA TARA dil lla es dal E PRCA TAS SRE TY PAGS SURERGING hs Loa boca A AAP RAE FIG SANE ea City of Clovis Standard Specifications 2009 i 1 48 TRAVELED WAY Sep a eee eee 6 Sain teen we 6 SECTION 2 PROPOSAL REQUIREMENTS AND CONDITIONS 7 221 GENERAL LAG tidus hee tad atid genta 7 2 2 EXAMINATION OF SITE OF WORK PLANS SPECIFICATIONS AND CONTRACT DOCUMENTS 7 2 3 FORM OF PROPOSAL seated niu dete tne ened 7 2 4 QUANTITIES awe aie a Aone 7 2 5 UNIT OR LUMP SUM PRICES taut i erties et ce
26. Where necessary the Engineer will furnish the necessary control points for all required pavement striping and markings Alignment and layout of the work by the Contractor shall conform to Section 84 1 02 Control Of Alignment and Layout of the State Standard Specifications The Contractor shall provide an experienced technician to supervise the location alignment layout dimensions and application of the pavement striping and marking In areas of high traffic volume the Contractor shall schedule work to apply traffic lines and markings in off peak traffic hours or on weekends In all cases the Contractor shall use proper and sufficient directional signs warning devices barricades pedestals lights traffic cones flagpersons or such other devices to protect the work workers and the public All markings and striping shall be protected from injury and damage of any kind while the material is drying All adjacent surfaces shall be protected from disfiguration by spatter splashes spillage and dripping of material Damaged stripes or markings shall be cleaned and reapplied by the Contractor at his expense 84 6 Traffic Sign Installation Traffic signs shall be installed at the locations of the type and at the height shown on the Plans as specified in the Specifications as directed by the Engineer and in conformance with the current California MUTCD If a sign is to be installed in existing concrete the concrete shall be c
27. shall then be reconstructed with the proper taper to finished grade When existing manholes or inlets are to be abandoned pipes entering the manhole or inlet shall be securely closed by a tight fitting plug or wall of minor concrete not less than 0 5 foot thick or by a tight brick wall not less than 0 67 foot thick with cement mortar joints Minor concrete shall conform to the provisions in Section 90 10 Minor Concrete of the State Standard Specifications The bases of manholes or inlets shall be broken in a manner to prevent entrapment of water Unless otherwise specified by the Contract Specifications the manhole or inlet shall be demolished to an elevation 3 5 feet below finished grade and backfilled in conformance with the provisions in Section 19 3 03 B Structure Backfill 15 2 05 B Fences Corner posts with braces shall be placed at the junctions of reconstructed fences and existing cross fences and the two fences properly fastened thereto Gates to be reused shall be installed in reconstructed fences at the locations designated by the Engineer Clearing required for reconstructed fences shall conform to the provisions in Section 16 Clearing and Grubbing Removing and reconstructing fence shall be performed manner that will prevent the escape of any animals contained within the fenced area 15 2 05 C Extending Pipes Existing pipe shall be extended as shown on the Plans or specified in the Contract Specifications and
28. 86 8 Maintaining Existing And Temporary Electrical Systems Maintaining existing and temporary electrical systems shall conform to the provisions of Section 86 1 06 Maintaining Existing and Temporary Electrical Systems of the State Standard Specifications The Contractor may use temporary splices and wiring as approved by the Engineer to maintain existing and temporary traffic signal and lighting systems Contractor shall install overhead conductors or cables or use existing underground conductors with temporary splices together with a minimum of two 2 12 inch one way three section or four section signal faces as required for each direction of entering traffic to maintain traffic signal operation Shutdowns of traffic signal systems shall be limited to the period from 9 a m to 4 p m of normal working days or as specified on the Plans or the Contract Specifications excluding legal holidays weekends and non working days as determined by Engineer The limited time period for traffic signal shutdown between 9 a m and 4 p m shall be determined by the Engineer Traffic control plans and plans indicating the use of temporary stop signs shall be submitted by the Contractor to the Engineer for approval five days prior to doing the work Plans shall conform to the State of California Department of Transportation Caltrans Manual of Traffic Controls for Construction and Maintenance Work Zones latest edition No traffic signal shutdown sha
29. MUNICIPAL UTILITIES AND FACILITIES SECTION 63 STORM DRAINAGE FACILITIES All storm drainage facilities including pipelines inlets manholes and all appurtenances whether temporary or permanent shall be as specified in the current Fresno Metropolitan Flood Control District Standard Specifications and Standard Drawings EXCEPTION Trench and structure excavation and backfill for drainage facilities located in City of Clovis easements and public rights of way shall conform to the provisions in Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration of these Standard Specifications Temporary storm drain facilities shall conform to the applicable City Standard Drawings Location or relocation of storm drains or laterals shall conform to Section 64 11 Alignment Changes Separation Criteria of these Specifications City of Clovis Standard Specifications 2009 168 SECTION 64 SANITARY SEWER FACILITIES 64 1 General This work shall consist of furnishing all sewer main pipelines branch fittings building or house branches services manholes stub outs lampholes and other sewer facilities as shown on the Plans and in conformance with the Standard Drawings as specified in the Specifications and as directed by the Engineer including testing and internal inspection of all sewer main pipe after installation 64 2 Materials 64 2 1 PVC Pipe And Fittings Unless otherwise specified
30. ito vs 276 86 16 PULL BOXES 277 86 17 CONDUCTORS AND 279 86 18 FUSED SPLICE 8 281 86 19 BONDING AND 282 City of Clovis Standard Specifications 2009 86 20 SERVICE 282 86 21 SERVICE EQUIPMENT 1 282 86 22 TESTING 284 86 23 het ata 285 86 24 PAINTING ss ata de teat 285 86 25 VEHICLE SIGNAL FACES VISORS AND BACKPLATES 286 86 26 PEDESTRIAN SIGNAL 2 2 287 86 27 SIGNAL MOUNTING 5 nern nn nne 287 86 28 PEDESTRIAN PUSH 287 86 29 HIGH PRESSURE 8 04 0 288 86 30 HIGH PRESSURE SODIUM 58 0000000 288 86 31 PHOTOELECTRIC 5 288 86 32 HIGH PRESSURE SODIUM LAMP 575
31. CITY OF CLOVIS STANDARD SPECIFICATIONS March 2009 Prepared by City of Clovis Engineering Division Steven E White City Engineer CITY CLOVIS STANDARD SPECIFICATIONS TABLE OF CONTENTS SECTION 1 DEFINITIONS AND TERMS Tee GENERAL cetera cata test iat odes TaD AG CEP TAN GE 1 3 ae a eee vee eee ed 1 4 BASEMENT gt 1 6 CALIFORNIA MANUAL UNIFORM TRAFFIC CONTROL DEVICES CALIFORNIA MUTCD TET CITY OWNER 1 8 COMPLETION einen 119 GON TRACT 1 10 CONTRACT SPECIFICATIONS CONTRACTOR 112 stele 1213 DIVIDED ROADWAY 1214 ENCROACHMENT a a 1215 ENGINEER ener as laos 1 16 ENGINEER S ESTIMATE
32. Electric and Water Service and Section 17 Water Use Where the City s water system is utilized for construction water the Contractor shall obtain a water meter from the City of Clovis fire hydrant meter are required for all users The Contractor shall obtain the permission of the Engineer as to which fire hydrants are to be utilized Except as provided in Section 19 3 03 A 1 Initial Backfill Precast Pipe jetting of trench backfill is not allowed Flooding of trenches from the top is not permitted 19 3 04 Progress Of Work Trench And Structure Excavation Backfill All work of excavation and backfilling shall be done as quickly as possible City of Clovis Standard Specifications 2009 120 Where trench or structure excavation is to occur an area with improved surfacing the existing surfacing at any location shall be removed no sooner than 48 hours prior to excavation at that location No surfacing shall be removed on Friday unless excavation and follow up work will occur the same day Unless authorized in writing by the Engineer no more than 650 feet of trench shall be excavated at any location ahead of any preceding trench which has not received pipeline or other conduit and backfilled No excavation or trench shall be opened and left open more than 24 hours before a the installation of the pipeline or other conduit which is to be placed in said trench b the start of construction of a structure in said excava
33. Terminal blocks shall be provided for terminating the field connectors Lugs shall be connected to field connectors and soldered prior to connecting to terminal blocks 86 45 Auxiliary Equipment All components shall conform to the provisions in Section 86 3 Controller Assemblies of the State Standard Specifications 86 46 Modulated Light Signal Detection System The modulated light signal detection system shall conform to the details shown on the Plans and these special provisions The Opticom 700 series or better produced by 3M is the only system approved All components of the Opticom system shall be matched system components produced by the 3M Company includes data encoded emitter optical detector optical detector cable and data encoded phase selector Information on Opticom equipment can be obtained by contacting the following or contact the local authorized 3M products distributor Advance Traffic Products Inc 909 SE Everett Mall Way Suite B280 Everett WA 98208 3740 TEL 425 347 6208 FAX 425 347 6308 A GENERAL Each modulated light signal detection system shall consist of an optical emitter assembly or assemblies located on the appropriate vehicle and optical detector discriminator assembly or assemblies located at the traffic signal and sense harnesses Each system shall permit detection of two classes of authorized vehicles Class mass transit vehicle
34. The signed written guaranty or the bond whichever is required by the Contract Specifications shall be delivered to the Engineer before Acceptance of the Contract All costs for compliance with this Section 3 5 shall be included in the various bid items no additional payment will be made therefor City of Clovis Standard Specifications 2009 11 SECTION 4 SCOPE WORK 4 1 Intent Of Plans And Specifications The intent of the Plans and Specifications is to prescribe the details for the construction and completion of the work which the Contractor undertakes to perform in accordance with the terms of the contract Where the Plans or Specifications describe portions of the work in general terms but not in complete detail it is understood that only the best general practice is to prevail and that only materials and workmanship of the first quality are to be used The Contractor shall furnish all labor materials tools equipment and incidentals and do all the work involved in completing all of the contract requirements satisfactory and workmanlike manner The Plans Specifications and other Contract documents will govern the work Anything in the Specifications and not on the Plans or on the Plans and not in the Specifications shall be as though shown or mentioned in both The Contractor shall keep at the worksite a copy of the Plans and Contract Specifications to which the Engineer shall have access at all times While
35. e g available space limited slope existing structures may create a situation in which there is no City of Clovis Standard Specifications 2009 323 April 14 2003 Revised October 16 2003 Page 5 of 11 Guidance Memo No 2003 02 alternative but to install water mains sanitary sewer mains or other non potable pipelines at a distance less than that required by the regulations existing Section 64630 proposed Section 64572 In such cases through permit action the Department may approve alternative construction criteria The alternative approach is allowed under the proposed regulation Section 64551 c A water system that proposes to use an alternative to the requirements in this chapter shall demonstrate to the Department how it will institute additional mitigation measures to ensure that the proposed alternative would not result in an increased risk to public health Appropriate alternative construction criteria for two different cases in which the regulatory criteria for sanitary sewer main and water main separation cannot be met are shown in Figures 1 and 2 Case 1 New sanitary sewer main and a new or existing water main alternative construction criteria apply to the sanitary sewer main Case 2 New water main an existing sanitary sewer main alternative construction criteria may apply to either or both the water main and sanitary sewer main Case 1 New Sanitary Sewer Main Installation Figures 1 an
36. loop detectors connected in series in the adjacent pull box and installed as shown on plans Probes and magnetic detector circuit shall not be megger tested City of Clovis Standard Specifications 2009 290 86 38 Loop Detector Installation Procedure 1 10 All loop detectors shall be installed as shown on the Plans If loop detectors are to be installed PVC the conductors shall be installed 34 inch Schedule 40 PVC conduit and installed as shown on the plans PVC encased loop detectors shall measure 6 ft x 6 ft or as shown on the plans All other loop detectors shall be installed as shown in the most recent edition of the State of California Standard Plans ES 5A and ES 5B and in conformance with these Specifications Supply and install a termination pull box with extension as shown in the Type A Curb Termination Details and shoulder termination drawings in these Special Provisions and in accordance with the most recent edition of the State of California Standard Plans ES 5D Each loop detector shall consist of three turns or as shown on the plans of stranded copper wire 12 AWG for PVC loops and 14 AWG for sawcut loops Type 1 loop conductors PVC encased shall have Type USE insulation 600 volt Type 2 loop conductors sawcut loops shall conform to IMSA 51 5 or IMSA 51 7 specifications Each loop detector shall have a separate lead in to the termination pull box Loop conductors shall be wound and labeled as dep
37. where T test time in seconds K value from table L distance between successive manholes in feet Failure of the leakage test will be grounds for rejection of the section tested until discovery and correction of the reason for the failure and successful retesting of the section 64 9 Deflection Deformation Test PVC Sewer Pipelines PVC sewer pipe which is designated as flexible in nature shall be tested for excessive deflection This test shall be performed after backfilling and compaction but prior to the placement of aggregate base or asphalt concrete surfacing and prior to television inspection as specified in Section 64 10 Television Inspection Installed Pipe Interior The Contractor shall demonstrate that the maximum pipe deflection deformation does not exceed 5 percent of the nominal pipe interior diameter by pulling a properly sized rigid ball or a mandrel through the main line pipe A rubber flush ball does not meet the requirement for deflection testing Failure of the deflection test shall be grounds for rejection of the section tested The Contractor shall undertake measures necessary to correct the deflection Retesting of the failed section will be conducted to affirm correction If correction requires re laying or otherwise disturbing the pipe the Contractor may be required by the Engineer to repeat the leakage test at no cost to the City City of Clovis Standard Specifications 2009 178 64 10 Television
38. 1 Disinfected tertiary recycled water defined in section 60301 230 and 2 Storm drainage c New supply lines conveying raw water to be treated for drinking purposes shall be installed at least 4 feet horizontally from and one foot vertically below any water main If crossing a pipeline conveying a fluid listed in subsection a new water main shall be constructed perpendicular to and at least one foot above that pipeline No connection joints shall be made in the water main within eight horizontal feet of fluid pipeline e The vertical separation specified in subsections a b and c is required only when the horizontal distance between a water main and pipeline is ten feet or less f New water mains shall not be installed within 100 horizontal feet of any sanitary landfill wastewater disposal pond or hazardous waste disposal site or within 25 feet of any cesspool septic tank sewage leach field seepage pit or groundwater recharge project site g The minimum separation distances set forth in this section shall be measured from the nearest outside edge of each pipe barrel ALTERNATIVE CRITERIA FOR CONSTRUCTION Water Mains and Sewers and Other Non potable Fluid carrying Pipelines When new water mains new sanitary sewer mains or other non potable fluid carrying pipelines are being installed in existing developed areas local conditions City of Clovis Standard Specifications 2009 322
39. 5 calendar days from the beginning of such delay notify the Engineer in writing of the causes of delay and the Engineer s finding of the facts thereon shall be final and conclusive No extension of time will be granted for a delay caused by a shortage of materials unless the Contractor furnishes to the Engineer documentary proof that the Contractor has made every effort to obtain the materials from all known sources within reasonable reach of the work in a diligent and timely manner and further proof in the form of supplementary progress schedules as required in Section 8 5 Construction Schedule that the inability to obtain the materials when originally planned did in fact cause a delay in final completion of the entire work which could not be compensated for by revising the sequence of the Contractor s operations The term shortage of materials as used in this Section 8 9 shall apply only to materials articles parts or equipment which are standard items and are to be incorporated in the work The term shortage of materials shall not apply to materials parts articles or equipment which are processed made constructed fabricated or City of Clovis Standard Specifications 2009 70 manufactured to meet the specific requirements of the contract Only the physical shortage of material will be considered under these provisions as a cause for extension of time Delays in obtaining materials due to priority in filling orders will n
40. Casing spacers shall electrically isolate the carrier pipe from the casing Casing spacer materials shall also conform to the following requirements 1 Bands shall be 304 stainless steel 8 inches wide for carrier pipes up to 24 inches in diameter and 12 inches wide for larger carrier pipes Bands shall be two segment 14 gauge bands for carrier pipes less than 42 inches in diameter and shall be three or more segment 12 gauge bands for larger carrier pipes Bands shall be fitted with a flexible PVC liner on the inner surface of the band The PVC liner shall have a thickness of 0 09 inch a hardness of 85 90 ASTM D2240 Durometer A and a dielectric strength of not less than 58 000 volts ASTM D149 City of Clovis Standard Specifications 2009 203 2 Risers shall be 304 stainless steel 10 gauge designed and fabricated to support the carrier pipe and its liquid load Risers shall be sized to position support and stabilize the carrier pipe in the casing 3 Runners shall be high pressure molded glass reinforced polymer having a compressive strength not less than 18 000 psi Runners shall be not less than two inches wide shall be at least 8 inches long for use with an 8 inch casing band and at least 11 inches long for use with a 12 inch casing band Runners shall be attached to the band or riser as applicable for the particular casing spacer design by 3 8 inch welded 304 stainless steel studs and lock nuts The studs and locknuts
41. City of Clovis Standard Specifications 2009 325 6 Reinforced concrete pressure pipe steel cylinder type AWWA 300 97 or C302 99 or C303 95 City of Clovis Standard Specifications 2009 326 April 14 2003 Revised October 16 2003 Page 7 of 11 Guidance Memo No 2003 02 If the sanitary sewer main crossing above the water main does not meet the Case 1 Zone C requirements the water main should have no joints within ten feet from either side of the water main in Zone C and be constructed of one of the following HDPE pipe with fusion welded joints per AWWA C906 99 Ductile iron pipe with hot dip bituminous coating Dipped and wrapped one fourth inch thick welded steel pipe Class 200 pressure rated PVC water pipe DR 14 per AWWA C900 97 amp 905 97 or 5 Reinforced concrete pressure pipe steel cylinder type per AWWA C300 97 or C301 99 or C303 95 D If the sanitary sewer main crossing below the water main does not meet the requirements for Case 1 Zone D the water main should have no joints within eight feet from either side of the sanitary sewer main in Zone D and should be constructed as for Zone C gt SINS 22 Water Mains and Pipelines Conveying Non potable Fluids When the basic separation criteria cannot be met between water mains and pipelines conveying non potable fluids the requirements described above for sanitary sewer mains should apply This includes the requirements for selecting
42. Government Code bank or savings and loan certificates of deposit interest bearing demand deposit accounts standby letters of credit or any other security mutually agreed to by the Contractor and the City The escrow agreement used pursuant to this Section 9 8 shall be substantially similar to the Escrow Agreement for Security Deposits In Lieu of Retention in Section 22300 of the Public Contract Code deemed as incorporated herein by reference The Contractor shall obtain the written consent of the surety to the agreement Any of the alternatives to the retentions normally withheld by the City are subject to the provisions of Section 9 7 Stop Notices City s Right To Withhold Payments and to the approval of the City Finance Director 9 9 Notice Of Potential Claim In the event that a dispute over the conduct or payment of any portion of the Work was not resolved by issuance of a contract change order or other agreement between the Contractor and the Engineer and it is the intent of the Contractor to submit a formal claim to resolve the matter the Contractor shall file with the Engineer a written notice of such intent pursuant to Section 4 12 Notices Change Orders and Claims Such notice of potential claim shall City of Clovis Standard Specifications 2009 83 be filed at the earliest possible time to permit early resolution if possible but any case within 5 calendar days of the time the dispute first arose The
43. If the Contractor fails to commence correction within said reasonable time or ever fails to continue correction after expiration of said reasonable time the City may instruct Contractor to stop performing such Work and notify Contractor that City shall perform such Work itself Any direction to Contractor to not perform such Work shall act as a deletion of such Work from Contractor s scope of Work and City may accept the Contractor s remaining contractual scope of Work as complete pursuant to Section 8 14 Acceptance of Contract even though the deleted Work may not have been performed yet by City City may perform the deleted Work at any time by whatever reasonable method the City may deem expedient without prejudice to other remedies the City may have In the event the City takes bids to complete the Work so deleted Contractor shall not be eligible for the award of the contract The Contractor will be invoiced all of the City s costs of performing the deleted Work including compensation for additional professional and internally generated services and expenses made necessary by such deletion The City may withhold the estimated costs from any retention release and or progress payments due the Contractor pursuant to Section 9 7 Stop Notices City s Right to Withhold Payments If retention and payments withheld then or thereafter due the Contractor are not sufficient to cover the City s actual costs of completing the deleted Work
44. Regardless of composition or combination of materials used in trench resurfacing measurement will be as though only one material is used Measurement of resurfacing around structures will not be made as no separate payment will be made therefor Unless otherwise specified in the Contract Specifications restoration of miscellaneous surfaces for trenches or structures will be included in the cost of the various items of work and no measurement will be made Measurement of facilities raised to grade shall be in accordance with the contract item therefor In the absence of a contract item s for the measurement and payment of raising City of Clovis Standard Specifications 2009 123 existing and or new facilities to grade within the trench surface restoration area measurement will be made and payment therefor shall be included in the various items of work 19 3 07 Payment Except for Slurry Cement Backfill and Pervious Backfill Material payment for trench and structure excavation backfill and compaction including any benching plowing or scarifying required by the Engineer shall be included in the amount bid for installing the pipe conduit structure or other facility to be installed in such trench or other excavation Payment shall include full compensation for furnishing all labor materials tools equipment and incidentals including water and for doing all the work involved as shown on the Plans as set forth in these Specific
45. SECTION 39 ASPHALT CONCRETE PAVEMENT DIKES 167 SECTION 40 PORTLAND CEMENT CONCRETE PAVEMENT 167 SECTION 41 THROUGH 62 BLANK 167 SECTION 63 STORM DRAINAGE FACILITIES 168 SECTION 64 SANITARY SEWER FACILITIES 169 6421 GENERAL 169 64 2 MATERIALS 169 64 2 1 PVG PPE AND 169 64 2 2 JOINTS GASKETS 171 64 2 3 TEST REQUIREMENTS 171 64 2 4 TIME LIMIT FOR INSTALLATION 172 64 2 5 VITRIFIED CLAY 172 6422 6 172 64 3 TRENCHING 173 64 4 SEWER PIPELINE INSTALLATION wicca eteietd atid sha ie Gohan 173 64 5 SERVICE LATERAL INSTALLATION aidan 174 64 6 175 64 7 BACKFILL COMPACTION AND SURFACE 176 64 8 LEAKAGE TEST SEWER MAINS AND SERVICE LATERALS cccsccsssscsesesececscsesesscscsesacseseees 176 64 9 DEFLECTION DEFORMATION TEST PVC
46. The Contractor shall furnish closed circuit television equipment for an interior inspection of the newly installed sewer force mains The television inspection of the mains shall be made after leakage and deflection tests have been performed passed and prior to placing of street aggregate base or asphalt paving Any broken pipe separation of joints or any pipe exceeding the permitted tolerances for line and grade shall be replaced or repaired Any pipe repaired or replaced shall be retested for leakage and deflection A DVD disc showing the initial video inspection as well as any retests shall be provided to the City at no additional cost City of Clovis Standard Specifications 2009 184 Contractor shall be responsible for all costs associated with furnishing the television inspection and making final repairs to the sewer force mains and re inspection utilizing the closed circuit television equipment 65 9 Alignment Changes Separation Criteria All non potable water mains which include sewer force mains sanitary sewers recycled water mains storm drains and potable water mains must meet the horizontal and vertical separation standards of the California Waterworks Standards contained in Section 64572 Title 22 of the California Administrative Code or shall be installed in accordance with alternate construction criteria as specified therein Included in the Appendix to these Specifications is a document titled Guidance Memo N
47. a grass free area 24 in diameter shall be provided around the tree no watering basin shall be formed and an Arbor Guard or approved equal trunk protective device shall be installed Trees shall be watered immediately after planting Root barriers shall be installed in conformance with the applicable Standard Drawings for Root Barrier and for Tree Planting City of Clovis Standard Specifications 2009 139 20 3 04 A Structural Soil Where the installation of Structural Soil is shown on the Plans or specified in the Contract Specifications Structural Soil shall be Rosenbalm Rockery s Structural Soil or approved equal 20 3 05 Tree Fertilizer During the planting operation apply Best Packs planting tablets or equal per the manufacturer s recommendations 20 3 06 Tree Staking Stake Coniferous Evergreen trees with one Lodge Pole Pine stake Stake Deciduous and Broadleaf trees with two Lodge Pole Pine stakes For all trees planted in park strips adjacent to streets or in lawn areas adjacent to sidewalks place stakes parallel to the street or sidewalk For Conifers planted in other areas place stake on the prevailing windward side of the tree For Deciduous and Broadleaf trees in all other areas place stakes perpendicular to the prevailing wind direction Each stake shall be vertical 12 to 18 inches from the trunk of the tree and at least 12 inches into native soil below bottom of tree planting hole Stakes shall not be dr
48. and Section 15 2 02 D Pavement Markers and the directions of the Engineer Amendments Section 85 1 08 Measurement and Section 85 1 09 Payment Are hereby amended to reflect that measurement and payment for installing Raised Pavement Markers will be made on a lump sum basis unless otherwise specified in the Contract Specifications All other aspects of these sections shall remain unchanged City of Clovis Standard Specifications 2009 270 SECTION 86 TRAFFIC SIGNALS AND INTERSECTION SAFETY LIGHTING 86 1 General These Standard Specifications shall apply to the installation and modification of traffic signal and intersection safety lighting facilities and other traffic signal related work Work or equipment not specified or shown on the Plans these Standard Specifications and the Contract Specifications but necessary for the proper operation of the work shall be provided and installed at no additional cost to the City 86 2 Description Furnishing installing modifying and removing traffic signals and lighting systems shall conform to the provisions in Section 86 1 01 Description of the most recent issue of the Standard Specifications and Standard Plans of the Department of Transportation State of California the California Manual on Uniform Traffic Control Devices MUTCD for Streets and Highways these Standard Specifications the Standard Drawings the Project Plans and Contract Specifications Payment therefor
49. approximately fifteen seconds so the fittings do not push off the pipe f Using clean rag wipe off all excess solvent to prevent weakening at the joint g exercise care in going to the next joint so that the pipe is not twisted thereby disturbing the last completed joint h Allow at least fifteen minutes setup time for each welded joint before moving i Repair damaged plastic pipe by replacing the damaged segment 12 Backflow Prevention Devices Backflow prevention devices will be installed in a protective cage The cage will be constructed of a 3 16 inch angle steel frame with No 9 expanded steel fabric welded to the frame at each point of contact between the fabric and the frame The enclosure will include provisions for padlocking and handles for lifting For devices up to 2 inches a single hinged cage shall be furnished and installed For devices 2 inches and greater a double hinged cage that opens from the center shall be furnished and installed The dimensions of the cage will vary depending on the size and type of device required Consult the enclosure manufacturer s specifications to determine the appropriate model number A minimum of 6 inches clearance is required between the device and the cage 13 Control Wiring Lay the wiring from the remote control valves to the controller Lay alongside the supply mains where practical Tape wires together at 10 foot intervals All wiring passing under existing or futur
50. bells warning tape tracer wire pigtail units splice enclosures connectors and other incidental materials will be made These will be considered as part of the price paid for conduit or cable installation Pullboxes cabinets or other enclosures will be measured on an each basis Where a bid item is included in the Contract Specifications testing and documentation of Fiber Optic Cable materials and systems will be measured on a lump sum basis If no bid item is provided testing and documentation will be included in the cost of Fiber Optic Cable installation Where a bid item is provided therefor Surface Restoration will be measured as specified in the Contract Specifications Where no bid item is provided surface restoration will not be measured and included in the cost of conduit installation City of Clovis Standard Specifications 2009 250 82 28 Payment Unless otherwise specified the Contract Specifications Fiber Optic Facilities will be paid for as follows Single Fiber Optic Conduit installations will be paid for a lineal foot basis Multiple conduit runs will be paid for as specified in the Contract Specifications The unit price paid for Fiber Optic Conduit shall include all labor materials equipment and incidentals necessary for a complete conduit system including excavation backfill including colored concrete backfill where specified compaction deflection testing pull tape marker tape tracer wire coup
51. by the use of other forces City of Clovis Standard Specifications 2009 31 When 2 or more contractors are employed on related or adjacent work or obtain materials from the same material source each shall conduct their operations in such a manner as not to cause any unnecessary delay or hindrance to the other Each contractor shall be responsible to the other for all damage to work to persons or property caused to the other by their operations and for loss caused the other due to unnecessary delays or failure to finish the work within the time specified for completion 5 16 Maintaining Drainage The Contractor shall provide and maintain drainage to the area of work Temporary provisions for drainage of any area during construction where existing drainage facilities have been damaged or altered or where normal drainage patterns of adjacent areas will be interrupted by the Contractor during his operations shall be made by the Contractor and as directed by the Engineer The Contractor shall be responsible for all damages to public or private property upstream or downstream of the work incurred due to failure to provide adequate drainage within and through the construction area or due to blockage of existing drainage facilities or pathways at or upstream from the area of work or for re routing flows to areas not historically receiving such drainage In the performance of Maintaining Drainage the Contractor shall comply in all respects with
52. destroying weeds insects diseases rodents or nematodes and any substance or mixture of substances intended for use as a plant regulator defoliant or desiccant shall be considered a pesticide 7 9 Payment Of Taxes The contract prices paid for the work shall include full compensation for all taxes which the Contractor is required to pay whether imposed by Federal State or local government including without being limited to Federal Excise Tax City of Clovis Standard Specifications 2009 56 tax exemption certificate nor any document designed to exempt the Contractor from payment of any tax will be furnished to the Contractor by the City as to any tax on labor services materials transportation or any other items furnished pursuant to the contract 7 10 Permits And Licenses Unless otherwise provided in the Contract Specifications the Contractor shall procure all required permits and licenses and give all notice necessary and incidental to the due and lawful prosecution of the work The Contractor shall secure any required permits from the appropriate agencies prior to making any preliminary soil investigations in public street rights of way and shall abide by the provisions of said permits The Contractor and all subcontractors must comply with the Business License provisions of Section 3 3 Required Contract Securities Insurance Certificate Business License Injury and Illness Prevention Plan For all non public
53. involved therein as shown on the Plans as set forth in the Specifications and as directed by the Engineer This shall include furnishing and installing the fire service pipe fittings structures gate valve and valve box thrust blocks connection to main pipe and all excavation backfill and compaction returning and adjusting valve box to final grade following trench surface restoration street or alley construction or reconstruction testing sterilization and all incidentals Unless otherwise indicated in the Contract Specifications the cost of furnishing and installing any wet tap required for the fire service line shall be included in the unit price bid for fire service lines complete Payment for wet taps except those directly associated with fire hydrants or fire service installations shall be as set forth in the Contract Specifications City of Clovis Standard Specifications 2009 198 SECTION 67 RECYCLED WATER DISTRIBUTION SYSTEMS 67 1 General This work shall consist of furnishing all materials and constructing recycled water mains as shown on the Plans and Standard Drawings as specified in the Specifications and as directed by the Engineer Recycled water mains shall conform to the provisions in Section 66 Potable Water Distribution Facilities except as may be specified in this Section 67 67 2 Materials All materials used in constructing recycled water facilities shall be new and shall conform to these Stan
54. opposition to such determination must be made within ten 10 days after the City has given notice of the decision If the City and the Contractor cannot agree on an adjustment in the Contract Sum or the Contract Time Contractor shall proceed pursuant to Section 4 12 Notices Change Orders and Claims 7 14 2 Trenches And Excavations Greater Than 4 Feet In Depth Hazardous Waste Pursuant to Section 7104 of the State Public Contract Code whenever the work requires digging trenches or other excavations that extend deeper than four feet below the surface the following provisions apply A The contractor shall promptly and before the following conditions are disturbed notify the Engineer in writing of any 1 Material that the contractor believes may be material that is hazardous waste as defined in Section 25117 of the Health and Safety Code that is required to be removed to a Class 1 Class II or Class III disposal site in accordance with provisions of existing law 2 Subsurface or latent physical conditions at the site differing from those indicated by information about the site made available to bidders prior to the deadline for submitting bids 3 Unknown physical conditions at the site of any unusual nature different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract B The Engineer shall promptly investigate the conditions and if he finds
55. or required by the provisions of Section 8 15 Utility and Non Street Facilities Potholing slurry cement backfill for the installation of conduits that will contain fiber optic cable shall be 2 sack sand cement slurry conforming to Section 19 3 062 Slurry Cement Backfill of the State Standard Specifications 82 26 Fiber Optic Testing 82 26 A General Prior to arrival of the cable the Contractor shall provide detailed test procedures for all field testing to the Engineer The procedures shall include the tests involved and how the tests are to be conducted These tests plans shall be subject to the approval of the Engineer The active components shall be tested by the Contractor after installation The Contractor shall provide all personnel equipment instrumentation and materials necessary to perform all testing The Engineer shall be notified in writing a minimum of two 2 working days prior to all field tests The notification shall include the exact location of the system to be tested Documentation of all tests results shall be provided to the Engineer for approval within two 2 working days after the tests involved The Contractors attention is directed Section 82 26 G System Testing and Documentation regarding the requirements for recording test results Attenuation tests shall be performed with an OTDR capable of recording and displaying anomalies of 0 2 dB as a minimum Single mode fibers SM shall be tes
56. shall match the surface elevation of the pull box and slope away from the pull box at the rate of 1 50 2 slope The width of the collar shall be 12 inches wide and 6 inches in depth The Contractor shall clean all pull boxes entered for installation of conduit or wire of all dirt and debris All pull box lids damaged by Contractor operations shall be replaced at his expense The wiring in pull boxes shall be neatly bundled coiled and reinstalled in the box Where existing pull boxes are removed and replaced with new larger boxes the existing conduits within which the fiber cable is installed shall be cut back to within 2 5 inches of the edge of the new box When the conduits are cut the existing conductors must be either be removed or well protected The ends of the cut conduits must have bushings placed on them The bushings can be threadless City of Clovis Standard Specifications 2009 232 At completion of all work in pull boxes an approved ant repellent Rainbow Insect Control Distributed by Southwest Power 800 670 7746 or an approved equal shall be supplied by the Contractor in quantity specified by the Contract Specifications 82 15 Fiber Optic Cabinets Fiber optic cabinets shall be furnished conforming to the type and model shown on the Plans or specified by the Contract Specifications and to Section 86 3 04 Controller Cabinets of the State Standard Specifications The cabinets shall be installed at the locations and
57. special construction materials and the separation requirements shown in Figures 1 and 2 Note that not all construction materials allowed for sanitary sewer mains will be appropriate for other non potable fluid lines For example certain plastic lines may not be appropriate for the transport of some fuel products The selection of compatible materials of construction for non potable fluids is a decision to be made by the project engineer Water Mains and Sewage Force Mains Sewage force mains shall not be installed within ten feet horizontally of a water main When a sewage force main must cross a water main the crossing should be as close as practical to the perpendicular The sewage force main should be at least one foot below the water main City of Clovis Standard Specifications 2009 327 April 14 2003 Revised October 16 2003 Page 8 of 11 Guidance Memo No 2003 02 When new sewage force main crosses under an existing water main and a one foot vertical separation cannot be provided all portions of the sewage force main within eight feet horizontally of the outside walls of the water main should be enclosed in a continuous sleeve In these cases a minimum vertical separation distance of 4 inches should be maintained between the outside edge of the bottom of the water main and the top of the continuous sleeve When new water main crosses over an existing sewage force main the water main should be construct
58. 02 Removing and Replacing Improvements of the State Standard Specifications and these Standard Specifications It shall be the Contractor s responsibility and expense to remove and replace all improvements including improvements damaged by the Contractor as stated under Section 86 22 Testing in these Standard Specifications 86 13 Foundations Foundations shall conform to the provisions in Section 86 2 03 Foundations of the State Standard Specifications and these Standard Specifications Portland Cement Concrete shall conform to Section 90 Portland Cement Concrete of the State Standard Specifications may be produced from commercial quality aggregates and shall be Class 2 containing not less than 590 lbs yd 6 sack mix of Portland Cement No admixtures shall be used without written permission from the City All concrete shall have a Class surface finish as specified in Section 51 1 18B Class 1 Surface Finish of the State Standard Specifications unless these Standard Specifications or Contract Specifications specify otherwise City of Clovis Standard Specifications 2009 274 controller cabinet base shall be 8 inches higher than the surface of controller cabinet pad or sidewalk Controller pad shall be 0 1 foot above finished grade if placed in unpaved area unless elevation is stated on plans If the pad is located in an existing or future sidewalk area pad shall be placed at sidewalk eleva
59. 1 17 Extra Work Any obligations construction or service outside the scope of the contract 1 18 Finish Grade The elevation or slope shown on the plans assigned to the design finished surface of an improvement including earthwork which will receive no paving or other surfacing after all work on the improvement has been completed 1 19 Grading Plane The surface of the basement material subgrade upon which the lowest layer of subbase base pavement surfacing or other specified layer is placed 1 20 Inspector A duly authorized agent of the Engineer City of Clovis Standard Specifications 2009 3 1 21 Laboratory Established commercial laboratories authorized by the City to test materials and work involved in the contract 1 22 Legal Holidays Those days designated as City holidays as designated by the Clovis City Council in observance of which City offices are closed 1 23 Line and Grade The term used to describe the horizontal and vertical lines elevations and slopes shown on the plans to which all improvements and earthwork are to be constructed 1 24 Liquidated Damages The amount prescribed in the Contract Specifications to be paid to the City or to be deducted from any payments due or to become due the Contractor for each day s delay in completing the whole or any specified portion of the work beyond the time allowed in the Contract Specifications 1 25 Manual On Uniform Traffic Control Devices California The Calif
60. 1 Description Mobilization shall consist of preparatory work and operations including those necessary for the movement of personnel equipment supplies and incidentals to the project site for the establishment of all offices buildings and other facilities necessary for work on the project and for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items on the project site Mobilization shall conform to the requirements of Section 11 Mobilization of the State Standard Specifications The following references therein shall have the meanings given below Section 7 1 17 Acceptance of Contract shall mean Section 8 14 Acceptance of Contract of these Standard Specifications Section 9 1 06 Partial Payments shall mean Section 9 6 Partial Progress Payments and Retentions of these Standard Specifications Section 9 1 07 Payment after Acceptance shall mean Section 9 12 Payment of Retention of these Standard Specifications City of Clovis Standard Specifications 2009 87 SECTION 12 TRAFFIC CONTROL CONSTRUCTION TRAFFIC CONTROL DEVICES 12 1 General This work shall consist of providing for the convenience and safety of traffic in connection with the Contractor s operations Traffic control shall be furnished provided and maintained in accordance with Section 12 2 01 Traffic Control Plan Notifications b
61. 40 or cast iron conforming to the provisions ASTM A126 for Class B The valve disc shall be secured to the shaft by means of solid smooth sided stainless steel or Monel taper pins or dowel pins having a circular cross section Each taper or dowel pin shall extend through the shaft and shall be mechanically secured in place The use of bolts setscrews knurled or fluted dowel pins expansion pins roll pins tension pins spring pins torque plugs or other devices in lieu of the specified pins will not be allowed Butterfly valve discs shall have a continuous stainless steel edge welded or applied to the disc as specified in AWWA C504 The twin wire arc method for applying the stainless steel edge to the disc is not allowed Manual actuators shall be worm gear or traveling nut style that must be within 4 turns of having at least 2 turns per diameter inch of the valve size to rotate the disc 90 degrees Actuators shall be of totally enclosed self locking worm gear or traveling nut type with adjustable stops factory set to limit disc travel Actuator cases shall be designed for installation and operating in a buried or submerged location and shall be fully gasketed sealed and grease packed Actuators shall be capable of withstanding and external water pressure of 10 psi without leakage to the interior of the operator Actuators shall be sized to produce a torque of 1 5 times the required valve torque The required valve torque shall be based o
62. 639 Hz 0 119 Hz for Class signals and 14 035 Hz 0 255 Hz for Class signals c Establishing the validity of received signals on the basis of frequency and length of time received A signal shall be considered valid only when received for more than 0 50 second No combination of Class signals shall be recognized as a Class II signal regardless of the number of signals being received up to a maximum of ten signals Once a valid signal has been recognized its effect shall be held by the module in the event of temporary loss of the signal for a period adjustable from 4 5 seconds to 11 seconds in at least 2 steps at 5 seconds 0 5 second and 10 seconds 0 5 second d Providing an output for each channel that will result in a low or grounded condition of the appropriate input of a Model 170 controller unit For Class signals the output shall be a 6 25 Hz 0 1 percent rectangular waveform with a 50 percent duty cycle For Class II signals the output shall be steady Each discriminator module shall receive electric power from the controller cabinet at either 24 volts DC or 120 volts AC Each channel together with its associated detectors shall draw not more than 100 milliamperes at 24 volts DC or more than 100 milliamperes at 120 volts AC Electric power one detector input for each channel and one output for each channel shall terminate at the printed circuit board edge connector pins listed below City of Clovis Standard S
63. 8 13 or suspension by City under Section 8 11 Temporary Suspension of the Work shall not act as a waiver of any claims by City against Contractor or others for damages based on breach of contract negligence or other grounds Contractor does not have the right to terminate the Contract or to suspend or slow down its performance of the Work If Contractor believes that it is entitled to additional compensation money and or time for any reason or that it has been wronged for any reason then it may submit a request for additional compensation and or modification of the Contract however despite such requests as Contractor may make or disputes as may exist Contractor shall continue to diligently prosecute the Work and acceptably perform the Work as required by the Contract through completion 8 14 Acceptance Of Contract When the Engineer has made the final inspection as provided in Section 5 22 Final Inspection and determines that the Work has been fully performed the Engineer will certify the Work as ready for Acceptance and recommend that the City Council formally accept the Work and immediately upon and after the Acceptance of the Work by the City Council the Contractor will be relieved of the duty of maintaining and protecting the work as a whole and the Contractor will not be required to perform any further work thereon except for warranty work and the Contractor shall be relieved of the responsibility for injury to persons or
64. Association ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials AWG American Wire Gage AWPA American Wood Preservers Association AWS American Welding Society AWWA American Water Works Association EIA Electronic Industries Association IEEE Institute of Electrical and Electronics Engineers NEMA National Electrical Manufacturers Association UL Underwriters Laboratories Inc 1 2 Acceptance The formal acceptance by the City Council of an entire contract which has been completed in all parts and requirements in accordance with the Plans and Specifications and any modifications thereof previously approved The Notice of Completion shall mean the document recorded with the Fresno County Recorder indicating the formal acceptance of a specified Contract 1 3 Base A layer of specified material of planned thickness placed immediately below the pavement or surfacing City of Clovis Standard Specifications 2009 1 1 4 Basement Material The material in excavation or embankments underlying the lowest layer of subbase base pavement surfacing or other specified layer which is to be placed See Section 1 44 Subgrade 1 5 Bidder Any individual firm partnership corporation or combination thereof submitting a proposal for the work contemplated acting directly or through a duly authorized representative 1 6 California Manual On Uniform
65. Christy Model N48T with two extensions two piece bolt down lid The lid shall be inscribed Communications Fiber Optic Pullboxes shall be installed at the locations and in conformance with the details shown on the Plans Where shown on the Plans or specified in the Contract specifications bonding and grounding shall be provided conforming to the provisions of Section 86 19 Bonding and Grounding Fiber optic conduit tracer wire ends shall not be connected nor grounded in pullboxes City of Clovis Standard Specifications 2009 231 Installation of pullboxes shall comply with the following special requirements 1 The joints between the pulbox and extensions and between the extensions shall be grouted A layer of roofing paper shall be wrapped around the outside of the pullbox and extensions before backfilling 2 The Contractor s attention is directed to Section 86 2 06C Installation and Use of the State Standard Specifications Conductors and Fiber Optic Cables shall not be installed in the pullbox prior to grouting the pullbox A sump consisting of clean inch crushed gravel shall be installed beneath the pullbox The sump and gravel shall be 12 inches deep and extend 6 inches beyond the outside edges of the pullbox 4 The bottom of the pullbox shall consist of a 1 inch minimum thickness non shrink grout placed over a layer of roofing paper installed between the grout and the gravel sump The grout s
66. City contracts and other non City work done under Encroachment Permit private development including subdivisions contractors shall comply with Section 5 13 Electric and Water Service and Section 17 Water Use Contractors will be charged for City water used This includes water taken through hydrant meters for construction purposes and water taken through water meters for irrigation system testing and landscape planting up to and including the 90 day maintenance period specified in Section 20 8 Maintenance Period These specifications shall apply to all areas to receive landscape planting including park sites street median islands trails or paseos street park strips street landscape strips and any other area shown on the Plans to receive landscape planting 20 1 02 Inspection All of the work described herein will be subject to inspections by an Engineering Division inspector and specialized City Parks Division personnel as ordered by the Engineer Such specialized inspections will be made of items including but not limited to the following a Grading b Imported soil and soil amendments prior to and during incorporation into work c Weed control operations prior to planting d Placement and arrangement of plant materials prior to planting e Condition of plant material prior to placement f Digging and preparation of plant holes for trees g Planting and staking of trees h Inspection during
67. DBY waterproof sealing packets or approved equal An expansion loop of 20 inches minimum shall be provided at each wire connection and or directional turn unless otherwise specified Wiring shall occupy the same trench and shall be installed along the same route as and underneath the pressure supply lines whenever possible All wire splices in field runs shall be located in valve boxes and indicated on the as built plans Control wires shall be identified at the controller A separate common wire shall be installed for each controller 18 Automatic Controller Electrical and Solar Controllers shall be fully automatic in operation and shall be of the type and performance as specified on the Plans or in the Contract Specifications Each controller shall have the capacity to operate the number of valve stations indicated on the Plans Controllers shall be certified by Underwriters Laboratories and bear their stamp of approval Controllers shall be programmable for the various operations as indicated on the Plans or as specified in the Contract Specifications including programmable master valve and pump on off functions when such equipment is specified City of Clovis Standard Specifications 2009 152 19 Gate Valves Gate valves shall be of the type and performance as specified on the Plans 20 Backflow Prevention Unit The backflow prevention unit shall be a reduced pressure principle device The backflow prevention unit
68. DEVIATIONS 00 00 15 4 6 EXISTING FACILITIES AND STRUCTURES SHOWN ON 00 200044 4 2 20 15 4 7 OMISSIONS IN PLANS AND SPECIFICATIONS 15 4 8 INCORPORATION OF REFERENCED SPECIFICATIONS 6 0000 15 4 9 WORK TOBE DONE sind Dee a an 15 4 100 CHANGES 52 0 ce AG att Ko IIR xtra lo Reh 17 4214 EXTRA WORK css 17 4 12 NOTICES CHANGE ORDERS AND CLAIMS 0 0 08 17 4 13 INTERIM 23 SR A 25 SECTION 5 CONTROL OF WORK 26 AUTHORITY OF LHE ENGINEER 26 529S TANDARDS 4 1556 26 5 3 CONTRACTOR S RESPONSIBILITY FOR THE 26 5 4 CONTRAGTIOR S EQUIPMENT Actas nn ented oe 26 5 5 9 26 5 6 cd 27 5 7 SUPERINTENDENC
69. EXCAVATION c cccccessescesecersesceeccaeecesvarcaeeseeveaecarserseaeerserevaneneesarverenaesanes 154 2127 INSTALA TON er ee 154 21 8 PRESSURE TEST c ccscescsscsscsecceccececccesscssecarsescusceencaecscesaeseeenaesarsesevaesaeseneaecaeesaeenaeeareeses 160 21 9 BACKFILL AND 0 0 0 AEAEE orrara earann arreen 160 21 10 SYSTEM TESTING ADJUSTMENT 06 161 21 11 00000 162 City of Clovis Standard Specifications 2009 21 12 0 0 deere tae 163 21 13 COMPLETION dott a eTa 163 21 14 SVSTENEG UARANTEE 163 21 15 MEASUREMENT AND PAYMENT cccssscsssesscscscsssessssesesssesecsesssacsesssassesesesecacsesaacaeseseseees 164 SECTION 22 FINISHING ROADWAY 165 SECTION 23 BLANK 165 SECTION 24 LIME STABILIZATION 166 SECTION 25 AGGREGATE SUBBASES 166 SECTION 26 AGGREGATE BASES 166 SECTION 27 CEMENT TREATED BASES 166 SECTION 28 LEAN CONCRETE BASE 166 SECTION 29 TREATED PERMEABLE BASES 166 SECTION 30 THROUGH 36 BLANK 166 SECTION 37 BITUMINOUS SEALS 167 SECTION 38 BLANK 167
70. F and a minimum average thickness of 45 mils The jacket shall be marked as required by IPCEA NEMA d The finished outside diameter of the cable shall not exceed 0 35 inch e The capacitance as measured between any conductor and the other conductors and the shield shall not exceed 48 picofarads per foot at 1 000 Hz f The cable run between each detector and the controller cabinet shall be continuous without splices or shall be spliced only as directed by the detector manufacturer City of Clovis Standard Specifications 2009 300 4 Data Encoded Discriminator Phase Selector Module Each data encoded discriminator phase selector module shall be designed to be compatible and usable with a Model 170E controller unit and to be mounted in the input file of a Model 332 controller cabinet and shall conform to the requirements of Chapter of the State of California Department of Transportation Traffic Signal Control Equipment Specifications dated April 1978 and to all addendums thereto current at the time of project advertising Each discriminator module shall be capable of operating two channels each of which shall provide an independent output for each separate input Each discriminator module which used with its associated detectors shall be capable of a Receiving Class signals at a range of up to 1 000 feet and Class II signals at a range of up to 1 800 feet b Decoding the signals on the basis of frequency at 9
71. Inspection Installed Pipe Interior The Contractor shall furnish closed circuit television equipment for an interior inspection of the newly installed sewer mains The television inspection of the sewer mains shall be made after leakage and deflection tests have been performed and prior to placing of street aggregate base or asphalt paving Any broken pipe separation of joints or any pipe exceeding the permitted tolerances for line and grade shall be replaced or repaired Any pipe repaired or replaced shall be retested for leakage and deflection A DVD disc showing the initial video inspection as well as any retests shall be provided to the City at no additional cost The Contractor shall be responsible for all costs associated with furnishing the television inspection and making final repairs to the sewer mains and re inspection utilizing the closed circuit television equipment 64 11 Alignment Changes Separation Criteria All non potable water mains which include sanitary sewers sewer force mains recycled water mains storm drains and potable water mains must meet the separation standards of the California Waterworks Standards contained in Section 64572 Title 22 of the California Administrative Code or shall be installed in accordance with alternate construction criteria as specified therein Included in the Appendix to these Specifications is a document titled Guidance Memo No 2003 02 Guidance Criteria for the Separation of Water
72. Mains and Non Potable Pipelines published by the California Department of Health implementing said Section 64572 This document sets forth minimum spacing requirements between drinking water pipelines and sewer and other non potable water pipelines and has been used to set the location of the sewer main In the event that field conditions require a change in the planned alignment horizontal or vertical of the sanitary sewer under no circumstances shall a change be made without obtaining the express and written approval of both the City inspector and the City Design Engineer Any change so authorized must comply with the Guidance Memo 64 12 Measurement Measurement for sewer main installation and service lateral installation shall be by the lineal foot of pipe installed and shall be the actual horizontal length installed measured through wye fittings Wyes will not be measured separately when constructed with a lateral Where wyes are to be installed for future lateral connections measurement for wye fittings shall be per each wye fitting installed Measurement for manholes shall be per each manhole installed 64 13 Payment The unit price bid per lineal foot for sewer mains shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as set forth in these Specifications and the Contract Specifications and as directed by the Engine
73. PRECAST PIPE CONDUIT 0 cccccccsssscsesesecececscsesacseseseecseseeeeaees 119 19 3 03 A 2 FINAL BACKFILL PRECAST PIPE CONDUIT ccccccscscsssscsesesecccecscsesacseseseeecaeseeeeases 119 19 3 03 A 3 BACKFILL CAST IN PLACE PIPE cccsssssscsesesececscscsesscaesesesesecsesesecaesesanecsesesesesee 119 19 3 03 B STRUCTURE BACKEILD sie 119 19 3 03 C SLURRY CEMENT BACKFILL si 120 19 3 03 D PERVIOUS BACKFILE 120 19 3 03 COMPACTION ap Ba edd 120 19 3 03 120 19 3 04 PROGRESS OF WORK TRENCH AND STRUCTURE EXCAVATION 120 19 3 05 RESTORATION OF SURFACES 2 121 19 83 06 MEASUREMENT 123 19 3 07 PAYMENT Wises We eat 124 19 4 EMBANKMENT 124 19 4 01 GENERAL i ve Weed eae 124 19 4 02 IMPORTED BORROW 125 19 403 PLACING 125 19 4 04 lt ole he 126 19 42 05 58 126 19 206 PAYMENT 127 SECTION 20 LANDSCAPE PLANTING 1
74. Payment The unit price bid per lineal foot for water mains shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as set forth in the Specifications and as directed by the Engineer This shall include furnishing and installing the pipe and fittings installing concrete thrust blocks trenching backfilling compacting sterilization hydrostatic pressure testing water and all incidentals The unit price bid per each for gate or butterfly valves shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as set forth in the Specifications and as directed by the Engineer This shall include furnishing and installing the valve valve box and valve extension installing concrete thrust blocks trenching backfilling compacting testing sterilization pressure testing water returning and installing valve box to final grade following trench surface restoration street or alley construction or reconstruction and all incidentals The unit price bid per each for fire hydrants complete shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as set forth in the Specifications and as directed by the Engineer This shall
75. Plans or specified in the Contract Specifications the entire area within the project limits shall be cleared and grubbed by the City of Clovis Standard Specifications 2009 104 Contractor No payment will be made to the Contractor for clearing grubbing outside these limits unless such work is authorized by the Engineer All of the work shown on the Plans and included in the Specifications that is located in public streets alleys parks trails or other public rights of way of the City of Clovis shall be done in accordance with City ordinances regulating the use of public rights of way within the City except as otherwise provided in these Specifications The Contractor shall comply with all regulations and requirements of the City of Clovis and shall conduct his operations in compliance therewith Within the limits of Clearing and Grubbing the area above the natural ground surface shall be cleared of all vegetation such as trees logs upturned stumps roots of down trees brush grass weeds and other organic material or other objectionable material as determined by the Engineer The provisions of Section 20 1 03 Rough Grading apply for special treatment of grass weeds and other organic material in projects involving landscape planting Within the limits of Clearing and Grubbing the area below the natural ground surface shall be grubbed to a depth necessary to remove all stumps large roots buried logs all other org
76. Pruning Prune all roots to a depth of 2 feet Pruning location shall be 6 inches inside the tree spade circumference Pruning shall be performed at least sixty 60 days prior to the anticipated spading date or as directed by the Engineer The rootball soil shall be kept moderately moist during this period All pruning cuts shall be clean cut Any torn root endings shall be trimmed back to create clean cuts 20 6 03 B Branch Pruning Pruning objectives shall be to reduce foliage 10 to 25 to remove crossing branches and to remove branches that will interfere with future branch spacing All cuts shall be performed in accordance with ANSI Pruning Standards ANSI A300 Part 1 All cuts shall be clean with no ragged edges and shall be made just outside the branch collar Tree wound dressing shall not be applied to the newly exposed wood Trimming shall be to a branch no smaller than one half the size of the branch being removed Limbs with diameter larger than one quarter the diameter of the trunk or branches larger than 6 inches shall not be removed unless said removal has been determined by the Engineer to be necessary to provide tree spade access Limbs shall be tied from the top down as required to prevent injury during handling and transport 20 6 03 C Rootball The Contractor shall spade the rootball on the day of transplanting The treespade shall be centered around the tree Cuts made by the spade shall be clean spades shall close
77. Reinforced concrete pipe jacked into place without steel casing shall not vary from theoretical alignment and grade at the time of completion of jacking by more than 6 inches in 100 feet for storm drain and 1 inch in 100 feet for sanitary sewer carrier pipe 68 7 Frac Out Contingency Plan Unless otherwise specified in the Contract Specifications a Frac Out Contingency Plan will be required Such Plan shall be prepared in accordance with the following provisions and submitted to the Engineer For jack and bore tunneling activities that use drilling lubricants the Contractor shall prepare and implement a contingency plan that is intended to minimize the potential for a release of drilling lubricant frac out associated with tunneling activities provide for the timely detection of frac outs and ensure an organized timely and minimum impact response in the event of a frac out and release of drilling lubricant The contingency plan shall include at a minimum the following measures 1 A full time monitor shall attend all drilling to look for observable frac out conditions or lowered pressure readings on drilling equipment 2 If a frac out is identified all work shall stop including the recycling of drilling lubricant In the event of a frac out into water the pressure of water above the tunnel may keep excess mud from escaping through the fracture The location and extent of the frac out shall be determined and the frac out shall be mon
78. Section 7 7 Water Pollution Prevention The costs for Maintaining Drainage by the Contractor shall be included in the amount bid for the various items of work no separate payment will be made therefor 5 17 Inspection During Construction Meetings As provided in Section 5 1 Authority of the Engineer the Engineer will delegate authority to a representative Inspector who shall at all times have access to the work during construction and shall be furnished with every reasonable facility for ascertaining full knowledge relative to the progress workmanship and character of materials used and employed in the work The Contractor shall provide facilities necessary to ensure the safety of the Engineer City inspectors and the personnel of authorized testing firms as appropriate The City and its agents employees inspectors and testing firms may videotape audiotape or photograph any aspect of the Work or Contractor s activities as part of their documentation of the project and certain issues Whenever the Contractor varies the day or period of the day during which work is performed he shall give due notice to the Engineer or Inspector so that proper inspection may be provided Any work done in the absence of the Engineer or Inspector is subject to rejection For non public work conducted under a City Permit reference is made to Section 7 2 03 of the City of Clovis Municipal Code regarding inspection fees and re inspection fees
79. Standard Specifications 2009 183 65 6 Leakage Testing After completing the installation backfill and compaction of a section of sewer force main and after all other underground utilities including City other agency and privately owned utilities are in and compacted but prior to the placement of aggregate base or asphalt concrete pavement and prior to conducting the deflection tests and video inspection as required herein the Contractor shall at his expense conduct a leakage test using hydrostatic pressure The test shall be performed in accordance with the procedures set forth in Section 66 12 Hydrostatic Pressure Test and under the supervision of the Engineer The Contractor shall provide all water necessary for hydrostatic testing in conformance with the provisions in Section 17 Water Use The Contractor shall make all arrangements and pay all fees necessary for the lawful disposal of water discharged during hydrostatic testing operations Water so discharged may be used by the Contractor for construction purposes with the prior written approval of the Engineer The length of installed sewer force main which has not passed hydrostatic testing at any particular time during work under Contract shall not be more than 1 400 lineal feet unless specifically directed or allowed otherwise by the Engineer in writing The Contractor shall provide additional lengths of restrained pipe and or other measures and facilities as may b
80. Standard Specifications and these Standard Specifications Mounting assemblies shall closely match the curvature of the pole All set screws exposed to weather shall be zinc or cadmium plated and have square heads Mounting assemblies shall consist of bronze terminal compartments with galvanized steel conduits and ductile iron fittings Slipfitter attachments MAS MAT shall be bronze Where the signal heads are equipped with adjustment locking serrations the mating surface of the mounting hardware shall be provided with matching serrations Mountings shall be as stated in D O T Standard Plans ES 4A ES 4B ES 4C and ES 4D Clam shell mountings shall not be used After installation of signal facilities if bolt threads extend more than 1 inch beyond nut bolts shall be cut to three threads beyond nut and painted with unthinned zinc rich paint conforming to the requirements of Section 91 Paint of the State Standard Specifications All adjustable mast arm signal mountings shown on plans shall be similar to the Pelco Astro Brac AB 3008 clamp kit using a 6 inch tenon length with a 2 3 8 inch O D for plumbizer mount Installation of the Astro Brac shall be in accordance with the manufacturer s recommendations If the Astro Brac tenon is removed or changed any way new straps shall be installed when Astro Brac is reused or adjusted 86 28 Pedestrian Push Buttons Pedestrian push buttons shall conform to Section 86 5 02 Pedestrian
81. TRAVEL AND SUBSISTENCE 46 2 D PAYROLL RECORDS eed eed 46 7 2 E LABOR NONDISCRIMINATION 49 7 2 APPRENTICES 49 7 2 G WORKERS COMPENSATION 50 7 2 H SUITS TO RECOVER PENALTIES 50 7 3 CONTRACTOR S LICENSING 5 50 7 4 CONTRACTOR S INSURANCE REQUIREMENTS AND HOLD HARMLESS 50 725 VEHICLE de ttn Gh eee RG een Ge ae heed ee 54 7 6 AIR POLLUTION CONTROL 5 statin heed eldest di ddan 54 7 7 WATER POLLUTION 22 54 7 7 A STORM WATER POLLUTION PREVENTION PLAN SWPPP REQUIREMENTS 55 7 7 A 1 PREPARATION OF A NOI AND VICINITY 55 7 7 A 2 PREPARATION OF A STORM WATER POLLUTION PREVENTION PLAN SWPPP 55 7 7 A 3 IMPLEMENTATION OF 56 T A SITE STABILIZATION 56 7 7 A 5 PREPARATION OF NOT AND POST CONSTRUCTION STORM WATER MANAGEMENT PLAN 56 TB EPAYMENT o L 56 1 8
82. Traffic Control Devices California MUTCD The California Manual on Uniform Traffic Control Devices for streets and highways dated September 26 2006 and amendments thereto Supersedes the MUTCD and MUTCD California Supplement 1 7 City Owner The City of Clovis California acting as a municipal corporation and or a trustee for improvement districts within the City The term Owner and City shall have the same meaning 1 8 Completion A For purposes of a Notice of Completion and Civil Code sections 3082 3106 and 3179 3214 completion means the date of acceptance of the Work as complete by the City Council pursuant to Civil Code section 3086 B For purposes of retention release under Public Contract Code section 7107 completion means any of the following 1 The occupation beneficial use and enjoyment of a work of improvement excluding any operation only for testing startup or commissioning by the public agency or its agent accompanied by cessation of labor on the work of improvement 2 The acceptance by the public agency or its agent of the work of improvement 3 After the commencement of a work of improvement a cessation of labor on the work of improvement for a continuous period of 100 days or more due to factors beyond the control of the contractor 4 After the commencement of a work of improvement a cessation of labor on the work of improvement for a continuous period of 30 days or more if
83. Use of these Standard Specifications no additional payment will be made for water used in making or applying Dust Palliative City of Clovis Standard Specifications 2009 109 SECTION 19 EARTHWORK 19 1 General 19 1 01 Description This work shall consist of all excavation grading removal and replacement of material placement of embankment subgrade preparation and compaction and all other operations required in the construction of the finished earth surface for roadways and other surface improvements including performing all operations necessary to excavate all materials regardless of character and subsurface conditions from the roadway or areas adjacent thereto excavation backfill compaction and restoration of surfaces of trenches for the placement of pipelines conduits and other utilities including but not limited to pipelines for sewer water non potable water storm drains irrigation and fiber optic conduits excavation backfill compaction and restoration of surfaces for the construction or installation of structures excavation of drainage and irrigation ditches and channels excavation of selected material from the roadway and borrow material for use as specified construction of embankments including the placing of selected material and imported borrow in connection therewith as specified backfilling holes pits and other depressions within the roadway area applying water removing and replacing unsuitable mater
84. after the advertisement for the contract the Engineer will not accept the proposal and the City reserves the right to make the changes without compensation to the Contractor under the provisions of this section The Contractor shall continue to perform the work in accordance with the requirements of the contract until an executed change order incorporating the cost reduction proposal has been issued If an executed change order has not been issued by the date upon which the Contractor s cost reduction proposal specifies that a decision thereon should be made or such other date as the Contractor may subsequently have specified in writing the cost reduction proposal shall be deemed rejected The Engineer shall be the sole judge of the acceptability of a cost reduction proposal and of the estimated net savings in construction costs from the adoption of all or any part of the proposal In determining the estimated net savings the right is reserved to disregard the contract bid prices if in the judgment of the Engineer those prices do not represent a fair measure of the value of work to be performed or to be deleted The City reserves the right where it deems such action appropriate to require the Contractor to share in the City s costs of investigating a cost reduction proposal submitted by the Contractor as a condition of considering the proposal Where this condition is imposed the Contractor shall indicate acceptance thereof in writing and tha
85. and couplings shall be compatible with those used for pipe joints Spigots shall have a home mark to indicate proper penetration when the joint is made Elastomeric gaskets shall conform to the provisions in ASTM F477 for thermoset elastomeric gaskets and these specifications Gaskets shall be factory installed by the pipe manufacturer and shall be specifically intended for use with the pipe Gaskets shall be manufactured from a synthetic elastomer containing not less than 50 by volume of first grade synthetic rubber The remainder of the compound shall consist of pulverized fillers free of rubber substitutes reclaimed rubber and deleterious substances A gasket shall contain no more than one splice A splice shall be made by applying a suitable cement to the ends and vulcanizing the splice in a full mold 64 2 3 Test Requirements During production of the pipe the pipe manufacturer shall perform the tests specified in ASTM D3034 A certificate of compliance with specification requirements shall be provided by the manufacturer for each lot of pipe from which pipe is delivered and shall be delivered with the pipe The certificates of compliance shall include the test results The Contractor shall submit the certificates of compliance to the Engineer prior to commencing excavation for installation of the pipe In addition when so directed by the Engineer the Contractor shall obtain PVC compound samples and shall provide test specimens
86. and Hold Harmless Section 7 16 Injury or Damage to Persons or property and Section 8 15 Utility and Non Street Facilities Potholing 15 1 02 A Traffic Signal Detection Loops Traffic Signal Detection Loops may exist as far as 300 feet or more from a signalized intersection After calling for USA mark outs the Contractors working within such an area must meet with the City Traffic Signal Technician at the project site to physically review all detection loops in the area in order to minimize damage to the existing loops that are to remain Any loops that are to remain which are damaged by the Contractor s operation shall at the Contractor s expense be replaced in accordance with the provisions in Section 86 Traffic Signals and Intersection Safety Lighting and as directed by the Engineer 15 2 Miscellaneous Facilities 15 2 01 Description Miscellaneous facilities shall include all structures drainage irrigation water and sewer facilities water wells or cisterns drain wells septic tanks or pits leach fields right of way and traffic control facilities including traffic signal detection loops mail boxes fences walls survey monuments corners or other markers private driveways or approaches and any other miscellaneous improvements or facilities not mentioned in this Section 15 2 but located within the area to be cleared and grubbed constructed or reconstructed except concrete bridges and concrete culverts whic
87. and other depressions backfilling excavations resulting from the removal of structures and other facilities or replacement of unsuitable material will be paid for in accordance with Section 15 Removing Existing Facilities Section 16 Clearing and Grubbing and Section 19 2 07 Subgrade Preparation Compaction City of Clovis Standard Specifications 2009 127 SECTION 20 LANDSCAPE PLANTING 20 1 General 20 1 01 Description Landscape planting shall consist of performing all work necessary for soil and bedding preparation furnishing planting and establishing all forms of landscaping as shown on the Plans as specified in the Specifications and in conformance with the applicable Standard Drawings The work shall include planting of seed for turf placing sod planting trees shrubs plants and ground cover transplanting trees plants and shrubs The work shall also include furnishing all labor materials such as support posts straps and stakes fertilizer soil amendments tools equipment and transportation maintenance and watering of the planted materials during the required plant establishment and maintenance periods watering for dust control clean up of the work site and any other incidental materials or work required to complete all of the work involved in landscape planting all as shown on the Plans and as specified in these Specifications the Contract Specifications and as directed by the Engineer For
88. and property damage products and completed If Commercial General Liability operations This coverage is insurance or other form with a general to be maintained for 10 years aggregate limit is used either the after the completion of the general aggregate limit shall apply Contract separately to this project location or the general aggregate limit shall be twice the required occurrence limit 2 Automobile Liability 1 000 000 accident for bodily injury and property damage Workers Compensation As required by the State of California 4 Employer s Liability 1 000 000 accident for bodily injury disease 5 Builder s Risk when required Completed value of the project with no coinsurance by the Contract penalty provisions Specifications City of Clovis Standard Specifications 2009 51 6 Professional Liability 1 000 000 as needed for design build This coverage is to be maintained for 3 years after expiration of the Contract These amounts are standard amounts and may vary by project Unless otherwise specified in the Contract Specifications the Contractor shall provide the coverage amounts above specified Deductibles and Self Insured Retentions Any deductibles or self insured retentions must be declared to and approved by the City At the option of the City either a the insurer shall reduce or eliminate such deductibles or self insured retentions as respects the City its officers officials
89. any PVC pipe and fittings more than 2 years old from the date of manufacture PVC pipe that is stored for more than 3 weeks under conditions that may subject the pipe to sunlight or other sources of ultraviolet light shall be covered or otherwise protected from such exposure to prevent pipe material degradation ultraviolet radiation The foregoing shall also apply to elastomeric gaskets 64 2 5 Vitrified Clay Pipe Vitrified clay pipe and fittings shall only be used if required by the Plans or Contract Specifications In such case vitrified clay pipe shall be extra strength bell and spigot and shall conform to ASTM Specification Designation C 700 with preformed factory fabricated plastisol joints complying with ASTM Specification Designation C 425 04 Vitrified clay sewer pipe shall also conform to standards of the Clay Products Institute 64 2 6 Manhole Materials Cast in Place Concrete Concrete for cast in place manholes shall be Class 2 concrete conforming to the provisions in Section 90 of the State Standard Specifications unless otherwise shown on the Plans or specified in the Contract Specifications Portland cement shall be Type II low alkali sulfate resistant conforming to the provisions in ASTM C150 Slump shall not exceed 3 inches Before using concrete the Contractor shall submit in writing to the Engineer a copy of all mix designs Precast Reinforced Concrete Manhole Sections Precast reinforced concrete manhole sections for man
90. at all times 17 3 Chemical Additives If the Contractor elects to do so chemical additives may be used in water for compaction If chemical additives are used furnishing and applying the additives shall be at the Contractor s expense The right is reserved by the Engineer to prohibit the use of a particular type of additive to designate the locations where a particular type of additive may not be used or to limit the amount of a particular type of additive to be used at certain locations all if the Engineer has reasonable grounds for believing that such use will in any way be detrimental 17 4 Payment Full compensation for developing and furnishing water in compliance with this Section 17 shall be considered as included in the various contract items of work requiring water including water required for irrigation systems testing and landscape watering through the 90 day maintenance period No additional compensation will be paid therefor In accordance with Section 4 10 Changes no separate or additional compensation for developing and furnishing additional water will be made for any increase or decrease in the quantity of water required regardless of the reason for such increase or decrease City of Clovis Standard Specifications 2009 108 SECTION 18 DUST PALLIATIVE Dust palliative shall be as specified in Section 18 Dust Palliative of the State Standard Specifications except that in accordance with Section 17 Water
91. be manufactured with standard cast iron pipe outside diameters and the nominal laying length shall be 20 feet The pipe shall be green in color and shall be factory marked to indicate that it conveys wastewater not for potable use 65 2 2 DI Pipe Ductile iron DI pipe for sewer force mains shall be either Thickness Class 50 or Pressure Class 250 for pipe 16 inches in diameter or smaller and either Thickness Class 50 or Pressure Class 200 for pipes larger than 16 inches in diameter conforming to the provisions in Section 66 Potable Water Distribution Facilities of these Specifications and the Contract Specifications The pipe shall be manufactured with standard cast iron pipe outside diameters and the nominal laying length shall be 18 feet The interior surface of all DI pipe and fittings for sewer force mains shall be lined with a factory applied lining of either City of Clovis Standard Specifications 2009 181 1 Protecto 401 ceramic epoxy lining a product of Induron Coatings Inc www protecto401 com having a nominal thickness no less than 40 mils or 2 PolybondPlus composite fusion bonded epoxy and polyethylene lining a product of American Cast Pipe Company www acipco com having a nominal thickness no less than 60 mils or approved equal Factory application of the lining and any necessary field applications for repairs shall conform to the recommendations of the lining manufacturer and the pipe manufac
92. be performed in accordance with an approved test plan Any material or equipment that fails to meet the requirements of the contract shall be repaired or replaced and the test shall be repeated until satisfactory All functional test results including results of failed tests or re tests shall be submitted and delivered with all material and equipment delivered to the site City of Clovis Standard Specifications 2009 244 Full performance tests shall be performed by the manufacturer by the Contractor on not less than five 5 percent or at least one 1 unit of material selected at random from the normal production run The full performance test shall be performed in accordance with a test plan developed by the Contractor and approved by the Engineer D Subsystem Testing Subsystem testing shall encompass the testing of all material equipment and cable after installation but prior to acceptance tests These tests shall be done in accordance with the performance testing called out under each individual item in these special provisions Equipment and hardware shall be installed in accordance with the plans and special provisions All material equipment and cable shall be tested after installation at the site Subsystem testing and inspections shall include visual inspection for damaged or incorrect installation adjustments and alignment and measurement of parameters and operating conditions The Contractor shall notify the Engineer of h
93. be moistened prior to seeding and the seed shall be distributed in an even uniform manner Seed shall be planted using a mechanical drill seeder such as a Brillion or a Culti Pack type device Broadcast type equipment may be used only for overseeding in established turf areas For both types of planting seed beds shall be kept continually moist after planting The time interval between water off and water on irrigation is to be governed strictly by the amount of surface moisture 20 2 04 Planting Turf Sod Where shown on the plans or specified in the Contract Specifications turf sod shall be furnished and planted in accordance with these specifications The variety of sod shall be a premium quality Bermudagrass approved by the Engineer Sod shall be installed in accordance with the following a Irrigate areas to receive sod to a depth of 2 inches prior to installation Sod is not to be planted on dry soil b Sod must be installed within 8 hours of delivery to the job site Protect stored or unused sod from damage by heat sunlight or any other adverse condition City of Clovis Standard Specifications 2009 135 Handle sod with care Torn pieces must have ends cut straight Pieces smaller than 24 inches in length are to be used only for patching or repairs d Lay sod evenly in a staggered pattern of strips so that the roll ends are consistently at different locations Lay and fit sod so that all end joints and cut
94. cabinet as shown on the plans using six 6 3 8 diameter zinc plated or stainless steel hex head cap screws with flat washers lock washers and hex nuts as required A raceway for the interconnecting cables and wiring between the battery cabinet and the controller cabinet shall be provided by appropriately sized zinc plated malleable iron chase bushings installed between the two cabinets Chase bushings shall be equipped with steel locknuts and plastic insulating bushings The battery cabinet exhaust fan shall be connected to terminals T1 3 AC and T1 5 AC in the controller cabinet by means of two No 14 AWG conductors 86 49 Measurement And Payment Unless otherwise specified in the Contract Specifications Traffic Signal and Safety Lighting Installations will be measured and paid for on a lump sum basis Where more than one traffic signal installation location is included in the contract each signal installation location will be identified and paid for separately Payment shall include all costs for a complete installation as shown on the Plans and as specified in the Contract Specifications all to the satisfaction of the Engineer including all labor materials and incidentals required for a complete and functioning signal system City of Clovis Standard Specifications 2009 313 SECTION 87 BLANK City of Clovis Standard Specifications 2009 314 MATERIALS SECTION 88 ENGINEERING FABRICS Engineering fabrics shall be
95. changes in direction of the mainline pipe 2 Lateral line Irrigation Pipe All lateral line or non pressure line plastic pipe shall be standard weight class 200 polyvinyl chloride PVC 1120 normal impact All plastic pipe shall conform to current National Sanitation Foundation NSF Pipe Size IPS standards and American Society for Testing amp Materials ASTM requirements Pipe shall be of improved white rigid compound as manufactured by Lasco Industries or approved equal City of Clovis Standard Specifications 2009 150 3 Pipe Identification All pipe shall be continuously and permanently marked with the following information a Manufacturer s name or trademark b Nominal pipe size c Schedule and type of pipe d Pressure rating in PSI and NSF seal of approval 4 Plastic Pipe Fittings and Connections All plastic fittings shall be white rigid PVC combination Type and grade standard weight schedule 40 and or have working pressure rating no lower than that of the pipe The sockets must conform to the outside diameter of the pipe as recommended by the pipe manufacturer All plastic fittings and connectors shall be injection molded of an improved PVC compound featuring high tensile strength high chemical resistance and high impact strength in terms of current ASTM standards for such fittings and as manufactured by Lasco Industries or approved equal Where threads are required in pl
96. date of completion of the contract 7 2 E Labor Nondiscrimination The Contractor shall comply with Section 1735 of the Labor Code which reads as follows No discrimination shall be made in the employment of persons upon public works because of the race religious creed color national origin ancestry physical handicap medical condition marital status or sex of such persons except as provided in Section 12940 of the Government Code and every contractor for public works violating this section is subject to all the penalties imposed for a violation of this chapter The Contractor shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the contract 7 2 F Apprentices The Contractor and subcontractors shall comply with the provisions in Sections 1777 5 1777 6 and 1777 7 of the California Labor Code and Title 8 California Code of Regulations Section 200 et seq To ensure compliance and complete understanding of the law regarding apprentices and specifically the required ratio thereunder the Contractor and each subcontractor should where some question exists contact the Division of Apprenticeship Standards 455 Golden Gate Avenue San Francisco CA 94102 or one of City of Clovis Standard Specifications 2009 49 its branch offices prior to commencement of work the contract Responsibility for compliance with this section lies with the Contractor It is State and C
97. employees and volunteers or b the Contractor shall provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations claim administration and defense expenses Other Insurance Provisions The general liability and automobile liability policies are to contain or be endorsed to contain the following provisions 1 The City its officers officials employees and volunteers are to be covered as insureds with respect to liability arising out of automobiles owned leased hired or borrowed by or on behalf of the contractor and with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials parts or equipment furnished in connection with such work or operations General liability coverage can be provided the form of an endorsement to the Contractor s insurance or as a separate owner s policy 2 For any claims related to this project the Contractor s insurance coverage shall be primary insurance as respects the City its officers officials employees and volunteers Any insurance or self insurance maintained by the City its officers officials employees or volunteers shall be excess of the Contractor s insurance and shall not contribute with it 3 Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled by either party except after thirty 30 days prior written notic
98. ends of the lead in cable shall be taped and waterproofed to prevent moisture from entering cable 10 Identify and tag circuit pairs in the pull box adjacent to the probes Identify and tag with probe number as shown on plans in detector assignment schedule slot column Identify and tag lead in cable with sensor number and phase as shown on plans Tags shall be plastic and attached to cable with a non ferrous permanent fastener 11 Magnetic detector circuits shall not be megger tested 86 42 Magnetic Detector Connections The intermediate and far magnetic detectors shall be connected as shown on the magnetic detector probe connection diagrams attached to these Standard Specifications If more than one probe for far or intermediate detection is used and is connected to one lead in cable these probes shall be connected in parallel 86 43 Solid State Traffic Actuated Controllers 170 controller assembly which includes a controller unit controller components and completely wired controller cabinet shall be supplied and installed by the Contractor This material shall conform to the provisions in the State Standard Specifications Section 86 3 Controller Assemblies and the following 1 The 170 E controller unit and the 332A cabinet shall be an 8 phase unit 2 The controller shall be supplied with a Model 412C program module configured for Memory Select 4 per paragraph 2 4 2 2 2 of the Transportation Electrical Equ
99. excavating selected material and topsoil from within the limits of the project and excavating drainage and irrigation ditches and channels Quantities of roadway excavation will be computed by means of average areas and distances between these areas except as provided in the following paragraph Where due to changed conditions or the nature of a particular operation or for any other reason it is impossible or impractical to measure quantities of roadway excavation by means of average areas the Engineer will compute the quantities of material excavated by a method which in the Engineer s opinion is best suited to obtain an accurate determination When quantities of roadway excavation are computed by means of average end areas and center line distances a correction for curvature will not be applied to quantities within the roadway prism In computing the quantity of material outside the original roadway prism where the roadway center line is used as a base correction will be made for curvature if the center line radius is 1 000 feet or less City of Clovis Standard Specifications 2009 115 Excavation excess of the planned authorized cross section will not be paid for Contractor shall backfill and compact as directed by the Engineer unauthorized excavated areas to the original ground elevation or authorized section at the Contractor s expense 19 2 09 Payment Quantities of roadway excavation measured specified i
100. existing water supply and shall make connections in accordance with the Plans Standard Drawings and the Specifications The water meter required for the project will be provided at no cost by the City Public Utilities Department The Contractor shall furnish the meter box all fittings valves pipeline and all appurtenances required for a complete water service The Contractor shall comply with the provisions in Section 5 13 Electrical and Water Service and Section 17 Water Use Unless otherwise specified in the Contract Specifications the Contractor will be charged for all water consumed in the installation of landscape irrigation systems including testing of irrigation systems Unless otherwise noted on the Plans or Contract Specifications the irrigation system has been designed in such a manner so that a All irrigation will occur between the hours of 10 00 p m and 6 00 a m b Each individual valve station is capable of operating effectively at line pressure c Booster pumps have been added only to allow the operation of multiple valve stations concurrently The Contractor shall not vary the installation of the irrigation system from these design parameters without the express approval of the Engineer 21 3 Permits Prior to beginning any work the Contractor shall obtain a City of Clovis Encroachment Permit from the City Engineering Division an Electrical Permit and a Plumbing Permit from the City Building Divi
101. flushed from the water mains 3 48 hours after flushing water samples are taken for bacteriologic tests 4 96 hours after samples are taken results of water samples are reported to the Contractor 5 If the bacteriologic tests show a coliform M P N 100 ML water of less than 1 1 on all samples the water facilities tested will be considered clear In the event the coliform number is 1 1 or above the sterilization procedure shall be commenced again within 24 hours of notice by the City that the bacteriologic tests failed Should the end of any of the foregoing periods fall on a City nonworking day the order of procedure will be continued to the next regular City working day The Contractor shall provide all water necessary for disinfection in conformance with the provisions in Section 17 Water Use The Contractor shall make all arrangements and pay all fees necessary for the lawful disposal of water discharged during disinfection and hydrostatic testing operations Potential recipients with which the Contractor may wish to negotiate arrangements for the disposal of water include but are not necessarily limited to private property owners Fresno Irrigation District FID and Fresno Metropolitan Flood Control District FMFCD Water so discharged may be used by the Contractor for construction purposes with the prior written approval of the Engineer 66 12 Hydrostatic Pressure Test After the water pipe and all appurtenances have be
102. for any additional work involved in drying embankment material to the required moisture content shall be considered as included in the contract price paid for excavating or furnishing the material and no additional compensation will be allowed therefor Any subsequent trenching through completed embankments including trenching for utility or communications conduits shall comply with Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration Contractor shall assure that others doing work within the area under the control of the Contractor comply with this requirement 19 4 05 Measurement Where embankment construction is shown on the Plans measurement shall be by the cubic yard Where embankment construction is included as backfill for other contract items of work no measurement will be made City of Clovis Standard Specifications 2009 126 19 4 06 Payment The unit price paid for Embankment Construction shall include compensation for furnishing all equipment and performing all work required for clearing subgrade preparation for placing embankment including placing and compacting approved material where unsuitable and unstable embankment foundation material has been removed benching plowing or scarifying as required excavation hauling placing and compacting local or imported borrow and finish grading to the lines and grades shown on the plans Filling and compacting holes pits
103. for reduced scope of work or work that the City otherwise permits Contractor to not perform and such credits will be based on the reasonable bid value of the unperformed work including markups for overhead and profit r The estimated value of performing work deleted pursuant to Section 8 12 Use of Completed Portions City s Right to Complete 5 False claims by Contractor t Breach of any provision of the Contract Documents u Potential loss liability or damages to the City that is potentially caused by the Contractor and v As permitted by other provisions in the Contract The City shall provide written notice to Contractor of items for which the City is withholding from a payment at the time that the payment is being processed To claim wrongful withholding by the City or if Contractor otherwise disputes any amount being withheld Contractor must follow the claim procedures of Section 4 12 Notices Change Orders and Claims Upon request of the Contractor from whose payment or release the City withheld funds the Contractor shall be given a written copy of the City s reasons for withholding When the grounds for withholding funds are removed payment or release shall be made for amounts withheld because of them No interest shall be paid on any amounts withheld due to the failure of the Contractor to perform in accordance with the terms and conditions of the Contract Documents In addition to withholding amoun
104. in conformance with the details shown on the Plans Fiber optic cabinets shall be Anodized Aluminum McCain Model 336A equipped with Corbin Locks Lamp Assembly Service Panel 19 inch Cage Assembly Fan Thermostat Assembly and Anchor Bolts Cabinets are to be mounted on a concrete pedestal as specified in the Caltrans Standard Plans for this model and shall be anchored to the pedestal in conformance with the manufacturer s recommendations or details shown on the Plans or any referenced Standard Drawings Concrete for fiber optic cabinet pedestals shall be Class 2 concrete conforming to the provisions in Section 90 Portland Cement Concrete of the State Standard Specifications Tracer wire shall be installed to and inside cabinets consistent with Section 82 10 Tracer Wire After conductors have been installed in the conduit runs the ends of conduits terminating in cabinets shall be sealed with an approved type of sealing compound 82 16 Fiber Optic Markers Where required fiber optic markers shall be furnished and installed at the locations and in conformance with the details shown on the Plans as specified in the Contract Specifications and as directed by the Engineer in accordance with the manufacturer s recommendations 82 17 Fiber Optic Cable All fiber optic cable for each project shall be single mode type from the same manufacturer who is regularly engaged in the production of this material The glass used shall be manufa
105. in performing all aspects of tree transplanting follow all recommendations of the Engineering Inspector and City Parks Personnel adhere to these specifications and to good horticultural practices relating to transplanting trees and provide proper maintenance and watering until acceptance of the transplanted trees by the Engineer Should a transplanted tree fail to survive and the Engineer determines that the failure is due to the Contractor s negligence in carrying out the foregoing operations the Contractor shall forfeit an amount per failed tree specified in the Contract Specifications as a liquidated damage 20 6 08 Measurement And Payment All costs for transplanting trees in conformance with these specifications including tree preparation plant site preparation transportation fertilizing watering and all other incidental costs related thereto shall be included the unit or lump sum price bid for transplanting trees In the absence of a bid item the cost thereof shall be included in the lump sum bid for Landscaping in accordance with Section 20 10 Measurement and Payment 20 7 Cleanup After all planting operations are completed the Contractor shall remove all trash excess soil empty plant containers or other accumulated debris from the site at no extra cost to the City Contractor shall repair all scars ruts or mars in the area caused by work operations Areas shall be left in a neat and orderly condition The cost for c
106. is made that the quantity which can be determined by computations based on the details and dimensions shown on the plans will equal the estimated quantity No allowance will be made in the event that the quantity based on computations does not equal the estimated quantity In case of discrepancy between the quantities shown in the Engineer s Estimate for a final pay item and the quantity or summation of quantities for the same item shown on the Plans payment will be based on the quantity shown in the Engineer s Estimate 9 4 Scope Of Payment The Contractor shall accept the compensation provided in the Contract as full payment for furnishing all labor materials tools equipment and incidentals necessary to the completed Work for performing all Work contemplated and embraced under the Contract also for loss or damage arising from the nature of the Work or from the action of the elements or from any unforeseen difficulties which may be encountered during the prosecution of the Work until the acceptance by the City and for all risks of every description connected with the prosecution of the Work also for the expenses incurred in consequence of the suspension or discontinuance of the Work as provided in the Contract and for completing the Work according to the Plans and Specifications Neither the payment of any estimate nor of any retained percentage shall relieve the Contractor of the obligation to make good any defective work or material
107. it is believed that much of the information pertaining to physical conditions which may affect the cost of the proposed work will be shown on the Plans or indicated in the Contract Specifications the City does not warrant the completeness or accuracy of such information The Contractor shall ascertain the existence of any such conditions affecting the cost of the work which would have been disclosed by reasonable examination of the site No test investigation statement or estimate of a factual situation not incorporated in the Contract Documents shall be relied on by the Contractor Any test investigation statement or estimate of fact incorporated in the Contract shall be considered by the Contractor to be a suggestion only and he shall request equal access to the underlying or background informative material or source and shall arrive at his own opinion thereon including his determination of how reliable might be any conclusion appearing in or inferred from the Contract Documents In general the drawings will indicate dimensions position and kind of construction and the written Specifications will indicate qualities and methods Any work indicated on the Plans and not mentioned in the written Contract Specifications or vice versa shall be furnished by the Contractor as though fully set forth in both Work not particularly detailed marked or specified shall be as similar parts that are detailed marked or specified All alterations author
108. main supply side of the valve as shown on the Standard Drawings For DI water mains larger than 12 inches in diameter the Contractor shall construct valve foundations conforming to the details shown on the Plans and Standard Drawings 66 2 6 Butterfly Valves This work shall consist of furnishing all materials and installing butterfly valves as shown on the Plans as specified in the Specifications and as directed by the Engineer Butterfly valves and the materials used in their manufacture shall conform to the provisions in the most recent revisions of AWWA C504 and NSF ANSI Standard 61 and these specifications The design pressure class for butterfly valves shall be class 150B Butterfly valves shall be Groundhog butterfly valves as manufactured by Henry Pratt Line Seal butterfly valves as manufactured by the Mueller Company or approved equal The valve manufacturer shall have 10 years experience manufacturing butterfly valves The valve manufacturers name year of manufacture valve size model number and rated design pressure shall be cast on the body of each valve The operating direction to open shall be left counterclockwise and to close shall be right clockwise The direction to open shall be cast on the operating nut or hand wheel Butterfly valves shall be of the tight closing rubber seat type suitable for underground installation as shown on the Plans Valves shall have a full uninterrupted 360 degree sealing surface and
109. material shall be a medium density polyethylene conforming to ASTM 01248 Type II Class Category 4 or 5 Grade The light absorption coefficient wnen measured in accordance with ASTM D3349 shall be a minimum of 400 at a wavelength of 375 nm The jacket shall be free from holes splits and blisters with a total minimum jacket thickness of 40 5 mils Jacketing material shall be applied directly over the tensile strength members and flooding compound and shall not adhere to the armored strength material The City of Clovis Standard Specifications 2009 237 polyethylene shall contain carbon black to provide ultraviolet light protection and shall not promote the growth of fungus The outer jacket or sheath shall be marked with the manufacturer s name the words Fiber Optic Cable date of manufacturer sequential meter markers strand count and type of fiber optic strand The markings shall be repeated every meter 39 inches The actual length of the cable shall be within 0 1 percent of the length marking The marking shall be in a contrasting color to the cable jacket The height of the marking shall be approximately 3 mm 0 12 inch The cable shall contain at least one 1 ripcord under the inner sheath for easy sheath removal The finished cable shall be capable of withstanding a pulling tension of 2700 N 272 16 kg minimum 5 Cable Performance General The fiber optic cable shall withstand water pene
110. may become due the Contractor under this contract All shipping and delivery costs including delivery to the construction site shall be at the Contractor s expense City of Clovis Standard Specifications 2009 284 In the event traffic signal equipment submitted for inspection does not comply with specifications the Contractor shall remove said equipment for repair within three 3 working days after notification that the equipment is rejected In the event the equipment is not removed within said period it may be shipped to the Contractor at his expense Functional Testing A City of Clovis representative and a representative from the City of Fresno Traffic Signal Maintenance Division and the construction Contractor or his representative shall be present at the time of initial turn on The following items are the responsibility of the Contractor and must be completed to the satisfaction of the City Engineer prior to signal turn on 1 City of Clovis Engineer must be notified in writing seven 7 working days in advance of proposed turn on 2 wiring shall have been tested for shorts and continuity Detector loops shall be megger tested and have readings that meet specifications 3 All field connections shall be made 4 All signal heads shall be properly aligned as directed by City Engineer 5 All auxiliary functions e g pedestrian signals pedestrian push buttons vehicle detectors highway lighting signs lane lines and
111. not be required for non pressure lateral lines with swing joints Pressure shall be sustained in the lines for not less than four 4 hours If leaks develop the joints shall be replaced and the tests repeated until the entire system is proven watertight Tests shall be observed and approved by the City Inspector prior to backfill If irrigation lines are plowed into place all pipe joints are to be exposed for the pressure test Upon completion of each phase of the work the Contractor shall check and adjust each sprinkler head to meet the site requirements and plan Water consumed for pressure testing will be charged to the Contractor in accordance with Section 5 13 Electrical and Water Service and Section 17 Water Use 21 9 Backfill And Compaction Backfill and Compaction shall conform to the applicable requirements of Section 19 3 03 Trench and Structure Backfill and Compaction City of Clovis Standard Specifications 2009 160 Backfill shall not be placed until the installed system has been tested inspected approved by the City Material shall be approved soil Unsuitable material such as pipe remnants wire clods and rocks over 2 inches in size shall be removed from the premises and disposed of legally Backfill for the first 6 inches around the mainline pipe and control wires shall be sand or native soil approved by the Engineer All backfilling shall be done carefully and shall be properly tam
112. of the trench excavated below the approved grade shall be corrected and brought up to grade with approved material thoroughly compacted Trenches bottoming in hardpan shall be over excavated a minimum of 6 inches below the grade established for the bottom of the pipe and any bells or couplings and then backfilled to the design pipe grade with select material and thoroughly compacted No additional payment will be made for such over excavation backfill and compaction In all trenches or structure sites where a firm foundation is not encountered such as soft spongy or otherwise unsuitable material the material shall be removed a minimum depth of 12 inches or to a depth determined by the Engineer below the normal bottom of the trench or structure excavation The over excavated space shall be backfilled with suitable material containing sufficient moisture to produce maximum compaction The backfill material shall be free from lumps or other unsuitable material and when compacted to the satisfaction of the Engineer shall be finish graded as provided herein or as required by the Engineer for pipelines conduits or structures No additional payment will be made for such additional excavation or backfill The width of the trench from the bottom to the top of the pipe or conduit shall be a minimum of 6 inches but no more than 12 inches on either side of the pipe or per the pipe manufacturer s recommendations The Contractor shall make every effort t
113. one hole will occur at the top every 5 feet and one hole will occur at the bottom every 5 feet Immediately after completion of the jacking or boring operation if in the opinion of the Engineer excessive voids have been created outside the jacked pipe lean grout shall be injected through the grout connections in such a manner as to completely fill all voids outside the casing pipe or reinforced concrete pipe resulting from the jacking or boring operation The lean grout shall consist of one part Portland cement to not more than 4 parts sand by volume placed at low pressure Grout pressure is to be controlled so as to avoid deformation of casing pipe and or avoid movement of the surrounding soil Sand for grout to be placed outside the casing shall be of such fineness that 100 percent will pass a No 8 sieve and not less than 35 percent will pass a No 50 sieve After completion of grouting the grout connections shall be closed with cast iron threaded plugs For jacked reinforced concrete pipe if the annular space in the joints on the inside of the pipe exceeds one inch the space shall be filled with cement mortar for the full periphery of the joint and finished smooth and flush with the interior walls of the pipe Filling finishing annular spaces shall be accomplished after the entire installation is completed for City of Clovis Standard Specifications 2009 206 larger pipe Contractor shall adhere to the safety requirements o
114. pavement markings etc shall be in place and operational 6 The Service shall be complete including the utility company meter The Contractor shall allow 24 hours following the completion of the above items for the controller s to be delivered and installed by the City of Fresno The fifth paragraph in Section 86 2 14C Functional Testing of the State Standard Specifications is amended to read During the test period the Contractor shall maintain the system or systems supplied and installed by the Contractor The cost of any damages and maintenance including emergency maintenance done by the City of Clovis shall be at the Contractor s expense and shall be deducted from any monies due or to become due the Contractor Materials supplied by the City and installed by the Contractor as stated in the Technical Specifications shall be maintained by the City and shall be replaced or repaired by the City if damaged by public traffic If any City supplied material is damaged by Contractor the Contractor shall repair or replace material at his cost The City will pay for all electrical energy for the traffic signal and highway lighting 86 23 Galvanizing All galvanizing shall conform to the provisions in Section 86 2 15 Galvanizing of the State Standard Specifications 86 24 Painting Painting shall conform to the provisions in Section 86 2 16 Painting of the State Standard Specifications and to these Standard Spe
115. pockets Additional native soil shall be added as necessary to maintain ground level during the settling period Evergreen trees or deciduous trees in leaf shall be sprayed with an anti desiccant as directed and approved by the Engineer City of Clovis Standard Specifications 2009 144 20 6 05 Staking And Guying Transplanted trees shall be staked and guyed from three different equidistant points one of which should be in line with and providing support against the prevailing wind Appropriate straps shall be provided to protect the tree from direct contact with the wire or cable using rubber hose or flexible plastic tubing Smaller trees 30 to 50 inches diameter rootball shall be anchored with wooden stakes and ties strong enough to support the tree Larger trees greater than 50 inch rootball shall be anchored with 1 8 inch or 3 16 inch cable and earth anchors Tie white surveyor s tape at breast height to each cable to provide cable visibility 20 6 06 Mulching Where mulching of tree wells is shown on the plans or specified in the Contract Specifications place Walk on bark mulch approved by the City to a depth of 3 inches to cover the soil surface at a diameter 24 inches wider than the drip line of the tree but not touching the trunk of the tree in order to improve water retention in the soil and to moderate soil temperatures in the summer 20 6 07 Responsibility The Contractor shall at all times exercise due diligence
116. practice Markers that are lost or disturbed by his operations shall be replaced at the Contractor s expense by a person appropriately licensed by the State of California for Land Surveying The Contractor shall comply with the provisions in Section 70 2 Survey Monuments The costs for furnishing Construction Surveying and Staking by the Contractor shall be included in the amount bid for the various items of work no separate payment will be made therefor 5 15 Cooperation The Contractor shall cooperate in all respects with all public and private agencies including the Fresno Irrigation District Fresno Metropolitan Flood Control District Cable TV and Telephone Companies Pacific Gas and Electric Company the Fresno and Clovis City Water Sewer Parks Solid Waste Streets and Traffic Divisions and the respective Fire and Police Departments The Contractor shall comply with the provisions in Section 8 15 Utility and Non Street Facilities Potholing Should construction be under way by other forces or by other contractors within or adjacent to the limits of the work specified or should work of any other nature be under way by other forces within or adjacent to those limits the Contractor shall cooperate with all the other contractors or other forces to the end that any delay or hindrance to their work will be avoided The right is reserved to perform other or additional work at or near the site including material sources at any time
117. prevent movement during backfill operations The tracer wire from each direction of the pipe shall extend up into each valve or blowoff box with an excess of 4 feet of wire coiled and attached to the inside of the box in a manner that allows easy access to the wires The wires shall be tagged Tracer Wire with a waterproof label Ends of wire shall not be attached to each other or grounded 66 7 Thrust Blocks Thrust blocks shall not be used for DI water mains larger than 12 inches in diameter unless otherwise directed or approved by the Engineer Thrust blocks shall be constructed at all fittings and valves for PVC water mains as required by these Standard Specifications and as shown on the applicable Standard Drawing Thrust blocks shall be constructed at all fittings and valves for DI water mains 12 inches in diameter and smaller in conformance with the provisions in these Standard Specifications and as shown on the applicable Standard Drawings In lieu of thrust blocks at fittings restrained joint fittings and restrained pipe joints may be used with the prior written approval of the Engineer For DI water mains 12 inches in diameter and smaller thrust blocks shall be constructed at all valves in conformance with the provisions in these specifications and as shown on the applicable Standard Drawing Concrete thrust blocks shall be provided on water mains at all points in the line where a change in direction of more than 5 degrees occur
118. prior to backfilling dirt Dirt and debris shall be removed from pull box prior to installing conductors A one inch 1 diameter drain hole shall be provided in the center of the pull box Grout shall be installed to cover the crushed rock sump bottom of the of the pull box and sloped toward the drain hole The drain hole shall run through the grout bottom into and exposing the rock sump Contractor s attention is directed to Section 86 2 06C Installation and Use of the State Standard Specifications conductors shall not be installed prior to grouting the pull box Pull boxes shall be placed at same elevation as adjacent standard base service cabinet base or signal controller cabinet base if not in an existing or future sidewalk area and elevation is not shown on plans Pull boxes shall 5 feet from base or as shown on the plans Pull boxes in existing or future sidewalk areas shall be placed at sidewalk elevation The pull box elevation for pull boxes installed in median areas shall match the slope of the two adjacent curbs The pull box elevation for pull boxes installed in sidewalks planting areas adjacent to sidewalks or median islands shall be at proposed final grade Pull box elevation shall be 0 1 foot above finished grade for all other areas unless elevation is shown on plans or otherwise directed by the Engineer Pull boxes installed in median islands for left turn intermediate and far detectors shall be placed adjacent t
119. pruned in this manner shall be removed and replaced at Contractor s expense Tree stakes or ties that for any reason are damaged or rendered inadequate for support during this period shall be replaced to their original condition 20 4 Shrubs 20 4 01 Spacing The Contractor shall furnish and plant shrubs conforming to and in accordance with Section 20 1 07 Plant Material the applicable Standard Drawing for Shrub Planting these Standard Specifications and in the quantities varieties and locations shown on the Plans and specified in the Contract Specifications When shrubs are to be planted in rows the total dimension shall be verified and the plants equally spaced within the designated area City of Clovis Standard Specifications 2009 140 Where shrubs are shown an informal pattern the Contractor shall space the material appropriately and as directed by the Engineer A minimum 3 clearance shall be maintained between shrubs and hardscape features such as sidewalks curbs fences or any such fixture 20 4 02 Shrub Planting Holes And Backfilling Shrub planting holes shall be dug and prepared in accordance with the Standard Drawing for Shrub Planting at the locations shown on the Plans to receive shrubs or at the locations determined in accordance with Section 20 4 01 Spacing Holes shall have level bottoms a diameter twice that of the root ball and a depth equal to the planned bottom of the root ball Planting h
120. requirements including submittal of all required documentation during the life of the project shall be included in the various items of work No separate or additional payment will be made therefor Reference is made to Section 7 10 Permits and Licenses The Contractor shall also comply with the provisions in Section 10 Dust Control 7 7 Water Pollution Prevention The Contractor shall exercise every reasonable precaution and shall conduct and schedule operations so as to protect all storm drain systems storm water retention detention basins irrigation canals or natural streams located within adjacent to or in any way connected with the project from pollution with mud silt fuels oils bitumens calcium chloride pesticides herbicides and any other harmful materials The Contractor shall conduct water pollution prevention on all contracts awarded by the City but for projects of one 1 acre or greater the following special requirements shall apply City of Clovis Standard Specifications 2009 54 7 7 A Storm Water Pollution Prevention Plan SWPPP Requirements The following provisions are required for all construction contracts awarded by the City for sites one 1 acre in size or greater Their purpose is to provide detailed instructions to contractors to ensure that construction practices do not cause pollutant discharges to the above described storm water conveyance storage systems Contractors are encouraged to use
121. shall be liquid asphalt grade SC 800 in conformance with Section 93 Liquid Asphalts of the State Standard Specifications Patch mix asphalt concrete shall be placed in the slot The slot shall be filled and compacted with a pneumatic tamper until crown is slightly above the existing surface and to the same width as the slot The minimum thickness of asphalt concrete shall be 2 5 inches Excess asphalt concrete remaining shall not be used and shall be removed from roadway Patch mix asphalt concrete shall be Type gt inch maximum coarse shall conform to the provisions in Section 39 2 Materials and Section 39 3 Storing Proportioning and Mixing Materials of the State Standard Specifications and the Contract Specifications and shall include treatment by heater remix as shown on the applicable City Standard Drawing for Trench Resurfacing All slot patching shall be slurry sealed with Type II slurry as the last order of work for the loop slot patch operation The supplier shall furnish without charge samples of all materials entering into the work and no material shall be used prior to approval by the Engineer Samples of material from local sources shall be taken by or in the presence of the Engineer otherwise the samples will not be considered for testing 86 41 Magnetic Detector Installation Procedure 1 Supply and install pull box with extension at each end of the 3 inch P V C conduit at
122. shall place the controller in stop timing mode when a conflict occurs and when the following circuits malfunction Red signal output microprocessor and power supply voltages The Monitor shall not register a conflict due to the controller being in RR 1 or due to monitoring the pedestrian flashing Don t Walk 14 The Monitor shall be fully guaranteed to perform satisfactory as specified in these specifications and special provisions for a period of two years from date of acceptance by the City of Clovis The testing of this Monitor shall conform to the provisions of Section 86 2 14 Testing of the State Standard Specifications and these Specifications 15 The Monitor shall provide for full simultaneous R Y G intersection display by means of front panel Red Yellow and Green LED inputs to each channel City of Clovis Standard Specifications 2009 296 16 The Monitor shall have a simple diagnostic mode to provide the signal status for the previous two faults without the aid of a PC 17 Data logging capabilities shall include four event log types a Previous Failure Log shall record field signal voltages control signal voltages and cabinet temperature all stamped with the time and date of the event up to 25 events b Monitor Reset Log shall document and time stamp the entry to flash and the exit from flash up to 25 events c AC Line Log shall record any AC Line events power down short interrupt and brownout which cause
123. shown on the Plans or specified in the Contract Specifications Each pipe shall be subjected to a hydrostatic pressure test of at least 500 psi at the point of manufacture No field welding of DI pipe is permitted unless specifically directed or approved otherwise in writing by the Engineer All welding of DI pipe for welded outlets or other DI pipe features for which welding is shown on the Plans or specified in the Contract Specifications shall be shop welding done by the pipe manufacturer Pipe shall have standard asphaltic coating on the exterior Pipe shall also have a cement mortar lining on the interior in accordance with AWWA ANSI C104 A21 4 or latest revision DI pipe for water mains shall have a blue 8 mil polyethylene wrap conforming to the provisions in AWWA ANSI C105 A21 5 The polyethylene wrap shall be marked with the words POTABLE WATER or approved equivalent arranged in two continuous lines of text each on opposite sides of the polyethylene wrap The class or nominal thickness net weight without lining and casting period shall be clearly marked on each length of pipe Additionally the manufacturer s mark country where cast year in which the pipe was produced and the letters DI or ductile shall be cast or stamped on the pipe Except as provided below all pipe shall be furnished with Push on Type Joints such as Tyton or Fastite Joints shall be in accordance with AWWA ANSI 111 21 11 of l
124. single maintained contact switch on the respective emitter control unit The switch shall be capable of being located to be readily accessible to the vehicle driver The control unit shall contain a pilot light to indicate that the emitter power circuit is energized and shall be capable of generating only one modulating code either that for Class vehicles or that for Class II vehicles 2 Functional Each emitter unit shall transmit optical energy in one direction only 3 Electrical Each emitter assembly shall be capable of providing full light output with input vehicle battery voltages of between 10 and 16 volts DC An emitter assembly shall not be damaged by input voltages up to 7 5 volts DC above supply voltage The emitter assembly shall not generate voltage transients on the input supply which exceed the supply voltage by more than 4 volts Each emitter assembly shall consume not more than 100 watts at 17 5 volts DC and shall have a power input circuit breaker rated at 10 to 12 amperes 12 volts DC The design and circuitry of each emitter shall permit its use on vehicles with either negative or positive ground without disassembling or rewiring of the unit 4 Mechanical Each emitter unit shall be housed in a weatherproof corrosion resistant housing The housing shall be provided with facilities to permit mounting on various types of vehicles and shall have provision for aligning the emitter unit properly and for locking the emit
125. subbase base surfacing or pavement removed will be included in the quantities of the type of excavation in which they are located and no separate payment will be made therefor Clearing and Grubbing for earthwork operations shall conform to the provisions in Section 16 Clearing and Grubbing Applying water for earthwork operations shall conform to the provisions in Section 17 Water Use City of Clovis Standard Specifications 2009 110 19 1 02 Protection Of Property The Contractor shall comply with the provisions of Section 5 3 Contractor s Responsibility for the Work Section 5 9 Preservation of Property Section 7 4 Contractor s Insurance Requirements and Hold Harmless Section 7 16 Injury or Damage to Persons or Property and Section 8 15 Utility and Non Street Facilities Potholing Operations shall be conducted in such a manner that existing roadway or other facilities utilities railroad tracks and other non street facilities which are to remain in place shall not be damaged The Contractor at the Contractor s expense shall furnish and install sheet piling cribbing bulkheads shores or whatever means may be necessary to adequately support material carrying the facilities or to support the facilities themselves and shall maintain the supports until they are no longer needed Temporary pavements facilities utilities and installations shall also be protected until they are no lo
126. survey markers in conformance with professional standards prior to beginning construction Temporary ties and resetting of monuments corners or other markers shall be performed by a licensed land surveyor obtained by the Contractor prior to beginning construction Monuments corners or other markers shall be re set to their original precise location and elevation and marked as required Known monuments corners or survey markers not to be disturbed by the work shall be protected from damage Any known monuments corners or markers damaged or destroyed due to the Contractor s failure to protect them shall be replaced in conformance with the applicable Standard Drawing and this Section 70 2 at the Contractor s expense 70 3 Adjusting Existing Facilities To Finish Grade Existing facilities shall include manhole frames and covers water valve boxes and covers water meter boxes and covers and other similar existing facilities that must fit or match the final finished surface of the improvement in which they are located The facilities shall be adjusted to grade within five 5 working days following the completion of the surfacing in which they are located Sewer recycled water and storm drain manhole frames and covers and water or recycled water valve boxes and covers shall be temporarily lowered below the grading plane and triangulated or monumented to provide quick location throughout the construction process The manhole frames and covers a
127. the Contractor shall pay the difference to the City Prior to performing any of the deleted work itself City may at its option tender completion of the work to the Contractor s surety for completion by someone other than Contractor 8 13 Termination Of Contract If the Contractor files for bankruptcy if the Contractor makes a general assignment for the benefit of his creditors if a receiver should be appointed on account of the Contractor s insolvency if the Contractor or any subcontractors should violate any of the provisions of the Contract if the Contractor should refuse or should fail except in cases for which extension of time is provided to supply enough skilled workmen or proper materials if the Contractor should fail to make prompt payment to subcontractors or for material or labor or if the Contractor should disregard laws ordinances or the instructions of the Engineer the City may serve written notice upon the Contractor and its surety of the City s intention to terminate the Contract such notice to contain the reasons for such intention to terminate the Contract and to provide five 5 calendar days for the Contractor to cure such violations and make satisfactory arrangements for correction thereof In the case of filing for bankruptcy the Contractor agrees that by entering this Contract it also stipulates that the bankruptcy court may grant relief to the City from any automatic stay as to this Contract and as to any escrow ag
128. the Monitor to transfer to Flash operation and shall record the line voltage up to 40 events d Configuration Change Log records any change to the diode matrix switches or jumper selection up to 10 events All events shall be sorted by time and date to enable them to be viewed in the real time line in which they occurred Diagnostic software for this purpose shall be available from the signal monitor manufacturer The controller cabinet temperature shall be recorded in all fault event records as well as in the real time mode 18 The Monitor shall provide a selectable Minimum Flash Time option to enable it to be compatible with the Model 2070 controller This selectable flash interval shall be at least 6 seconds and no more than 10 seconds in duration following a power up an AC Line interruption or a brownout restore During this interval the unit will suspend all fault monitoring functions and close the Output relay contacts The Minimum Flash Interval will be terminated after at least 6 seconds if the Watchdog input has made 5 transitions between the True and False state and the AC Line voltage is greater than the restore level 19 The Monitor shall be compatible with the MT 180 Monitor Tester 20 The Monitor shall be equipped with an EIA 232 serial link to provide access with a computer for status event log review and archival The Monitor shall also be compatible with the BiTran Systems 233 Software to update the Controller Unit w
129. the elements to be considered by the Contractor in determining the bid and will not under any circumstances be considered as the basis of a claim against the City on the contract 7 2 C Travel And Subsistence Payments The Contractor shall make travel and subsistence payments to each workman needed to execute the work in conformance with the requirements in Labor Code Section 1773 8 7 2 D Payroll Records The Contractor shall conform to the requirements in Labor Code Section 1776 a portion of which is quoted below Regulations implementing Labor Code Section 1776 are located in Sections 16016 through 16019 and Sections 16207 10 through 16207 19 of Title 8 California Code of Regulations a Each contractor and subcontractor shall keep accurate payroll records showing the name address social security number work classification straight time and overtime hours worked each day and week and the actual per diem wages paid to each journeyman apprentice worker or other employee employed by him or her in connection with the project for which a Contract is awarded by the City Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury stating both of the following 1 The information contained in the payroll record is true and correct 2 The employer has complied with the requirements of Sections 1771 1811 and 1815 for any work performed by his or her employees on the public wo
130. the public agency files for record a notice of cessation or a notice of completion C For all other purposes including but not limited to assessment of liquidated damages completion means the point where Contractor has fully and correctly performed all Work in all parts and requirements a Final Inspection has been made all corrective and punch list Work has been performed and the Engineer has certified that the Work is ready for acceptance by the City Council Completion does not mean substantial completion or any other form of partial or insufficient performance of the Work 1 9 Contract The written agreement covering the performance of the work and the furnishing of labor materials tools and equipment in the construction of the work The Contract shall include the Agreement Notice Inviting Bids Proposal Plans these Standard Specifications the Contract Specifications Contract Bonds Permits any and all supplemental agreements amending or extending the work contemplated and which may be required to complete the work in a substantial and acceptable manner Supplemental agreements are written agreements covering alterations amendments or extensions to the contract and include contract change orders City of Clovis Standard Specifications 2009 2 1 10 Contract Specifications The booklet containing the Notice Inviting Bids Proposal Form Reference to Standard Specifications Special Provisions Technical Provisions wh
131. the supplier before the use of any such water will be permitted on the work City of Clovis Standard Specifications 2009 107 Non potable water used in the mixing and curing of concrete shall conform to the provisions in Section 90 2 03 Water of the State Standard Specifications Non potable water if used shall not be conveyed in tanks or drain pipes which will be used to convey potable water There shall be no connection between non potable water supplies and potable water supplies Non potable water supply tanks pipes and any other conveyances of non potable water shall be labeled NONPOTABLE WATER DO NOT DRINK 17 2 Application Water shall be applied in the amounts at the locations and for the purposes designated in the Contract Specifications and these Standard Specifications and as ordered by the Engineer Water for compacting embankment material subbase base and surfacing material and for providing dust control shall be applied by means of pressure type distributors or pipe lines equipped with a spray system or hoses with nozzles that will ensure a uniform application of water Equipment used for the application of water shall be equipped with a positive means of shut off Unless otherwise permitted by the Contract Specifications or the Engineer or unless all the water is applied by means of pipe lines at least one mobile unit with a minimum capacity of 1 000 gallons shall be available for applying water on the project
132. the unit price bid for the type of construction requiring the use of selected material No payment for stockpiling of selected material will be made 19 2 07 Subgrade Preparation Compaction Reference is made to Sections 1 4 Basement Material 1 19 Grading Plane and 1 44 Subgrade Unless otherwise shown on the Plans or specified in the Contract Specifications for streets divided by a concrete median island the grading plane extends from the back of the concrete curb and gutter adjacent to the outside travel lane parking lane or bicycle lane the outside curb and gutter to the back of the concrete median curb For streets not divided by concrete median island the grading plane extends from the back of one outside curb and gutter to the back of the opposite outside curb and gutter For alleys trails paths or other places to receive an improved surface the grading plane shall extend 12 inches beyond right of way permitting either side of the planned finish surface The preparation and compaction of the subgrade below the grading plane to receive subbase aggregate base asphalt concrete concrete or other paving materials shall consist of the following The soil material beneath the grading plane shall be bladed or disked to a depth of 6 inches and all rocks hardpan chunks or otherwise unsuitable material over 2 inches in greatest dimension shall be removed and disposed of off the project site in accordance wit
133. to the Engineer for approval 82 26 F System Verification At Completion OTDR Testing Once the passive cabling system has been installed and is ready for activation one hundred 100 percent of the fiber links shall be tested with the OTDR for attenuation Test results shall be recorded dated compared and filed with previous copies Copies of traces and test results shall be submitted to the Engineer for approval If the OTDR test results are unsatisfactory the link shall be replaced at the Contractor s expense The new link shall City of Clovis Standard Specifications 2009 242 then be tested to demonstrate acceptability Copies of the test results shall be submitted to the Engineer for approval Installed System Link Loss Budget The Link Loss Budget Worksheet shall be completed for each service point as defined in the conductor schedules using the data gathered throughout the installation process The completed worksheets shall be included as part of the system documentation and in the As Built Plans Refer to As Built Plans in these specifications for additional requirements The total connector losses shall be calculated by the Contractor by summing the individual attenuation values for each connector pair in the path excluding the transmitter and the receiver connectors The total splice losses shall be calculated by the Contractor by summing the individual attenuation values for each splice in the link The tota
134. topped Root condition of plants will be determined by the City by removing soil from the roots of at least two 2 plants but not more than 2 of the total number of species or variety from each source 20 1 08 Planting General Seeding Planting shall not commence until all construction work clearing and grubbing grading soil preparation and weed control are complete In addition no planting activities are to proceed until the irrigation system is 100 complete connected to a permanently installed City water meter and backflow prevention device is operational and approved by the Engineer Exceptions may be granted by the Engineer on a case by case basis Planting of trees and shrubs shall conform to the applicable Standard Drawings for Tree Planting and Shrub Planting to Section 20 3 04 Tree Planting Holes and Backfilling Root Barriers for trees and Section 20 4 02 Shrub Planting Holes and Backfilling Planting holes shall be dug and prepared as required for the individual plant No plant material shall be planted if the root ball is broken or cracked either before or during the process of planting Once set the root ball or trees and shrubs shall be scored to a depth of 1 inch to prevent circling roots City of Clovis Standard Specifications 2009 133 Plants shall be set so that each plant shall bear the same relation to soil level when planted as it did when in its container Generally trees and shrubs should be set
135. trench or structure backfill shall be granular native material free from debris lumps hardpan chunks paving material or organic matter of other deleterious or unsuitable substances Material shall be approved by the Engineer before use in the work 19 3 03 A Trench Backfill Backfill of trenches shall conform to the Standard Drawings pertaining thereto these Standard Specifications and the directions of the Engineer Backfill for trenches in which City of Clovis Standard Specifications 2009 118 precast pipe including utility or communications conduits has been installed shall be placed in two phases classified as Initial Backfill and Final Backfill 19 3 03 A 1 Initial Backfill Precast Pipe Conduit After the precast pipe or conduit has been laid to line and grade Initial Backfill shall consist of placing by hand and firmly compacting selected native material under the haunches and up to the spring line of the pipe so as to form a firm bedding and then filling with selected native material and compacting to a level 12 inches above the top of the pipe The method of compacting and obtaining density requirements for initial backfill shall be such that the line and grade of the pipe is not disturbed and the pipe is not damaged Selected native material shall be granular free of all rocks hardpan paving material organic matter or other deleterious substances Jetting of Initial Backfill to completely fill the space under pipe hau
136. turf shall be Buckner Brass or approved equal c Walla Walla MP Rotator for shrub or turf City of Clovis Standard Specifications 2009 151 12 Rotors shall be Hunter Series Stainless Steel Rain Bird 5500 Series Stainless Steel or Rain 7005 Series Stainless Steel 13 Drip Emitters Drip emitters shall be of the type and performance as listed on the Plans 14 Drip Filters Filters shall be capable of efficiently removing foreign particles that would clog emitters Filter shall be a flushable type and contain a replaceable stainless steel element Filters shall contain a 200 mesh screen or as prescribed by the emitter manufacturer The filter shall be of the type and performance as listed on the Plans 15 Remote Control Valves Electric remote control valves shall be Irritrol Series 100 102 16 Valve Boxes Valve boxes shall Christy Fibrelyte or approved equal Standard size shall be 11 inches x 17 inches 17 Control Wiring Connections between the controller and remote control valves shall be continuous made with direct burial wire AWG UF Type single conductor installed in accordance with valve manufacturer s wire chart and specifications Valve hot wire to be no smaller than AWG No 14 Valve common wire to be no smaller than AWG No 12 Where more than one wire is placed in a trench the wiring shall be taped together at intervals of no more than 10 feet All splices shall be made using 3M
137. unavoidable adverse effect on the critical path of the scheduled construction 4 12 5 4 Pass Through Claims If any portion of a Claim is based on a request for additional compensation money or time by of Contractor s subcontractors or suppliers the Contractor must prepare and submit as part of its Claim its own analysis of the subcontractor s request and the Claim must include a copy of the subcontractor s request along with any other necessary supporting City of Clovis Standard Specifications 2009 20 documentation addition to conforming to all requirements of this Section 4 12 regarding Claims the Contractor s analysis of the subcontractors request must include a detailed explanation by Contractor of why the request by subcontractor or supplier is the City s responsibility including Contractor s analysis of a why the amount of damages is appropriate b how a breach by Contractor caused the subcontractor or supplier to incur these damages how the Contractor s breach was caused by a breach by City A subcontractor or supplier may not submit a claim directly to the City since it does not have a contract with the City and a Contractor may not simply forward such a claim to the City City of Clovis Standard Specifications 2009 21 4 12 6 Procedures For Claims Less Than Or Equal To 375 000 Public Contract Code 20104 2 4 12 6 1 Claims Less Than 50 000 For Claims of less than fifty th
138. warning devices and protective measures that action on the part of the Engineer shall not relieve the Contractor from responsibility for public safety or abrogate the obligation to furnish and pay for these devices and measures In accordance with Section 5 8 Emergency Availability in the event a condition or situation develops either during or after normal work hours which requires the attention of the Contractor the following process applies If the condition or situation presents a clear and imminent public hazard and is deemed by the Engineer to be an EMERGENCY and in the event the Contractor fails to immediately City of Clovis Standard Specifications 2009 63 respond the Engineer s direction to correct the condition or attempts to contact the after hours emergency response personnel of the Contractor fail or in the event contact is made and the Contractor is either unwilling or unable to respond in a timely manner to the condition or situation deemed an emergency by the Engineer then the Engineer shall mobilize immediately the resources necessary to respond to the situation In the event a condition or situation is deemed by the Engineer to present a potential public hazard and is considered to be URGENT and upon notification thereof by the Engineer to the Contractor the condition is not corrected within 3 hours or in the event attempts to contact the after hours emergency response personnel of the Contractor fail or in th
139. with said Section 4 11 Extra Work 19 2 Roadway Excavation 19 2 01 General Roadway excavation shall consist of all excavation involved in the grading and construction of the roadway except trench and structure excavation ditch or channel excavation and any excavation separately designated and paid for as a separate item Unless otherwise specified in the Contract Specifications Roadway Excavation shall include excavation removal and disposal of all material located within the prism of the roadway to be constructed as shown on the plans Roadway shall have the meaning ascribed by Section 19 1 01 Description 19 2 02 Unsuitable Material Unsuitable material encountered below the natural ground surface in embankment areas or below the grading plane in excavation areas shall be excavated and disposed of as directed by the Engineer Unsuitable material is defined as material the Engineer determines to be A of such unstable nature as to be incapable of being compacted to specified density using ordinary methods at optimum moisture content or B too wet to be properly compacted and circumstances prevent suitable in place drying prior to incorporation into the work or C otherwise unsuitable for the planned use The presence of excessive moisture in a material is not by itself sufficient cause for determining that the material is unsuitable The removal and disposal of unsuitable material will be paid for as roadw
140. with the top of the root ball approximately 1 inch above the finish grade Each plant shall be placed in the center of the plant pit Planting holes except trees shall be backfilled around the root ball with the amended soil removed from the hole Planting holes for trees shall be backfilled with a mix composed of M Roots or approved equal and soil removed from the hole using mix ratios recommended by the additive manufacturer Reference is made to Section 20 3 04 Tree Planting Holes and Backfilling Root Barriers Backfill material in planting holes shall be tamped firm and a shallow basin as shown on the Standard Drawings formed around the plant to hold enough water to saturate the root ball and backfill Plants and trees shall be watered immediately after planting 20 2 Turf 20 2 01 Seeded Turf Where the Plans or Contract Specifications require the planting of seeded turf seed to be furnished for the work shall be of top quality and of the variety specified Seed shall be certified as compliant with requirements of the Agricultural Code of the State of California and the California Seed Law Certification tags shall be currently dated Seed varieties shall consist of the following Summer application Futura Heat Bermudagrass or approved equal Winter application Mensa Perennial Ryegrass or approved equal The Contractor shall furnish both varieties of seed to the job site sufficient in quantity to plant all areas to receive tur
141. 0 feet of lead in cable The loop test measurements shall be documented on the Loop Detector Test Results form provided in these technical specifications The form will be signed and dated by the individual performing the tests as well as by the Engineer Supply and install Type lead in cable IMSA 50 2 Within the detector lead in cable the conductor with the white insulation shall always be installed above the conductor with the black insulation for each phase on the terminal strip within the controller cabinet The lead in cable shall not be spliced between the loop detector termination pull box and the controller cabinet terminal strip Cable for the advance left turn detector may be spliced at two locations Once at the advance loop lead in pull box and once at the termination pull box for the near City of Clovis Standard Specifications 2009 291 left turn loop detectors The ends of the lead in cables and the 2 loop wires shall be waterproofed to prevent moisture from entering 11 After all tests and installation procedures have satisfied the requirements stated in these Specifications the Contract Specifications Standard Plans and Construction Drawings the Contractor shall make the final connections in the termination pull box Current flow within each loop shall be as shown on the standard Plans ES 5A 12 Magnetic vehicle detectors shall not be meg tested 13 Connections shall be made using uninsulate
142. 009 187 66 2 5 Gate Valves Gate valves shall conform to the details shown on the Plans and Standard Drawings therefor and to the requirements of AWWA Standard C 509 Valves shall be manufactured by Mueller Co or City approved equal with iron body bronze mounted double disc non rising stem with one O ring seal above and below the thrust collar nut operated and turning left counterclockwise to open right clockwise to close Valves shall be manufactured to be compatibly jointed with the water pipe or fittings being valved as shown on the Plans or specified in the Contract Specifications Reference is made to the applicable Standard Drawings therefor for flanged connection requirements Buried valves shall be provided with valve wells per the Standard Drawing to allow access to the valve operator Valve wells shall be constructed of 8 inch diameter PVC water main pipe Where the valve operator is deeper than 4 feet below future grade a valve stem extension shall be provided Valve stem extensions shall be hot dipped galvanized square steel tubing shall securely fit up to the operating nut on the valve and shall have a nominal 2 inch nut at the top of the extension Centering discs near the top and bottom of the extension shall be provided Valve stem extensions shall be extended to within 12 to 18 inches of finished grade Valves at hydrant and or wet tap locations shall be flanged on one side to directly connect to the tee on the
143. 009 263 83 17 System Guarantee In conformance with Section 7 23 Guarantee the entire lighting system shall be guaranteed by the Contractor to give satisfactory service operating without defect and the Contractor shall guarantee the quality of materials equipment and workmanship including settling of backfilled trenches or other areas of work below finish grade for a period of one year following the date of the filing of the Notice of Acceptance for all of the work by the City If within one year from the date of the filing of the Notice of Acceptance for all of the work any portion of the work including all materials furnished and installed which fails to function originally designed and installed resulting from inferior or faulty materials or workmanship or settlement occurs requiring adjustments in conduits pull boxes cabinets services switchboards lights or any other facilities or equipment furnished and installed paving or other surface restoration to the proper level of the permanent grades the Contractor as part of the work under his Contract shall make all adjustments and corrections without extra cost to the City including the complete restoration of all damaged planting paving or other improvements of any kind Any damage to other work resulting from such failure or the correction thereof shall be remedied at the Contractor s expense 83 18 Operations And Service Manual At the completion of the work and pr
144. 09 278 At completion of all work in pull boxes an approved ant repellent Rainbow Insect Control Distributed by Southwest Power 800 670 7746 or approved equal shall be supplied by the Contractor and installed by the City 86 17 Conductors And Wiring Conductors and wiring shall conform to the provisions in Section 86 2 08 Conductors Section 86 5 01A 4 Construction Materials and Section 86 2 09 Wiring of the State Standard Specifications and these Standard Specifications 1 Multi conductor cable used for vehicle signals pedestrian signals and P P B s from controller cabinet to terminal blocks on standards shall be polyethylene insulated polyethylene jacketed of 600 volt rating IMSA color coded and shall comply with International Municipal Signal Association specifications No 20 1 1962 or the IMSA superseding specification of more recent issue The 3 5 and 7 Conductor cables shall be 14 AWG solid copper Conductor cables to be used are as follows a 7 conductor cable shall be used for all vehicle signals only b 5 conductor cable shall be used for all pedestrian signals only 2 conductor cable shall be used for all P P B s Cables shall not be spliced to any other cable d Type C DLC cable shall be used for all detector lead in circuits f single conductors shall be used for photoelectric switches g Approved 3 conductor cable shall be used for emerge
145. 1 43 Subbase A layer of specified material of planned thickness between a base and the basement material 1 44 Subgrade That portion of the roadbed on which pavement surfacing base subbase or a layer of any other material is placed See Section 1 4 Basement Material 1 45 Surety Surety or Corporate Surety refers to a corporate surety company included on the State of California Department of Insurance Admitted Sureties List most current edition and acceptable to the City 1 46 Surfacing The uppermost layer of material placed on the traveled way or shoulders This term is used interchangeably with pavement 1 47 Traffic Lane The portion of a traveled way for the movement of a single line of vehicles 1 48 Traveled Way The portion of the roadway for the movement of vehicles generally between faces of curbs 1 49 Work All the obligations and construction specified indicated shown required or contemplated in the Contract and Contract Documents including all alterations amendments or extensions thereto made by Contract Change Order or other written orders of the Engineer and including all punch list corrective work as built or as constructed drawings and manuals at the end of the construction The Work shall constitute work and work of improvement under Civil Code sections 3082 3106 and a work of improvement shall not include work being performed by the Owner by itself or through other contracto
146. 11 Alternatively the Engineer may direct the rearrangement of the street or underground improvement if movement of the underground facility is not essential Should the Contractor desire to have any rearrangement made in any utility facility or other improvement for the Contractor s convenience in order to facilitate the Contractor s construction operations which rearrangement is in addition to or different from the rearrangements indicated on the Plans or in the Contract Specifications the Contractor shall make whatever arrangements are necessary with the owners of the utility or other non street facility for the rearrangement and bear all expenses in connection therewith The Contractor shall immediately notify the Engineer of any delays to the Contractor s operations as a direct result of underground main or trunk line facilities which were not indicated on the Plans or in the Contract Specifications or were located in a position substantially different from that indicated on the Plans or in the Contract Specifications or as a direct result of utility or other non highway facilities not being rearranged as herein provided other than delays in connection with rearrangements made to facilitate the Contractor s construction operations or delays due to a strike or labor dispute These delays will be considered right of way delays within the meaning of Section 8 10 Right of Way Delays and compensation for the delay will be determined in confor
147. 25 Aggregate Subbases of the State Standard Specifications SECTION 26 AGGREGATE BASES Aggregate bases shall be as specified in Section 26 Aggregate Bases of the State Standard Specifications SECTION 27 CEMENT TREATED BASES Cement Treated Bases shall be as specified in Section 27 Cement Treated Bases of the State Standard Specifications SECTION 28 LEAN CONCRETE BASE Lean Concrete Base shall be as specified in Section 28 Lean Concrete Base of the State Standard Specifications SECTION 29 TREATED PERMEABLE BASES Treated Permeable Base shall be as specified in Section 29 Treated Permeable Bases of the State Standard Specifications SECTION 30 THROUGH 36 BLANK City of Clovis Standard Specifications 2009 166 SURFACING AND PAVEMENTS SECTION 37 BITUMINOUS SEALS Bituminous Seals shall be as specified in Section 37 Bituminous Seals of the State Standard Specifications SECTION 38 BLANK SECTION 39 ASPHALT CONCRETE PAVEMENT DIKES Asphalt Concrete pavement other asphalt surfacing and dikes shall be as specified in Section 39 Asphalt Concrete of the State Standard Specifications SECTION 40 PORTLAND CEMENT CONCRETE PAVEMENT Portland Cement Concrete Pavement shall be as specified in Section 40 Portland Cement Concrete Pavement of the State Standard Specifications SECTION 41 THROUGH 62 BLANK City of Clovis Standard Specifications 2009 167
148. 28 20 1 GENERAL wis be st ie latte aot 128 20 4 0T DESCRI TON amuse each 128 20 02 INSPECTION A 128 20 1 03 ROUCH O 129 20 1 04 SOIL PREPARATION AND AMENDMENT 0 0 130 20 105 FINISH GRADING 132 20 1 06 WEED CONTROL 132 20 1 7 133 20 1 08 PLANTING GENERAL 133 20 2 1 EA EA DOTEE 134 20 2 01 lt 134 20 202 TURF 135 20 2 03 PLANTING TURE SEED ix 135 City of Clovis Standard Specifications 2009 vi 20 2 04 PLANTING TURF SOD crs eres ccna Penns delves ace deed eae elles 135 20 2 05 T R WATERING te Vittoria 136 20 2 06 TURFGRASS ESTABLISHMENT PERIOD 0 ccceccecscess
149. 3 SHRUB FERTILIZER 141 2054204 2 141 20 4 05 SHRUB ESTABLISHMENT PERIOD 4 00 141 20 5 GROUND 141 20 5 01 SPACING So ee alae ae 141 20 5 02 GROUND COVER 141 20 5 03 MULCHING aviation Abel a eel Ae eo ela 142 20 5 04 GROUND COVER FERTILIZER ccccescescesssessescesceeecesveceeserserevareerseaesrserevaneneeseuvrenaesares 142 20 5 05 GROUND COVER ESTABLISHMENT PERIOD 0 c ccccecessescessesceseeeseseeeseseaecaeseseasenenevenens 142 20 6 TREE TRANSPLANTING cccceccccscescesecessesceacsarsesseaecaeecresaeesersersaesarsersuaeseeersvaneneesanerenaeserss 142 20 6 07 GENERAL Aidit 142 20 6 02 PLANTING SITE 0 00 142 20 6 02 A DRAINAGE 142 20 6 02 TREE TRANSPLANTING HOLE c cccssssssssscsseseescscsseseseceeseesesecoesecsecacaecaesecssencatecanees 143 20 6 03 TREE PREPARATION c ccccccscescecccossescesccrsescesecaeeceseauecersersaesarsessuaesnasersvaneneesenvrenaeseres 144 20 6 02
150. 4 2 1 PVC Pipe and Fittings or shall be connected to similar pipe stub outs from manholes Sewer service laterals 4 inches or 6 inches in diameter may be connected directly to existing sewer mains 18 inches in diameter or greater providing that a machine core is used in connecting to the main sewer Sewer service laterals 8 inches in diameter or greater connecting to sewer mains shall require the construction of a manhole at the point of connection All connections shall be of materials and methods as approved by the Engineer Sewer fittings unless otherwise specified or directed shall be inclined at an angle of not greater than 45 from the horizontal Service laterals shall extend from the sewer main to the right of way line of the street or alley where the service lateral shall be promptly closed at the bell end with a plug manufactured for that purpose The Contractor shall mark the location of the end of the service lateral by putting an S mark on the curb face Said mark is to be chiseled into existing concrete or stamped if the concrete is freshly poured In cases where a concrete curb does not exist the Contractor shall mark the location of the terminus of the building or house branch for future location by driving an iron pipe or rod in the trench backfill at the end of the pipe as shown on the Standard drawing Excavations for laying service laterals shall be made in accordance with the Plans or Contract Specification
151. 8 Connect control wires to controllers in sequential arrangement according to assigned identification numbers on drawings Controllers shall be properly grounded per Article 250 of the National Electric Code and conform to local regulations Reference is made to Section 21 2 Design for operating hours Controllers shall be programmed so as not to apply excess water Care shall be taken to prevent run off and slope soil erosion caused by prolonged applications of water Note Contractor will be cited and fined for water waste in accordance with Clovis Municipal Code Solar powered controllers shall be installed per manufacturer s recommendation and as directed by the City Inspector 18 Automatic Controller Schedule Install automatic controller schedule in laminated plastic or a watertight plastic envelope inside controller cover showing which valves are connected to which stations on controller 19 Controller Charts The Contractor shall provide one controller chart for each controller supplied 20 The chart shall show the area controlled by automatic controller and shall be the maximum size controller door will allow 21 The chart may be a reduced drawing of the actual as built system However in the event the controller sequence is not legible when the drawing is reduced it shall be enlarged to a size that will be readable when reduced 22 Sprinkler Heads Sprinkler heads located in areas where ground cover planti
152. ALS 250 252 83 4 8 dual 255 83 5 SPECIALIZED INSPECTION is 255 City of Clovis Standard Specifications 2009 83 6 TESTS STANDARDS AND 0 000 256 93 7 teat 256 83 8 TRENCHING AND EXCAVATION FOR CONDUITS AND FOUNDATIONS 256 83 9 SYSTEMINSTALLATIONS 257 83 10 BACKFILL AND COMPACTION TRENCHES AND FOUNDATIONS 261 83 11 PULLBOX INSTALLATION 261 83 12 INSTALLATION OF 4 262 83 13 INSTALLATION OF SERVICES AND SWITCHBOARDS 263 83 14 SURFAGE RESTORATION 263 93 15 5 263 83 16 AS CONSTRUCTED DRAWINGS 263 83 17 SYSTEM GUARANTEE AN 264 83 18 OPERATIONS AND SERVICE MANUAL
153. ANK 315 SECTION 90 PORTLAND CEMENT CONCRETE 315 SECTION 91 PAINT 315 SECTION 92 ASPHALTS 315 SECTION 93 LIQUID ASPHALTS 315 SECTION 94 ASPHALTIC EMULSIONS 315 SECTION 95 EPOXY 315 APPENDIX 316 City of Clovis Standard Specifications 2009 GENERAL PROVISIONS SECTION 1 DEFINITIONS AND TERMS 1 1 General Unless the context otherwise requires wherever in these Standard Specifications and other contract documents the following terms or pronouns in place of them are used the intent and meaning shall be interpreted as provided in this Section 1 Reference to a particular section in these Standard Specifications is made by section number without denoting of these Standard Specifications Reference to standard specifications or standards of other agencies or organizations is so noted See Section 4 8 Incorporation of Referenced Specifications Where used in these Standard Specifications or any referenced Specifications the following abbreviations shall have the titles affixed thereto in the table below AAN American Association of Nurserymen AASHTO American Association of State Highway and Transportation Officials AISC American Institute of Steel Construction AISI American Iron and Steel Institute ANSI American National Standards Institute APHA American Public Health Association API American Petroleum Institute American Railway Engineering and Maintenance of Way AREMA
154. Any failure of equipment facilities landscape planting or workmanship prior to the end of the one year or other specified period shall be repaired or corrected by the Contractor at his sole expense in accordance with instructions of the Engineer The provisions of Sections 3 5 Material Statement Samples and Guarantees 5 23 Guarantee of Workmanship and 6 10 Guarantee of Materials also apply City of Clovis Standard Specifications 2009 65 SECTION 8 PROGRESS AND PROSECUTION 8 1 Sequence And Progress Of The Work Unless otherwise provided in the Contract Specifications the Contractor shall direct the order and sequence of work and coordinate the construction of the several parts of the Contract to a successful completion as rapidly as possible If the Engineer determines at any time that appliances used or to be used are insufficient or improper for securing the quality of work required or the required rate of progress the Engineer may order the Contractor to increase efficiency or to improve their character The Contractor shall conform to such order but the failure of the Engineer to demand any increase of such efficiency or any improvement shall not release the Contractor from the obligation to secure the quality of work or the rate of progress specified 8 2 Assignment Of Contract The Contractor shall not assign the Contract or any part thereof without the approval of the City or without the consent of su
155. Association NFPA Insulated Power Cable Engineers Association IPCEA Institute of Electrical and Electronic Engineers IEEE Illumination Engineering Society IES National Electrical Testing Association Inc NETA 83 7 Design The objective of the Plans and Contract Specifications design is to provide a lighting system which will operate in an efficient safe and satisfactory manner The finished system shall adequately and efficiently illuminate all areas to be covered and shall perform in all respects in conformance with the plans and specifications and to the satisfaction of the Engineer The electrical drawings are diagrammatic and do not necessarily show all raceways wiring number or types of fittings offsets bends or exact locations of items required by the electrical systems Materials not shown or indicated which are clearly necessary for proper operation or installation of systems shown shall be provided at no increase in contract price The Contractor shall not willfully install the lighting system facilities as indicated on the Plans when it is obvious in the field that obstructions or other features exist that might not have been considered in the design Such obstructions or differences should be brought to the attention of the Engineer in writing by the Contractor for consideration of adjustment in proposed facility locations prior to installation of facilities 83 8 Trenching And Excavation For Conduits And Fo
156. CE ENGLOSURE Sm weed 240 62 22 CONNECTORS ahi tiie httpd eer 240 82 23 PASSIVE CABLE ASSEMBLIES AND 2 4 241 82 24 WARNING TAPE ae aah de 241 82 25 SLURRY CEMENT BACKEILLE 241 92 26 TESTING sl a eat techincal asta reas 241 82 26 A GENERAL 241 82 26 242 82 26 eee ieee 242 82 26 D AFTER CABLE amp 242 82 26 242 82 26 F SYSTEM VERIFICATION AT 2 2 2 000 242 82 26 G SYSTEM TESTING AND DOCUMENTATION 9 244 82 27 MEASUREMENT 249 82 528 55 E 251 SECTION 83 LIGHTING SYSTEMS 252 83 1 GENERAL 252 83 2 EQUIPMENT LIST 252 83 3 MATERI
157. Chapter 16 Section 64572 provide separation criteria for new construction However when these criteria cannot be met the risk of contamination can be reduced by increasing the structural integrity of pipe materials and joints and ensuring minimum separation requirements are met Therefor the following guidance details construction criteria for the installation of water mains and non potable pipelines to minimize the risk of contamination of drinking water City of Clovis Standard Specifications 2009 317 April 14 2003 Revised October 16 2003 Page 2 of 11 Guidance Memo No 2003 02 DEFINITIONS COMPRESSION JOINT push on joint that seals by means of the compression of a rubber ring or gasket between the pipe and a bell or coupling CONTINUOUS SLEEVE A protective tube of high density polyethylene HDPE pipe with heat fusion joints or other non potable metallic casing without joints into which a pipe is inserted DISINFECTED TERTIARY RECYCLED WATER Wastewater that has been filtered and subsequently disinfected in accordance with Section 60301 230 Chapter 3 Water Recycling Criteria Title 22 California Code of Regulations HOUSE LATERAL A sewer line connecting the building drain and the sanitary sewer main serving the street SUPPLY LINE Pipelines conveying raw water to be treated for drinking purposes in accordance with Section 64572 proposed Water Works Standards WATER MAIN Means any pipel
158. City or other jurisdictional agency and who has agreed to do work encompassed by said permit in conformance with the requirements thereof 1 30 Plans The official Construction Plans which show the location character dimensions and details of the work to be performed Standard Drawings sometimes referred to as Standard City of Clovis Standard Specifications 2009 4 Plans profiles typical cross sections working drawings and supplemental drawings or reproductions thereof approved by the Engineer are to be considered as a part of the Plans As used in this definition the term Standard Drawings refers to the City of Clovis Standard Drawings 1 31 Proposal The written offer of the bidder for the work when made out and submitted on the prescribed proposal form properly signed and guaranteed 1 32 Proposal Form The approved document upon which the City requires formal bids be prepared and submitted for the work 1 33 Proposal Guaranty The cash cashier s check certified check or bidder s bond accompanying the proposal submitted by the bidder as a guarantee that the bidder will enter into a contract with the City for the performance of the work if the contract is awarded to the bidder 1 34 Right of Way The whole right of way or area which is reserved for and secured for use in constructing the roadway and its appurtenances 1 35 Roadbed The roadbed is that area upon which a traveled surface will be installed generally betw
159. Contractor within sixty 60 days after i written protest to an approved change order under Section 4 10 Changes or ii City s rejection of Contractor s proposed change order under Section 4 12 3 Proposed Change Orders however notwithstanding the above any and all Claims must be submitted no later than seven 7 days after the Engineer certifies the Work as complete and ready for acceptance by the City Council Failure to timely submit a Claim acts as a complete waiver of Contractor s right to recover money or time on the issues for which a Claim was required In no event will the Contractor be allowed to reserve its rights to assert a Claim for time extension or additional cost later than as required by this provision unless the Owner agrees in writing to allow such reservation Before expiration of the time for submitting a Claim Contractor may ask once in writing for a fifteen 15 day extension of any deadline for submission of a Claim and Owner shall grant such extension if reasonable grounds exist However no further extensions shall be permitted and any failure by Contractor to timely ask for an extension waives Contractor s right to an extension 4 12 5 Content Of Claim 4 12 5 1 Claim Format Every Claim shall be in writing In addition the Contractor shall certify each and every Claim at the time of submission as follows 1 name of declarant declare the following Contractor company name has contracted wi
160. D If the water main crossing above the sanitary sewer main does not meet the Case 2 Zone D requirements the sanitary sewer main should have no joints within four feet from either side of the water main in Zone D and be constructed of one of the following 1 HDPE pipe with fusion welded joints per AWWA C906 99 2 Ductile iron pipe with hot dip bituminous coating and mechanical joints gasketed bolted joints continuous section of Class 200 DR 14 per AWWA C900 97 PVC pipe or equivalent centered over the pipe being crossed 4 A continuous section of reinforced concrete pressure pipe per AWWA C302 95 centered over the pipe being crossed or 5 Any sanitary sewer main within a continuous sleeve Case 2 New water mains Installation Figures 1 and 2 Zone Special Construction Required for Water Main A No water mains parallel to sanitary sewer mains shall be constructed without prior written approval from the Department B If the sanitary sewer main paralleling the water main does not meet the Case 1 Zone B requirements the water main should be constructed of one of the following HDPE pipe with fusion welded joints per AWWA C906 99 Ductile iron pipe with hot dip bituminous coating Dipped and wrapped one fourth inch thick welded steel pipe Class 200 Type II asbestos cement pressure pipe Class 200 pressure rated PVC water pipe DR 14 per AWWA C900 97 amp C905 97 or equivalent or eS
161. E AND 28 5 8 28 5 9 PRESERVATION OF PROPERTY 28 10 6 2222 25 29 RIGHTS OF WAY 2 29 5 12 DISPOSAL OF MATERIAL OUTSIDE THE RIGHT OF WAY 29 5 13 lt 30 5 14 CONSTRUCTION SURVEYING STAKING 2 2 31 515 COOPERATION uA ch fst eect de toe cc 31 5 16 MAINTAINING 32 City of Clovis Standard Specifications 2009 ii 5 17 INSPECTION DURING CONSTRUCTION 32 5 18 DIFFERING SITE CONDITIONS 33 5 19 REMOVAL OF DEFECTIVE OR UNAUTHORIZED 4 33 5 20 SURFACE RESTORATION 33 5 21 CLEANUP ea TG 34 5 22SFINAL INSPEC ON 2526 34 5 23 GUARANTEE OF WORKMANSHIP 44 35 5 24 COST REDUCTION INCENTIVE
162. FIBER OPTIC FACILITIES 82 1 General This work shall consist of furnishing and installing fiber optic facilities including conduit fiber optic cable warning tape pull tape wire conductors tracer wire pull boxes cabinets and foundations and all incidentals thereto for a complete and functional fiber optic system all in accordance with the Plans the applicable Standard Drawings and Specifications and as directed by the Engineer 82 2 Equipment List And Drawings Where required to be submitted to the Engineer by the Plans or the Contract Specifications equipment lists and drawings of equipment and material to be furnished shall conform to the applicable provisions in Section 86 1 04 Equipment List and Drawings of the State Standard Specifications and these Standard Specifications The equipment list shall give firm delivery dates for materials In the event these dates cannot be met the equipment supplier and Contractor shall provide documentary proof of search for alternate sources of supply at least thirty 30 calendar days prior to the stated delivery dates Such action shall not be justification for granting additional working days but shall be evidence of proceeding to completion in good faith 82 3 Regulations And Codes Any electrical equipment and material required to be furnished shall conform to the provisions of Section 86 1 02 Regulations and Codes of the State Standard Specifications to the California Electr
163. Facilities 67 2 6 Tracer Wire Tracer wire shall conform to Section 66 2 12 Tracer Wire 67 3 Trenching Excavation Backfill Compaction And Surface Restoration Trenching and other excavating backfill compaction and surface restoration for recycled water mains and services shall conform to the requirements of Section 8 15 Utilities and Non Street Facilities Potholing and Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration 67 4 Alignment Changes Separation Criteria All alignment changes horizontal or vertical shall conform to the provisions of Section 66 4 Alignment Changes Separation Criteria 67 5 Installation Of Recycled Water Mains Fittings And Valves Installation of Recycled Water Mains Fittings and Valves shall conform to the provisions of Section 66 5 Installation of Water Mains Fittings and Valves and the following provisions Unless required otherwise by specific pipe elevations or cover or clearance depths shown on the Plans recycled water mains shall be installed with a minimum depth of cover as shown in the following table Where necessary to avoid conflicts with existing utilities the depth of cover shall be increased as required Such adjustments shall be accomplished by gradual changes in pipe depth whenever possible utilizing joint deflections not exceeding manufacturer s recommendations When fittings are required to accomplish such chang
164. In these cases tools with a manufacturer s rated striking energy in excess of 1 200 foot pounds per City of Clovis Standard Specifications 2009 102 blow freely falling mass a falling mass attached to cable or chain shall not be used for breaking or removing concrete which is attached to or supported by the bridge Existing reinforcement that is to be incorporated in new work shall be protected from damage and shall be thoroughly cleaned of all adhering material before being imbedded in new concrete A freely falling mass or a falling mass attached to a cable rope or chain shall not be used above any area open to the public Falling masses shall not be used within 30 feet horizontally of any area open to the public unless adequate protective shields are in place Protective shields shall be of sufficient size and strength to prevent any debris or equipment from endangering the public The shields shall be designed and proportioned as required by the size of equipment and method of operations employed but in no case shall the shields have a strength less than that provided by good sound 2 inch thick Douglas fir planking supported on posts at 5 foot centers Before beginning concrete removal operations involving the removal of a portion of a monolithic concrete element a saw cut approximately one inch deep shall be made to a true line along the limits of removal on faces of the element which will be visible in the complete
165. No compensation will be made in any case for loss of anticipated profits The lump sums and or unit prices shown in the bid proposal shall include full compensation for all Work and expenses appurtenant to the accomplishment of the project described in these Standard Specifications in the manner indicated herein including all items delineated in the Contract documents for which specific bid items are not set up in the bid proposal The Contractor shall proportionally spread all incidental costs associated with the work for which there are no separate bid items into the amount bid for those items of work for which there are bid items and no separate or additional payment will be made for any requirement of the Contract not specifically listed on the bid proposal 9 5 Payment For Extra Work Extra Work as defined in Section 4 11 Extra Work when ordered and accepted shall be paid for under a written contract change order in accordance with the terms therein provided Payment for Extra Work will be made at the unit price or lump sum previously agreed upon by the Contractor and the City or on a force account basis When extra work is to be paid for on a force account basis the Contractor shall be compensated in accordance with the provisions of Section 9 1 03 Force Account City of Clovis Standard Specifications 2009 79 Payment of the State Standard Specifications Any references therein to State or Department shall m
166. Push Button Assemblies of the State Standard Specifications these Specifications and the Contract Specifications The pedestrian push button housing shall be metallic and shall closely match the curvature of the pole Install P P B 36 inches up from pole base plate and on the side of the pole facing crosswalk If mounted on a 3 foot post a post top mounting shall be provided Pedestrian push buttons shall be Type B with sign and housing as shown on page ES 5C of the State Standard Plans The pedestrian push button switches shall meet American Disabilities Act Accessible Pedestrian Signals standards Sign shall have international symbol as shown on Page ES 5C of the Standard Plans City of Clovis Standard Specifications 2009 287 Pedestrian pushbuttons shall meet or exceed all ADA accessibility guidelines contain the features below Additional or different features will be contained in the Contract Specifications 1 The button shall be raised or flush and shall be a minimum of 2 inches in diameter 2 Activating force of less than 3 5 Ibs 3 Telescoping tamper proof design 4 Stainless steel actuator surface and assembled with all stainless steel components 5 Dustproof water resistant microswitch with an operating life of gt 10 million actuations It shall be a single pole precision snap acting type switch and shall be UL rated 6 The switch housing shall be aluminum and powder coated a dark green color P
167. R MAINS AND NON POTABLE PIPELINES The purpose of this memo is to update guidance dated April 5 1983 for consistency with proposed 2003 regulations Should there be any modification to the proposed Water Works Standards that may impact the content of this guidance the guidance will be amended accordingly GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON POTABLE PIPELINES BACKGROUND When buried water mains are in close proximity to non potable pipelines the water mains are vulnerable to contamination that can pose a risk of waterborne disease outbreaks For example sewers sanitary sewer mains and sewage force mains frequently leak and saturate the surrounding soil with sewage due to structural failure improperly constructed joints and or subsidence or upheaval of the soil encasing the sewer If a nearby water main is depressurized and no pressure or negative pressure occurs that situation is a public health hazard that is compounded if an existing sewer is broken during the installation or repair of the water main Further failure of a water main in close proximity to other pipelines may disturb their bedding and cause them to fail In the event of an earthquake or other disaster simultaneous failure of all pipelines could occur The most effective protection against this type of drinking water contamination is adequate construction and separation of non potable pipelines and water mains The Waterworks Standards Title 22
168. RMINATION OF 8 14 ACCEPTANCE OF 0000000 0 8 15 UTILITY NON STREET FACILITIES 2 888 SECTION 9 MEASUREMENT AND PAYMENT 9 1 MEASUREMENT OF 5 9 2 COST BREAKDOWN ie 9 3 FINAL PAY ITEMS a Add atin 09 425 9 5 PAYMENT FOR EXTRA WORK ol 9 6 PARTIAL PROGRESS PAYMENTS 8 9 7 STOP NOTICES CITY S RIGHT TO WITHHOLD 9 8 PAYMENT OF WITHHELD FUNDS SUBSTITUTIONS FOR 10 9 9 NOTICE OF POTENTIAL O AN 9 10 FINAL PROGRESS 9 11 FINAL PAYMENT TO RELEASE OWNER 22 2 4 804 46400000 9 12 PAYMENT OF RETENTION 355 SECTION 10 DUST CONTROL 1024 DUST CONTRO bts
169. SEWER 5 178 64 10 TELEVISION INSPECTION INSTALLED PIPE 4 179 64 11 ALIGNMENT CHANGES SEPARATION CRITERIA ccccccsesesececscscsesacsesesecececsesesacsesesacseseees 179 64 12 179 64 13 PAYMENT 179 SECTION 65 SANITARY SEWER FORCE MAINS 181 05 1 GENERA Le Rie tei 181 65 2 MATERIA S 181 05 251 PVG PIPE st 181 65 22 181 5 2 3 6 A 182 G52 THRUSG 183 City of Clovis Standard Specifications 2009 viii 65 3 FORCE MAIN 5 183 65 4 TRACER WIRE 2 2 6 Enar Eara 183 65 5 PLUG VALVE 0 2 0 183 65 6 LEAKAGE TESTING cccceccescssccersescesccctenceaecucecasssaecarsescvsesaesencuaevacecassaecnaesasease
170. Safety and Health Reference is made to Section 19 3 02 Trench and Structure Excavation of these Specifications for additional safety requirements 68 4 Excavating Jacking And Receiving Pits Before starting excavation the Contractor shall submit drawings or details of jacking pit bracing casing pipe jacking equipment skids or concrete support blocks bracing to prevent pipe shifting or flotation and all other equipment or methods to be used Excavation for jacking and receiving pits shall conform to the provisions in Section 8 15 Utility and Non Street Facilities Potholing Section 19 3 02 Trench and Structure Excavation and to the following provisions Jacking and receiving pits shall not extend beyond vertical planes passing through the jacking and receiving pit limits shown on the Plans and shall be sheathed shored sloped or braced in accordance with the Safety Regulations of the State of California Department of Industrial Relations Division of Industrial Safety 68 5 Boring And Jacking Unless otherwise specified the methods and equipment used in jacking operations shall be optional with the Contractor provided that the proposed method is approved by the Engineer Such approval however shall in no way relieve the Contractor of the responsibility for making a satisfactory installation meeting the criteria set forth on the Plans or specified in the Contract Specifications or these specifications Only workers
171. Section 7 14 Trenches and Excavations Hazardous Waste No recyclable material shall be disposed of at any landfill All disposable recyclable materials shall be disposed in a manner that facilitates recycling A certificate of compliance stating disposal location and manner of disposal of recyclable materials shall be submitted to the Engineer City of Clovis Standard Specifications 2009 29 When any material is to be disposed of outside the right of way the Contractor shall first obtain a written permit from the property owner on whose property the disposal is to be made and shall file with the Engineer said permit or a certified copy thereof When material is disposed of as above provided the Contractor shall conform to all requirements of the City Municipal Code pertaining to grading hauling and filling of earth including any permits bonds so required Hauling of any materials from the work site shall conform to the provisions in Section 6 12 Materials Hauling The contractor shall clean up and dispose of all excess materials and other debris in any right of way or ground occupied by him and shall restore utilities and improvements on public or private property that has been used or damaged by his operations Full compensation for all costs involved in disposing of materials as specified in this Section 5 12 including all costs of hauling and any landfill or other fees shall be considered as included in the price paid f
172. State Standard Specifications City of Clovis Standard Specifications 2009 215 73 9 Backfilling After removal of forms the area adjacent to the newly constructed concrete improvement shall be cleaned of all surplus concrete and other debris and the area filled with clean earth suitable for planting except in front of the gutter Backfill shall be placed behind the curb prior to any excavation in the street area below the plane of the bottom of curb and gutter Where there is a planter strip between the curb and the sidewalk the planter strip shall be filled to within 1 inch of the top of curb and sidewalk with clean earth suitable for planting The area of traffic divider median islands not to be capped with concrete shall be backfilled with clean earth suitable for planting to within 2 inches of a line extending between adjacent tops of curb 73 10 Measurement Unless otherwise specified in the Contract Specifications concrete curb concrete gutter alley gutter concrete curb and gutter and concrete mowstrip shall be measured by the lineal foot Curb depressions will be included in the measurement of length of concrete curb or concrete curb and gutter as the case may be Unless otherwise specified in the Contract Specifications concrete sidewalks and wheelchair ramps concrete driveway approaches concrete alley approaches concrete valley gutters and concrete median caps shall be measured by the square foot Measurement of conc
173. Such fees shall be applied in accordance with the fee schedule in effect at the time of permit issuance The inspection approval and or acceptance of the work shall not relieve the Contractor of any obligations to fulfill the Contract as prescribed Defective work shall be made good and unsuitable materials may be rejected notwithstanding the fact that such defective work and unsuitable materials may have been previously overlooked by the Engineer or Inspector and accepted or estimated for payment City of Clovis Standard Specifications 2009 32 Projects financed in whole part with funds from sources other than the City shall be subject to inspection at all times by the agency providing said funds or its authorized agent When specified in the Contract Specifications the Contractor shall meet no less than weekly with the City to review all construction issues The City shall prepare minutes for each meeting and forward them to Contractor Contractor s failure to correct the minutes within four 4 days shall be deemed agreement with the content of the minutes Either party has the right to audiotape or videotape the weekly meeting 5 18 Differing Site Conditions During the progress of the work if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature differing materially from those ordinarily encountere
174. TM D1556 or other methods approved by the Engineer may be used for sampling of compacted soil The Contractor s responsibility for costs associated with testing shall be in accordance with the provisions of Section 6 8 Samples and Tests The contractor shall give notice to the Engineer two 2 working days in advance of when the required compaction tests are to be taken Normally the first series of tests will be taken at the expense of the City Any further tests needed to check recompacted areas because of a failure to pass the original test shall be at the expense of the Contractor The Engineer shall specify the locations where compaction tests are to be taken 6 10 Guarantee Of Materials The Contractor shall comply with the provisions in Sections 3 5 Materials Statement Samples and Guarantees 5 23 Guarantee of Workmanship and 7 23 Guarantee The Contractor shall guarantee all materials including landscape plantings irrigation systems equipment and workmanship of the installation for a period of one year from the date of the Acceptance of the Work by the City Council Additional guarantees may be required by the Contract Specifications Should any material or appliance or any work develop any defect or weakness due in the opinion of the Engineer to the use of imperfect materials equipment or workmanship or failure to follow the Contract including the Plans and Specifications the Contractor shall be no
175. The manufacturer producer supplier or fabricator of foreign material shall furnish to the Engineer a Certificate of Compliance in conformance with the provisions in Section 6 5 Certificates of Compliance In addition certified mill test reports clearly identifiable to the lot of material shall be furnished where required in these specifications the Contract Specifications or otherwise requested by the Engineer 6 7 Local Materials Local material is rock sand gravel earth or other mineral material other than local borrow or selected material obtained or produced from sources in the vicinity of the work specifically for use on the project Local material does not include materials obtained from established commercial sources Local materials shall be furnished by the Contractor from any source the Contractor may elect except that when mandatory local material sources of certain materials are designated in the special provisions the Contractor shall furnish material from those designated mandatory sources The Contractor shall make all arrangements necessary to obtain materials from any local material source other than a mandatory local material source If the Contractor elects to obtain material from any other non mandatory source the Contractor shall furnish the Engineer with satisfactory evidence that the Contractor has entered into an agreement with the property owner for obtaining material from that source and with copies of any neces
176. a mistake was made in the bid presented the bidder shall give the Engineer written notice within 5 days after the opening of the bids of the alleged mistake specifying in the notice in detail how the mistake occurred 2 10 Rejection Of Proposals The City reserves the right to reject any or all proposals Proposals may be rejected if they show any alteration of form additions not called for conditional or alternative bids incomplete bids erasures or irregularities of any kind Proposals in which the prices are obviously unbalanced may be rejected The City may reject all bids for budgetary reasons More than one proposal from an individual a firm or partnership a corporation or an association under the same or different names will not be considered Reasonable grounds for believing that any bidder is interested in more than one proposal for the work contemplated may cause the rejection of all proposals in which such bidder is interested City of Clovis Standard Specifications 2009 9 SECTION AWARD AND EXECUTION OF CONTRACT 3 1 Award Of Contract The award of the Contract if it is awarded will be to the lowest responsible bidder whose proposal complies with all the requirements described For projects with no alternates the award shall be determined by comparing the base bids When alternative bids are included in the bid proposal the award shall be determined by comparing the lowest totals of the base bid plus the bids of th
177. absence of a contract item for City of Clovis Standard Specifications 2009 101 removing concrete the cost thereof will be considered as being included the various items of work and no measurement for payment will be made No deductions will be made from any excavation quantities for the volume of concrete removed 15 3 04 Payment Payment for concrete removal will be made at the price per unit of measurement specified in the Contract Specifications Payment includes full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work and performing all the operations involved in removal of concrete as shown on the Plans as specified the Specifications and as directed by the Engineer No additional compensation will be paid for the removal of concrete containing steel reinforcing or other steel where encountered In the absence of a contract item for removal of concrete the cost thereof shall be considered as included in the various items of work and no additional payment will be made therefor 15 4 Bridge Concrete Culvert Removal 15 4 01 Description This work shall consist of removing existing bridges concrete culverts or portions thereof The type and general dimensions of the bridges or portions of bridges or concrete culverts to be removed will be shown on the Plans or described in the Contract Specifications For purposes of these Standard Specifications bridge shal
178. ace 4 Hex head stainless steel mounting screw with nylon locking patch and a cone tip point to lock the bushing securely in place Cast threads opposite the mounting screw to tighten the fit during installation The bushing shall of malleable iron construction and shall be zinc plated or mechanically galvanized All metallic conduits within a pull box cabinet or pedestal shall be bonded together by means of a solid No 8 bare copper wire connected to the individual bonding bushings The distance between conduits entering pull boxes and cabinet bases shall be a minimum of two inches No conduit run shall pass through a signal controller or luminaire base including future bases as shown on plans except the conduit which terminates within the base If conduit is installed under existing pavement sidewalk or driveway it shall be placed by directional boring or jacking Pavement shall not be disturbed without the written permission of the Engineer If more than one conduit is being jacked to the same location and are parallel to each other or if one conduit is being jacked parallel to an existing conduit a distance of 18 inches or more shall be maintained between these conduits All dirt and debris shall be cleaned out of conduits prior to installing conductors Where conduit is installed and no conductors are placed within said conduit the contractor shall in the presence of the Engineer or his representative pull a mandre
179. aced with sandy soil Backfilling shall be performed in 24 inch lifts with each lift thoroughly saturated with water prior to placing the next lift Payment for drainage holes will be made at the contract item bid price therefor If no contract item is provided for drainage holes the cost thereof shall be paid for as Extra Work in conformance with Section 4 11 Extra Work 20 3 04 Tree Planting Holes And Backfilling Root Barriers Tree planting holes shall be dug and prepared in accordance with the applicable Standard Drawings for Tree Planting at the locations shown on the plans to receive trees or at the locations determined in accordance with Section 20 3 02 Spacing Holes shall have level bottoms and a diameter twice that of the root ball At locations approved by the Engineer planting holes may be prepared by auguring two 24 diameter holes side by side In either case holes shall have a depth no greater than the planned depth of the root ball Reference is made to Section 20 1 08 Planting General and Section 20 3 05 Tree Fertilizer Planting holes for trees shall be backfilled with a mix composed of M Roots approved equal and soil removed from the hole using mix ratios recommended by the additive manufacturer Backfill material in planting holes shall be tamped firm and a watering basin conforming to the applicable Standard Drawing for Tree Planting formed around the plant For trees located in turf areas
180. acer wire may shall not be placed on the inside of conduit installed by direct horizontal boring methods but shall be affixed to the outside of the conduit in a manner approved by the Engineer 82 11 Damaged Conduit Damaged conduit shall not be installed and removed from the jobsite If the conduit is damaged during or after installation the conduit shall be replaced or repaired to the satisfaction of the engineer Any fiber optic conduit whose inner surface is damaged or not smooth or is clogged or crushed shall be replaced 82 12 Restoration Of Surfaces Restoration of Surfaces shall be performed in accordance with the details shown on the Plans as specified in the Contract Specifications and with Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration 82 13 Adjusting And Cleaning Upon completion of installation of fiber optic conduits and boxes inspect interiors of fiber optic conduits and boxes and clear all blockages remove burrs dirt and construction debris Reference is made to Section 82 9 Conduit Deflection Deformation Test 82 14 Fiber Optic Pullboxes Pullboxes shall be furnished and installed in conformance with Section 86 16 Pullboxes and the applicable Standard Drawings except as modified in this Section 82 14 Unless otherwise shown on the Plans or specified in the Contract Specifications Pullboxes shall be City of Clovis Standard Specifications 2009 230
181. actor or any person from the duty of exercising due care The Contractor shall take all necessary precautions for safe operation of the Contractor s equipment and the protection of the public from injury and damage from the Contractor s equipment 7 6 Air Pollution Control For all projects the Contractor shall comply with State air pollution control rules regulations ordinances and statutes which apply to any work performed pursuant to the contract including any air pollution control rules regulations ordinances and statutes specified in Section 11017 of the Government Code The Contractor shall also comply with all of the requirements of Regulation VIII of the San Joaquin Valley Air Pollution Control District APCD It will be the Contractors responsibility to contact the APCD to determine the requirements of said Regulation and any costs related to compliance therewith All costs for compliance including any permit fees shall be included in the various items of work no separate or additional payment will be made therefor Reference is made to Section 7 10 Permits and Licenses In addition to foregoing requirements for projects specified in the Contract Specifications to be subject to Rule 9510 of the APCD Contractors shall before submitting a bid contact the APCD and determine the project specific requirements of said Rule Any project specific permit fee will be paid by the City All other costs for compliance with the Rule 9510
182. actor under the Contract Liquidated damages will accrue without notice and any failure by City to withhold for some or all of them shall not act as a waiver by City of its rights to later claim the liquidated damages Any waiver of liquidated damages by the City must be express and in writing It is further agreed that in case the Work is not finished and completed in all parts and requirements within the specified time the City shall have the right to extend or not to extend the time for completion as may seem best to serve the interest of the City If the City decides to extend the time limit for the completion of the Contract the City shall further have the right to charge to the Contractor his heirs assigns or sureties and to deduct from the final payment for the work all or any part as the City may deem proper of the actual cost of engineering inspection superintendence and other overhead expenses which are directly chargeable to the Contract and which accrue during the period of such extension except that the cost of final surveys and preparation of the final estimate shall not be included in such charges The Contractor shall not be assessed with liquidated damages or the cost of engineering and inspection during any delay in the completion of the work caused by acts of God or acts of the public enemy the City fire epidemics quarantine restrictions strikes and freight embargoes provided that the Contractor shall within five
183. ade with liquid chlorine calcium hypochlorite in solution or sodium hypochlorite solution shall be water mixed and introduced into the mains to form a chlorine concentration of approximately 100 parts per million ppm or that which will provide a minimum residual of 50 ppm in all parts of the line after 24 hours have elapsed During the sterilization process all valves hydrants and other accessories shall be operated After chlorination the water shall be flushed from the line at its extremities until the replacement water tests are equal chemically and bacteriologically to those of the permanent source of supply The placing of HTH capsules or tablets in pipe sections during the laying process will be considered as an acceptable method of introducing chlorine for the test The chlorine water solutions shall be diluted to a chlorine concentration of not more than 100 ppm and not less than 50 ppm measured in the water lines The Contractor shall keep adequate chlorine residual testing and indicating apparatus available on the site during the entire sterilization period After final flushing the flushing fittings shall be plugged with devices intended for this purpose at the pressure class of the pipe Where water main is coated plugs and outlets shall be similarly coated Bacteriologic samples of water for the specified bacteriologic test shall be taken from each end of the sterilized main located downstream of the point of introduction of c
184. aking final payment to the subcontractor for work performed on the public works City project the contractor shall obtain an affidavit signed under penalty of perjury from the subcontractor that the subcontractor has paid the specified general prevailing rate of per diem wages to the subcontractor s employees on the public works City project and any amounts due pursuant to Section 1813 of the Labor Code Pursuant to Section 1775 of the Labor Code the Division of Labor Standards Enforcement shall notify the Contractor on a public works City project within 15 days of the receipt by the Division of Labor Standards Enforcement of a complaint of the failure of a subcontractor on that public works City project to pay workers the general prevailing rate of per diem wages If the Division of Labor Standards Enforcement determines that employees of subcontractor were not paid the general prevailing rate of per diem wages and if the City did not retain sufficient money under the contract to pay those employees the balance of wages owed under the general prevailing rate of per diem wages the contractor shall withhold an amount of moneys due the subcontractor sufficient to pay those employees the general prevailing rate of per diem wages if requested by the Division of Labor Standards Enforcement The Contractor shall pay any money retained from and owed to a subcontractor upon receipt of notification by the Division of Labor Standards Enforcement that th
185. al loss that in the opinion of the Engineer was unavoidable Payment will be determined on the basis of extra work on a force account basis or as otherwise agreed to by and between the Engineer and the Contractor in accordance with Section 4 11 Extra Work City of Clovis Standard Specifications 2009 71 8 11 Temporary Suspension Work The Engineer shall have the authority to suspend the Work wholly or in part for such period as City desires The Contractor shall immediately obey such order of the Engineer to suspend the Work and shall not resume the Work until ordered in writing by the Engineer In the event that a suspension of Work is ordered as provided above and should that suspension be ordered by reason of the failure of the Contractor to carry out orders or to perform any provision of the contract or by reason of weather conditions being unsuitable for performing any item or items of Work which Work in the sole opinion of the Engineer could have been performed prior to the occurrence of the unsuitable weather conditions had the Contractor diligently prosecuted the Work when weather conditions were suitable then Contractor shall not be entitled to compensation money or time for the suspension and the Contractor at the Contractor s expense shall do all the work necessary to provide a safe smooth and unobstructed passageway through construction for use by traffic during the period of that suspension as provided in S
186. all be approved by the Engineer in advance Such water shall be chemically and biologically suitable for the intended use In conformance with Section 20 Landscape Planting and Section 21 Landscape Irrigation Systems the water supply for landscape planting and irrigation systems shall be provided by the Contractor in accordance with the Plans and Specifications A permanent water meter will be furnished by the City for each irrigation system connection to the City water system unless otherwise specified The Contractor will be charged for all water consumed through these connections in addition to water consumed through the hydrant meter including water consumed for testing purposes and for landscape irrigation through the 90 day maintenance period and up to final acceptance of the work by the Engineer All costs for furnishing electric service and water including water consumed for landscape irrigation and irrigation system testing shall be included in the various related bid items of work no additional payment will be made therefor City of Clovis Standard Specifications 2009 30 5 14 Construction Surveying Staking Unless otherwise specified in the Contract Specifications construction surveying and staking shall be provided by the Contractor Surveying and staking shall be conducted only by a person licensed by the State of California to practice Land Surveying Surveying shall conform to the quality and practice require
187. all other areas unless elevation is shown on plans or otherwise City of Clovis Standard Specifications 2009 261 directed by the Engineer Pull boxes installed median islands for left turn intermediate and far detectors shall be placed adjacent to the curb farthest from the left turn lane When pull boxes are placed in dirt and planting areas a concrete collar shall be constructed around the pull box The surface elevation of the collar shall match the surface elevation of the pull box and slope away from the pull box at a rate of 1 50 2 slope The width of the collar shall be 12 wide and 6 in depth On long runs pull boxes shall be installed at a maximum spacing of 200 feet Pull boxes shall be required at all conduit change of direction The word LIGHTING shall be inscribed on all pull box covers except for splice boxes if used adjacent to PG amp E s service pole This pull box cover shall be inscribed as indicating P G amp E Pull box covers shall not contain hold down bolts or holes unless otherwise shown on the Plans or specified in the Contract Specifications At completion of all work in pull boxes an approved ant repellent Rainbow Insect Control Distributed by Southwest Power 800 670 7746 or approved equal shall be supplied by the Contractor and installed by the City 83 12 Installation Of Grounding Grounding systems shall comply with all the codes and ordinances specified Grounding systems sh
188. all provide continuity through the entire electrical system including Panel board ground buses All conduit or other raceways All motors All lighting fixtures Grounding terminals of all receptacles Miscellaneous grounds required by code gt Main service grounds Equipment and raceway bonding procedures shall be rigidly maintained and meet all jurisdictional requirements of codes and regulations There will be an equipment bond wire in all conduits Good electrically continuous metal to metal contacts shall be made wherever possible at all panel boxes pull boxes etc Where it is not possible to obtain good contacts the conduit shall be bonded around the boxes with a 6 B amp S gauge rubber covered double braided wire with ground clamps Provide a separate grounding conductor in all flexible conduit runs to include watertight flexible conduit with integral grounding straps Install ground conductors inside conduit with ungrounded conductors Extend from nearest panel to device being connected All new service installations shall be grounded in accordance to code requirements and per the Plans Isolated transformers including mini power zones shall be grounded on the secondary to a ground rod An existing service will be grounded to a visible ground rod and City of Clovis Standard Specifications 2009 262 metal water piping Check resistance to ground at all locations new existing services an
189. alvanized or may be cleaned and painted with two coats of zinc oxide zinc dust paint conforming to the requirements of Federal Specification MIL P 15145 the paint to be properly compounded in a suitable vehicle in the ratio of one part zinc oxide to 4 parts zinc dust by weight Chain link fence fabric specified for the fence shall be attached to the gate frame by the use of stretcher bars and the tie wires as specified for fence construction and suitable tension connectors spaced at approximately one foot intervals The gates shall be hung by at least two steel or malleable iron hinges not less than 3 inches in width so designed as to securely clamp to the gate posts and permit the gate to be swung back against the fence Gates shall be provided with a combination steel or malleable iron catch and locking attachment of approved design Stops to hold gates open and a center rest with catch shall be provided for all double gates Walk gates shall be provided with stops only 80 2 4 Concrete Concrete for post footings shall be Class 3 conforming to the requirements of Section 90 Portland Cement Concrete of the State Standard Specifications 80 2 5 Timber Timber for Timber Barricades shall conform to the requirements shown on the Standard Drawing for Temporary Timber Barricade 80 3 Clearing And Grubbing Clearing and Grubbing shall conform to the requirements of Section 16 Clearing and Grubbing 80 4 Excavation And Preparati
190. ance of the work embraced under these Specifications as will secure a satisfactory quality of work and rate of progress Such methods shall meet the approval of the Engineer and shall be submitted for approval before being used on the work The Engineer reserves the right during the progress of the work to make suggestions and revisions in the methods in order that a high quality of work and satisfactory rate of progress may be obtained When ordered by the Engineer the Contractor shall discontinue unsuitable methods of work City of Clovis Standard Specifications 2009 26 5 6 Order Of Work Where required by the Plans or Specifications the Contractor shall follow the sequence of operations as set forth therein City of Clovis Standard Specifications 2009 27 Full compensation for conforming to those requirements will be considered included in the prices paid for the various contract items of work and no additional compensation will be allowed therefor 5 7 Superintendence And Personnel The Contractor shall designate in writing before starting work an authorized representative who shall have the authority to represent and act for the Contractor to receive suggestions or direction from the Engineer or Inspector and to see them faithfully executed The Contractor shall provide the name address and phone number of each such superintendent or foreman so designated When the Contractor is comprised of 2 or more persons firms par
191. ances and Appearance of the State Standard Specifications City of Clovis Standard Specifications 2009 267 The application rates of waterborne or solvent borne paint provided in Section 84 3 05 Application of the State Standard Specifications and as amended by these Standard Specifications Two coats of paint shall be applied at the rate of 100 square feet per gallon of paint at a thickness of 15 mils wet Beads shall be applied for both coats of paint at a rate of 5 Ibs per gallon of paint Word markings letters numerals legends and symbols shall be applied utilizing suitable approved equipment together with approved stencils and templates All markings shall be standard and shall be identical with those used by the City of Clovis The Contractor shall borrow stencils for directional arrows and word markings from the City of Clovis Public Utilities Department at 155 N Sunnyside Avenue and return them in good condition Stencils damaged by the Contractor will be replaced at the Contractor s expense When no previously applied figures markings or traffic striping are available to serve as a guide suitable layouts such as cat tracking shall be spotted in advance of the permanent application Written approval of temporary layout shall be obtained prior to permanent application The Contractor shall mark or otherwise delineate the traffic lanes in the new roadway or portion of roadway or detour before opening it to traffic
192. and Quality of Materials at the option of the Engineer the source of supply of each of the materials shall be approved by the Engineer before delivery is started and before such material is used in the work Representative preliminary samples of the character and quality prescribed shall be submitted by the Contractor or producer of all materials to be used in the work for testing or examination as desired by the Engineer The Contractor shall furnish and deliver such City of Clovis Standard Specifications 2009 40 samples of materials as requested by the Engineer without charge material shall be used until it has been approved by the Engineer Samples will be secured and tested whenever necessary to determine the quality of materials Whenever a reference is made in these Standard Specifications to a specification manual or test designation either of the ASTM the AASHTO Federal Specifications or any other recognized national organization and the number or other identification representing the year of adoption or latest revision is omitted it shall mean the specification manual or test designation in effect on the day the Notice Inviting Bids for the work is dated Whenever the specification manual or test designation provides for test reports such as certified mill test reports from the manufacturer copies of those reports identified as to the lot of material shall be furnished to the Engineer by the Contractor The m
193. and by the Contractor for a a time extension b payment of money or damages arising from work done by or on behalf of the Contractor payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled to or c an amount the payment of which is disputed by the local agency However a Claim does not include a proposed change order submitted pursuant to these provisions since a City of Clovis Standard Specifications 2009 17 proposed change order is less formal procedure that is preliminary to a Claim In addition a Claim does not include vouchers invoices progress payment applications or other routine or authorized forms of requests for progress payments on the Contract The responsibility to substantiate Claims shall rest with the Contractor 4 12 2 Notice Requirements Written notices of potential extra work potential delay and or potential Claims based on Extra Work or delay shall be submitted to City by Contractor within seven 7 days of becoming aware of the facts and or issue creating such potential for Extra Work delay or Claim unless such facts and or issue are or may soon be affecting the costs or critical path of the Work in which case the written notice s shall be submitted immediately so the City may take immediate action to mitigate cost and schedule impacts for the Work The written notice shall explain the nature of the potential Extra Work delay or Claim so the City
194. and completion dates of various activities including early and late dates and float for each activity procurement of materials the critical path and scheduling of equipment City of Clovis Standard Specifications 2009 67 The construction schedule shall be consistent respects with the time and order of work requirements of the Contract The Contractor shall submit an updated schedule on a monthly basis that includes an accurate as built schedule and the current as planned schedule The Contractor shall submit its daily logs for the month with the updated schedule Float shall be used by the parties on a first come first serve basis If the Contractor desires to make a significant change in his method of operations after commencing construction he shall submit to the Engineer a revised construction schedule in advance of beginning revised operations If the Contractor s actual progress falls behind the scheduled progress within seven 7 days of a City request the Contractor shall prepare and submit a recovery plan The recovery plan must include a revised schedule that would recover the lost time and still complete the Work by the scheduled completion deadline The recovery plan shall also list any additional costs that would be incurred by Contractor during implementation of the recovery plan If the City directs Contractor to implement the recovery plan then Contractor shall do so If the Contractor believes that it is en
195. and for doing all the work involved in stalling signs as shown on the Plans as specified in the Specifications or as directed by the Engineer City of Clovis Standard Specifications 2009 269 SECTION 85 RAISED PAVEMENT MARKERS 85 1 General Raised Pavement Markers shall be as specified in Section 85 Pavement Markers of the State Standard Specifications except as modified in this Section 85 Deletions Section 85 1 07 Pavement Recesses is hereby deleted Delete from all other sections any reference to pavement recesses Additions Section 85 1 08 Pavement Marker Protection In compliance with Sections 7 18 Public Safety 15 2 02 C Traffic Stripes and Pavement Markings and 15 2 02 D Pavement Markers the Contractor shall provide appropriate traffic control measures to protect all newly placed raised pavement markers from damage up to and including scheduling the installation during off peak or weekend periods Any damaged pavement markers shall be immediately replaced at the Contractor s expense Where existing raised pavement markers are to remain the Contractor shall take special care to protect existing pavement markers from damage or coating The Contractor shall at his expense replace all damaged or coated markers Section 85 1 09 Pavement Marker Removal Removal of Pavement Markers shall comply with Sections 7 18 Public Safety 15 2 02 C Traffic Stripes and Pavement Markings
196. and quality equal to the best material in the existing facility Furnishing of material to replace unsuitable materials as ordered by the Engineer will be paid for as extra work as provided in Section 4 11 Extra Work 15 2 05 A Frames Covers Grates And Manholes Frames covers or grates of existing manholes water valve covers inlets or other facilities shall be adjusted to grade with new materials in accordance with the provisions of these specifications the Contract Specifications and the Standard Drawings In the absence of any requirements set forth by the foregoing raising existing facilities to grade shall be accomplished using new materials similar in character to those in the original structure Existing facilities being adjusted to grade shall be cleaned internally of all mud and debris down to and including the bottom of the manhole other structure or water valve box regardless of whether the material was present prior to beginning of construction After the existing cover or grate frame has been removed the top of the structure to be raised shall be trimmed to provide a suitable foundation for the new material When reconstruction or adjustment of a concrete drainage or other facility requires partial removal of concrete sufficient concrete shall be removed to permit new reinforcing steel to be spliced to existing reinforcing steel as specified in Section 52 1 08 Splicing of the State Standard Specifications Existing reinfo
197. and shall be used in lieu of such conflicting portions in the other specifications in accordance with Section 4 2 Coordination Interpretation and Precedence of Plans and Specifications 4 9 Work To Be Done The work to be performed under the Contract consists of furnishing all materials equipment supplies labor and transportation and performing all Work as required by the Contract in strict accordance with the contract documents in a satisfactory and workmanlike manner The Work includes all work material and services not expressly called for the Contract Specifications or not shown on the Plans but which may be necessary for completion and proper construction to carry out the Contract in good faith The site of Work shall be left in a City of Clovis Standard Specifications 2009 15 neat condition The cost of all Work performed furnished and installed is to be included in the amount bid for the various items of Work with no separate compensation allowed therefor City of Clovis Standard Specifications 2009 16 4 10 Changes The City reserves the right to make such alterations deviations additions to or deletions from the plans and specifications including the right to increase or decrease the quantity of any item or portion of the Work or to delete any item or portion of the Work see Section 2 4 Quantities as be deemed by the Engineer to be necessary or advisable and to require such Extra Work as
198. and the Contractor for his own convenience requests a closure such request shall be made to the Engineer in writing not less than ten 10 working days prior to the requested date of closure Such request shall be accompanied by a Traffic Management Plan Road Closure and Detour Plan prepared by a Civil or Traffic Engineer registered by State of California The Plan shall conform to the appropriate Part s of the California MUTCD The Engineer shall respond to the Contractor not less than four 4 working days prior to the requested date of closure If City of Clovis Standard Specifications 2009 89 approved by the Engineer the Contractor shall implement the plan as prepared including any amendments made by the Engineer thereto Notifications shall be made in accordance with Subsection 12 2 01 Traffic Control Plan Notifications Where the Engineer determines that non emergency traffic or other conditions warrant closure of a road the Engineer may direct the Contractor to immediately prepare a Traffic Management Plan no later than twenty four 24 hours for review by the Engineer Alternatively the City may prepare such Plan The Contractor shall implement the Plan at the time prescribed by the Engineer Changed conditions considered to be dangerous or emergencies requiring immediate closure of a road shall immediately be brought to the Engineer s attention If deemed warranted by the Engineer the Contractor shall immediately implem
199. andscaping shall be roto tilled but soil amendment added Option 1 Soil amendment components for all soil types and application rates Black Humus 20 cubic yards per acre Powdered Agricultural Grade Gypsum 15 Calcium minimum 2 000 Ibs per acre M Roots Roots Inc or approved equal 435 Ibs per acre City of Clovis Standard Specifications 2009 130 a Notify City Inspector for observation of application and incorporation of soil amendment b Roto till soil amendment mix into the soil to a depth of 8 to 12 inches City of Clovis Standard Specifications 2009 131 Option 2 a Collect representative soil samples from areas to receive landscape planting Record and stake each sample location and mark samples accordingly b Have a Soil Chemical Analysis and Percent Organic Analysis performed on the samples by a certified Soils Testing Lab c Obtain a Soil Amendment Recommendation from a Certified Crop Advisor based on the Soils Lab Analyses and submit it to the City Engineering Inspector for approval prior to use d Notify City Engineering Inspector for observation of application and incorporation of soil amendment as specified in this Section 20 1 04 Rototill soil amendment mix into the soil to a depth of 8 to 12 inches Note for Option 2 Where soil types vary significantly by location to the extent that soil amendment recommendations will also vary care must be given by the contractor t
200. anic material and other objectionable material as determined by the Engineer including but not limited to concrete or masonry wood metal or other scrap All recyclable items and materials to be removed shall be removed in a manner that facilitates their recycling Trees designated for removal shall be removed in such a manner as not to injure standing trees plants and improvements which are to be preserved Tree branches extending over the roadway which interfere with the work shall be trimmed in a professional manner by the Contractor at the direction of the Engineer All concrete asphalt concrete and oiled dirt within the right of way shall be removed by the Contractor unless designated to remain on the Plans If said concrete asphalt concrete or oiled dirt is located within the roadway alley curb and gutter or sidewalk prism to be replaced the removal shall be considered as included in the contract items of work for the replacement and not as Clearing and Grubbing Where a portion of an existing concrete facility is to be removed it shall be cut to a minimum depth of 1 5 inches with an abrasive type saw at the first scoring line at or outside the planned joint and removed without damage to any portion that is to remain in place If curbs and gutters cannot be cut off square and neat the entire curb and gutter shall be removed to the nearest weakened plane or expansion joint The shortest allowable remaining portion between expansion jo
201. anufacturer s test reports shall supplement the inspection sampling and testing provisions in this Section 6 and shall not constitute a waiver of the City s right to inspect When material which cannot be identified with specific test reports is proposed for use the Engineer may at the Engineer s discretion select random samples from the lot for testing Test specimens from the random samples including those required for retest shall be prepared in accordance with the referenced specification and furnished by the Contractor at the Contractor s expense The number of the samples and test specimens shall be entirely at the discretion of the Engineer Unidentified metal products such as sheet plate and hardware shall be subject to the requirements of Section 55 2 07 Unidentified Stock Material of the State Standard Specifications When requested by the Engineer the Contractor shall furnish without charge samples of all materials entering into the work and no material shall be used prior to approval by the Engineer except as provided in Section 6 5 Certificates of Compliance Samples of material from local sources shall be taken by or in the presence of the Engineer otherwise the samples will not be considered for testing All tests of materials furnished by the Contractor shall be made in accordance with the commonly recognized standards of national organizations and such special methods and tests as prescribed in these Specificati
202. are suspended for any reason the Contractor shall remove all equipment and other obstructions from that portion of the roadway open for use by public traffic Temporary facilities which the Contractor uses to perform the work shall not be installed or placed where they will interfere with the free and safe passage of public traffic Temporary facilities which could be a hazard to public safety if improperly designed shall comply with design requirements specified in the contract for those facilities or if none are specified with standard design criteria or codes appropriate for the facility involved Working drawings and design calculations for the temporary facilities shall be prepared and signed by an engineer who is registered as a Civil Engineer in the State of California and shall be submitted to the Engineer for approval pursuant to Section 4 4 Working Drawings The submittals shall designate thereon the standard design criteria or codes used Installation of the temporary facilities shall not start until the Engineer has reviewed and approved the drawings Should the Contractor appear to be neglectful or negligent in furnishing warning devices and taking protective measures as above provided the Engineer may direct attention to the existence of a hazard and the necessary warning devices shall be furnished and installed and protective measures taken by the Contractor at the Contractor s expense Should the Engineer point out the inadequacy of
203. arkings 84 2 Materials 84 2 1 Thermoplastic materials Thermoplastic material shall conform to Section 84 2 02 Materials of the State Standard Specifications except that only Alkyd Binder Thermoplastic shall be used 84 2 2 Paints Paint shall be waterborne unless otherwise shown on the plans or specified in the Contract Specifications All paints whether waterborne or solventborne shall be rapid dry designed for traffic use and shall conform to the latest revisions of the San Joaquin Valley Unified Air Pollution District Control Architectural Coatings Rule 4601 which requires that traffic paints shall not exceed the limit of 150 grams of volatile organic compounds VOC s per liter of coating as applied excluding water Paint shall also comply with any applicable State air pollution regulations 84 2 2 A Waterborne Paint Waterborne paint rapid dry shall comply with the following specifications Color White Yellow Black Pigment by weight 2 60 59 58 Vehicle by weight 38 42 38 42 38 42 Total Solids by weight minimum 76 75 74 Viscosity 77 78 92 78 92 78 92 Fineness of Grind Hegman minimum 3 5 3 5 3 5 Dry time 77 F without beads ASMT D 711 minutes maximum 10 10 10 Flexibility 8 Mils wet 24 hours are dry Mandrel No cracking No cracking No cracking Contrast Ratio 15 Mils wet min 98 98 98 Weight per gallon minimum 13 50 13 0 12 50 Ref
204. as specified in Section 88 Engineering Fabrics of the State Standard Specifications SECTION 89 BLANK SECTION 90 PORTLAND CEMENT CONCRETE Portland Cement Concrete shall be as specified in Section 90 Portland Cement Concrete of the State Standard Specifications SECTION 91 PAINT Paint shall be as specified in Section 91 Paint of the State Standard Specifications SECTION 92 ASPHALTS Asphalts shall be as specified in Section 92 Asphalts of the State Standard Specifications SECTION 93 LIQUID ASPHALTS Liquid Asphalts shall be as specified in Section 93 Liquid Asphalts of the Stata Standard Specifications SECTION 94 ASPHALTIC EMULSIONS Asphaltic Emulsions shall be as specified in Section 94 Asphaltic Emulsions of the State Standard Specifications SECTION 95 EPOXY Epoxy shall be as specified in Section 95 Epoxy of the State Standard Specifications City of Clovis Standard Specifications 2009 315 APPENDIX City of Clovis Standard Specifications 2009 316 STATE OF CALIFORNIA DEPARTMENT HEALTH SERVICES Memorandum Date April 14 2003 Revised Date October 16 2003 To Regional and District Engineers From David P Spath Ph D Chief Original signed by Dave Drinking Water and Environmental Management 601 North 7th Street MS 216 Sacramento CA 95814 916 322 2308 Subject GUIDANCE MEMO NO 2003 02 GUIDANCE CRITERIA FOR THE SEPARATION OF WATE
205. as to avoid undue bending or concentrated external load at any point City of Clovis Standard Specifications 2009 156 All lumber rubbish and rocks shall be removed from the trenches by the Contractor Pipe shall have a firm uniform bearing for the entire length of each pipe line to prevent uneven settlement Wedging or blocking under riser tees shall be done only if specified on the plans Pad trenches with soil as necessary to provide uniform bearing surfaces Where extensive lengths of pipe are installed snake pipe in trench from side to side to allow for expansion and contraction 1 foot per 100 feet 1 100 of pipe is the minimum allowance for snaking Pipe shall not be placed when there is water in the trench or when the temperature is 32 F or below All changes in the direction of the pipe shall be made with fittings not by bending Make solvent joints in the following sequence a Make sure pipe is cut square and all connecting surfaces are properly cleaned and dry b Apply an even coat of colored primer to pipe and fitting prior to application of solvent c Apply an even coat of solvent to the inside of the fitting d Apply a liberal even coat of solvent to the outside of the pipe making sure that the coat area is equal to the depth of the fitting socket e Insert the pipe quickly into the fitting and turn the pipe approximately one quarter turn to distribute the solvent and remove air bubbles Hold the joint for
206. astic fittings these shall be injection molded also 5 Fittings Identification All fittings shall bear the manufacturer s name or trademark material designation size applicable IPS schedule and NSF seal of approval 6 Plastic to steel Connections At all PVC pipe to steel pipe connections the Contractor shall complete the steel connection first Teflon tape shall be used on all threaded PVC to steel pipe joints applied to the male threads only and light wrench pressure is to be applied A minimum of three 3 wraps of Teflon tape shall be used 7 Plastic Pipe Cement Solvent cement joints for plastic pipe and fittings shall be made as prescribed by the manufacturer The high chemical resistance of the pipe and fitting compounds specified in the foregoing sections makes it mandatory that an aggressive colored primer which is a true solvent for PVC be used in conjunction with a solvent cement designed for the fit of pipe and fittings of each size range specified 8 Galvanized Pipe Pipe shall be hot dip galvanized continuous welded seamless schedule 40 steel pipe conforming to applicable current ASTM standards 9 Galvanized Fittings All fittings shall be galvanized malleable iron ground joint Schedule 40 conforming to applicable current ASTM standards 10 Sprinkler Heads Sprinkler spray heads shall be Rain Bird 1800 or Hunter Pro Spray 11 Spray nozzles a nozzles for shrubs shall be Rain Bird MPR b nozzles for
207. at the base of the rootball Twisting shall be avoided during the removal of the rootball Any torn roots shall be trimmed to create a clean cut The rootball shall be protected from drying during holding and transport to the new site Protection shall be provided by clear plastic wrapping shielded from the sun or by covering with regularly weted burlap Provision shall be made to dampen the rootball should holding conditions threaten to allow it to dry out 20 6 04 Tree Transplanting The transplanted tree shall be placed in the tree transplanting hole at a level duplicating its original soil depth Backfill material consisting of native material originally removed from the transplanting hole shall be tamped in on all sides of the rootball Care shall be exercised by the Contractor in replacing stratified layers of backfill as they existed before removal from the hole Backfill shall be placed in layers not to exceed 2 feet with each layer watered thoroughly prior to placement of the next layer Best Paks or approved equal plant tabs shall be placed every 2 along the circumference of the rootball 6 inches below the finished soil line Immediately after the tree has been transplanted a 4 inch deep circular watering basin shall be constructed around the base of the tree extending 24 inches outside the rootball circumference The watering basin shall be filled with water immediately and repeatedly and backfill probed with a pole to remove all air
208. at the contract price per cubic yard for the type of excavation in which the object is encountered i e roadway excavation trench or structure excavation etc However if the presence of the object is not indicated on the plans or in the Contract Specifications and its presence could not have been ascertained by visual inspection the removal and disposal of the object will be paid for as extra work as provided in Section 4 11 Extra Work instead of at the applicable contract item price if the Contractor so requests in writing The request shall be made prior to removal Unless otherwise specified in the Contract Specifications no blasting of any kind will be permitted Where backfill of a cavity or depression resulting from removal of a buried manmade object is required it will be paid for in accordance with Section 15 Removing Existing Facilities or Section 16 Clearing and Grubbing except that backfill for objects removed from within trench or structure excavations will not be paid for separately but included in the price paid City of Clovis Standard Specifications 2009 111 for the pipe conduit or structure requiring the excavation Where the buried object is not shown on the plans and could not reasonably be ascertained from the surface and backfill is required but not covered by any other item of work and the cavity is not located in a trench or structure excavation payment for backfill shall be made in accordance
209. aterial complies in all respects to the State Standard Specifications and these Standard Specifications Materials Testing Testing on materials will be performed by Independent Testing Labs The Controller shall be capable of passing the self evaluation program developed by the State of California Department of Transportation Controllers will be tested to 160 F The Contractor shall deliver the controller auxiliary equipment and controller cabinet to the City of Fresno for testing The testing shall be performed by the City of Fresno Traffic Signal Maintenance Shop 2101 G Street Fresno CA 93706 The Contractor shall allow ten 10 working days for the City of Fresno Traffic Signal Maintenance Department to inspect and study each unit Call the City of Fresno Traffic Signal Maintenance Shop at 559 621 1492 48 hours prior to delivery to the City of Fresno for testing When equipment being tested has been rejected for failure to comply with specifications the Contractor shall allow ten 10 working days for the City to retest each unit rejected The retesting period shall begin when the corrected equipment is made available at the test site Rejected equipment shall be replaced with new equipment by the Contractor All testing subsequent to rejection of the equipment for failure to comply with the specifications will be at the expense of the Contractor Deductions to cover the cost of such testing will be made from any monies due or which
210. atest revision and be furnished complete with all necessary accessories Pipe fittings shall be ductile iron conforming to the requirements of AWWA C110 Class 350 for pipe diameters 24 inches or less and Class 250 for pipe diameters greater than 24 inches Fittings shall have a standard asphaltic coating on the exterior Fittings shall also have a cement mortar lining on the interior in accordance with AWWA ANSI C104 A21 4 of latest revision Fittings for DI water mains larger than 12 inches in diameter shall be restrained joint fittings Where required pipe joints adjacent to restrained joint fittings shall be restrained pipe joints The length of pipe for which joint restraint is required adjacent to restrained joint fittings shall conform to the details shown on the Plans Thrust blocks shall not be used for DI water mains larger than 12 inches in diameter unless otherwise directed or approved by the Engineer 66 2 3 Thrust Blocks Unless otherwise specified in the Plans or Contract Specifications concrete for thrust blocks shall be Class 1 2 3 or 4 conforming to Section 90 Portland Cement Concrete of the State Standard Specifications 66 2 4 Water Services Materials for Water services shall conform to the applicable details shown on the Standard Drawings therefor and the provisions in these Standard Specifications Water service fittings shall be no lead compliant brass City of Clovis Standard Specifications 2
211. ations the Contract Specifications and as directed by the Engineer The unit price paid for Slurry Cement Backfill and Pervious Backfill Material shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved as shown on the Plans as set forth in these Specifications the Contract Specifications and as directed by the Engineer Unless otherwise provided in the Contract Specifications the unit price bid per lineal foot for temporary or final trench resurfacing shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans and Standard Drawings as set forth in these Specifications the Contract Specifications and as directed by the Engineer including maintaining temporary surfacing and removing it prior to final resurfacing sawcutting or trimming existing pavement edges and application of tack coat No payment will be made for temporary or permanent resurfacing or sawcutting existing pavement therefor around structures the cost thereof shall be included in the price paid for the structure involved When the Contract does not include a pay item for temporary or final trench resurfacing as above specified and unless otherwise provided in the Contract Specifications full compensation for any necessary temporary or final trench resurfacing including required sawcuttin
212. atter or other unsatisfactory material and shall have a minimum R value of 55 as determined from tests conducted in accordance with Section 6 8 Samples and Tests Selected material from excavation or imported borrow material having a Sand Equivalent value less than 10 shall not be placed within 2 5 feet of finished grade and shall be placed in the lower portions of embankments Clods or hard lumps of earth over 8 inches in greatest dimension shall be broken up before compacting the material in embankment Large rocky material including rocks broken concrete or other solid materials or hard lumps such as hardpan or cemented gravel which cannot be broken readily shall not be used in embankments All imported borrow shall be subject to the approval of the Engineer The Contractor shall supply to the City at the Contractor s expense test results required by the Engineer to determine the suitability of any borrow proposed for import These tests which are to be representative of the material delivered to the site will be required at the original site of the proposed borrow material and also at the delivery site The Contractor shall remove at the Contractor s expense any borrow placed which fails to meet the approval of the Engineer 19 4 03 Placing Where shown in the Plans or specified in the Contract Specifications the Contractor shall provide excavation grading placement and compaction for the construction of roadway embankment from ap
213. ay excavation for the quantities involved if the removal of the unsuitable material is shown on the plans or specified in the Contract Specifications If the removal of the unsuitable material is not shown on the plans or specified in the Contract Specifications the removal and disposal of the unsuitable material will be paid for at the contract price for roadway excavation for the quantities involved unless either the Engineer prior to removal of any unsuitable material orders the unsuitable material to be removed and disposed of and paid for as extra work as provided in Section 4 11 Extra Work or the Contractor prior to removal of the unsuitable material requests in writing that the removal and disposal of the unsuitable material be paid for as extra work as provided in said Section 4 11 However no payment will be made for removal and replacement or re working of unsuitable material if such condition is deemed by the Engineer to have been caused by the Contractor s operations such as but not limited to over watering When unsuitable material is removed and disposed of the resulting space shall be backfilled with material suitable for the planned use Unless otherwise specified or directed by the Engineer the material shall be either material conforming to Section 19 2 06 City of Clovis Standard Specifications 2009 112 Selected Material conforming to Section 19 4 02 Imported Borrow backfill material
214. be A Phase Black City of Clovis Standard Specifications 2009 259 Phase Red Phase Blue Neutral White Ground Green City of Clovis Standard Specifications 2009 260 Color coding for 277 480 240 volt system shall be A Phase Brown B Phase Orange C Phase Yellow Neutral Gray Ground Green Color coding utilized shall be noted on electrical as constructed drawings and shop drawings to submitted by the Contractor to the Engineer in conformance with Section 83 16 As Constructed Drawings The color coding for control circuit wires will be as noted on the Plans or as agreed upon with the Electrical Engineer and will be of a color other than that designated for the phase wires Where control wires are installed and various colors are used they shall be noted on the as constructed drawings and shop drawings submitted as above provided Y Splices Splice only in accessible junction or outlet boxes Splices in conductors 8 and smaller shall be made with Scotchlok connectors Splices in conductors 6 and larger shall be made with approved pressure connectors Submit all methods of splicing for approval by the Engineer Wiring in panel boards switchboards and cabinets shall be neatly installed Wiring shall be grouped laced or clipped and fanned out to wiring terminals Z Miscellaneous In addition to all other requirements for identification and marking of wires panel boards and junction bo
215. be a mixture of bentonite and water or polymers and additives Bentonite sealants and water will be used to lubricate the drilling head It is mandatory that minimum pressures and flow rates be used during drilling operation so as not to fracture the subgrade material around or above the bore Uncontrolled jetting where the primary purpose is to use fluid force to erode soil for creation of the final bore hold diameter is prohibited The drilling system shall utilize small diameter fluid jets to fracture and mechanical cutters to cut and excavate the soil as the head advances forward After installation of conduit in the bored hole the hole shall be sealed with bentonite slurry Where it is necessary for the Contractor to install conduits by open trenching they must be in accordance with the project details and all applicable specifications Other installation methods such as the Flow Mole method may be approved by the Engineer upon receipt and approval of a written proposal from the Contractor City of Clovis Standard Specifications 2009 229 No change in horizontal vertical alignment from that shown on the Plans will be permitted without the express approval of the Engineer 82 9 Conduit Deflection Deformation Test Unless otherwise noted on the Plans or specified in the Contract Specifications all fiber optic conduit shall be tested for excessive deflection This test shall be performed after backfilling and compaction but prior t
216. be the responsibility of the sewer Contractor to return and install the manhole covers to finish grade as specified and as shown on the Standard Drawings The Contractor should be aware that connections to existing sewers will be wet and the Contractor shall make whatever arrangements are necessary to complete the manhole connections under the wet conditions Where necessary mounds or dikes shall be placed around the perimeter of manhole covers to prevent rainwater or other inflow of water from entering the manholes No steps shall be installed in manholes unless otherwise noted on the plans 64 7 Backfill Compaction And Surface Restoration Backfilling compacting and restoration of surfaces of trenches and excavations for sewer facilities shall conform to the requirements of Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration 64 8 Leakage Test Sewer Mains And Service Laterals After completing the installation backfill and compaction of a section of sewer main pipeline with service laterals and after all other underground utilities including City other agency and privately owned utilities are in and compacted but prior to the placement of aggregate base or asphalt concrete pavement and prior to conducting the deflection tests and video inspection as required herein the Contractor shall at his expense conduct a leakage test using low pressure air The test shall be performed using the fol
217. ble from the processor modules allowing remote programming of extension modules City of Clovis Standard Specifications 2009 305 Central Hub The System shall contain an intelligent central hub which functions as a central switching point for the video processors and accessories This hub shall enable the user to switch between any of the peripheral processors without the need of switching any monitor communication or pointing device connections The hub shall support industry standard 10 100Base T communications and shall contain the following features e Supports 10 100Base T autosense full half duplex e Complies with 802 3 specifications e Protocols supported TCP IP TCP and UDP ARP ping HTTP ICMP IGMP Four 4 video inputs via DB15 spider cable Four 4 RJ45 extension module interface connectors One 1 RJ45 Ethernet connector One 1 EIA 232 local access port USB Mouse port One 1 BNC composite video out connector Edge connector compatible with the standard 170 input file The System shall be designed to operate reliably in the adverse environment found in the typical roadside traffic cabinet It shall meet the environmental requirements set forth by the NEMA National Electrical Manufacturers Association TS1 and TS2 standards as well as the environmental requirements for Type 170 controllers Operating temperature shall be from 35 C to 74 C at 0 to 95 relative humidity non condensing E IMAGE SENSOR The
218. ble on most battery models 3 0 Electrical Specifications 3 1 Input Specification City of Clovis Standard Specifications 2009 309 22 City of Clovis Standard Specifications 2009 Nominal Input Voltage Input Voltage Range Input Frequency Input Configuration Input Current Max draw Input Protection Output Specification Nominal Output Voltage Power Rating Output Voltage Regulation Output Frequency Output Configuration Output Wave Form Overload capability Fault clearing Short circuit protection Efficiency Load Power Factor 120 VAC Single Phase 85 VAC to 140 VAC 50 or 60 Hz 5 3 Wire Hot Neutral amp Ground 7 2 amps Power Factor Corrected Input Fuse 12 amps 120 VAC Single Phase 1 kVA 1000VA 700W 2 for 100 step load change and from High battery to Low battery condition 50 or 60 Hz J 5 Keyed circular connectors and duplex receptacle True Sinewave 100 for 10 minutes 200 for 1 2 second Current limit and automatic shutdown Current limit and automatic shutdown 85 at full load 0 7 lagging through unity to 0 7 leading 310 Physical Specifications UPS Electronics Module 4 1 Dimensions Rack mount Width 19 in Depth 16 21 in for 2 KVA Height 3 5 in 2U Shelf mount Width 19 in Depth 10 in Height 6 in Wall mount Width 6 9 in Depth 9 5 in Height 16 in Detachable Power Interface Module Width 6 in De
219. ble with police panel functions i e Signals OFF switch must kill power to the field wiring even when on UPS Battery power I Traffic UPS shall not duplicate or take over flash operation or flash transfer relay functions TO City of Clovis Standard Specifications 2009 308 J Traffic UPS shall be capable of providing continuous fully conditioned regulated sinusoidal AC power to selected devices such as signal controllers modems communications hubs NTCIP adapters and video equipment 2 0 Description The Clary SP Series shall consist of two major components the Electronics Module with an internal Power Interface Module and the Battery System 2 1 The Electronics Module shall consist of the following A True sine wave high frequency inverter utilizing IGBT Technology B 3 stage temperature compensated battery charger C For connection from the Electronics Module to the Power Interface Module and Battery System dedicated harnesses shall be provided with quick release keyed circular connectors and braided nylon sleeving over all conductors Local and remote control of UPS functions Local and remote communications capabilities Capable of accepting an NTCIP ready adapter or a Spread Spectrum Radio modem mio 2 2 Mounting Configuration 2 2 1 The complete Clary UPS system batteries 5 1250 control unit etc shall be installed in the piggyback battery cabinet extension 2 3 Battery S
220. blies and components shall be compatible components designed for the purpose intended and factory manufactured by a company regularly engaged in the production of material for the fiber optic industry All components or assemblies shall be first class non corroding with a design life of at least twenty 20 years All components or assemblies of the same type shall be from the same Manufacturer 82 24 Warning Tape Warning tape shall be provided and placed in the trench over conduits which contain or are to contain fiber optic cable as shown on the plans The warning tape shall be 4 wide with bold printed black letters of approximately 0 75 on bright orange color background and contain the printed warning CAUTION BURIED FIBER OPTIC CABLE repeated at approximately 30 intervals The printed warning shall be non erasable and shall be rated to last with the tape for a minimum of forty 40 years Warning tape shall be Condux International Inc Allen System Inc Reff Industries Inc or approved equal The construction of the warning tape shall be such that it will not delaminate when it is wet It shall be resistant to insects acid alkaline and other corrosive elements in the soil It shall have a minimum of 120 lb tensile strength per 4 wide strip and shall have a minimum of seven hundred 700 percent elongation before breakage 82 25 Slurry Cement Backfill Where shown on the Plans or specified in the Contract Specifications
221. bs gutters curb and gutters curb depressions sidewalks curb wheelchair ramps driveway approaches alley approaches valley gutters fence mowstrips and median caps of the form and dimensions shown on the Plans or Standard Drawings as set forth in the Specifications and as directed by the Engineer Curb wheelchair ramps shall also comply with the most current Federal and State Accessibility Standards whichever is more restrictive All concrete improvements as above defined shall be constructed by using fixed forms except that curbs curb and gutters and alley gutters may be constructed by using an extrusion or slip form machine 73 2 Portland Cement Concrete Concrete for curbs sidewalks and other surface improvements shall conform the requirements of Section 90 Portland Cement Concrete of the State Standard Specifications and shall be Class 1 or Class 2 except valley gutters shall be Class 1 For extruded or slip formed concrete improvements the maximum size of aggregate used shall be at the option of the Contractor but in no case shall the maximum size be larger than 1 inch or smaller than 3 8 inch For extruded or slip formed concrete the cement content shall be as specified for Class 1 concrete 73 3 Reinforcement Where the use of steel reinforcement is indicated on the Plans or Standard Drawings it shall be furnished and installed in accordance with Section 52 Reinforcement of the State Standard Specifica
222. bservation and inspection of the Engineer or the Inspector and any work done without the sanction or presence of the Engineer or Inspector will be subject to rejection 5 8 Emergency Availability The Contractor shall furnish to the Engineer prior to the issuance of a Notice to Proceed a list of persons together with their addresses and 24 hour telephone numbers who are authorized to act on behalf of the Contractor in an emergency arising out of conditions at the work site after normal working hours The Contractor shall conform to the requirements in Section 7 18 Public Safety 5 9 Preservation Of Property In accordance with Sections 5 3 Contractor s Responsibility For Work 7 16 Injury or Damage to Persons or Property the Contractor shall be liable for any and all damage done to any public or private property structure facility or improvement due to his operations Due care shall be exercised to avoid injury to existing street improvements or facilities roadside trees and landscaping that are not to be removed pole lines fences signs survey markers and monuments buildings and structures conduits pipelines under or above ground all street facilities and any other improvements or facilities within or adjacent to the City of Clovis Standard Specifications 2009 28 work area or on private property adjacent to the work area and all such facilities shall be protected from injury or damage The Contract
223. by the Engineer 66 2 Materials All materials used in constructing potable water facilities shall be new and shall conform to these Standard Specifications unless otherwise specified in the Contract Specifications or shown on the Plans Pipe for water mains 12 inches and less in diameter may be either polyvinyl chloride PVC pipe or ductile iron pipe at the Contractor s option except where the specified minimum depth of cover is not achieved Unless otherwise specified in the Contract Specifications or shown on the Plans where a minimum depth of cover of 4 feet is not achieved pipe for water mains 12 inches and less in diameter shall be DI pipe Pipe for water mains larger than 12 inches in diameter shall be DI pipe or where designated in the Plans or Contract Specifications PVC pipe conforming to ASTM Designation C905 66 2 1 PVC Pipe And Fittings For Water Mains PVC pipe for water mains in sizes from 4 inches through 12 inches in diameter shall be Class 150 High Pressure Water Pipe conforming to the requirements of AWWA C900 the latest edition of ASTM Specification Designation D 1784 and wall thickness meeting the requirements of DR18 Where Special Pipe is shown on the Plans or specified in the Contract Specifications special pipe shall be Class 200 and wall thickness to meet requirements of DR 14 Pipe joints shall be integral bell and spigot gasketed joints conforming to the requirements of ASTM D 3139 with a solid cross se
224. c to award a contract before all utility relocations utility undergrounding right of way purchases removal of obstructions relocation of underground facilities by others or other potential causes of delay are removed Where known these will be shown on the Plans with the actions to be taken and enumerated in the Contract Specifications The City will make every effort to ascertain the approximate time required to clear the right of way and so indicate in the Contract Specifications The contractor shall also make a diligent effort by contacting the owner agency company of the time expected to clear the right of way before submitting a bid In so doing the contractor shall include in his costs any delays that can be expected or result from such relocations or acquisitions The Engineer may grant a time extension deemed warranted due to such delays or may temporarily suspend the contract in accordance with Section 8 11 Temporary Suspension of Work Section 7102 of the State Public Contract Code notwithstanding no additional compensation will be paid for such delays If new and unforeseen right of way delays not contemplated before the award of the contract causes the Contractor to sustain a loss which could not have been avoided by the judicious handling of forces equipment and plant there shall be paid to the contractor that amount that the Engineer may find to be a fair and reasonable compensation for that part of the Contractor s actu
225. cameras used for traffic detection shall be furnished by the system supplier and shall be qualified by the supplier to ensure proper video detection system operation The image sensor shall produce a useable image of the bodies of vehicles under all roadway conditions regardless of time of day The minimum range of scene luminance over which the camera shall produce a useable video image shall be the minimum range from nighttime to daytime but not less than the range of 0 1 lux to 10 000 lux The image sensor shall use a CCD sensing element and shall output monochrome or color video with resolution of not less than 350 lines vertical and 500 lines horizontal The image sensor shall be equipped with an auto iris control based on an average scene luminance and shall be equipped with an auto iris lens The image sensor electronic circuitry shall include an optical filter to produce a satisfactory image at night The image sensor shall be housed as a minimum in a NEMA 4 water resistant dust proof enclosure The housing enclosure shall be filed rotatable to allow proper alignment between the image sensor and the traveled road surface The image sensor enclosure shall include a thermostatically controlled heater to prevent the formation of ice and condensation in cold weather as well as assure City of Clovis Standard Specifications 2009 306 proper operations of the lens iris mechanism The heater shall not interfere with the operation of
226. cations The Contractor shall submit a draft SWPPP for review approval and certification by the City no later than two weeks after receipt of the Notice of Award City of Clovis Standard Specifications 2009 55 Within 24 hours of approval by the City the Contractor shall provide the City with a complete copy of the certified SWPPP Any amendments to the SWPPP shall also be submitted to the City for review approval and certification Within 24 hours of approval the Contractor shall provide the City with documentation and certification of such amendments 7 7 A 3 Implementation Of SWPPP The Contractor shall be responsible implementing and maintaining the SWPPP at all times throughout the entire construction site and for the duration of the project including both dry and wet weather seasons The Contractor shall maintain a copy of the SWPPP on site for the duration of the contract and shall prepare all required inspection maintenance and training documentation with the SWPPP and shall provide same upon request by agency or City enforcement personnel 7 7 A 4 Site Stabilization All soil disturbed by the work shall stabilized by methods approved by the Engineer prior to terminating permit coverage 7 7 A 5 Preparation Of NOT And Post Construction Storm Water Management Plan Following completion of the construction project the Contractor shall submit a completed Notice of Termination NOT and PCSWMP to the City for review approval and s
227. ce may be tested and sampled at any time The fact that material is used on the basis of a Certificate of Compliance shall not relieve the Contractor of responsibility for incorporating material in the work which conforms to the requirements of the Plans and Specifications and any such material not conforming to such requirements will be subject to rejection whether in place or not The form of the Certificate of Compliance and its disposition shall be as directed by the Engineer No additional payment will be made for furnishing certificates and all costs incurred shall be included in the prices bid for other items of work 6 6 Foreign Materials Materials which are manufactured produced or fabricated outside of the United States shall be delivered to a distribution point in California unless otherwise required in these Standard Specifications or the Contract Specifications where they shall be retained for a sufficient period of time to permit inspection sampling and testing The Contractor shall not be entitled to an extension of time for acts or events occurring outside of the United States and it shall be the Contractor s responsibility to deliver materials obtained from outside of the United States to the point of entry into the continental United States in sufficient time to City of Clovis Standard Specifications 2009 39 permit timely delivery to the job site provisions Section 8 9 Liquidated Damages will apply
228. ce of the initial layer of asphalt concrete if the pavement is to be replaced in lifts City of Clovis Standard Specifications 2009 122 Asphalt concrete shall be furnished and placed conformance with Section 39 Asphalt Concrete of the State Standard Specifications When replacing pavement in existing paved areas the new pavement shall be placed in accordance with the Standard Drawings therefor which shall apply to replacing pavement around structures as well as within trenches The Contractor shall not commence surface paving until the subbase and or base have been inspected and approved Violation of this requirement shall be cause for rejection of that portion of paving involved When compacted the new pavement edge shall be flush with the existing pavement and edge of adjacent concrete improvements where applicable The surface shall be smooth without humps or depressions Except where the trench is located in the crown of the road the top of the finished surfacing shall deviate no more than inch higher and in no case lower than a line struck off from two points on the existing road surface one on each side of the trench Deviation from this tolerance shall be cause for rejection of the surfacing Restoration of miscellaneous surfaces shall consist of replacing or restoring in kind any surface damaged or disturbed by the work including but not limited to grass landscaping of any kind gravel oiled dirt concrete or s
229. central switching point between the processor modules and which will facilitate communications with a remote personal computer C VEHICLE DETECTION A minimum of ninety six 96 detection zones shall be supported and each detection zone can be sized to suit the site and the desired vehicle detection region Overall performance of the System shall be comparable to inductive wire loop detectors City of Clovis Standard Specifications 2009 304 Detection shall be at least 98 accurate under normal weather conditions days amp night and 96 accuracy under adverse or inclement conditions fog rain snow etc Detection zones may ANDed or ORed together to indicate presence on a single detector output channel Placement of detection zones shall be done using a pointing device and a graphical interface built into the System and displayed on a video monitor The setup program shall be included in the processor module The creation and placement of detection zones shall be accomplished without the use of a personal computer When a vehicle is detected crossing a detection zone the detection zone will flash a symbol on the video overlay display to confirm the detection of the vehicle Detection zones shall be capable of being directional to reduce false detections from objects traveling in directions other than the legal direction of travel in the detection area The System shall reliably detect vehicle presence when the image sensor is mounte
230. ch Invert channels shall be smooth and semicircular in shape conforming to the inside of the adjacent pipe invert or flow channels may be provided by use of the bottom half of the specified main pipe The floor and wall of the manhole outside the channels shall be smooth and shall slope toward the channels The top of the manhole base section shall be keyed to receive the tongue end of the riser section The key shall be formed in the freshly poured concrete by using a template manufactured to the dimensions of the riser section If the riser is cast in place monolithically with the base section by using a slip form or other means the key may be omitted between the base and riser If the base and riser sections are not poured monolithically but separately a key shall be provided in the base section In either case a key will be required in the top of the riser section to receive the tongue end of the tapered cone The joints between the base and all precast elements of the manhole including adjustment rings and manhole frame shall be filled with cement mortar or approved equal prior to joining the elements The interior of the manhole shall be troweled smooth with a wooden trowel removing excess mortar extruded out of joints for the entire height of the manhole from the manhole frame to the floor All excess mortar and any other debris shall be removed from the manhole Changes in direction of flow shall be made with a smooth curve of a
231. ch fences barriers lights and signs as are necessary to give adequate warning to the public at all times throughout the duration of the contract that the road street or other work area is under construction and of any dangerous condition to be encountered as a result thereof Traffic control conforming to Part 6 of the California MUTCD shall be maintained at all times in through and surrounding the construction site Compliance with the requirements of said manual shall be considered as a minimum requirement and the Contractor shall provide additional safety devices when necessary to maintain a safe condition The Contractor may be required to cover certain signs which regulate or direct public traffic to roadways that are not open to traffic The Engineer will determine which signs shall be covered Safe adequate continuous and unobstructed pedestrian and vehicular access shall be maintained to fire hydrants residences commercial and industrial establishments etc unless other arrangements satisfactory to the owners have been made Safe and adequate pedestrian zones and public transportation stops as well as pedestrian crossings of the work at intervals not exceeding 300 feet also shall be maintained unless otherwise approved by the Engineer Where public traffic and or emergency vehicles must be routed over areas under construction the contractors operations shall be conducted in such a manner as to provide a smooth and stable roadway su
232. ch shall include two rotatable photocell assemblies an electronic assembly and a base The base shall have an opening to permit its mounting on a mast arm or a vertical pipe nipple or suspension from a span wire The mounting opening shall have female threads for 3 4 inch conduit A cable entrance shall be provided which shall have male threads and gasketing to permit a waterproof cable connection Each detector shall weigh not more than 1 1 2 pounds and shall present a maximum wind load area of 36 square inches The housing shall be provided with weep holes to permit drainage of condensed moisture 3 Cable Optical detector cable shall meet the requirements of IPCEA S 61 402 NEMA WC 5 Section 7 4 600 volt control cable 75 C Type B and the following a The cable shall contain 3 conductors each of which shall be No 20 7 x 28 stranded tinned copper with low density polyethylene insulation Minimum average insulation thickness shall be 25 mils Insulation of individual conductors shall be color coded 1 yellow 1 blue and 1 orange b The shield shall be either tinned cooper braid or aluminized polyester film with a nominal 20 percent overlap Where the film is used a No 20 7 x 28 stranded tinned bare drain wire shall be placed between the insulated conductors and the shield and in contact with the conductive surface of the shield c The jacket shall be black polyvinyl chloride with minimum ratings of 600 volts and 176
233. cifications _ Unthinned cold galvanized zinc rich paint conforming to the requirements in Section 91 Paint of the State Standard Specifications shall be used on all damaged galvanized surfaces City of Clovis Standard Specifications 2009 285 All paint shall be furnished by the Contractor Minor touch up painting all material whose surface is damaged or not protected from rusting shall be painted as directed by the Engineer Painting shall be done by brush Aerosol cans shall not be used All salvaged used or borrowed equipment that is reused shall be painted as stated in specifications On signal modification projects all existing and reused traffic signal facilities except controller cabinets service pedestal poles and luminaires shall be repainted 86 25 Vehicle Signal Faces Visors And Backplates Signal faces signal heads and auxiliary equipment as shown on the plans and the installation thereof shall conform to the provisions in Section 86 4 01 Vehicle Signal Faces Section 86 4 04 Backplates and Section 86 4 08 Signal Mounting Assemblies of the State Standard Specifications and these Standard Specifications Top openings of signal heads shall be sealed with neoprene gaskets and metal washers If the signal head is equipped with adjustment locking serrations the neoprene gasket and metal washer shall be installed on the inside of the signal head All vehicle signal indications shall hav
234. clude the following major test and acceptance categories 1 Physical inspection 2 Functional tests 3 Performance tests The contractor shall test the communication system according to the approved acceptance test plan and shall provide all test equipment labor and ancillary items required to perform the testing The test equipment shall be certified to be calibrated to the manufacturer s specifications The model and part numbers and date of last calibration of all test equipment shall be included with the test results Acceptance testing shall not commence until all material required by these special provisions and plans are delivered installed and aligned and the Engineer has approved all production test and site test documentation and results All acceptance test results shall be fully documented and such documentation provided as a condition of acceptance G Physical Inspection The Contractor can provide documentation to prove delivery of all material equipment cable and documentation If any material or documentation is outstanding or have been replaced under pre acceptance warranty a physical inspection and documentation shall be provided for this material The physical inspection shall consist of inspecting all insulated material to ensure workmanship satisfies the specified requirements H Functional Tests The Contractor shall test all system functions to demonstrate that all data circuits and all equipment satisfy the fu
235. cluded in the various other items of work No additional payment will be made therefor Full compensation for removing preparing disassembling packaging bundling tagging hauling and stockpiling of salvaged materials including any temporary storage prior to stockpiling and disposal of unwanted portions of facilities or damaged materials shall be considered as included in the contract price paid for the item involved and no separate payment will be made therefor In the absence of a contract item the cost thereof shall be considered as included in the various other items of work No additional payment will be made therefor When the contract does not include separate items for removing any of the existing facilities encountered within the area to be cleared and grubbed or the removal is not included in another item then payment for removing the facilities shall be considered as included in the contract prices paid for clearing and grubbing or excavation of the type in which the facilities are located If the contract does not include items for clearing and grubbing or excavation then removing the existing facilities within the area to be cleared and grubbed will be considered as being included in the various items of work and no additional payment will be made therefor When an existing facility which is outside the area to be cleared and grubbed is shown on the Plans or specified in the Contract Specifications to be removed and the contract d
236. conditions the automatic iris and associated automatic gain control The resulting data signal to noise ratio shall be recorded The data signal to low frequency noise ratio shall be measured according to EIA TIA 250 C The resulting data signal to low frequency noise ratio shall be greater than 39 dB If an AGC circuit does not allow measurement as per EIA TIA 250 C Contractor shall submit an alternative test plan for approval The data signal to periodic noise ratio shall be measured according to 250 The resulting data signal to periodic noise ratio shall be greater than 52 dB If any circuit or element fails to satisfy the specified performance requirements the Contractor shall determine the cause and correct the failure to the satisfaction of the Engineer The full performance tests shall be repeated under operating conditions as determined by the Engineer J System Documentation The Contractor shall submit a draft copy of all documentation for review and approval prior to production of documentation The Engineer will review and approve or reject the draft documentation within four 4 weeks of receipt The Contractor shall modify the documentation if required and submit provisional documentation The Engineer will approve or reject the provisional documentation within three 3 weeks of receipt The Contractor shall arrange for re submission in a timely manner to meet the schedule in the case that the documents are rejec
237. cords at the principal office of the contractor c The certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement or shall contain the same information as the forms provided by the division d contractor or subcontractor shall file a certified copy of the records enumerated in subdivision a with the entity that requested the records within 10 days after receipt of a written request e Any copy of records made available for inspection as copies and furnished upon request to the public or any public agency by the awarding body the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement shall be marked or obliterated in a manner so as to prevent disclosure of an individual s name address and social security number The name and address of the contractor awarded the contract or the subcontractor performing the contract shall not be marked or obliterated f The contractor shall inform the body awarding the contract of the location of the records enumerated under subdivision a including the street address city and county and shall within five working days provide a notice of a change of location and address g The contractor or subcontractor shall have 10 days in which to comply subsequent to receipt of a written notice requesting the records enumerated in subdivision a In the event that the contractor or subcontractor fails to comply within the 10 day period
238. ction elastomeric seal gasket conforming to the requirements of ASTM F 477 The bell section shall consist of an integral wall section and shall be at least as strong as the pipe wall Pipe shall withstand a quick burst test pressure of 755 psi in accordance with ASTM D 1599 applied in 60 to 70 seconds Pipe shall withstand a drop impact test of 73 F at impact of a falling 20 Ib missile with a 2 radius nose according to ASTM D 2444 The pipe shall be manufactured with standard cast iron pipe outside diameters and the nominal laying length shall be 20 feet for all sizes PVC pipe for water mains shall be blue in color and clearly labeled with the following information Manufacturer s name or trademark Legend Class Potable Water Nominal pipe size ASTM Designation Unless otherwise shown on the Plans or specified in the Contract Specifications pipe fittings for PVC pipe for water mains pipe shall be ductile iron conforming to the requirements of AWWA C110 for Class 350 and Section 66 2 2 Ductile Iron Pipe and Fittings for Water Mains of these Specifications City of Clovis Standard Specifications 2009 186 Pipe and fittings must be assembled with nontoxic lubricant 66 2 2 Ductile Iron Pipe And Fittings For Water Mains Ductile iron DI potable water main pipe shall conform to the requirements of AWWA C150 for Pressure Class 150 or higher or Special Thickness Class 50 or higher unless a higher class designation is
239. ction results the thickness of lifts may be increased by the Engineer but in no case shall lifts exceed 3 feet loose depth In no case shall backfill material be allowed to free fall directly onto the pipe Initial backfill efforts may proceed no sooner than 48 hours after construction of the pipe except that compaction efforts using equipment which imparts load on the pipe or structures shall not proceed for a minimum of seven 7 calendar days following placement of the pipe unless this requirement is specifically waived by the Engineer or is otherwise specified Each lift shall be compacted prior to placement of the next lift of backfill material In cases of excessive trench width soil conditions and soil type as determined by the Engineer to assure proper pipe load distribution and bonding between trench backfill and trench walls the Contractor may be required by the Engineer to bench plow or scarify trench walls prior to placement of backfill The cost for such trench wall treatment if so required shall be included in the price paid per linear foot of pipe No additional payment will be made therefor 19 3 03 B Structure Backfill Structure backfill shall consist of placing and compacting backfill material around structures to the lines designated on the Plans or directed by the Engineer Where cast in place structures are constructed no backfill shall be placed until all forms are removed all voids in the concrete properly filled a
240. ctor s responsibility to assure that others doing work within the area under his control including subcontractors utility and communications contractors comply with this provision The relative compaction of the top 6 inches of subbase under curb returns including the landing driveway approaches including adjacent sidewalk valley gutters paved trails and alleys shall be no less than 95 percent No compaction test of subgrade shall be made until such time as the subgrade is finished to within 1 inch high of finished subgrade The Contractor shall notify the Engineer when the subgrade is ready for compaction testing and the City Engineer will notify the appropriate testing laboratory designated to perform such tests The Engineer shall specify the locations where compaction tests are to be made No excavation shall be made below the plane of the bottom of curb or curb and gutter subsequent to installing curb or curb and gutter until backfill has been placed behind the curb 19 2 08 Measurement The following earthwork operations will be measured and paid for as roadway excavation for the quantities of material involved and no additional compensation will be allowed therefor Excavating the roadway prism to the grading plane including slope rounding public and private road approaches connections and driveways excavating unsuitable material when shown on the plans or specified in the Contract Specifications excavating surplus material
241. ctured by Corning The Contractor shall submit to the Engineer for approval a certification that the Manufacturer has been engaged in the production of this material for a minimum of three 3 years The optic fibers shall be contained with loose buffer tubes The loose buffer tubes shall be stranded around an all dielectric central member in a Reverse Oscillation Lay with aramid yarn as the primary strength member and a polyethylene sheath for overall protection Unless otherwise specified on the Plans or by the Contract Specifications the cable shall have a minimum 36 fibers with 12 fibers per tube 82 17 A Overview Of Fiber Optic Cable Plant This Section 82 17 A is intended to provide an overview for projects where fiber optic cable is to be installed In case of conflicts the Plans the Contract Specifications and all other provisions of these Standard Specifications shall take precedence over this overview in the event of any conflicts For the purposes of testing all fiber strands terminated at the splice vault shall be spliced into pigtails terminated with SC connectors These pigtails shall be a minimum of 36 inches in length These pigtail connections shall be utilized to test the fiber optic cable plant to be installed as a part of this project In addition all data receiver and other fiber optic electronics shall be tested at this point prior to connection to the control center by others The following is a glossary of terms which a
242. d and shall not shift excessive portions of the contract price into any particular part of the Work especially parts of the Work being performed earlier in the schedule No partial payment will be made to the Contractor until such schedule has been submitted to and approved by the Engineer if required by him 9 3 Final Pay Items When an item of work is designated as F or S F in the Engineer s Estimate or is otherwise indicated in the Contract Specifications as a Final Pay Item the estimated quantity for that item of work shall be the final pay quantity unless the dimensions of any City of Clovis Standard Specifications 2009 78 portion of that item are revised by the Engineer or the item or any portion of the item is eliminated If the dimensions of any portion of the item are revised and the revisions result in an increase or decrease in the estimated quantity of that item of work the final pay quantity for the item will be revised in the amount represented by the changes in the dimensions If a final pay item is eliminated the estimated quantity for the item will be eliminated If a portion of a final pay item is eliminated the final pay quantity will be revised in the amount represented by the eliminated portion of the item of work The estimated quantity for each item of work designated as F or S F or indicated otherwise as a final pay item in the Engineer s Estimate shall be considered as approximate only and no guarantee
243. d specified in the Contract Specifications Casing spacers shall be installed within 2 feet of each end of the casing pipe at each side of each carrier pipe joint and at evenly spaced intermediate locations to provide a maximum distance between casing spacers of 5 feet on center The carrier pipe shall be supported on skids during the installation of the pipe The skids shall be installed in such a manner as to relieve the couplings from all load and bearing Casing spacers shall be installed in conformance with the manufacturer s recommendations and as specified in these specifications City of Clovis Standard Specifications 2009 205 At the successful completion of the installation casing end seals shall be installed accordance with Plans and Contract Specifications Care shall be taken during the placement of these seals that the pipe is not damaged deflected or displaced The Contractor shall diligently monitor soil and groundwater conditions encountered during casing and or carrier pipe installation and shall provide any and all necessary groundwater seepage control and dewatering The excavated hole whether bored or hand dug shall not be more than 1 inch in diameter greater than the outside limits of the casing or reinforced concrete pipe jacked without casing pipe If the nature of the material is such that caving will likely occur and which may result in a greater space than above specified a metal shield or jacking head sha
244. d with each cable reel Packing and Shipping The completed cable shall be packaged for shipment on lagged wooden reels The cable and reel shall be wrapped in water resistant covering Each end of the cable shall be securely fastened to the reel to prevent the cable from coming loose during transport Two meters 6 6 of cable length on each end of the cable shall be assessable for testing Both ends of the cable shall be sealed to prevent the ingress of moisture Each cable reel shall have a durable weatherproof label or tag showing the manufacturers name the cable type the actual length of cable on the reel the Contractor s name the contract number and the reel number A shipping record shall be included in an attached weatherproof envelope showing the above information and shall include the date of manufacture cable characteristics size attenuation bandwidth etc cable information number and any other pertinent information The diameter of the reel shall be at least 30X the diameter of the cable The fiber optic shall be in one 1 continuous length per reel with no factory splices in the fiber Each reel shall be marked to indicate the direction the reel should be rolled to prevent loosening of the cable 82 18 Fiber Optic Cable Testing For cable testing see the testing section in Section 82 26 Fiber Optic Testing 82 19 Fiber Optic Pig Tail Unit Where shown on the Plans or specified in the Contract Specifications p
245. d work 15 4 03 Measurement And Payment Unless otherwise provided in the Contract Specifications the work to be performed in accordance with this Section 15 4 will be measured and paid for on a lump sum basis Payment shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved in removing bridges or concrete culverts or portions thereof including salvaging materials not to be reused in the project when salvaging is specified and not otherwise paid for as shown on the Plans as specified in the Specifications and as directed by the Engineer Full compensation for removing materials that are to be reused in the project shall be considered as included in the contract prices paid for reconstructing relocating or resetting the items involved or in such other contract pay items that may be designated in the Contract Specifications No additional payment will be made therefor In the absence of a bid item for bridge or concrete culvert removal the cost thereof shall be included in the various bid items of work and no additional payment will be made therefor City of Clovis Standard Specifications 2009 103 GRADING LANDSCAPING FINISHING ROADWAY SECTION 16 CLEARING AND GRUBBING 16 1 Description Clearing and grubbing shall consist of the removal and disposal of all objectionable materials within the limits of the project as required by the Plans these Specif
246. d 2 Zone Special Construction Required for Sanitary Sewer Main A Sanitary sewer mains parallel to water mains shall not be permitted in this zone without prior written approval from the Department and public water system If the water main paralleling the sanitary sewer main does not meet the Case 2 Zone B requirements the sanitary sewer main should be constructed of one of the following 1 High density polyethylene HDPE pipe with fusion welded joints per AWWA C906 99 Spirally reinforced HDPE pipe with gasketed joints per ASTM F 894 Extra strength vitrified clay pipe with compression joints Class 4000 Type II asbestos cement pipe with rubber gasket joints PVC sewer pipe with rubber ring joints ASTM D3034 or equivalent Cast or ductile iron pipe with compression joints or Reinforced concrete pressure pipe with compression joints per AWWA C302 95 Oe Ol Oe City of Clovis Standard Specifications 2009 324 April 14 2003 Revised October 16 2003 Page 6 of 11 Guidance Memo No 2003 02 If the water main crossing below the sanitary sewer main does not meet the requirements for Case 2 Zone C the sanitary sewer main should have no joints within ten feet from either side of the water main in Zone C and should be constructed of one of the following 1 A continuous section of ductile iron pipe with hot dip bituminous coating or 2 One of the Zone D options 1 3 4 or 5 below
247. d 30 feet or higher above the roadway when the image sensor is adjacent to the desired coverage area and when the length of the detection area or field of view FOV is not greater than ten 10 times the mounting height of the image sensor The image sensor shall not be required to be mounted directly over the roadway A single image sensor placed at the proper mounting height with the proper lens shall be able to monitor six 6 to eight 8 traffic lanes simultaneously D HARDWARE Processor Modules The System shall consist of video detection processor modules and extension modules which utilize edge card connectors that plug directly into Type 170 input files _ Processor modules shall be available in single or dual video input configurations Detection inputs shall be transmitted to the controller via the standard Type 170 input file Each processor module shall be equipped with the following connections BNC video input connector NTSC BNC video output connector NTSC Selectable 75 ohm or Hi Z video input termination USB mouse or trackball port DB9 male connector for RS232 interface RJ 45 port for interconnection with extension modules Software upgrades shall be accomplished via the serial port connection with no hardware modification required Extension modules used to increase the detection zones of each camera shall interconnect with the processor modules by means of RJ 45 ports The extension modules shall be programma
248. d and generally recognized as inherent in the work provided for in the contract are encountered at the site the party discovering those conditions shall promptly notify the other party in writing of the specific differing conditions before they are disturbed and before the affected work is performed Upon written notification from the Contractor the Engineer will investigate the conditions and if the Engineer determines that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract an adjustment excluding loss of anticipated profits will be made and the contract modified in writing accordingly The Engineer will notify the Contractor of the Engineer s determination whether or not an adjustment of the contract is warranted No contract adjustment which results in a benefit to the Contractor will be allowed unless the Contractor has provided the required written notice No contract adjustment will be allowed under the provisions specified in this section for any effects caused on unchanged work Any contract adjustment warranted due to differing site conditions will be made conformance with the provisions in Section 4 10 Changes and Section 4 12 Notices Change Orders and Claims 5 19 Removal Of Defective Or Unauthorized Work All work which is defective in its construction or deficient in any of the requirements of the contract documents sha
249. d by the Engineer The Engineer shall be notified before surveying and or construction staking commences The contractor shall furnish cut sheets prepared by the surveyor to the Engineer immediately upon the setting of the grades The Contractor shall preserve construction survey stakes and marks for the duration of their usefulness The Contractor shall be responsible for the replacement cost of any lost or disturbed construction staking necessary to complete the work The Contractor shall immediately inform the Engineer in writing of any discrepancies discovered during the course of the work between the Plans and the construction staking and the Engineer shall promptly verify the same Any work done after such discovery until authorized will be done at the Contractor s risk Three consecutive points set on the same slope shall be used together so that any variation from a straight grade can be detected Any such variation shall be reported to the Engineer Any deviation of constructed facilities from the grades shown on the Plans and staked in the field shall be the responsibility of the Contractor Grades for underground conduits will be set at the surface of the ground and the Contractor shall be responsible for transferring such grades to the bottom of the trench The Contractor shall preserve property line and corner survey markers except where their destruction is unavoidable when the Contractor is proceeding in accordance with accepted
250. d by these specifications and to provide a complete and healthy growing landscaping all as shown on the Plans as specified in the Contract Specifications and these Standard Specifications shall be included in the lump sum price paid for Landscaping Said price shall also include the cost of all establishment periods the 90 calendar day maintenance period and 1 year guarantee No separate or additional payment will be made Structural soil will be measured and paid for as specified in the Contract Specifications Where no bid item is provided for Structural Soil the cost thereof shall be included in the lump sum price paid for Landscape Planting and no separate payment will be made therefor City of Clovis Standard Specifications 2009 147 SECTION 21 LANDSCAPE IRRIGATION SYSTEMS 21 1 General The work shall consist of furnishing and installing landscape irrigation systems complete and fully functional all as shown on the Plans Standard Drawings as specified in the Specifications and as directed by the Engineer The work shall include furnishing all labor materials equipment and supplies necessary for the installation of irrigation pipelines of varying sizes all forms of sprinklers or other water delivery and control devices and systems backflow prevention devices booster pumps protective cages electrical service panels and all related wiring controllers valves valve boxes water service connections water meter boxes wat
251. d for protection during inclement weather Toilet accommodations shall also be maintained for the use of employees on the work The accommodations shall be in approved locations properly screened from public observation and shall be maintained in a strictly sanitary manner The Contractor shall obey and enforce all State County and City sanitary regulations and orders and shall take precautions against infectious diseases and the spread of same and shall maintain at all times satisfactory sanitary conditions around all shanties tool and supply houses and on all other parts of the work The cost of compliance with this Section 7 11 shall be included in the various bid items of work no separate payment will be made therefor 7 12 Safety Provisions First Aid Injury Illness Prevention Program The Contractor shall comply with the provisions of the State Labor Code Division 5 Safety in Employment the State Division of Occupational Safety and Health Construction Safety City of Clovis Standard Specifications 2009 57 Orders and General Industry Safety Orders of Title 8 California Code of Regulations as well as all other applicable laws ordinances and regulations In compliance with State Labor Code Section 6708 the Contractor shall maintain adequate emergency first aid treatment for his employees sufficient to comply with the Federal Occupational Safety and Health Act of 1970 Public Law 91 596 In compliance with Labor Code S
252. d in line splices and soldered using Rosin Core solder No open flame soldering shall be allowed After soldering the Contractor shall insulate the splices per Section 86 2 09E Splice Insulation of the State Standard Specifications 14 The Contractor may use either of the following splice insulation options a Method B as shown on the State of California Standard Plans ES 13A followed with outer layer of friction tape and covered with an approved electrical insulating coating b Heat shrink tubing as provided in the State Standard Specifications Section 86 2 09E Splice Insulation When three more conductors are to be enclosed within a single splice using heat shrink tubing mastic shall be placed around each conductor prior to being placed inside the heat shrink tubing The mastic shall be the type recommended by the manufacturer of the heat shrink tubing 15 The distance between the side of a loop and the loop lead in from an adjacent detector shall be 24 inches minimum The distance between loop lead ins shall be 6 inches minimum Loops placed during new pavement construction shall be placed prior to the final lift of AC or AC overlay The top of PVC loops shall be 0 1 ft below the top of base rock or dirt and shall be held in position by installing a wooden stake in each corner 16 Multiple loop detectors connected to a single loop lead in cable shall be connected in series 17 The slots for sawcut loop i
253. d in the Contract Specifications B All circuits shall be identified at the service panel C Wires shall not be taped together inside conduits D Lighting systems installed as a component of a landscape design shall conform to all design and materials specifications on the Plans E Unless otherwise noted on the Plans security lights in parks or play lots along trails or walkways alleys and in parking or other areas are to be controlled by time clocks and photo cells which are to be installed at the control panel as shown on the Plans and according to manufacturer s recommendations Timers and photocells shall be of type make and model indicated on the Plans or specified in the Contract Specifications For most installations the photo cell should be installed facing north In larger parks or installations the security lighting system may be split having some lights controlled strictly by photocell and some by time clock photocell Installation shall follow the Plans for the specific system design specifications City of Clovis Standard Specifications 2009 257 Ornamental or landscape lighting including low voltage systems shall also be controlled by a time clock photocell control These lights shall have relay switches that are separate from the security lighting system For maintenance purposes a test switch that bypasses the photocell is to be installed in the control panel The switch is to be identified as the test
254. d to each worker for each calendar day or portion thereof for which each worker was paid less than the prevailing wage rate shall be paid to each worker by the Contractor or subcontractor If a worker employed by a subcontractor on a public works City project is not paid the general prevailing per diem wages by the subcontractor the prime contractor of the project is not liable for the penalties described above unless the prime contractor had knowledge of that failure of the subcontractor to pay the specified prevailing rate of wages to those workers or unless the prime contractor fails to comply with all of the following requirements 1 The contract executed between the contractor and the subcontractor for the performance of work on the public works City project shall include a copy of the requirements in Sections 1771 1775 1776 1777 5 1813 and 1815 of the Labor Code 2 The contractor shall monitor the payment of the specified general prevailing rate of per diem wages by the subcontractor to the employees by periodic review of the certified payroll records of the subcontractor 3 Upon becoming aware of the subcontractor s failure to pay the specified prevailing rate of wages to the subcontractor s workers the contractor shall diligently take corrective action to halt or rectify the failure including but not limited to retaining sufficient funds due the subcontractor for work performed on the public works City project 4 Prior to m
255. d to the satisfaction of the Engineer Finish of concrete surface improvements shall be free from blemishes and shall be as follows a Curbs Trowel smooth and finish with a light brush b Sidewalks and mowstrips Medium sweat finish c Gutters valley gutters and median caps Finish with medium broom d Driveway approaches Finish with a medium broom except wings shall be finished with a light broom and sidewalk area to receive a medium sweat finish e Wheelchair ramps Finish as indicated on the Standard Drawings Broomed surfaces to be used by pedestrian traffic shall be broomed transverse to the line of traffic 73 7 Tolerances The top and face of finished curbs shall be true and straight and the top surface of curbs shall be of uniform width free from humps sags or other irregularities When a straightedge 10 feet long is laid on the top or face of the curb or on the surface of gutters or valley gutters the surface shall not vary more than 1 8 inch from the edge of the straightedge except at designed grade changes or curves The surface of sidewalks wheelchair ramps driveway and alley approaches mowstrips and median caps shall not vary more than 3 16 inch along a 10 foot straightedge except at grade changes 73 8 Curing All surface concrete improvements shall be cured by application of an approved curing compound in conformance with the requirements of Subsection 90 7 01B Curing Compound Method of the
256. d transformers Submit test results and test method to the project Inspector or Engineer of record If resistance exceeds 25 OHMS install additional ground rods separated at least 6 0 until resistance is reduced to 25 OHMS or less CEC 250 84 83 13 Installation Of Services And Switchboards Switchboards shall be installed as indicated the Plans in accordance with manufacturer s written instruction and with recognized industry practices to ensure that switchboards comply with requirements of NEMA and CEC standards and applicable portions of NECA s Standard of Installation Prior to energizing circuitry check all accessible connections to manufacturer s torque specifications Subsequent to wire and cable hook ups energize switchboards and demonstrate functioning in accordance with requirements All G F I breakers shall be tested and shown to comply with CEC Section 230 95 accordance with International Electrical Testing Association Inc NETA standards by a NETA certified independent testing company 83 14 Surface Restoration Surface restoration shall conform to Section 19 3 05 Restoration of Surfaces 83 15 System Testing The Contractor shall furnish all labor and test equipment required to fully test the equipment installed as shown on the Plans and as specified in the Specifications and demonstrate its proper operation in accordance with the following A test must demonstrate that each piece of equi
257. dard Specifications unless otherwise specified in the Contract Specifications or shown on the Plans Pipe for recycled water mains 12 inches and less in diameter may be either polyvinyl chloride PVC pipe or ductile iron pipe at the Contractor s option except where the specified minimum depth of cover is not achieved Where the specified minimum depth of cover is not achieved pipe for recycled water mains 12 inches and less in diameter shall be ductile iron pipe Pipe for recycled water mains larger than 12 inches in diameter shall be ductile iron pipe or where shown on the Plans or specified in the Contract Specifications PVC pipe conforming to ASTM Designation C905 67 2 1 PVC Pipe And Fittings For Recycled Water Mains PVC pipe and fittings for recycled water mains shall conform to the provisions in Section 66 2 1 PVC Pipe and Fittings for Water Mains except as specified in this Section 67 2 1 PVC pipe for recycled water mains shall be purple in color Pantone Color 512 and shall be factory marked with the words CAUTION NONPOTABLE WATER DO NOT DRINK black letters arranged in a continuous line of text on both sides and for the full length of the pipe 67 2 2 Ductile Iron Pipe And Fittings For Recycled Water Mains Ductile iron DI pipe and fittings for recycled water mains shall conform to the provisions in Section 66 2 2 Ductile Iron Pipe and Fittings for Water Mains except as spec
258. dditional compensation will be allowed therefor 7 19 Patents The Contractor shall be responsible for the use of patented materials equipment devices or processes used on or incorporated in the work The Contractor shall assume all costs arising from the use of patented materials equipment devices or processes used on or incorporated in the work and agrees to indemnify and save harmless the City the Engineer and their duly authorized representatives from all suits at law losses liability demands claims or actions of every nature for or on account of the use of any patented materials equipment devices or processes 7 20 Property Rights Of Materials Nothing in the Contract shall be construed as vesting in the Contractor any right of property in the materials used after they have been attached or affixed to the work or the soil or after payment has been made for 90 percent of the value of materials delivered to the site of the work or stored subject to or under the control of the City All such materials shall become the property of the City upon being so attached or affixed or upon payment of 90 percent of the value of materials delivered to the site of the work or stored subject to or under the control of the City As provided in Subsection 5 3 Contractor s Responsibility For The City of Clovis Standard Specifications 2009 64 Work the Contractor shall care for and protect the work until final acceptance of the work by t
259. dditional terminal facilities as shown in the details and diagrams Auxiliary phase sense harnesses per details and diagrams shall be installed in each cabinet to allow interfacing of phase green signals and if installed auxiliary detector assembles D SYSTEM OPERATION The Contractor shall demonstrate that all of the components of each system are compatible and will perform satisfactorily as a system Satisfactory performance shall be determined using the following test procedure 1 Each system to be used for testing shall consist of an optical emitter assembly an optical detector at least 200 feet of optical detector cable and a discriminator module The discriminator modules shall be installed in the proper input file slot of a Model 332 controller cabinet The controller cabinet together with a Model 170 controller unit with the appropriate operating program a Model 210P monitor unit and 120 volt AC power will be available Two tests shall be conducted one using a Class signal emitter and a distance of 1 000 feet between the emitter and the detector the other using a Class 11 signal emitter and a distance of 1 800 feet between the emitter and the detector All range adjustments on the module shall be set to Maximum for each test Each above test shall be conducted for a period of one hour during which the emitter shall be operated for 30 cycles each consisting of a one minute on interval and a one minute off interval Durin
260. de Claim process and the two procedures shall be sequential City of Clovis Standard Specifications 2009 22 Failure to timely file Government Code Claim shall act as complete waiver by Contractor of the disputed item The Government Code Claim shall be handled by Contractor and City as required by the Government Code commencing with Section 900 For purposes of the applicable Government Code provisions the running of the period of time within which a Government Code Claim must be filed shall be tolled from the time the Contractor submits his or her written Claim pursuant to this Section 4 12 until the time that such Claim is denied as a result of the meet and confer process in Section 4 12 6 3 including any time utilized by such meet and confer process 4 12 7 Procedures For Claims Over 375 000 Claims over 375 000 shall be handled by Contractor and City in the same manner as Claims of 375 000 or less see Section 4 12 6 Procedures for Claims Less Than or Equal to 375 000 except that City shall a respond in writing to all written Claims within 90 days of receipt of the Claim or may request in writing within 45 days of receipt of the Claim any additional documentation supporting the Claim or relating to defenses to the Claim the Owner may have against the Contractor and b respond within 45 days after receipt of the further documentation or within a period of time no greater than that taken by the Contractor in producing t
261. dered in making the award will be returned to the bidder whose proposal they accompanied Retained proposal guaranties will be held until the Contract has been executed after which all guaranties will be returned except those forfeited as required in Section 3 2 Execution of Contract 3 5 Material Statement Samples And Guarantees As permitted in Section 6 Control of Materials before any Contract is awarded the bidder may be required to furnish a complete statement of the origin composition and manufacturer of any or all materials to be used in the construction of the work together with samples which may be subjected to the tests provided for in these Specifications to determine their quality and fitness for the work In compliance with Sections 5 23 Guarantee of Workmanship 6 10 Guarantee of Materials and 7 23 Guarantee the Contractor is required to guarantee all materials equipment and workmanship for a period of one year from the date of Acceptance as denoted in Section 8 14 Acceptance of Contract In addition to the overall guarantee the bidder may also be required by the Contract Specifications to furnish a written or other form of guaranty such as a bond covering certain items of work for varying periods of time from the date of recordation of said Notice of Acceptance When the guaranty is required the form and the time limit of the guaranty shall be as specified in the Contract Specifications
262. ductors The Contractor shall comply with the following requirements 1 Contractor shall diligently prosecute the underground work to completion 2 During the underground work all trenches jacking pits and foundation bases shall be maintained in a safe manner and as directed by the Engineer 3 There shall be no prolonged inconveniences to property owners or vehicular traffic 4 After completion of the underground work the Contractor shall securely fasten all barricades to foundation anchor bolts All debris shall be removed and the project site left in a neat and presentable appearance as directed by the Engineer 5 All underground work within the roadway shall be completed prior to any road paving 6 Refer to the Project Plans for additional Construction Notes Second Stage Construction This stage of construction shall consist of doing the above ground work The above ground work shall consist of the installation of the signal and luminaire standards vehicle signal and pedestrian signal heads P P B s luminaires detector probes and controller cabinet s The Contractor shall comply with the following requirements 1 The Contractor shall not do any above ground work until all above ground materials are received by the Contractor except for luminaires luminaire standards conductors and service cabinet may be installed prior to receiving all above ground materials 2 The Contractor will be charged working days whil
263. e and chalk 1 000 hours weatherometer and fadometer with less than 10 percent fade and chalk The electrical equipment enclosure and the metering enclosure shall be painted a ranch green conforming closely to Federal Standard No 595 Name plates shall be provided for each control component The name plate shall be phenolic black background with white lettering except main breaker which will be red with white lettering All name plates will be fastened by stainless steel screws The Contractor shall supply all materials and perform all electrical work needed to connect the signal and lighting circuits to the utility company service The service cabinet shall contain all the breakers shown on the Standard Drawing therfor The enclosure shall also have a contactor and circuit as shown in the service pedestal schematic Each circuit breaker shall be labeled All field wire connecting lugs shall be capable of connecting a No 2 AWG stranded conductor All live wire installations shall meet the approval of the utility company The live wire circuit from the service to the underground service meter box shall consist of conductors as specified by the servicing utility A copy of the wiring diagram for the integrated City of Clovis Standard Specifications 2009 283 system shall encased plastic holder and mounted inside the electrical equipment enclosure The service cabinet base shall be concrete integral with the sidewalk if side
264. e backplates unless otherwise indicated on the Plans Tunnel visors shall be used with the open slot portion installed at bottom All signal components shall be metal except for LED modules and seals All LED modules for traffic signal units shall be supplied by the Contractor Signal alignment shall be as directed by the Engineer All signal sections shall be provided with a Light Emitting Diode LED signal module and shall conform to the provisions in Section 86 4 02 Light Emitting Diode Signal Module of the State Standard Specifications the most recent version of the California Transportation Electrical Equipment Specifications TEES and these Standard Specifications All vehicular LED modules shall be Type 1 and shall be listed in the most recent California Department of Transportation Qualified Products List The Light Emitting Diode LED signal module shall replace the reflector socket gasket and lens assembly of an incandescent signal face as specified in Section 86 4 01 Vehicle Signal Faces of the State Standard Specifications Each LED unit shall consist of a convex lens made of smooth non refracting ultraviolet stabilized polycarbonate the LED array a printed circuit board a power supply and two conductors as specified in Section 86 4 02 Light Emitting Diode Signal Module of the State Standard Specifications Each conductor shall be equipped with a quick disconnect connector All LED modules shall have a gask
265. e by certified mail return receipt requested has been given to the City 4 Coverage shall not extend to any indemnity coverage for the active negligence of the additional insured in any case where an agreement to indemnify the additional insured would be invalid under Subdivision b of Section 2782 of the Civil Code Acceptability of Insurers Insurance is to be placed with insurers with a current A M Best s rating of no less than A VII unless otherwise acceptable by the City Only California admitted insurers may be used Insurance is to be placed with insurers which are currently licensed by the State Insurance Commissioner and are acceptable to the City Verification of Coverage Contractor shall furnish the City with original certificates and endorsements including amendatory endorsements effecting coverage required by this clause All certificates and City of Clovis Standard Specifications 2009 52 endorsements are to be received approved by the City before work commences however failure to do so shall not operate as a waiver of these insurance requirements The City reserves the right to require complete certified copies of all required insurance policies including endorsements effecting the coverage required by these Specifications at any time Waiver of Subrogation Contractor hereby agrees to waive subrogation which any insurer of contractor may acquire from contractor by virtue of the payment of any loss Cont
266. e event contact is made and the Contractor is either unwilling or unable to respond within three hours of contact then the condition or situation deemed a HAZARD will be upgraded to an EMERGENCY by the Engineer and the appropriate measures as above provided will be taken Due care will be taken to effect only those measures necessary to remove the emergency or urgent condition or situation The Contractor will be invoiced for all direct costs incurred by the City plus an emergency response fee of 500 and an administrative fee of 250 Once additional resources are deployed by the Engineer to resolve the emergency the Contractor may still participate to reduce the cost of the deployment by the Engineer All costs incurred by the City for taking such corrective action will be deducted from monies owed the Contractor Parties not under contract to the City but subject to these Standard Specifications will be billed for the City s costs The foregoing process shall apply to all Contracts awarded by the City and also to Encroachment Permits issued by the City to Contractors for non public work The provisions of Section 9 7 Stop Notices City s Right to Withhold Payments will apply Except as otherwise provided in this Section 7 18 or in the Contract Specifications full compensation for conforming to all of the provisions in this Section 7 18 shall be considered as included in the prices paid for the various contract items of work and no a
267. e inconvenience and delay as possible Where possible traffic shall be routed on new or existing paved surfaces Existing traffic signals and highway lighting within the project area or affected by the work shall be kept in operation for the benefit of the traveling public during progress of the work Unless otherwise provided in the Contract Specifications the Contractor shall be responsible for routine maintenance of existing systems Construction operations shall be conducted in such a manner as to cause as little inconvenience as possible to abutting property owners Convenient access to driveways houses and buildings along the line of the work shall be maintained and temporary approaches to crossings or intersecting streets shall be provided and kept in good condition When the abutting property owner s access across the right of way line is to be eliminated or to be replaced under the contract by other access facilities the existing access shall not be closed until the replacement access facilities are usable Spillage resulting from hauling City of Clovis Standard Specifications 2009 61 operations along or across any public traveled way shall be removed immediately by the Contractor at the Contractor s expense Water or dust palliative shall be applied if ordered by the Engineer for the alleviation or prevention of dust nuisance as provided in Section 10 Dust Control The Contractor will be contacted when a situation or conditio
268. e laid relocated or reset Where an existing facility not conforming to current Americans With Disabilities Act ADA Standards is to be replaced unless otherwise shown on the Plans or specified in the Contract Specifications the new facility shall be constructed to meet current ADA standards as directed by the Engineer Materials to be reused shall not be removed until their use is no longer required as determined by the Engineer Materials to be reused in the work shall be cleaned of earth and other foreign materials Adhering concrete shall be removed from materials to be City of Clovis Standard Specifications 2009 97 reused the work Materials shown on the Plans or specified in the Contract Specifications to be reused in the work that are damaged as a result of the Contractor s operations shall be repaired by the Contractor at the Contractor s expense to the satisfaction of the Engineer Materials that are damaged beyond repair as a result of the Contractor s operations shall be disposed of outside the right of way in conformance with the provisions in Section 5 12 Disposal of Material Outside the Right of Way Material from existing facilities to be reused in the work that in the opinion of the Engineer is unsuitable for use in the work shall become the property of the Contractor and shall be disposed of in conformance with the provisions in said Section 5 12 The unsuitable material shall be replaced with material of a kind
269. e necessary to comply with this requirement 65 7 Deflection Deformation Test PVC Sewer Force Mains Where shown on the Plans or specified in the Contract Specifications that PVC sewer force mains are to be tested for deformation this test shall be performed after backfilling and compaction but prior to the placement of aggregate base or asphalt concrete surfacing and prior to television inspection specified in Section 65 8 Television Inspection Installed Pipe Interior The Contractor at his expense shall provide any necessary special measures to allow access to the pipe interior for testing equipment and when complete shall restore and seal the pipeline opening to the satisfaction of the Engineer The Contractor shall demonstrate that the maximum pipe deflection deformation does not exceed 5 percent of the nominal pipe interior diameter by pulling a properly sized rigid ball or a mandrel through the main line pipe A rubber flush ball does not meet the requirement for deflection testing Failure of the deflection test shall be grounds for rejection of the section tested The Contractor shall undertake measures necessary to correct the deflection Retesting of the failed section will be conducted to affirm correction If correction requires re laying or otherwise disturbing the pipe the Contractor may be required by the Engineer to repeat the leakage test at no cost to the City 65 8 Television Inspection Installed Pipe Interior
270. e of the project manager and signed off by the project manager The Contractor shall notify the Engineer of his intent to proceed with functional and subsystem testing forty eight 48 hours prior to commencement of each test Full environmental conditions shall be tested as part of the functional tests for field equipment Subsystem testing and inspections shall include visual inspection for damaged or in correct installation adjustments and alignment and measurement of parameters and operating conditions Pre Installation Testing Pre installation testing shall include testing of all material equipment and cables in a laboratory environment prior to the delivery to the site Use of laboratory facilities shall be arranged by the Contractor The tests shall either be conducted at the equipment manufacturer s premises or at a laboratory arranged by the Contractor All material except test equipment and special tools shall be bench tested in accordance with the following paragraphs which include those items described elsewhere requiring pre installation testing for each individual item where applicable All active equipment shall be connected to normal operating power energized and subjected to normal operating conditions for a continuous period of time in the laboratory of not less than forty eight 48 hours Functional testing shall be performed by the manufacturer on all material prior to delivery to the site The functional tests shall
271. e original drawings and shall be approved by the Engineer The City will indicate the proposed precise location of the control panels 3 Grades Before starting work on the system the Contractor shall carefully check all grades to ensure the work may safely proceed and keep within the specified material depths If the slope of the landscaped area exceeds 10 1 inline check valves shall be installed at each sprinkler subject to low head drainage 4 Standard of Installation Material and workmanship shall be in accordance with local codes and ordinances of legally constituted authorities except where provisions of these specifications exceed such requirements these specifications shall govern 5 General Installation Any equipment installed by the Contractor and deemed to be for the use of the City in various situations control valves control panels etc shall be so installed to be readily accessible and quickly operable Two keys for lockable equipment shall be supplied to the City upon installation Equipment deemed by the City to be inoperable for its intended purpose shall be reinstalled by the Contractor in an operable position before approval will be given Routing of pressure supply lines as indicated on the drawings is diagrammatic Install lines and various assemblies in such a manner as to conform to details on plans City of Clovis Standard Specifications 2009 155 6 Assemblies Install all assemblies specified her
272. e paved walks and roads shall be installed inside PVC Schedule 40 Type II pipe sleeve of adequate sizes to permit convenient City of Clovis Standard Specifications 2009 157 threading of all bundles as shown the plans Wires shall not be taped together inside conduits The conduit shall extend at least 12 inches beyond the edges of the paved walks or road Wire sizes shall be determined by the number of valves operating on a given wire and the distance from the controller to the farthest valve as specified by the charts furnished by the remote control valve manufacturer Valve wire may be any color other than white No splices are permitted Common ground wire must be white and splices are permitted only at remote control valves Use 3M DBY wire splices or approved equal when splices are made Each remote control valve is to have a dedicated individual 14 GA direct burial wire that is continuous in length to the automatic controller The common wire is to be 12 GA direct burial and is to be dedicated to the controller it serves No cross connection of common wires between different controllers will be allowed 14 Valves Boxes Valve boxes shall be set to finished grade Only one remote control valve may be installed in each box Furnish purple valve boxes where reclaimed water is or may be used in accordance with Section 67 Recycled Water Distribution Systems Remote control valves shall be connected and aligned to pr
273. e specified in the special provisions obliteration shall consist of placing an earth cover of not less than 0 5 foot in thickness or shall consist of rooting plowing pulverizing or scarifying to a minimum depth of 0 5 foot or to the bottom of the impermeable underlying base whichever is the greater When obliteration is accomplished by rooting plowing pulverizing or scarifying the bituminous material shall be broken up into pieces not larger than 4 inches in greatest dimension and mixed with an equal amount of underlying material After obliteration the area shall be graded as directed by the Engineer so that it will blend in with the surrounding terrain and be well drained If the Contractor elects to obliterate surfacing by placing an earth cover the existing base and surfacing shall be scarified for its full depth and broken up so that the material contains no lumps larger than 12 inches in greatest dimension before the earth cover is placed Wherever a portion of existing surfacing is to be obliterated the outside edge of the existing surfacing which is to remain in place shall be sawed to a neat line prior to obliteration operations 15 2 02 C Traffic Stripes And Pavement Markings 1 Where shown on the Plans or specified in the Contract Specifications traffic stripes and pavement markings paint and thermoplastic to be removed shall be accomplished by wet sandblasting or other approved methods which will cause the least pos
274. e such that it shall be self centering upon closure and so designed that the gasket will not be required to support the weight of the manhole sections The rubber gasket shall be the sole element of the joint depended upon to provide water tightness Manhole adjustment rings shall be precast concrete manhole adjustment rings conforming to the details shown on the Standard Drawings Mortar used in manholes shall be composed of one part by weight Portland cement Type Il low alkali conforming to ASTM C150 2 parts by weight sand Steel reinforcement bars shall be deformed billet steel bars of the size called for in the Plans and Specifications conforming to the provisions in ASTM A615 for Grade 60 Metal frames and covers for manholes shall be cast iron meeting the provisions in ASTM A48 for Class 25 and shall conform to the details shown on the Plans and Standard Drawings Covers shall be marked Sanitary Sewer molded into the cover by the manufacturer 64 3 Trenching And Excavation Trenching for sanitary sewer pipes and service laterals and excavating for sewer manholes shall conform to the requirements of Section 8 15 Utilities and Non Street Facilities Potholing and Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration 64 4 Sewer Pipeline Installation Construction of sewer pipelines connecting to existing sewers shall begin at the existing sewer location and proceed up
275. e to accomplish corrective work any of which results in an overrun in contract time the provisions of Section 8 9 Liquidated Damages will be applied City of Clovis Standard Specifications 2009 34 5 23 Guarantee Of Workmanship In conformance with Sections 3 5 Materials Statement Samples and Guarantees 6 10 Guarantee of Materials and 7 23 Guarantee the Contractor shall guarantee all materials equipment and workmanship of the installation and Work for a period of one year from the date of Acceptance of the Work by the City Council Additional longer guarantees may be required by the Contract Specifications Should any material or appliance or any work develop any defect or weakness due in the opinion of the Engineer to the use of imperfect materials equipment or workmanship or failure to follow the Contract including the Plans and Specifications the Contractor shall be notified within the time period of the Guarantee and shall immediately perform at Contractor s expense the necessary repairs or replacements to make the defective item or items suitable and satisfactory Expiration of the Guarantee time period shall not void an obligation of the Contractor which is based on a timely notice by the City Should exigencies necessitate the repairs before the Contractor could be notified or should the Contractor refuse to make the repairs or replacements within a reasonable period of time the Engineer shall have t
276. e wage complaint has been resolved If notice of the resolution of the wage complaint has not been received by the Contractor within 180 days of the filing of a valid notice of completion or acceptance of the public works City project whichever occurs later the Contractor shall pay all moneys retained from the subcontractor to the City These moneys shall be retained by the City pending the final decision of an enforcement action Pursuant to the requirements in Section 1773 of the Labor Code the City has obtained the general prevailing rate of wages which rate includes employer payments for health and City of Clovis Standard Specifications 2009 44 welfare pension vacation travel time and subsistence pay as provided for in Section 1773 8 of the Labor Code apprenticeship or other training programs authorized by Section 3093 of the Labor Code and similar purposes applicable to the work to be done for straight time overtime Saturday Sunday and holiday work The holiday wage rate listed shall be applicable to all holidays recognized in the collective bargaining agreement of the particular craft classification or type of workmen concerned City of Clovis Standard Specifications 2009 45 The general prevailing wage rates and any applicable changes to these wage rates available at the office of the City Clerk 1033 Fifth Street Clovis CA 93612 General prevailing wage rates are also available from the California Department of I
277. e waiting for shipment of the above ground materials 3 Refer to the Project Plans for additional Construction Notes 86 7 Warranties Guarantees And Instruction Sheets Workmanship and equipment guarantees shall conform to the provisions in Section 86 1 05 Warranties Guarantees and Instruction Sheets of the State Standard Specifications and to Sections 5 23 Guarantee of Workmanship and 6 10 Guarantee City of Clovis Standard Specifications 2009 272 of Materials of these Standard Specifications All materials replacing materials under warranty shall have the same warranty as stated in this contract The new warranty shall commence at the date the original material is replaced with the new material All work done under the Contract by the Contractor shall be guaranteed in writing to the Engineer for 12 months from the date of acceptance The terms of the guarantee shall be clearly stated and shall be approved by the Engineer prior to acceptance of the contract Prior to acceptance of the contract the Contractor shall supply the City with the manufacturer s standard warranties and guarantees for the satisfactory operation of all materials supplied by the Contractor This warranty or guarantee shall extend for a period of twelve months or more from the date of acceptance Pedestrian signals shall be guaranteed by the manufacturer for two 2 years Signal controller conflict monitors shall be guaranteed for two 2 years
278. ean City References in said Section 9 1 03 to Section 9 1 06 Partial Payments shall mean Section 9 6 Partial Progress Payments and Retentions of these Standard Specifications If the Contractor and the City cannot agree on the force account price to be paid for Extra Work or if the Contractor and the City cannot agree that certain work is Extra Work then the Contractor shall follow the claim and change order procedures of Sections 4 10 Changes and 4 12 Notices Change Orders and Claims Payment as provided herein shall constitute full compensation to the Contractor for performance of Extra Work and no additional compensation will be allowed therefor 9 6 Partial Progress Payments And Retentions By the twentieth day of each month the Contractor shall on forms approved by the Engineer furnish the Contractor s estimate of work completed prior to that date based on the schedule of values submitted by the Contractor pursuant to Section 9 2 Cost Breakdown The estimate and application must include the Contractor s previous month s daily logs and updated monthly schedule or the City has the right to reject it For materials delivered to the site and which are eligible for partial payment the amount of any material to be considered in making an estimate will in no case exceed the amount thereof which has been reported by the Contractor to the Engineer on forms approved by the Engineer pro
279. ected by the State Department of Agriculture and certified to have complied with its regulations Plant nomenclature shall be defined by the list of plant materials on the Landscape Planting Plan All trees shrubs and other plants shall be the variety and size shown on the plans and shall conform to the requirements of these specifications All trees shrubs and other plants shall be tagged with their botanical and common plant name in accordance with recommendations of the American Association of Nurserymen Substitutions for the indicated plant material will be permitted provided the substitute materials are approved in advance by the Engineer and the substitutions are made at no additional cost All substitute plant material shall conform to the requirements of these Specifications unless otherwise approved by the Engineer All plant material shall be symmetrical typical for variety and species sound healthy vigorous free from plant disease insect pests or their eggs mechanical injury excessive abrasions or other objectionable disfigurements and shall have healthy normal root systems well filling their containers but not to the point of being root bound All plant material shall have a habit of growth that is normal to the species and be sound healthy and vigorous Tree trunks shall be sturdy and well hardened off Trees and shrubs shall not be pruned prior to delivery except as authorized by the City In no case shall trees be
280. ection 6401 7 the Contractor shall have established implemented and maintains an Injury and Illness Prevention Plan The Contractor shall comply with Section 3 3 Required Contract Securities Insurance Certificate Business License Injury and Illness Prevention Plan for plan submittal requirements Except as provided in Sections 7 13 Worker Protection From Toxic or Explosive Gases 7 14 Trenches and Excavations Hazardous Waste and 7 15 Worker Protection From Caving Ground in Excavations full compensation for all costs involved in providing job safety worker protection and emergency first aid treatment shall be included in the amounts bid for the various items of work no separate payment will be made therefor 7 13 Worker Protection From Toxic Or Explosive Gases Confined Spaces Entry In conformance with the provisions of the State Labor Code and the Safety Orders set forth in Section 7 12 Safety Provisions First Aid Injury lllness Prevention Program the Contractor shall protect workers from toxic or explosive gases by providing whatever testing equipment and other special equipment that may be needed to detect the presence of and to remove such toxic or explosive gases found or suspected to exist in any above or below ground facilities whether newly constructed or existing excavations or other activities involved in the work Detection and removal shall be accomplished by methods which comply with the r
281. ections 7 17 Public Convenience and 7 18 Public Safety and as specified in the Contract Specifications In the event that the Contractor fails to perform the Work above specified the City may perform that Work and the cost thereof will be deducted from moneys due or to become due the Contractor In the event that a suspension of Work is ordered by the Engineer due to unsuitable weather conditions and in the sole opinion of the Engineer the Contractor has prosecuted the Work with energy and diligence prior to the time that operations were suspended the cost of providing a smooth and unobstructed passageway through the Work will be paid for as Extra Work as provided in Section 4 11 Extra Work or at the option of the Engineer that Work will be performed by the City at no cost to the Contractor If the Engineer orders a suspension of all of the Work or a portion of the Work which is the current controlling operation i e critical path due to unsuitable weather conditions and in the sole opinion of the Engineer the Contractor has prosecuted the Work with energy and diligence prior to the time that operations were suspended then Contractor shall be entitled to a time extension for the period of the suspension If the portion of Work suspended is not a current controlling operation or operations but subsequently does become the current controlling operation or operations the determination of time extension will be made on the basis of t
282. ed the Contractor shall expose and determine the locations of all crossing and adjacent utility facilities in advance by pothole excavation A minimum separation of 12 inches shall be maintained between fiber optic conduit and other facilities Fiber optic conduit shall be pitched to drain toward access boxes or vaults No change in horizontal or vertical alignment from that shown on the Plans will be permitted without the express approval of the Engineer The ends of each conduit shall be sealed with Ductseal or other electrical sealing compound approved by the Engineer 82 8 A Direct Horizontal Boring Where direct horizontal boring is permitted by the Plans Contract Specifications or authorized by the Engineer the process shall generally consist of the use of the technique of creating and directing a bore hole along a predetermined path to a specified target location where indicated on the plans to install conduits This technique shall involve the use of mechanical and hydraulic equipment to change the boring course and shall use instrumentation to monitor the location and orientation of the boring head assembly along the predetermined course The Contractor shall comply with Section 8 15 Utility and Non Street Facilities Potholing and Section 82 10 Tracer Wire prior to commencing with boring operations Drilling shall be accomplished with fluid assisted mechanical cutting Unless otherwise approved boring fluids shall
283. ed aval dente Mead eed a 7 2 60 PROPOSAL ei Arete ee et 8 2 7 DESIGNATION OF SUBCONTRACTORS 2 4 8 2 8 WITHDRAWAL OF 18 2 2004400000 0 8 2 9 9 2 10 REJECTION OF PROPOSALS stead 9 SECTION 3 AWARD AND EXECUTION OF CONTRACT 10 321 AWARD OF GONTRACT oi ari ie Ane eal ha a ae 10 3 2 EXECUTION OF 10 3 3 REQUIRED CONTRACT SECURITIES INSURANCE CERTIFICATE BUSINESS LICENSE INJURY AND ILLNESS PREVENTION PLAN 10 3 4 RETURN OF PROPOSAL GUARANTIES 11 3 5 MATERIAL STATEMENT SAMPLES AND GUARANTEES 11 SECTION 4 SCOPE OF WORK 12 4 1 INTENT OF PLANS AND 6 460440000 00 12 4 2 COORDINATION INTERPRETATION AND PRECEDENCE OF PLANS AND SPECIFICATIONS 13 4 3 abe Senses 14 14 4 5 CONFORMITY WITH PLANS AND ALLOWABLE
284. ed by City inspectors in preparing for and making the determination that the work has not been satisfactorily completed to warrant an inspection If the inspection was scheduled to occur on overtime a weekend or holiday said charge will be calculated at the standard City overtime double time rate as applicable Failure to pay the bill will be cause to deduct the amount from monies due the Contractor 21 5 Materials In accordance with Section 6 Control Of Materials any material specified by name and or model number in the Plans Standard Drawings Contract Specifications or these Standard Specifications shall be deemed to be used for the purpose of identifying the standard of quality and type of materials and insuring the specific use of that material in the construction of the system If substitution of a material is desired by the Contractor sufficient descriptive literature and material samples must be furnished to establish the material as an equal substitute In addition the Contractor must state his reasons for desiring substitute materials Material used in landscape irrigation systems shall conform to the following requirements 1 Mainline Irrigation Pipe All mainline or pressure supply line plastic pipe shall be standard weight class 315 polyvinyl chloride PVC 1120 high impact solvent weld pipe Pipe 2 inches in diameter or less shall be Schedule 40 PVC solvent weld The Contractor shall provide adequate thrust blocks at all
285. ed in lieu of painting numbers on standards Numbers shall be located facing the center of the intersection and 10 feet above the base plate of the standard Reflectorized adhesive numbers shall have black numbers and reflective silver or white backgrounds City of Clovis Standard Specifications 2009 275 When the mast arm is not installed the Contractor shall place galvanized steel rain cover provided by the pole manufacturer to seal the hole chased for electrical conductors entering the standard The rain cover shall be bolted to the pole using the standard mast arm bolts supplied with the pole The grounding nut welded inside the standard near the handhold shall have clean usable threads The grounding bolt shall also have clean usable threads and can be threaded into grounding nut without using rethreading tools The Contractor shall be certain prior to installing any new or salvaged signal equipment that this signal will be visible to the motorists and pedestrians and the equipment will not block or obscure any existing signal equipment from the motorist or pedestrian s view Full compensation for furnishing and installing signs and mounting hardware on traffic signal standards and mast arms shall be considered as included in the contract lump sum price paid for traffic signals and lighting and no additional compensation shall be allowed therefor 86 15 Conduit Conduit shall conform to the provisions in Section 86 2 05 Co
286. ed in these specifications and furnished by the Contractor shall conform to the requirements of Section 12 3 Traffic Handling Equipment and Devices of the State Standard Specifications All references therein to the MUTCD and MUTCD California Supplement shall mean the California MUTCD as defined in Section 1 Definitions and Terms 12 4 Measurement And Payment Unless otherwise provided in the Contract Specifications all costs for providing Traffic Control and Construction Area Traffic Control Devices as required in this Section 12 shall be measured and paid for at the lump sum price bid for Traffic Control and includes compensation for furnishing all labor materials tools equipment signs devices pavement markings channelizers flaggers as required road closures and detours as shown on the Plans or specified in the Contract Specifications temporary fences securing approval of traffic control plans notifications providing convenient access to adjacent residences and businesses all devices required for the control of traffic as herein provided and all City of Clovis Standard Specifications 2009 90 incidentals and work required for furnishing Traffic Control and Construction Area Traffic Control Devices At the discretion of the Engineer monthly progress payments may be prorated on the basis of the ratio that the completed dollar amount of the work bears to the total contract dollar amount less any other prorated ite
287. ed of pipe materials with a minimum rated working pressure of 200 psig or the equivalent Water Mains and Tertiary Treated Recycled Water or Storm Drainage The basic separation criteria for water mains and pipelines conveying tertiary treated recycled water or storm drainage lines are a 4 foot horizontal separation where lines are running parallel and a 1 foot vertical separation water line above recycled or storm drainage where the lines cross each other When these criteria cannot be met the Zone A criteria apply where lines are running parallel and the Zone C and Zone D criteria apply where the lines cross each other as shown on Figures 1 and 2 For these situations the Zone P criteria are in effect and prohibit construction less than 1 foot in parallel installations and less than 4 inches in vertical crossing situations For tertiary treated recycled water and storm drainage lines the Zone B criteria requirements for special pipe do not apply as the basic separation criteria is a four foot horizontal separation criteria for parallel lines The tertiary treated recycled water lines should be constructed in accordance with the color coding and labeling requirements per Section 116815 California Health and Safety Code of Regulations MISCELLANEOUS GUIDANCE stringent requirements be necessary if conditions such as high groundwater exist HDPE or similar pipe may be required to provide flexibility to move wit
288. ed shall furnish and submit with the executed contract an original Insurance Certificate indicating coverage in compliance with Section 7 4 Contractor s Insurance Requirements and Hold Harmless The Contractor shall comply with Section 7 10 Permits and Licenses The Contractor to whom the contract is awarded and all Subcontractors listed on the Contractor s Bid Proposal or any Subcontractor substituted or added after a contract is awarded and in accordance with these Specifications must obtain a City of Clovis Business License and pay all fees associated therewith Business Licenses are to be obtained from the City of Clovis Finance Department 1033 Fifth Street Clovis CA 93612 Bidders must contact the Finance Department to determine fee amounts prior to submitting a bid This requirement applies regardless of the business address or location of the Contractor or any Subcontractor Evidence showing the Contractor and all subcontractors have obtained a City of Clovis Business License shall be submitted to the Engineer with the executed Contract In compliance with Section 7 12 Safety Provisions First Aid Injury and Illness Prevention Plan the Contractor shall submit with the above documents a copy of the Contractor s Injury and Illness Prevention Plan 3 4 Return Of Proposal Guaranties All proposal guaranties will be held until the Contract has been awarded after which the guaranties accompanying proposals no longer consi
289. ed therefor Surface Restoration will be paid for as specified in the Contract Specifications Where no bid item is provided the cost for Surface Restoration shall be included in the price paid for Fiber Optic Conduit or Cable installation City of Clovis Standard Specifications 2009 251 SECTION 83 LIGHTING SYSTEMS 83 1 General The work shall consist of furnishing and installing exterior lighting systems typically associated with landscape features such as parks trail systems parking lots or other exterior public places but not including lighting systems for public street right of way Lights generally will be stand alone facilities connected in groups and not attached to or mounted on buildings Lighting systems are to be complete and fully functional all as shown on the Plans the Standard Drawings as specified in the Specifications and as directed by the Engineer The work shall include but not be limited to furnishing all labor materials equipment and supplies necessary for the installation of lights or lighting systems electrical conduit wiring service panels foundations for cabinet or lights and all incidentals related thereto In conformance with Section 2 2 Examination of Site of Work Plans Specifications and Contract Forms the Contractor shall examine carefully the site of work Submission of a bid shall mean that the Contractor has investigated the site and is satisfied as to the conditions to be enco
290. ed therefor The Contractor will be charged for water consumed Where the Contractor is allowed to utilize the City water supply if the City furnished meter is not so equipped the Contractor shall provide an approved backflow prevention device between the public water supply and his equipment for applying or transporting water when the Engineer determines that a backflow condition could be caused by the method or equipment used to draw water from the public supply In addition to fees and charges related to use of the water meter and the water consumed the Contractor will be charged penalties for failure to return the meter for periodic reading as required by the Department and or failure to timely return the meter after completion of the project The Contractor shall comply with all the requirements of Section 7 6 Air Pollution Control The Contractor shall submit a Dust Control Plan to the Engineer when such plan is required by the regulations of the San Joaquin Valley Air Pollution Control District or the Contract Specifications If the Contractor fails to provide dust control measures so ordered by the Engineer within one hour after being notified the Contractor shall pay to the City a penalty of fifty dollars 50 00 for each half hour or portion thereof that elapses from the time the penalty is ordered into effect by the Engineer until dust control measures ordered by the Engineer are completely carried out and the dust nuisance miti
291. edestrian push buttons shall be tested and field verified for proper operation throughout the full range of movement prior to acceptance Testing shall ensure smooth and uninterrupted movement within the mechanical portion of the pedestrian push button housing action Any pedestrian push button found to not operate properly shall be replaced at the Contractor s expense 86 29 High Pressure Luminaires High pressure sodium luminaires shall conform to the provisions in Section 86 6 01 High Pressure Sodium Luminaires of the State Standard Specifications and these Standard Specifications Luminaire voltage shall be 120 volts Each luminaire shall be provided with an internal ballast assembly including ballast capacitor and lamp starter unit mounted on a down opening door The door shall be hinged to the luminaire housing and secured separately from the refractor door and shall be easily removable and replaceable All connections from the ballast assembly shall be made with a single multi circuit connector or individual color coded NEMA tab connectors Field connections to the luminaire shall terminate on a barrier type terminal block secured to the housing Intersection safety lighting luminaires shall be 150 watt high pressure sodium with filtered optics and shall be equal or better than General Electric s M 250 A2 power door cutoff No M2AC15S1N2GMC32 and shall have Type III distribution Luminaires shall be the cutoff type 86 30 Hig
292. een curbs delineating the edges of the traveled way The roadbed rises in elevation as each increment or layer of subbase base surfacing or pavement is placed 1 36 Roadway That portion of the right of way included between the outside lines of sidewalks or curbs slopes ditches or channels including all the appertaining structures and other features necessary to proper drainage and protection 1 37 Shoulders The portion of the roadway contiguous with the traveled way for accommodation of stopped vehicles for emergency use and for lateral support of base and surface courses Shoulders may be paved or unpaved 1 38 Special Provisions The Special Provisions and other specifications included in them by virtue of reference See Section 1 10 Contract Specifications 1 39 Specifications Where used in these Standard Specifications the term Specifications without modifier shall mean collectively these Standard Specifications and the Contract Specifications embodying all the applicable specification documents therein 1 40 Standard Drawings The latest edition of the Standard Drawings of the City of Clovis City of Clovis Standard Specifications 2009 5 1 41 Standard Specifications These Standard Specifications and other specifications included in them by virtue of reference 1 42 State The State of California Department of Transportation This term is used interchangeably with Caltrans and has the same meaning
293. egulations governing such detection and removal The Engineer and the City Fire Department should be notified immediately after detection The Contractor shall also comply with the provisions of the California Code of Regulations Title 8 General Industry Safety Orders Article 108 Confined Spaces whenever the contractor or any of his employees must enter a confined space as defined in said Safety Orders whether the confined space is new or existing The above requirements are minimum requirements In addition the Contractor shall provide for the life of the Contract similar protection for any person including the Engineer or any of his authorized representatives subcontractors or any other person authorized or required to enter such underground facilities for inspection repairs or any other reason If the presence of toxic or explosive gases are due to the actions of the contractor all costs for worker protection detection removal or repairs are to be borne by the contractor If the presence of toxic or explosive gases are the result of latent or other conditions outside the control of the Contractor compensation will be paid in accordance with Section 4 10 Changes In the event of a dispute nothing in this Section 7 13 shall free the contractor of the responsibility to immediately take the necessary actions to provide worker protection and to remove or repair the cause of the presence of toxic or explosive gases All cost
294. ein according to the respective detail drawings or specifications pertaining to specific items required to complete the work Perform work according to best standard practice with prior approval All plastic and galvanized steel threaded pipe and fittings shall be assembled using Teflon tape applied to the male threads only A minimum of three 3 wraps of Teflon tape will be required 7 Pipe Clearance All pipes shall have a minimum clearance of 4 inches from each other and 6 inches from pipes of other trades Parallel pipes shall not be installed directly over one another 8 Plastic to Steel Connections At all PVC to steel pipe connections the Contractor shall complete the steel connections first Connections shall always be plastic into steel never steel into plastic Teflon tape shall be used on all threaded PVC to steel pipe joints applied to male threads only and light wrench pressure is to be applied 9 Pipe and Fittings Galvanized Steel Pipe All pipe shall be reamed and rough edges or burrs removed so that a smooth and unobstructed flow can be obtained Teflon tape shall be carefully and smoothly placed on the male threads only All threaded joints must be tightened with wrenches No caulking or joint compound of any kind will be permitted Immediately upon installation of lines all openings shall be capped or plugged to prevent the entrance of materials that would obstruct the pipe Caps shall remain in place until removal
295. el casing pipe to line and grade without damage the Contractor shall provide steel casing pipe of such greater wall thickness at no additional cost to the City Steel casing pipe shall be of the size and class or strength designation shown on the Plans or specified in the Contract Specifications except that the class of pipe designated has been determined for vertical loads only Additional facilities reinforcement or strength of pipe required to withstand jacking pressure shall be determined and furnished by the Contractor at his expense All field joints also shall be butt welded full circumference or by other means approved by the Engineer Joints to be field welded shall be shop cut to ensure a true 90 to the longitudinal axis of the pipe Use of a jacking band to reinforce the end of the pipe receiving the jacking thrust will be required It shall be the Contractor s responsibility to provide joints that are capable of resisting the jacking stresses without failure 68 2 2 Casing Spacers Casing spacers shall be prefabricated stainless steel and shall be as designed and manufactured by Pipeline Seal amp Insulator Inc Houston Texas www pipelineseal com PSI and shall be PSI Model S8G 2 for carrier pipes up to 24 inches in diameter and shall be Model 5126 2 for larger carrier pipes or approved equal Casing spacers shall be specifically designed and fabricated for the specific project and application for which they are furnished
296. el door shall face the street The cabinet shall be equipped with a Signal Monitor Unit with the following features 1 A Model 210 enhanced Signal Monitor as manufactured by Eberle Design Incorporated EDI Model 2010ECL or approved equal shall be supplied and installed in the controller cabinet 2 The Contractor shall supply and install a 16 channel monitor with harness This monitor shall be a self contained compact device capable of being installed in the existing slot designed for the Model 210 monitor located in the output file of the 332A cabinet This Monitor shall utilize the existing connections for the Model 210 monitor plus a harness connection on the front panel 3 The front panel connector will not correspond to the Model 210 monitor or the NEMA monitor specifications This connector and harness shall only contain the monitoring circuits used for monitoring the enhanced features The Monitor shall be capable of performing all the functions of a Model 210 monitor with the front panel harness disconnected 4 The Monitor shall be designed to adapt RED SIGNAL MONITORING to the conventional Model 332A controller cabinet The Monitor shall be directly interchangeable with the standard 210 via the rear edge card connector and shall be designed to meet all the state specifications governing the regular 210 monitor The Monitor shall also be capable of monitoring for the absence of a signal i e dark signal head other combinations
297. emark Legend Type PSM SDR 35 PVC Sewer Pipe City of Clovis Standard Specifications 2009 169 Nominal pipe size PVC cell classification City of Clovis Standard Specifications 2009 ASTM D3034 12454 B or 12454 C or 13364 B 170 pipe fittings shall conform to the provisions ASTM F1336 these specifications PVC fittings and accessories shall be as manufactured and furnished by the pipe supplier or approved equal and have bell and or spigot configurations identical to that of the pipe Where shown on the Plans injection molded PVC wye fittings shall be used for future building or house branch connections at the time of installation of the sanitary sewer main Where indicated on the Plans or specified in the Contract Specifications each wye branch for future sewer service connections shall be provided with an end cap or plug approved by the pipe manufacturer for use with its product PVC Fittings shall be clearly marked as follows Manufacturer s name or trademark PSM Nominal size ASTM D3034 Material Designation PVC 64 2 2 Joints And Gaskets Joints shall be integral bell and spigot push on joints conforming to the provisions in ASTM D3212 and these Special Provisions with factory installed elastomeric gaskets Joints shall be configured so as to prevent improper installation of the gasket and ensure that the gasket remains in place during the joining operation Bell and spigot configurations for fittings
298. en graded to conform to the adjacent soil All rocks must be collected and removed from the site PVC piping and fittings shall not be backfilled during periods of extreme heat or when a sudden lowering of the temperature of the pipe may cause separation of joints or fittings 21 10 System Testing And Adjustment After the installation of automatic controller valves sprinkler heads drip emitters and other equipment the complete system shall be operated in the presence of the Engineer Any defective or inoperative material shall be repaired or replaced to the satisfaction of the Engineer The Contractor shall balance and adjust the various components of the system so the overall operation of the system is most efficient This includes a synchronization of the controllers adjustments to heads and emitters and individual station adjustments on the controllers City of Clovis Standard Specifications 2009 161 When the irrigation system is completed the Contractor in the presence of the City Inspector and Parks Division shall perform a test to check the coverage of the system The Contractor shall inform the City of any deviation from the plan required due to wind planting soil or site conditions that bear on proper coverage The Contractor shall furnish all materials and labor required to correct any inadequacies of coverage due to site conditions or unauthorized deviations from the Plans If such corrections or additions are required i
299. en laid backfill has been placed and compacted and all compaction tests have passed and the pipe has passed the bacteriologic disinfection test but prior to placement of aggregate base or pavement material a hydrostatic pressure test shall be conducted on the entire pipeline while completely isolated from any existing water mains for a period of one hour at a hydrostatic pressure of 100 psi All valves in the pipeline shall be in the open position during system testing Any leaks failures or imperfect construction revealed by such test shall be promptly corrected by the Contractor and retested until all visible leakage has been stopped and test results do not exceed the allowable leakage which shall be determined by the following equation _ 7 400 where L allowable leakage gal hr N number of joints in the tested line D nominal inside diameter of pipe inches P average test pressure psi The Contractor shall provide all water necessary for hydrostatic testing in conformance with the provisions in Section 17 Water Use The Contractor shall make all arrangements and pay all fees necessary for the lawful disposal of water discharged during hydrostatic testing operations Potential recipients with which the Contractor may wish to negotiate arrangements for the disposal of water include but are not necessarily limited to private City of Clovis Standard Specifications 2009 196 property owners Fresno Irriga
300. ence relating to the Contractor s responsibility for providing for the convenience and safety of the public in connection with the Contractor s operations The provisions of Section 12 Traffic Control Construction Area Traffic Control Devices concerning flagging and traffic handling equipment and devices used in carrying out the requirements of Section 7 17 Public Convenience apply to this Section 7 18 Whenever the Contractor s operations create a condition hazardous to traffic or to the public the Contractor shall at the Contractor s expense and without cost to the City furnish erect and maintain those fences temporary railing Type K barricades lights signs and other devices and take such other protective measures that are necessary to prevent accidents or damage or injury to the public Fences temporary railing Type K barricades lights signs and other devices furnished erected and maintained by the Contractor at the Contractor s expense are in addition to any construction area traffic control devices for which payment is provided for elsewhere in these specifications The Contractor shall also furnish such flaggers as are necessary to give adequate warning to traffic or to the public of any dangerous conditions to be encountered and payment therefor will be made as provided in Section 12 Traffic Control Construction Area Traffic Control Devices City of Clovis Standard Specifications 2009 62 Sig
301. ent grounding shall be installed as necessary to provide continuous ground system and approved for use by UL Ground Rods shall be Copperweld or approved equal inch diameter 10 feet long All grounding conductors shall be copper sizes not less than that required under CEC requirements Article 250 All grounding is to be installed per CEC Article 250 V Molded Case Circuit Breakers General Provide factory assembled molded case circuit breakers of frame sizes characteristics and ratings indicated Circuit breakers shall be UL listed and meet NEMA Standards Publication AB1 Breakers covered under this specification may be applied in switchboards panel boards motor control centers combination motor starters and individual enclosures Circuit breakers shall be manufactured by G E Seimans Cutler Hammer or Square D W Small Power Secondary Panel Board Breakers Bolt on construction Square D QOB GE Seimans or Cutler Hammer equivalent Breakers indicated as Ground Fault Interruptive shall provide UL Class AC 5 milliampere sensitivity ground fault protection integral within the breaker Single pole GFI breakers shall take no more panel space than a conventional breaker X Color Coding Color coding shall be factory applied colors on conductors 10 and smaller For larger conductors use phase tape Color coding shall be strictly adhered to and shall be as follows Color coding for 120 208 240 volt systems shall
302. ent the closure in accordance with the instructions given by the Engineer 12 2 05 Deficiencies Should the Contractor appear to be neglectful or negligent in furnishing warning devices and taking protective measures as provided in Section 12 2 02 Contractor s Operations the Engineer may direct the Contractors attention to the existence of a hazard the necessary warning devices shall be furnished and installed and protective measures taken by the Contractor at the Contractor s expense Should the Engineer point out the inadequacy of warning devices and protective measures that action on the part of the Engineer shall not relieve the Contractor from responsibility for public safety or abrogate the obligation to furnish and pay for these devices and measures Reference is made to Section 7 18 Public Safety and the penalties described therein for failure to correct hazards identified by the Engineer In addition to penalties to correct hazardous conditions the Contractor shall pay a penalty of 250 00 per day for each day in which work is begun prior to implementing traffic control in conformance with this Section 12 In conformance with Section 9 7 Stop Notices Right to Withhold Payments said costs and penalties shall be deducted from any monies owed the Contractor or shall be invoiced to the Contractor 12 3 Construction Area Traffic Control Devices 12 3 01 Traffic Control Devices All traffic control devices requir
303. er This shall include but not be limited to furnishing and installing the pipe trenching backfilling compacting leakage and deflection testing and internal video inspection The unit price bid per lineal foot for service laterals shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as set forth in the Specifications and as directed by City of Clovis Standard Specifications 2009 179 the Engineer This shall include but not be limited to furnishing and installing the wye fitting pipe trenching backfilling compacting plugging and marking and leakage testing The unit price bid per each for wye fittings where wye fittings only no lateral are to be installed shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as set forth in the Specifications and as directed by the Engineer in excess of the cost of installing main line pipe This shall include but not be limited to furnishing and installing the wye fitting and plug trenching backfilling compacting leakage testing and internal video inspection When the contract does not include a pay item for wye fittings as above specified and unless otherwise provided in the Contract Specifications full compensation for wye fittings shown on the plans
304. er edges of the fabric shall have the wire ends bent back to form a closed loop knuckled 3 Posts and Braces The base material for the manufacture of steel pipe used for posts and braces shall conform to the specifications of ASTM Designation A120 standard weight and the base material for the manufacture of other steel sections used for posts and braces shall be good commercial quality weldable steel Posts and braces shall be galvanized in accordance with ASTM Specification Designation A123 Posts and braces shall conform to the following requirements Corner and End Posts round pipe only Pipe 2 7 8 in outside diameter O D 5 79 Ib ft weight Line Posts Pipe 2 3 8 O D 3 65 Ib ft weight City of Clovis Standard Specifications 2009 218 Section 2 x 2 1 4 4 1 Ib ft weight Gate Posts round pipe only Individual Gate Width Weight Up thru 6 ft 2 7 8 in 5 79 16 7 ft thru 13 ft 4 9 11 Ib ft 14 ft thru 18 ft 6 5 8 in 18 97 lb ft Over 18 ft 8 5 8 in 24 70 Ib ft Braces Pipe 1 5 8 O D 2 27 b ft weight H Section 1 1 2 in x 1 5 16 in All posts shall be fitted with rainproof caps designed so as to fit securely over the top of the posts and carry the top tension wire except that the top of H Section posts may be open slotted in such a manner as to securely hold the top tension wire in position without vertical movement Such slotting shall allow
305. er consumed in system testing and security lighting systems related to irrigation improvements where required In compliance with Section 2 2 Examination of Site of Work Plans Specifications and Contract Documents the Contractor shall examine carefully the site of work Submission of a bid shall mean that the Contractor has investigated and is satisfied as to the conditions to be encountered the character quality and quantity of work to be performed and materials to be furnished and the requirements of the Plans the Contract Specifications and these Standard Specifications All work called for on the Plans the Standard Drawings or set forth in the Specifications shall be executed in accordance with all governing ordinances laws codes and regulations including but not limited to the current edition of the California Plumbing Code and the California Electrical Code and shall meet all local conditions Any changes and or additions in work necessary to comply with ordinances laws codes and regulations and or conditions will be made without additional expense to the City but such changes shall have the prior written approval of the Engineer 21 2 Design The objective of the Plans and Specifications design is to provide an assembled and installed landscape irrigation system which will operate in an efficient and satisfactory manner The finished system shall adequately and efficiently irrigate all areas to be covered and shall
306. ere used Proposal Requirements and Conditions Description of Bid Items Appendices and any other documents which may be added to the booklet 1 11 Contractor The person or persons firm partnership corporation or combination thereof private or municipal who have entered into a contract with the City as party or parties of the second part or their legal representatives 1 12 Days Unless otherwise specified in these Standard Specifications or the Contract Specifications days mean calendar days 1 13 Divided Roadway A roadway with separated traveled ways for traffic generally in opposite directions 1 14 Encroachment Any structure or object of any kind or character placed without the authority of law either in under or over any City right of way An encroachment can include but not be limited to any tower pole pole line pipe pipeline driveway fence stand private roadway billboard or sign Encroachments can also include special events conducted in or on City rights of way such as street festivals sidewalk sales community sponsored events or activities or community approved activities See Section 1 28 Permit 1 15 Engineer The City Engineer acting either directly or through properly authorized agents the agents acting within the scope of the particular duties delegated to them 1 16 Engineer s Estimate The list of estimated quantities of work to be performed as contained in the Proposal Form
307. erials from the facility are designated to be salvaged the remaining materials from that facility shall be removed and disposed of Materials to be salvaged shall not be removed until their use is no longer required as determined by the Engineer Salvaged materials shall be cleaned of earth and other foreign materials Adhering concrete shall be removed from salvaged materials When practicable salvaged materials shall be hauled directly to the location specified in the Contract Specifications and stockpiled however salvaged materials may be temporarily stored at a location selected by the Contractor and approved by the Engineer and later hauled to and stockpiled at the final location Materials which are lost for any reason before stockpiling at the final location shall be either replaced by the Contractor at the Contractor s expense or at the discretion of the Engineer the estimated cost of replacement may be deducted from any moneys due or to become due to the Contractor Materials designated to be salvaged that are damaged as determined by the Engineer shall be segregated from undamaged material The damaged material shall become the property of the Contractor and shall be disposed of outside the right of way in conformance with the provisions in Section 5 12 Disposal of Material Outside the Right of Way Materials to be salvaged that are damaged as a result of the Contractor s operations shall be repaired by the Contractor at the Co
308. eriod referenced in Section 20 8 Maintenance Period all basins around shrubs shall be maintained at a depth of 3 inches Watering shall occur at intervals adequate to promote healthy root and plant growth Shrubs shall be maintained in their natural shapes Overlong or scraggly branches shall be pruned where necessary 20 5 Ground Cover 20 5 01 Spacing Where Ground Cover plant material is shown on the plans to be planted in an informal pattern material shall be planted in a random pattern and not in straight rows The Contractor shall space the material as determined by the Engineer or spaced as specified in the ground cover list on Landscape Planting Plan where such plan is included 20 5 02 Ground Cover Areas For areas shown on the plans to receive Ground Cover the material shall be planted sufficiently deep to cover all roots At the time of planting all ground cover plants the earth City of Clovis Standard Specifications 2009 141 around each plant shall be firmed sufficiently to force out all air pockets Alternate procedures in the planting of ground covers shall be approved by the Engineer but shall not release the Contractor from the noted guarantee described herein 20 5 03 Mulching Where shown on the plans or specified in the Contract Specifications mulch shall be applied as top dressing all ground cover watering basins with bark to a depth of 2 inches Mulch shall be Walk on Bark 20 5 04 Ground Cover Fertili
309. ers clamps or any device which is bolted shall be provided with flat washers behind bolt heads except where stove bolts are used and flat and lock washers behind nuts All turnbuckles or other adjusters shall be double nutted to lock the adjuster City of Clovis Standard Specifications 2009 221 Where post extensions and strands of wire are specified the wire shall be stretched tight and fastened to extension arms with tie wires or hog rings Where the wire terminates it shall be securely tied to the extension arm 2 Timber Barricades Timber Barricades shall be constructed at the locations shown on the Plans and conforming to the details shown on the Standard Drawing for Temporary Timber Barricade Use of the word Temporary shall not be confused with smaller barricades used for traffic delineation Clearing and grubbing for Timber Barricades shall conform to Section 16 Clearing and Grubbing Excavation and preparation of subgrade shall comply with Section 80 4 Excavation and Preparation of Subgrade Excavations for posts shall be backfilled and thoroughly compacted to the satisfaction of the Engineer 80 6 Measurement Measurement for 6 foot chain link fence will be by the lineal foot of chain link fence installed as shown on the Plans to be determined by the Engineer from actual measurements the width of gate openings being deducted Measurement of gates will be per each for each type of gate installed as s
310. erty and to deduct the cost of such remedy from money due the Contractor or levy as a fine in the case of non public work 5 11 Rights Of Way The City will provide the right of way for the work to be constructed as shown on the Plans The Contractor shall procure at no cost to the City all temporary construction easements not shown in the Plans which the contractor may deem necessary to carry out the work to be done under the Contract The Contractor shall bring said temporary construction easements to a condition at least equal to that existing prior to their use to the satisfaction of the Engineer The Contractor shall not occupy property outside the right of way shown on the Plans except by written agreement with the owner of said property a copy of which shall be provided the Engineer Nothing in these Standard Specifications shall be construed as allowing the Contractor to make any arrangements with any person to permit occupancy or use of any land structure or building within the limits of the Contract for any purpose whatsoever either with or without compensation in conflict with any agreement between the owner former owner or tenant of such land structure or building 5 12 Disposal Of Material Outside The Right Of Way The Contractor shall make arrangements for the legal disposal of non hazardous materials outside the right of way and shall pay all costs involved Disposal of hazardous material shall be handled in accordance with
311. es in depth of cover no 90 degree bends may be used unless otherwise directed or approved by the Engineer Minimum Depth of Pipe Diameter Cover 6 or Smaller 36 8 and 10 42 12 48 14 and 16 54 18 or Larger 60 Recycled water mains shall be installed true to the alignment and profile shown on the Plans Occasional variations of two inches or less from the alignment shown on the Plans and one inch or less from the profile shown on the Plans will be permitted provided that City of Clovis Standard Specifications 2009 200 such variations occur gradually over distance of 20 feet or more the opinion of the Engineer Reference is made to Section 67 4 Alignment Changes Separation Criteria Where proposed recycled water mains are to be connected to existing recycled water mains the existing recycled water mains may or may not be in service or under pressure The Contractor shall contact the Engineer to determine the status before attempting any connections Existing recycled water mains can be expected as a minimum to be filled with water The Contractor shall dewater existing recycled water mains as necessary to facilitate the connection of proposed recycled water mains Pipe shall be installed with the wording RECYCLED WATER DO NOT DRINK facing upwards A tracer wire shall be installed with all recycled water mains in conformance with the applicab
312. es in multiple lanes using the video image A minimum of ninety six 96 detection zones shall be user definable through interactive graphics by placing lines and or boxes in an image ona VGA or video monitor B FUNCTIONAL CAPABILITIES Four 4 video sources The video sources can be video cameras or video tape players The video shall be digitized and analyzed at a rate of 30 times per second The System shall be able to detect the presence of vehicles in up to twenty four 24 detection zones per camera A detection zone is defined as an area the approximate width and length of an average size passenger car Detection zones shall be programmed via a menu displayed on a video monitor and a pointing device connected to the vision processor module without the need for a separate on line personal computer The menu shall facilitate placement of the detection zone Detection shall be in real time as the vehicles travel across each detector zone The System shall provide the ability to compensate for vibration and sway of the camera Input images shall be automatically stabilized The System shall have an RS232 port for communications with an external computer and shall have the capability to send and receive detector patterns to and from the external computer through the RS232 port The System shall be remotely accessible for system reconfiguration or status monitoring The System shall have an intelligent central hub which functions as a
313. es shall be placed in adjacent pull box Fuse shall be installed on ungrounded conductor Fuse shall be retained in load side of holder when disconnected 86 33 Removing Electrical Equipment Removing electrical equipment shall conform to the provisions in Section 86 7 01 Removing Electrical Equipment of the State Standard Specifications and these Standard Specifications 86 34 Reinstalling Removed Electrical Equipment Reinstalling removed electrical equipment shall conform to the provisions in Section 86 7 02 Reinstalling Removed Electrical Equipment of the State Standard Specifications 86 35 Stockpiling Salvaged Electrical Equipment Existing equipment removed and not reused shall be salvaged and shall be stockpiled in a safe protected place The Contractor shall include in his bid for the delivery of all salvaged equipment The salvaged equipment shall be delivered to the City of Clovis Corporation Yard 908 Villa Avenue Clovis California A written inventory of all salvaged material delivered shall be given to the project inspector 86 36 Red Light Enforcement Indicators A Red Light Enforcement Indicator is a device to allow traffic enforcement officers to monitor traffic signal RED light status from convenient locations other than from directly in front of the signal head Red Light Enforcement Indicators shall be the McCain Enforcer Unit or other approved equal The device is connected to the RED vehicle si
314. escesesereercescsareesseaeeerevaneneesereerenaeeanes 136 2053 ies Brad hs satin 138 20 301 GENERAL ho de lhe 138 20 3 02S PAGING da Shean 138 20 3 03 DRAINAGE HOLES fe Scared 138 20 3 04 TREE PLANTING HOLES AND BACKFILLING ROOT BARRIERS 139 20 3 04 A STRUCTURAL da denda ae Ee a aa eben ae 140 20 3 05 TREE FERTILIZER ccccecsccssescssecessescesecarsesceseceeenscaaesasvensaesauserseaecaesereuaeeuesaevneeaneeres 140 2053 06 2 140 2023 0 7 MULCHING E 140 20 3 08 TREE ESTABLISHMENT 140 2 140 2052 140 20 4 02 SHRUB PLANTING HOLES AND 12 2 141 20 4 0
315. ess otherwise specified in the Contract Specifications or if no bid item is included in the contract therefor the cost of any fittings shall be considered as included in the cost of sewer force main and no additional compensation will be paid therefor The unit price bid per each for plug valves shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as specified in the Specifications and as directed by the Engineer This shall include furnishing and installing the valve valve box and valve extension installing concrete thrust blocks trenching backfilling compacting testing sterilization pressure testing water returning and installing valve box to final grade following trench surface restoration street or alley construction or reconstruction and all incidentals City of Clovis Standard Specifications 2009 185 SECTION 66 POTABLE WATER DISTRIBUTION FACILITIES 66 1 General This work shall consist of furnishing and installing potable water main pipelines fittings water services fire hydrants valves valve and meter boxes blow offs water sampling stations and all appurtenances including excavation and backfill disinfection and pressure testing all at the locations and in the sizes shown on the Plans All work shall be done in accordance with the Plans the Standard Drawings the Specifications and as directed
316. ess payment shall be made 9 11 Final Payment To Release Owner The acceptance without notice of potential claim by the Contractor of the final payment shall be and shall operate as a release to the Owner City of all claims and all liability to the Contractor for all things done or performed for or relating to the work and for every act and neglect of the City and others relating to or arising out of the work excepting only the Contractor s claims if any for amounts withheld by the City upon final payment However no payment final or otherwise shall operate to release the Contractor or his sureties from any obligation upon or under this Contract or the Contractor s bond 9 12 Payment Of Retention Retention shall be released at the latest sixty 60 days after the occurrence of any of the definitions of Completion for purposes of Public Contract Code Section 7107 see definitions of Completion in Section 1 8B Any final payment and release of retentions will exclude any amounts withheld in conformance with Section 9 7 Stop Notices Rights of the City to Withhold Payments and Public Contract Code section 7107 When specified in the Contract Specifications certain portions of the amount retained pursuant to Section 9 6 Partial Progress Payments and Retentions may be withheld until the satisfactory completion of a ninety 90 day maintenance period required for work pertaining to the installation of landscapi
317. et and shall be waterproof after installation and connection All green ball and green arrow LED modules shall be equipped with a clear non tinted lens The LED units shall be connected directly to 120 VAC with quick disconnect terminals The indications shall not glow immediately after de energization A step down transformer shall not be used The internal power supply shall be of a constant current design The LED units shall be compatible with currently used controller assemblies i e solid state load switches flashers and enhanced signal monitors without the addition of any external components City of Clovis Standard Specifications 2009 286 86 26 Pedestrian Signal Faces Pedestrian signal faces shall conform to the provisions in Section 86 4 06 Pedestrian Signal Faces of the State Standard Specifications and these Standard Specifications All pedestrian signals shall be Type A similar to the Indicator Controls Corp Pedestrian Signal with International Symbols All pedestrian signal components shall be metal except for LED modules and seals Pedestrian signal units shall be Full Symbol MUTCD compliant LED Countdown Type with 9 numerals Gelcore Model PS7 CFF1 01A 18 or approved equal Signal alignment shall be as directed by the Engineer 86 27 Signal Mounting Assemblies All signal mounting assemblies shall conform to the provisions in Section 86 4 08 Signal Mounting Assemblies of the State
318. et forth in the Contract Specifications or at the discretion of the Engineer a meeting will be called by the Engineer with the Contractor subcontractors and interested agencies or parties affected by the work to discuss the proposed work The preconstruction meeting shall be the proper time and place for the Contractor to submit to the Engineer required documents including as a minimum the following Construction Schedule Section 8 5 Traffic Management Control Plan Section 12 2 01 Names of Superintendent Section 5 7 Emergency Contact List Section 5 8 Proposed Notice to Residents Section 8 7 Temporary Easements Section 5 11 Request for City Approved Water Source Section 5 13 8 5 Construction Schedule After notification of award and prior to start of any work at the pre construction conference the Contractor shall submit to the Engineer for acceptance his proposed construction schedule Acceptance or lack of rejection by City of a proposed construction schedule shall not be deemed approval and shall not create responsibility on the part of the City for any defects or mistakes in the schedule The Contractor bears sole responsibility for the accuracy utility and reasonableness of the schedule The construction schedule shall be in the form of a tabulation chart or graph and shall be in sufficient detail to show the chronological relationship of all activities of the project including but not limited to estimated starting
319. ether already accrued or estimated to accrue in the future f Reasonable doubt that the Work can be completed for the unpaid balance of any Contract Sum or by the completion date g Damage to the property or work of the City another contractor or subcontractor h Unsatisfactory prosecution of the Work by the Contractor and or failure to perform all required Work i Failure to store and properly secure materials j Failure of the Contractor to submit on a timely basis proper and sufficient documentation required by the Contract Documents including without limitation monthly progress schedules shop drawings submittal schedules schedule of values product data and samples proposed product lists executed change orders and verified reports City of Clovis Standard Specifications 2009 81 k Failure of the Contractor to maintain and submit record as built drawings I Erroneous estimates by the Contractor of the value of the Work performed other false statements in an Application for Payment Unauthorized deviations from the Contract Documents n Failure of the Contractor to prosecute the Work in a timely manner in compliance with established progress schedules and completion dates Subsequently discovered evidence or observations nullifying the whole or part of a previously issued Change Order or Certificate for Payment p Previous overpayment to Contractor q Credits owed to the City
320. experienced in jacking operations shall be used in performing the work Excavation for the casing or concrete pipe not using a casing pipe shall be accomplished by boring or by hand digging Sluicing or jetting with water will not be permitted If the Contractor elects to utilize uninterrupted around the clock bore and jack operations to prevent freezing of the casing or carrier pipe or to preclude instability at the heading of the bore and jack or should the Contractor be required by the City or other permitting agencies to utilize such procedures upon encountering such conditions the bore and jack operations once commenced shall be continued uninterrupted until casing or RC pipe installation is complete Full compensation for additional costs incurred as a result of such continuous operations including any overtime inspection involved shall be considered as included in the Contract unit price paid per linear foot for the steel casing pipe item involved and no additional compensation will be allowed therefor Steel casing pipe and carrier pipe shall be installed as shown on the Plans in conformance with the Contract Specifications these specifications and as directed by the Engineer Steel casing pipe shall be installed such that carrier pipe when installed to the lines and grades shown on the Plans will be approximately centered within its casing pipe Carrier pipe to be installed within steel casing shall be as indicated on the Plans an
321. f Section 68 3 Tunnel Safety Orders and Section 19 3 02 Trench and Structure Excavation In general excavated material shall be removed from the casing or reinforced concrete pipe as jacking progresses and no accumulation of excavated material within the casing will be permitted Should appreciable loss of ground occur in installations where the face of the excavation is accessible the voids shall be backpacked promptly to the extent practicable with an approved soil cement 68 6 Grade Tolerance The Contractor s attention is called to the fact that extreme care will be required in placing the casing pipe so as to permit the construction of the carrier pipe to the lines and grades shown on the Plans It shall be the Contractor s responsibility for selecting a size of casing at or above the minimum specified in order that the jacking may be done with a sufficient degree of accuracy to permit installation of the carrier pipe to the grade as shown on the Plans within the tolerances set forth in these Specifications for the particular carrier pipe installed Any and all increased costs resulting from the Contractor s use of steel casing pipe with greater diameter or thickness than the minimum specified shall be borne solely by the Contractor Variations from theoretical alignment and grade of the steel casing pipe at the time of completion of jacking shall not exceed one percent of the distance from the jacking point except as follows
322. f any kind City of Clovis Standard Specifications 2009 163 21 15 Measurement And Payment Unless otherwise specified in the Contract Specifications landscape irrigation systems will be measured and paid for on a lump sum basis for the entire system complete in every detail The lump sum price bid for landscape irrigation system shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as specified in the Specifications and as directed by the Engineer This shall include but not be limited to clearing and grubbing furnishing and installing all equipment such as pipe fittings heads emitters valves and valve boxes controllers wiring electric service water service backflow preventers filters providing excavation backfill and compaction testing adjusting guaranteeing and all incidentals City of Clovis Standard Specifications 2009 164 SECTION 22 FINISHING ROADWAY Finishing Roadway shall be as specified in Section 22 Finishing Roadway of the State Standard Specifications SECTION 23 BLANK City of Clovis Standard Specifications 2009 165 BASES AND SUBBASES SECTION 24 LIME STABILIZATION Lime Stabilization shall be as specified in Section 24 Lime Stabilization of the State Standard Specifications SECTION 25 AGGREGATE SUBBASES Aggregate Subbases shall be as specified in Section
323. f fibers specified on the conductor schedule for each location plus an additional twenty 20 percent spare capacity The splice enclosure shall be complete with splice organizer trays brackets plugs clips cable ties seals and sealants as needed The splice enclosure shall be suitable for pull box installation as specified The splice enclosure shall contain splice organizer trays A splice enclosure shall be provided at all locations identified on the conductor schedule If the Contractor requires additional splice enclosures to support the pulling plan these enclosures shall be provided and installed at no additional cost to the City 82 22 Connectors Fiber optic connectors shall be SC type for single mode applications The SC connector operating temperature range shall be 40 F to 176 F Insertion loss shall not exceed 0 4 dB and the return reflection loss on single mode connectors shall be at least 40 dB Connection durability shall be less than 0 2 dB change per 1000 mating cycles All terminations shall provide a minimum 50 Ib pull out strength Factory test results shall be documented and submitted to the Engineer prior to installing any of the connectors City of Clovis Standard Specifications 2009 240 Field termination shall be limited to splicing of adjoining trunk cable ends and pigtail breakouts The pigtails shall utilize factory installed SC connectors 82 23 Passive Cable Assemblies And Components Fiber optic assem
324. f planting in accordance with these specifications Unless otherwise specified in the Contract Specifications the seed variety appropriate for the season shall be planted The seed not planted shall be furnished at no cost to the City The following method shall be used to determine the appropriate planting seed variety a At the time all areas to receive turf planting are considered ready to plant the Contractor shall measure soil temperatures at representative locations for four consecutive days at a depth of 1 inch b For soil temperatures at or below 65 F plant Ryegrass Typically September 1 through March 31 c For soil temperatures above 65 plant Bermudagrass Typically April 1 through August 31 For inconsistent temperature readings consult the City Parks Division Manager d The Contractor shall confirm all test results with the City Parks Division Manager prior to proceeding with planting and shall notify the Engineering Inspector prior to commencing planting operations e The following spread rates shall be used for planting seed Futura Heat Bermudagrass 100 Ibs per acre City of Clovis Standard Specifications 2009 134 Mensa Perennial Ryegrass 200 Ibs per acre 20 2 02 Turf Fertilizer The Contractor shall furnish and apply commercial fertilizer conforming to the requirements of the California Food and Agriculture Code and these specifications to areas planted with turf seed or sod The commercial fer
325. f surface water is sufficient to damage surface mortar or cause a flow or wash of the concrete surface City of Clovis Standard Specifications 2009 213 unless the Contractor provides adequate protection against damage All concrete that has been frozen or damaged by other causes as determined by the Engineer shall be removed and replaced by the Contractor at the Contractor s expense Fixed form construction shall conform to Sections 73 1 04 Fixed Forms 73 1 05A Fixed Form Curb Construction and 73 1 06 Sidewalk Gutter Depression Island Paving Curb Ramp Wheelchair Ramp and Driveway Construction of the State Standard Specifications and as set forth in this Section 73 5 Extruded or slip formed construction shall conform to Section 73 1 05B Extruded or Slip Formed Curb Construction of the State Standard Specifications and as set forth in this Section 73 5 The extrusion machine shall go no faster than the curb and or gutter or alley gutter can be finished using good workmanlike practices Construction Joints Construction joints shall be as shown on the Standard Drawings and as specified below for both fixed form and extruded or slip formed construction as follows a Where concrete improvements such curb and gutter valley gutters and sidewalk are to be placed adjacent to existing pavement the pavement shall be sawcut and removed 6 inches beyond the inside edge of the formwork The edge of the exis
326. feet as measured from the container soil level 20 3 02 Spacing Trees shall be planted at the locations shown on the plans or specified in the Contract Specifications except as provided herein In the absence of dimensioned plans or Contract Specifications for trees that are to be spaced in rows the total dimension shall be verified and the trees equally spaced within the designated area Where trees are shown in an informal pattern the Contractor shall space the trees as accordingly maintaining an unequal spacing as shown on the plans and as directed by the Engineer In all cases the Contractor is to ensure that the spacing of trees conforms to the following spacing guidelines Trees shall be planted no closer than a 30 feet from street corners measured from curb return ends or stop signs b 15 feet from alleys c 15 feet from driveways d 20 feet from light poles 15 feet from power poles f 10 feet from fire hydrants g 6 feet from concrete improvements unless otherwise shown on the plans h 8 feet from sewer and storm drain lines i 10 feet from gas and electrical lines j 10 feet from water lines k 10 feet from telephone and cable television lines 1 20 feet from other acceptable trees m 6 feet from adjoining property line When tree spacing conflicts with the above guidelines the Contractor is to recommend alternate locations to be approved by the Engineer 20 3 03 Drainage Holes Sub
327. ffic signal controller cabinet to the terminal compartments on the signal standard mountings and to the Detectors circuits shall run from the controller cabinet to the pull box adjacent to detectors with no splices In Section 86 2 09D Splicing and Terminations of the State Standard Specifications delete Item No which states UNGROUNDED TRAFFIC SIGNAL INDICATION CONDUCTORS TO A TERMINAL COMPARTMENT OR SIGNAL HEAD ON A STANDARD MAY BE SPLICED TO THROUGH CONDUCTORS OF THE SAME PHASE IN THE PULL BOX ADJACENT TO THE STANDARD All conductors running to a terminal block shall be connected to the terminal block Conductors between the signal mounting terminal block on the standard and the terminal strip in the signal head or pedestrian head shall be No 16 AWG or larger stranded THWN except for M A S and M A T signal conductors which shall be No 14 AWG stranded THWN Conductor insulation color within mounting assemblies shall be red yellow and brown for vehicle signals and brown for walk and red for don t walk for pedestrian signals All neutral conductors shall be white throughout their entire length All single conductors except bonding jumpers shall be stranded All splices shall be made at the midpoint of the slack conductor in all pull boxes and standards All conductors shall be copper Insulation on all single conductors in underground conduits shall be THWN except for bonding conductor At any point
328. ficers agents and employees against any and all liability loss and damages 9 8 Payment Of Withheld Funds Substitutions for 10 retention Reference is made to the retention provisions of Section 9 6 Partial Progress Payments and Retentions Upon the Contractor s request pursuant to Public Contract Code Section 22300 the City will make payment of funds withheld from progress payments to ensure performance of the contract if the Contractor deposits in escrow with the City or with a bank acceptable to the City securities equivalent to the amount withheld The Contractor shall be beneficial owner of any securities substituted for moneys withheld and shall receive any interest thereon Upon satisfactory completion of the Contract the securities shall be returned to the Contractor Alternatively upon the Contractor s request the City will make payment of retentions earned directly to an escrow agent The Contractor may direct the investment of the payments into securities and the Contractor shall receive the interest earned on the investments upon the same terms provided for securities deposited by the Contractor Upon satisfactory completion of the contract the Contractor shall receive from the escrow agent all securities interest and payments received by the escrow agent from the City pursuant to the terms in Section 22300 of the Public Contract Code Securities eligible for investment shall include those listed in Section 16430 of the
329. g embedded in new concrete Unless otherwise provided in the Contract Specifications removed concrete shall not be buried in adjacent embankments and shall be disposed of in accordance with Section 5 12 Disposal of Material Outside the Right of Way If burial is otherwise provided for removed concrete shall be broken into pieces which can be readily handled and incorporated into embankments and is placed at a depth of not less than 3 feet below finished grade and slope lines The removed concrete shall not be buried in areas where piling is to be placed or within ten feet of trees pipelines poles buildings or other permanent objects or structures The floors of concrete basements pits and structures that are not required to be removed and which are located within the roadway shall be broken in a manner that will prevent the entrapment of water Full compensation for breaking up concrete will be considered as included in the prices paid for the various contract items of work and no separate payment will be made therefor When there is a contract item for shattering concrete concrete pavement and similar slabs upon which embankments are to be constructed the concrete shall be broken up into pieces not larger than 2 feet in greatest dimension and left in place 15 3 03 Measurement The work performed under this Section 15 3 and paid for by contract items will be measured by the method specified in the Contract Specifications In the
330. g shall be considered as included in the prices bid for the other various items of work and no separate payment will be made therefor Unless otherwise provided in the Contract Specifications full compensation for restoration of miscellaneous surfaces shall be considered as included in the price bid for the various items of work and no separate payment will be made therefor 19 4 Embankment Construction 19 4 01 General Embankment construction shall consist of constructing roadway embankments including the preparation of the areas upon which embankment materials are to be placed the construction of temporary surcharge embankment above the grading plane the construction of earthen dikes within or outside the right of way the placing and compacting of approved material within the areas to receive embankment where unsuitable material has been removed and the placing and compacting of embankment material in holes pits and other depressions within the area to receive embankment Embankment material shall be either selected material conforming to Section 19 2 06 Selected Material or imported borrow conforming to Section 19 4 02 Imported Borrow City of Clovis Standard Specifications 2009 124 19 4 02 Imported Borrow The Contractor shall at his expense make his own arrangements for obtaining imported borrow and pay all costs involved Imported borrow shall be of a quality suitable for the purpose intended free of vegetable m
331. g square mm min Attenuation 1 300 nm MM 1310 nm SM lt 04 dB km 1 550 nm lt 0 3 dB km Attenuation at the Water Peak lt 2 1 dB km 1383 3nm Chromatic Dispersion Zero Dispersion Wavelength 1301 to 1321 5 nm Zero dispersion Slope lt 0 092 ps nm km Maximum Dispersion 3 3 ps nm km for 1285 1330 nm lt 18 ps nm km for 1550 Cut Off Wavelength lt 1 260 nm Mode Field Diameter 9 3 0 5 um 1t 1300 nm Peterman 1 10 5 1 0 um at 1550 nm 3 Color Coding In buffer tubes containing multiple fibers each fiber shall be distinguishable from others in the same tube by means of color coding The colors shall be targeted in accordance with the Munsell color shades and shall meet EIA TIA 598 Color Coding of Fiber Optic Cables The color formulation shall be compatible with the fiber coating and the buffer tube filling compound and be heat stable It shall not fade or smear or be susceptible to migration and it shall not affect the transmissions characteristics of the optical fibers and shall not cause fibers to stick together Cable Construction Buffer tubes The loose tubes shall provide clearance between the fibers and the inside of the tube to allow for thermal expansion without restraining the fiber The fibers shall be loose or suspended within the tubes The fibers shall not adhere to the inside of the buffer tube The loose buffer tubes shall be extruded from material having a coefficient of friction
332. g the total test period 1 the emitter signal shall cause the proper response from the Model 170 controller unit during each on interval and 2 there shall be no improper operation of either the Model 170 controller unit or the monitor during each off interval E CERTIFICATES AND WARRANTIES Manufacturers certificates and warranties shall be presented to the Engineer City of Clovis Standard Specifications 2009 303 86 47 Video Vehicle Detection Normally the City of Clovis is to provide equipment and City of Fresno personnel will install the cameras and set up programming in the cabinet The Contractor shall provide all other equipment needed to accept video detection systems A GENERAL This Specification sets forth the minimum requirements for a Video Vehicle Detection System System that detects vehicles on a roadway using video images of the vehicle traffic and provides detector outputs to a traffic controller or similar device System Hardware The System shall consist of one to four image sensor s or other video source s machine vision processor modules and extension modules a central hub for switching and communications a monochrome or color video monitor and a pointing device The System hardware shall be complete and operational when properly installed Substitution of components at additional cost or purchase of additional hardware shall not be required System Software The System shall be able to detect vehicl
333. gated Such penalty shall be deducted from any monies owed the Contractor or invoiced to the contractor In addition to the penalties as specified above if conditions warrant the Engineer may order City forces to eliminate or prevent the dust nuisance An amount equal to three 3 times the City s actual cost thereof in addition to the penalties as herein provided shall be deducted from any monies owed the Contractor or shall be invoiced to the Contractor Reference is made to Section 9 7 Stop Notices City s Right to Withhold Payments 10 2 Payment Payment for Dust Control shall include the cost for all labor materials and equipment including the cost of all water used in the performance of the work necessary to provide City of Clovis Standard Specifications 2009 85 dust control and to comply with all regulatory agencies requirements Where the Contract includes a lump sum bid item for Dust Control full compensation for dust control shall be included in the lump sum price bid therefor Payment will be prorated on the basis of the ratio of the total Contract amount completed to date to the total original Contract amount less the sum of dust control and any other prorated items Where no bid item is provided for dust control the cost thereof shall be included in the various bid items of work no separate payment will be made therefor City of Clovis Standard Specifications 2009 86 SECTION 11 MOBILIZATION 11
334. ge and shall meet or exceed the specifications elsewhere under these specifications This measurement shall be repeated for each data link The Engineer shall approve the data test The Contractor shall measure record and demonstrate that the performance meet or exceed the specified EIA TIA 250 C requirements listed below Differential gain 5 Differential phase less than or equal to 3 Chrominance to luminance delay inequality 33 ns Amplitude Vs frequency characteristics See figure 3 of ETA TIA 250 C Frequency response characteristic Signal to noise ratio 60 dB Signal to low frequency noise ratio 48 dB Signal to periodic noise Or IN Output signal level 1 Volt Peak to Peak F Acceptance Testing The acceptance testing shall be conducted in accordance with the approved test plan The acceptance testing shall include conducting acceptance tests and subsequent re tests and documentation of the test results City of Clovis Standard Specifications 2009 246 Final accepted tests shall be conducted after the site and subsystem test results have been reviewed and accepted by the Engineer These tests include the complete system in normal operations The test plan shall address the full testing requirements of the specifications The test plan shall detail all tests to be performed the test results that are expected and the test schedule The acceptance test plan shall in
335. ges damaged from any cause prior to or during paving operations shall be re cut or re trimmed as directed by the Engineer No additional payment will be made therefor Where Aggregate Base is specified to be used as part of the resurfacing structural section or backfill it shall be furnished and placed in conformance with Section 26 Aggregate Bases of the State Standard Specifications Where Portland Cement Concrete is specified to be used as part of the resurfacing structural section or backfill unless otherwise specified on the Plans or in the Contract Specifications it shall be Class 1 2 3 or 4 with 1 inch maximum aggregate conforming to the requirements of Section 90 Portland Cement Concrete of the State Standard Specifications The top surface of the concrete shall be given a rough rake finish while the mix is still workable with the corrugations parallel with the trench Where called for on the Plans or Specifications or directed by the Engineer calcium chloride of up to 2 percent by weight of the cement shall be added to the concrete mix A paint binder of asphaltic emulsion shall be furnished and applied in conformance with Section 39 4 02 Prime Coat and Paint Binder Tack Coat of the State Standard Specifications to all vertical or other surfaces of existing pavement curbs gutters or other surfaces against which asphalt concrete pavement is to be placed Paint binder shall also be applied to the top surfa
336. ght to later submit a proposed change order or Claim on that issue The proposed change order shall indicate the grounds for the additional compensation money and or time requested and the amount of compensation money and or time requested and Contractor shall include all information supporting the proposed change order The City may accept the proposed change order reject it in whole or in part or request additional information If City does not respond to the proposed change order within thirty 30 days the proposed change order shall be deemed rejected in whole as of the thirtieth day If the City requests additional information then the Contractor shall submit it within fifteen 15 days and the City shall have fifteen 15 days after such submission to accept or reject in part the proposed change order If the City fails to respond within fifteen 15 days after such submission of additional information then the proposed change order shall be deemed rejected in whole as of the fifteenth day Any written protest to an approved change order see Section 4 10 Changes of these Standard Specifications and Section 4 1 03A Procedures and Protest of the State Standard Specifications and any proposed change order see previous paragraph shall be certified pursuant to Section 4 12 5 Content of Claim City of Clovis Standard Specifications 2009 18 4 12 4 Time For Submittal Of Claim Any Claim must be submitted by
337. gnal indicator wiring The enforcement indicator will be activated only when the RED vehicle signal indicator is energized The device shall consist of RED LEDs installed in a barrel sun visor The barrel sun visor is to be rotatable and adjustable both vertically and horizontally to permit the device to be aimed at a specific viewing location The enforcement indicator s wiring is to be connected to the standard traffic signal terminal block with spade connectors or as approved by the Engineer 86 37 Vehicle Detectors Detectors shall conform to the provisions in Section 86 3 01 Controller Assemblies and Section 86 3 03 Model 170 and Model 2070 Controller Assemblies as contained in the latest edition of the Traffic Signal Control Equipment Specifications of the State of City of Clovis Standard Specifications 2009 289 California Department of Transportation and Section 86 5 01 Vehicle Detectors of the State Standard Specifications and these Standard Specifications The detector amplifiers shall be two channel loop detector sensor unit Model 222 and two channel magnetic detector sensor unit model 232 When using video detection equipment model 222 loop detector sensor units shall be replaced with 2 channel model 242 isolators Magnetic detector sensing elements probes shall be model 231 Probes and amplifiers shall be compatible The model 222 loop detector sensor units shall be capable of operating 4 6 x 6
338. h Pressure Sodium Lamps High pressure sodium lamps shall conform to the provisions in Section 86 6 01B High Pressure Sodium Lamps of the State Standard Specifications 86 31 Photoelectric Controls Photoelectric Controls shall conform to the provisions in Section 86 6 07 Photo Electric Controls of the State Standard Specifications and these Standard Specifications and shall be Type 11 The photoelectric control PEC shall be mounted atop the pole identified in the plans using an adapter manufactured for that purpose The Control will be wired back to the City of Clovis Standard Specifications 2009 288 service pedestal using three 12 stranded type THHN conductors color coded to match the PEC The safety lighting PEC socket shall have a low profile shorting cap installed The supply voltage rating for photoelectric units shall be 60HZ 105 240 volts The photoelectric window shall be oriented to the north 86 32 High Pressure Sodium Lamp Ballasts Ballasts shall conform to the provisions in Section 86 6 01A High Pressure Sodium Lamp Ballasts and Section 86 6 01A 1 Regulator Type Ballasts of the State Standard Specifications and these Specifications Attention is called to Section 86 2 095 Fused Spliced Connectors of the State Standard Specifications Integral regulator type ballasts lag type shall be provided Luminaire ballast fusing shall be as stated in State Standard Plans Sheet ES 13B Fus
339. h Section 5 12 Disposal of Material Outside the Right of Way The material thus disced or bladed shall be thoroughly mixed watered and rolled to a smooth and even condition to a relative compaction of not less than 95 percent in compliance with Sections 6 8 Samples and Tests and 6 9 Compaction Tests to a depth of not less than 6 inches below the grading plane or as otherwise shown on the Plans or Standard Drawings or specified in the Contract Specifications Any soft spongy or otherwise unstable areas shall be repaired by completely removing the material and replacing it with acceptable materials in accordance with these Specifications Before subbase aggregate base asphalt concrete concrete or other paving material is placed the Engineer may require at the Contractor s expense a test roller of size and City of Clovis Standard Specifications 2009 114 weight as approved by the Engineer to pass over the finished subgrade to ascertain that there are no such soft or spongy areas No subsequent layer of a structural section shall be placed until the finished subgrade is in a stable condition satisfactory to the Engineer regardless if said subgrade passed any prior compaction test Any trenches cut for pipelines or conduit installation after the subgrade or any other layer of the roadway prism has been stabilized shall be compacted in compliance with Section 19 3 03 E Compaction herein It shall be the Contra
340. h are provided for in Sections 15 3 Removing Concrete and 15 4 Bridge Concrete Culvert Removal 15 2 02 Removal Methods Removing or abandoning existing facilities which interfere with construction or which are directed to be removed or abandoned by the Engineer shall be performed as shown on the Plans as specified in the Specifications or as directed by the Engineer City of Clovis Standard Specifications 2009 93 15 2 02 Well Abandonment All existing drainage or supply wells within the limits of the project which are not in use or intended for future use shall be abandoned in accordance with State of California Bulletin 74 81 Water Well Standards as amended by Bulletin 74 90 Fresno County Health Department regulations and the Clovis Standard Drawing therefor The Contractor performing the well abandonment shall be licensed to perform such work Class A or Class C 57 in accordance with the provisions of the State Business and Professions Code Chapter 9 Division 3 The Contractor shall obtain a permit for the work from the Clovis Building Division prior to performing the well abandonment and shall coordinate with the Building Division for inspection of the work as required The exposed well shall be securely covered during all periods of inactivity with a suitable cover sufficiently anchored to prevent hazard to the public and or contamination of the well 15 2 02 B Obliterating Roads And Detours Unless otherwis
341. h of not less than 2 500 Ibs and shall be printed with sequential measurement markings for its full length J Services and Switchboards shall be of the make model or type complying with the details shown on the Plans or as specified in the Contract Specifications 83 4 Permits And Licenses The Contractor shall comply with the requirements of Section 7 10 Permits and Licensing The Contractor will be required to obtain an electrical and any other related permit from the City Building Division prior to beginning any work and pay all fees related thereto The contractor must posses all required State licenses and state same on the bid proposal 83 5 Specialized Inspection All of the work described herein will be subject to inspections by an Engineering Division inspector and specialized City Building Division inspector as ordered by the Engineer Such specialized inspections will be made of all electrical facilities subject to the regulations and codes listed in Section 83 3 Paragraph B Regulations and Codes The Contractor shall notify the Engineer at least two 2 working days in advance of any electrical work and also at least two 2 working days in advance of any work done intermittently in order that inspection required by the Electrical Code can be coordinated All overtime inspection charges incurred by specialized City Building Division personnel shall be paid by the Contractor when inspection services are required
342. h replacement 19 2 05 Deficiency Material If the quantity of acceptable material from excavation is not sufficient to construct the embankments required by the work the quantity of material needed to complete the embankments shall consist of imported borrow conforming to Section 19 4 02 Imported Borrow as shown on the Plans or specified in the Contract Specifications or as determined by the Engineer The Contractor shall obtain the imported borrow in conformance with the provisions in said Section 19 4 02 If the contract does not include an item for imported borrow payment for the required imported borrow will be made by extra work as provided in Section 4 11 Extra Work 19 2 06 Selected Material Selected material shall be defined as material which is excavated from a location within the right of way as specified in the Contract Specifications or shown on the plans and the Contractor shall have no choice in the selection Selected material shall be used as shown on the plans or specified in the Contract Specifications Topsoil excavated within the limits of the project shall be considered as selected material Selected material not used for topsoil may be used as backfill for filling holes pits or other depressions caused by removal of existing facilities in conformance with Section 15 Removing Existing Facilities Section 16 Clearing and Grubbing Section 19 1 04 Removal and Disposal of Buried Man Made Object
343. hall be accompanied by a Statement of Compliance signed by the employer or the employer s agent indicating that the payrolls are correct and complete and that the wage rates contained therein are not less than those required by the contract The Statement of Compliance shall be on forms furnished by the State or on any form with identical wording The Contractor shall be responsible for the submission of copies of payrolls of all subcontractors If by the 15th of the month the Contractor has not submitted satisfactory payrolls as requested by the Engineer for all work performed during the monthly period ending on or before the first of that month the City will retain an amount equal to 10 percent of the estimated value of the work performed during the month from the next monthly estimate except that this retention shall not exceed 10 000 nor be less than 1 000 or such other amount as may be determined from time to time by the State Department of Industrial Relations Retentions for failure to submit satisfactory payrolls shall be additional to all other retentions provided for in the contract The retention for failure to submit payrolls for any monthly period will be released for payment on the monthly estimate for partial payments next following the date that all the satisfactory payrolls for which the retention was made are submitted The Contractor and each subcontractor shall preserve their payroll records for a period of 3 years from the
344. hall be per each valve installed Measurement for recycled water service lines shall be per each water service line installed 67 11 Payment The unit price paid per lineal foot for recycled water mains shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work City of Clovis Standard Specifications 2009 201 involved therein as shown on the Plans as set forth the Specifications and as directed by the Engineer This shall include furnishing and installing the pipe and fittings installing concrete thrust blocks trenching backfilling compacting hydrostatic pressure testing water and all incidentals The unit price paid per each for gate butterfly or other valves shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as set forth in the Specifications and as directed by the Engineer This shall include furnishing and installing the valve valve box and valve extension installing concrete thrust blocks trenching backfilling compacting testing sterilization pressure testing water returning and installing valve box to final grade following trench surface restoration street or alley construction or reconstruction and all incidentals The unit price paid per each for recycled water service lines shall include full compensation for furnishing a
345. hall be sloped to drain to the center of the bottom where a 2 inch diameter drain hole shall be installed through the grout and roofing paper 5 Conduits shall enter the pullbox at the top of the bottommost extension Conduits shall extend into the pullbox a maximum of 3 inches and a minimum of 2 inches Conduits shall not enter the pullbox from the bottom without the express approval of the Engineer Connection of existing or new conduits to pullboxes shall be included as part of pullbox installation The distance between conduits entering pull boxes shall be a minimum of 2 inches After conductors have been installed in the conduit runs the ends of conduits terminating in pull boxes shall be sealed with an approved type of sealing compound Pull boxes shall be placed at the same elevation as adjacent existing or future sidewalk area where finish elevations are not shown on the plans The top elevation for pull boxes installed in median areas shall match the slope of the two adjacent curbs The pull box elevation for pull boxes installed in planting areas adjacent to sidewalk or sidewalk area shall be at sidewalk grade Pull boxes shall not be located within the limits of handicap ramps When pull boxes are to be placed in dirt and planting areas adjacent to curbs a concrete collar shall be constructed around the pull box and abut the curb The top of the pull box shall match slope of the adjacent top of the curb The surface elevation of the collar
346. he then current controlling operation or operations If a suspension of Work is ordered by the Engineer due to the failure on the part of the Contractor to carry out orders given or to perform any provision of the contract the days on which the suspension order is in effect shall be considered for time extension only if permitted under Section 8 8 Time of Completion 8 12 Use Of Completed Portions City s Right To Complete The City shall have the right to take possession of use or maintain and protect any completed portions of the Work However such possession use or maintenance and protection shall not be deemed as accepting any Work regardless of whether it has or has not been completed in accordance with the Contract documents The City has the right to perform some or all of the Contractor s remaining Work if the Contractor fails or refuses to carry out the Work in accordance with the Contract Documents The City may exercise this right at any time during the Contractor s work including the closeout or punch list phases The City shall first provide written notice to Contractor of Contractor s failure or refusal to perform in accordance with the Contract Documents and such notice shall demand commencement or correction of such failure or refusal to perform City of Clovis Standard Specifications 2009 72 within reasonable time not to be less than seven 7 days Such notice need not specifically refer to this provision
347. he City 7 21 Amendments To Contracts Each and every provision of law and clause required by law to be inserted in the Contract for the work to be done under the Specifications shall be deemed to be inserted therein and the Contract shall be read and enforced as though it were included therein and if through mere mistake or otherwise any such provision is not inserted or is not correctly inserted then upon the application of either party thereto the Contract shall forthwith be physically amended to make such insertion 7 22 Verbal Statements Not Binding It is understood and agreed that the written terms and provisions of the Contract shall supersede all verbal statements of the Engineer or other representatives of the City and such statements shall not be effective or be construed as entering into or forming a part of or altering in any way whatsoever the written agreement 7 23 Guarantee Whether working under a City Contract or under Encroachment Permit for Utility Communications or private work the Contractor shall guarantee the proper installation and performance of all equipment facilities and materials installed including all landscape plantings and irrigation systems or work performed pursuant to the Plans Contract Specifications these Specifications or City Encroachment Permit for a period of one year from the date of the Acceptance of the Work by the City Council or other period set forth in the Contract Specifications
348. he Contractor prior to placing final resurfacing Final replacement of pavement shall be performed in a manner consistent with good construction practices and methods which when completed shall leave all areas requiring replacement of pavement with as neat an appearance as possible Areas to receive final pavement replacement shall be completely cleaned of all debris rubbish dirt temporary paving or any other deleterious material which might affect the quality of the work in any way Cleaning shall be accomplished to a minimum of 6 feet outside the edges of trenches or other areas to receive pavement replacement This distance may be increased by the Engineer as necessary to prevent contamination of the new work Where sawcutting of existing pavement edges is not shown on the standard drawing or specified all damaged existing pavement shall be removed and the edges trimmed to neat lines as directed by the Engineer and by a method approved by the Engineer Where sawcutting of existing pavement edges is shown on the standard drawing or is specified the cut shall be made on a straight line along both sides of trenches and to neat lines around structures or other locations requiring pavement replacement The cut shall be made a minimum of 3 inches in depth and shall encompass all pavement damaged by the work or specified to be removed or replaced All edges of existing pavement whether trimmed or sawcut shall be protected from damage Any ed
349. he additional information whichever is greater 4 12 8 Closeout Meet And Confer Before the submission of a final payment application Contractor may request a closeout meet and confer session with the City to discuss any previously submitted Claims that the City did not grant in full City is under no obligation to meet and confer but may in its discretion choose to do so Nothing related to this closeout meet and confer process tolls the running of the period of time for Contractor to present a Government Code Claim pursuant to Sections 4 12 6 Procedures for Claims Less Than or Equal to 375 000 and 4 12 7 Procedures for Claims Over 375 000 4 12 9 Continuing Contract Performance Despite submission or rejection of a Claim the Contractor shall proceed diligently with performance of the Contract as directed by City and the City shall continue to make any undisputed payments in accordance with the Contract 4 13 Interim Cleanup During the construction of the project the Contractor shall provide periodic cleanup as the work progresses such cleanup to be accomplished as soon as practicable and as public necessity and convenience require as determined by the Engineer In general daily interim cleanup will be required If the Contractor fails to provide periodic cleanup measures so ordered within a reasonable time period as determined by the Engineer the shall pay to the City a liquidated damage of a minimum of Two Hundred Fif
350. he amount from monies due the Contractor City of Clovis Standard Specifications 2009 149 A pre final inspection of the work shall be made by the City Engineering Inspector and Parks Division personnel in the presence of the Contractor at the time when all landscaping and irrigation work is completed and inspection is requested by the Contractor to commence the plant maintenance period In compliance with Section 20 8 Maintenance Period and Section 21 12 Maintenance Period the Contractor shall make the inspection request to the Engineer two working days prior to the requested time of such inspection After the system has been completed in all respects the Contractor shall instruct an authorized representative of the City Parks Division in the operation and maintenance of the system and shall furnish a complete set of written operating instructions At the time of the pre final inspection the Contractor shall have prepared and transmit to the City Engineering Inspector a set of record or as built drawings of the landscaping and irrigation work At the conclusion of the maintenance period a final inspection shall be scheduled by the Contractor two working days in advance of the requested inspection In the event the Contractor schedules an inspection and has not completed the work that is to be inspected or made an effort to do so the Contractor will be billed at the standard City hourly rate for the cost of time expend
351. he or she shall as a penalty to the state or political subdivision on whose behalf the contract is made or awarded forfeit twenty five dollars 25 or such other amount as may be amended from time to time by the Department of Industrial Relations added by City for each calendar day or portion thereof for each worker until strict compliance is effectuated Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement these penalties shall be withheld from progress payments then due A contractor is not subject to a penalty assessment pursuant to this section due to the failure of a subcontractor to comply with this section City of Clovis Standard Specifications 2009 48 The penalties specified in subdivision 9 of Labor Code Section 1776 for noncompliance with the requirements in Section 1776 may be deducted from any moneys due or which may become due to the Contractor If required by the Engineer a copy of all payrolls shall be submitted weekly to the Engineer Payrolls shall contain the full name address and social security number of each employee the employee s correct classification rate of pay daily and weekly number of hours worked itemized deductions made and actual wages paid They shall also indicate apprentices and ratio of apprentices to journeymen The employee s address and social security number need only appear on the first payroll on which that name appears The payroll s
352. he right to make the necessary repairs or replacements at the expense of the Contractor preserving as far as possible all available evidence of the cause of failure This guarantee provision applies to all work performed in City right of way or property whether by contract with the City or work performed under Encroachment Permit by or for utility or Communications companies or other private entities For work done under Encroachment Permit failure to correct or pay for defective workmanship or materials may result in denial of future permits to perform work in City rights of way or property All costs for providing all required Guarantees of Workmanship shall be included in the various bid items no additional payment will be made therefor 5 24 Cost Reduction Incentive The Contractor may submit to the Engineer in writing proposals for modifying the Plans Specifications or other requirements of the contract for the sole purpose of reducing the total cost of construction The cost reduction proposal shall not impair in any manner the essential functions or characteristics of the project including but not limited to service life economy of operation ease of maintenance desired appearance or design and safety standards City of Clovis Standard Specifications 2009 35 Cost reduction proposals shall contain the following information 1 A description of both the existing Contract requirements for performing the work the pro
353. here needed Filler rods shall be solid medium or high density polyethylene The diameter of filler rods shall be the same as the outer diameter of the buffer tubes Stranding Completed buffer tubes shall be stranded around the over coated central member using stranding methods lay lengths and positioning such that the cable shall meet mechanical environmental and performance specifications A polyester binding shall be applied over the stranded buffer tubes to hold them in place Binders shall be applied with sufficient tension to secure the buffer tubes to the central member without crushing the buffer tubes The binders shall be non hygroscopic non wicking or rendered so by the flooding compound and dialectic with low shrinkage Core and Cable Flooding The cable core interstices shall be filled with a polyolefin based compound to prevent water ingress and migration The flooding compound shall be homogeneous free from dirt and other foreign matter non hygroscopic electrically non conductive non nutritive to fungus and readily removable The compound shall be free from dirt and foreign matter and shall be readily removable with conventional non toxic solvents A water blocking tape can be substituted for a filling compound Tensile Strength Member Tensile strength shall be provided by high tensile strength aramid yarns and fiberglass which shall be helically stranded evenly around the cable core Outer jacket The outer jacket
354. hlorine disinfectant and at other locations as determined necessary by the Engineer When an entire water main is to be tested it shall be completely isolated from the existing system Bacteriologic samples shall be taken a minimum of 48 hours after the mains have been flushed of all chlorine Such samples shall be obtained by the Contractor using pipe and fittings supplied by the Contractor as directed by the Engineer Bacteriologic samples shall be obtained in the following manner At corporation stops risers shall be installed that will discharge water directly downward towards the ground The discharge point of the risers shall be a minimum of 24 inches above the ground Risers shall include the necessary bends to accomplish the foregoing and shall be equipped with in line valves near the discharge points to regulate the flow The Contractor shall provide and supply these hookups full compensation therefor to be included in the amount bid for the various water main bid items For mains over 1 320 feet in length with no services samples in addition to those obtained at each end shall be taken at intermediate points in such a manner that at least one sample is taken for each 660 feet of main The recommended procedure of sterilizing and testing water mains is as follows City of Clovis Standard Specifications 2009 195 1 Chlorine residual of between 50 and 100 ppm is introduced into the water mains 2 24 hours later treated water is
355. holes shall conform to the provisions in ASTM 478 Elliptical single line reinforcement is not allowed The ends of manhole sections shall be in planes at right angles to the longitudinal axis of the section The ends of manhole sections shall be finished to regular smooth surfaces and no point on any surface of either the spigot end or bell end shall project beyond or be more than 1 4 inch short of the specified plane In addition to the tongue and groove joints shown on the Standard Drawings joints for manhole sections may be rubber gasket joints of flush bell and spigot design with a contained rubber gasket Joints and gaskets shall conform to the provisions in ASTM C443 for standard gaskets except as modified or required otherwise in these Special Provisions The gasket shall be confined in a groove or by a shoulder on the spigot end of the manhole City of Clovis Standard Specifications 2009 172 section so that neither movement of the section nor hydrostatic pressure can displace the gasket When the joint is assembled the gasket shall be compressed to effect a watertight seal Rubber gasket joint assemblies shall be formed and accurately manufactured so that installed manhole sections will form a continuous watertight manhole with a smooth and uniform interior surface and shall provide for slight movements of the sections due to expansion contraction settlement or lateral displacement The shape and dimensions of the joint shall b
356. hout potential joint leaks Sanitary sewer mains should not be installed within 25 feet horizontally of a low head 5 psig or less pressure water main New water mains and sanitary sewer mains should be pressure tested accordance with manufacturer s specifications City of Clovis Standard Specifications 2009 328 When installing water mains sewers or other pipelines measures should be taken to prevent or minimize disturbances of existing pipelines Disturbance of the conduit s supporting base could eventually result in pipeline failure City of Clovis Standard Specifications 2009 329 April 14 2003 Revised October 16 2003 Page 9 of 11 Guidance Memo No 2003 02 Special consideration should be given to the selection of pipe materials if corrosive conditions are likely to exist These conditions may be due to soil type and or the nature of the fluid conveyed in the conduit such as a septic sewage producing corrosive hydrogen sulfide NOTE Dimensions are from the outside of the water main to the outside of the other pipeline manhole or sleeve City of Clovis Standard Specifications 2009 330 April 14 2003 Revised October 16 2003 FIGURE 1 PARALLEL CONSTRUCTION Page 10 of 11 Not To Scale Cantar Lina Note Zones 1denical on either side of center lines Zones P aprofiblted zone Section 69630 2 Laltorma Lode of litle 22 Cu
357. hown on the Plans A gate unit complete in place shall include one gate or in the case of double gates one double unit with all necessary fittings hardware and gate posts with braces latches stops and other devices required by the Standard Drawings Plans or Specifications Measurement for Timber Barricades shall be on an each basis 80 7 Payment When the Contract does not include a pay item for clearing and grubbing or for excavation and preparation of subgrade as above specified and unless otherwise provided in the Contract Specifications full compensation for any necessary clearing and grubbing and any excavation and preparation of subgrade required to prepare the fence pad to the grades shown on the Plans or directed by the Engineer shall be included in the costs for the various fence construction items of work and no separate payment will be made therefor Payment for 6 foot chain link fence shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans and Standard Plans as set forth in the Specifications and as directed by the Engineer This shall include clearing and preparing the fence pad where no separate item is provided therefor furnishing and installing the fence and posts providing samples and tests furnishing and installing post extension arms and strands of wire where indicated and all incidentals required to pr
358. ial excavating and grading road approaches driveways and connections removal of unstable material outside the roadway prism preparation of basement material for the placing of other material thereon all as shown on the Plans and Standard Drawings as specified in the Specifications and as directed by the Engineer and furnishing all labor materials tools equipment and incidentals and for doing all the work that may be required to construct and maintain the roadway pipeline or other facilities requiring earthwork For purposes of this Section 19 roadway shall include streets alleys easements trails parking lots park sites or the sites of other surface improvement work Whenever reference to finished grade or finished surface is made it shall be considered to be the finished surface of the completed facility All hauling of material from to or on the job site shall comply with Section 6 12 Materials Hauling Where loads are not required to be covered if directed by the Engineer the loads shall be watered after trimming to eliminate dust as provided in Section 10 Dust Control The Contractor shall comply with the provisions of Sections 5 9 Preservation of Property and 5 10 Protection of the Work and Section 15 Removing Existing Facilities relative to protection and preservation of property the work and other utilities in performing earthwork operations Quantities of all types of existing
359. ical Code and to modifications as specified in these Standard Specifications The Contractor shall notify the Engineer at least two 2 working days in advance of any electrical work and also at least two 2 working days in advance of any work done intermittently in order that inspection required by the Electrical Code can be coordinated 82 4 Fiber Optic Conduit Unless otherwise shown on the Plans or specified in the Contract Specifications fiber optic conduit shall be 3 inch diameter HDPE or PVC Schedule 40 or 80 furnished and installed as shown on the Plans in conformance with the Specifications and as directed by the Engineer 82 5 Pull Tape Pull tape shall be installed in each fiber optic conduit Each end of each fiber optic conduit shall be fitted with an approved watertight expansion plug with integral provisions for secure attachment of the pull tape The ends of the tape shall be secured to the expansion plug to ensure that the tape does not draw back into the conduit Pull tape shall be flat woven polyester have a minimum pull tensile strength of not less than 2 500 and shall be printed with sequential measurement markings for its full length The length of pull tape provided in each conduit shall include a minimum of 72 inches of excess tape in each pullbox or other terminating enclosure 82 6 Couplings And Bells All couplings shall be a compression type fitting Communication bells installed on the ends of condui
360. ical subdivision on whose behalf a contract is awarded a penalty of not more than fifty dollars 50 or such other amount as may be amended from time to time by the Department of Industrial Relations for each calendar day or portion thereof for each worker paid less than the prevailing rates as determined by the Director of Industrial Relations for the work or craft in which the worker is employed for any public City work done under the contract by the Contractor or by any subcontractor under the Contractor in violation of the requirements of the Labor Code and in particular Labor Code Sections 1770 to 1780 inclusive The amount of this forfeiture shall be determined by the Labor Commissioner and shall be based on consideration of the mistake inadvertence or neglect of the Contractor or subcontractor in failing to pay the correct rate of prevailing wages or the previous record of the Contractor or subcontractor in meeting their respective prevailing wage obligations or the willful failure by the Contractor or subcontractor to pay the correct rates of prevailing wages A mistake inadvertence or City of Clovis Standard Specifications 2009 43 neglect in failing to pay the correct rate of prevailing wages is not excusable if the Contractor or subcontractor had knowledge of the obligations under the Labor Code In addition to the penalty and pursuant to Labor Code Section 1775 the difference between the prevailing wage rates and the amount pai
361. ications the Contract Specifications and as directed by the Engineer Clearing and Grubbing shall be performed in advance of grading operations and in accordance with the requirements of these specifications Reference is made to Section 15 Removing Existing Facilities Any existing facility not specifically designated on the plans or Contract Specifications to be removed or to remain shall be removed and disposed of in accordance with this Section 16 Removal and disposal of existing roadway or alley materials in advance of roadway or alley reconstruction shall be considered as excavation for the associated construction items and not a part of or to be paid for as Clearing and Grubbing Any holes depressions or pits resulting from the removal of objectionable material shall be backfilled in accordance with Section 19 4 Embankment Construction 16 2 Preservation Of Property The Contractor shall comply with the requirements of Sections 5 3 Contractor s Responsibility for Work 5 9 Preservation of Property 7 4 Contractors Insurance Requirements and Hold Harmless 7 16 Injury or Damage to Persons or Property and Section 8 15 Utility and Non Street Facilities Potholing Whether shown on the Plans or not existing improvements adjacent property utility and other facilities and trees and plants that are not to be removed shall be protected from injury or damage resulting from the Contractor s operatio
362. icator will illuminate only when a total absence of input signals on a channel is detected The Switch Fail indicator will illuminate only if the Enhanced feature is enabled for a given channel and more than one signal is detected simultaneously 7 The flashing operation of this Monitor shall lock in and shall release only upon operation of a reset switch However if there is a complete failure of power to the controller assembly the lock in shall release unless a conflict precedes a complete power failure This shall place the Monitor in flash operation until reset switch is reset 8 A parts layout schematic diagram parts list and theory of operation shall be supplied with the Monitor 9 The Monitor furnished under this specification shall be the most improved model past the development stage and in the factory production 10 The Monitor shall be functionally wired to utilize its maximum capacity i e absence of Red 24 V D C Watchdog Monitor etc 11 A Red signal input on the Monitor shall be sensed when it exceeds 70 VAC RMS and a Red signal input shall not be sensed when it is less than 50 VAC RMS Red signals between 50 and 70 VAC RMS may or may not be sensed 12 A Green or Yellow signal input on the Monitor shall be sensed when it exceeds 25 VAC RMS and a Green or Yellow signal input shall not be sensed when it is less than 15 VAC RMS Green or Yellow signals between 15 and 25 VAC RMS may or may not be sensed 13 The Monitor
363. icted on Standard Plans ES 5A The word top shall be placed on the top side of each PVC loop for correct installation The top side is the side with the condulet cover Allow additional length of each conductor for the run to the termination pull box plus five feet of slack Each pair of loop lead in conductors shall be twisted together at the rate of two turns per foot from the loop detector in the roadway to the point of connection with the DLC cable in the termination pull box Identify and tag each DLC cable in the termination pull box with the loop assignment designation shown on the plans Include the phase number and the input slot assignment on the tags Tags shall be plastic and attached to the cable with non metallic permanent fasteners Each pair of loop lead in conductors shall be tagged as above Also tag the loop conductors with start S and finish F Identify and tag each DLC cable in the controller cabinet with the loop assignment designation shown on the plans All loop detectors and loop detector circuits shall be meg tested at 500v and shall test not less than 100 megohms from phase to ground Each loop shall be continuity tested and meg tested at the termination pull box in the presence of the Engineer prior to splicing Test each loop circuit for continuity circuit resistance and insulation resistance at the controller cabinet location The loop circuit resistance shall not exceed 0 5 ohms plus 0 35 ohms per 10
364. ifications until the formal acceptance of the work by the City Council the Contractor shall have the charge and care thereof and shall bear the risk of injury or damage to any part thereof by the action of the elements or from any other cause whether arising from execution or from the nonexecution of the work The Contractor shall rebuild repair restore and make good all injuries or damages to any portion of the work occasioned by any of the above causes before final acceptance and shall bear the expense thereof except such injuries or damages occasioned by acts of the Federal Government or the public enemy The City shall not be held responsible for the care or protection of any material or parts of the work prior to final acceptance except as expressly provided in the Specifications The Contractor shall comply with the requirements of Sections 5 9 Preservation of Property and 7 16 Injury or Damage to Persons or Property 5 4 Contractor s Equipment The Contractor shall provide adequate and suitable equipment and means of construction to meet all the requirements of the work When ordered to do so by the Engineer the Contractor shall remove unsuitable equipment from the work and discontinue the operation of unsatisfactory equipment The use of any equipment which is obsolete as to type in bad condition or worn out will not be permitted on the work 5 5 Suitable Methods The Contractor shall use such methods for the perform
365. ifications and these Standard Specifications When conduit is installed using the Trench in Pavement Method Type 1 conduit shall be used except when the conduit is to be used for magnetic detectors See Section 86 41 Magnetic Detector Installation Procedure of these Standard Specifications for magnetic detector conduit installation Conduit shall be installed 30 below finished grade in all areas except in sidewalk and in median areas where the depth shall be not less than 18 inches below grade Patch mix asphalt concrete shall be inch maximum coarse shall conform to the provisions in Section 39 2 Materials and Section 39 3 Storing Proportioning and Mixing Materials of the State Standard Specifications and the Contract Specifications City of Clovis Standard Specifications 2009 276 include treatment heater remix as shown on City of Clovis Standard Drawing ST 20 Insulated bonding bushings shall be required These bushings shall be a Thomas amp Betts Blackjack Series BG100 BG600 malleable iron bushings or approved equal and shall contain the following features 1 Approved for threaded and non threaded 1 conduit installation 2 A lay in style grounding lug cast integral to the bushing Wire range shall be 14 2 0 3 Bushing insulator rated to 150 C covering the top of the bushing including lug corners Insulator shall be positively locked into pl
366. ified in the Contract Specifications payment for installing and removing detours shall be included in the price bid for Traffic Control or if there is no bid item included in the various bid items of work No additional payment will be made therefor The Contractor shall be aware that detours which pass through jurisdictions other than the City of Clovis may be subject to special requirements by those jurisdictions Any costs thereof shall be paid for as above provided When traffic is routed through the work provisions for a passageway through construction operations shall also conform to the foregoing Sections but will not be considered as detour construction or detour maintenance This work shall conform to and be paid for as provided in Section 7 17 Public Convenience unless otherwise specified in the Contract Specifications In accordance with Section 8 11 Temporary Suspension of Work the failure or refusal of the Contractor to construct and maintain detours at the proper time or route traffic through the works as required shall be sufficient cause for closing down the work until the detours or rerouting are in satisfactory condition for use by traffic Any damage caused by the Contractor s operations or by traffic to detours installed solely for the convenience of the Contractor and not required by the Plans Specifications or the Engineer shall be promptly repaired by the Contractor to the satisfaction of the Engineer C
367. ified in this Section 67 2 2 DI pipe for recycled water mains shall be installed with a purple 8 mil 3 inch wide minimum polyethylene wrap conforming to the provisions AWWA ANSI C105 A21 5 polyethylene wrap shall be marked with the words CAUTION NONPOTABLE WATER DO NOT DRINK or approved equivalent arranged in two continuous lines of text each on opposite sides the polyethylene wrap and for the full length of the pipe 67 2 3 Thrust Blocks Valves Valve Boxes Thrust Blocks Valves and Valve Boxes shall conform to the applicable sections in Section 66 Potable Water Distribution Facilities and the following provisions The valve operator or valve extension for deep valves shall be marked with a purple weatherproof tag containing the words Recycled Water Do Not Drink in black letters Valve boxes and lids shall be Christy Type G 4 with the words Recycled Water stamped in prominent letters on top of the lid City of Clovis Standard Specifications 2009 199 67 2 4 Recycled Water Services Materials for recycled water services shall conform to the applicable details shown on the Plans the Standard Drawings and the Specifications Recycled water services shall not have concrete collars 67 2 5 Nuts Bolts Screws Fasteners Other Service Materials Nuts Bolts Screws Fasteners and Other Service Materials shall conform to the applicable sections in Section 66 Potable Water Distribution
368. ignated wavelength of the system under test Its display indicates the amount of power injected by the light source that arrives at the receiving end of the link Segment A section of fiber optic cable that is not connected to any active device and may or may not have splices per the design Splice Closure A container used to organize and protect splice trays The container allows splitting or routing of fiber cables from multiple locations The container is environmentally sealed to protect the fibers Splice Module Housing SMH The SMH stores splice trays as well as pigtails and short cable lengths Splice Tray A container used to organize and protect spliced fibers Splice Vault A box with a maximum inside clearance which is used to house splice closures Storage Cabinet Designed for holding excess cable slice for protection The storage cabinet allows the user flexibility in equipment location and the ability to pull cable back for re splicing 82 17 B Single Mode Fiber Optic Outside Plant Cable 1 General Unless otherwise shown on the Plans or specified in the Contract Specifications trunk fiber optic cable shall be all dielectric central membrane gel filled or tape water blocked duct type loose tube and contain strands of single mode SM dual window 1310 nm and 1550 nm fibers as shown on the Plans specified in the Contract Specifications and in conformance with these special provisions The Contractor at his optio
369. ignature Within 24 hours of approval the Contractor shall provide the City with a final copy of the project s PCSWMP The City shall submit the executed NOT to the Central Valley Regional Water Quality Control Board RWQCB for termination of General Construction Permit coverage 7 7 B Payment Unless otherwise provided by the Contract Specifications and with the exception of the NOI fee all costs for compliance with this Section 7 7 including preparation of the SWPPP all inspection and other required reports documentation training preparation of the PCSWMP and NOT and any and all work associated with the maintenance of BMPs shall be included in the price bid therefor If no bid item is provided the cost shall be included in the various items of work no separate payment will be made therefor 7 8 Use Of Pesticides The Contractor shall comply with all rules and regulations of the California Department of Food and Agriculture the Department of Public Health the Department of Industrial Relations and all other State Federal or Local agencies which govern the use of pesticides required in the performance of the work on the contract Pesticides shall include but shall not be limited to herbicides insecticides fungicides rodenticides germicides nematocides bactericides inhibitors fumigants defoliants desiccants soil sterilants and repellents Any substance or mixture of substances intended for preventing repelling mitigating or
370. igtail units shall be composed of six 6 pre connectorized fiber optic pigtails All optic fibers shown on the plans to be connectorized shall be terminated with a FC SC Ultra Polish type nickel plated zinc bayonet zircona ceramic tip keyed connector All cables shall use the same connectors The connector shall not require a mechanical splice to a factory polished tip All connectors must be pre connectorized with pigtails that meet the fiber specifications in these specifications The pigtail unit shall be composed of 6 900 micron color coded pigtails The surface of the fiber end installed in a connector shall be free of scratches pits and chips at 200X No index matching fluids gels or anti reflection coatings shall be applied to the end of the fiber The connectors shall conform to the following a Insertion Loss 0 25 dB typical 0 4 dB Maximum Reflectance Less than 50 dB at 1310 nm measured with a back reflection meter City of Clovis Standard Specifications 2009 239 Optical Fiber Nominal Outside Diameter 125 micrometers d Tensile Strength Less than 0 2 dB change based on a 10 kg load without adhesive e Temperature Cycling Less than 0 2 dB change based on 40 C to 80 C 100 cycles f Humidity Less than 0 2 dB change 60 C at 95 relative humidity for 500 hours g Durability Less than 0 2 dB change per 1000 insertions cleaned every 25th insertion h Undercut protrusion 50 nm i A
371. ilt drawings of the landscaping and irrigation work At the conclusion of the maintenance period a final inspection shall be scheduled by the Contractor two working days in advance of the requested inspection In the event the Contractor schedules an inspection and has not completed the work that is to be inspected or made an effort to do so the Contractor will be billed at the standard City hourly rate for the cost of time expended by City inspectors in preparing for and making the determination that the work has not been satisfactorily completed to warrant an inspection If the inspection was scheduled to occur on overtime a weekend or holiday said charge will be calculated at the standard City overtime double time rate as applicable Failure to pay the bill will be cause to deduct the amount from monies due the Contractor 20 1 03 Rough Grading Before soil preparation is to begin the entire area that is to receive landscape planting shall be cleared and grubbed in accordance with Section 16 Clearing and Grubbing and shall be graded in accordance with Section 19 Earthwork to lines and grades as indicated on plans in the Contract Specifications or established by the Engineer If there is no contract pay item for clearing and grubbing the cost thereof shall be considered as included in the various line items of work Prior to grading operations all woody plant material not removed as part of clearing and grubbing operat
372. in accordance with ASTM D1987 The Contractor shall also provide one test pipe selected at random by the Engineer from each 1200 feet or fraction thereof or from each pipe lot or fraction thereof A lot shall be defined as all pipe having identical identification marking The length of test pipe for each selected pipe shall be a minimum of 8 feet The Engineer may test the specimens for compliance with specification requirements City of Clovis Standard Specifications 2009 171 When so directed by the Engineer the Contractor shall furnish test specimens of gaskets from each batch used in the work When the pipe is delivered to the work site the Engineer may require additional testing to determine conformance with specification requirements for pipe flattening impact resistance pipe stiffness and extrusion quality The basis for acceptance will be compliance with specification requirements as determined by the inspection of pipe fittings and couplings the certificates of compliance and the results of any tests conducted by the Engineer 64 2 4 Time Limit For Installation If the Contractor proposes to install any PVC pipe and fittings that are more than 180 days old from the date of manufacture the Contractor shall retest the materials within 60 days prior to installation at the Contractors expense to demonstrate compliance with specification requirements unless otherwise directed by the Engineer The Contractor shall not install
373. in pipe material shall be as shown on the Plans Where a particular pipe material is not designated on the Plans for sewer force main construction and sewer force mains are installed in slurry cement backfill as shown on the Plans sewer force mains may be either PVC pipe or DI pipe at the Contractor s option except where thrust restraint is accomplished by the use of restrained joints Where thrust restraint is accomplished by the use of restrained joints sewer force mains shall be DI pipe Where a particular pipe material is not designated on the Plans for sewer force main construction and sewer force mains are not installed in slurry cement backfill as shown on the Plans sewer force mains shall be DI pipe All pipe fittings for sewer force mains shall be DI fittings conforming to the requirements of AWWA C110 for Class 250 65 2 1 PVC Pipe PVC pipe for sewer force mains in sizes from 4 through 12 inches in diameter shall be Class 150 conforming to the requirements of AWWA C900 for DR18 PVC pipe for sewer force mains in sizes from 14 through 36 inches in diameter shall be PR 165 conforming to the requirements of AWWA C905 for DR 25 Pipe joints shall be integral bell and spigot gasketed joints conforming to the requirements of ASTM D 3139 with an elastomeric seal gasket conforming to the requirements of ASTM F 477 unless otherwise shown on the Plans or specified in these specifications or the Contract Specifications The pipe shall
374. in the Contract Specifications pipes for sanitary sewer mains fittings and building and house branches services shall be polyvinyl chloride PVC as specified herein PVC pipe shall conform to the provisions in the ASTM Standard Specifications tabulated below for the standard dimension ratio SDR or pipe stiffness PS designation given and these specifications Pipe Size Inches ASTM SDR or PS 4 15 D3034 SDR 35 18 30 F679 PS 115 PVC pipe and fittings shall be manufactured of PVC compound containing not more than 10 parts per 100 by weight of additives and fillers including but not limited to stabilizers antioxidants lubricants and colorants PVC pipe and fittings for sanitary sewers and sewer services shall be green in color Chemical Resistance PVC pipe shall have the properties in the following table when tested before and after exposure to certain chemical solutions as specified in the American Public Works Association Standard Specifications for Public Works Construction Greenbook Section 207 15 3 as amended ASTM Test Allowable Change ee oc 112 Days Exposure Minimum Yield Soran psi D 0 0 No Reduction Impact Strength Ft Ibs in D 256 Method A Notch Min Size x x 2 0 Reduction Weight Change Unconditioned Conditioned PVC Pipe shall be clearly marked as follows at intervals of five feet or less Manufacturer s name or trad
375. include furnishing and installing the hydrant assembly pipe fittings structures break off fittings bury extensions gate valve and valve box furnishing City of Clovis Standard Specifications 2009 197 installing protection posts where required excavation backfill and compaction returning and adjusting valve box to final grade following trench surface restoration street or alley construction or reconstruction testing sterilization water and all incidentals Unless otherwise indicated in the Contract Specifications the cost of furnishing and installing any wet tap required for the hydrant shall be included in the unit price bid for fire hydrants complete The unit price bid per each for water service lines shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as set forth in the Specifications and as directed by the Engineer This shall include furnishing and installing the service pipe appurtenances including all taps fittings stops saddles spacers meter box lid trenching backfilling compacting testing sterilization water adjusting meter box to finish sidewalk grade and all incidentals The unit price bid per each for fire service lines complete shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work
376. ine except for user service lines within the distribution system in accordance with Section 64551 70 proposed Water Works Standards RATED WORKING WATER PRESSURE A pipe classification system based on internal working pressure of the fluid in the pipe type of pipe material and the thickness of the pipe wall SANITARY SEWER MAIN A gravity sewer conveying untreated municipal wastewater SEWAGE FORCE MAIN A pressurized sewer conveying untreated municipal wastewater APPLICABILITY Note that the construction criteria presented in this document apply to house laterals that cross above a water main but not to those house laterals that cross below a water main Water mains or non potable pipelines that are 24 inches in diameter or larger may pose a higher degree of public health concern because of the large volumes of flow involved Therefor installation of water mains or non potable pipelines 24 City of Clovis Standard Specifications 2009 318 inches in diameter or larger should be reviewed approved in writing by the Department on a case by case basis prior to construction In no case should water mains and non potable pipelines conveying sewage or other liquids be installed in the same trench City of Clovis Standard Specifications 2009 319 April 14 2003 Revised October 16 2003 Page 3 of 11 Guidance Memo No 2003 02 REGULATORY REQUIREMENTS Any new development project in which all the undergro
377. ing the soil shall not be worked when the moisture content is so great that excessive compaction will occur nor when it is so dry that dust will form or that clods will not break readily Water shall be applied as necessary to provide ideal moisture for filling and for planting as herein specified and for control of dust in accordance with Section 10 Dust Control In addition to the clearing and grubbing requirements all areas specified for landscape planting of any kind shall be ripped to a depth of 8 inches to 12 inches so the soil is loose and friable In areas to receive turf the top 3 inches of the surface soil shall be cleared of all concrete stones asphalt concrete roots wire sticks and any other debris larger than 1inch in greatest dimension The Contractor shall dispose of all debris in accordance with Section 5 12 Disposal of Material Outside the Right of Way After the area designated to receive landscape planting is rough graded to the lines and grades as shown on the plans ripped and cleared of debris and unless otherwise noted in the Plans or Contract Specifications the Contractor shall amend the soil by using the methods of either Option 1 or Option 2 below The Contractor shall notify the City Engineering Inspector who will observe the preparation application of soil amendment Unless otherwise specified in the Contract Specifications areas designated on the plans to receive tree planting only and no other l
378. ing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as specified in the Specifications and as directed by the Engineer This shall include clearing and grubbing furnishing and installing all equipment such as conduits pull tape tracer wire pull boxes cabinets sensors wiring electric service excavation backfill and compaction testing adjusting guaranteeing and all incidentals City of Clovis Standard Specifications 2009 264 SECTION 84 TRAFFIC STRIPES SIGNS AND PAVEMENT MARKINGS 84 1 General This work shall consist of furnishing and installing thermoplastic or painted traffic stripes traffic lines traffic signs and pavement markings including glass beads at the locations and in accordance with the details shown on the Plans as specified in the Specifications or as directed by the Engineer For the purposes of these Standard Specifications traffic stripes traffic lines are defined as longitudinal centerlines and lanelines which separate traffic lanes in the same or opposing direction of travel and longitudinal edgelines which mark the edge of the traveled way or the edge of lanes or longitudinal lines which mark bicycle lanes Pavement markings are defined as transverse markings which include but are not limited to word and symbol markings limit lines stoplines crosswalk lines bicycle lane markings shoulder markings and parking stall m
379. ing bushings by means of split bolt or approved C tap connectors This grounding conductor shall be extended and attached to the grounding point within the service pedestal the controller cabinet and to each signal and lighting standard If a stranded No 8 AWG bonding jumper is used to bond the signal and lighting standards it shall be connected to the standard using a ring terminal crimp connector of the correct size To bond PPB posts a solid No 8 AWG bonding jumper shall be connected between the leveling nuts on all anchor bolts and the PPB post and run to the bonding wire in the adjacent pull box Grounding jumpers shall be visible after cap has been poured on foundation Grounding jumpers shall be attached by a 3 16 inch or larger brass bolt in the signal standard or controller cabinet and shall be run to the ground rod or bonding wire in adjacent pull box 86 20 Service Service shall conform to the provisions in Section 86 2 11 Service of the State Standard Specifications and these Standard Specifications The service shall be 120 volts for signal circuit and 120 volts for safety and street lighting circuit See the Plans and Contract Specifications 86 21 Service Equipment Enclosure A service equipment enclosure shall be installed as shown on the Plans and stated in these Standard Specifications Enclosure shall meet the requirements of the servicing utility and shall conform to the provisions in Section 86 1 02 Regu
380. ints shall be 7 5 lineal feet No patching at expansion joints will be permitted Removal of portions of asphalt concrete shall done as indicated in the Plans or Contract Specifications Where existing house foundations and floor slabs overlap into the project area the whole foundation shall be removed The portion beyond and outside the project area will be considered within the project area and included in the bid price of clearing and grubbing Existing manholes drain wells drainage structures structures and headwalls to be abandoned shall be removed in accordance with Section 15 Removing Existing Facilities If no contract item is provided therefor removal shall be considered as Clearing and Grubbing City of Clovis Standard Specifications 2009 105 All traffic signs and street signs within the limits to be cleared grubbed shall be considered as Miscellaneous Facilities and if required shall be removed salvaged and stockpiled in accordance with Section 15 2 Miscellaneous Facilities of said Section 15 16 4 Removal And Disposal Of Materials All materials removed and not otherwise specified to be salvaged or reused in the work shall be lawfully disposed of by the Contractor at disposal sites outside the right of way in conformance with Section 5 12 Disposal Of Material Outside The Right Of Way All existing materials that are designated to be salvaged shall be removed cleaned and hauled to the
381. inuous output provided for signal controllers and modems Standby output provided for signals in flash mode operation optional delay timer available for short term battery run under full cycling operation C Up to the maximum rating the Traffic UPS shall be capable of running any combination of signal heads whether Incandescent LED or Neon by any manufacturer regardless of power factor without overdriving the poorer power factor LED heads which may cause early degradation low luminosity or early signal failure D Upon loss of utility power the Traffic UPS shall insert battery power into the system via a supplied Power Interface Module PIM In case of UPS failure and or battery depletion the PIM will ensure that the UPS will drop out and upon return of utility power the traffic control system will default to normal operating mode E The Power Interface Module PIM shall enable removal and replacement of the Traffic UPS without shutting down the traffic control system i e hot swap capability Connectors shall be equipped with a safety interlock feature F For 170 or California style cabinets upon loss of power the Traffic UPS shall actuate the existing Flash Transfer Relays FTRs and Mercury Contactor MC to force the traffic control system into Flash Mode operation Existing Flasher Modules and Flash Transfer Relays shall be utilized To facilitate emergency crews and police activities the Traffic UPS shall be compati
382. ion and has not completed the work that is to be inspected or made an effort to do so the Contractor will be billed for the cost of the inspection and must remit the cost prior to final approval and inspection of the work 21 12 Maintenance Period A ninety 90 day maintenance period will be required for all irrigation systems This maintenance period will run concurrently with the landscape planting maintenance period in accordance with Section 20 8 Maintenance Period All of the applicable terms and conditions of said Section 20 8 as they apply to the conduct of the maintenance period shall also apply to this Section 21 12 The maintenance period for landscape irrigation systems shall begin after all landscape construction activities have been completed all approved equipment and improvements have been installed and upon receiving written approval by the Engineer to commence the maintenance period The Contractor shall continuously maintain and provide all necessary repairs until a written notice of final acceptance for maintenance is received from the City The Contractor shall have the charge and care thereof and shall bear the risk of injury or damage to any part thereof by the action of the elements or from any other cause not the fault of the City The Contractor shall rebuild repair restore and make good all injuries or damages to any portion of the work before final acceptance for maintenance 21 13 Completion Upon completion
383. ion wires shall be a minimum of 7 gauge coil spring steel of good commercial quality Tie wires and hog rings shall be at least 9 gauge steel Post clips shall be at least 6 gauge steel Tension wires tie wires post clips and City of Clovis Standard Specifications 2009 219 hog rings shall be galvanized accordance with the provisions of ASTM Specification Designation A116 Coating Class 3 3 Wire Strands for Extensions Wire strands for extensions shall be 9 gauge 3 8 mm diameter galvanized steel of a good commercial quality Three strands shall be installed where extensions are called for on the Plans 80 2 3 Gates Drive gates may be single or double and shall be of the widths designated on the Plans and the Contract Pay Item Walk gates shall be 4 feet wide Gates shall be constructed in accordance with the Standard Drawings Gate frames shall be constructed of not less than 1 1 2 inch inside diameter galvanized standard weight pipe conforming to ASTM Specification Designation A120 Gate frames shall be cross trussed with 3 8 inch diameter adjustable truss rods The adjuster shall be provided with flat and lock washers and shall be double nutted to lock the adjuster The corners of gate frames shall be fastened together and reinforced with a malleable iron fitting designed for the purpose or they may be welded and regalvanized as provided herein All abraded and damaged galvanized surfaces or welded areas shall be reg
384. ions including any remaining shrubs vines weeds or any other unwanted growth shall be removed Unless otherwise directed by the Engineer areas to be cut or to receive fill shall have the topsoil stripped and stockpiled before grading operations begin in accordance with Section 19 2 06 Selected Material Areas to be filled shall be sufficiently compacted to prevent settlement when watered After completion of the grading operations the topsoil is to be replaced in areas to receive landscape planting Excess topsoil shall be disposed of in accordance with Section 5 12 Disposal of Material Outside the Right of Way Topsoil or other fill imported to the site if needed shall be classified as Imported Borrow accordance with Section 19 4 02 Imported Borrow and paid for at the contract unit price therefor unless otherwise specified in the Contract Specifications The cost of Rough Grading shall be included in the unit or lump sum price bid therefor which shall include all work equipment and incidentals required for clearing of material not removed as clearing and grubbing discing stripping storing and moving topsoil as required grading including cut and fill operations as required watering for dust control application of City of Clovis Standard Specifications 2009 129 weed control all other work and incidentals required to bring the site to lines and grades shown on the plans New or pre existing media
385. ior to acceptance by the Engineer the Contractor shall furnish an Operations and Service Manual to the Engineer Information contained in the manual shall consist of 8 1 2 inch x 11 inch size catalog data on each item together with parts lists description of operation maintenance information shop drawings wiring diagrams and test reports as installed Catalogs and data in the manuals shall be neat clean copies Drawings shall be accordion folded to letter size and installed in an envelope within the manual An index shall be provided which shall list all contents in an orderly manner with the respective equipment supplier s name address and telephone number the manufacturer s recommended servicing instructions Diagrams shall be complete for each system installed Provide divider sheets with identifying tabs between each category 83 19 Measurement And Payment Lights Unless otherwise specified in the Contract Specifications lights will be measured and paid for on an each basis which shall include the furnishing and installing the light fixture complete with foundation lenses bulbs internal wiring and all other appurtenances thereto Electrical System Unless otherwise specified in the Contract Specifications lighting electrical systems will be measured and paid for on a lump sum basis for the entire system complete in every detail The lump sum price paid for the electrical system shall include full compensation for furnish
386. ipment Specifications dated March 29 2002 This program module shall be fully loaded with proms as specified by Caltrans All Microprocessor Units MPU furnished in the Model 170E controller and the Model 412C Program Module shall properly execute existing object programs developed to operate with a Motorola 6800 or 6802 MPU This equipment will be subject to testing and inspection at the City of Fresno test facilities The Model 170E controller will be tested to 160 F and must pass the CALTRANS Diagnostic and Acceptance Test Program Ver 2 4 11 dated September 1999 The Model 412C Program Module shall be fully populated The U1 Eprom shall be unprogrammed blank 3 All controller programming software shall be provided by the City 4 Each controller shall be capable of passing the Self Evaluation Program developed by the State of California Department of Transportation City of Clovis Standard Specifications 2009 294 5 All controllers supplied shall comply with State Law AB3418 requiring compatibility with NTCIP data protocol 6 Controller shall be supplied by companies on the latest issue of the approved Qualified Products List QPL The Contractor shall arrange for the controller controller components and the controller cabinet to be delivered to the City of Fresno Traffic Signal Maintenance Shop 2101 G Street Fresno CA 93706 After testing by the City of Fresno the Contractor shall pick up the controller cabinet s Co
387. is California 93612 All proposals must give the unit price where indicated or lump sum where unit prices are not called for for each of the items Proposals are to be filled out completely and must be signed by the bidder all as indicated on the proposal form The Bid Proposal Form includes the following documents all of which are to be completed in all respects and submitted as a complete package Bid Proposal Bid Summary Bidder s Information Subcontractors List Noncollusion Declaration and Bid Security Depending on the nature of the project other documents may be included by the City and shall be completed in all respects and submitted by the bidder with the Bid Proposal Form or as otherwise indicated by the City All proposals must be submitted under sealed cover 2 4 Quantities The estimates of the quantities of work to be performed and materials to be furnished given in the Notice Inviting Bids Bid Proposal and in the Contract Specifications are approximate only being given as a basis for the comparison of bids The City does not expressly or by implication agree that the actual amount of work will correspond therewith but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work that may be deemed necessary or expedient by the City Engineer Reference is made to Section 4 10 Changes regarding changes to quantities 2 5 Unit Or Lump Sum Prices The unit or l
388. is as normal in trench pipe as set forth in these Specifications for the particular type of pipe to be installed City of Clovis Standard Specifications 2009 208 SECTION 69 BLANK City of Clovis Standard Specifications 2009 209 SECTION 70 MISCELLANEOUS STREET IMPROVEMENTS 70 1 General This work shall consist of constructing or reconstruction of miscellaneous street improvements including relocation of mail boxes signs fences or walls witnessing and resetting survey monuments lowering and adjusting existing facilities to finish grade removal and replacement of connecting driveways drive approaches and other connecting facilities all as shown on the Plans and applicable Standard Drawings as specified in the Specifications and as directed by the Engineer 70 2 Survey Monuments The Contractor shall comply with the provisions in Section 5 14 Construction Surveying Staking Survey monument wells to replace known monuments to be damaged or destroyed by the work shall be furnished and installed at the locations shown on the Plans and as directed by the Engineer The survey monument well shall be furnished and constructed in conformance with the applicable Standard Drawings The Contractor shall retain a licensed land surveyor to survey and reset said monument and furnish and install the well and appurtenances All known monuments corners or other survey markers to be disturbed by the work shall be tied by temporary
389. is intent to proceed with subsystem testing forty eight 48 hours prior to commencement of each test Installation documentation and test results shall be provided for all material equipment and cable prior to commencement of accepted tests Installation documentation shall be in accordance with these special provisions and shall include the following as appropriate Model part number and serial number for all material and equipment Test equipment model number serial number settings and date of last calibration All strap and switch settings Records of all adjustments and levels Alignment measurements Identification of interconnections All factory laboratory and site test results E Data Link Testing The data link testing shall be conducted after the Contractor submits a test plan and receives approval from the Engineer based on these special provisions plans and the manufacturer recommended test procedures for the equipment involved Measurements shall be made from the baseband in to baseband out connections data communications link shall include a data transmitter data receiver interconnecting optical fiber connectors and power supplies The data link is to provide point to point transmission and reception of a full motion NTSC baseband signal using an optical fiber as the transmission medium Each data link in the communications system shall be tested with a data test signal at the transmitter input The Contractor
390. is necessary for completion of installation Thrust blocks shall be installed as recommended by the pipe manufacturer or as shown on the detail drawings All mainline and lateral PVC pipe traversing paved concrete or hardscape areas is to be installed in galvanized iron pipe sleeves that are at least 2 inches in diameter larger than the pipe within the sleeve Galvanized iron pipe for electrical wires traversing such areas shall allow a generous amount of room for the wires present or to be installed and for pulling additional wire in the future 10 Joining of Pipe It is the responsibility of the Contractor to be familiar with any and all methods of assembling joining and installation of the various types of pipe to be used The Contractor shall strictly adhere to recommendations in the manufacturer s guide If during any phase of the work the Contractor or any of the workers are not familiar with the recommended procedures the Contractor shall arrange with the manufacturer of the particular product for the services of a qualified manufacturer s representative to instruct the workers in the proper recommended procedures 11 Plastic Pipe The Contractor shall exercise care in handling loading unloading and storing plastic pipe and fittings All plastic pipe and fittings shall be stored under a weatherproof roofed structure before using and shall be transported in a vehicle with a bed long enough to allow the length of pipe to lie flat so
391. it At the pull box not containing the probe lead in and the DLC cables the excess pull rope shall be of sufficient length to reach back across the roadway to the opposite side pull box City of Clovis Standard Specifications 2009 293 6 Probe lead in conductors shall be continuous without splices from probe to adjacent pull box Excess probe lead in conductor slack shall not be cut or removed Probe and lead in conductors shall not be megger tested 7 Supply and install Type C lead in cable from the pull box adjacent to the probes to the field terminals in the 332 controller cabinet Within the controller cabinet identify and tag each DLC cable with the loop assignment designation shown on the plans The cable shall be the same type specified for inductive loop detectors Within the detector lead in cable the conductor with the white insulation shall always be installed above the conductor with the black insulation for each phase on the terminal strip within the controller cabinet Cable shall be continuous without splices from pull box adjacent to probe to controller cabinet 8 Splices in pull box adjacent to probes shall be in line splices and soldered using Rosen Core solder No open flame soldering shall be allowed 9 The Contractor shall insulate splices as stated in the State Standard Specifications Section 86 2 09E Splice Insulation and Section 86 38 Loop Detector Installation Procedure of these Specifications The
392. ith monitor status and automatically synchronize the Monitor clock and calendar The Model 332A cabinet shall be lockable and shall include the following components Model No 200 Switch Packs Model No 222 2 Channel Loop Detector Amplifiers Model No 232 2 Channel Magnetic Probe Detector Amplifiers Model No 242 2 Channel DC Isolators Model No 752 Emergency Vehicle Preemption Discriminator s Refer to the Project Plans to determine the quantity of each component to be supplied The Model 332A controller cabinet shall contain the power supply PDA 2 two Model 204 flashers all necessary relays the Conflict Monitor a red interface adaptor a thermostatically controlled exhaust fan a door switch operated fluorescent light a slide out shelf drawer storage unit and four anchor bolts City of Clovis Standard Specifications 2009 297 All crimp type connectors between the Lower Input Panel and the Input File shall be soldered All 15 amp and 20 amp circuit breakers shall be short delay For example Potter and Brumfield Curve 3 or Carling switch Delay 22 The locking system shall be a Corbin 3 point system The lock shall be a Corbin 2 keyed alike to be compatible with the controller cabinet locks currently in use throughout the City of Clovis The Model No 231 sensing element shall be compatible with the Model No 232 2 channel magnetic detector amplifier M Systems Model No 231 sensing elements probes are approved
393. ithstand twenty five 25 cycles of mechanical flexing at a rate of 30 1 Cycles minute The average increase in attenuation for the fibers shall be lt 0 10 dB at 1550 nm single mode at the completion of the test Outer cable jacket cracking or splitting observed under 10X magnification shall constitute failure The test shall be conducted in accordance with EIA 455 104A Fiber Optic Cable Cyclic Flexing Test except that the sheave diameter shall be a maximum diameter of 20X and the cable OD The cable shall be tested in accordance with the Test Conditions 1 and IIl of the EIA 455 The cable shall withstand a tensile load of 2700 N 272 16 kg without exhibiting an average increase in attenuation of greater than 0 10 dB single mode The test shall be conducted in accordance with EIA 455 33 Fiber Optic Cable Tensile Loading City of Clovis Standard Specifications 2009 238 Bending Test using a maximum mandrel sheath diameter of 560 mm The load shall be applied for one 1 hour in Test Condition II of the EIA 455 procedure Quality Assurance All optical fibers shall be proof tested by the fiber optic cable manufacturer at a minimum load of 3 500 kg mm2 Documentation of factory results shall be provided to the Engineer prior to shipping All optical fibers shall be attenuation tested by the manufacturer in conformance with Section 82 18 Fiber Optic Testing The attenuation of each fiber shall be provide
394. ities Potholing The Contractor will be responsible for locating all underground utilities The depth of the drainage hole shall be determined as follows a The hole must penetrate through and beyond the underlying paving material or hardpan soil stratum All paving material or hardpan shall be removed from the drilled hole b The hole shall be drilled to a depth where visual evidence of the subsurface sand or gravel drainage stratum is apparent c If no sand or gravel drainage stratum is apparent the drainage hole shall be drilled to a minimum of 10 feet deep City of Clovis Standard Specifications 2009 142 After drilling the drainage hole shall be backfilled with sandy soil placed 2 foot lifts Each lift shall be thoroughly watered Repeat the process until the drainage hole is completely backfilled 20 6 02 B Tree Transplanting Hole The transplanting hole shall be excavated to the depth of the bottom of the anticipated spaded root ball and to a diameter so as to create a planting hole extending 3 feet on all sides beyond the spaded rootball Excavated material removed from the hole shall be set aside for later backfill If different layers of soil exist each stratum shall be kept separate for replacement at the same level during backfill Any loose hardpan shall be removed from material excavated from the hole City of Clovis Standard Specifications 2009 143 20 6 03 Tree Preparation 20 6 03 A Root
395. itored for 4 hours to determine whether the drilling lubricant congeals bentonite will usually harden effectively sealing the frac out location 3 If the drilling lubricant congeals no other actions shall be taken that would potentially suspend sediments in the water column 4 Surface releases of bentonite shall be allowed to harden and then shall be removed City of Clovis Standard Specifications 2009 207 5 contingency plan shall identify additional measures to be taken to contain remove the drilling lubricant if it does not congeal 68 8 Backfill Compaction Restoration Of Surfaces Jacking and receiving pits shall be backfilled and compacted and the surface restored in accordance with Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration 68 9 Measurement Measurement for steel casing pipe jacked into place shall be by the lineal foot of casing pipe jacked into place as shown on the Plans or directed by the Engineer Measurement for reinforced concrete pipe with rubber gasket joints without steel casing jacked into place shall be by the lineal foot of pipe jacked into place as shown on the Plans or directed by the Engineer Where carrier pipe is indicated on the Plans to be placed within a jacked casing pipe carrier pipe will be measured by the lineal foot of pipe installed 68 10 Payment The unit price bid per lineal foot for steel casing pipe jacked into p
396. ity of Clovis Standard Specifications 2009 25 SECTION 5 CONTROL WORK 5 1 Authority Of The Engineer The Engineer shall decide all questions which may arise as to the quality or acceptability of materials furnished and work performed and as to the manner of performance and rate or progress of the work all questions which may arise as to the interpretation of the Plans and Specifications all questions as to the acceptable fulfillment of the Contract on the part of the Contractor and all questions as to compensation including any claims and change orders under Section 4 10 Changes Section 4 12 Notices Change Orders and Claims and Section 9 5 Payment for Extra Work The Engineer s decision shall be final and binding upon the Contractor The Engineer shall also have the authority to enforce and make effective such decisions and orders which the Contractor fails to carry out promptly In accordance with Section 5 17 Inspection during Construction the Engineer will delegate authority to representative inspectors to assure compliance with Plans and Specifications 5 2 Standards The Engineer shall establish such standards as may be necessary for the proper construction of a finished product In the absence of specific standards recognized standards of construction or approved practices shall govern the work 5 3 Contractor s Responsibility For The Work Except as specifically provided in these Standard Spec
397. ity policy to encourage the employment and training of apprentices on public works contracts as may be permitted under local apprenticeship standards 7 2 G Workers Compensation Pursuant to the requirements in Section 1860 of the Labor Code the Contractor will be required to secure the payment of workers compensation to the Contractor s employees in conformance with the requirements in Section 3700 of the Labor Code and in accordance with the provisions of Section 7 4 Contractors Insurance Requirements And Hold Harmless 7 2 H Suits To Recover Penalties And Forfeitures The Contractor is subject to Sections 1730 to 1733 inclusive of the Labor Code concerning suits to recover amounts withheld from payment for failure to comply with requirements of the Labor Code or contract provisions based on those laws Those sections provide that a suit on the Contract for alleged breach thereof in not making the payment is the exclusive remedy of the Contractor or the Contractor s assignees with reference to amounts withheld for those penalties or forfeitures and that the suit must be commenced and actual notice thereof received by the awarding authority prior to 90 days after completion of the contract and the formal acceptance of the job Submission of a claim pursuant to Section 9 10 Final Payment for the amounts withheld from payment for those penalties and forfeitures is not a prerequisite for those suits and these claims will not be conside
398. iven into the root ball Stake tops shall be below crown of the tree 20 3 07 Mulching Where mulching of tree watering basins is shown on the Plans or specified in the Contract Specifications Walk on Bark mulch shall be applied as top dressing in accordance with the Standard Drawing for Tree Planting Trunks of trees shall not be engulfed with mulch For trees located in turf areas a 24 inch diameter grass free area shall be provided around each tree Mulch shall be omitted for these locations 20 3 08 Tree Establishment Period The Tree Establishment Period is the time required for newly planted trees to exhibit an initial healthy and robust appearance absent of wilting or other signs of stress as determined by the Engineer The Tree Establishment Period shall commence immediately upon planting and shall continue until the commencement of the maintenance period specified in Section 20 8 Maintenance Period The maintenance period will not be permitted to commence until all trees have met the requirements of the tree establishment period During the tree establishment period as well as the maintenance period all watering basins around trees shall be maintained at a depth of 3 inches Watering shall occur at intervals adequate to promote healthy root and plant growth Trees are to be maintained in their natural shapes Branches shall be thinned out where necessary In no case shall trees be pruned by heading or topping Any plants severely
399. ives subcontractors or any other person required to be exposed to such hazard in the performance of the work inspection of the work or any other reason Payment for worker protection from caving ground in excavations during construction shall be made at the price bid therefor no additional payment will be made Payment shall include all materials labor and equipment necessary to adequately brace shore shield or slope all excavations and trenches as required by and the Division of Occupational Safety and Health Title 8 Construction Safety Orders Also included are any costs incurred by the Contractor in obtaining all required OSHA permits and preparing a detailed plan showing the design of shoring bracing sloping or other provisions to be made for worker protection as required by State Labor Code Section 6705 If the bid item therefor is based on a lump sum amount payment will be pro rated on the basis of the ratio of completed length of trench or other excavation requiring Worker Protection to the total length of trench or other excavation requiring Worker Protection 7 16 Injury Or Damage To Persons Or Property Reference is made to Section 5 3 Contractor s Responsibility For The Work Section 5 9 Preservation of Property Section 7 4 Contractors Insurance Requirements and Hold Harmless and Section 7 16 Injury or Damage to Persons or Property Neither the City Council the Engineer nor any other officer author
400. ized agent employee or volunteer shall be personally responsible for any liability arising under the Contract The Contractor shall indemnify and save harmless the City the City Council the Engineer and all City Officers Employees agents and volunteers from any suits claims damages losses liability City of Clovis Standard Specifications 2009 60 demands or actions brought by person or persons for or on account of injuries or damage sustained in or arising out of the construction of the Work or in consequence thereof The City Council may retain as much of the money due the Contractor as shall be considered necessary until disposition has been made of such suits or claims for damages as aforesaid If either party to the Contract suffers injury or damage to person or property because of an act or omission of the other party any of the other party s employees or agents or others for whose acts such party is legally liable written notice of such injury or damage whether or not insured shall be given to the other party within a reasonable time not exceeding ten 10 days after first observance The notice shall provide sufficient detail to enable the other party to investigate the matter If a Claim for additional cost or time related to this Claim is to be asserted it shall be made as provided in Section 4 12 Notices Change Orders and Claims 7 17 Public Convenience This Section 7 17 defines the Contractor s res
401. ized by the Engineer which affect the requirements and information given on the approved plans shall be in writing No changes shall be made in any plan or drawing after the same has been approved by the Engineer except by direction of the Engineer During the course of the work if the Contractor discovers any discrepancies between the Plans and the conditions in the field or any errors or omissions on the Plans or in the Specifications which will significantly affect the work it shall be the Contractor s duty to inform the Engineer immediately in writing and the Engineer shall promptly verify the same Any work done after such discovery until authorized will be done at the Contractor s risk City of Clovis Standard Specifications 2009 12 4 2 Coordination Interpretation And Precedence Of Plans And Specifications The Plans Specifications and all supplementary documents are essential parts of the Contract and a requirement occurring in one is as binding as though occurring in all They are intended to be cooperative to describe and to provide for a complete work City of Clovis Standard Specifications 2009 13 Whenever conflict appears in portions of the Contract it shall be resolved by application of the order of precedence given below unless the Engineer shall order otherwise Change Orders and Supplemental Agreements Agreement Pre bid Addenda Contract Specifications Contract Construction Plans or D
402. justification for granting additional working days but shall be evidence of proceeding to completion in good faith The Contractor shall furnish a maintenance manual for all controller units and auxiliary equipment The maintenance manual and operation manual may be combined into one manual The maintenance manual or combined maintenance and operation manual shall be submitted at the time the controllers are delivered for testing or if ordered by the Engineer previous to purchase The maintenance manual shall include but need not be limited to the following items 1 Specifications City of Clovis Standard Specifications 2009 271 Design Characteristics General Operation Theory Function of All Controls Trouble Shooting Procedure Diagnostic Routine Block Circuit Diagram Geographical Layout of Components Schematic Diagrams List of Replaceable Component Parts with Stock Numbers CHONOOARWN 86 6 Order Of Work Order of work shall conform to the provisions in Section 5 1 05 Order of Work of the State Standard Specifications and these Standard Specifications First Stage Construction This stage of construction shall consist of doing all underground signal and lighting work The underground work consists of the installation of all conduit including service conduit pull boxes signal and luminaire bases including P P B bases controller base service cabinet and base loop detectors magnetic vehicle detectors and con
403. l and dispose of them away from the premises 81 6 Measurement Measurement for concrete masonry wall will be by the lineal foot of concrete masonry wall installed as shown on the Plans to be determined by the Engineer from actual measurement 81 7 Payment When the Contract does not include a pay item for clearing and grubbing or excavation and preparation of subgrade as specified in this Section 81 and unless otherwise provided in the Contract Specifications full compensation for any necessary clearing and grubbing and any excavation and preparation of subgrade required to prepare the subgrade and pad for the wall foundation as shown on the Plans or directed by the Engineer shall be considered as included in the price bid for concrete masonry wall and no separate payment will be made therefor Payment for Concrete Masonry Wall shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as set forth in the Specifications and as directed by the Engineer This shall include clearing and preparing the wall pad and subgrade where no separate item is City of Clovis Standard Specifications 2009 226 provided therefor constructing pilasters and concrete footings furnishing placing reinforcing steel concrete block mortar and grout and all incidentals City of Clovis Standard Specifications 2009 227 SECTION 82
404. l Code Article 2 Traffic Administration and California Vehicle Code CVC Section 23114 as it relates to covering spillage and other requirements All references to highway in the CVC shall mean City streets as well as State highways City of Clovis Standard Specifications 2009 42 SECTION 7 LEGAL RELATIONS AND RESPONSIBILITY 7 1 Laws To Be Observed The Contractor shall be and remain fully informed of all existing and future State and Federal laws City and County ordinances and regulations and revisions thereto that in any way affect those engaged or employed in or on the work or in any way affect the conduct of the work and of all orders or decrees of governmental or other bodies or officials having jurisdiction or authority over the same The Contractor and all subcontractors persons firms or corporations employed by or under the control of the Contractor shall at all times observe and comply with all such laws ordinances and regulations orders and decrees The Contractor shall protect and indemnify the City and its officers employees and agents against any claim or liability arising from or based on the violation of any such law ordinance regulation order or decree whether by the Contractor the Contractor s employees subcontractors persons firms or corporations employed by the Contractor If any discrepancy or inconsistency is discovered in the Plans or Specifications for the work in relation to any such law ordi
405. l applicable codes and regulations D Foundations Foundations for light standards shall comply with Section 86 2 03 Foundations of the State Standard Specifications E Pull Boxes Pull boxes shall conform to the provisions in Section 86 16 Pull Boxes except as follows Pull boxes shall be No 5E with extensions unless otherwise noted on plans Pull boxes covers and extensions shall be precast reinforced concrete unless otherwise shown on the Plans Standard Drawings or specified in the Contract Specifications F Cabinets Other Enclosures All cabinets service panels and any other enclosures shall be of the model and type indicated on the Plans Standard Drawings or specified in the Contract Specifications G Conduit Threaded rigid galvanized metal shall be used for all exterior locations above grade or as shown on Plans Rigid conduit shall be new galvanized threaded conforming to UL 6 All couplings and connectors shall be threaded At NEMA locations conduit shall enter boxes through hubs provided or Meyers type hubs All rigid steel conduit installed in contact with the earth will have a factory applied PVC outer covering and be installed with the proper tools according to the manufacturer s specifications PVC Schedule 40 conduit shall be used at underground locations and below vapor barrier of slabs and in solid grouted masonry walls where wall entry and exit points are made with rigid galvanized steel No
406. l consist of constructing chain link fence and gates at locations and in accordance with the details shown on the Plans and Standard Drawings as specified in the Specifications and as directed by the Engineer Concrete mowstrips for fences shall conform to Section 73 Concrete Curbs Sidewalks Surface Improvements The work shall also consist of constructing timber barricades at the locations shown on the Plans and in accordance with the applicable Standard Drawing and the Specifications 80 2 Materials All fence and gate materials shall be new galvanized ferrous materials galvanized material or material upon which serious abrasions of the galvanizing occur shall not be used in the work A certificate of compliance may be required from the manufacturer of all products used in constructing chain link fence and gates including posts and shall be submitted to the Engineer in conformance with Section 6 5 Certificates of Compliance All timber shall be new and first quality 80 2 1 Fence Gate Posts Fence gate and post materials shall comply with the following 1 Height The fence shall stand at a height of 6 feet above the grade indicated on the Plans when erected 2 Fabric Chain link fence and gate fabric shall conform to the specifications of ASTM Designation A392 Class 1 zinc coating The wire used in the manufacture of the fabric shall be 9 gauge and woven into approximately 2 inch mesh The upp
407. l cost of locating the facility will be paid for as extra work as provided in Section 4 11 Extra Work City of Clovis Standard Specifications 2009 75 If the Contractor discovers underground main or trunk lines not indicated the plans or in the Contract Specifications the Contractor shall immediately give the Engineer and the Utility Owner if not the City written notification of the existence of those facilities The main or trunk lines shall be located and protected from damage as directed by the Engineer and the cost of that work will be paid for as extra work as provided in said Section 4 11 The Contractor shall if directed by the Engineer repair any damage which may occur to the main or trunk lines The cost of that repair work not due to the failure of the Contractor to exercise reasonable care will be paid for as extra work as provided in said Section 4 11 Damage due to the Contractor s failure to exercise reasonable care shall be repaired at the Contractor s cost and expense Where it is determined by the Engineer that the rearrangement of an underground facility is essential in order to accommodate the street or underground improvement and the Plans and Specifications do not provide that the facility is to be rearranged the Engineer will provide for the rearrangement of the facility by other forces or the rearrangement shall be performed by the Contractor and will be paid for as extra work as provided in said Section 4
408. l include concrete box culverts Where portions of bridges or culverts are to be removed the removal operations shall be conducted so that there will be the least interference to public traffic using the structure involved When complete bridges or culverts are to be removed removal operations shall not be started until public traffic is no longer routed over the structure to be removed 15 4 02 Removal Methods At least 10 days before beginning bridge or culvert removal the Contractor shall submit to the Engineer details of the removal operations showing the methods and sequence of removal and equipment to be used Traffic control conforming to Section 12 Traffic Control Construction Area Traffic Control Devices and as directed by the Engineer shall be provided Materials that are to be salvaged shall be carefully removed and stockpiled near the site at a location designated by the Engineer Material which is to be used in any specified reconstructed bridge work and has been damaged or destroyed as a result of the Contractor s operations shall be repaired or replaced by the Contractor at the Contractor s expense Piling piers abutments and pedestals shall be removed to at least one foot below ground line or three feet below finished grade whichever is lower Where portions of a bridge or culvert are to be removed the removal operations shall be performed without damage to any portion of the structure that is to remain in place
409. l of other losses shall be calculated by summing the individual attenuation values for each component in the link not previously addressed These items may include but are not limited to couplers splitters routers and switches The Total System Loss shall be recorded on the Link Loss Budget Worksheet Test Failures If during any of these system verification tests the results prove to be unsatisfactory the fiber optic cable and or defective splice enclosures will not be accepted The unsatisfactory components shall be replaced at the Contractor s expense The new segment of cable shall undergo the same testing procedure to determine acceptability Copies of the test results shall be submitted to the Engineer for approval The removal and replacement of a segment of cable shall be interrupted as the removal and replacement of a single contiguous length of cable connecting two 2 splices two 2 connectors or a splice and a connector The removal of only one small section containing the failure and therefor introducing new unplanned splices will not be allowed All costs for fiber optic testing shall be included in and incidental to the bid cost for the item tested There will be no additional payments for testing of any project component or service City of Clovis Standard Specifications 2009 243 82 26 G System Testing And Documentation A Description The system testing and documentation shall cover pre installation testing subsyste
410. l or cylindrical wire brush of appropriate and approved size through the conduit and then the conduit shall be blown out with compressed air When required by the engineer the ends of conduits containing no conductors shall be threaded and shall be capped using standard pipe caps or pennies to protect the raceway against dirt and concrete until wiring is installed 86 16 Pull Boxes Pull boxes shall be of the type or model shown on the Plans and conforming to the provisions in Section 86 2 06 Pull Boxes of the State Standard Specifications and these Standard Specifications Pull boxes covers and extensions shall be precast reinforced concrete except as shown on plans or in the standard drawings City of Clovis Standard Specifications 2009 277 All pull boxes shall have extensions All pull boxes shall be unless otherwise noted on the Plans Lids for No 6 pull boxes shall be plastic Metal lids on traffic rated pull boxes need not be reinforced Pull boxes housing Signal Interconnect Cable SIC or fiber optic communications facilities at signalized intersections shall be a Christy N48T utility box w two 2 extensions and a 2 piece reinforced concrete lid or approved equal Intermediate pull boxes not located at intersections shall be No 6 or greater When pull box extensions are used grouting shall be placed between pull box and extension A layer of roofing paper shall be wrapped around pull box and extension
411. lace shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as specified in the Specifications and as directed by the Engineer This shall include excavating backfilling and compacting the jacking and receiving pits boring and tunneling furnishing and installing the casing complete with grout fittings furnishing and installing metal shields furnishing and installing skids and tie downs spacers bands grouting and backfill of voids sealing ends of casing and all other incidental work over and above that associated with the normal work of furnishing and installing the carrier pipe in a trench situation The unit price bid per lineal foot for reinforced concrete pipe with rubber gasket joints jacked into place shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as set forth in the Specifications and as directed by the Engineer This shall include but not be limited to excavating backfilling and compacting the jacking and receiving pits boring and tunneling furnishing and installing the pipe complete with grout fittings furnishing and installing metal shields grouting and backfill of voids and all incidentals Carrier pipe to be placed in casing pipe as shown on the Plans will be paid for on a lineal foot bas
412. lations and Code of State Standard Specifications and to Section 86 4 Regulations Codes and Permits of these Standard Specifications Enclosure shall be factory pre wired and tested to meet NEMA standards The Contractor shall secure an electrical service permit from the City of Clovis Building Department prior to installing the service cabinet Service cabinet shall be Tesco 26 100 Type AF Tesco 24 200 UPS or approved equal See City of Clovis Standard Drawing TS 5 The service cabinet shall have an external receptacle for an auxiliary power source Metal work shall be cold rolled sheet steel throughout 12 gauge hot dipped galvanized steel exterior and 14 gage interior Seams shall be welded using the most advanced TIG or MIG method External corners and seams to be ground smooth doors to be padlock able and vandal resistant A padlock shall be furnished by the City of Clovis for the service cabinet City of Clovis Standard Specifications 2009 282 Hinges shall be continuous stainless steel piano type screws rivets or bolts shall be visible outside the enclosure Enclosure shall be constructed to conform to provisions of a Type AF service in accordance with the latest edition of the State Standard Plans Measurement of enclosure to conform to those shown on plans except the height shall be between 36 to 50 Enclosure wiring shall conform to NEMA Class II Wiring troughs shall be provided the encl
413. le provisions in Section 66 Potable Water Distribution Facilities of these Specifications Sterilization of recycled water mains is not required 67 6 Tracer Wire Installation A tracer wire shall be installed with all pipe for recycled water mains Materials and installation shall conform to Sections 66 2 12 Tracer Wire and 66 6 Tracer Wire Installation 67 7 Thrust Block Valve Box Installation Thrust Blocks and Valve Boxes shall be installed in accordance with Section 66 7 Thrust Blocks and 66 8 Valve Box Installation 67 8 Water Service Installation Recycled water service lines including metered service lines where required equipment and appurtenances shall be installed in accordance with the manufacturer s recommendations as shown on the Plans and the Standard Drawings therefor The Contractor shall mark the location of recycled water service lines by putting a RW mark on the curb face Said mark is to be chiseled into existing concrete or stamped in new concrete before it has set 67 9 Hydrostatic Pressure Test Hydrostatic pressure testing shall be performed in accordance with Section 66 12 Hydrostatic Pressure Test 67 10 Measurement Measurement for recycled water main installation and fitting installation shall be by the lineal foot of pipe installed and shall be the actual horizontal length installed measured through fittings Measurement for gate butterfly or other valves s
414. leanup shall be included in the various contract items and no additional payment made therefor 20 8 Maintenance Period Unless otherwise provided in the Contract Specifications a ninety 90 calendar day maintenance period will be required for all landscape planting as specified herein The maintenance period will not be commenced until all work regardless of nature called for in the Plans Contract Specifications and these specifications for Landscape Planting is completed inspected and approved by the Engineer unless otherwise authorized by the City of Clovis Standard Specifications 2009 145 Engineer written notice to commence the maintenance period will be issued to the Contractor by the Engineer Maintenance period work includes at a minimum on a weekly basis all litter pickup and removal watering mowing edging weeding plant replacement mulching cultivating pest and disease control and trimming necessary to bring the planted areas to a healthy growing condition and any additional work including emptying of trash receptacles needed to keep the work site neat and attractive Prior to the final inspection at the conclusion of the maintenance period the Contractor shall apply a pre emergent herbicide at the recommended rate During the maintenance period any plant indicating weakness or probability of dying shall be replaced at the Contractor s expense Constant diligence shall be maintained to prevent disease i
415. lectance minimum 85 50 N A City of Clovis Standard Specifications 2009 VOC gms liter maximum 150 150 150 84 2 2 B Solvent Borne Paint Where shown on the Plans or specified by the Contract Specifications to be applied solvent borne paint shall comply with the following specifications 84 2 3 Glass Beads Color White Yellow Black Pigment by weight 57 62 57 62 57 62 Vehicle by weight 38 42 38 42 38 42 Total Solids by weight minimum 72 72 72 Viscosity K U 77 F 70 85 70 85 70 85 Fineness of Grind Hegman Minimum 4 4 4 Dry time 77 F without beads ASMT D 711 minutes maximum 3 6 3 6 3 6 Flexibility 8 Mils wet 24 hours are dry gt No cracking No cracking No cracking Contrast Ratio 15 Mils wet min 98 98 98 Reflectance minimum 85 50 N A VOC gms liter maximum 150 150 150 Glass beads spheres shall conform to State Specification No 8010 004 Type 1 and meet the following requirements General Glass spheres shall lend themselves readily to firm embedment when dropped on freshly placed waterborne and solvent borne traffic paint Appearance A minimum of 75 of the spheres by count shall be true spheres when testing in accordance with applicable ASTM Methods They also shall be free of air inclusions milkiness and dark spots The spheres shall be clean and free of any foreign material Coatings Spheres
416. led in contact with or adjacent to steel buried in the ground and also at insulated fittings junction shall be wrapped with a minimum of two overlapping layers of specified tape Tape shall follow the contours of the junction and extend 6 inches or more over the steel and over the brass fittings or valve as far as practical e Galvanized steel pipe under a concrete slab 25 Concrete Equipment Pads Concrete pads shall be provided for all irrigation and electrical equipment in locations approved by the City Inspector All pads shall be installed at finished grade and will be a minimum of 3 inches thick All pads shall be installed with the slab extending inch above finish grade All pads shall be sloped to drain to matching drainage patterns at inch per foot Unless otherwise directed by the City Inspector the installer will locate the irrigation controller backflow preventer and electrical service panel on a common pad 21 8 Pressure Test The Contractor shall notify all necessary parties 48 hours prior to pressure testing The Contractor is to center load pipe with small amounts of backfill to prevent arching or slipping of pipe under pressure All solvent welded pipe joints shall be allowed to set at least 24 hours before any pressure testing can be performed All pressure lines shall be tested under hydrostatic pressure of 125 psi after installation The Contractor shall provide all equipment for such tests Pressure tests will
417. less specifically provided for in the contract change order authorizing the use of the cost reduction proposal The amount specified to be paid to the Contractor in the change order which effectuates a cost reduction proposal shall constitute full compensation to the Contractor for the cost reduction proposal and the performance of the work thereof pursuant to the change order The City expressly reserves the right to adopt a cost reduction proposal for general use on contracts administered by the City when it determines that the proposal is suitable for application to other contracts When an accepted cost reduction proposal is adopted for general use only the Contractor who first submitted that proposal will be eligible for compensation pursuant to this section and in that case only as to those contracts awarded to that Contractor prior to submission of the accepted cost reduction proposal and as to which the cost reduction proposal is also submitted and accepted Cost reduction proposals identical or similar to previously submitted proposals will be eligible for consideration and compensation under the provisions of this Section 5 24 if the identical or similar previously submitted proposals were not adopted for general application to other contracts administered by the City Subject to the provisions contained herein the City shall have the right to use all or any part of any submitted cost reduction proposal without obligation or compensation of an
418. lings bells and all incidentals required for a complete and functional conduit system ready to receive installation of cable Single Fiber Optic Cable installations will be paid for a lineal foot basis Multiple Fiber Optic Cable installations will be paid for as specified in the Contract Specifications The unit price paid for Fiber Optic Cable shall include all labor materials equipment and incidentals necessary for a complete cable system splice enclosures pigtail units connectors and all incidentals required for a complete and functional cable system Pullboxes cabinets or other enclosures shall be paid for per each which shall include all costs for furnishing and installing complete assemblies with footings and adjacent slab work as required completing conduit and cable entries and all incidentals necessary for a complete installation Where a bid item is provided therefor testing and documentation of Fiber Optic Cable materials and systems shall be paid for on a lump sum basis which shall include all labor materials testing or other equipment and all necessary incidentals to conduct and complete all testing required by these specifications the Plans or as directed by the Engineer Where no bid item is provided therefor the cost of testing and documentation of Fiber Optic Cable materials and systems shall be included in the price paid for Fiber Optic Cable installation and not paid for separately Where a bid item is provid
419. ll be installed which extends a minimum of 18 inches ahead of the jacked casing or pipe The metal shield shall cover a minimum of the upper 1 2 of the periphery of the jacked casing or pipe Excavation shall not proceed beyond the shield Where ground conditions at the face of the jacking pit are such that sloughing or caving of ground is likely to occur at the face of the excavation upon commencement thereof the face of the pit shall be made stable so that an excessive void is not carried with the face of the excavation for the length of the casing or pipe This may be accomplished by solid sheathing at the portal of the jack or excavating and backfilling the face of the pit with cohesive material Cavities or voids outside the limits specified above regardless of cause shall be backfilled with sand soil cement or cement mortar as provided herein or as directed by the Engineer All casing pipe 24 inches in diameter or larger and all reinforced concrete pipe 24 inches in diameter or larger shall be furnished with preinstalled fittings suitable for attachment to grout pumping equipment Such grout connections unless otherwise indicated on the Plans shall be placed at 30 120 240 and 330 measured clockwise from vertical around the circumference of the casing or pipe and at intervals in each row along the pipe of no greater than 10 feet Alternate bottom holes shall be staggered and alternate top holes shall be staggered so that
420. ll be backfilled with slurry cement conforming to Section 19 3 062 Slurry Cement Backfill of the State Standard Specifications The type of surface restoration for such locations shall be directed by the Engineer City of Clovis Standard Specifications 2009 77 SECTION 9 MEASUREMENT AND PAYMENT 9 1 Measurement Of Quantities A All work to be paid for at a contract price per unit of measurement will be measured by the Engineer in accordance with the U S Customary Units of Measurement A ton shall consist of 2 000 pounds avoirdupois B Quantities of work shall be determined from measurements or dimensions in horizontal planes However linear quantities of pipe piling fencing and timber shall be considered as being the true length measured along the longitudinal axis C Volumetric quantities will be determined by the Engineer and shall be the product of the mean area or vertical or horizontal sections and the intervening horizontal or vertical dimension When payment is to be made on the basis of weight the weighing shall be done on scales furnished by and at the expense of the Contractor or on other sealed scales regularly inspected by the State of California Department of Food amp Agriculture Division of Measurements amp Standards or its designated representative All scales shall be suitable for the purpose intended and shall conform to the Specifications of the State of California Department of Food amp Agric
421. ll be permitted without all traffic control devices in place and operational 86 9 Scheduling Of Work Scheduling of work shall conform to the provisions in Section 86 1 07 Scheduling of Work of the State Standard Specifications and these Standard Specifications The Contractor shall notify the Engineer at least one 1 working day in advance of any electrical work and also at least one 1 working day in advance of any work if any work is done intermittently in order that inspection can be coordinated 86 10 Safety Precautions All electrical work shall conform to the provisions in Section 86 1 08 Safety Precautions of the State Standard Specifications City of Clovis Standard Specifications 2009 273 86 11 Excavating And Backfilling All excavating and backfilling shall conform to the provisions in Section 86 2 01 Excavating and Backfilling of the State Standard Specifications and Sections 8 15 Utility and Non Street Facilities Potholing and 19 3 Trench Structure Excavation Backfill Compaction and Surface Restoration of these Standard Specifications Backfilling shall be placed at a maximum slope of 2 1 the 2 dimension shall be horizontal from all bases pull boxes and other facilities as directed by the Engineer Water shall be capable of draining away from all signal facilities when slope work is completed Backfill for all conduit crossing under pavement shall contain a two 2 sack
422. ll be remedied or removed and replaced by the Contractor in an acceptable manner and no compensation will be allowed for such correction Any work done beyond the lines and grades shown on the Plans or established by the Engineer or any extra work done without written authority will be considered as unauthorized and will not be paid for 5 20 Surface Restoration The Contractor shall replace all graded surface material adjacent and or appurtenant to the work removed disturbed or damaged by the Contractor s operations and shall restore paving curbing sidewalks gutters landscaping fences lawn and other surfaces disturbed to a condition equal to that before the work began or as indicated in the Contract Specifications or Plans and shall furnish all labor and material incidental thereto Where bid items are not provided for each type of restoration full compensation therefor shall be included in the amount bid for the various items of Contract work The Contractor shall comply with the provisions Section 19 3 05 Restoration of Surfaces City of Clovis Standard Specifications 2009 33 5 21 Final Cleanup When construction is completed and prior to application for acceptance of the work the Contractor shall clean all work areas and all grounds occupied by him in connection with the work of all debris excess materials temporary structures and equipment All portions of the work shall be left in a neat presentable condition The r
423. ll be upon the Contractor and the Contractor shall furnish all information necessary as required by the Engineer The Engineer shall be the sole judge as to the quality and suitability of alternative articles or materials and the Engineer s decision shall be final Upon submittal by the Contractor the Engineer will determine the acceptability of the requested substitution which may include such samples and tests as may be required by Section 6 8 Samples and Tests herein In such cases of proving equal status the Contractor shall pay the costs of required testing No time extension to any Contract will be allowed due to any such proposed substitution or the time required to determine the acceptability of such substitutions 6 5 Certificates Of Compliance A Certificate of Compliance stating that the materials to be used in the work comply in all respects with the requirements of the Plans and Specifications shall be supplied to the Engineer upon request or if required to be submitted by the Contract Specifications The certificate shall be signed by the manufacturer of the material or the manufacturer of assembled material delivered to the work and the lot so certified must be clearly identified in the certificate Certificates of Compliance shall be provided in triplicate and shall be submitted to the Engineer for review prior to the use of the product or material in the work All materials used on the basis of a Certificate of Complian
424. ll labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as set forth in the Specifications and as directed by the Engineer This shall include furnishing and installing the service pipe and appurtenances including all taps fittings stops saddles spacers meter box and lid if required trenching backfilling compacting testing adjusting meter box if required to finish sidewalk grade and all incidentals City of Clovis Standard Specifications 2009 202 SECTION 68 JACKING PIPE 68 1 General This work shall consist of furnishing boring and jacking into place at the locations and type of pipe shown on the Plans or specified in the Contract Specifications in accordance with these Standard Specifications and Standard Drawings and as directed by the Engineer Reinforced concrete pipe with rubber gasket joints as a carrier pipe as specified in this Section 68 may be jacked into place directly without a jacked steel casing All other carrier pipe must be installed within a jacked steel casing 68 2 Materials 68 2 1 Steel Casing Pipe Steel casing pipe shall be of the outside diameter OD and minimum wall thickness not less that that shown on the Plans and shall be butt welded of sheets conforming to ASTM A 570 commercial grade or of plate conforming to ASTM A 283 If the Contractor s operations require a greater wall thickness for successful installation of the ste
425. ll length of the pipe When two pipes are to be placed in the same trench a minimum 4 inch space between pipes must be maintained The depth of the trenches shall be sufficient to provide a minimum cover above the top of the pipe as follows a 24 inches minimum over main lines b 18 inches minimum over non pressure rotary pop up lateral lines c 12 inches minimum over non pressure pop up spray head lateral lines d 24 inches minimum over lines located in paved areas 21 7 Installation Installation of all irrigation facilities shall comply with the applicable Standard Drawings and the following specifications 1 Water Supply The Contractor shall connect to the water supply line at the location and as indicated on the Plans Minor changes in location caused by actual site conditions may be required and shall be approved by the Engineer The actual location shall be shown by the Contractor on the as built drawings to be furnished to the City upon completion of the work The Contractor shall comply with the provisions in Section 5 13 Electrical and Water Service Section 17 Water Use and Section 21 13 Completion City of Clovis Standard Specifications 2009 154 2 Layout The Contractor shall be responsible for layout of proposed facilities at the site and any minor adjustments required due to differences between the site and drawings Any such deviations in layout shall be within the intent of th
426. llowing subsection as described below 1 Master Items Index This shall be the first section of the amp Manual This section shall describe the purpose of each manual and brief description to the directory of the manual It shall also reference equipment manuals as required for additional and support material 2 Theory of Operation The manual shall contain a functional description of each element of the system explaining how each function is being achieved separately and how each element works together to form the complete system 3 Operations The manual shall describe how to operate the system and each particular type of equipment Equipment layout of controls displays and all other information required to correctly operate the system and each functional unit shall be provided Procedures shall also be provided for initial tune up of the system and adjustment and checkout required to ensure that the system is functioning within the performance requirements Warning of special procedures shall be given The functions land settings of all parameters shall be explained 4 Corrective Maintenance The manual shall include fault diagnostic and repair procedures to permit the location and correction of faults to the level of each replaceable module Procedures shall include alignment and testing of the equipment following repair the test equipment tools and the test set up 5 Preventative Maintenance The manual shall incl
427. loads in a uniformly distributed layer of a thickness not greater than that necessary to support the equipment while placing subsequent layers after which the remainder of the embankment shall be constructed in layers and compacted as specified Embankments shall be maintained to the grade and cross section shown on the plans until the acceptance of the contract 19 4 04 Compacting Embankments shall be constructed in layers of uniform thickness as specified in Section 19 4 03 Placing Each layer shall be compacted to a relative compaction of not less than 90 except that any layer within 2 5 feet of finish grade shall be compacted to a relative compaction of not less than 95 Sidehill embankments where the width including bench cuts for bonding existing and new embankments is too narrow to accommodate compacting equipment may be constructed by end dumping if permitted by the Engineer until the embankment including benching is wide enough to permit the use of compacting equipment after which the remainder of the embankment shall be placed in layers and compacted as specified At the time of compaction the moisture content of embankment material shall be such that the specified relative compaction will be obtained and the embankment will be in a firm and stable condition Embankment material which contains excessive moisture shall not be compacted until the material is dry enough to obtain the required compaction Full compensation
428. location shown on the Plans or specified in the Contract Specifications and in accordance with Sections 6 11 Salvage of Materials and 15 2 04 Salvage The roadway and adjacent areas shall be left with a neat and finished appearance No accumulation of flammable material shall remain on or adjacent to the right of way 16 5 Measurement Clearing and Grubbing will be measured on a lump sum basis 16 6 Payment The lump sum price paid for Clearing and Grubbing shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved in clearing and grubbing as shown on the Plans set forth in the Specifications and as directed by the Engineer If the Contract does not include a pay item for Clearing and Grubbing as herein specified and unless otherwise provided in the Contract Specifications full compensation for clearing and grubbing required to perform the construction operations specified shall be considered as included in the price bid for other various items of work and no additional compensation will be paid therefor City of Clovis Standard Specifications 2009 106 SECTION 17 WATER USE 17 1 Description This work shall consist of developing a water supply and furnishing all water required for the work and applying all water The Contractor shall comply with the provisions of Section 5 13 Electric and Water Service Water for use in the work
429. lowing procedures and under the supervision of the inspecting Engineer Each section of sewer between two successive manholes shall be tested by plugging all pipe outlets with suitable test plugs All pneumatic plugs shall be seal tested before being used in the actual test installation One length of pipe shall be laid on the ground and sealed at both ends with the pneumatic plugs to be checked Air shall be introduced into the plugs to 25 pounds per square inch gauge pressure psig The sealed pipe shall be pressurized to 5 psig The plugs shall hold against this pressure without bracing and without movement of the plugs out of the pipe To commence the leakage test air shall be slowly added until the internal pressure is raised to 4 0 psig The compressor used to add air to the pipe shall have a blow off valve set at 5 psig to assure that at no time the internal pressure in the pipe exceeds 5 psig The internal pressure of 4 psig shall be maintained for at least two minutes to allow the air temperature to stabilize after which the air supply shall be disconnected and the pressure reduced to 3 5 psig The time in minutes that is required for the internal air pressure to drop from 3 5 psig to the lower pressure indicated in the appropriate table below shall be measured and the results compared with the values tabulated below Gauges used to measure test pressures shall read from 0 psig to 10 psig maximum with 1 2 psig increments If required
430. m testing data link testing physical inspection functional testing performance testing final acceptance and system documentation is required to validate the operation performance of the system and described elsewhere in these special provisions B Test Plan The Contractor shall develop and submit an installation and test plan to the Engineer within twenty 20 working days of the start of this contract The test and installation plan shall detail the method of installation and all testing for all material equipment and cable and the associated schedule of activities based on these special provisions plans the manufacturer s recommended test procedures and industry standard practices 1 copy of the test plan shall be submitted to the Engineer for approval The Engineer will review then approve or disapprove of the plan within two 2 weeks If the Engineer rejects the test plan the Contractor shall submit a revised test plan within five 5 working days for review and approval by the Engineer The tests shall quantitatively demonstrate that the design and production of material and equipment meet the requirements of these special provisions and plans The Contractor shall submit all test results including results of failed tests or re tests shall be submitted and delivered to the Engineer and a copy placed with the equipment at the site All test equipment shall be supplied by the Contractor All testing shall be done in the presenc
431. m the State Division of Occupational Safety and Health The permit may be either a Project Permit project specific or an Annual Permit The contractor shall comply with all the requirements of the permit and those of the Safety Orders In addition to the above permit requirement in compliance with the provisions of State Labor submit to the Engineer in advance of any excavation a detail plan showing the design Code Section 6705 for trenches or excavations five feet or more in depth the contractor shall of shoring bracing sloping or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trenches or excavations If such plan varies from the shoring system standards of the State Division of Occupational Safety and Health the plan shall be prepared stamped and signed by a Civil or Structural Engineer registered in the State of California Nothing in this subsection shall be deemed to allow the use of a shoring sloping or protective system less effective than that required by the DOSH Construction Safety Orders The requirements as above set forth by the State Division of Occupational Safety and Health and the State Labor Code for the provision of worker protection from the hazard of caving ground are minimum requirements In addition the Contractor shall provide for the life of the Contract the same protection for any person including the Engineer or any of his authorized representat
432. mance with the provisions in said Section 8 10 The Contractor shall be entitled to no other compensation for that delay Any delays to the Contractor s operations as a direct result of utility or other non highway facilities not being rearranged as provided in this Section 8 15 due to a strike or labor dispute will entitle the Contractor to an extension of time as provided in Section 8 9 Liquidated Damages The Contractor shall be entitled to no other compensation for that delay Potholes or other excavations performed to determine the location of Utility and Non Street Facilities and which potholes or excavations will remain outside the area to be excavated for improvements shown on the Plans or specified in the Contract Specifications shall be backfill compacted and the surface thereof restored in accordance with Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration Exception Potholes or other excavations of diameter or equivalent dimension if non circular of 9 inches or less or any other pothole or excavation because of depth shape or City of Clovis Standard Specifications 2009 76 other cause determined by the Engineer not to be feasible to apply the methods of said Section 19 3 shall be backfilled in accordance with the following manner The bottom 1 foot of the pothole or other excavation shall be backfilled with clean sand the remainder of the pothole or other excavation sha
433. may take such action if necessary Failure to timely submit a written notice of potential Extra Work delay and or Claim shall act as a waiver by Contractor of any right to later submit a proposed change order or pursue a Claim on that issue Contractor acknowledges that these written notices are critical to the Owners management of the project and the mitigation of project costs and scheduling 4 12 3 Proposed Change Orders If Contractor disagrees with an approved change order issued pursuant to Section 4 10 Changes then Contractor shall submit a written protest pursuant to said Section 4 10 including but not limited to Section 4 1 03 Changes of the State Standard Specifications If Contractor otherwise believes that it is entitled to additional compensation for money and or time including but not limited to grant of a time extension payment of money or damages arising from work done by or on behalf of the Contractor payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled to or an amount the payment of which is disputed by the local agency then Contractor shall submit a proposed change order within twenty 20 days of i becoming aware of the potential right to additional compensation or ii the date by which it should have become aware of the potential right to additional compensation Failure to timely submit a proposed change order shall act as a waiver by Contractor of any ri
434. may be determined by the Engineer to be required for the proper completion or construction of the whole work contemplated No adjustment will be made in the contract unit price of any contract item as a result of quantity changes regardless of the amount of the increase or decrease including deletion of any item Other changes required by the Engineer will be made in accordance with Section 4 1 03 Changes of the State Standard Specifications In said Section 4 1 03 reference to Section 8 1 07 shall mean Section 8 Progress and Prosecution of these Standard Specifications and reference to Section 9 1 03 shall mean Section 9 1 03 of the State Standard Specifications For all changes the City shall reasonably compensate Contractor with money including overhead and profit and or time for any Extra Work ordered by the City to be performed and the City shall receive a reasonable credit for money including overhead and profit and or time saved by any deletion of work 4 11 Extra Work The Contractor shall be compensated for Extra Work In the event portions of such work are determined by the Engineer to be covered by some of the various items for which there is a bid price or combinations of such items the remaining portion of such work will be classed as Extra Work Extra Work also includes work specifically designated as Extra Work in the Plans Specifications or the Contract Specifications Unless otherwise specifically indicated i
435. missions from the Plans or the Specifications of the materials or details of work which are manifestly or obviously necessary to carry out the intent of the Plans and Specifications or which are customarily furnished or performed shall not relieve the Contractor of the responsibility for furnishing such omitted materials or performing such omitted work but shall be furnished or performed as if fully shown or described in the Plans or Specifications Any materials or work mentioned in the Specifications and not shown on the Plans or shown on the Plans and not mentioned in the Specifications shall be of the same effect as if shown or mentioned in all 4 8 Incorporation Of Referenced Specifications Where referenced thereto on the Plans or the Specifications the work embraced herein shall be done in accordance with the provisions of the State of California Department of Transportation Standard Specifications latest revision which Specifications are hereinafter referred to as the State Standard Specifications and the Fresno Metropolitan Flood Control District Standard Specifications latest revision hereinafter referred to as the FMFCD Standard Specifications in accordance with the following provisions In case of a conflict between the City s Standard Specifications and any other referenced and or incorporated set of specifications such as the State or FMFCD Standard Specifications the City s Standard Specifications take precedence over
436. mpletion thereof except when working days are not being charged in conformance with the provisions in Section 8 11 Temporary Suspension of Work of these Specifications City of Clovis Standard Specifications 2009 69 For contracts whose completion schedule is based calendar days a calendar day shall mean every day of the calendar including weekends and holidays Exclusions for inclement weather which prevents the Contractor from performing as above provided for working days will be permitted unless otherwise specified in the Contract Specifications 8 9 Liquidated Damages It is agreed by the parties to the Contract that in case all the Work called for under the Contract is not complete before or upon expiration of the time limit as set forth in the Contract Specifications damage will be sustained by the City Since it is and will be impractical to determine the actual damage which the City will sustain in the event of and by reason of such delay and since the delay will cause incalculable inconvenience to the public it is therefor agreed that the Contractor will pay to the City the sum indicated in the Contract Specifications for each and every calendar day s delay beyond the time prescribed to complete the Work and the Contractor agrees to pay such sum as set forth in the Contract Specifications and in case the same is not paid agrees that the City may deduct the amount thereof from any money due or that may become due the Contr
437. ms Where no bid item for Traffic Control is provided all costs for providing Traffic Control and Construction Area Traffic Control Devices shall be included in the various bid items of work no additional payment will be made therefor Where road closures and detours are provided for the convenience of the Contractor which are not otherwise shown on the Plans to be constructed all costs shall be borne by the Contractor for such road closures and detours including preparation of the required Traffic Management Plan No additional payment will be made therefor Where the Engineer determines that non emergency emergency or hazardous conditions not created by the Contractor nor are due to the failure of the Contractor to act or use due diligence and care in performance of the work warrants road closures and detours which are not otherwise shown on the Plans to be constructed the cost thereof shall be paid for as extra work in accordance with Section 9 5 Payment for Extra Work including preparation of a Traffic Management Plan if so directed by the Engineer Where road closures and detours are made necessary due to conditions created by the Contractor or due to the failure of the Contractor to act or use due diligence and care in the performance of the work and where no closure or detour was otherwise contemplated the Contractor shall be responsible for the cost thereof including the cost of preparing a Traffic Management Plan No addi
438. n Section 19 2 08 Measurement will be paid for at the contract price per cubic yard That price shall include excavating sloping rounding tops and ends of excavations loading hauling and depositing within the work site hauling and disposing of material outside the right of way spreading and compacting the material complete in place and preparing subgrade at the grading plane as specified in Sections 19 1 03 Grade Tolerance and 19 2 07 Subgrade Preparation Compaction The above price and payment shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved in performing roadway excavation work completely as shown on the Plans specified in the Specifications and as directed by the Engineer City of Clovis Standard Specifications 2009 116 19 3 Trench And Structure Excavation Backfill And Surface Restoration 19 3 01 General This work shall consist of all excavation backfill and compaction necessary for the construction or installation of underground pipelines conduits structures and other facilities and the replacement or restoration of surfaces disturbed by such work all as set forth in the Plans Standard Drawings the Specifications and as directed by the Engineer As a minimum structures shall include manholes storm drain inlets water valve boxes and vaults of any kind Backfill compaction and surface restoration of poth
439. n and expense may provide cables with additional fibers The cable shall comply with all the requirements of the United States Department of Agriculture Rural Electrification Administration Specifications REA PE 90 2 Quality Assurance All work and material described in this section shall meet or exceed the applicable provisions of the following documents CFR 1755 900 RUS Specification for Filled Fiber Optic Cables ANSI 8 47 1983 American National Standard for Polyolefin insulated Thermoplastic Jacketed Communication Cables 455 27 Method of Measuring Uncoated Diameter of Optical Waveguide Fibers 455 28 Method for Measuring Tensile Failure Point of Optical Waveguide Fibers EIA TIA 455 82A Water Penetration Test EIA 455 95 Absolute Optical Power Test for Optical Fibers and Cables EIA 455 103 Buffered Fiber Bend Test EIA 359 A 1 Special Colors General Fiber Characteristics City of Clovis Standard Specifications 2009 235 Single mode fibers within the finished cable shall meet the requirements in the following table Fiber Characteristics Table Parameters SM Type Step Index Core Diameter 8 3 nominal Cladding Non circulatory 125 um 1 75 um Core to Cladding Offset lt 0 8 um Coating Diameter 250 um 15 um Cladding Non Circularity Defined as 1 min cladding lt 1 0 Dia max cladding dia x100 Proof Tensile Test 3 500 k
440. n conformance with Section 15 2 02 D Pavement Markers and at the completion of work replace them in accordance with Section 85 Raised Pavement Markers 3 The Contractor shall remove the existing paint and thermoplastic stripping pavement markings or raised pavement markers where required no earlier than five 5 days before the start of any of the applications specified in 2 above After removing the existing paint markings or markers unless otherwise authorized by the Engineer the Contractor shall immediately install temporary reflectorized markers which shall be left in place until beginning the applicable application Extra caution shall be required at locations with traffic signal loops where pavement markings or striping must be removed Loops are located just below surface grade Temporary reflective road marker tabs manufactured by Hye Lites Davidson Plastic Co MV Plastic Chip Seal Marker or approved equal shall be placed in accordance with the manufacturer s specifications but not more then 15 foot intervals Temporary City of Clovis Standard Specifications 2009 95 reflective road marker tabs shall also be placed at all stop bars that are removed and shall have a minimum of six 6 reflectors or as directed by the Engineer All temporary markers shall be completely removed prior to the applicable applications specified in 2 above and reinstalled upon completion of the application prior to installation of
441. n is identified as a PUBLIC INCONVENIENCE An appropriate response time will be granted usually 24 hours The contractor must resolve the issue within the response time granted Liquidated damages will accrue at the rate of 250 per calendar day for each day beyond the resolution date that the situation remains unresolved The City may at its option take corrective action following the expiration of the granted time All costs incurred by the City for taking such corrective action plus a 250 administrative fee will be deducted from monies owed the Contractor or billed to the Contractor in the case of non public work being done under permit The foregoing process shall apply to all Contracts awarded by the City and also to Encroachment Permits issued by the City to Contractors for non public work The provisions of Section 9 7 Stop Notices City s Right to Withhold Payments will apply Full compensation for conforming to the provisions in this Section 7 17 shall be considered as included in the prices paid for the various contract items of work and no additional compensation will be allowed therefor 7 18 Public Safety The Contractor shall provide for the safety of traffic and the public during construction The Contractor s attention is directed to the provisions of Section 7 4 Contractor s Insurance Requirements and Hold Harmless Section 7 16 Injury or Damage to Persons or Property and Section 7 17 Public Conveni
442. n islands to receive landscape planting shall be cleared of all debris including but not limited to asphalt concrete and concrete and any pre existing road surfacing or base material between the median curbs shall be removed to the depth of original ground Reference is made to Section 8 15 Utility and Non Street Facilities Potholing All debris or pre existing roadway materials removed from median island areas shall be disposed of in accordance with said Section 5 12 Removal of debris including pre existing roadway materials shall be paid for at the contract price for Clearing and Grubbing In the absence of an item for Clearing and Grubbing the cost shall be considered as included in the various items of work and no additional payment will be made therefor Median islands shall be backfilled with topsoil to the lines and grades shown on the plans Topsoil imported to fill median areas shall be placed in accordance with these specifications and be paid for at the contract price for Imported Borrow In the absence of a contract item for Imported Borrow the cost of importing topsoil to the work site and placing shall be included in the various items of work no separate payment will be made therefor Imported soil shall be amended as provided in Section 20 1 04 Soil Preparation and Amendment 20 1 04 Soil Preparation And Amendment For all areas shown on the Plans or specified in the Contract Specifications to receive landscape plant
443. n ten 10 percent of the estimated value of the work done and ten 10 percent of the value of materials so estimated to have been furnished and delivered and unused as part security for the fulfillment of the contract by the Contractor At the discretion of the Engineer at any time after fifty 50 percent of the work has been completed if the Engineer finds that satisfactory progress is being made the City may reduce the amount retained from any of the remaining partial progress payments in accordance with Section 9203 of the State Public Contract Code The City shall pay monthly to the Contractor while carrying on the Work the balance not retained as aforesaid after deducting therefrom all previous payments and all sums to be City of Clovis Standard Specifications 2009 80 kept retained under the provisions of the Contract No monthly estimate or payment shall be required to be made when in the judgment of the Engineer the Work is not proceeding in accordance with the provisions of the contract No monthly estimate or payment shall be construed to be an acceptance of any defective work or improper materials Attention is directed to the prohibitions and penalties pertaining to unlicensed contractors as provided in Business and Professions Code Sections 7028 15 a and 7031 9 7 Stop Notices City s Right To Withhold Payments In addition to the ten 10 percent withheld pursuant to Section 9 6 Partial Progress Payment
444. n the Plans or the Specifications any work or responsibility of the Contractor set forth in the Specifications or on the Plans and not set forth as a separate bid item shall be considered incidental or appurtenant to the work and full compensation for the cost thereof included in the various bid items of work Such work or responsibility will in no case be considered as Extra Work When work is classified as Extra Work by the Engineer the Contractor shall do such Extra Work and furnish labor materials and equipment therefor upon receipt of an approved Contract Change Order or other written order of the Engineer and in the absence of such approved Contract Change Order or other written order of the Engineer the Contractor shall not be entitled to payment for such Extra Work Extra Work when ordered and accepted shall be paid for in accordance with the terms of this Section 4 11 and Section 9 5 Payment For Extra Work 4 12 Notices Change Orders And Claims If the Contractor requests additional compensation whether money or time or otherwise believes that it is entitled to a modification of the Contract terms and conditions then Contractor shall follow the procedures for pursuing such requests specified in the Contract otherwise Contractor shall have waived its rights to such pursuit and any later attempts to recover such compensation or modification shall be barred 4 12 1 Definition Of Claim A Claim is a separate dem
445. n the rated pressure at 16 feet per second and 150 psi differential pressure using the method described in the Appendix to AWWA C504 Stop limiting devices must withstand 450 ft lbs of input torque against the open and closed stops without failure Test reports and proof of design for the actuator may be required to be submitted for design of stop limiting devices and internal components All interior and exterior ferrous surfaces shall be factory coated with two or more coats of 2 part epoxy coating to a minimum dry film thickness of 12 mils Butterfly valve installation shall conform to the details shown on the Plans and the applicable details shown on the Standard Drawing for valve installation For water mains the valve box shall conform to the details shown on the Standard Drawing therefor City of Clovis Standard Specifications 2009 189 66 2 7 Valve Boxes Each valve shall be provided with a valve box in conformance with the applicable Standard Drawing therefor Valve boxes shall be precast concrete with heavy cast iron ring seating a deeply ribbed cast iron cover providing an 8 inch diameter clear opening and shall be Christy No G5 traffic box or approved equal Cover marking shall read Water A one piece 8 inch inside diameter PVC riser extension shall be provided to allow unobstructed access to the valve operating nut 66 2 8 Fire Hydrants And Fire Services Fire hydrants and Fire Services shall be furnished as indicated on
446. n the sprinkler system the Contractor shall make all adjustments and corrections without any extra cost to the City 21 11 Inspection Reference is made to Section 21 4 Specialized Inspection In addition to the specialized inspection specified in said Section 21 4 periodic inspections shall be required for basic operations and installations during progression of the work It shall be the Contractor s obligation to call and schedule inspections including the City Building Division for work covered under the California Electrical and Plumbing Codes Inspections will include but not necessarily be limited to the following items a Grading b Layout and flagging of sprinkler heads and system c Trenching d Pipe and Wire placement e Partial fill compaction of trenches f Control valve installation g Electrical Service installation h Electrical panel installation 1 Irrigation controller installation and operation j Mainline sustained pressure check k Booster pump installation Backflow preventer installation m Water Service installation and meter connection All overtime inspection charges incurred by City personnel shall be paid by the Contractor when inspection services are required outside of normal working hours Work requiring inspection before or after the normal 8 hours of a normal working day or taking place on holidays Saturdays and Sundays will be considered overtime inspection A pre final i
447. naesarevaetanees 184 65 7 DEFLECTION DEFORMATION TEST PVC SEWER FORCE 184 65 8 TELEVISION INSPECTION INSTALLED PIPE 00 184 65 9 ALIGNMENT CHANGES SEPARATION CRITERIA cesssscssesesssecscsscsseececsacaseessesacsneaseeaesaeats 185 65 10 MEASUREMENT 185 65 171 PAYMENT 2 185 SECTION 66 POTABLE WATER DISTRIBUTION FACILITIES 186 66 1 5 etna iain Mae car 186 66 2 MATERIALS Calton ne A coed anit 186 66 2 1 PVC PIPE AND FITTINGS FOR WATER 186 66 2 2 DUCTILE IRON PIPE AND FITTINGS FOR WATER 187 66 2 3 TARUST BLOCKS2 187 66 2 4 WATER SERVICES ete 187 66 2 5 GATE VALVES 2 E E E ide ot ats 188 66 2 6 BUTTERFLY VALVES cceccescceccesceccscecessaccnaecarseccnaesercesecaeseesuaceaaesausarenaesausenseaevaneereeaeess 188 66 2 7 aie seed dee chee 190 66 2 8 FIRE HYDRANTS AND FIRE SERVICES
448. nance regulation order or decree the Contractor shall forthwith report the same to the Engineer in writing 7 2 Labor Code Requirements The following requirements of the State Labor Code apply to all City Contracts 7 2 A Hours Of Labor Eight hours labor constitutes a legal day s work The Contractor or any subcontractor under the Contractor shall forfeit as a penalty to the State of California twenty five dollars 25 or such other amount as may be amended by the Department of Industrial Relations from time to time for each worker employed in the execution of the contract by the respective Contractor or subcontractor for each calendar day during which that worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the requirements of the Labor Code and in particular Section 1810 to Section 1815 thereof inclusive except that work performed by employees of Contractors in excess of 8 hours per day and 40 hours during any one week shall be permitted upon compensation for all hours worked in excess of 8 hours per day at not less than one and one half times the basic rate of pay as provided in Section 1815 thereof 7 2 B Prevailing Wage The Contractor and any subcontractor under the Contractor shall comply with Labor Code Sections 1774 and 1775 Pursuant to Section 1775 the Contractor and any subcontractor under the Contractor shall forfeit to the State or polit
449. nches may be permitted by the Engineer depending on soil conditions and type 19 3 03 A 2 Final Backfill Precast Pipe Conduit Final Backfill for trenches in which precast pipe or conduit has been placed shall consist of placing and compacting backfill material into the remaining trench cavity following completion of initial backfill Backfill material shall be returned to the trench in lifts not to exceed 0 67 foot in depth loose and compacted Each lift shall be compacted the full depth of the lift prior to placement of the next lift of backfill material Jetting of final backfill will not be permitted In cases of excessive trench width soil conditions and soil type as determined by the Engineer to assure proper pipe load distribution and bonding between trench backfill and trench walls the Contractor may be required by the Engineer to bench plow or scarify trench walls prior to placement of backfill The cost for such trench wall treatment if so required shall be included in the price paid per linear foot of pipe No additional payment will be made therefor 19 3 03 A 3 Backfill Cast in Place Pipe Backfill material for trenches in which cast in place concrete pipe has been constructed shall be returned to the trench in lifts not to exceed 0 67 foot in depth Depending on soil condition and type and upon satisfactory demonstration to the Engineer that the methods proposed by the Contractor achieve the required consolidation and compa
450. nctional requirement of the specifications The connectivity of each data channel shall be demonstrated The Contractor shall document all functional test results In the event that any aspect of the functional tests are determined by the Engineer to have failed the Contractor shall cease all acceptance testing and determine the cause of the failure and make repairs to the satisfaction of the Engineer Acceptance testing shall at the discretion of the Engineer be repeated beginning from the start of functional tests Performance Tests The Contractor shall conduct operational performance tests on the following All data control circuits operational from the data switch system to the system elements located in the field Response to alarm inputs City of Clovis Standard Specifications 2009 247 System diagnostics Data tests shall satisfy the end to end performance requirements under normal operating conditions The Contractor shall test the data subsystem and record the test results The data signal to noise shall be measured according to EIA TIA 250 C The data signal to noise ratio shall be measured and recorded with both the data input reference and with suitable data test equipment providing the data reference signal When the source is the test equipment the data signal to noise ratio shall be greater than 47 dB Adjustments shall be calculated to account for any deviation in output level resulting from the variable light
451. ncy preemption detectors See Modulated Light Signal Detection System h Belden No 8281 cable shall be used for video camera detection systems i Type C DLC cable No 14 AWG shall be used to supply power to the pole mounted cameras used in video detection systems Detector lead in cable shall be Type C and have a polyethylene jacket IMSA specification number 50 2 1984 The 7 conductor cables shall not be connected to the pedestrian signal mounting terminal block The 5 conductor cables shall not be connected to the vehicle signal mounting terminal block The 3 amp 2 conductor P P B cables shall be connected in the pedestrian signal mounting terminal block The P P B neutral shall never be connected to the pedestrian signal 120 volt neutral Conductor installation and cable insulation colors in cables shall be as shown on terminal location drawing in the Technical Specifications All neutral conductors shall be white throughout their entire length All conductors shall have insulation colors appropriate to the use of the conductor and all applicable codes The use of colored phase tape will not be allowed City of Clovis Standard Specifications 2009 279 The first sentence of the second paragraph of Section 86 2 09A Circuitry of the State Standard Specifications is amended to read All control circuit conductors shall be run continuously without splices from a terminal block located in the tra
452. nd the exterior of the structure has been inspected by the City of Clovis Standard Specifications 2009 119 Engineer approved for backfilling Backfill material shall be placed in lifts not to exceed 0 67 foot in loose depth and compacted Depending on soil condition and type and upon satisfactory demonstration to the Engineer that the methods proposed by the Contractor achieve the required consolidation and compaction results the thickness of lifts may be increased by the Engineer but in no case shall lifts exceed 3 feet loose depth Each lift shall be compacted prior to placement of the next lift of backfill material 19 3 03 C Slurry Cement Backfill Where specified in the Plans or Contract Specifications and as specified in Section 8 15 Utility and Non Street Facilities Potholing for backfill of small diameter excavations slurry cement backfill shall be furnished and placed in conformance with Section 19 3 062 Slurry Cement Backfill of the State Standard Specifications 19 3 03 D Pervious Backfill Material Where specified in the Plans or Contract Specifications Pervious Backfill Material shall be furnished and placed in conformance with Section 19 3 065 Pervious Backfill Material of the State Standard Specifications 19 3 03 E Compaction Compaction shall conform to the requirements of Section 6 9 Compaction Tests and the applicable Standard Drawings for Trench Backfill and Resurfacing All
453. nd valve boxes and covers shall then be raised to finish grade concrete collars poured and asphalt concrete patch placed in accordance with the Standard Drawings and as directed by the Engineer Other existing facilities shall be adjusted to finish grade in accordance with the applicable utility or facility authority involved and as directed by the Engineer Where the utility or facility authority involved desires to do the work with their own forces and or materials the Contractor shall pay all the costs associated therewith 70 4 Measurement And Payment Unless otherwise specified in the Contract Specifications Miscellaneous Street Improvements shall be measured and paid for on a lump sum basis Payment shall include City of Clovis Standard Specifications 2009 210 full compensation for all labor equipment and materials required to complete all the work described herein as shown on the Plans and as specified in the Contract Specifications If the Contract does not include a pay item for Miscellaneous Street Improvements the cost thereof shall be included in the prices bid for the other various items of work and no separate payment will be made therefor City of Clovis Standard Specifications 2009 211 SECTION 71 BLANK SECTION 72 BLANK City of Clovis Standard Specifications 2009 212 SECTION 73 CONCRETE CURBS SIDEWALKS SURFACE IMPROVEMENTS 73 1 General This work shall consist of constructing concrete cur
454. ndard with a DB 9F connector with open collectors 40 V 20 mA indicating a Loss of Utility Power b Inverter Failure and 311 9 5 9 6 9 7 10 0 10 1 12 0 13 0 Low Battery An RS232 Interface shall be provided via DB 9F connector allowing full interactive remote computer monitoring and control of the UPS functions Front Panel controls Power ON Cold DC Start Alarm Silence Battery Test Bypass Breaker and DC Battery Breaker Reliability Calculated MTBF is 100 000 hours based on component ratings When Bypass and Power Interface Module are included system MTBF increases to 150 000 hours Options Delay timer to provide up to 3 minutes of full cycling while on battery before switching to flash mode only available where 100 low power LED signals and pedestrian heads are used Fast Charge battery charger 2 5 amps or higher UPS Link Internally mounted STMP NTCIP adapter Spread Spectrum radio modem with Intelligent Routing software 112 5 kpbs transmission rate Tripp Connector a 12 VDC power inserter to allow maintenance vehicles to power the system indefinitely Input Transient Voltage Surge Suppressor TVSS Extended run times via additional batteries Serviceability L Maintainability Mean Time To Replace or Repair 10 1 1 Electronics 15 minutes or less 10 1 2 Battery System 15 minutes or less Warranty Standard warranty terms cover entire Traffic UPS including batter
455. ndicates the flow line or invert of the pipe all cuts unless otherwise indicated refer to this line The interior of the pipe shall be kept free from dirt and other foreign material as the laying progresses Any pipe that shows undue settlement or is damaged shall be taken up and replaced or re laid at the Contractor s expense The open ends of all sewer pipes being installed must be covered to keep out animal life etc whenever the pipe is left unattended for any length of time such as overnight The end of any sewer that does not terminate at a manhole shall be closed at the bell end with a plug manufactured for that purpose PVC pipe exposed to the sun during the summer months must be allowed to cool before connection is made to manholes and other facilities and prior to backfill 64 5 Service Lateral Installation Service laterals shall be furnished and installed by the Contractor at the locations shown on the Plans in conformance with the Standard Drawing pertaining thereto the Contract Specifications and the directions of the Engineer Pipe for sewer service laterals shall conform to the requirements of Section 64 2 1 PVC Pipe and Fittings and shall be installed in accordance with the requirements of Section 64 4 Sewer Pipeline Installation Sewer service laterals 4 inches or 6 inches in diameter shall be connected to all sewer mains less than 18 inches in diameter at prefabricated wye fittings conforming to Section 6
456. nduit of the State Standard Specifications and these Standard Specifications Conduit material shall be Type 1 as stated in Section 86 2 05A Material Item A of the State Standard Specifications Conduit shall be rigid metallic conforming to the requirements in UL Publication UL 6 Non metallic flexible and intermediate metallic conduit shall not be used except as shown on the Plans or as stated in the Contract Specifications or these specifications Conduit terminating in standards or pedestals shall extend not more than 2 inches vertically above foundation and shall be vertical Conduit terminating in pull boxes shall extend 2 inches into the cavity of the pull box Conduits shall enter the pull box at the top of the extension No conduit may enter a pull box from the bottom unless approved by the Engineer After conductors have been installed the ends of the conduits terminating in pull boxes controller cabinet and service pedestal shall be sealed with an approved type of sealing compound Plastic bushings shall also be required the ends of non metallic conduit This includes but is not limited to both ends of the 3 inch PVC conduit used for magnetic vehicle detectors and both ends of any 3 4 PVC loop detector conduit or home run conduits When Trenching in Pavement Method is specifically allowed the installation shall conform to the provisions in Section 86 2 05C Installation of the State Standard Spec
457. ndustrial Relations Internet Web Site at http www dir ca gov The wage rates determined by the Director of Industrial Relations for the project refer to expiration dates Prevailing wage determinations with a single asterisk after the expiration date are in effect on the date of advertisement for bids and are good for the life of the contract Prevailing wage determinations with double asterisks after the expiration date indicate that the wage rate to be paid for work performed after this date has been determined If work is to extend past this date the new rate shall be paid and incorporated in the contract The Contractor shall contact the Department of Industrial Relations as indicated in the wage rate determinations to obtain predetermined wage changes Pursuant to Section 1773 2 of the Labor Code general prevailing wage rates shall be posted by the Contractor at a prominent place at the site of the work Changes in general prevailing wage determinations which conform to Labor Code Section 1773 6 and Title 8 California Code of Regulations Section 16204 shall apply to the project when issued by the Director of Industrial Relations at least ten 10 days prior to the date of the Notice Inviting Bids for the project The City will not recognize any claim for additional compensation because of the payment by the Contractor of any wage rate in excess of the prevailing wage rate set forth in the contract The possibility of wage increases is one of
458. ng and irrigation facilities in accordance with Sections 20 8 Maintenance Period and 21 12 Maintenance Period City of Clovis Standard Specifications 2009 84 MISCELLANEOUS PROVISIONS SECTION 10 DUST CONTROL 10 1 Dust Control This work shall consist of maintaining dust control about the site of the work including any haul roads to or from the site by whatever means are necessary such as watering sweeping or oiling so as to cause the least possible dust nuisance to the public Any dust control measure ordered by the Engineer shall be promptly and immediately carried out The requirements of Section 7 Legal Relations and Responsibilities as it relates to air pollution water pollution public convenience and public safety shall be adhered to as a part of providing Dust Control The Contractor shall make arrangements for and shall acquire and pay all costs for a satisfactory water supply in accordance with Section 5 13 Electrical and Water Service and Section 17 Water Use The Contractor shall furnish equipment for transporting and applying water for dust control The equipment shall meet the approval of the Engineer Water for the work may be taken from a City approved source If taken from the City water system the contractor shall obtain a water meter from the Utilities Section of the City Public Utilities Department Operations Center at 155 N Sunnyside Avenue and make payment of any deposit requir
459. ng construction or repair B Removing by flushing contaminating materials that may have entered the water main during construction or repair C Disinfecting any residual contamination that may remain after cleaning D Determining the bacteriologic quality of fresh water in the main after disinfecting the main All mains shall be flushed with potable water after completion of construction and prior to disinfecting The Contractor shall provide a sufficient number of suitable outlets at the end s of the line s being sterilized in addition to those required by the Plans to permit the main to be flushed with water at a velocity of at least 5 5 feet per second over its entire length The outlets provided shall meet the requirements for fittings as specified for the type City of Clovis Standard Specifications 2009 194 main constructed Temporary blow offs may be installed during the sterilization and flushing to satisfy those requirements Drainage facilities shall be constructed such that the water lines cannot be contaminated through flushing outlets The outlets provided shall meet the requirements for fittings as specified for the type main constructed Temporary blow offs may be installed during the sterilization and flushing to satisfy those requirements Drainage facilities shall be constructed such that the water lines cannot be contaminated through flushing outlets After flushing chlorine gas or chlorine compound solution m
460. ng is indicated shall be set on permanent risers with top of head located above finished grade per plan detail rotary pop up sprinkler heads adjacent to walks or roads shall be set 6 inches from edge of walk or road and pop up spray heads adjacent to walks or roads shall be set 2 inches from edge of walk or roads Upon completion of the installation the Contractor shall adjust sprinkler heads to properly distribute water flow and shall place entire irrigation system in correct operating condition Adjust sprinklers so that water spray does not contact structures such as fences walls or buildings Adjust sprinkler heads to avoid applying water on roadways walkways sidewalks and other areas that are not landscaped Where reclaimed water is to be used purple caps shall be provided on sprinklers 23 Drip Emitters Upon completion of the installation the Contractor shall adjust the drip emitters to properly distribute water flow and shall place the entire irrigation system in correct operating condition City of Clovis Standard Specifications 2009 159 24 Cathodic Insulation Protection Protection shall be installed as follows a Between wrapped galvanized steel pipe and unwrapped galvanized steel or cast iron pipe in ground using couplings or flanges b Between pipes and equipment except at sprinkler heads backflow preventer c Between old and new steel piping d Wherever brass copper or bronze is instal
461. ng said Section 64572 This document sets forth minimum spacing requirements between drinking water pipelines and sewer or reclaimed water pipelines and has been used to set the location of the water main In the event that field conditions require a change in the planned alignment horizontal or vertical of the water main under no circumstances shall a change be made without obtaining the express and written approval of both the City inspector and the City Design Engineer Any change so authorized must comply with the Guidance Memo 66 5 Installation Of Water Mains Fittings And Valves Potable water mains fittings valves and all appurtenances shall be furnished and installed as shown on the Plans in conformance with the Specifications the Standard Drawings and as directed by the Engineer Water mains shall be installed true to the alignment and profile shown on the Plans Occasional minor variations of two inches or less from the alignment shown on the Plans and one inch or less from the profile shown on the Plans will be permitted provided that such variations occur gradually over a distance of 20 feet or more and are approved by the Engineer Where necessary to avoid conflicts with existing utilities the depth of cover shall be increased or decreased as approved by the Engineer Such adjustments shall be accomplished by gradual changes in pipe depth whenever possible utilizing joint deflections not exceeding manufacturer s recommenda
462. nger required When temporary supports and other protective means are no longer required they shall be removed and disposed of as provided in Section 5 12 Disposal of Material Outside the Right of Way 19 1 03 Grade Tolerance The grading plane shall not vary consistently above or below the design grade Except for cuts made for roadway prisms the tops and ends of cuts shall be rounded as directed by the Engineer Immediately prior to placing subsequent layers of material thereon the grading plane shall conform to one of the following A When asphalt concrete or asphalt concrete base or concrete is to be placed on the grading plane the grading plane at any point shall not vary more than 0 05 foot above or below the grade established by the Engineer B When subbase or base material other than asphalt concrete base to be placed on the grading plane is to be paid for by the ton the grading plane at any point shall not vary more than 0 10 foot above or below the grade established by the Engineer C When the material to be placed on the grading plane is to be paid for by the cubic yard the grading plane at any point shall be not more than 0 05 foot above the grade established by the Engineer 19 1 04 Removal And Disposal Of Buried Man Made Objects If a buried man made object encountered in excavation is to be removed and its removal and disposal is not included in another item of work the removal and disposal will be paid for
463. notice shall provide the nature and circumstances involved in the dispute which shall remain consistent throughout the dispute 9 10 Final Progress Payment Provided no notices of potential claim proposed change orders or claims are pending under Section 4 12 Notices Change Orders and Claims the Engineer shall after the completion of the Contract make a final estimate of the amount of work done thereunder and the value of such work and the City shall pay the entire sum so found to be due after deducting therefrom ten 10 percent of the final estimate or other amounts as provided in Section 9 6 Partial Progress Payments and Retentions and Section 9 7 Stop Notices City s Right To Withhold Payments to be retained following completion of the work If a notice of potential claim proposed change order or claim is pending under Section 4 12 Notices Change Orders and Claims and is not resolved in time necessary for the processing of the final monthly progress payment as provided in the above paragraph the Engineer shall cause a semi final estimate to be prepared and the Contractor shall be paid any amounts due less any retentions as provided in Section 9 6 Partial Progress Payments and Retentions and Section 9 7 Stop Notices City s Right to Withhold Payments Upon resolution of the procedures under said Section 4 12 a final estimate will be prepared as above provided and a final progr
464. ns Unless otherwise specified in the Contract Specifications or on the plans only trees and plants that are designated on the plans or marked for removal by the Engineer shall be removed The Contractor shall notify Underground Service Alert and shall make such additional investigations and examinations as necessary to determine the existence and locations of all pipes conduits and other underground improvements and shall consult with and advise the owners of the utilities before undertaking any work that might endanger them The Contractor shall bear full responsibility for any damage to pipes conduits poles or any other structures or utilities The Contractor shall not make any claim for inconvenience delay or added cost of performing the work which may be attributed in any degree to inaccuracy of information furnished by the City of Clovis relative to the locations sizes dimensions depths and character of any pipes conduits poles or other structures and utilities Existing survey monuments and stakes shall be fully protected from damage or displacement and they shall not be disturbed unless directed by the Engineer Any survey monumentation disturbed in connection with the Contractor s operations shall be reset in accordance with Section 70 2 Survey Monuments Such re monumentation shall be at the Contractor s expense with no additional compensation paid therefor 16 3 Construction Unless otherwise specified or shown on the
465. ns lights flags other warning and safety devices and their use shall conform to the requirements set forth in Part 6 of the California MUTCD Signs or other protective devices furnished and erected by the Contractor at the Contractor s expense as above provided shall not obscure the visibility of nor conflict in intent meaning and function of either existing signs lights and traffic control devices or any construction area signs and traffic control devices for which furnishing of or payment for is provided elsewhere in the specifications Signs furnished and erected by the Contractor at the Contractor s expense shall be approved by the Engineer as to size wording and location The installation of general roadway illumination shall not relieve the Contractor of the responsibility for furnishing and maintaining any of the protective facilities herein before specified All movements of workmen and construction equipment on or across lanes open to public traffic shall be performed in a manner that will not endanger public traffic and be in conformance with Section 7 5 Vehicle Code When leaving a work area and entering a roadway carrying traffic the Contractor s equipment whether empty or loaded shall in all cases yield to traffic No material or equipment shall be stored where it will interfere with the free and safe passage of public traffic and at the end of each day s work and at other times when construction operations
466. nsects and or rodent infestations and proper preventative or control measures shall be taken All areas included in the work shall be substantially clean and free of debris and weeds All plant materials shall be live healthy and free of infestations Any erosion or settling of soil caused by watering shall be repaired at the Contractor s expense All walks curbs and gutters shall be kept clear of debris mud dust and standing water by sweeping mopping or hosing down as required for complete cleanliness The maintenance period may be terminated or suspended by the Engineer should it be determined that the Contractor fails to adequately water replace unsuitable plants control weeds or perform other work necessary for the proper establishment of all new landscaping If terminated by the Engineer a new 90 calendar day maintenance period will commence once the Engineer determines that the Contractor has corrected all deficiencies If suspended by the Engineer the 90 calendar day maintenance period shall be temporarily interrupted and will be resumed by the Engineer when it is determined the Contractor has corrected all deficiencies Unless otherwise specified in the Contract Specifications the 90 calendar day maintenance period is incorporated in the overall contract time Reference is made to Section 8 9 Liquidated Damages Should failure to complete all the work required by the Contract lead to a delay in commencing the maintenance pe
467. nspection of the work shall be made by the City Engineering and Building Division Inspectors and Parks Division personnel in the presence of the Contractor at the time when all landscaping and irrigation work is completed and inspection is requested by the Contractor to commence the plant maintenance period In conformance with Section 20 8 Maintenance Period and Section 21 12 Maintenance Period the Contractor shall make the inspection requests to the Engineer two working days prior to the requested time of such inspection After the system has been completed in all respects the Contractor shall instruct an authorized representative of the City Parks Division in the operation and maintenance of the system and shall furnish a complete set of written operating instructions A final inspection of the work shall be made by the inspectors of the City Engineering and Parks Divisions in the presence of the Contractor at the end of the required maintenance period when all landscaping and irrigation work is completed The Contractor shall provide 48 hours notification in advance of such inspection Prior to the final inspection the City of Clovis Standard Specifications 2009 162 Contractor shall prepared and transmitted to the City set of Record Drawings builts of the landscaping and irrigation work No final inspection will commence without the Record Drawings In the event that the Contractor schedules an inspect
468. nstallations shall be filled using hot melt rubberized asphalt sealant that conforms to Section 86 5 01A 5 Installation Details of the State Standard Specifications 18 loop test measurements as detailed in the Standard Plans ES 5A Installation Details note 17 shall be documented on the Loop Detector Test Results form provided in these technical specifications The form shall be signed and dated by the individual performing the tests as well as by the Engineer and shall be placed in the controller cabinet 86 39 Sawcut Loop Detector Installation Loop detector installation shall conform to the provisions in Section 86 5 01A 5 Installation Details of the State Standard Specifications Loop detector conductors installed in the surface of a new or existing roadway shall be placed in a sawcut slot as shown in ES 5A and ES 5B of the State Standard Plans The slots shall be dry and clean from all dirt and debris and shall be filled with hot melt rubberized asphalt sealant after the conductors have been installed 86 40 PVC Loop Detector Slot Patching Procedure PVC loop detector slots shall be dry and clean from all dirt and debris Asphaltic emulsion paint binder shall be sprayed on all surfaces of the slot in accordance with City of Clovis Standard Specifications 2009 292 the provisions Section 39 4 02 Prime Coat and Paint Binder Tack Coat of the State Standard Specifications Asphalt binder
469. ntact the Traffic Signal Supervisor at 559 621 1492 at least 48 hrs prior to pick up or delivery Cost of picking up the cabinet shall be included in bid The City of Fresno shall deliver and install the controller and components at time of signal turn on The Contractor shall give the City of Clovis and the City of Fresno Traffic Signal Maintenance Division seven 7 days notice prior to signal turn on All initial testing by the City of Fresno shall be paid by the City of Clovis Retests shall be the responsibility of the Contractor 86 44 Controller Cabinet The controller cabinet s supplied by the Contractor shall conform to the provisions in Section 86 3 Controller Assemblies of the State Standard Specifications and these Standard Specifications Material and equipment must comply with the latest plans and specifications of the State of California Department of Transportation and must be supplied by companies on the latest issue of the approved Qualified Products List QPL The cabinet shall be Type 332A and shall be constructed of anodized aluminum and in accordance with the State of California D O T Traffic Signal Control Equipment Specifications dated January 1989 or latest issue All signal components shall be installed on a removable rack All space connectors shall be soldered to wire The cabinet shall be sealed to foundation as stated in Note No 15 on Sheet ES 3C of the latest edition of the State Standard Plans The Police Pan
470. nting and installation of irrigation systems such as for dust control compaction etc shall be obtained in accordance with 5 13 Electrical and Water Service Section 17 1 A City Water Permit and Section 17 1 B Nonpotable Water 17 1 A City Water Permit Prior to taking any water from the City water system the Contractor shall obtain a City of Clovis fire hydrant permit and water meter Said permit and the required water meter are available at the Public Utilities Department Operations Center at 155 N Sunnyside Avenue All water taken from City hydrants must be metered and the Contractor shall pay all fees relating to the use of the water meter and water consumed as outlined in Section 6 5 103 e of the Clovis Municipal Code and this Section 17 Any unpaid balance will be deducted from amounts owed the Contractor A backflow prevention device approved by the Engineer shall be provided and connected between the hydrant water meter and the equipment receiving the water or the equipment must have an approved backflow prevention device installed thereon 17 1 B Nonpotable Water Non potable water consists of non potable water developed from other sources of water such as that furnished by an irrigation district The Contractor shall pay all costs and fees and comply with all regulations or permit requirements of the supplier The Contractor shall furnish the Engineer with a copy of the permit or other written authorization of
471. ntractor s expense to the satisfaction of the Engineer Materials that are damaged beyond repair as a result of the Contractor s operations shall be disposed of outside the highway right of way as provided in said Section 5 12 and replaced at the Contractor s expense or at the discretion of the Engineer the estimated cost of replacement may be deducted from any moneys due or to become due to the Contractor Replacements for lost or damaged materials shall be of the same kind and of the same or better quality and condition as the lost or damaged materials were prior to removal Salvaged material shall be packaged and bundled specified in the Contract Specifications or as directed by the Engineer except that frames and covers or frames and grates of existing manholes inlets or other facilities such as water valve frames and lids shall be match marked in pairs 15 2 05 Reconstruction Existing facilities that are shown on the Plans or specified in the Contract Specifications to be reconstructed or re installed at existing or new locations shall conform to the design of the existing facilities and shall be equal in all respects to the best portions of the existing facilities work of reconstruction shall be performed in accordance with the Plans Contract Specifications and the requirements of these Specifications for new work of similar character which apply to the type of facility to be reconstructed adjusted modified remodeled r
472. nufacturer s recommendations Buried plug valves shall be fitted with necessary gear box valve well valve stem extension operating nut diviner position indicator valve box valve box lid and concrete collar Valve stem extension shall be installed when operating nut exceeds a depth of 4 feet as measured from final grade of valve box rim Final grade shall be existing proposed or future grade of the valve box rim as shown on the Plans or as directed by the Engineer 65 2 4 Thrust Blocks Unless otherwise specified in the Plans or Contract Specifications concrete for thrust blocks shall be Class 1 2 3 or 4 conforming to Section 90 Portland Cement Concrete of the State Standard Specifications 65 3 Force Main Installation Sewer force mains shall be installed as shown on the Plans and shall conform to the requirements of Section 8 15 Utility and Non Street Facilities Potholing Sections 19 3 Trench Excavation Backfill Compaction and Surface Restoration and 64 4 Sewer Pipeline Installation the Contract Specifications and the pipe manufacturer s recommendations Where required by the Plans or the Contract Specifications slurry cement backfill for sewer force main installation shall conform to the provisions in Section 19 3 062 Slurry Cement Backfill of the State Standard Specifications Slurry cement backfill shall attain a minimum compressive strength of 300 psi at 7 days Coloring of slurry cemen
473. o 2003 02 Guidance Criteria for the Separation of Water Mains and Non Potable Pipelines published by the California Department of Health implementing said Section 64572 This document sets forth minimum spacing requirements between drinking water pipelines and sewer or reclaimed water pipelines and has been used to set the location of the sewer force main In the event that field conditions require a change in the planned alignment horizontal or vertical of the sewer force main under no circumstances shall a change be made without obtaining the express and written approval of both the City inspector and the City Design Engineer Any change so authorized must comply with the Guidance Memo 65 10 Measurement Measurement for sewer force main installation shall be by the lineal foot of pipe installed and shall be the actual horizontal length installed measured through fittings if any Measurement for plug valves shall be on a per each basis installed 65 11 Payment The unit price bid per lineal foot for sewer force mains shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as set forth in the Specifications and as directed by the Engineer This shall include furnishing and installing the pipe couplings or special joints trenching backfilling compacting leakage and deflection testing and internal video inspection Unl
474. o properly mark each area to receive the appropriate recommended amendment based on the soil sample location data 20 1 05 Finish Grading After the application of soil amendment pursuant to Section 20 1 04 Soil Preparation and Amendment all areas to receive landscape planting shall be final graded to the lines and grades shown on the plans Areas to be seeded shall be evenly graded to present a smooth and even surface free of humps and hollows Immediately prior to seeding the surface of the area to be planted shall be sufficiently loose and friable to receive the seed The Contractor shall finish grade all areas to receive landscape planting below the surfaces of all adjacent walks curbs mow strips paved areas etc to the depth specified below and in all cases without abrupt changes in gradient Turf Areas inch Tree Shrub and Ground Cover Areas 1 inch 20 1 06 Weed Control After grading operations have been completed pursuant to Section 20 1 05 Finish Grading and prior to planting the Contractor shall notify the Engineer of site conditions All remaining weeds shall be removed and or eradicated as determined by a licensed Pest Control Advisor PCA in writing The Contractor shall verify the method of weed control employed whether by fumigation chemical methods mechanical methods or others as determined by a licensed PCA in writing The Contractor shall use and apply weed control materials in accordance with manufac
475. o additional compensation will be paid therefor 15 2 02 E Traffic Signs All traffic signs and street signs within the limits of the improvement if required shall be removed salvaged and stockpiled at locations designated by the Engineer The Contractor shall install and ultimately remove temporary traffic control devices if required at locations designated by the Engineer Traffic control signs and street signs previously removed and salvaged shall be replaced upon completion of the work 15 2 03 Disposal Removed existing facilities that are not to be salvaged or reused in the work shall become the property of the Contractor and shall be disposed of as provided in Section 5 12 Disposal of Material Outside the Right of Way 15 2 04 Salvage Materials from existing facilities which are shown on the Plans or specified in the Contract Specifications to be salvaged shall remain the property of the City Salvaging shall include the removal disassembly preparation marking bundling packaging tagging hauling and stockpiling of salvaged materials or facilities to the location specified in the Contract Specifications Materials include parts articles and equipment of assembled facilities Salvaging does not include the preparation of existing material that is to be reused in the work City of Clovis Standard Specifications 2009 96 Materials from an existing facility to be salvaged shall be salvaged except when only specific mat
476. o minimize the width of the trench at the top of the trench Excessive trench widths as determined by the Engineer may require special trench and pipe backfill methods to counteract excessive pipe loads and provide a bond between backfill and trench walls Reference is made to Sections 19 3 03 A 2 Final Backfill Precast Pipe and 19 3 03 A 3 Backfill Cast in Place Pipe No additional payment will be made for such special backfill methods for failure of the Contractor to exercise good construction practices to minimize trench widths Trenches for cast in place concrete pipe shall be graded and prepared to provide full firm and uniform support by undisturbed earth or compacted fill throughout the bottom 220 of the pipe periphery The Contractor shall be responsible for drainage of trenches and other excavation areas and such areas shall be kept as dry as practicable throughout the construction period Pumping or other approved method shall be used to remove any accumulation of water Trenches damaged because of failure to provide temporary drainage control shall be repaired or reconstructed at the Contractor s expense The Contractor shall adhere to the provisions of Section 5 16 Maintaining Drainage No drainage water may be pumped or otherwise deposited in any sanitary sewer system unless otherwise approved by the Engineer 19 3 03 Trench And Structure Backfill And Compaction Unless otherwise specified material used for
477. o the curb farthest from the left turn lane When pull boxes are placed in dirt and planting areas a concrete collar shall be constructed around the pull box The surface elevation of the collar shall match the surface elevation of the pull box and slope away from the pull box at a rate of 1 50 2 slope The width of the collar shall be 12 inches wide and 3 inches in depth Concrete collars installed near the back of curb shall abut the back of the curb The longest dimension of the pull box shall be parallel to the road centerline or as shown on plans or as directed by the Engineer Pull boxes for the installation of magnetic vehicle detectors probes shall be installed with the largest dimension of the pull box at right angles to the road centerline and parallel to magnetic detector conduit run On long runs pull boxes shall be installed at a maximum spacing of 200 feet Pull boxes shall be required at all conduit change of direction or changes in conduit material or size The words SIGNAL TRAFFIC SIGNAL STREET LIGHTING INTERCONNECT or COMMUNICATIONS as appropriate shall be inscribed on all pull box covers except for the splice box if used adjacent to PG amp E s service pole This pull box cover shall be inscribed as indicating P G amp E Pull box covers shall not contain hold down bolts or holes unless otherwise shown on the Plans or specified in the Contract Specifications City of Clovis Standard Specifications 20
478. o the placement of aggregate base or asphalt concrete surfacing and prior to installing fiber optic cable where specified The Contractor shall demonstrate that the maximum pipe deflection deformation does not exceed 5 percent of the nominal pipe interior diameter by pulling a properly sized rigid ball or a mandrel through the conduit A rubber flush ball does not meet the requirement for deflection testing Failure of the deflection test shall be grounds for rejection of the section tested The Contractor shall undertake measures necessary to correct the deflection Retesting of the failed section will be conducted to affirm correction 82 10 Tracer Wire A tracer wire shall be installed on the outside of the conduits including all sweeps whether the conduit is installed by open trench or direct horizontal boring methods with each fiber optic conduit run Only one wire is required for multiple conduit installations Tracer wire shall be stranded 10 gauge copper wire with white insulation The wire shall be firmly secured in an approved manner to the top center of single conduit installations or at the location shown on the Plans or designated by the Engineer for multiple conduit runs to limit disturbance during backfill operations The tracer wire shall extend along all sweeps and from pullbox to pullbox or to cabinets with at least 10 feet of wire extending into each pullbox or cabinet Tracer wire ends shall not be connected or grounded Tr
479. oadways in which construction operations have been accomplished as well as all haul roads upon which spillage has occurred shall be swept clean as directed by the Engineer Roads adjacent to construction activity which have received dirt or debris tracked from the construction area shall also be swept and cleaned Upon completion of Final Cleanup the Contractor shall notify the Engineer in writing that the work is complete in all parts and requirements and ready for final inspection as provided in Section 5 22 Final Inspection If the Contractor fails to provide Final Cleanup to the satisfaction of the Engineer a final inspection will not be performed by the Engineer until such cleanup is provided If the contract time is exceeded due to the Contractor s failure to provide or is late in providing the required final cleanup the provisions of Section 8 9 Liquidated Damages will be applied All costs for providing Final Cleanup shall be included in the various bid items of work no additional payment will be made therefor 5 22 Final Inspection Whenever the Work provided and contemplated by the Contract has been completed in all parts and requirements and the final cleanup performed in accordance with Section 5 21 Final Cleanup the Contractor shall request in writing a final inspection be made by the Engineer The written request shall include a statement that the Work has been completed in all parts and requirements of
480. oes not include an item for its removal or its removal is not included in another item then payment for removing the facility will be considered as included in the contract price paid for clearing and grubbing If the contract does not include an item for clearing and grubbing then the cost thereof shall be considered as included in the various items of work and no additional payment will be made therefor If the Engineer orders the removal of a facility which is not shown on the Plans or specified in the Contract Specifications to be removed then removing the existing facility will be paid for as extra work as provided in Section 4 11 Extra Work 15 3 Removing Concrete 15 3 01 Description Concrete shall be removed at the locations shown on the Plans or described in the Contract Specifications or where directed by the Engineer Removal shall be to the lines and elevations shown specified or determined by the Engineer City of Clovis Standard Specifications 2009 100 Concrete shall be defined as all portions of mortared rubble masonry brick or stone curbs gutters and sidewalks and portland cement concrete curbs gutters sidewalks gutter depressions driveways aprons slope paving island paving barriers retaining walls spillways dams structures foundations footings and all other portland cement concrete or masonry construction except bridges concrete culverts and pavement which are provided for in Section 15 4 B
481. of consistency the term wall as used in this Section 81 shall also mean Fence as said term is used in the Uniform Building Code for this type of construction 81 2 Materials Materials for concrete masonry wall and pilaster construction shall be as follows 1 Concrete Masonry Units Hollow load bearing masonry units shall be Grade A units conforming to the ASTM Specification Designation C90 and in addition the requirements of the Quality Control Standards of the Concrete Masonry Association All masonry units shall be sound and free of cracks and other defects that would interfere with the proper placing of the unit or impair the strength or permanence of the construction Minor cracks incidental to the usual method of manufacture or minor chipping resulting from customary methods of handling in shipment and delivery shall not be deemed grounds for rejection Cement Cement shall be Type or Type II Portland cement conforming to ASTM Specification Designation C150 Mortar Mortar shall be freshly prepared and uniformly mixed in the ratio of one part Portland cement 1 4 part minimum to 1 2 part maximum lime putty or hydrated lime damp loose sand not less than 2 and not more than 3 times the sum of the volumes of the cement and lime used 4 parts maximum and shall conform to ASTM Specification Designation C270 If plastic type cement is used lime putty shall be omitted Grout Grout for pouring or pumping shall be as follo
482. of incorrect signals and Yellow timing City of Clovis Standard Specifications 2009 295 5 This Monitor shall be a microprocessor based signal monitor This 170 2070 series Monitor shall have the capability to handle up to 16 channels with three inputs per channel The unit shall have three other monitoring functions a watchdog monitor which can be deselected a 24 VDC monitor and an AC line voltage monitor A diagnostic capability shall be available for troubleshooting This Monitor shall be capable of monitoring a Yellow signal which is shorter than the required time 2 7 seconds plus DIP switch setting and shall engage the fault relay and display the faulted channel If the Yellow phase is skipped a fault will be indicated The PCA Program Card Ajar indicator shall illuminate if no program card is present or improperly seated The PIAF indicator shall indicate that a power interruption has occurred after a fault was indicated The current display shall indicate the failed channels at the time the fault occurred 6 The Monitor shall have switches that are selectable individually on a per channel basis via DIP switches located behind the front panel When the Enhanced feature for a particular channel is enabled the three inputs Green Yellow and Red comprising that channel will be monitored for a proper display i e one of the three inputs must be active at all times and only one input may be active at any given time The Red Fail ind
483. of work including the 90 day maintenance period the Contractor shall provide to the City a Two additional keys to each enclosure and controller box b Two each of any specialized tools required for the operation and or maintenance of each type of component installed in the system c Other items as specified in the Plans and Specifications including a set of Record Drawings as builts as provided in Section 21 11 Inspection 21 14 System Guarantee In compliance with Section 7 23 Guarantee the entire irrigation system shall be guaranteed by the Contractor to give satisfactory service and the Contractor shall guarantee the quality of materials equipment and workmanship including settling of fill areas or backfilled trenches below finish grade for a period of one year following the date of the filing of the Notice of Acceptance for all of the work by the City If within one year from the date of the filing of the Notice of Acceptance for all of the work problems develop resulting from inferior or faulty materials or workmanship or settlement of fill areas or trench backfill occurs requiring adjustments in pipes valves emitters heads sod or paving to the proper level of the permanent grades the Contractor as part of the work under his Contract shall make all adjustments and corrections without extra cost to the City including the complete restoration of all damaged planting paving or other improvements o
484. oil all as directed by the Engineer The surfaces of all trenches excavations or other areas damaged or disturbed by the work upon completion of miscellaneous surface restoration shall conform to the elevations and character of the areas which existed before work commenced In all cases regardless of surface material or type all existing or new facilities shall be brought to the finish grade of that surface in compliance with Section 15 2 05 A Frames Covers Grates Manholes The interior of the existing or new facilities including water valve barrels shall be thoroughly cleaned of all debris or dirt regardless of whether the debris or dirt was present before construction began Restoration of surfaces shall comply with Sections 4 13 Interim Cleanup 5 20 Surface Restoration and 5 21 Final Cleanup 19 3 06 Measurement Trench and structure excavation will not be measured as it is to be included in the work requiring such excavation and backfill Unless otherwise provided in the Contract Specifications measurement of Slurry Cement Backfill or Pervious Backfill Material used for trench backfill shall be by lineal foot as measured along the centerline of trench in which such backfill was placed Measurement for temporary or permanent trench resurfacing will be by the lineal foot as measured along the centerline of the actual trench resurfaced unless otherwise indicated in the Plans and or Contract Specifications
485. oles for shrubs shall be backfilled in accordance with Section 20 1 08 Planting General and Section 20 4 03 Shrub Fertilizer with the amended soil removed from the planting hole Backfill material in planting holes shall be tamped firm and a watering basin conforming to the Standard Drawing for Shrub Planting formed around the plant Shrubs shall be watered immediately after planting 20 4 03 Shrub Fertilizer During the planting operation apply Best Packs or approved equal planting tablets per the manufacturer s recommendations 20 4 04 Mulching Where mulching of shrub watering basins is shown on the plans or specified in the Contract Specifications Walk on Bark mulch shall be applied as top dressing in accordance with the Standard Drawing for Shrub Planting Shrub stems shall not be engulfed with mulch 20 4 05 Shrub Establishment Period The Shrub Establishment Period is the time required for newly planted shrubs to exhibit an initial healthy and robust appearance absent of wilting or other signs of stress as determined by the Engineer The Shrub Establishment Period shall commence immediately upon planting and shall continue until the commencement of the maintenance period specified in Section 20 8 Maintenance Period The maintenance period will not be permitted to commence until all shrubs have met the requirements of the shrub establishment period During the shrub establishment period as well as the maintenance p
486. oles or other excavations performed to determine the location of underground utilities or facilities as required by Section 8 15 Utility and Non Street Facilities Potholing shall conform to the applicable portions of this Section 19 3 and to the special backfill requirements of said Section 8 15 19 3 02 Trench And Structure Excavation Excavations shall be made to the depths and widths required to accommodate the construction or installation of pipelines conduits and structures to specified dimensions and to the lines and grades shown on the Plans The Contractor shall comply with the provisions of Sections 7 12 Safety Provisions First Aid Injury Illness Prevention Program 7 13 Worker Protection From Toxic Or Explosive Gases Confined Spaces Entry and 7 15 Worker Protection From Caving Ground In Excavations and all Safety Orders issued by the State Division of Industrial Safety Material excavated from trenches or for structures shall be placed to offer minimum obstructions to traffic The City has made every effort to locate and show all underground utilities and facilities on the plans However before excavation the Contractor shall be responsible to field verify the locations by calling for USA mark outs potholing and any other means or methods to determine both the horizontal and vertical locations of underground utility and other facilities and shall notify the Engineer immediately if conflicts occur The C
487. on Of Subgrade Any required excavation or embankment construction shall be to the lines and grades shown on the Plans or established by the Engineer Excavation embankment construction City of Clovis Standard Specifications 2009 220 and preparation of subgrade shall conform to the requirements of Section 19 Earthwork Unless otherwise indicated minimum relative compaction of finished fence pad shall be 90 percent The area around each gate shall be graded to allow all gates to be swung back against the fence without dragging on the ground surface 80 5 Construction 1 Chain Link Fence Gates Line posts shall be spaced not farther apart than 10 feet from center to center and unless otherwise specified shall be set vertically All posts shall be set in concrete footings conforming to details show on the Standard Drawings Unless otherwise directed by the Engineer footings shall be crowned at the top to permit water to flow away from the posts End corner and gate posts shall be braced to the nearest line post as shown on the Standard Drawings with horizontal braces used as compression members and galvanized 3 8 inch diameter steel adjustable truss rods used as tension members The adjuster shall be provided with flat and lock washers and shall be double nutted as directed by the Engineer to lock the adjuster Where the distance between corner and or gate posts is 1 000 feet or greater line posts shall be braced h
488. onforming to the requirements of the Specifications shall be considered as defective and all such materials whether in place or not shall be rejected and shall be removed immediately from the site of the work unless otherwise permitted by the Engineer No rejected material the defects of which have subsequently been corrected shall be used until approved by the Engineer Upon failure on the part of the Contractor to comply with any order of the Engineer made under the provisions of this article the Engineer shall have authority to remove and replace City of Clovis Standard Specifications 2009 38 defective material and to deduct the cost of removal and replacement from any monies due or to become due to the Contractor 6 4 Trade Names Or Equal Whenever the material or article to be furnished is described by trade name brand name or other reference is made to specific manufacturer or supplier or approved equal or City approved equal it shall be understood that the use of a trade name or brand name is intended to describe a specific quality of material to be used in the project The City s intention shall not be interpreted to exclude or omit the products of any responsible manufacturer if such products are equal or superior in every respect to those specifically described No substitutions shall be used in the work without prior approval of the Engineer The burden of proof as to the quality and suitability of alternatives sha
489. ons Whenever the specifications require compliance with specified values for the following properties tests will be made by the California Test indicated unless otherwise specified Properties California Test Relative Compaction 216 or 231 Sand Equivalent 217 Resistance R value 301 Grading Sieve Analysis 202 Durability Index 229 Unless provided otherwise in the Specifications the cost of original testing shall be borne by the City for work performed under Contract for the City Any retesting required because of failure of materials to pass the initial test shall be done at the expense of the Contractor All other tests required for work not under contract with the City and located in City streets and alleys or on private property shall be borne by the Contractor or permittee in the case of non public work performed under a City Encroachment Permit City of Clovis Standard Specifications 2009 41 6 9 Compaction Tests Relative compaction of soil in trenches embankment or structural backfill shall be determined by the laboratory standard of test procedure California Method 216 except that dry random sampling methods dry weight basis testing may be used To be considered a passing test all compaction tests must meet the required relative percent compaction and must indicate a moisture content within 2 of optimum The Drive Cylinder method ASTM Designation D 2937 the Sand Cone Method AS
490. ontractor shall comply with the provisions of Section 8 15 Utility and Non street Facilities Potholing relating to existing utilities and the location and protection thereof The location of subsurface obstructions found in the field may necessitate a variance in the depth or alignment of proposed facilities When a trench or structure site is to be located in an existing oiled earth or pavement area the existing surfacing to be removed shall be cut by methods shown on the plans or as approved by the Engineer along neat lines on each side of the trench or around the structure site Existing surfacing when removed shall be kept separated from the material that is to be returned to the excavation as backfill Failure to comply with this requirement shall be grounds for rejection of the contaminated material for use as backfill Trenches shall be uniformly graded and prepared to provide a firm and uniform bearing for the entire length of the barrel of the pipe to be placed therein Coupling or bell holes are required for all trenches to receive pipes or conduits with couplings or bells and shall be excavated at each location where pipes are to be joined Coupling or bell holes shall be of sufficient and of adequate size to permit ease in making the joint and so the coupling or bell does not rest on the bottom of the hole excavated therefor Except for pipe bells and City of Clovis Standard Specifications 2009 117 couplings any portion
491. op or working drawings shall be of a size and scale to clearly show all necessary details Unless otherwise specified shop or working drawings shall be submitted in quadruplicate to the Engineer for approval or correction at least fifteen 15 calendar days before approved drawings will be required for the work If corrections are required the Contractor shall make corrections as directed by the Engineer and shall deliver four 4 copies of the corrected shop or working drawings to the Engineer Upon final approval one set will be returned to the Contractor marked approved or approved as corrected For items requiring shop drawings no materials shall be furnished or work done before approval of the drawings Approval of shop or working drawings by the Engineer means that there is substantial and acceptable conformance with the Plans and Specifications but details of design may not necessarily be checked for adequacy or accuracy An approval shall not relieve the Contractor from the responsibility for errors or omissions in the drawings or from deviations from the Contract documents unless such errors omissions or deviations were specifically called to the attention of the Engineer in writing The Contractor is responsible for the correctness of the shop or working drawings for shop fits and field connections and for the results obtained by use of such plans City of Clovis Standard Specifications 2009 14 In the event of discrepancy bet
492. oppings should be kept out of the grout space Mortar that projects into the grout space shall be removed so that protrusions will not restrict the flow of grout grout will tend to bridge at these locations and require too much puddling or vibration to assure complete filling of grout space Vertical cells to be filled shall have a vertical alignment to maintain a continuous unobstructed cell area not less than 2 x 3 inches Grout for cells containing reinforcement shall be stopped 17 below the top of a course to form a key at pour joints Reinforcing bars shall be straight except for bends or hooks as detailed on the Standard Drawings Horizontal reinforcing bars shall be laid on the webs of the masonry units in continuous masonry courses consisting of bond beam or channel units and shall be solidly grouted in place Vertical reinforcing steel shall a minimum clearance of inch from the masonry and not less than one bar diameter between bars Wire reinforcement shall be completely embedded in mortar or grout Joints with wire reinforcement shall be at least twice the thickness of the wire Concrete scum and grout stains on the wall shall be removed immediately After the wall is constructed it should not be saturated with water for curing or any other purpose At the conclusion of the masonry work the Contractor shall clean all the masonry remove equipment used in the work and remove all debris refuse and surplus masonry materia
493. or the plug shall be externally adjustable Valve flanges shall conform to the provisions of ANSI B16 1 for Class 125 Flanged ends shall be fastened with ANSI Type A304 stainless steel nuts and bolts Plug valves shall be furnished with permanently lubricated sleeve Type 326 stainless steel metallic bearings Grit excluder seals shall be provided in the upper and lower journals to isolate the bearings Plug valve shaft seals shall be the self adjusting type replaceable without removing the valve bonnet Shaft seal shall be rated for pressure or vacuum service Externally adjustable packing gland is not allowed Manual gear actuators shall be totally enclosed worm and gear type permanently lubricated For valves 2 to 20 inches in nominal size the flow way shall be round 100 percent open area full port design For valves greater than 20 inches in nominal size the flow way shall be round or rectangular 100 percent open area full port design All interior ferrous surfaces exposed to fluid flows shall be factory coated with a thermo setting 2 part epoxy or fusion epoxy coating having a minimum dry thickness of 8 mils All City of Clovis Standard Specifications 2009 182 exterior ferrous surfaces shall receive two coats of Plasite 7122 as produced by Carboline Company www carboline com or approved equal with each coat having a different color and being 6 to 8 mils in dry thickness All linings and coatings shall conform to the ma
494. or defects 82 26 D After Cable Installation After the fiber optic cable has been pulled and terminated one hundred 100 percent of all fibers shall be tested with the OTDR for attenuation Test results shall be recorded dated compared and filed with the previous copies of these tests Copies of traces and test results shall be submitted to the Engineer for approval If the OTDR test results are unsatisfactory the fiber optic cable segment will be unacceptable The unsatisfactory segment of cable shall be replaced with a new segment without additional splices at the Contractor s expense The new segment of cable shall then be tested to demonstrate acceptability Copies of the test results shall be submitted to the Engineer for approval 82 26 E Outdoor Splices At the conclusion of all outdoor splices at one 1 location all splices shall be tested with the OTDR Splice segments shall be tested at 1310 nm and at 1550 Individual fusion splice losses shall not exceed 0 07 dB Measurement results shall be recorded dated validated by the OTDR trace printout and filed with the records of the respective cable runs Copies of traces and test results shall be submitted to the Engineer If the OTDR test results are unsatisfactory the splice shall be unacceptable The unsatisfactory splice shall be replaced at the Contractors expense The new splice shall then be tested to demonstrate acceptability Copies of the test results shall be submitted
495. or shall provide and install suitable approved safeguards to protect property or improvements from injury or damage If property or improvements are injured or damaged by reason of the Contractor s operations they shall be replaced or restored to a condition as good as when the Contractor entered upon the work or as good as required by the specifications being performed under this Contract In certain cases where the Contractor damages an existing facility such as a curb return and or landing the Engineer may require the Contractor at his expense to reconstruct the return to meet current Americans With Disabilities Act ADA requirements and standards The Engineer may make or cause to be made such temporary repairs as are necessary to restore to service any damaged facility The cost of such repairs shall be borne by the Contractor and may be deducted by the City from any monies due or to become due to the Contractor under the Contract 5 10 Protection Of The Work The Contractor shall provide and maintain proper barricades fences signal lights or watchmen to properly protect the work persons animals and property against injury The cost of such protection shall be included in the amount bid for the various items of work In accordance with Section 7 18 Public Safety the Engineer reserves the right to remedy any situation condition or neglect on the part of the Contractor as regards the protection of the work the public or prop
496. or the Contract items of work involving such materials and no additional compensation will be allowed therefor No additional payment will be granted the Contractor for inconvenience or delays encountered in complying with the requirements of this Section 5 12 5 13 Electric And Water Service The Contractor shall provide and pay for electric service for power and lighting required for the construction of the work of the Contract and shall maintain such service until the completion of the Contract The Contractor shall make arrangements for and shall acquire a water supply for the work done under the Contract The Contractor shall pay for all water so used In accordance with the provisions of Section 17 Water Use water to be used in work contracted to the City may be taken from the City s water system at a location approved by the City If taken from the City s water system the Contractor shall obtain a water meter from the Utilities Division of the City Public Utilities Department and pay any deposits or fees required therefor including charges for water used Failure to return the meter at specified intervals for reading and or late return of the meter when the work is completed will result in additional fees A backflow prevention device may be required by the City and shall be furnished and installed by the Contractor prior to any water being taken from the City s system Water taken from a source other than the City system sh
497. ored with a 6 inch diameter hole If a sign is to be placed where new concrete is to be poured a 6 inch diameter PVC sleeve shall be provided in the new concrete Solid embedment of sign posts in concrete is not permitted Sleeves may be obtained from the City of Clovis Public Utilities Department at 155 N Sunnyside Avenue Sign posts shall be imbedded in the ground to the depth specified in the Plans Contract Specifications or California MUTCD as applicable Any voids around sign posts passed City of Clovis Standard Specifications 2009 268 through sleeves concrete shall be backfilled with soil and thoroughly compacted to the satisfaction of the Engineer 84 7 Measurement Unless otherwise specified in the Contract Specifications striping and marking pavement shall be measured on a lump sum basis and shall include any required removal of existing pavement striping or markings Unless otherwise specified in the Contract Specifications traffic signs will be measured on a per each basis 84 8 Payment The lump sum price paid for striping and marking pavement shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as specified in the Specifications or as directed by the Engineer The per each price paid for signs shall include full compensation for furnishing all labor materials tools equipment and incidentals
498. orizontally and trussed in both directions at intervals not to exceed 1 000 feet as shown on the Standard Drawings The tension wires shall be interrupted at this location by cutting and attaching them to one of the braced line posts Tension wires shall then be continued from this same line post to the next corner or gate post Changes in line where the deflection angle is 10 degrees or more shall be considered as corners and corner posts with bracing specified for corners shall be installed Chain link fabric shall be fastened on the outside of the posts surrounding the area being fenced unless otherwise directed by the Engineer The fabric shall be stretched and securely fastened to the posts and between posts the top and bottom edges of the fabric shall be fastened to the tension wires Tension wires shall be stretched tight and attached to corner or gate posts in a manner approved by the Engineer The fabric shall be fastened to end corner and gate posts with inch wide by 34 inch thick stretcher bars and not less than 1 8 inch wide by inch thick stretcher bar bands spaced at 1 foot intervals The fabric shall be fastened to line posts with tie wires or post clips and to tension wires with tie wires or hog rings The wire or clip fasteners shall be spaced 14 inches apart on line posts with a minimum of 6 per post and 18 inches apart on tension wires All bolted fixtures including gate hinge attachments turnbuckles or other adjust
499. ornia Manual on Uniform Traffic Control Devices for streets and highways California MUTCD dated September 26 2006 and amendments thereto Supersedes the MUTCD and MUTCD California Supplement 1 26 Median That portion of a divided roadway separating the traveled ways for traffic in opposite directions including inside shoulders if any Medians may be raised or un raised paved or unpaved 1 27 Pavement The uppermost layer of material placed on the traveled way or shoulders This term is used interchangeably with surfacing 1 28 Permit As used in these Standard Specifications the document issued by a jurisdictional agency specifying the terms and conditions under which the permittee is authorized to perform certain work typically associated with a Contract awarded by the City Permits may be issued by one or more agencies which have jurisdiction by law or by ownership over various aspects of the work Permits may take the form of providing authorization to perform general roadwork to install construct or repair certain encroachments or govern such things as air pollution and storm water pollution prevention The term Encroachment Permit describes the permit issued by the City Engineering Division and does not apply to Building Permits issued by the City Building Division See Section 1 14 Encroachment 1 29 Permittee The person or persons partnership or corporation private or public who has obtained a permit from the
500. ose alternatives specifically identified in the bid proposal to be used for the purpose of determining the lowest bid The City reserves the right to add or subtract any of the alternatives after the lowest bid has been determined The award if made will be made within forty five 45 calendar days after the opening of the proposals If the lowest responsible bidder refuses or fails to execute the Contract the City may award the Contract to the second lowest responsible bidder the award if made will be made within sixty 60 calendar days after the opening of the proposals If the second lowest responsible bidder refuses or fails to execute the Contract the City may award the Contract to the third lowest responsible bidder the award if made will be made within seventy five 75 calendar days after the opening of the proposals The periods of time specified above within which the award of a Contract may be made will be subject to extension for further periods agreed upon in writing between the City and the bidder concerned All bids will be compared on the basis of the Engineer s Estimate of quantities of work to be done as shown in the bid proposal Bids shall be submitted on base bids and all alternate bids if any in order to be considered responsive 3 2 Execution Of Contract The Contract shall be signed by an authorized representative of the successful bidder and returned within twelve 12 calendar days after the bidder has received no
501. osure as necessary Control wiring shall be 7 strand No 14 TW except for hinge wiring which shall be 19 strand No 14 THHN Wiring shall be arranged so that any piece of apparatus may be removed without disconnecting any wiring except the leads to that piece of apparatus Wiring lugs for field conductors shall be compatible with 2 conductors All wiring shall be marked with permanent clip sleeve wire markers Felt pencil or stick back markers will not be acceptable The painting process shall include five stages of metal preparation using dip tanks as follows Alkaline cleaner Clear water rinse Phosphoric acid application Clear water rinse Inhibitive acid rinse to seal phosphated surfaces ie The finished paint coating shall be dry powder electrostatically applied polyurethane plastic and then baked on at a minimum temperature of 380 F The finish shall conform to test method No Calif 645 and have a color retention of no fade after 500 hours in a fadometer The electrostatic painted finish shall provide a minimum pencil hardness of HB and a corrosion or adhesion loss not to exceed 1 8 inch average width from a scribe mark after a minimum exposure of 500 hours to salt spray Salt spray resistance 500 hours Less than 1 8 inch undercutting per ASTM B117 adherence test method 645 180 bend over inch mandrel without cracking 1 000 hours at 100 percent humidity with an X scribe mark then apply tape and pull Fad
502. ot constitute a shortage of materials If the Contractor is delayed by the City in completion of the Work by reason of changes made under Section 4 10 Changes by failure of the City to acquire or clear right of way by Extra Work under Section 4 11 Extra Work or by any act of the Engineer or of the City not contemplated by the contract an extension of time commensurate with the delay in completion of the work thus caused will be granted provided that the Contractor shall notify the Engineer in writing of the causes of delay within 15 days from the beginning of the delay The Engineer shall ascertain the facts and the extent of the delay and the Engineer s findings thereon shall be final and conclusive Except for the additional compensation provided for in Section 8 10 Right of Way Delays and except as provided in Public Contract Code Section 7102 the Contractor shall have no claim for damage or compensation for any delay or hindrance It is the intention of the above provisions that the Contractor shall not be relieved of liability for liquidated damages or engineering and inspection charges for any period of delay in completion of the work in excess of that expressly provided for in this Section 8 9 8 10 Right Of Way Delays The City makes a diligent effort at securing a clear right of way for the performance of the work required by the contract For some contracts it is in the best interests of the City and or the publi
503. ousand dollars 50 000 the City shall respond in writing to any written Claim within 45 days of receipt of the Claim or may request in writing within 30 days of receipt of the Claim any additional documentation supporting the Claim or relating to defenses to the claim the City may have against the Contractor If additional information is thereafter required it shall be requested and provided pursuant to this subdivision upon mutual agreement of the City and Contractor The City s written response to the Claim as further documented shall be submitted to the Contractor within 15 days after receipt of the further documentation or within a period of time no greater than that taken by the Contractor in producing the additional information whichever is greater 4 12 6 2 Claims Over 50 000 And Less Than 375 000 For claims over fifty thousand dollars 50 000 and less than or equal to three hundred seventy five thousand dollars 375 000 the City shall respond in writing to all written Claims within 60 days of receipt of the Claim or may request in writing within 30 days of receipt of the Claim any additional documentation supporting the Claim or relating to defenses to the Claim the City may have against the Contractor If additional information is thereafter required it shall be requested and provided pursuant to this subdivision upon mutual agreement of the City and Contractor The City s written response to the Claim as fu
504. outside of normal working hours Work requiring inspection before or after the normal 8 hours of a normal working day or taking place on holidays Saturdays and Sundays will be considered overtime inspection The Contractor will be billed at the standard City hourly overtime rate Failure to pay the bill will be cause to deduct the amount from monies due the Contractor In the event the Contractor schedules an inspection and has not completed the work that is to be inspected or made an effort to do so the Contractor will be billed at the standard City hourly rate for the cost of time expended by City inspectors in preparing for and making the City of Clovis Standard Specifications 2009 255 determination that the work has not been satisfactorily completed to warrant inspection If the inspection was scheduled to occur on overtime a weekend or holiday said charge will be calculated at the standard City overtime double time rate as applicable Failure to pay the bill will be cause to deduct the amount from monies due the Contractor 83 6 Tests Standards And Procedures The tests standards or recommended procedures of the following agencies shall relate to all parts of these Standard Specifications and shall be considered a minimum American National Standards Institute ANSI Underwriters Laboratories Inc UL National Electrical Manufacturers Association NEMA Electrical Testing Laboratories ETL National Fire Protection
505. ovide a complete fence installation as specified Payment for each type of gate shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans and Standard Drawings as set forth in the Specifications and as directed by the Engineer This shall include clearing and preparing the gate opening area where no separate item is provided therefor furnishing and installing gates providing samples and tests furnishing and installing post extension arms and strands of wire where indicated and all incidentals City of Clovis Standard Specifications 2009 222 Payment for Timber Barricades shall include compensation for labor tools materials and incidentals required for the complete installation as shown on the Plans and applicable Standard Drawings and as specified in the Specifications including paint and reflectors City of Clovis Standard Specifications 2009 223 SECTION 81 CONCRETE MASONRY WALL FENCE 81 1 General This work shall consist of furnishing all materials and constructing a concrete masonry wall at the locations lines and grades as shown on the Plans in conformance with Standard Drawings as specified in the Specifications and as directed by the Engineer Included is the footing and pilaster construction reinforcing steel concrete masonry units and other facilities to complete the wall For purposes
506. ovide the most efficient flow of water to the irrigation heads Each valve is to be enclosed in the specified valve box The valve box shall be secured on firm soil clear of valves and wiring connections Backfill carefully to prevent settlement and subsequent damage Each valve box corner is to be set on a brick to prevent settling with a minimum of one cubic foot of pea gravel installed below the valve 15 Remote Control Valves Remote control valves shall be adjusted so that all heads operate within the pressure range recommended by the head manufacturer Remote control valves shall be adjusted so a uniform distribution of water is applied by the heads to the planting areas for each individual valve system Make all connections for operation 16 Flushing of Lines After all new piping is in place and connected and all necessary diversion work has been completed the control valves shall be opened and a full head of water used to flush out the system 17 Automatic Controllers Locate controllers in general locations shown with exact placement to be determined at the job site by the City s representative Connect to 120 volt source s provided at the site Install electrical service pedestal at the connection Use rigid metal conduit above grade slab or floor Where specified provide and install rechargeable battery backup in controllers per the manufacturer s recommendations City of Clovis Standard Specifications 2009 15
507. ovisions in Section 86 2 095 Fused Splice Connectors of the State Standard Specifications Fuse rating and type shall be as shown on page ES 13B of the State Standard Plans Fuses shall be the standard midget ferrule type with non time delay feature and shall be 13 32 inches x 1 1 2 inches The fuse shall be supplied and installed in pull box adjacent to luminaire Fuse shall be installed on the ungrounded conductor Fuse holder shall be installed so the fuse is retained in the load side of the holder when disconnected The head of the metal assembly screw shall be recessed a minimum of 1 32 inch below the top of a plastic boss which surrounds the head City of Clovis Standard Specifications 2009 281 86 19 Bonding And Grounding Bonding and grounding shall conform to the provisions in Section 86 2 10 Bonding and Grounding of the State Standard Specifications and these Standard Specifications Bonding and grounding of electrical systems shall be by stranded or solid copper wire A 5 8 inch x 8 foot copper clad ground rod shall be installed within the service cabinet enclosure and shall be connected to the grounding point in the service pedestal using a No 6 AWG copper wire Equipment bonding jumpers shall be No 8 AWG or larger copper wire A No 8 AWG stranded copper grounding conductor with green THWN insulation shall be installed in all signal and street lighting conduits and connected to the bonding wire between bond
508. ow ground that are required to be rearranged as used herein rearrangement includes installation relocation alteration or removal as a part of the street improvement will be rearranged in advance of construction operations Where it is not anticipated that the rearrangement will be performed prior to construction or where the rearrangement must be coordinated with the Contractor s construction operations the existing facilities that are to be rearranged will be indicated on the plans or in the Contract Specifications Where a rearrangement is indicated on the plans or in the Contract Specifications the Contractor will have no liability for the costs of performing the work involved in the rearrangement unless the Plans or Contract Specifications indicate such rearrangement is to be performed by the Contractor The right is reserved to the City and the owners of facilities or their authorized agents to enter upon the street right of way for the purpose of making those changes that are necessary for the rearrangement of their facilities or for making necessary connections or repairs to their properties In compliance with Section 5 15 Cooperation the Contractor shall cooperate with forces engaged in this work and shall conduct operations in such a manner as to avoid any unnecessary delay or hindrance to the work being performed by the other forces Wherever necessary the work of the Contractor shall be coordinated with the rearrangement of u
509. pacted at street or alley crossings temporary surfacing shall be placed in conformance with Section 19 3 05 Restoration of Surfaces and in accordance with the Plans and Standard Drawing therefor 19 3 05 Restoration of Surfaces For trench or structure excavations located in existing paved areas not to be reconstructed as part of the work final pavement replacement shall be accomplished as soon as possible and practicable but in no case less than the time limits specified in the Contract Specifications Restoration of surfaces shall consist of restoring the surfaces resurfacing of all trenches and surfaces at or around structure sites or any other surfaces damaged or disturbed by the work Surfaces shall include pavement of any kind including asphalt concrete portland cement concrete paving stones grass shrubbery or other landscaping gravel treated or untreated soil etc All work shall be done in accordance with the Plans Standard Drawing and the Specifications City of Clovis Standard Specifications 2009 121 Temporary trench resurfacing shall comply with the applicable Standard Drawing for Trench Backfill and Resurfacing and placed and diligently maintained by the Contractor until permanent trench resurfacing is installed Temporary surfacing shall be placed at all street and alley crossings and such other locations as specified or shown on the Plans or directed by the Engineer Temporary surfacing shall be removed by t
510. pecifications The traffic signal power backup shall include but not be limited to a shelf mounted Clary SP1250PD N PLUS or rack mounted Clary SP1000SR SN as shown on the Plans or specified in the Contract Specifications with the OPB 1241 battery pack consisting of six 6 extreme temperature batteries an external battery cabinet Clary CBO 127 Style 3 or approved equal mounted piggyback style onto the Model 332A controller cabinet and any cables and connectors necessary to install the traffic signal power backup system in the controller cabinet complete in place and operational OVERVIEW The Clary SP Series Traffic UPS is a turnkey true on line power conditioner and battery backup or uninterruptible power system UPS designed for transportation and traffic applications The Clary SP Series is capable of operating up to its rated power level in extreme environments with existing equipment on the street today including a traffic signal controller cabinet complete with all ancillary devices and all signal heads Incandescent LED Neon etc Where shown on plans the SP Series Traffic UPS shall be furnished and installed in conformance with the following specification 1 0 Operation A The Traffic UPS shall be capable of producing simultaneous fully regenerated conditioned and true sine wave standby and continuous AC outputs B Suggested operating mode for respective outputs during power failure Cont
511. pecifications 2009 301 Board edge connector assignment shall be as follows A DC ground 24 VDC P NC C NC D Detector input Channel AR NC 24 VDC to detectors S NC F Channel A output C T NC U NC H Channel A output E V NC J Detector input Channel BW Channel output K DC ground to detectors X Channel output L Chassis ground Y NC AC Z NC N AC Slotted for Keying NC not connected cannot be used by manufacturer for any purpose C Collector E Emitter Two auxiliary inputs for each channel shall enter each module through the front panel connector 1 Auxiliary detector 1 input Channel A 2 Auxiliary detector 2 input Channel A 3 Auxiliary detector 1 input Channel B 4 Auxiliary detector 2 input Channel B Each channel output shall be an optically isolated NPN open collector transistor capable of sinking 50 milliamperes at 30 volts and shall be compatible with the Model 170 controller unit inputs Each discriminator module shall be provided with means of preventing transients received by the detector from affecting the Model 170 controller assembly Each discriminator module shall have a single connector board shall be capable of being inserted into the input file of a Model 332 cabinet and shall occupy one slot width of the input file The front panel of each module shall have a handle to facilitate withdrawal and the following controls and indicators for each channel
512. ped All soil shall be tamped and jetted to eliminate any voids Surplus earth remaining after backfilling shall be disposed of as directed by the City Inspector Backfilling for all pipe shall be carried out in two basic stages A Stage One Backfilling This shall be accomplished as soon as possible after the pipe is placed A bedding of uniform depth with no voids must be provided along the entire length of the pipe The bedding dirt should be placed in the trench and tamped into the areas under the pipe using a suitable tool Joints should be left exposed until hydrostatic tests are completed Cover only those portions of the pipe necessary to prevent movement or damage B Stage Two Backfilling This shall be completed after all hydrostatic tests are completed and the piping system has been thoroughly checked for leaks or other defects Continue to add backfill soil in 4 inch layers and hand tamp to achieve a density similar to adjacent soil After 12 inches in main line trenches of hand tamped soil is in place over the pipe and fittings backfilling can be continued using light machinery to place dirt in the trenches in 6 inch layers and to compact the dirt to conform to adjacent soil Extreme care should be taken to avoid damage to the pipe from machinery that is too heavy All trenches shall then be water jetted to assure uniform settling and compaction Backfilling operations will not be considered complete until the top surface has be
513. perform in all respects in conformance with the plans and specifications and to the satisfaction of the City Due to the scale of the drawings it is not always possible to indicate all offsets pipe or conduit fittings etc which may be required The Contractor shall carefully investigate the structural and finished conditions affecting the work and plan the work accordingly furnishing such fittings couplings pipes conduits etc as may be required to meet such conditions Drawings are generally diagrammatic and indicative of the work to be installed in the most direct and professional manner so that conflicts between irrigation systems lighting systems planting and architectural features will be avoided The Contractor shall verify the correctness of all finish grades within the work area in order to ensure the proper soil coverage as specified for the irrigation system pipes The Contractor shall not willfully install the irrigation facilities as indicated on the Plans when it is obvious in the field that obstructions or grade differences exist that might not have been considered in the design Such obstructions or differences should be brought to the attention of the Engineer in writing by the Contractor for consideration of adjustment in proposed facility locations prior to installation of facilities City of Clovis Standard Specifications 2009 148 Contractor shall verify and be familiar with the location and size of the
514. perly filled out and executed including accompanying documentation as therein required less the amount of the material incorporated in the work to the time of the estimate Only materials to be incorporated in the work will be considered The estimated value of the material established by the Engineer will in no case exceed the contract price for the item of work for which the material is furnished Payment requests submitted after the 20th day of the month will not be processed for payment in the following month but will be processed for payment in the next succeeding monthly payment period when such payment will become due and payable The Engineer shall review and revise if necessary the Contractor s progress payment application If the City determines that the application is not a proper payment request the City shall return it to Contractor as soon as practicable with an explanation of why it is not proper but not later than seven 7 days after receipt If the Contractor and City cannot agree on the amount of work performed or other aspects of the application then the Contractor shall resubmit using the Engineer s version If the Contractor feels that it should be paid more it may follow the claims process under Section 4 12 Notices Change Orders and Claims The City shall make the payment within thirty 30 days of the Contractor s submittal of an undisputed and properly submitted payment application The City shall retai
515. permanent striping All protective covers of markers left in place shall be removed after the application for nighttime reflectivity and visibility Prior to the application of paint thermoplastic stripping and pavement markings temporary road marker tabs shall be removed completely Re installation of Traffic Stripes and Pavement Markings shall comply with Section 84 Traffic Stripes Signs and Pavement Markings 15 2 02 D Pavement Markers Where removal of existing raised pavement markers is called for on the Plans and or Contract Specifications markers including underlying adhesive shall be removed by an approved method that will result in the least possible damage to the pavement or other surfacing Damage to the pavement or surfacing caused by pavement marker removal shall be repaired by the Contractor at the Contractor s expense by methods acceptable to the Engineer Pavement markers whether shown for removal or not that will be in conflict with the intent of any new striping diagram shall be removed During the removal of ceramic type pavement markers screens or other protective devices shall be furnished to contain any fragments as provided for in Section 7 18 Public Safety Fragments resulting from the removal of pavement markers shall be removed from the roadway before the lane or lanes are opened to traffic Removal shall be at the direction of the Engineer The cost thereof shall be included in the various items of work n
516. pex offset less than 50 mm j Connectorized fibers shall be clearly labeled using a labeling convention approved by the Engineer 82 20 Splicing All permanent fiber optic cable splices shall be the fusion type and shall not exceed 0 15 dB loss per splice Splicing of fiber optics cables shall not be permitted except in emergency situations and with prior approval of the Engineer The field splices shall connect the fibers of two 2 or more fiber optic lengths together as indicated on the conductor schedules These splices shall be placed in a splice tray and these tray s shall then be placed in the splice enclosure The termination splices shall connect the fiber optic cable span ends with pigtails The termination splices shall be placed in a splice tray The individual fibers shall be looped one 1 full turn within the splice tray to avoid micro bending A 2 inch minimum bend radius shall be maintained during installation and after final assembly in the optical fiber splice tray Each bare fiber shall be individually restrained in a splice tray The optic fibers in buffer tubes and the placement of the bare optical fibers in the splice tray shall be such that there is no discernable tensile force on the optical fiber 82 21 Splice Enclosures The fiber optic field splices shall be enclosed in splice closures which shall be waterproof rodent proof and re enterable The enclosures shall have sufficient capacity to splice the maximum number o
517. plant establishment period i Pre final Inspection prior to commencement of Maintenance Period j Inspection during plant maintenance period k Final inspection after completion of the plant maintenance period All overtime inspection charges incurred by specialized City Parks Division personnel shall be paid by the Contractor when inspection services are required outside of normal working hours Work requiring inspection before or after the normal 8 hours of a normal working day or taking place on holidays Saturdays and Sundays will be considered overtime inspection City of Clovis Standard Specifications 2009 128 The Contractor will be billed at the standard City hourly overtime rate Failure to pay the bill will be cause to deduct the amount from monies due the Contractor A pre final inspection of the work shall be made by the City Engineering Inspector and Parks Division personnel in the presence of the Contractor at the time when all landscaping and irrigation work is completed and inspection is requested by the Contractor to commence the plant maintenance period The Contractor shall comply with the requirements of Section 20 8 Maintenance Period The Contractor shall make the inspection request to the Engineer two working days prior to the requested time of such inspection At the time of the pre final inspection the Contractor shall have prepared and transmit to the City Engineering Inspector a set of record or as bu
518. plastic conduit shall be installed in slab floors or in exposed locations PVC conduit shall be Type 40 heavy thick wall polyvinyl chloride conduit Underwriters Laboratories tested furnished in 10 foot lengths conforming to UL 651 77 City of Clovis Standard Specifications 2009 254 PVC coated rigid galvanized conduit All metallic conduits installed in contact with concrete in contact with earth shall be coated with a minimum 40 Mil PVC factory applied coating on all conduit lengths and fittings The coating shall correspond to ATSM 0638 68 01706 0140 64 and D746 64T Specifications and Federal Test Standard 141 Method 615z Coating shall be continuous without flaws showing exposed metal Coating shall extend to the device conduit is terminated to in exposed locations and 12 above grade in unexposed locations Where direct horizontal boring is to be utilized unless otherwise shown on the Plans or specified in the Contract Specifications electrical conduit shall be SDR 11 HDPE furnished and installed in conformance with and at the locations shown on the Plans in conformance with the Contract Specifications the provisions in these Specifications and as directed by the Engineer Conduit shall be smooth wall direct burial rated and specifically designed for electrical wiring H Tracer wire shall be No 10 stranded copper with white insulation I Pull Tape shall be flat woven polyester have a minimum pull tensile strengt
519. pment A factory certified representative from the supplier shall be on site during installation Training shall be provided to personnel of the contracting agency or their authorized representative Training duration time shall be required to insure the personnel of the contracting agency have received sufficient classroom training to properly set up operate and maintain the video detection system G WARRANTY MAINTENANCE AND SUPPORT The System and all of its components shall be warranted by its supplier for a minimum of two 2 years from the date of installation at the project site During the warranty period the supplier shall repair with new materials or replace at no charge any product containing a warranty defect The supplier shall maintain an adequate inventory of parts to support maintenance and repair of the system These parts shall be available for delivery within thirty 30 days of placement of an acceptable order at the supplier s then current pricing The supplier shall maintain a program for technical support and software updates following expiration of the warranty period Ongoing support by the supplier shall include upgrades of the system software These upgrades updates shall be provided free of charge City of Clovis Standard Specifications 2009 307 86 48 Auxiliary Power System The traffic signal power backup system shall be installed by the contractor in accordance with the manufacturer recommendations and s
520. pment outlet fixture device and appurtenance is in sound operating condition and in proper cooperative relation to associate equipment Submit complete test reports with the operations and service manual submission Any portion of the work which does not perform satisfactorily or any defects which are disclosed by testing shall be corrected by Contractor at his expense before work will be accepted 83 16 As Constructed Drawings The Contractor shall furnish to the Engineer a complete set of as constructed drawings which clearly indicate all deviations from the basic Contract Drawings including exact dimensioned locations and depths for all stubbed conduits location and size of spare conduits and conductors all new and uncovered existing work outside the buildings power feeder runs and communications primary conduit runs per requirements of the General Conditions Corrections and changes shall be kept up to date at all times All submittals and shop drawings shall be resubmitted with record drawings showing all revisions and changes made clearly marked with field termination wire so as to reflect actual construction record conditions Revision and changes will be enumerated and new dates of drawings shown The Contractor shall file all submittals with the Engineer at the conclusion of work Acceptance of the work may be delayed by the Engineer until all submittals are complete City of Clovis Standard Specifications 2
521. pole location where the cable terminates City of Clovis Standard Specifications 2009 280 Detector splices shall be as stated Section 86 2 09 Splice Insulation of the State Standard Specifications Detector splices shall be made only in the pull box adjacent to the detector All splices insulated by Method B as shown in the State Standard Plans page ES 13A shall be covered by an outer layer of friction tape Cover entire splice with electrical insulating coating and allow to dry Heat Shrink Tubing may be used and shall conform to the specifications stated in Section 86 2 09E Splice Insulation of the State Standard Specifications Splices shall be in line splices and shall be soldered with rosin core solder No open flame soldering shall be allowed At pull boxes all conductors containing splices shall be neatly placed on top of all other conductors within the pull box Signal Interconnect Cable SIC shall be as stated in Section 86 2 08E Signal Interconnect Cable SIC of the State Standard Specifications and shall consist of six No 20 minimum stranded tinned copper conductors as shown on the plans Each conductor shall be insulated with 0 013 inch minimum nominal thickness color coded polypropylene material Conductors shall be in twisted pairs Color coding shall distinguish each pair Each pair shall be wrapped with an aluminum polyester shield and shall have a No 22 or larger stranded tinned copper d
522. ponsibility with regard to convenience of the public and traffic in connection with the Contractor s operations Section 7 18 Public Safety provides requirements relating to the Contractor s responsibility for the safety of the public The provisions in Section 7 18 are in addition to the provisions in this Section 7 17 and the Contractor will not be relieved of the responsibilities as set forth in Section 7 18 by reason of conformance with any of the provisions in this Section 7 17 The Contractor shall adhere to the provisions of Section 4 14 Detours and Section 12 Traffic Control Construction Area Traffic Control Devices concerning traffic control requirements flagging and traffic handling equipment and devices used in carrying out the provisions in this Section 7 17 and said Section 7 18 and for provisions relating to the passage of traffic over or around the work by detours and other traffic In the event of a suspension of the work the provisions of Section 8 11 Temporary Suspension of Work will apply The Contractor shall so conduct operations as to offer the least possible obstruction and inconvenience to the public and shall have under construction no greater length or amount of work than can be prosecuted properly with due regard to the rights of the public Unless otherwise provided in the Contract Specifications or approved by the Engineer all public traffic shall be permitted to pass through the work with as littl
523. posed changes 2 An itemization of the contract requirements that must be changed if the proposal is adopted 3 detailed estimate of the cost of performing the work under the existing contract and under the proposed change The estimates of cost shall be determined in the same manner as if the work were to be paid for on a force account basis as provided in Section 9 1 03 Force Account Payment of the State Standard Specifications 4 statement of the time within which the Engineer must make a decision thereon 5 The contract items of work affected by the proposed changes including any quantity variation attributable thereto The provisions of this Section 5 24 shall not be construed to require the Engineer to consider any cost reduction proposal which may be submitted hereunder proposed changes in basic design of a bridge or of a pavement type will not be considered as an acceptable cost reduction proposal and the City will not be liable to the Contractor for failure to accept or act upon any cost reduction proposal submitted pursuant to this section nor for any delays to the work attributable to any cost reduction proposal If a cost reduction proposal is similar to a change in the Plans or Specifications under consideration by the City for the project at the time the proposal is submitted or if the proposal is based upon or similar to these Standard Specifications the Contract Specifications or Standard Drawings adopted by the City
524. property or damage to the work which occurs after the formal Acceptance by the City Council Within ten 10 days of Acceptance by the City Council the City shall record a Notice of Completion with the Fresno County recorder s office Acceptance of any Work shall not be deemed a waiver of the City s rights to remedy by the Contractor of a defective Work covered by warranty or guarantee for which the City gives timely notice to Contractor and b latent defects resulting from defective materials or workmanship discovered after the City s recording of its Notice of Completion City of Clovis Standard Specifications 2009 74 8 15 Utility And Non Street Facilities Potholing Attention is directed to Sections 4 6 Existing Facilities and Structures Shown on Plans 5 9 Preservation of Property The Contractor shall protect from damage utility and other non street facilities that are to remain in place or to be installed relocated or otherwise rearranged As used in this Section 8 15 non street facilities means any above or below ground facilities which are not a part of the roadway structural section curb and gutter and sidewalk Utility shall include sewer water recycled water storm drain and irrigation pipelines above and below ground electrical and gas facilities cable or other communications facilities It is anticipated that some or all of the utility and other non street facilities both above ground and bel
525. proved by the Engineer so that its plain end is moved past the gasket until it makes contact with the base of the socket and has been shoved home Allowance shall be provided in making the joint for expansion of the pipe City of Clovis Standard Specifications 2009 192 4 Whenever necessary to deflect the pipe from a straight line either in vertical or horizontal plane to avoid obstructions or where long radius curves are permitted the degree of deflection of joints shall not exceed the manufacturer s recommendations and must be approved by the Engineer Wet tap connections shall be made at the locations shown on the Plans and in conformance with the applicable City Standard Drawings Disinfection of pipe for potable water mains shall conform to the provisions of Section 66 11 Sterilization of Water Facilities Hydrostatic testing shall conform to the provisions in Section 66 12 Hydrostatic Pressure Test Damage to any pipe fittings valves or appurtenances shall be grounds for rejection of the damaged material Any repairable damage to the pipe lining or fittings shall be repaired by the Contractor at his expense The Contractor shall be responsible for any damage to materials until the time of acceptance of the finished work 66 6 Tracer Wire Installation A tracer wire shall be installed with all pipe for potable water mains The wire shall be secured in an approved manner to the outside top center of the pipe to
526. proved surplus excavated material selected material or from Imported Borrow to the line grade and cross section shown on the Plans or as directed by the Engineer Unsuitable surplus excavated material shall be disposed of by the Contractor in accordance with Section 5 12 Disposal of Material Outside the Right of Way If the quantity of selected material is not sufficient to construct the embankments required by the Plans the quantity of material needed to complete the embankments shall consist of Imported Borrow Embankments shall be constructed in layers The loose thickness of each layer of embankment material before compaction shall not exceed 8 inches Areas to receive embankment construction shall first be cleared of all debris bushes weeds stumps or other deleterious material in accordance with Section 16 Clearing and Grubbing If embankment material is to be placed on existing slope areas the existing surface shall be benched plowed or scarified in accordance with the plans or as directed by the Engineer to produce a bond with the material to be placed Attention is directed to Section 19 4 04 Compacting Where embankment is to be made and compacted on slopes or where new embankment is to be compacted against existing embankments or where embankment is built one half width at a time the original slopes and old or new embankments shall be cut into a minimum of 3 feet horizontally as the work is brought up in layers Ma
527. pth 2 8 in Height 9 in 4 2 Weight UPS 30 Ibs Shipping weight 35 Ibs 5 0 Environmental Specifications 5 1 The UPS shall meet or exceed NEMA temperature standards from 40 F to 165 F 5 2 The UPS shall be shall be certified and field proven to meet or exceed NEMA temperature standards A certificate of compliance shall be made available upon request 6 0 Battery Specifications 6 1 The battery system shall be certified and field proven to meet or exceed NEMA temperature standards from 40 F to 165 F 6 2 ratings see table 1 6 3 Hydrogen gas emissions must meet MIL Spec MIL B 8565J 6 4 Dimensions see table 1 6 5 Weights see table 1 Table 1 Clary OUTPOST Batteries Amp Hrs Capacity UNIT OVERALL DIMENSIONS assumes 77 25 WEIGHT Inches cm Clary Nomina 3 Hour 8 Hour 20 Hour Lbs Length Width Height Pt No Volts Rate Rate Rate kg L W H OPB 23 7 68 5 15 7 22 12394 YPC 2 STATE gay 24667 1308 1624 OPB 29 7 68 5 15 7 22 1241 SENOS Se Rom Sa Aer AIA asy uaga 404 50 OPB 32 9 41 5 22 9 35 12514 12796 36A 10300 1326 03 75 Available with handles Add to part no when requesting 7 0 7 1 City of Clovis Standard Specifications 2009 Communications Controls amp Diagnostics Alarm Function Monitoring The traffic UPS shall come sta
528. ptical power into the receiver exceed the manufacturer s specified saturation level The optical receive level shall once again be measured and recorded These minimum and maximum receive levels define the data receivers dynamic range and shall meet or exceed the specifications as specified elsewhere under these special provisions This measurement shall be repeated for each data link The Engineer shall approve the data test The Contractor shall measure and record the baseband data output level from the data receiver under test This measurement shall be repeated for each data link The Contractor shall measure record and tabulate the receivers dynamic range at the optical connector of the data receiver from the data transceiver under test To do this the measured optical attenuation of the fiber being used shall be increased to the point at which the data test set just beings to show a 3 dB degradation of the data signal to noise ratio in accordance with EIA 250 C data test procedures The optical receive power into the data receiver shall be measured and recorded Then the optical attenuation shall be decreased until the data test set once again shows degradation of the data and registers errors At no time shall the optical power into the receiver exceed the manufacturer s specified saturation level The optical receive level shall once again be measured and recorded These minimum and maximum receive level define the data receiver s dynamic ran
529. r not that will be in conflict with the intent of any new striping shown on the Plans or specified in the Contract Specifications shall be removed Where Traffic Striping or Pavement Markings are to be removed and not to be followed by any of the applications described below the pavement shall be sealed as specified in the Contract Specifications If not specified the Contractor shall seal the pavement using a method to be approved by the Engineer 2 Traffic stripes and Pavement Markings to be removed for various pavement surface treatment operations shall comply with the following Preparation for Fog Seal or Slurry Seal In addition to the provisions of 1 above for Fog Seal and Slurry Seal applications the Contractor shall protect existing permanent raised pavement markers from damage or coating Damaged or coated markers shall be replaced in accordance with Section 85 Raised Pavement Markers at the contractor s expense Preparation for Cape Seal In addition to the provisions of 1 above for Cape Seal applications the Contractor shall remove permanent raised pavement markers in conformance with Section 15 2 02 D Pavement Markers and at the completion of work replace them in accordance with Section 85 Raised Pavement Markers Preparation for Overlay Unless the Plans or Contract Specifications require otherwise for Overlay applications the Contractor shall only remove permanent raised pavement markers i
530. r other than that designated in the original bid to permit any subcontract to be assigned or transferred to allow a subcontract to be performed by other than the original subcontractor or to subcontract work for which no subcontractor was designated in the original bid and which is more than one half of one percent 7 of the contract amount or in the case of a City designated Street Project one half of one percent or ten thousand dollars 10 000 whichever is greater Violation of any of the above provisions is a violation of the Contract and cause for ordering any unapproved subcontractor from the work site The Contractor shall comply with Section 8 3 Subcontracting which contains additional regulations regarding subcontractors 2 8 Withdrawal Of Proposals Any bid may be withdrawn at any time prior to the time fixed in the public notice for the opening of bids but only upon filing with the City Clerk a written request of the withdrawal The bidder or the bidder s duly authorized representative shall execute the request The withdrawal of a bid does not prejudice the right of the bidder to file a new bid A bid will not City of Clovis Standard Specifications 2009 8 received and no bid may be withdrawn after the time fixed the Notice Inviting Bids for the opening of bids 2 9 Relief Of Bidders The provisions of Public Contract Code Sections 5100 to 5107 inclusive applies to all Contracts If the bidder claims
531. r plowing become unfavorable as determined by the Engineer plowing shall be terminated Trenches for conduit and equipment shall be cut to required grade lines and compacted to provide an accurate grade and uniform bearing for the full length of the conduit When two conduits are to be placed in the same trench a minimum 4 inch space between conduits must be maintained Unless otherwise shown on the Plans or specified in the Contract Specifications the depth of trenches shall be sufficient to provide a minimum of 36 cover above the top of the conduit 83 9 System Installation A The Contractor shall verify and be familiar with the location of existing or proposed electrical supply sources and shall make connections in accordance with applicable codes the Plans and applicable Standard Drawings and the Specifications The electrical meter required for the project will be provided by PG amp E The Contractor shall furnish the meter box pedestal footing electrical panels all fittings sweeps conduit and all appurtenances required for a complete electrical service The Contractor shall be responsible for providing an electrical service in a service panel in accordance with the Plans and the Contract Specifications Where lighting systems are to be provided in conjunction with other improvements requiring electrical services such as irrigation controllers or booster pumps the Contractor shall make provision as shown on the Plans or specifie
532. ractor agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation The workers compensation policy shall be endorsed to contain a waiver of subrogation in favor of the City for all work performed by the contractor its agents employees independent contractors and subcontractors Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor All coverages for subcontractors shall be subject to all of the requirements stated herein City of Clovis Standard Specifications 2009 53 Surety Bonds The Contractor shall provide the following surety bonds Bid Bond Performance Bond and Payment Bond all in the amounts specified in Section 3 3 Required Contract Securities Insurance Certificates Business License Injury and Illness Prevention Plan All costs for compliance with this Section 7 4 shall be included in the various items of work No separate payment will be made therefor 7 5 Vehicle Code Pursuant to the authority contained in Vehicle Code Section 591 the City has determined that within those areas that are within the limits of the project and are open to traffic the Contractor shall comply with all the requirements set forth in Divisions 11 12 13 14 and 15 of the Vehicle Code In accordance with the statement in Vehicle Code Section 591 this section shall not relieve the Contr
533. ractor as may be on the site of the work and necessary therefor In such case the Contractor shall not be entitled to receive any further payment until the work is finished If the unpaid balance of the Contract price shall exceed the expenses of finishing the work including compensation for additional managerial and administration services such excess shall be paid to the Contractor If such expense shall exceed such unpaid balance the Contractor and its surety shall pay the difference to the City The expense incurred by the City as herein provided and damage incurred through the Contractor s default shall be certified by the Engineer The City may at any time terminate the Contract for the City s convenience and without cause Upon receipt of written notice from the City of such termination for the City s convenience the Contractor shall 1 cease operations as directed by the City in the notice 2 take actions necessary or that the City may direct for the protection and preservation of the Work and 3 except for Work directed to be performed prior to the effective date of termination stated in the notice terminate all existing subcontracts and purchase orders and enter into no further subcontracts and purchase orders The Contractor shall be entitled to receive payment for Work executed and costs incurred by reason of such termination but not overhead and profit on the Work not executed Any termination by City under this Section
534. rain wire outside the shielded pair Splices shall not be made Cable shall run from one traffic signal controller cabinet to the next traffic signal controller cabinet with no splices The cable jacket shall be black high density polyethylene rated for a minimum of 300 volts and 140 F and shall have a nominal wall thickness of 40 mils minimum The cable jacket or the moisture resistant tape directly under the outer jacket shall be marked with the manufacturer s name insulation type designation number of conductors and conductor size and voltage and temperature ratings The Optical Detector Cable shall be designed to be utilized by the Opticom Priority System 700 Series or better furnished by the 3M Company Advanced Traffic Products Inc 909 SE Everett Mall Way Suite B280 Everett WA 98208 3740 Phone 425 347 6208 Fax 425 347 6308 or contact a local authorized 3M dealer One optical detector cable shall be installed to the mast arm standard as shown on the plans The length s of each cable shall be sufficient to run from the controller through the conduit system to the end of the mast arm plus an additional 15 feet The cable will be run through the conduit system toward its respective mast arm standard No splices will be allowed in the cable The excess cable shall be neatly bundled tied and placed in the standard s adjacent pull box 86 18 Fused Splice Connectors All fused splice connectors shall conform to the pr
535. rance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor his agents representatives employees or subcontractors City of Clovis Standard Specifications 2009 50 The following insurance requirements minimum and be amended by the Contract Specifications to include increased coverage limits and expanded coverage including Course of Construction Builder s Risk Insurance The Course of Construction policy shall name the City as Loss Payee Minimum Scope of Insurance Coverage shall be at least as broad as 1 Insurance Services Office ISO Commercial General Liability coverage occurrence Form CG 00 01 or ISO form Form CG 00 09 11 88 Owners and Contractors Protective Liability Coverage Form Coverage for Operations of Designated Contractor 2 Insurance Services Office Form CA 00 01 covering Automobile Liability Code 1 any auto 3 Workers Compensation insurance as required by the State of California and Employer s Liability Insurance 4 Builder s Risk Course of Construction insurance covering all risks of loss less policy exclusions Surety bonds as described below Professional Liability if Design Build Minimum Limits of Insurance Contractor shall maintain limits no less than 1 General Liability 5 000 000 occurrence for bodily injury Including operations personal injury
536. rawings City Standard Specifications including General Provisions City Standard Drawings Any other referenced and incorporated specifications Any other referenced and incorporated plans or drawings 0 00 Detailed plans and specifications shall take precedence over general plans specifications even within the same level of precedence Dimensions called out on the Plans shall control and supersede scaled dimensions No scaled dimension shall be used in the execution of the work unless no dimension is called out on the Plans and the use of a scaled dimension is authorized by the Engineer 4 3 Interpretations Should it appear that the work to be done or any matter relative thereto is not sufficiently detailed or explained on the Plans or Specifications the Contractor shall apply to the Engineer for such further explanations as may be necessary and shall conform to such explanation or interpretation as part of the Contract so far as may be consistent with the intent of the original Plans and Specifications In the event of doubt or question relative to the true meaning of these documents reference shall be made to the Engineer whose decision thereon shall be final 4 4 Working Drawings When working drawings or shop drawings are required by the Plans or Specifications or requested by the Engineer they shall be prepared in accordance with modern engineering practice by the Contractor at the Contractor s expense Sh
537. rce A transportable piece of fiber optic test equipment that when coupled with a power meter is used to perform end to end attenuation testing This device contains a stabilized light source operating at the designed wavelength of the system under test It also couples light from the sources into the fiber to be received at the far end by the receiver Link A passive section of the system the ends of which are to be connected to active components A link may include splices and couplers Mechanical Splice A device that permanently joins fiber ends to identical or similar fibers Mechanical splices are not to be permanently utilized on any project Optical Time Domain Reflectometer OTDR A piece of fiber optic test equipment similar in appearance to an oscilloscope that is used to measure the total amount of power loss between two 2 points This test instrument provides a visual and printed display of the relative location of system components such as fiber sections splices and connectors as well as the losses that are attributed to each component Patchcord A short jumper Pigtail Relatively short length of fiber optic cable that is connectorized on only one 1 end Power Meter A transportable piece of fiber optic test equipment that when coupled with a light source is used to perform end to end attenuation testing It contains a detector that is City of Clovis Standard Specifications 2009 234 sensitive to light at the des
538. rcement that is to be incorporated in new work shall be protected from damage and shall be thoroughly cleaned of adhering material before being embedded in new concrete Concrete removal shall be performed without damage to the portion that is to remain in place Damage to the existing concrete which is to remain in place shall be repaired to a condition equal to that existing prior to the beginning of removal operations The cost of repairing existing concrete damaged by the Contractor s operations shall be at the Contractor s expense If a manhole cover that is raised to grade is unstable or noisy under traffic the conditions shall be corrected by placing a coil of asphalt saturated rope a plastic type washer or asphaltic compounds approved by the Engineer on the cover seat Facilities located in the pavement area shall not be constructed to final grade until the adjacent pavement or surfacing has been completed All facilities shall be raised to final grade within 10 calendar days of being covered with final paving The Engineer shall approve the order in which facilities are raised Portions of manholes that are to be lowered shall be removed as directed by the Engineer Where insufficient depth will exist to allow the proper use of grade adjusting rings to raise the cover to final pavement grade the manhole shall be lowered to an approximate depth of City of Clovis Standard Specifications 2009 98 3 5 feet below finished grade
539. re subsequently utilized in these specifications City of Clovis Standard Specifications 2009 233 Breakout A breakout cable shall be produced by 1 removing the jacket just beyond the last tie wrap point 2 exposing 3 to 6 feet of the cable buffers aramid strength yarn and central fiberglass strength member and 3 cutting the aramid yarn central strength member and the buffer tubes to exposes the individual glass fibers for spicing or connection to the appropriate device Connector A mechanical device used to align and join two 2 fibers together to provide a means for attaching to and decoupling from a transmitter receiver or another fiber patch panel Connectorized A term that describes the termination point of a fiber after connectors have been affixed Couplers Couplers are devices which mate two 2 fiber optic connectors to facilitate the transition of optical light signals from one connector into another Couplers may also be referred to as adapters feed thrus and barrels They are normally located within FDUs mounted in panels They may also be used unmounted to join two 2 simplex fiber runs EIA Stands for Electronic Industries Association Fiber Distribution Unit FDU A combination of the Connector Module Housing CMH and the Splice Module Housing SMH in the same enclosure Jumper A short fiber optic that has connectors installed on both ends and is used for connection with a FDF Light Sou
540. re to comply with any provision or requirement of the General Construction Permit To insure permit compliance the Contractor is directed to the official web site for the California Storm water Quality Association CASQA http www cabmphandbooks com Construction asp Contractor can obtain copies of the State General Construction Permit Notice of Intent NOI and Notice of Termination NOT forms instructions for completing the forms and a Model Construction Activities Storm Water Pollution Prevention Plan SWPPP In summary the Contractor shall be required to comply with the following permit requirements These requirements include 7 7 A 1 Preparation Of A NOI And Vicinity Map Unless otherwise provided in the Contract Specifications the City shall at its expense prepare and submit the executed NOI map and permit fee to the SWRCB for General Construction Permit coverage prior to commencement of construction The Contractor shall receive a copy of the executed NOI from the City 7 7 A 2 Preparation Of A Storm Water Pollution Prevention Plan SWPPP The Contractor shall prepare a SWPPP that is project specific At a minimum the SWPPP must address general project information a construction activity schedule pollutant sources and best management practices BMPs maintenance inspection and repair of BMPs Contractor training site stabilization a post construction management plan an overall permit compliance plan and certifi
541. red 7 3 Contractor s Licensing Laws All bidders and contractors shall be licensed in accordance with the laws of this State specifically the provisions the Business and Professions Code Division 3 Chapter 9 Any bidder or contractor not so licensed is subject to the penalties imposed by such laws In accordance with the requirements in Public Contract Code Section 10164 in all contracts where Federal funds are involved the Contractor shall be properly licensed at the time the Contract is awarded 7 4 Contractor s Insurance Requirements And Hold Harmless Hold Harmless The Contractor shall indemnify defend and hold harmless the City and its officers officials employees agents and volunteers from and against all claims damages losses actions suits demands liability and expenses including attorney fees arising out of the performance of the work described herein caused in whole or in part by any act or omission of the Contractor any subcontractor anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable except where caused by the active negligence sole negligence or willful misconduct of the City The provisions of Section 7 1 Laws to be Observed Section 7 16 Injury or Damage to Persons or Property and Section 7 19 Patents also apply Insurance Requirements For Contractors The Contractor shall procure and maintain for the duration of the contract insu
542. red below ground Nuts and bolts used for above ground installation on pipe flanges etc shall be hexagonal head machine bolts and hexagonal nuts conforming to ASTM Designation A307 Grade B All bolt threads shall be lubricated with graphite and oil Exposed portions of nuts and bolts shall be coated with a bitumastic material to retard corrosion 66 2 12 Tracer Wire Tracer wire shall be 10 stranded copper with white insulation 66 3 Trenching And Excavation Trenching and excavating for water mains and service lines shall conform to the requirements of Section 8 15 Utility and Non Street Facilities Potholing and Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration 66 4 Alignment Changes Separation Criteria All potable water mains and non potable water mains which include sanitary sewers sewer force mains storm drains and recycled water mains must meet the separation standards of City of Clovis Standard Specifications 2009 190 the California Waterworks Standards contained in Section 64572 Title 22 of the California Administrative Code or shall be installed in accordance with alternate construction criteria as specified therein Included in the Appendix to these Specifications is a document titled Guidance Memo No 2003 02 Guidance Criteria for the Separation of Water Mains and Non Potable Pipelines published by the California Department of Health implementi
543. reement so that City may proceed pursuant to this provision and terminate the contract if necessary If within five 5 calendar days after the serving of the notice of intent to terminate such violations do not cease and satisfactory arrangements for correction thereof are not made then the City may at its discretion terminate the Contract at any time thereafter In the event of any such termination the City shall immediately serve written notice thereof upon the Contractor and its surety and the surety shall have the right to take over and perform the Contract provided however that if the surety within ten 10 calendar days after the serving upon it of notice of termination does not give City written notice of its intention to take over and perform the Contract or does not commence performance thereof within the ten 10 calendar days stated above from the date of the serving of such notice of termination the City may take over the work and prosecute the same to completion by City of Clovis Standard Specifications 2009 73 contract by other method it may deem advisable for the account and at the expense of the Contractor and its surety and the Contractor and its surety shall be liable to the City for any excess cost incurred by the City In such event the City may without liability for so doing take possession of and utilize in completing the work such materials appliances plant and other property belonging to the Cont
544. removal and replacement of a post without disturbing the top tension wire All posts shall be of a total length of not less than 9 feet as shown in the Standard Drawings except that where post caps are used which hold tension wires the post may be shortened a sufficient amount so that the top of the cap is at the approximate level of the fence fabric but no lower In no case however shall the post be shorter than 8 8 where post caps are used nor shall the length embedded in the concrete footing including any mowstrip be less than 3 feet Reference is made to Section 6 8 Samples and Tests which is modified in this Section 80 2 1 In addition to any of the requirements of said Section 6 8 one post from each lot of posts and one brace from each lot of braces to be used in the work shall at the direction of the Engineer be tested in accordance with the requirements of ASTM Designation A120 If that post or brace fails 2 additional posts or braces from the same lots will be tested If either of the 2 additional sampled posts or braces fails the entire lot of posts will be rejected 80 2 2 Extension Arms Tension Wire Wire Strands 1 Extension arms stretcher bars and other required fittings and hardware Extension arms stretcher bars and other required fittings and hardware shall be steel or malleable iron or wrought iron and shall be galvanized in accordance with ASTM Specification Designation A153 2 Tension wires Tens
545. rete driveway approaches and concrete alley approaches shall be made from the back of the curb to the back of the approach 73 11 Payment Payment for concrete curb concrete gutter concrete curb and gutter and concrete mowstrip shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as set forth in the Specifications and as directed by the Engineer including subgrade preparation Payment for concrete sidewalks and wheelchair ramps concrete driveway approaches concrete alley approaches concrete valley gutters and concrete median caps shall include full compensation for furnishing all labor materials tools equipment special surfacing materials and incidentals and for doing all the work involved therein as shown on the Plans as set forth in the Specifications and as directed by the Engineer including subgrade preparation Compensation for steel reinforcement required for concrete valley gutters or any other facilities requiring steel reinforcement shall be included in the cost for concrete valley gutters or other facilities requiring steel reinforcement City of Clovis Standard Specifications 2009 216 SECTION 74 THROUGH 79 BLANK City of Clovis Standard Specifications 2009 217 RIGHT OF WAY AND TRAFFIC CONTROL FACILITIES SECTION 80 CHAIN LINK FENCE GATES TIMBER BARRICADES 80 1 General This work shal
546. rete pipe as a carrier pipe is specified to be jacked into place directly without a jacked steel casing said reinforced concrete pipe conforming to ASTM Specification C76 latest revision shall be furnished The reinforced concrete pipe shall be constructed such that no bells protrude from the outside periphery of the pipe Sleeves for joints on reinforced concrete pipe shall be furnished and manufactured of galvanized steel stainless steel or fiberglass sufficient in strength to withstand all loads and which will maintain a rubber gasketed watertight joint 68 3 Tunnel Safety Orders Reference is made to the Tunnel Safety Orders of the California Department of Industrial Relations and to any other applicable safety codes The tunnel site jacking location will be classified as to gas hazard by the California Department of Industrial Relations The classification document issued by the State will be included in the Appendix of the Contract Specifications The Contractor shall comply with the Tunnel Safety Orders and shall attend a preconstruction safety meeting with a representative of the Division of Occupational Safety and Health Mining and Tunneling Unit wherein the Contractor shall present his safety program Any subcontractors involved in such tunneling shall likewise be present The City of Clovis Standard Specifications 2009 204 Contractor shall contact the California Department of Industrial Relations Division of Occupational
547. return and install the valve box to finish grade as specified 66 9 Water Service Installation Water service lines including domestic metered service lines and fire service lines equipment and appurtenances shall be installed in accordance with the manufacturer s recommendations as shown on the Plans and the Standard Drawings therefor The Contractor shall mark the location of water service lines by putting a W mark on the curb face Said mark is to be chiseled into existing concrete or stamped in new concrete before it has set 66 10 Backfill Compaction And Surface Restoration Backfilling compacting and restoration of surfaces of trenches and excavations for water facilities shall conform to the requirements of Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration 66 11 Sterilization Of Water Facilities Newly installed water mains and facilities shall be disinfected in accordance with the latest revisions of AWWA Standards and these specifications prior to placing in service While completely separated from existing mains and isolated from existing mains and prior to pressure testing and prior to acceptance of work the entire pipeline including all valves fittings hydrants service laterals and other accessories shall be sterilized in accordance with AWWA Specification C 601 which provides detail specifications for A Limiting contaminated materials from entering the water mains duri
548. rety unless the surety has waived its rights to notice of assignment Consent will not be given to any proposed assignment which would relieve the original Contractor or the Contractor s surety of their responsibilities under the contract All assignments of funds are subject to the prior lien for services rendered or materials supplied for the performance of the work called for in favor of all persons firms or corporation rendering such services or supplying materials and all deductions provided for in the contract and particularly all monies withheld whether assigned or not shall be subject to being used by the City for the completion of the work in the event that the Contractor should be in default therein 8 3 Subcontracting Section 2 7 Designation of Subcontractors sets forth the requirement that any subcontractor who performs in excess of one half of one percent 1 2 of the original contract price or in the case of a street project so designated by the City one half of one percent 1 2 or 10 000 whichever is greater shall be designated on the Bid Proposal Form At the time of the pre construction conference the Contractor shall file with the Engineer a written statement showing the work to be subcontracted the names of the subcontractors and the description of each portion of the work to be subcontracted In accordance with Section 4109 of the State Public Contract Code subcontracting of any portion of the work in exce
549. rface at all times when the specific area is not under actual construction Dust control conforming to Section 10 Dust Control shall be provided at all times Alternating traffic over work areas use of one way traffic control with flaggers or any other methods used by the Contractor shall be approved by the Engineer and shall conform to Part 6 of the California MUTCD 12 2 03 Flaggers Flaggers while on duty and assigned to traffic control or to give warning to the public that the street or other area is under construction and of any dangerous conditions to be encountered as a result thereof shall perform their duties and shall be provided with the necessary equipment in conformance with Part 6 of the California MUTCD The equipment shall be furnished and kept clean and in good repair by the Contractor at the Contractor s expense 12 2 04 Road Closures Where road closures and detours are required by the Contract Specifications or the plans the Contractor shall implement such closures in accordance with the provisions thereof Notifications shall be provided in accordance with Section 12 2 01 Traffic Control Plan Notifications Where road closures are prohibited by the Contract Specifications and work must pass through or over areas of construction the Contractor shall conduct his operations in accordance with Section 12 2 02 Contractor s Operations Where road closures are not prohibited by the Contract Specifications
550. ridge Concrete Culvert Removal and Section 19 1 01 Description Types of existing subbase base surfacing and pavement to be removed will be classified for payment as the type of excavation in which the subbase base surfacing and pavement are located The work for removal of concrete shall include removal and disposal of any reinforcing steel except as provided herein Concrete pipe and clay pipe will be considered as miscellaneous facilities to be removed salvaged relaid or disposed of as provided in Section 15 2 Miscellaneous Facilities and will not be paid for as removing concrete 15 3 02 Removal Methods Unless otherwise specified in the Contract Specifications existing concrete shall be removed to a depth of at least three feet below finished grade Existing concrete shall be cut to a true line where new concrete is to join existing concrete Explosives shall not be used for any concrete removal Concrete removal operations shall be performed without damage to any portion that is to remain in place Damage to the existing concrete which is to remain in place shall be repaired to a condition equal to that existing prior to the beginning of removal operations The cost of repairing existing concrete damaged by the Contractor s operations shall be at the Contractor s expense Existing reinforcement that is to be incorporated in new work shall be protected from damage and shall be thoroughly cleaned of adhering material before bein
551. riod or should the maintenance period be terminated or suspended any of which causes the work including the maintenance period to go beyond the contract time allowed the provisions of said Section 8 9 shall apply 20 9 Guarantee In compliance with Section 6 10 Guarantee of Materials and Section 7 23 Guarantee all plant and turf areas shall be guaranteed as to growth and health for a period of one 1 year after acceptance of the contract by the City Council Any areas that are not healthy and growing shall be replaced at no additional cost to the City The Contractor within seven 7 days of written notification by the Engineer shall remove and replace any plant material that for any reason fails to meet the requirements of these specifications Replacement shall be made with plant material as indicated or specified for the first planting and all such replacement material shall be guaranteed as specified for the original guaranteed material City of Clovis Standard Specifications 2009 146 20 10 Measurement Payment Except as otherwise provided in this Section 20 for specified work or as be specified in the Contract Specifications the cost of providing all labor equipment materials including all seed sod trees shrubs groundcover any other specified plant material amendment fertilizer or other incidentals to provide all work as required for preparation planting watering or any other work require
552. rk prevents the work from beginning at the usual starting time and the crew is dismissed as a result thereof and the Contractor does not proceed with at least 75 percent of the normal labor and equipment force engaged in the current controlling operation or operations for at least 60 percent of the total daily time being currently spent on the controlling operation or operations the Contractor will not be charged for a working day whether or not conditions should change thereafter during that day and the major portion of the day could be considered to be suitable for those construction operations Determination that a day is a non working day by reason of inclement weather or conditions resulting immediately therefrom shall be made by the Engineer The Contractor will be allowed fifteen 15 days from the issuance of the weekly statement of working days in which to file a written protest setting forth in what respects the Contractor differs from the Engineer otherwise the decision of the Engineer shall be deemed to have been accepted by the Contractor as correct The Engineer will furnish the Contractor a weekly statement showing the number of working days charged to the contract for the preceding week the number of working days of time extensions being considered or approved the number of working days originally specified for the completion of the contract and the number of working days remaining to complete the contract and the extended date for co
553. rks City project City of Clovis Standard Specifications 2009 46 b The payroll records enumerated under subdivision a shall be certified and shall be available for inspection at all reasonable hours at the principal office of the contractor on the following basis City of Clovis Standard Specifications 2009 47 1 certified of employee s payroll record shall be made available for inspection or furnished to the employee or his or her authorized representative on request 2 A certified copy of all payroll records enumerated in subdivision a shall be made available for inspection or furnished upon request to a representative of the awarding body the Division of Labor Standards Enforcement and the Division of Apprenticeship Standards of the Department of Industrial Relations 3 A certified copy of all payroll records enumerated in subdivision a shall be made available upon request by the public for inspection or for copies thereof However a request by the public shall be made through either the awarding body the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement If the requested payroll records have not been provided pursuant to paragraph 2 the requesting party shall prior to being provided the records reimburse the costs of preparation by the contractor subcontractors and the entity through which the request was made The public shall not be given access to the re
554. roved by the Engineer prior to the start of any excavation work 86 14 Standards Steel Pedestals And Posts Standards steel pedestals and posts shall conform to the provisions in Section 86 2 04 Standards Steel Pedestals and Posts of the State Standard Specifications and these Standard Specifications All standards shall be round When the Contractor or distributor places order for signal standards and mast arms the plans and specifications shall be sent with the order to the manufacturer enabling the manufacturer to construct the standards and mast arms as shown on the Plans or specified in the Specifications Standards shall not be painted except for luminaire identification number Numbers shall be placed on all new standards on which luminaires are installed The Engineer shall obtain these numbers from Pacific Gas and Electric Company and place on plans in a schedule These numbers shall be 3 inches in height and shall be placed after standard and signal head and or luminaire installation The stencil used for painting these numbers shall be approved by the City prior to painting The galvanized surface of the standard shall be cleaned prior to painting these numbers as stated in Section 86 2 16 Painting of the State Standard Specifications The numbers shall be painted on the signal standards using two applications of black enamel Reflectorized adhesive numbers conforming to PG amp E standards and specifications may be us
555. rrent or Section 64572 2 California Code of Regulations Title 22 Proposed City of Clovis Standard Specifications 2009 Guidance Memo No 2003 02 331 April 14 2003 Revised October 16 2003 Page 11 of 11 Guidance Memo No 2003 02 FIGURE CROSSINGS Not To Scale CASE 1 NEW SEWER MAIN Zone Joints Sewer Main Zone Prohibited Tare Tsim Main Zone Prohibited Zone Special Pipe Joints in Sewer Main CASE 2 KEW WATER MAIN Zone No Joints in Water Mam Zone Prohibited Zone Special Water No Joints in Water Main City of Clovis Standard Specifications 2009 332
556. rs that is merely related to the Work City of Clovis Standard Specifications 2009 6 SECTION 2 PROPOSAL REQUIREMENTS AND CONDITIONS 2 1 General The City Clerk will receive at City Hall 1033 Fifth Street Clovis California 93612 prior to the hour and day specified in the Notice Inviting Bids sealed proposals for furnishing material supplies equipment and labor for performing the work as specified in the Plans these Specifications and the Contract Specifications Proposals submitted at or after the hour specified for receipt of bids will be returned unopened 2 2 Examination Of Site Of Work Plans Specifications And Contract Documents The bidder is required to carefully examine the site of the proposed work the Plans and Specifications for the work contemplated Bid submission shows the bidder has investigated the site and is satisfied as to the conditions to be encountered and the scope of work and understands the requirements of the Plans and Specifications Prospective bidders must satisfy themselves by such means as they prefer as to local conditions and all other matters which influence their bid for the work The City or Engineer shall not be liable on account of any obstructions of any nature unforeseen difficulties in construction or unreliable information from any source 2 3 Form Of Proposal All proposals must be made upon blank forms to be obtained from the office of the City Engineer 1033 Fifth Street Clov
557. rther documented shall be submitted to the Contractor within 30 days after receipt of the further documentation or within a period of time no greater than that taken by the Contractor in producing the additional information whichever is greater 4 12 6 3 Meet And Confer If the Contractor disputes the City s written response or the City fails to respond within the time prescribed the Contractor may so notify the City in writing either within 15 days of receipt of the City s response or within 15 days of the City s failure to respond within the time prescribed respectively and demand an informal conference to meet and confer for settlement of the issues in dispute Upon a demand the City shall schedule a meet and confer conference within 30 days for settlement of the dispute The conference may take place during regularly scheduled project meetings 4 12 6 4 Government Code Claims Following the meet and confer conference if the Claim or any portion remains in dispute the Contractor must file a claim as provided in Chapter 1 commencing with Section 900 and Chapter 2 commencing with Section 910 of Part 3 of Division 3 6 of Title 1 of the Government Code a Government Code Claim The process of filing of a Government Code Claim is specifically required in addition to the contractual claims process in these Standard Specifications such contractual claims process described above does not act as a substitute for the Government Co
558. rtment on a case by case basis 1 Storage ponds or land disposal sites for wastewater or industrial process water containing toxic materials or pathogenic organisms 2 Solid waste disposal sites 3 Facilities such as storage tanks and pipe mains where malfunction of the facility would subject the water in the main to toxic or pathogenic contamination City of Clovis Standard Specifications 2009 320 Although the following requirements have not yet been adopted they should be within the next two years and should be used as guidance for future construction City of Clovis Standard Specifications 2009 321 April 14 2003 Revised October 16 2003 Page 4 of 11 Guidance Memo No 2003 02 Proposed requirements as of the date of this document Section 64572 Water Main Separation a New water mains and new supply lines shall not be installed in the same trench as and shall be at least 10 feet horizontally from and one foot vertically above any parallel pipeline conveying 1 Untreated sewage 2 Primary or secondary treated sewage 3 Disinfected secondary 2 2 recycled water defined in section 60301 220 4 Disinfected secondary 23 recycled water defined in section 60301 225 and 5 Hazardous fluids such as fuels industrial wastes and wastewater sludge b New water mains and new supply lines shall be installed at least 4 feet horizontally from and one foot vertically above any parallel pipeline conveying
559. s any material specified by name and or model number in the Plans Standard Drawings the Specifications shall be deemed to be used for the purpose of identifying the standard of quality and type of materials and insuring the specific use of that material in the construction of the system If substitution of a material is desired by the Contractor sufficient descriptive literature and material samples must be furnished to establish the material as an equal substitute In addition the Contractor must state his reasons for desiring substitute materials B Regulations and Codes All electrical equipment and material and its installation shall conform to the current requirements of the latest editions from the following authorities Where two or more City of Clovis Standard Specifications 2009 252 codes conflict the most restrictive shall apply Nothing the Plans Specifications shall be construed to permit work not conforming to applicable codes City of Clovis Standard Specifications 2009 253 Occupational Safety and Health Act OSHA National Electrical Code NEC California Code of Regulations CCR Title 8 California Electrical Code Title 19 Fire and Panic Safety Standard Title 24 Building Standards Uniform Building Code National Fire Code C Lights Lights shall be furnished in the voltage size color type or model shown on the Plans or specified in the Contract Specifications Lights shall conform to al
560. s or Section 19 2 02 Unsuitable Material Selected Material used for backfill or embankment construction shall comply with Section 19 4 02 Imported Borrow City of Clovis Standard Specifications 2009 113 When selected material is shown the Plans or designated the Contract Specifications as a specified layer in the roadway prism spreading and compacting the material shall conform to the provisions in Section 25 Aggregate of the State Standard Specifications When practicable and processing is not specified selected material shall be hauled directly from excavation to its final position in the roadway prism and compacted in place and the work will be paid for at the contract price for roadway excavation When practicable selected material shall remain in place until it can be excavated and placed in final position as provided above No additional compensation will be allowed for any delay or inconvenience in excavation operations except that if ordered in writing by the Engineer selected material may be excavated and stockpiled at locations designated by the Engineer and later placed in final position in the roadway prism Excavating selected material and stockpiling if required will be paid for at the contract price for roadway excavation Removing the selected material from stockpiles for later placement in its final position will not be paid for Placement and compaction will be paid for at
561. s Where no direction is given service laterals shall be installed in such a manner that 1 at no time will an existing street be closed to traffic 2 Whenever service laterals are to be installed in existing major streets that have been resurfaced within the last five years or in pavement that is in good condition and free of cracking they shall be installed by boring methods rather than open cut trenches Laterals crossing over water mains shall comply with Section 64 11 Alignment Changes City of Clovis Standard Specifications 2009 174 64 6 Manhole Construction Manhole structures shall be constructed at the locations shown on the Plans and as specified in the Contract Specifications and as indicated on the standard drawings pertaining thereto Construction of Manholes shall comply with Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration and Section 64 2 6 Manhole Materials Manholes shall be complete structures in place and backfilled including the furnishing and placing of all materials involved Cast in Place Concrete manholes shall consist of a poured in place base and riser section reinforced concrete reducing cone sections Pre cast concrete pipe manholes shall consist of a poured in place concrete base section reinforced concrete pipe riser and reducing cone sections Both types shall have a cast iron frame and cover and a poured in place concrete collar with paving pat
562. s are free of voids Sod shall be placed flush with the finished grade of adjacent walkways curbs or other hardscape areas e Tamp each roll into position against adjacent strips to eliminate gaps openings or uneven joints f Trim sod to conform to turf area shapes Expose all sprinklers and valve boxes Provide a clean straight edge g Roll all sod areas with a roller of appropriate weight immediately after installation to remove air pockets and provide complete contact between sod and soil h After installation irrigate sod completely and at subsequent intervals to provide optimum moisture throughout the period of establishment Reference is made to Section 20 2 05 Turf Watering 20 2 05 Turf Watering After approval of the turf planting operations by the City Inspector the Contractor shall continuously irrigate to keep all planted areas moist but not flooded The areas shall not be watered to the extent of saturating the soil After water has once been applied no portion of the seeded areas shall be allowed to dry out during the entire germination period The Contractor shall be responsible to alter the watering times and frequencies to meet site conditions Sod shall be irrigated thoroughly so that moisture penetrates through the sod into the original soil Use of a penetrating agent is advised 20 2 06 Turfgrass Establishment Period The turfgrass establishment period is the time required for all areas of seed planted
563. s at all gate valves 10 inches or larger at all fire hydrant buries and at all dead ends Thrust blocks shall be installed between the fittings and undisturbed earth of the trench wall and shall be at least the minimum dimensions shown on the Standard Drawings For conditions not covered on said standard the bearing area shall be as required by the Engineer 66 8 Valve Box Installation Valve boxes shall be installed as shown on the Standard Drawings therefor The valve box cover shall be centered over the valve operating nut with boxes and extensions plumb City of Clovis Standard Specifications 2009 193 In existing surfaced areas valve boxes shall be installed to finish grade concrete collars poured and the pavement patched in accordance with Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration In undeveloped areas where no surfacing exists or is contemplated in conjunction with the water installation valve boxes shall be brought to a level 1 1 2 inches above existing ground elevation and concrete collars poured In areas where street or alley surfacing is to be done in conjunction with or immediately after utility installation such as new subdivisions valve boxes shall be installed to finish grade after paving has been completed a concrete collar poured and the pavement patched as above required Unless specifically provided otherwise in the Contract Specifications the Contractor shall
564. s and Retentions the City may withhold or nullify the whole or any part of any partial or final progress payment or any release of retention to such extent as may reasonably be necessary to protect the City from loss on account of a Defective work not remedied irrespective of when any such work be defective b Failure of the Contractor to make proper payments for labor material equipment other facilities or to subcontractors c Any penalties provided in these Standard Specifications for failure of the Contractor to carry out specific orders of the Engineer d Stop Notices pursuant to Civil Code section 3186 unless the Contractor at its sole expense provides a bond or other security satisfactory to the City in the amount of at least one hundred twenty five percent 125 of the claim in a form satisfactory to the City which protects the City against such claim Any stop notice release bond shall be executed by a California admitted fiscally solvent surety completely unaffiliated with and separate from the surety on the payment and performance bonds that does not have any assets pooled with the payment and performance bond sureties The City may also withhold for the estimated reasonable cost of stop notice litigation to be incurred For any stop notice resolved and or released the City may withhold for any reasonable cost of litigation actually incurred for that stop notice e Liquidated damages against the Contractor wh
565. s for compliance with this Section 7 13 shall be included in the various bid items no separate payment will be therefor City of Clovis Standard Specifications 2009 58 7 14 Trenches And Excavations Hazardous Waste 7 14 1 Trenches And Excavations 4 Feet Or Less In Depth Below The Surface If the Contractor encounters conditions at the Site which are subsurface or otherwise concealed physical conditions which differ materially from those indicated in the Contract Documents or unknown physical conditions of an unusual nature which differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents then notice by the Contractor shall be given to the City promptly before conditions are disturbed and in no event later than ten 10 days after first observance of the conditions The City will promptly investigate such conditions and if they differ materially and cause an increase or decrease in the Contractor s cost of time required for or performance of any part of the Work will recommend an equitable adjustment in the Contract Sum Contract Time or both If the City determines that the conditions at the Site are not materially different from those indicated in the Contract Documents and that no change in the terms of the Contract is justified the City shall so notify the Contractor in writing stating the reasons Claims by Contractor in
566. s large a radius as the size of the manhole will permit Changes in size and grade of the channels shall be made gradually and evenly Stub outs shall be installed in manholes at the locations and sizes shown on the Plans All stub outs shall be sealed with a plug of a type approved by the manufacturer of the pipe All manholes shall be completed to finish grade with concrete collar and paving patches where indicated as shown on the Standard Drawings and as herein specified undeveloped areas where no street or alley surfacing is to be done in conjunction with or immediately after utility installation the manhole cover shall be finished off to a level 1 inch above ground elevation and shall be provided with 12 inches of grade rings In existing street areas where surfacing exists and no new street re grading is contemplated in conjunction with or immediately after utility installation the manhole cover shall be brought City of Clovis Standard Specifications 2009 175 to existing street grade and finished off areas where street or alley surfacing is to be done in conjunction with or immediately after utility installation such as new subdivisions manholes shall initially terminate with the top of the cone 6 inches below subgrade and shall be brought to street or alley surface with grade adjustment rings and completed after street paving is accomplished Unless specifically otherwise indicated in the Contract Specifications it will
567. s shall be capable of being detected at any range of up to 2 500 feet from the optical detector Class emergency vehicles shall be capable of being detected at any range up to 2 500 feet from the optical detector Each system shall have data encoded phase selectors Class signals those emitted by Class vehicles shall be distinguished from Class Il signals those emitted by Class Il vehicles on the basis of the modulation frequency of the light from the respective emitter The modulation frequency for City of Clovis Standard Specifications 2009 298 Class signal emitters shall be 9 639 Hz 0 110 Hz modulation frequency for Class II signal emitters shall be 14 035 Hz 0 250 Hz A system shall establish a priority of Class vehicle signals over Class vehicle signals and shall conform to the requirements in Section 25352 of the California Vehicle Code B EMITTER ASSEMBLY Each emitter assembly shall consist of a data encoded optical emitter unit an emitter control unit and connecting cables and shall conform to the following 1 General Each emitter assembly including lamp shall be designed to operate over an ambient temperature range of 34 C 30 F to 60 C 140 F at both modulation frequencies and to operate continuously at the higher frequency for a minimum of 3 000 hours at 25 C 77 F ambient before failure of the lamp or any other component Each emitter unit shall be controlled by a
568. sary permits licenses and environmental clearances before removing any material from those sources The furnishing of local materials from any source is subject to the provisions of Section 2 2 Examination of Site of Work Plans Specifications and Contract Documents Unless described in the Contract Specifications as a mandatory local material source or approved in writing by the Engineer material sources shall not be excavated at locations where the resulting scars will present an unsightly appearance from any street or highway No payment will be made for material obtained in violation of this provision The Contractor shall at the Contractor s expense make any arrangements necessary for hauling over local public and private roads from any source Local materials will be subject to the provisions of Section 6 8 Samples and Tests Full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved in conforming to the provisions in this Section 6 7 for furnishing and producing materials from any source shall be considered as included in the price paid for the contract item of work involving the material and additional compensation will be allowed therefor If there is no bid item for local materials the cost shall be included in the various bid items of work no additional payment will be made 6 8 Samples And Tests In accordance with Section 6 1 Source of Supply
569. sentative to instruct the workers in the proper recommended procedures Q Pull Tape Pull tape shall be provided in all conduits Each end of electrical conduit shall be fitted with an approved watertight expansion plug with integral provisions for secure attachment of the pull tape The ends of the tape shall be secured to the expansion plug to ensure that the tape does not draw back into the conduit The length of pull tape provided in each conduit shall include a minimum of 72 inches of excess tape in each pullbox or other terminating enclosure Use approved wire pulling lubricant for pulling 4 AWG and larger wire Oil or grease is prohibited as a conductor pulling lubricant All conductors 8 and smaller shall only be pulled by hand R Tracer Wire Tracer wire shall be installed in all conduit runs whether conduit is metallic or non metallic and shall be installed in compliance with Section 82 10 Tracer Wire Tracer wire shall be installed on the outside of all conduit installed including conduit installed by boring methods S All rocks or other debris shall be removed from conduit trenches Conduit shall have a firm uniform bearing for the entire length of each conduit to prevent uneven settlement Pad trenches with soil as necessary to provide uniform bearing surfaces T All changes in the direction of the conduit shall be made with sweeps or appropriate fittings not by bending U Grounding Suitable system and system compon
570. shall at the option of the Contractor be potable or non potable except for water used in connection with any phase or part of installing repairing cleaning disinfecting or pressure testing of sewers sewer force mains recycled water mains and potable water systems Water for such use shall be potable only Sources of non potable water supply shall be approved by the Engineer and such water shall be chemically and biologically suitable for the intended use Potable water may be furnished by the Contractor from an independent source or may be obtained from the City Water System In compliance with Section 20 Landscape Planting and Section 21 Landscape Irrigation Systems the water supply for landscape planting and irrigation systems shall be provided by the Contractor in accordance with the Plans and Contract Specifications A permanent water meter will be furnished by the City for each irrigation system connection to the City water system unless otherwise shown on the Plans or specified in the Contract Specifications Contractor will be charged for all water consumed through these connections including water consumed through the temporary hydrant meter obtained in compliance with this Section 17 and water consumed for irrigation system testing purposes and for landscape irrigation through the 90 day maintenance period and up to final acceptance of the work by the Engineer Water for construction purposes for landscape pla
571. shall also be approved by the University of Southern California Foundation for Cross Connection Control and Hydraulic Research The backflow prevention unit shall be installed downstream to water meters in a location approved by the Engineer The concrete pad therefor shall be Class 2 3 1 2 in thick 21 After being installed at the project site the backflow prevention unit must be tested and approved as functioning properly by an approved AWWA certified tester within 5 days of installation with the results sent to the City of Clovis Utilities Division Approval of the backflow prevention unit must precede any shrub tree or turf planting Plumbing from the water meter to the backflow preventer shall consist of galvanized pipe and fittings 22 Pressure Regulating and Pressure Sustaining Valve The pressure regulating and pressure sustaining valve shall be of the type and performance as specified on the Plans 23 Booster Pump Pump shall be Flow Tronics or Water Tronics and provide high efficiency reliability and stable operating pressures Pump submittals are required and shall be approved by the Engineer in writing The pump unit shall be pre fabricated and self contained with the following features a Variable frequency drive b High and low pressure system shutdown c Motor overload shutdown d Full flow bypass e Weather resistant rust proof enclosure either powder coated or stainless steel f Exhaust fan
572. shall be recessed below the wearing surface of the runner so as to provide a clearance of at least inch to the interior surface of the casing pipe in the installed condition allowing for runner wear during carrier pipe installation The recess shall be filled with a corrosion inhibiting filler approved by the Engineer 4 Hardware for joining band sections shall be 304 stainless steel studs locknuts and washers Hardware shall be 5 16 inch for carrier pipes up to 42 inch diameter and 3 8 inch for carrier pipes 42 inch and larger The casing spacer manufacturer shall have implemented a quality management system and shall hold a current certificate of registration issued by a certifying organization acceptable to the Engineer certifying that the quality management system conforms to the provisions of ISO 9001 2000 and is applicable to the manufacturing of casing spacers A copy of the certificate of registration shall be submitted to the Engineer 68 2 3 Casing End Seals Casing end seals shall be PSI Model or Model 5 as manufactured by Pipeline Seal and Insulator Inc Houston TX or approved equal Concrete plugs shall not be used for casing end seals unless otherwise shown on the plans or specified in the Contract Specifications such cases concrete shall be Class 2 conforming with Section 90 Portland Cement Concrete of the State Standard Specifications 68 2 4 Reinforced Concrete Pipe Where reinforced conc
573. shall be as specified in the contract documents 86 3 Definitions Reference is made to 86 1 015 Definitions of the State Standard Specifications for definitions applicable to these Standard Specifications 86 4 Regulations Codes And Permits All electrical equipment shall conform to the provisions in Section 86 1 02 Regulations and Code of the State Standard Specifications In conformance with Section 7 10 Permits and Licenses of these Standard Specifications in addition to the required Encroachment Permit the Contractor shall obtain an Electrical Permit for meter service pedestal installation or modification from the City Building Division and pay all associated fees therefor 86 5 Equipment List And Drawings Equipment lists and drawings of electrical equipment and material shall conform to the provisions in Section 86 1 04 Equipment List and Drawings of the State Standard Specifications and these Standard Specifications The Contractor shall furnish circuit drawings for all electrical equipment supplied in the contract The controller and controller cabinet drawings shall be approximately 24 x 36 in size and legible Equipment list shall give firm delivery dates for materials In the event these dates cannot be met the equipment supplier and Contractor shall provide documentary proof of search for alternate sources of supply at least 30 days prior to said promised delivery dates Such actions shall not be
574. shall be considered as included in the prices bid for other sewer pipeline items of work and no separate payment will be made therefor The unit price bid per each for manholes shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved therein as shown on the Plans as set forth in the Specifications and as directed by the Engineer This shall include but not be limited to furnishing and installing the manhole and pipe stub outs excavation backfill and compaction returning and adjusting manhole lids and frames to final grade following street or alley construction or reconstruction and connections to all pipes wet or otherwise City of Clovis Standard Specifications 2009 180 SECTION 65 SANITARY SEWER FORCE MAINS 65 1 General This work shall consist of furnishing and installing Poly Vinyl Chloride and Ductile Iron DI pipe for sewer force mains and all appurtenances installed complete as shown on the Plans as specified in the Specifications and as directed by the Engineer Reference is made to Section 64 Sanitary Sewer Facilities and Section 66 Potable Water Distribution Facilities of these specifications 65 2 Materials Pipe for sewer force mains shall be either PVC pipe or DI pipe Where a particular pipe material either PVC pipe or DI pipe is designated on the Plans for sewer force main construction the sewer force ma
575. shall be placed and compacted in accordance with Section 19 4 Embankment Construction 19 2 03 Slopes Excavation and embankment slopes shall be constructed in conformance with the lines and grades shown on the plans When completed the average plane of the slopes shall conform to the slopes indicated on the Plans and no point on the completed slopes shall vary from the designated slopes by more than 0 1 foot measured at right angles to the slope The tops of excavation slopes and the ends of excavations shall be rounded as shown on the plans or as directed by the Engineer 19 2 04 Surplus Material Unless otherwise shown on the Plans or specified in the Contract Specifications surplus excavated material shall be disposed of outside the right of way in accordance with Section 5 12 Disposal of Material Outside the Right of Way The Contractor shall not borrow or waste material unless authorized in writing by the Engineer If the quantity of surplus material is shown on the Plans or specified in the Contract Specifications the quantity shown or specified is approximate only The Contractor shall be satisfied that there is sufficient suitable material available for the completion of any embankments before disposing of any material outside the right of way Any shortage of material caused by premature disposal of any material by the Contractor shall be replaced by the Contractor and no compensation will be allowed the Contractor for suc
576. shall conform to the requirements for installing new pipe Existing headwalls endwalls or other structures shall be removed and disposed of or moved to the extended location as shown on the Plans or directed by the Engineer When headwalls or endwalls are to be moved the pipe shall be cut with smooth edges at a point about one foot back of the headwall or endwall along a plane perpendicular to the center line of the pipe The headwall or endwall shall then be moved and placed in its new location and the new pipe shall be connected to the existing pipe as shown on the plans or as directed by the Engineer 15 2 06 Measurement The work performed under this Section 15 2 Miscellaneous Facilities will be measured by units specified in the Contract Specifications for the various work described In the absence of a contract item setting forth methods of measurement the cost of the work involved shall be considered as included in the price paid for other various items of work and no measurement is required 15 2 07 Payment When the contract includes separate items with unit or lump sum prices for removing salvaging adjusting modifying remodeling abandoning obliterating relaying reconstructing relocating or resetting any of the miscellaneous facilities the quantities will be paid for at the contract unit or lump sum price for the item of work involved If no contract items are provided then the cost thereof shall be considered to be incl
577. shall conform to the requirements of Section 16 Clearing and Grubbing 81 4 Excavation and Subgrade Preparation Any required excavation or embankment construction for the wall footing shall be to the lines and grades shown on the Plans or established by the Engineer Excavation embankment construction and preparation of subgrade shall conform to the requirements of Section 19 Earthwork Unless otherwise indicated in the Plans or Contract Specifications minimum relative compaction of finished subgrade for wall footing shall be 90 percent 81 5 Wall Construction The wall construction including pilasters and footings shall be of the highest quality workmanship and all walls shall be laid true level plumb and neat and in accordance with the Plans and the Standard Drawing pertaining thereto Forms for footing construction shall be straight and true The exposed after wall construction finish top surface of the footing shall be a medium sweat finish Mortar and grout shall be mixed by placing half of the water and sand in the operating mixer Then the cement lime and remainder of the sand and water shall be added After all ingredients are in the batch mixer they shall be mechanically mixed for not less than 5 minutes Hand mixing shall not be employed unless specifically approved The mortar should be retempered with water as required to maintain high plasticity Retempering on mortar boards shall be done only by adding water wi
578. shall perform all level adjustments and alignments required on the data link in order for it to operate in accordance with these special provisions If any data link fails to meet the performance requirements the Contractor shall take all steps necessary to restore the failed link to the required performance Each data link in the communications system shall be tested for qualitative performance and connected to the BNC connector of the data link transmitter The Contractor shall measure and record the received optical power at the optical connector of the data receiver from the data transmitter under test using a ninety 90 percent APL Average picture level flat field input to the transmitter The Contractor shall measure record and City of Clovis Standard Specifications 2009 245 tabulate receiver s dynamic range at the optical connector of the data receiver from the data transmitter under test using a ninety 90 percent APL flat field input to the transmitter To do this the measured optical attenuation of the fiber being used shall be increased to the point at which the data test just begins to show a 3 dB degradation of the data signal to noise ratio in accordance with EIA 25 C data test procedures The optical receive power into the data receiver shall be measured and recorded Then the optical attenuation shall be decreased until the data test set once again shows degradation of the data and registers errors At time shall the o
579. shall shut off completely at the rated design pressure in either direction of flow Valves shall be suitable for very infrequent operation after extended periods of inactivity All valves and actuators shall be specially designed for service below grade where groundwater may completely submerge the valve and operator nut City of Clovis Standard Specifications 2009 188 Valves shall be short body and shall be constructed of cast iron conforming to the provisions in ASTM A126 for Class B or ductile iron conforming to the provisions in ASTM A536 for Grade 65 45 12 or Grade 70 50 05 Flanged end valves shall be faced and drilled as specified in ANSI B16 1 for Class 125 unless otherwise shown on the Plans Seats shall be Buna N rubber body seats of one piece construction molded bonded or retained in a machined cavity in the valve body Seats may not be located on the disc and may not be mechanically retained by segments and or screws Shafts and disc shaft fasteners for butterfly valves rated at 150 psi shall be constructed of Type 304 or Type 316 stainless steel Valve packing shall be of the self adjusting Chevron type The valve shall be fitted with sleeve bearings that are corrosion resistant and self lubricated Discs for butterfly valves shall be rated at 150 psi and shall be ductile iron conforming to the provisions in ASTM A536 for Grade 65 45 12 or Grade 70 50 05 or cast iron conforming to the provisions in ASTM 48 for Class
580. sible damage to the pavement Dry sandblasting may be used in selected areas only with the permission of the Engineer and with approval of the air pollution control authority having jurisdiction over the area in which the work will be performed Alternate methods of removal require prior approval of the Engineer Pavement marking images shall be removed in such a manner that the old message cannot be identified Where grinding is approved by the Engineer for use the pavement marking image shall be removed by grinding a rectangular area The minimum dimensions of the rectangle shall be the height and width of the pavement marking Residue resulting from removal operations shall be removed from pavement surfaces by sweeping or vacuuming before the residue is blown by the action of traffic or wind migrates across lanes or shoulders or enters into drainage City of Clovis Standard Specifications 2009 94 facilities Traffic stripes shall be removed before change is made in the traffic pattern Traffic Stripes and Pavement Markings designated to be removed and not to receive a pavement surface treatment per Section 15 2 02 C 2 shall be removed completely as herein specified and the surface sealed with a Walkmaster or an equivalent slurry approved by the Engineer Any voids created by grinding shall be filled using a Type II slurry approved by the Engineer All existing striping stenciling or other markings whether shown for removal o
581. sion and pay all fees associated therewith all in compliance with Section 7 10 Permits and Licenses 21 4 Specialized Inspection All of the work described herein will be subject to inspections by an Engineering Division inspector and specialized City Parks Division personnel as ordered by the Engineer Additional inspections will be conducted by the City Building Inspection Division for work covered by the California Electrical and Plumbing Codes Reference is made to Section 21 11 Inspection Specialized inspections will be made of items including the following a Grading b Alternative materials where allowed c Locations of above and below ground facilities if different from the plans d Performance inspection prior to planting e Pre final performance inspection prior to beginning plant maintenance period f Performance inspection during plant maintenance period g Final inspection after completion of the plant maintenance period All overtime inspection charges incurred by specialized City Parks Division personnel shall be paid by the Contractor when inspection services are required outside of normal working hours Work requiring inspection before or after the normal 8 hours of a normal working day or taking place on holidays Saturdays and Sundays will be considered overtime inspection The Contractor will be billed at the standard City hourly overtime rate Failure to pay the bill will be cause to deduct t
582. slurry backfill to within 76mm 3 inches of any finished surface When installing bases conduit and pull boxes in areas with existing asphalt concrete or concrete the existing asphalt concrete or concrete shall be sawcut and removed to the width necessary for trenching or digging All asphalt concrete concrete and dirt removed shall become the property of the Contractor After installation of conduit bases and pull boxes and the backfilling and compacting of dirt concrete or asphalt concrete shall be supplied and installed of equal material and thickness of the asphalt concrete or concrete removed Within the road bed conduits shall be placed by jacking or directional boring methods as stated in Section 86 2 05C Installation of the State Standard Specifications Conduit shall also be placed by jacking or directional boring methods beneath sidewalks and driveways as directed by the Engineer When removing the asphalt concrete or concrete from the median for the installation of conduit and pull boxes for the left turn intermediate and far detectors a sawcut shall be made adjacent to the curb farthest from the left turn lane adjacent to through traffic lane to the width needed for conduit and pull box installation Asphalt concrete or concrete and dirt shall be removed between this sawcut and the existing curb 86 12 Removing And Replacing Improvements Removing and replacing improvements shall conform to the provisions in Section 86 2
583. sponsibility of the Owner and d why the claimed cost is a reasonable amount 4 12 5 3 Claims For Additional Time And Cost 4 12 5 3 1 Notice And Extent Of Claim If the Contractor wishes to make a Claim for an increase in the Contract time the Claim shall include all facts supporting the Claim including but not limited to A a current schedule and delay analysis explaining i the nature of the delay ii the Owner s responsibility for the claimed delay iii the claimed delay s impact on the critical path and iv the claimed delay s impact on completion date including an analysis of float previously used and still remaining and B all facts and documents supporting any claim for additional compensation related to the increase in Contract time see 4 12 5 2 Claims for Additional Payment In the case of a continuing delay only one 1 initial Claim is necessary that is based on estimates of when the continuing delay will end but within thirty 30 days of the end of the continuing delay an updated final Claim must be submitted 4 12 5 3 2 Adverse Weather Claims If unusually severe weather conditions i e those conditions beyond the weather conditions that are within Contractor s scope see Section 8 8 Time of Completion are the basis for a Claim for additional time such Claim shall be documented by data substantiating that weather conditions were excessive could not have been reasonably anticipated and had an
584. ss of one half of one percent of the Contractor s total bid for which no subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity It will be the Contractor s responsibility to submit to the Engineer the facts constituting a public emergency or necessity If approved by the Engineer a finding in writing will made a part of the public record setting forth the City s decision and the reasons therefor The Contractor shall give personal attention to the fulfillment of the contract and shall keep the work under the Contractor s control No subcontractor will be recognized as such and all persons engaged in the work of construction will be considered as employees of the Contractor and the Contractor will be held responsible for their work which shall be subject to the provisions of the contract and specifications When a portion of the work which has been subcontracted by the Contractor is not being prosecuted in a manner satisfactory to the Engineer the subcontractor shall be removed immediately on the requisition of the Engineer and shall not again be employed on the work The Contractor shall be responsible for the coordination of all trades subcontractors and material handlers engaged in the work City of Clovis Standard Specifications 2009 66 Neither the City nor the Engineer will undertake to settle any differences between the Contractor and its subcontractors or between subcontrac
585. stream with the spigot end of the pipe in the direction of flow unless otherwise approved in writing by the Engineer Existing sewer lines shall remain operational at all times The Contractor shall furnish and install a gasketed stainless steel band type repair coupling specifically designed for such use and approved by the Engineer where PVC sewer pipe is to be connected to an existing pipe Sewer pipe and fittings shall be laid to true line and grade and jointed in compliance with the manufacturer s recommendation and shall be carefully adjusted to grade by scraping away or filling and tamping the trench bottom to eliminate any possible sag or high point in the pipe Occasional variations as follows will be permitted above grade 3 16 inch below grade not to exceed 3 8 inch alignment not to exceed 2 inches if gradual over a distance of 20 feet Use of blocks to support the pipe is prohibited Each joint of pipe must be fully pressed into place so that there will be no unevenness or settlement of one length of pipe with the other at the joint The Contractor shall furnish and use a laser device for control of alignment and grade of the sewer pipe When conditions are such that this method is impracticable such as on short City of Clovis Standard Specifications 2009 173 pipe runs the Contractor shall Engineer on the ground to set grade of each joint of pipe by means of an Engineer s level The grade line shown on the Plans i
586. sufficiently low to allow the fiber free movement Buffer tubes shall be made of tough abrasion resistance material to provide mechanical and environmental protection of the fibers yet designed to permit safe intentional scoring and breakout entry without jeopardizing the internal fibers City of Clovis Standard Specifications 2009 236 Buffer tube filling compound shall be homogenous hydrocarbon based gel with anti oxidant additives USRD to prevent water intrusion and migration The filling compound shall be non toxic and dermatological safe to exposed skin It shall be chemically and mechanically compatible with all cable components non nutritive to fungus non hygroscope and electrically non conductive The filling compound shall be free from dirt and foreign matter and shall be readily removable with conventional non toxic solvents Buffer tubes shall be stranded around a central member by the reverse oscillation stranding process Central Member The central member which functions as an anti buckling element shall be a glass reinforced plastic rod with similar expansion and contraction characteristics as the optical fibers A linear overcoat of Low Density Polyethylene shall be applied to the central member of the main truck fiber cable to achieve the optimum diameter to provide the proper spacing between buffer tubes during stranding Filler Rods Fillers may be included in the cable to lend symmetry to the cable cross section w
587. surface soil conditions may require drainage holes for proper tree development as determined by the Engineer Unless otherwise shown on the Plans or specified in the City of Clovis Standard Specifications 2009 138 Contract Specifications as directed by the Engineer the Contractor shall drill a representative number of test holes at least 10 feet deep to determine drainage characteristics of the underlying soil at areas to receive tree plantings Reference is made to Section 8 15 Utility and Non Street Facilities Potholing For locations which the Engineer determines the soil to be poorly draining the contractor shall proceed to drill drainage holes in accordance with the following At the locations directed by the Engineer 12 inch diameter drainage holes shall be drilled for each tree to be planted as designated on the drawings and details The depth of the drainage hole shall be determined as follows a The hole must penetrate through and beyond any underlying hardpan or other impervious material or soil stratum All hardpan or other impervious material shall be removed from the drilled hole b The hole shall be drilled to a depth where visual evidence of subsurface sand or gravel drainage stratum is apparent c If there is no apparent drainage stratum the drainage hole shall be drilled to a minimum of 10 feet deep After drilling is completed non sandy soil or impervious material drilled from the hole shall be repl
588. t Pipe shall be handled in accordance with the manufacturer s recommendations on loading unloading and storage 26 Water Meter Prior to beginning of planting the Contractor shall contact the City Utilities Division and request the installation of the water meter 21 6 Trenching And Excavation Trenching and Excavation shall conform to the requirements of Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration be open vertical construction and sufficiently wide to provide free working space around the work installed and to provide ample space for backfilling and tamping The use of a vibratory plow or methods other than open vertical trenching will not be allowed without the written approval of the Engineer To obtain such approval a field test must be performed at the proposed site with the equipment to be used in the presence of the Engineer The field test is to indicate if the proposed site is favorable to the plowing method Approval for plowing at one location does not allow the use of plowing at another location Approval for plowing must be obtained for each location where the use of plowing is proposed If at previously approved plowing locations conditions for plowing become unfavorable as determined by the Engineer plowing shall be terminated Trenches for pipe and equipment shall be cut to required grade lines and compacted to provide an accurate grade and uniform bearing for the fu
589. t acceptance shall constitute full authority for the City to deduct amounts payable to the City from any moneys due or that may become due to the Contractor under the contract If the Contractor s cost reduction proposal is accepted in whole or in part the acceptance will be by a contract change order which shall specifically state that it is executed pursuant to this Section 5 24 The change order shall incorporate the changes in the plans and specifications which are necessary to permit the cost reduction proposal or that part of it as City of Clovis Standard Specifications 2009 36 has been accepted to put into effect and shall include conditions upon which the City s approval thereof is based if the approval of the City is conditional The change order shall also set forth the estimated net savings in construction costs attributable to the cost reduction proposal effectuated by the change order and shall further provide that the Contractor be paid 50 percent of that estimated net savings amount The Contractor s cost of preparing the cost reduction incentive proposal and the City s costs of investigating a cost reduction incentive proposal including any portion thereof paid by the Contractor shall be excluded from consideration in determining the estimated net savings in construction costs Acceptance of the cost reduction proposal and performance of the work thereunder shall not extend the time of completion of the Contract un
590. t backfill if required by the Contract Specifications shall conform to the requirements therein Thrust restraint for all sewer force mains shall be accomplished by the use of restrained joints in conformance with the details shown on the Plans Thrust blocks are not acceptable for thrust restraint for sewer force mains 65 4 Tracer Wire Installation A tracer wire shall be installed with all pipe for sewer force mains Materials and installation shall conform to Sections 66 2 12 Tracer Wire and 66 6 Tracer Wire Installation 65 5 Plug Valve Installation Plug valves shall be furnished and installed at the locations as shown on the Plans as specified in the Specifications and as directed by the Engineer Reference is also made to Section 66 Potable Water Distribution Facilities Plug valves shall be installed such that the plug rotates about a horizontal axis Plug valves shall be installed in a manner to allow the plug to be stored in the top when the valve is open thus protecting the plug against grit and heavy solids that may pass through the valve Plug valves shall be installed such that they seat in the direction opposite the high pressure side such that the pressure of the water forces the plug against the seat for a tighter seal Plug valve box installation shall conform to the applicable details shown on the City Standard Drawing for valves except that the cover shall be marked SEWER City of Clovis
591. ted Draft documentation shall be submitted eight 8 weeks prior to the start of installation The draft documentation shall show the general approach in preparing the final manuals Upon approval of the draft documentation provisional documentation shall be supplied three 3 weeks prior to the start of site testing The provisional documentation shall be of the same format as the final manuals but with temporary insertion for items that cannot be finalized until the system is completed tested and accepted Final documentation shall be submitted no later than four 4 weeks after completion of the acceptance tests and shall incorporate all comments made during the approval stages The Contractor shall be responsible for all delay caused by non compliance to the specified requirements Final documentation shall be approved prior to its production Ten 10 copies of all final documents shall be delivered The copies shall be 8 gt inch x 11 inch paper and bound City of Clovis Standard Specifications 2009 248 three ring hard covered binders complete with dividers Also the documentation shall be furnished electronically in Word format System documentation shall be arranged in an operation and maintenance O amp M manual format providing all the information necessary to operate maintain and repair the equipment and cable to the lowest module or component level The operation and maintenance manual shall as a minimum consist of the fo
592. ted Macnee ns 228 82 6 COUPLINGS AND deceit dhe 228 82 7 EXCAVATION AND BACKFILL AND 414441 14 411114141 229 82 8 FIBER OPTIC CONDUIT INSTALLATION 229 82 8 A DIRECT HORIZONTAL 8 8 229 82 9 CONDUIT DEFLECTION DEFORMATION 230 82 10 TRACER WIRE aR Acta Racine 230 82511 DAMAGED CONDUIT 230 82 12 RESTORATION OF 8 230 82 13 ADJUSTING AND CLEANING 230 82 14 FIBER OPTIC PULLBOXES addenda 230 82 15 ant deh attendees 233 82 16 FIBEROPTIC MARKERS 233 82 17 FIBER OPTIC CABLE a 233 82 17 A OVERVIEW OF FIBER OPTIC CABLE nnt 233 82 17 B SINGLE MODE FIBER OPTIC OUTSIDE PLANT CABLE 235 82 18 FIBER OPTIC CABLE TESTING 239 82 19 22 239 92 20 SPLICING ra 3 ead cata so 240 92521 SPLI
593. ted at 1310 nm and City of Clovis Standard Specifications 2009 241 1550 OTDR shall have printer capable of producing a verifying test trace with fiber identification as shown in the sample Link Loss Budget Work Sheet numerical loss values the date and the operator s name It shall also have a DOS based 3 5 inch disk recording capability that has associated software to do comparisons and reproductions on 8 5 inch x 11 inch paper via personal computer 82 26 B Factory Testing Verification of the fiber specifications as listed in the Fiber Characteristics Table shall be supplied by the Manufacturer with the appropriate documentation After cabling before shipment but while on shipping reel one hundred 100 percent of all fibers shall be tested for attenuation Copies of the results shall be 1 maintained on file at the Contractor s Manufacturers and Owners place of business with a file identification number for minimum of ten 10 years 2 attached to the cable reel in a waterproof pouch and 3 submitted to the Contractor and to the Engineer prior to the delivery of the cable to the jobsite 82 26 C Arrival On Site The cable and reel shall be physically inspected by the Contractor on delivery for damage or any other potential defects The Contractor shall not install any damaged or defective cable The contractor shall be ultimately responsible for furnishing a fully functional system free from damage
594. ter unit into this alignment Each emitter control unit shall be provided with hardware to permit its mounting in or on an emergency vehicle or mass transit vehicles Where required for certain emergency vehicles the emitter control unit and all exposed controls shall be weatherproof C OPTICAL DETECTION DISCRIMINATOR ASSEMBLY Optical detection data encoded phase selector discriminator assembly shall conform to the following City of Clovis Standard Specifications 2009 299 1 General Each optical detection discriminator assembly shall consist of one or more optical detectors connecting cable and a discriminator module 2 Optical Detector Each optical detector shall be a weatherproof unit capable of receiving optical energy from two separately amiable directions The horizontal angle between the two directions shall be variable from 180 to 5 The reception angle for each photocell assembly shall be a maximum of 8 in all directions about the aiming axis of the assembly Measurements of reception angle will be taken at a range of 1 000 feet for a Type emitter and at a range of 1 800 feet for a Type II emitter All internal circuitry shall be solid state and electrical power shall be provided by the associated discriminator module Each optical detector shall be installed wired and aimed as specified by the manufacturer and as shown in the details and diagrams Each optical detector shall be contained in a housing whi
595. terial thus cut out shall be re compacted along with the new embankment material at the Contractor s expense unless the width of excavation required by the Engineer exceeds 3 feet in which case the excavation of material in excess of 3 feet horizontally will be measured and paid for as roadway excavation Where embankment is to be made and compacted on original slopes old or new embankments and end dumping is permitted the slopes of the original ground or embankment shall be benched plowed or cut into before starting end dumping City of Clovis Standard Specifications 2009 125 When embankment is to be placed on existing roadway the existing roadbed shall be scarified watered graded and rolled in advance of placing new material thereon The construction of earthen dikes the placing and compacting of approved material within the right of way where unsuitable material has been removed and the filling of holes pits and other depressions within the right of way shall conform to the provisions herein and in conformance with the provisions in said Section 19 4 04 Trenches holes depressions and pits outside of areas where embankments are to be constructed shall be graded to provide a presentable and well drained area Where embankments are shown on the plans to be constructed across low swampy ground which will not support the weight of hauling equipment the lower part of the embankment may be constructed by dumping successive
596. th public entity name for the name of project project am authorized by my employer contractor company name to prepare the attached claim for compensation in other words for money and or time extensions to public entity name regarding this project dated 200_ entitled and requesting and or ___ additional working days and prepared said attached claim am the most knowledgeable person at contractor company name regarding this claim am aware of all law that relates to and governs this claim including but not limited to California Penal Code section 72 Government Code sections 12650 et seq False Claims Act and Business and Professions Code sections 17200 et seq Unfair Business Practices Act aware that submission or certification of false claims or other claims that violate law or the contract may lead to fines imprisonment and or other severe legal consequences for myself and or contractor company name The attached claim is prepared and submitted in good faith does not breach the contract between contractor company name and public entity name for this project is not a false claim does not violate any law satisfies all provisions of the contract only contains truthful and accurate supporting data and only requests an amount that accurately reflects the adjustments to money and time for which honestly and in good faith believe that public entity name is responsible under its contract
597. that the conditions do materially so differ or do involve hazardous waste and cause a decrease or increase in the Contractor s cost of or the time required for performance of any part of the work shall issue a change order in accordance with Section 4 10 Changes C In the event that a dispute arises between the Engineer and the Contractor whether the conditions materially differ or involve hazardous waste or cause a decrease or increase in the Contractor s cost of or time required for performance of any part of the work the Contractor shall not be excused from any scheduled completion date provided for by the Contract but shall proceed with all work to be performed under the Contract The Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the contracting parties City of Clovis Standard Specifications 2009 59 Contractor shall comply with the requirements Section 5 12 Disposal of Material Outside the Right of Way 7 15 Worker Protection From Caving Ground In Excavations The Title 8 Construction Safety Orders of the Division of Occupational Safety and Health shall apply to all excavations In compliance with Sections 341 and 341 1 of Title 8 California Code of Regulations and Section 6500 of the State Labor Code for any trenches or excavations that are 5 feet or more in depth the Contractor must obtain a permit fro
598. the Contract For projects involving landscaping and irrigation systems the 90 day maintenance period provisions of Sections 20 8 Maintenance Period and 21 12 Maintenance Period apply The Engineer will determine the adequacy of the final cleanup and if found not to be in compliance with said Section 5 21 will not make the final inspection and instead direct the Contractor to perform additional cleanup as required until compliance is reached Upon making a determination that the final cleanup is in compliance with said Section 5 21 the Engineer will conduct a final inspection Representatives from various City Departments as well as other agencies who will own operate and maintain the improvements constructed by the Contractor will participate in the final inspection The inspection will be completed within a maximum of ten 10 working days The time required by the Engineer and others to conduct the final inspection will not be counted against the allotted time for completion of the contract Upon completion of the final inspection a list of items needing correction to comply with the contract documents if any will be provided by the Engineer to the contractor The time required to make such corrections will be charged against the allotted time for completion of the Contract Failure to complete the work in all parts and requirements of the contract including providing Final Cleanup in a timely manner to allow sufficient tim
599. the Contractor shall notify in writing all residents and tenants directly affected by the construction work Such notice shall provide the nature of the work the approximate time for the completion of work and any anticipated inconveniences The notice shall be on the contracting firm s letterhead and shall be signed and shall include the project superintendent s name and telephone number Prior to commencing work in each given area the Contractor shall furnish the Engineer a copy of the notice given to residents and tenants and shall certify the date location and method by which the notice was delivered The Contractor shall also comply with the requirements of Section 12 2 01 Traffic Control Plan Notifications For every occurrence when property access sewer service or water source is to be interrupted by the Contractor s work the Contractor shall give written notice to all affected residents tenants not less than two 2 calendar days nor more than five 5 calendar days City of Clovis Standard Specifications 2009 68 prior to said interruption notice s shall be in addition to the initial notice to residents described above All costs for compliance with this Section 8 7 shall be included in the various bid items of work no additional payment will be made therefor 8 8 Time Of Completion The Contractor shall complete all or any designated portion of the work called for under the contract in all parts and requiremen
600. the Contractor shall supply necessary fittings to accept a City supplied gauge City of Clovis Standard Specifications 2009 176 All gauging and testing shall be done outside the manholes shall be allowed to enter the manholes while the line is pressurized PVC Gravity Sewer Pipe Minimum Acceptable Time Required for Pressure Decrease from 3 5 to 3 0 psig Pipe Diameter Test Time inches Minutes Seconds 4 2 32 6 3 50 8 5 6 10 6 22 12 7 39 15 9 30 Pipes greater than 15 inches diameter shall be as specified the Contract Specifications City of Clovis Standard Specifications 2009 177 Vitrified Clay Sewer Pipe Minimum Acceptable Time Required for Pressure Decrease from 3 5 to 2 5 psig Only if this kind of pipe is required on the Plans or specified in the Contract Specifications Minimum Distance Pipe Diameter Test Time Between Manholes inches Minutes Seconds Feet K Value 4 2 0 430 0 428 6 2 45 380 0 592 8 3 45 320 0 702 10 4 46 260 1 100 12 5 40 215 1 580 15 7 0 170 2 470 18 8 36 145 3 560 21 10 6 125 4 850 24 11 6 105 6 340 Pipes greater than 24 inches in diameter shall be as specified in the Contract Specifications The above tabulated values shall be used for the respective diameter pipes except where the distance between successive manholes is less than the above tabulated values in which case the following formula will be used to determine the test time T KL
601. the Standard Drawing pertaining thereto Fire Hydrants shall be of the wet barrel type with each outlet operated by an independent valve The inlet to the hydrant shall be 6 inches formed to connect to the feeder pipe Hydrants shall be provided with break off fittings and with 30 inch bury and extensions as necessary 66 2 9 Copper Tubing All copper tubing shall conform to the latest revision of ASTM Specification Designation B 88 as latest amended The tubing shall be made of copper having a purity of at least 99 9 percent as determined by electrolytic assay except that silver may be counted as copper Copper tubing shall be seamless shall be of one grade designated type soft as listed in the above specifications The tubes shall be clean smooth round of proper dimension free from grooving indentations cracks flaws and scale and shall not crack when flaring The name or trademark of the manufacturer and a symbol indicative of the type shall be permanently marked at intervals not greater than 20 inches on the tubing 66 2 10 Other Service Material All service material shall be as indicated on the Plans Standard Drawings or as specified in the Contract Specifications 66 2 11 Nuts Bolts Screws and Fasteners All nuts bolts screws and fasteners used for connecting flanges valve body parts etc below the ground surface shall be manufactured of nickel cadmium steel or approved equal equipment within valve boxes is conside
602. the image sensor electronics and it shall cause interference with the video signal The enclosure shall allow the image sensor to operate satisfactorily over an ambient temperature range from 29 F to 131 F and humidity range from 0 relative humidity to 100 relative humidity The enclosure shall allow include a provision at the rear of the enclosure for connection of power and video signal cables fabricated at the factory Input power to the environmental enclosure shall be 115 to 120 VAC 60 Hz The enclosure shall be equipped with a sun shield that prevents sunlight from directly entering the lens The sunshield shall include a provision for water diversion to prevent rainwater from flowing into the camera field of view The video output by the image sensor shall be RS170 format The image sensor shall include a variable focal length lens with variable focus that can be adjusted without opening the camera housing The video signal shall be fully isolated from the camera enclosure and power cabling All video connections for the image sensor to the interface panel shall be isolated from earth ground The video output stage of the image sensor shall include transient protection to prevent damage due to voltage transients occurring on the coaxial cable leading from the image sensor to the processor modules F INSTALLATION SUPERVISION The supplier of the video detection system shall supervise the installation and testing of the System equi
603. the impression so that the upper surface of the pull top stiffener is flush with the concrete and the pull top stiffener shall be immediately peeled off After the pull top is removed the concrete shall be floated to fill all voids adjacent to the strip During final troweling the edges at plastic control joints shall be finished to a radius not to exceed 1 8 inch using a slit jointer tool The finished joint opening shall not be wider than 1 8 exclusive of radii d The above spacing for construction joints shall be required in lieu of the spacing indicated in Section 73 Concrete Curbs and Sidewalks of the State Standard Specifications City of Clovis Standard Specifications 2009 214 Mowstrips may not be poured monolithically with sidewalks or other concrete improvements The surface of sidewalks wheelchair ramps and driveway approaches shall be scored stamped or otherwise marked as shown on the Plans Standard Drawings Contract Specifications or as directed by the Engineer utilizing a scoring tool which will leave the edges rounded The construction of wheelchair ramps shall include any special surfacing required to be affixed to the concrete surface Where steel dowels are set forth on the Plans to anchor proposed concrete curbs to existing pavement adhesives may not be substituted therefor 73 6 Finish Immediately upon stripping curb forms and prior to backfill all rock pockets or honeycombs shall be repaire
604. the location shown on the plans The longest dimension of the pull box shall be parallel to the P V C conduit 2 Sawcut and trench between the two No 5E pull boxes Bottom of trench shall be 12 inches below finished grade see sheet ES 5C of State Standard Plans 3 Supply and install a 3 inch P V C schedule 40 conduit in slot and into pull box on each end Conduit shall extend not more than 2 inches inside the pull box wall bushings shall be installed on each end of this conduit prior to installation of the probes 4 Backfill the trench with a 2 sack concrete sand slurry to a depth of not less than 2 5 inches below the pavement surface Complete backfill operations in existing pavement as stated in Section 86 40 PVC Loop Detector Slot Patching Procedure of these specifications 5 Install Model 231 sensing elements probes as shown on plans and as stated in these Specifications Connections shall be made as shown on the drawings included in these Technical Specifications A polyethylene braided rope having a minimum diameter of 3 16 inch shall be installed to facilitate proper positioning and removal of the probe s Only a single pull rope shall be used regardless of the number of probes installed The rope shall be tied to the probe s in two locations and taped to the probe s in three locations A minimum of 3 feet of rope shall be left in the lead in cable pull box The ends of the pull rope shall be secured to the condu
605. the material The Contractor shall assure that the Engineer or the Engineer s authorized representative has free access at all times to the material to be inspected sampled or tested It is understood that the inspections and tests if made at any point other than the point of incorporation in the work in no way shall be considered as a guaranty of acceptance of the material nor of continued acceptance of material presumed to be similar to that upon which inspections and tests have been made and that inspection and testing performed by the Engineer shall not relieve the Contractor or the Contractor s suppliers of responsibility for quality control Manufacturers warranties guaranties instruction sheets and parts lists which are furnished with certain articles or materials incorporated in the work shall be delivered to the Engineer before acceptance of the contract Reports and records of inspections made and tests performed when available at the site of the work may be examined by the Contractor 6 2 Storage And Protection Of Materials The Contractor shall provide and maintain storage facilities and employ such measures as will preserve the specified quality and fitness of materials to be used in the work Stored materials shall be reasonably accessible for inspection Contractor shall also adequately protect new and existing work and all items of equipment for the duration of the Contract 6 3 Defective Material All materials not c
606. the minimum thickness of any Type THWN insulation shall be 13 mils for conductor sizes No 14 and No 12 18 mils for conductor size No 8 and No 6 and 36 mils for conductor sizes No 4 and No 2 At any point the minimum thickness of the nylon jacket shall be 4 mils for conductor sizes No 14 to No 10 inclusive 5 mils for conductor sizes No 8 and No 6 and 6 mils for conductor sizes No 4 and No 2 Lighting conductors between each luminaire and the adjacent pull box shall be No 10 AWG with THWN insulation Traffic signal and beacon conductors shall not be spliced Connections shall be made at terminals within the terminal compartment on signal mountings terminals on P P B s and terminals in the controller cabinet or service cabinet only All conductors fastened to connections on P P B shall have crimp style terminal lugs All conductors shall be fastened to terminals in the controller cabinet using crimp style terminal lugs All lugs shall be soldered to conductors This includes all new installations and all modified installations The cables that comprise a signal phase shall have an identification band placed near the end of the termination points and in every pull box The identification band shall be a 3 8 plastic strip and installed with a non ferrous permanent fastener All cables shall be labeled per phasing shown on plans The cables that are connected in the controller cabinet shall have an identification band that identifies the
607. these or similar requirements in their contracts with subcontractors The requirements are based upon Best Management Practices developed by the California Storm Water Quality Task Force as presented in the California Storm Water Best Management Practices Handbook Construction Activity The Fresno Metropolitan Flood Control District has developed a model Storm Water Pollution Prevention Plan SWPPP Whether or not such provisions are included in subcontracts the Contractor is responsible for compliance by others retained by the Contractor in the performance of the Contract The goal of these requirements is to prevent as much as possible the pollution of storm water conveyance storage systems by storm water runoff from construction sites by keeping storm water runoff containing pollutants out of drainage systems for sufficient time to reduce pollutant loads reducing the exposure and discharge of materials and wastes to storm water and by reducing erosion and sedimentation The work for which a Contract is awarded is subject to the provisions and requirements of the State General Construction Activity Storm Water Permit General Construction Permit The Contractor shall be responsible for complying with all General Construction Permit requirements as adopted and enforced by the State Water Resources Control Board SWRCB in August 1999 including any future revisions to that permit The Contractor shall indemnify and hold harmless the City for failu
608. thin a basin formed with the mortar and the mortar reworked into the water Retempering may only be done prior to hardening of the mortar Any mortar and grout which is unused after 17 hours from initial mixing time shall be discarded For bonding the masonry to the foundation the top surface of the concrete foundation shall be clean and with laitance removed and aggregate exposed before starting the masonry construction The starting joint on foundations shall be laid with full mortar coverage on the bed joint except the area where grout is to contact the foundation City of Clovis Standard Specifications 2009 225 Mortar joints shall be straight clean and uniform in thickness shall be tooled Tooling shall be done when the mortar is partially set but still sufficiently plastic to bond All tooling shall be done with a tool that compacts the mortar pressing the excess mortar out of the joint rather than dragging it out Joints that are not tight at the time of tooling shall be raked out pointed and then tooled If it is necessary to move a masonry unit after it has been once set in place the unit shall be removed from the wall cleaned and set in fresh mortar Lintels capping units and all bearing plates set by the mason shall be set in a full bed of mortar All cells whether containing reinforcement or not are to be filled with grout All grout shall be puddled or vibrated in place to consolidate without separation Mortar dr
609. tice that the Contract has been awarded No proposal shall be considered binding upon the City until execution of the Contract by all parties including the City Failure to execute and submit the Contract within 12 calendar days after the bidder has received notice that the Contract has been awarded shall be just cause for the annulment by the City of the award and the forfeiture of the proposal guarantee as liquidated damages The Contractor shall submit to the Engineer along with the executed Contract the documents required in Section 3 3 Required Contract Securities Insurance Certificate Business License Injury and Illness Prevention Plan and Section 7 4 Contractor s Insurance Requirements and Hold Harmless 3 3 Required Contract Securities Insurance Certificate Business License Injury And Illness Prevention Plan The bidder to whom the Contract has been awarded will be required to furnish a Labor and Material Bond equal to one hundred percent 100 of the Contract price and a Faithful Performance Bond equal to one hundred percent 100 of the Contract price Said bonds shall be secured from a corporate surety and are to be submitted to the City Engineer with the executed Contract Corporate Sureties are to comply with the definition in Section 1 45 Surety City of Clovis Standard Specifications 2009 10 In addition to furnishing the above required sureties the bidder to whom contract has been award
610. tices Act commencing with Section 4100 of the State Public Contract Code The Contractor shall file with the bid the name and address of each subcontractor who will perform more than one half of one percent gt of the contract amount or in the case of a project designated by the City as a Street Project one half of one percent of the contract amount or ten thousand dollars 10 000 whichever is greater To determine the value of work subcontracted where an entire item is subcontracted the value of work subcontracted will be based on the contract item bid price When a portion of an item is subcontracted the value of work subcontracted will be based on the estimated percentage of the contract item bid price determined from information submitted by the Contractor subject to approval by the Engineer Only one subcontractor shall be listed for each portion of the work The portion shall be defined as to its nature and extent The failure of the Contractor to specify a subcontractor constitutes a statement that the Contractor is qualified and intends to perform said work Designation of subcontractors must be made upon forms included with the bid package or to be obtained from the office of the City Engineer at City Hall The bidder must give the names of all the subcontractors and the form must be signed by the bidder The Contractor must have the consent of the City and approval of the City Engineer in writing to substitute a subcontracto
611. tified within the time period of the Guarantee and shall immediately perform at Contractors expense the necessary repairs replacements to make the defective item or items suitable and satisfactory Expiration of the Guarantee time period shall not void an obligation of the Contractor to repair or replace which is based on a timely notice by the City Should exigencies be such as to necessitate the repairs before the Contractor could be notified or should the Contractor refuse to make the repairs or replacements within a reasonable period of time the City shall have the right to make the necessary repairs or replacements at the expense of the Contractor preserving as far as possible all available evidence of the cause of failure All costs for providing guarantees shall be included in the various bid items no additional payment will be made therefor 6 11 Salvage Of Materials Where salvage of material is indicated on the Plans or in the Contract Specifications salvaged material shall remain the property of the City and shall be delivered and deposited by the Contractor at the location specified in the Plans Contract Specifications or by the Engineer No separate payment will be made for such salvaging and delivering of material the cost thereof shall be included in the various bid items of work 6 12 Materials Hauling Hauling of all materials to from or on the jobsite shall be performed in strict accordance with the Clovis Municipa
612. tility or other non street facilities and the Contractor shall make arrangements with the owner of those facilities for the coordination of the work The Contractor shall be aware of the possible existence of underground main or trunk line facilities not indicated on the Plans or in the Contract Specifications and to the possibility that underground main or trunk lines may be in a location different from that which is indicated on the Plans or in the Contract Specifications Prior to commencing any trenching excavation or boring operations or any work that may damage any of the facilities or interfere with their service the Contractor shall by potholing or other means approved by the Engineer ascertain the exact location of underground main or trunk line facilities whose presence is indicated on the Plans or in the Contract Specifications the location of their service laterals or other appurtenances and of existing service lateral or appurtenances of any other underground facilities which can be inferred from the presence of visible facilities such as buildings meters and junction boxes or manholes If the Contractor cannot locate an underground facility whose presence is indicated on the Plans or in the Contract Specifications the Contractor shall so notify the Engineer in writing If the facility for which the notice is given is in a substantially different location from that indicated on the plans or in the special provisions the additiona
613. tilizer shall be homogenous pellet form of a long lasting type of turf fertilizer consisting of both ammoniac and organic nitrogen phosphorus potassium potash sulfur and minor elements of iron zinc and manganese For areas planted with seed the Contractor shall provide a minimum of three applications of fertilizer The first application shall be made at the time of seeding The second application shall be made 30 days thereafter The third application shall be made 60 to 90 days following the second application Fertilizer shall be furnished and applied as follows a First application Balanced Starter Fertilizer approved by the Engineer b Second and third application Balanced Fertilizer approved by the Engineer spread at a rate that will provide 1 Ib of actual Nitrogen per 1 000 sq feet of seeded area c For areas planted with sod perform only the second and third applications 20 2 03 Planting Turf Seed Unless otherwise shown on the Plans or specified in the Contract Specifications planting of turf seed shall be done by hydroseeding Hydraulic equipment used for the application of the fertilizer seed and slurry of prepared wood mulch shall be of the Super Hydro seeded type The equipment shall have a built in agitation system and operating capacity sufficient to agitate suspend and homogeneously mix a slurry For some projects direct sowing of turf seed may be approved by the City In these instances the soil is to
614. ting pavement shall not be used as formwork b Expansion joints for curbs and gutters sidewalks mowstrips valley or alley gutters median island curbs and median caps shall be constructed at no greater than 45 foot intervals and at the ends of curb returns Expansion joints for curb gutter and sidewalks and median curbs and caps shall be collinear Expansion joints for curbs and gutters shall also be constructed on each side of curb depressions for driveway approaches Expansion joints for sidewalks shall also be constructed on each side of driveway approaches Expansion joints for fence mowstrips shall occur at post locations All expansion joints shall be tooled with a 3 8 inch maximum radius edger and filled with 3 8 inch thick premolded joint filler conforming to ASTM Specification Designation D1751 c Weakened plane joints shall be placed at 15 foot intervals except that for mowstrips they shall be placed at each post location not having an expansion joint Weakened plane joints may be made by the use of plastic materials Plastic weakened plane joint material shall be at least 1 inch deep T shaped 1 8 inch thick plastic strip with a minimum inch wide pull top stiffener This plastic strip shall have a suitable anchor to prevent vertical movement After preliminary troweling the concrete shall be parted to a depth of approximately 2 inches with a joint knife or a thin metal straight edge The plastic strip shall then be inserted in
615. tion The backfilling of said excavation or trench shall be completed within twenty four hours after the installation of the facility for which the excavation was made except for cast in place pipe installations and that portion of trenches or excavations to be used for connecting the extension of the installation provided said portion is adequately barricaded and protected and backfilled the following working day Backfill for cast in place concrete pipe shall be accomplished as soon as practicable but shall comply with the timing requirements of Section 19 3 03 A 3 Backfill Cast in Place Pipe Trenches shall be adequately barricaded and access shall be provided for abutting properties and street intersections Unless otherwise specified in the Contract Specifications or authorized in writing by the Engineer where an excavation or trench crosses a street intersection the excavation installation and backfill or bridging shall be conducted in a manner such that the street shall remain open at all times Alleys may be closed but shall be reopened at the end of the work day All excavations located within a street or alley for the purpose of boring or jacking pits shall be properly barricaded and protected and may be left open for a period of not more than seven 7 calendar days unless an extension of time is approved by the Engineer in writing Immediately after trenches or other excavations have been backfilled and preliminarily com
616. tion The controller cabinet foundation shall be constructed to place the police panel on the cabinet facing the adjacent street Foundation caps for signal standard bases not in existing sidewalk area shall be as follows P P B posts shall be 18 inch square or round type I A shall be 24 inch square or round all other foundation caps for signal standard bases shall be 30 inch square or round If a square foundation cap is used the sides of the cap shall be parallel or at right angles to road center line Foundation caps shall be 3 5 inches in thickness If sidewalk is being constructed at the same time as the signal standard bases are being constructed the signal standard base cap shall be placed monolithically with the sidewalk and at the same thickness as the sidewalk Top of all foundation caps for signal posts and standards shall be at sidewalk elevation or as stated on plans or as directed by the City Engineer After installation of signal standards anchor bolt threads shall extend three threads beyond the top of the nut If bolt threads extend beyond this specification bolts shall be cut to three threads above nut and painted with 2 applications of approved organic vehicle type unthinned zinc rich primer conforming to the requirements in Section 91 Paint of the State Standard Specifications Aerosol cans shall not be used The exact location of all foundations for signal equipment controller and service enclosures shall be app
617. tion District FID and Fresno Metropolitan Flood Control District FMFCD Water so discharged may be used by the Contractor for construction purposes with the prior written approval of the Engineer The length of water main which has not passed hydrostatic testing at any specific time during the work shall not be more than 1 400 lineal feet unless specifically directed or allowed otherwise by the Engineer in writing The Contractor shall provide additional lengths of restrained pipe and or other measures and facilities as necessary to comply with this requirement Tests shall not be made until at least 36 hours after the last concrete thrust or reaction blocking shall have been cast with high early strength cement or at least 7 days after the last concrete thrust or reaction blocking shall have been cast with standard cement All equipment testing and repair shall be furnished by the Contractor 66 13 Measurement Measurement for water main installation and fitting installation shall be by the lineal foot of pipe installed and shall be the actual horizontal length installed measured through fittings Measurement for gate and butterfly valves shall be per each valve installed Measurement for fire hydrants complete shall be per each fire hydrant assembly installed Measurement for water service lines shall be per each water service line installed Measurement for fire service lines shall be per each fire service line installed 66 14
618. tional payment will be made therefor City of Clovis Standard Specifications 2009 91 SECTION 13 BLANK SECTION 14 BLANK City of Clovis Standard Specifications 2009 92 SECTION 15 REMOVING EXISTING FACILITIES 15 1 General 15 1 01 Description This work shall consist of removing existing facilities which interfere with construction within the area to be cleared and grubbed as specified in Section 16 Clearing and Grubbing within any area of construction or reconstruction shown in the Plans or specified in the Specifications or as directed by the Engineer Removed facilities shall be disposed of salvaged relaid reset relocated or reconstructed as shown on the Plans or specified in the Contract Specifications Trenches holes depressions and pits caused by the removal of existing facilities shall be backfilled with embankment material as provided in Section 19 Earthwork Trenches holes depressions and pits caused by the removal of street or other facilities that are in surfaced areas otherwise to remain undisturbed shall be backfilled with materials equal to or better in quality and to the same thicknesses as the surrounding materials 15 1 02 Preservation Of Property Existing facilities which are to remain in place shall be protected in conformance with the provisions of Sections 5 3 Contractor s Responsibility for Work 5 9 Preservation of Property 7 4 Contractors Insurance Requirements
619. tions When fittings are required to accomplish such changes in depth of cover no 90 degree bends may be used unless otherwise directed or approved by the Engineer Any changes in the planned alignment horizontal or vertical shall be made in strict accordance with Section 66 4 Alignment Changes Separation Criteria Unless required otherwise by specific pipe elevations cover or clearance depths shown or not shown on the Plans water mains shall be installed with a minimum depth of cover of 48 inches As installation progresses all pipe valves fittings hydrants etc shall be thoroughly cleaned of all dirt rocks and other debris that may be found in the interior of the material The Engineer may direct the Contractor to swab the pipe to clean it At the end of each day s work all ends of the pipe shall be closed by means of a pre manufactured cap or special bulkhead or by other means approved by the Engineer Water pipe and fittings shall be installed in compliance with the manufacturer s recommendations with each length of pipe having an even bearing on a properly prepared trench bottom for its entire length with depressions cut for couplings bells and fittings Optional alternate methods of supporting the pipe slightly above the bottom of the trench on earth mounds may be implemented by the Contractor if approved by the pipe manufacturer and the procedures are carried out in strict compliance with his instructions Use of blocks
620. tions except that Sections 52 1 10 Measurement and 52 1 11 Payment of the State Standard Specifications are hereby deleted 73 4 Subgrade Preparation Subgrade Preparation shall conform to the requirements of Section 19 2 07 Subgrade Preparation Compaction and shall be constructed true to grade and cross section as shown on the Plans or directed by the Engineer It shall be thoroughly watered and rolled or hand tamped to obtain a relative compaction of no less than 95 percent under curbs gutters driveway approaches valley gutters and handicap ramps and a relative compaction of no less than 90 percent under sidewalks mowstrips and concrete median caps prior to placing the concrete All soft or spongy material shall be removed to a depth of not less than 18 inches or to stable soil below subgrade elevation for curbs gutters valley gutters and driveways and 3 inches below for caps mowstrips sidewalks and wheelchair ramps the resulting space filled with earth sand or gravel of a quality that when moistened compacted will form a stable foundation The subgrade and forms shall be wet immediately in advance of placing concrete 73 5 Construction Concrete shall not be placed on frozen or ice coated ground or subgrade or on ice coated forms reinforcing steel structural steel conduits precast members or construction joints Under rainy conditions placing of concrete shall be stopped before the quantity o
621. titled to additional compensation money or time for implementing the recovery plan then Contractor shall observe the Claims and change order procedures in Sections 4 10 Changes and 4 12 Notices Change Orders and Claims All schedules submitted by the Contractor shall be certified as true and correct using the general format of the certification form in said Section 4 12 The Contractor may not maintain any Claim or cause of action against the City for damages incurred as a result of its failure or inability to complete the Work in a shorter period than established in the Contract The parties stipulate that the period set forth in the Contract is a reasonable time within which to perform the Work 8 6 Beginning Of Work Unless otherwise provided in the Contract Specifications the Contractor shall commence work under the contract within fifteen 15 calendar days after the date of the Notice to Proceed and shall diligently prosecute the same to completion within the time limit provided in the Contract Specifications Should the Contractor begin work in advance of receiving the Notice to Proceed as above provided any work performed shall be considered as having been done at the Contractor s sole risk and as a volunteer and no payment is guaranteed for any such work performed 8 7 Notice To Residents Not less than two 2 calendar days nor more than five 5 calendar days prior to proceeding with the work in any given area
622. tnerships or corporations functioning on a joint venture basis the Contractor shall designate in writing before starting work the name of one authorized representative who shall have the authority to represent and act for the Contractor The authorized representative shall be present at the site of the work at all times while work is actually in progress on the contract When work is not in progress and during periods when work is suspended arrangements acceptable to the Engineer shall be made for any emergency work which may be required Whenever the Contractor or the Contractor s authorized representative is not present on any particular part of the work where it may be desired to give direction orders will be given by the Engineer which shall be received and obeyed by the superintendent or foreman who may have charge of the particular work in reference to which the orders are given Any order given by the Engineer not otherwise required by the Specifications to be in writing will on request of the Contractor be given or confirmed by the Engineer in writing If any subcontractor workman or person employed by the Contractor shall fail or refuse to carry out the directions of the Engineer or shall appear to the Engineer to be incompetent or to act in a disorderly or improper manner that person shall be removed from the work immediately upon notice by the Engineer and may not be employed again on the work All work shall be under general o
623. to be used on Waterborne Paint The spheres shall be treated with the correct coatings to maximize proper embedment and adhesion in water borne paint Spheres to be used on Solvent Borne Paint The spheres shall be completely uncoated There shall be no moisture or adhesion coating applied to the spheres Gradation The glass spheres shall conform to the following grading requirements to closely match the AASHTO Designation M 247 US Mesh By Weight Passing 20 100 30 85 10 50 15 35 100 0 5 City of Clovis Standard Specifications 2009 266 Physical Properties Glass spheres shall conform to the following properties Refractive Index minimum 1 50 Moisture Content maximum 0 01 84 2 4 Traffic Signs All traffic signs shall conform to the current Standards of the California MUTCD and the following All traffic signs shall be 0 080 inch thick aluminum Stop Signs Speed Limit Signs and all School and Pedestrian Signs shall have a 3M 4090 DG3 reflective sheeting with an applied 3M 1160 or equal Graffiti Film School and Pedestrian Signs shall be Florescent Yellow Green in color All other signs shall have 3M 3930 High Intensity Prismatic reflective sheeting with an applied 3M 1160 or equivalent Graffiti Film 84 2 5 Sign Mounting Hardware All mounting hardware shall be zinc coated galvanized or stainless steel Aluminum will only be allowed for rivets Banding shall be gt inch wide stainless steel Hose clamps
624. to support pipe or fittings is prohibited Valves and fire hydrants shall be installed as indicated on the Standard Drawings and as directed by the Engineer Hydrants shall be installed plumb with steamer outlet facing the curb Pipe may be cut by methods approved by CAL OSHA that will produce a square cut No wedge type roller cutters will be allowed PVC or DI pipe machined overall in lengths City of Clovis Standard Specifications 2009 191 shorter than 3 feet be used to make connections where approved by the Engineer Such pipe shall conform to Section 66 2 Materials of these Specifications Rubber gasketed joints shall be made in compliance with the manufacturer s recommendations and as follows 1 The gasket seat the socket and the gasket shall be wiped clean with a cloth The gasket shall be placed in the socket with the large end entering first It shall then be sprung into the gasket seat so that the groove fits over the head in the seat A thin film of lubricant shall then be applied to the inside surface of the gasket that will come in contact with the entering pipe 2 The plain end of the pipe to be entered shall be wiped clean and placed in proper alignment with the bell of the pipe to which it is to be joined In some cases it may be desirable to apply a thin film of lubricant to the outside of the plain end 3 The joint shall then be made by exerting sufficient force on the entering pipe by methods ap
625. tors Subcontracts shall include provisions that the contract between the City and the Contractor is part of the subcontract and that all terms and provisions of the contract are incorporated in the subcontract Subcontracts shall also contain certification by the subcontractor that the subcontractor is experienced in and qualified to do and knowledgeable about the subcontracted work Copies of subcontracts shall be available to the Engineer upon written request and shall be provided to the Engineer at the time any litigation against the City concerning the project is filed Pursuant to the provisions of Section 6109 of the Public Contract Code the Contractor shall not perform work under the contract with a subcontractor who is ineligible to perform work on the project pursuant to Section 1777 1 or 1777 7 of the Labor Code The purchase of concrete liquid asphalt paving asphalt pipelines valves fire hydrants casing or any other materials produced at and supplied from established and recognized commercial plants together with delivery of such materials to the site of the work by means of vehicles owned or operated by such plants or by recognized commercial hauling companies shall not be considered as subcontracting under these Standard Specifications Nothing contained in the Contract documents shall create any contractual relation between any subcontractor and the City 8 4 Preconstruction Conference Prior to construction and when s
626. tration when tested with 1 meter 39 inches static head or equivalent continuous pressure applied at one 1 end of a 1 meter 39 inches length of filled cable for one 1 hour No water shall leak through the open cable end Testing shall be done in accordance with 455 82B Fluid Penetration Test for Filled Fiber Optic Cable The cable shall exhibit no flow drop or leak at 80 C The weight of any compound that drips from the sample shall be less than 0 05 grams 0 002 ounce A representative sample of cable shall be tested in accordance with 455 81 Compound Flow Drip Test for Filled Fiber Optic Cable The test sample shall be prepared in accordance with Method A Crush resistance of the finished fiber optic cables shall be 220 N cm applied uniformly over the length of the cable without showing evidence of cracking or splitting when tested in accordance with 455 25 Repeated Impact Testing of Fiber Cables and Cable Assemblies The average increase in attenuation for the fibers shall be lt 0 10 dB at 1550 nm single mode for a cable subjected to this load The cable shall not exhibit any measurable increase in attenuation after removal of load Testing shall be in accordance with 455 41 Compressive Loading Resistance of Fiber Optic Cable except that load shall be applied at the rate of 3 mm to 20 mm 0 12 0 79 per minute and maintained for ten 10 minutes The cable shall w
627. trench and structure backfill including that for utility or communications conduit whether installed under City Contract or Encroachment Permit shall be compacted to a relative compaction of not less than 90 percent to within 24 inches of the bottom of the planned structural section of trench resurfacing or roadway structural section if the trench or structure is located in a roadway to be reconstructed as part of the work or the ground surface when the trench or structure is located in an unimproved area The upper 24 inches of trench and structure backfill shall be compacted to a relative compaction of not less than 95 percent For trenches or areas around structures that are to receive an improved surface the compacted backfill shall be brought to a smooth and level condition so as to receive the full thickness of surfacing Where the trench or area around a structure is not to be resurfaced the surface of compacted backfill shall be brought to a smooth condition even with adjacent undisturbed soil The surface of the finished backfill in all areas shall be made even and uniform free from depressions or raised areas Excess material resulting from backfill and compaction of trenches and structures not used in the work shall be disposed of outside the right of way as set forth in Section 5 12 Disposal of Material Outside the Right of Way 19 3 03 F Water The use of water in the work shall comply with the requirements of Section 5 13
628. ts permitted by the Contract and statutes including but not limited to Public Contract Code section 7107 the City may withhold an additional 50 contingency from any progress payment or retention release for any unknown uncertain or estimated withhold amount Once the withhold amount becomes known and certain then the City shall continue to withhold the known and certain amount and credit pay or release the remainder if any to Contractor If the known and certain amount exceeds the amount previously withheld then the City may withhold more from Contractor to cover the excess amount if unpaid contract funds or retention funds are available for withholding City of Clovis Standard Specifications 2009 82 The City s withholdings of any unpaid unreleased amounts for costs damages claims against the Contractor shall take priority over any third party claims against the unpaid or unreleased amounts including stop notices Any overpayment to the Contractor by the City and any failure to withhold an amount from payment that the City had the right to withhold shall not constitute a waiver by the City of its rights to withhold for such amounts from future payments to the Contractor or to otherwise pursue those amounts from the Contractor For any stop notice enforcement action against the City filed by any of the Contractor s subcontractors or suppliers of any tier the Contractor shall defend and indemnify the City and its of
629. ts shall be glued Bells shall be installed on each conduit that enters or exits any type of pull box or vault Sweep and entrance construction for vaults and pull boxes shall conform to the details shown on the Plans City of Clovis Standard Specifications 2009 228 82 7 Excavation And Backfill And Compaction Unless otherwise shown on the Plans or specified in the Contract Specifications the excavation backfill and compaction for fiber optic conduit pull boxes cabinets including potholes boring and receiving pits or any disturbances of existing surfaces caused by operations related to fiber optic facilities installation shall comply with Section 8 15 Utility and Non Street Facilities Potholing and Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration 82 8 Fiber Optic Conduit Installation Fiber optic conduit installation shall conform to the details shown on the Plans and as specified in the Specifications Unless otherwise specified the Contractor may install fiber optic conduit by open trench methods or by direct horizontal boring methods except that the Engineer may prohibit the use of direct horizontal boring methods where such methods are determined to be inadvisable in the opinion of the Engineer In either case the Contractor shall comply with the requirements of Section 8 15 Utility and Non Street Facilities Potholing Where direct horizontal boring methods are us
630. ts within the time set forth in the Contract Specifications The current controlling operation or operations i e the critical path is to be construed to include any feature of the work e g an operation or activity or a settlement or curing period considered at the time by the Engineer and the Contractor which if delayed or prolonged will delay the time of completion of the contract For contracts whose completion schedule is based on working days a working day is defined as any day except as follows Saturdays Sundays and legal holidays declared by the City Days on which the Contractor is prevented by inclement weather or conditions resulting immediately therefrom adverse to the current controlling operation or operations as determined by the Engineer from proceeding with at least 75 percent of the normal labor and equipment force engaged on that operation or operations for at least 60 percent of the total daily time being currently spent on the controlling operation or operations or Days on which the Contractor is prevented by reason of requirements in the Contract Specifications from working on the controlling operation or operations for at least 60 percent of the total daily time being currently spent on the controlling operation or operations Should the Contractor prepare to begin work at the regular starting time of any day on which inclement weather or the conditions resulting from the weather or the condition of the wo
631. turer DI pipe for sewer force mains shall be installed with a green 8 mil polyethylene wrap conforming to the provisions in AWWA ANSI C105 A21 5 The polyethylene wrap shall be marked with the words CAUTION RAW SEWAGE DO NOT DRINK or approved equivalent arranged in two continuous lines of text each on opposite sides of the polyethylene wrap 65 2 3 Plug Valves Plug valves shall be of the non lubricated eccentric type and shall be designed for a working pressure of 175 psi for valves 12 inch and smaller and 150 psi for valves 14 inch and larger Valves shall provide tight shut off at rated pressure All plug valves shall be from the same manufacturer Plug valves shall be Ballcentric Plug Valves as manufactured by the Henry Pratt Company available from the Southwest Valve and Equipment Company at www southwestvalve com or approved equal Plug valve bodies shall be cast iron conforming to the provisions of ASTM A126 for Class B with a welded in overlay of 90 nickel alloy content on all surfaces contacting the face of the plug The seat thickness shall be a minimum of 0 125 inch Sprayed plated nickel welded rings or seats screwed into the body are not acceptable The valve plug shall be constructed from ASTM A536 Grade 65 45 12 ductile iron The plug shall be one piece construction and shall be encapsulated with a Buna N elastomer The plug shall provide full bi directional shutoff capability The closed position travel stop f
632. turers recommendations and all applicable codes and ordinances The materials shall be applied by a licensed applicator or an employee under the supervision of a licensed applicator The Contractor shall consistently use recommended weed control methods throughout the construction period The Contractor will not allow weeds to become established or persist in any portion of the project Prior to beginning the 90 day maintenance period and prior to final acceptance the Contractor shall apply pre emergent herbicide at the manufacturer s City of Clovis Standard Specifications 2009 132 recommended rate on all non turf areas If weeds become persistent the maintenance period will be extended or suspended by the Engineer The City may require an application of pre emergent herbicide to turf areas if it is determined to be necessary Depending on conditions the Engineer may order additional applications of pre emergent herbicide on both turf and non turf areas 20 1 07 Plant Material In all cases materials shall be furnished as needed to complete the work in quantities designated on the Plans or the Specifications The Contractor shall provide upon request valid invoices to verify amounts of various materials to be used All plant material shall conform to the requirements of the Agricultural Code of the State of California these Specifications and the Contract Specifications All plant material shall be grown in nurseries that have been insp
633. turf to reach a healthy and vigorous growing status with no bare weak or sparse areas of grass and able to sustain a minimum of two mowings For sod planted turf the establishment period is the time required for the root system to become firmly attached to the native soil and the grass maintains a continuous healthy appearance with no changes of color or other indications of water deficiency or disease The establishment period for seeded or sod turf shall last until the overall maintenance period specified in Section 20 8 Maintenance Period commences During the establishment period the first mowing shall not commence until the grass is generally at least 2 inches but less than 4 inches high For the second mowing and all subsequent mowings the mower shall be set to cut the grass at a height of 1 gt inch for Bermuda grass 2 inches for Ryegrass After the first mowing the Contractor shall remove all rocks or other debris that would constitute a hindrance to subsequent mowings During and throughout the establishment period the Contractor shall reseed the spots or areas in which normal germination of the seed is not evident repair all damage done by his operations fill all depressions and eroded channels with sufficient top soil to raise to the proper grade compact lightly and reseed the filled areas and roll all seeded and reseeded areas The lawn shall be mowed at least once every seven 7 calendar days at no time Cit
634. ty Dollars 250 00 for each calendar day or portion thereof that elapses from the time the penalty is ordered into effect by the Engineer until periodic cleanup measures ordered by the Engineer are completely carried out and the nuisance eliminated or prevented Such penalty shall be deducted in accordance with Section 9 7 Stop Notices City s Right To Withhold Payments from any monies owed the Contractor or levied as a fine in the case of non public work In addition to the liquidated damage as specified above if conditions warrant the Engineer may order other forces to provide interim cleanup The full cost thereof in addition to the liquidated damage as herein provided shall be deducted from any monies owed the Contractor or shall be levied as a fine in the case of non public work City of Clovis Standard Specifications 2009 23 Full compensation for cleanup during construction shall be included the prices bid for the various items of work no separate payment will be made therefor City of Clovis Standard Specifications 2009 24 4 14 Detours Detours installed or constructed by the Contractor around the work or any portions thereof whether requested by the Contractor or required by the Plans or the Specifications for use by traffic shall conform to Sections 7 17 Public Convenience 7 18 Public Safety and Section 12 Traffic Control Construction Area Traffic Control Devices Unless otherwise spec
635. ude a list of all replaceable parts with exact parts description and number and a directory of recommended suppliers with correspondence address telephone and fax numbers 6 Parts List The manual shall include a copy of the results for all the tests that have been conducted for the contract 7 Test Results This section shall include a copy of the results for all the tests that have been conducted for the contract System schematic drawings shall be provided to identify the type of equipment at each location and the function of all equipment The drawings shall also show how the system is interconnected A comprehensive list of cabling and wiring shall be provided to clearly identify the interconnection and labeling 82 27 Measurement Unless otherwise specified in the Contract Specifications Fiber Optic Facilities will be measured as follows Single Fiber optic conduit installations will be measured on a lineal foot basis up to the inside face of pullboxes or cabinets or other enclosures Multiple conduit installations shall be measured as specified in the Contract Specifications City of Clovis Standard Specifications 2009 249 Measurement of single fiber optic cable installations will be made a lineal foot basis including excess required at pullboxes or cabinets Multiple cable installations will be measured as specified in the Contract Specifications No measurement of colored concrete backfill pull tape couplings
636. uded in the various other items of work No additional payment will be made therefor Payments shall include full compensation for furnishing all labor materials tools equipment and incidentals and for doing all the work involved in completing the operations as shown on the Plans as specified in the Specifications and as directed by the Engineer Full compensation for all excavation and backfill required to remove dispose of salvage relay reset relocate and reconstruct facilities for which payment is not otherwise provided City of Clovis Standard Specifications 2009 99 shall be considered included in the contract unit or lump sum price paid for the item of work involved and no separate payment will be made therefor If no contract items are provided then the cost thereof shall be considered to be included in the various other items of work No additional payment will be made therefor Full compensation for removal of existing striping pavement markings and raised pavement markers where required including additional grinding outside the limits of the existing pavement marking image to obtain a rectangular area and placement and removal of temporary pavement markings and repainting or remarking shall be considered as included in the contract price paid for the item of work involved and no additional compensation will be allowed therefor If no contract items are provided then the cost thereof shall be considered to be in
637. uipment shall be supplied to the City upon installation Conduit Clearance All conduits shall have a minimum clearance of 4 inches from each other Conduits for electrical facilities shall not be placed in a trench to be shared by other facilities such as irrigation pipe The spacing between electrical conduit and other parallel facilities shall be as shown on the Plans Parallel conduits shall not be installed directly over one another Immediately upon installation of conduit all openings shall be capped or plugged to prevent the entrance of materials that would obstruct the pipe Caps shall remain in place until removal is necessary for completion of installation All electrical conduit traversing paved concrete hardscaped areas is to be installed in schedule 40 galvanized iron pipe sleeves that are at least 2 inches in diameter larger than the conduit within the sleeve Joining of conduit It is the responsibility of the Contractor to be familiar with any and all methods of assembling joining and installation of the types of conduit to be used The Contractor shall strictly adhere to recommendations the manufacturer s guide If during any phase of the work the Contractor or any of the workers are not familiar with the recommended procedures the Contractor shall arrange with the manufacturer of the City of Clovis Standard Specifications 2009 258 particular product for the services of a qualified manufacturer s repre
638. ulture Division of Measurements amp Standards The scales shall be operated by a weigh master licensed in accordance with the provisions of the California Business and Professions Code The Contractor shall furnish a Public Weighmaster s certificate or a Private Weigh master s certificate of certified daily summary weight sheets The operator of each vehicle shall obtain a weight or load slip from the weigher and deliver said slip to the Engineer at the point of delivery of the material Other materials and items of work which are to be paid for on the basis of measurement shall be measured in accordance with the methods stipulated in these Specifications or the Contract Specifications for the particular items involved Full compensation for all expense involved in conforming to the requirements specified for measuring and weighing materials shall be considered as included in the unit price paid for the materials being measured or weighed and no additional compensation will be allowed therefor 9 2 Cost Breakdown Upon request of the Engineer the Contractor shall submit in a form acceptable to the Engineer a schedule showing the subdivision of lump sum bid prices into their various parts stating quantities and prices for each part to be made a basis for checking or computing monthly estimates if such partial payments for lump sum items are specified The prices shall include all costs of each item schedule of values shall be balance
639. ump sum prices inserted in the bid form by the bidder will be considered to be the bid prices for the various bid items of work performed In case of a discrepancy between the unit price bid and the calculated total for any bid item the unit price shall govern In case of a discrepancy between the unit or lump sum price in words and figures provided on the Bid Proposal the lump sum or unit price quoted in words shall prevail City of Clovis Standard Specifications 2009 7 2 6 Proposal Guaranty All proposals must be accompanied by either a cashier s check certified check or bidder s bond of a corporate surety in a sum equal to at least 10 percent of the total amount of the bid Checks or bonds must be payable to the City of Clovis Corporate Sureties must comply with the definition in Section 1 45 Surety Such securities will be retained by the City as a guarantee that the bidder if the bidder s bid is accepted will enter into a satisfactory Contract twelve 12 calendar days from the date notice of award is mailed to the bidder and will furnish good and sufficient bonds for the faithful performance thereof and for the payment of labor and material costs in accordance with the requirements of Section 3 3 Required Contract Securities Insurance Certificate Business License Injury and Illness Prevention Plan 2 7 Designation Of Subcontractors The Contractor shall comply with the California Subletting and Subcontracting Fair Prac
640. und facilities are being constructed for the first time must comply with the following regulatory requirements Existing requirements Section 64630 Title 22 CA Code of Regulations Water Main Installation c Water mains shall be installed at least 1 Ten feet 3 meters horizontally from and 1 foot 0 3 meters higher than sanitary sewer mains located parallel to the main 2 One foot 0 3 meters higher than sanitary sewer mains crossing the main 3 Ten feet 3 meters and preferably 25 feet 7 5 meters horizontally from sewage leach fields cesspools seepage pits and septic tanks d Separation distances specified in c shall be measured from the nearest outside edges of the facilities e Where the requirements of c and d cannot be met due to topography inadequate right of way easements or conflicts with other provisions of these regulations lesser separation is permissible if 1 The water main and the sewer are located as far apart as feasible within the conditions listed above 2 The water main and the sewer are not installed within the same trench 3 The water main is appropriately constructed to prevent contamination of the water in the main by sewer leakage f Water mains shall be disinfected according to AWWA Standard C601 81 before being placed in service g Installation of water mains near the following sources of potential contamination shall be subject to written approval by the Depa
641. undations Trenching and Excavation shall comply with Section 8 15 Utility and Non Street Facilities Potholing and Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration relative to trenching and excavating Excavations shall be open vertical construction sufficiently wide to provide free working space around the work installed and to provide ample space for backfilling and tamping In lieu of open trenching City of Clovis Standard Specifications 2009 256 for electrical conduit the Contractor at his option may utilize direct horizontal boring unless determined by the Engineer to unsuitable for a specific application Direct horizontal boring shall comply with Section 82 8 A Direct Horizontal Boring In any case the conduit shall be installed to the lines and grades shown on the Plans The use of a vibratory plow or methods other than open vertical trenching will not be allowed without the written approval of the Engineer To obtain such approval a field test must be performed at the proposed site with the equipment to be used in the presence of the Engineer The field test is to indicate if the proposed site is favorable to the plowing method Approval for plowing at one location does not allow the use of plowing at another location Approval for plowing must be obtained for each location where the use of plowing is proposed If at previously approved plowing locations conditions fo
642. untered the character quality and quantity of work to be performed and materials to be furnished and the requirements of the Plans and Specifications All work called for on the Plans the Standard Drawings and as set forth in the Specifications shall be executed in accordance with all applicable governing ordinances laws codes and regulations and shall meet all local conditions Any changes and or additions in work necessary to comply with ordinances laws codes and regulations and or conditions will be made without additional expense to the City but such changes shall have the prior written approval of the Engineer 83 2 Equipment List And Drawings Where required by the Plans or the Contract Specifications equipment lists and drawings of electrical equipment and material shall conform to the applicable provisions in Section 86 1 04 Equipment List and Drawings of the State Standard Specifications and these Standard Specifications The equipment list shall give firm delivery dates for materials In the event these dates cannot be met the equipment supplier and Contractor shall provide documentary proof of search for alternate sources of supply at least thirty 30 calendar days prior to the stated delivery dates Such action shall not be justification for granting additional working days but shall be evidence of proceeding to completion in good faith 83 3 Materials A General In conformance with Section 6 Control of Material
643. walk is being placed The base shall be 24 inches in depth and the length and width shall be as recommended by the manufacturer The elevation of the base in sidewalk areas shall be 2 inches above the existing proposed or future sidewalk elevation If no sidewalk exists a work pad shall be provided in addition to the cabinet base The pad shall be 3 inches thick and extend 18 inches in front of cabinet and shall not be integral to cabinet base Pad elevation where no future sidewalk is proposed shall be 0 1 foot above finished grade unless elevation is shown on plans or otherwise directed by the Engineer Base elevation shall be 2 inches above pad elevation unless elevation is shown on plans The manufacturer s bolt pattern and specifications shall be used The concrete base shall be located as shown on the plans One anchor bolt shall be bonded to circuit or ground wire All conductors shall enter bottom of cabinet from underground conduiting The meter reading opening shall face street or as directed by the Engineer 86 22 Testing All testing shall conform to the provisions of Section 86 2 14 Testing of the State Standard Specifications and these Standard Specifications A Certificate of Compliance shall be furnished in accordance with the provisions of Section 6 1 07 Certificates of Compliance of the State Standard Specifications and Section 6 5 Certificates of Compliance of these Standard Specifications certifying that all m
644. ween the scaled dimension on any drawing and the figures written thereon the figures shall be taken as correct unless otherwise determined by the Engineer 4 5 Conformity With Plans And Allowable Deviations Finished surfaces including the completed final surface of earth concrete pavement or other material or the completed top of a layer of subgrade base or surfacing in all cases shall conform with the lines grades cross sections and dimensions shown on the Plans Where tolerances are indicated in the Specifications the work shall be constructed within the tolerances Deviations from the Plans required by the exigencies of construction will be determined in all cases by the Engineer and authorized only in writing 4 6 Existing Facilities And Structures Shown On Plans Where underground and surface facilities or structures are shown on the Plans the locations depth and dimensions of such facilities or structures are believed to be reasonably correct but are not guaranteed Such facilities or structures are shown for the information of the Contractor but information so given is not to be construed as a representation that such facilities or structures will in all cases be found or encountered just where shown or that they represent all the structures which may be encountered The Contractor shall comply with the provisions in Section 8 15 Utility and Non Street Facilities Potholing 4 7 Omissions In Plans And Specifications O
645. with contractor company name So that could declare that the statements in this declaration and the attached claim were true and correct while preparing this declaration and claim consulted with City of Clovis Standard Specifications 2009 19 others including attorneys consultants or others who work for contractor company name when necessary to assure myself that said statements were true and correct declare under the penalty of perjury under the laws of the State of California that the foregoing is true and correct Executed 20_ at California name of declarant Contractor understands and agrees that any Claim submitted without this certification does not meet the terms of the Contract Documents that Owner or Owner s representatives may reject the Claim on that basis and that unless Contractor properly and timely files the Claim with the certification Contractor cannot further pursue the Claim in any forum and all rights to further compensation money or time regarding the issues covered by the Claim are waived due to a condition precedent not having been satisfied 4 12 5 2 Claims For Additional Payment If the Contractor wishes to make a Claim for additional monetary payment from Owner the Claim shall include all facts and documents supporting the Claim including but not limited to a the amount being claimed including calculations b why the claimed cost was incurred c why the claimed cost is the re
646. work an Encroachment Permit is required from the City Engineering Division before any work in street or other City right of way is commenced For public work for which a Contract has been awarded by the City the Contractor must obtain an Encroachment Permit from the City Engineering Division prior to commencing work unless otherwise specified by the Contract Specifications Satisfactory evidence of obtaining all required permits and licenses including the Contractor s and subcontractors business licenses shall be submitted to the Engineer with the executed contract and other documents required by the Specifications The Contractor shall abide by the conditions of said permits and licenses and perform all work governed by said permits and licenses in conformance therewith and as directed by the Engineer Compliance with this Section 7 10 shall be precedent to and a condition of issuance of the Notice to Proceed Except as provided in Section 7 6 Air Pollution Control relating to Rule 9510 and unless otherwise provided in the Contract Specifications full compensation for all costs involved in procuring all permits and licenses as indicated herein including all fees and charges therefor shall be included in the amount bid for the various items of work no separate payment shall be made therefor 7 11 Sanitary Regulations Necessary housing accommodations shall be provided by the Contractor for the workmen for changing clothes an
647. ws a Grout for pouring shall be of fluid consistency and shall conform to ASTM Specification Designation C476 Fluid consistency shall mean as fluid as possible for pouring without segregation of the constituent parts It shall be freshly prepared and uniformly mixed in the ratio of volumes as follows Type Grout Space Portland Damp Loose Damp Loose in its Least Cement Sand Aggregate Dimension arts arts arts Fine Less than 3 in 1 2 min 3 max Coarse 3 in or more 1 2 3 max 1 to 2 City of Clovis Standard Specifications 2009 224 b Grout for pumping shall be of fluid consistency as defined above shall have not less than seven sacks of cement in each cubic yard of grout 5 Lime Hydrated lime shall conform to ASTM Specification Designation C207 6 Aggregate Aggregate for mortar shall conform to ASTM Specification Designation C144 Aggregate for grout shall conform to ASTM Specification Designation C404 7 Concrete Portland cement concrete for footing shall be Class 2 conforming to the requirements of Section 90 Portland Cement Concrete of the State Standard Specifications or as indicated in the applicable Standard Drawings 8 Reinforcing steel Reinforcing steel shall be deformed bars conforming to ASTM Designation 15 and A305 except that ties may be plain bars Wire reinforcement shall conform to ASTM Specification Designation A82 81 3 Clearing And Grubbing Clearing and Grubbing
648. xes the identification of individual wires terminating in either junction boxes circuit breakers terminal strips or on control devices shall be done by means of waterproof permanent black ink on plastic Brady label 83 10 Backfill And Compaction Trenches And Foundations Backfill and compaction of trenches potholes boring and receiving pits and foundations shall comply with Section 19 3 Trench and Structure Excavation Backfill Compaction and Surface Restoration 83 11 Pullbox Installation When pull box extensions are used grouting shall be placed between pull box and extension A layer of roofing paper shall be wrapped around pull box and extension prior to backfilling dirt Dirt and debris shall be removed from pull box prior to installing conductors A one inch 1 diameter drain hole shall be provided in the center of the pull box Grout shall be installed to cover the crushed rock sump bottom of the of the pull box and sloped toward the drain hole The drain hole shall run through the grout bottom into and exposing the rock sump Contractor s attention is directed to Section 86 2 06C Installation and Use of the State Standard Specifications conductors shall not be installed prior to grouting the pull box The pull box elevation for pull boxes installed in sidewalks planting areas adjacent to sidewalks or median islands shall be at proposed final grade Pullbox elevation shall be 0 1 above finished grade for
649. y Terms are one year parts and labor with labor F O B factory JITS and Hot Swap programs are available please consult factory for more details Manufacturer The manufacturer of the SP1250 PD N Plus Series Traffic UPS shall be Clary Corporation located at 1960 S Walker Ave Monrovia CA 91016 Phone 800 44 CLARY Battery Cabinet The battery cabinet shall be a NEMA 3R rated enclosure constructed of 0 125 aluminum with an anodized finish matching the finish on the Model 332 controller cabinet The cabinet shall be provided with a continuous hinge door equipped with a neoprene door gasket a three point latching system and shall be keyed alike to be compatible with the controller cabinet locks currently in use throughout the City of Clovis The battery cabinet shall provide cooling and ventilation by means of a thermostatically controlled 120 VAC exhaust fan a louvered front door with a removable air filter and a roof overhang which is perforated for a natural flow of cooling air The cabinet shall contain four 4 adjustable removable full width metal shelves Shelves shall be approximately 10 3 8 City of Clovis Standard Specifications 2009 312 deep Overall cabinet dimensions shall be approximately 58 height by 25 width by 12 deep Clary CBS 127 Style 3 or approved equal 13 1 Battery Cabinet Mounting The external battery cabinet shall be mounted piggyback style to the Model 332A controller
650. y kind to the Contractor City of Clovis Standard Specifications 2009 37 SECTION 6 CONTROL MATERIALS 6 1 Source Of Supply And Quality Of Materials The Contractor shall furnish all materials required to complete the work Only materials conforming to the requirements of the specifications shall be incorporated in the work The materials furnished and used shall be new except as may be provided elsewhere in these specifications on the plans or in the special provisions The materials shall be manufactured handled and used in a workmanlike manner to ensure completed work in accordance with the plans and specifications Materials to be used in the work will be subject to inspection and tests by the Engineer or the Engineer s designated representative The Contractor shall furnish without charge such samples as may be required The Contractor shall furnish the Engineer a list of the Contractor s sources of materials and the locations at which those materials will be available for inspection The list shall be furnished to the Engineer in sufficient time to permit inspecting and testing of materials to be furnished from the listed sources in advance of their use The Engineer may inspect sample or test materials at the source of supply or other locations but the inspection sampling or testing will not be undertaken until the Engineer is assured by the Contractor of the cooperation and assistance of both the Contractor and the supplier of
651. y of Clovis Standard Specifications 2009 136 allowing the grass to achieve a height greater than 3 For the duration of the establishment period turf shall be maintained in a weed free condition Weeds in turf areas will be removed and or eradicated as recommended by a licensed Pest Control Advisor PCA in writing The establishment period will not end nor will the maintenance period specified in said Section 20 8 commence until all conditions set forth herein for Turfgrass Establishment Period are satisfied City of Clovis Standard Specifications 2009 137 20 3 Trees 20 3 01 General The Contractor shall furnish and plant trees conforming to and in accordance with Section 20 1 07 Plant Material the applicable Standard Drawings for Tree Planting and the Specifications and in the quantities varieties and locations shown on the Plans and specified in the Contract Specifications Where trees shown on the plans or specified in the Contract Specifications are designated by container size in gallons the following standards shall apply unless otherwise approved by the Engineer 5 Gallon Tree Standard Tree diameter shall be at least 5 inch as measured 6 inches from the container soil level Tree height shall be at least 4 1 2 feet as measured from the container soil level 15 Gallon Tree Standard Tree diameter shall be at least 34 inch as measured 6 inches from the container soil level Tree height shall be at least 6
652. y the Contractor at all times throughout the life of the Contract traffic control devices used in the performance of traffic control shall conform to the requirements of Section 12 3 Construction Area Traffic Control Devices The Contractor shall comply with the provisions of Section 7 17 Public Convenience and Section 7 18 Public Safety 12 2 Traffic Control 12 2 01 Traffic Control Plan Notifications A Traffic Control Plan Unless otherwise specified in Contract Specifications a Traffic Control Plan shall be prepared by the Contractor for all Contracts and submitted to the Engineer for approval prior to beginning construction Construction shall not begin without an approved plan The Traffic Control Plan shall conform to the requirements of this Section 12 Traffic Control Construction Area Traffic Control Devices and Part 6 of the California MUTCD Where road closures are anticipated or required the Contractor shall comply with Section 4 14 Detours and Section 12 2 04 Road Closures for special plan preparation requirements B Notifications At least forty eight 48 hours in advance of beginning work in any street alley or other public thoroughfare the Contractor shall notify the Engineer the City Police and Fire Departments all ambulance companies and any other jurisdictional agencies involved and comply with their requirements regarding traffic control and public convenience and safety
653. ystem 2 3 1 The battery shall be comprised of extreme temperature deep cycle AGM VRLA Absorbed Glass Mat Valve Regulated Lead Acid batteries that have been field proven and tested by the U S military 2 3 2 The battery system shall consist of one or more strings typically 4 or 6 batteries per string of extreme temperature deep cycle AGM NRLA Absorbed Glass Mat Valve Regulated Lead Acid batteries such as Clary Outpost batteries equivalent 2 3 3 Batteries shall be certified to operate at extreme temperatures from 40 F to 165 F 2 3 4 batteries shall be provided with appropriate interconnect wiring and shall be housed in an external battery cabinet 2 35 interconnect cable shall be protected with abrasion resistant nylon sheathing 2 3 6 The interconnect cable shall connect to the base module via a quick release circular connector 2 3 7 For purposes of safety and proper operation the circular battery connector shall have interlocking pins to prevent turn on if batteries are not connected and to shut off the UPS should the batteries be disconnected 2 3 8 Battery construction shall include heavy duty inter cell connections for low Impedance between cells and heavy duty plates to withstand shock vibration 2 3 9 top cover shall use tongue and groove construction and shall be epoxied to the battery case for maximum strength and durability 2 3 10 An optional lifting handle shall be availa
654. zer Ground Cover shall be fertilized as needed or as directed by the Engineer during the establishment and maintenance period 20 5 05 Ground Cover Establishment Period The Ground Cover Establishment Period is the time required for newly planted groundcover to exhibit an initial healthy and robust appearance absent of wilting or other signs of stress as determined by the Engineer The Ground Cover Establishment Period shall commence immediately upon planting and shall continue until the commencement of the maintenance period specified in Section 20 8 Maintenance Period The maintenance period will not be permitted to commence until all ground cover has met the requirements of the Ground Cover Establishment Period During the ground cover establishment period as well as the maintenance period referenced in said Section 20 8 all basins around the ground cover plants shall be maintained at a depth of 3 inches Watering shall occur at intervals adequate to promote healthy root and plant growth 20 6 Tree Transplanting 20 6 01 General Where transplanting of trees is shown on the Plans or specified in the Contract Specifications all work shall comply with these Standard Specifications 20 6 02 Planting Site Preparation 20 6 02 A Drainage Hole One 1 drainage hole minimum diameter of 12 inches shall be drilled for each tree to be transplanted as designated on the plans Reference is made to Section 8 15 Utility and Non Street Facil

Download Pdf Manuals

image

Related Search

Related Contents

電子データに関する仕様書    Service Manual - Scotsman Ice Systems  - Cymax AG  (TXHPET) User Manual - Texas is Cotton Country  USER`S MANUAL  Optical Disc Laminator  m2-19 mode d`emploi 9 514 0153 003  Arrow Plastic 3M User's Manual  Panasonic DMW-LND52  

Copyright © All rights reserved.
Failed to retrieve file