Home

CDS-560RS / N180

image

Contents

1. CDS 560RS 561 5 4 Check the length of the casing shoes When in position against the drive shoulder on the driver there should be between 12mm and 25mm clearance between the back face of the segments and the front face of the casing shoe depending on the size of the system This distance will increase as the drive shoulder and or the casing shoe wears 5 Make sure the segments swing from open to closed position freely by hand 6 Use the diagram on page 3 to make sure the correct length of starter casing has been calculated 7 When drilling commences use slow forward rotation If jamming occurs ease back on the feed force or lift the CDS 560RS and the casing until rotation starts again Initially the casing may rotate but after drilling down the casing 1 2 meters it will stop rotating 8 Apply only light feed and reduced air pressure when setting the first casing and make 9 When drilling through soft materials sand clays etc frequently lift the CDS RS and the casing a little to ensure that it is loose and to flush out any debris from the casing When the CDS RS is in the hang position all available air will go to directly flushing the casing In sand and gravels it is often preferable to reduce air and feed pressure to a minimum In all ground conditions it is good practice to lift the casing frequently to make sure it is loose and to clear all debris from the casing 11 HINTS AND TIPS CONTINUED 10 Whe
2. Drill Tubes Standard Hexagon Drive Drill rods used with the system will require sleeves fitting over their entire length This will be necessary to effectively reduce the annulus area between the drill pipe and the I D of the casing so as to increase the up hole velocity for efficient removal of the drill cuttings and also prevent blockages occurring inside the casing As a general guide the sleeve diameter should be 4 smaller than the bore of the casing but the exact size can be calculated by using the formula below A figure of 3000ft min 915 m min should be used as a minimum for the required velocity The length of the rods should be identical to the lengths of the casing This will guarantee access to the locking pins on the hexagon connection is clear of the casing Hammer In certain circumstances it may be necessary to sleeve the hammer This sleeve however should be a split bolt together type not welded The outer diameter of this sleeve should be the same as the diameter of the drill tube sleeves The formula below show the recommended sizes for both the casing and the casing shoes UP HOLE VELOCITY FORMULA METRIC VM Y CFM x 1305096 DM dm VM Velocity in m min Y Volume of air passed by Hammer at the selected pressure m3 min DM Diameter of casing bore squared in mm Dm Diameter of tube sleeve squared in mm UP HOLE VELOCITY FORMULA IMPERIAL VF Y CFM x 183 4 DIZ di VF Velocit
3. CDS RS CDS 560RS N180 MAINTENANCE OPERATING AND SERVICE MANUAL PATENTED AIRFLOW SYSTEM 1 INTRODUCTION The Bulroc CDS 560RS Overburden System is a concentric drilling system designed to simultaneously case a hole through loose overburden conditions down into the solid bedrock with minimal disturbance to surrounding sub structures This system has a multi stage cutting head to guarantee the drilled hole is straight with minimum deviation The independent segments around the periphery of the head give equal concentric cutting forces resulting in fast low torque drilling Since down time is very costly this system is designed to require the minimum amount of maintenance However when parts do eventually wear the construction of the system is such that the areas of the cutting head which experience most wear can be replaced independent of the slower wearing areas and so minimise operating costs LIST OF CONTENTS GENERAL INTRODUCTION 1 USNG THE COS sams Z USING THE CDS 560RS SYSTEM ee mene 5 6 HOW THE SYSTEM WORKS REFURBISHING WORN EQUIPMENT RING BIT amp THE SEGMENTS 8 WELDING THE DRIVER 9 TROUBLE SHOOTING strana 10 12 2 USING THE CDS 560RS Drill Rigs Drill rigs on which the CDS 560RS is to be used should have a feed length at least one metre more than the longest casing This will allow sufficient clearance for any adapters or drive subs required by the system
4. ched solid rock at its required depth then the system can be closed by resting the system on the bottom of the hole and again counter rotating With the segments fully closed the system can now be retracted through the casing leaving a clean cased hole See diagram 2 Should it be necessary to drill on further into the solid rock the CDS RS system can be detached from the Hammer and replaced with a conventional drill bit that can pass through the casing shoe See diagram 3 The Bulroc CDS RS overburden system simultaneously cases the hole by means of a shoulder on the driver This shoulder locates against the top face of the casing shoe which is welded into the starter casing Since the casing does not rotate with the drill tubes the torsional loads are relatively low and so either left hand threaded or welded casing can be used G REFURBISHING WORN EQUIPMENT The Ring bit and Segments The most frequent cause of button failure can be attributed to overdrilling and incorrect button regrinding Regrinding at regular intervals with the correct equipment not only improves component life but also improves production and reduced overall drilling costs 1 Buttons should be reground to their original shape when the wear flat is 1 3rd the diameter of the button 2 If the button is cracked or chipped it should be ground back flush to the steel matrix It is possible to carry on drilling with a number of broken buttons if they are gro
5. e socket in the rock the speed and feed can be reduced back to the correct rates suitable to the type of rock being drilled The segments on this concentric system should be much easier to move from open to closed position and consequently the most important consideration when using a concentric system is to maintain clockwise rotation throughout the entire drilling cycle The only time reverse rotation should be applied is when you wish to close the segments and at no time should the system be hammered without rotation as this will either allow the segments to vibrate back into a closed position or if this doesn t happen then the segments will form three sockets in the rock that could generate extremely high torque loads once rotation was re applied 12 When the casing has been set to the required depth and when drilling in sticky ground care must be taken to clean out the inside of the casing before extracting the drillstring Water poured inside the casing repeatedly and flushed out will help the process On occasions it may be necessary to pull the CDS RS system back into the casing to flush out blockages To perform this task the system should be lifted into the hang position and rotated clockwise for 2 or 3 revolutions to ensure the bit face is clean The system should then be pulled back against the casing shoe and the air turned off At this point the rod should be marked to give a reference point for when the system is fed back through the
6. is necessary is to burn off the old worn ring and replace it with a new drive ring This comes in two halves that require welding around the driver recess It is important that the system is used with a well fitting casing shoe which has the same 90 degree angle A badly worn casing shoe will cause rapid wear and unnecessary wear to a new or re formed drive shoulder on the driver 9 WELDING THE DRIVER WELDING PROCEDURES 1 The bit holder must be preheated to between 200 C and 250 C before any welding takes place 2 This temperature must be maintained throughout the welding process check temperature freguently using temp sticks 3 The weld must be applied in single runs around the shoulder area building it up to as near the original shape as possible Use 1mm CARBOFIL CRM01 AWSAS 28ER 80S g or equivalent Weld After Re machining 4 After welding the holder must be slow cooled This can be achieved by either burying the holder in a tank of vermiculite or similar or by wrapping it in an asbestos blanket This slow cooling is a very important part of the process Rapid cooling can cause cracking 5 Once the holder has returned to room temperature it should be turned on a lathe back to its original shape Dimensions for turning are given in the table on page 3 The correct shape is important to avoid rapid wear of the casing shoes and subsequent wear of the bit holder If a lathe is not available then a s
7. m hard wear resistant steel that should outlast many segment changes before they will require replacing Before re assembling the system it is important to check the condition of the slots in the driver where the ring bit lugs locate These slots may show some degree of wear and deformation and any signs of deformation must be removed using a small pencil grinder or similar to ensure correct location and drive of the ring bit This is particularly important if a NEW ring bit is being fitted to a WORN driver Re assembly Instructions To re assemble the system insert the new or re sharpened segments into their sockets and slide the new or refurbished drive ring onto the driver and rotate clockwise until it stops SELOC PIN SET RETAINING PIN Now insert a NEW retaining pin and gently drive home with the punch before finally inserting a new Seloc Pins Finally ensure a spot of tack weld is applied to secure the Pins in position so they cannot come out Recommendations for refurbishing worn components are given in page 8 HOW THE SYSTEM WORKS The Bulroc CDS 560RS overburden system is designed to enable the operator to drill and simultaneously case a hole through loose overburden ground conditions down into solid rock See diagram 1 After reaching the required depth the segments can be moved into the closed position by pulling the system up against the casing shoe and counter rotating If the hole has rea
8. mall hand grinder can be used to reform the drive shoulder Great care must be taken to get the surface even and correctly form the 90 degree shoulder if the surface is uneven and the angle incorrect it will lead to premature wear and jamming 10 HINTS AND TIPS Always Do the Following 1 Make sure the Driver will pass through all the lengths of casing intended for the job If the casing is to be welded extra clearance should be allowed for weld spots which may break through into the inside of the casing 2 If the casing is to be welded then the ends should be bevelled at an angle between 45 and 60 degrees To prevent weld breaking through and to help alignment a 3mm wide land should be left on each end face If the casing is the threaded type then it must be left hand Because of the cost of the thicker walled casing required to produce a thread it is normal practice to have threaded joints welded on to the end of thinner casing thus keeping the cost to a minimum If this is the case then great care must be taken to ensure the joints are true and concentric to the casing An out of line joint can result in either the system jamming inside the casing or the casing jamming in the hole As with welded casing the joints should have bevelled end faces to prevent weld breaking through into the inside of the casing 3 Check the casing shoes before the job starts The inside diameter of the shoe should be within the following tolerances
9. n drilling in sticky plastic clay the addition of water or even foaming agents in the hammer air may be necessary to maintain good flushing 11 When drilling through boulders or inclined rock faces the fact that this concentric system has a number of independently operating segments With a concentric system the independent segments only require a very small amount of movement to travel from the open to closed position this is somewhere in the region of 20 to 30 degrees rotation of the system Conseguently if you attempt to hammer without rotation then the segments will swing back into the closed position causing the system to produce a socket in the rock that is only the diameter of the pilot bit So once rotation is resumed the segments cannot open back out as they are retained by the sides of the rock socket To prevent this occurring a concentric system should have its RPM increased and feed rate reduced once it starts to encounter boulders or inclined rock By doing this you guarantee that the segments remain in the open position even if their contact with the rock is intermittent The system should then be fed slowly into the boulder or rock face until continuous cutting can be heard At no time must the rotation be stopped whilst hammering is taking place If at any point the system starts to jam against the inclined face it must be immediately pulled back and then slowly fed forward back into the rock Once the system has formed a complet
10. nt is 2013 Bulroc UK Limited All rights reserved Unauthorised duplication or distribution prohibited by law PATENTED AIRFLOW SYSTEM This page Ieft intentionally blank Bulroc UK Limited Turnoaks Business Park Burley Close Chesterfield Derbyshire United Kingdom S40 2UB Tel 44 0 1246 544700 Fax 44 0 1246 544701 E mail info bulroc com Web www bulroc com 2012 Bulroc UK Limited All Rights Reserved Rev 280214
11. shoe Reverse rotation for 1 revolution will then close the segments and allow the system to be pulled back into the casing Once inside the air can be turned back on and the system should then be moved up and down inside the casing until the blockage is cleared At no time must the system be rotated whilst it is inside the casing as this will cause the segments to jam against the casing wall 12 HINTS AND TIPS CONTINUED When the casing is clean the system should be fed back through the shoe using the reference point on the rod to indicate when it is through the shoe Once through the shoe the system can be rotated clockwise to open out the segments 13 Always re grind worn buttons Never do the Following 1 Penetrate too fast in loose ground Overfeeding will bury the CDS RS and block the casing with nowhere for the hammer air to exhaust hence stopping the hammer Always give the flushing air a chance to bail out the debris and keep the casing clear 2 Over rotate This will lead to premature button wear In rock or boulders rotation of the CDS RS should be between 4 to 6 rpm In loose ground conditions this can be increased by 50 3 Apply weld to either the ring bit or the segments This can lead to cracking and button failure No warranty can be considered on these parts if there is any evidence of welding Bulroc s CDS RS range of overburden drilling systems feature patented Bulroc Airflow technology This docume
12. und back in this way providing they are not affecting the gauge diameter or are not adjacent to each other since this would affect the smooth rotation of the bit 3 After regrinding check the protrusion heights of the buttons If a button protrudes too far from the steel body it will cause premature failure of the button The side protection buttons should be ground back flush with the body The gauge buttons should be ground back until their protrusion height is 1 2 their diameter To perform the task of regrinding correctly we recommend the use of a hand held grinder with gravity fed water supply necessary to cool the impregnated diamond grinding cups A combo type grinding cup of the approximate diameter will remove the surrounding steel matrix and reform the carbide button at the same time The Driver The shoulder on the driver where it contacts against the casing shoe will eventually wear This is quite normal and to be expected However when the drive shoulder does become worn to a taper shape it will begin to jam in the casing shoe At this point it will be necessary to re form the drive shoulder back to its original 90 degree angle by welding up this area of the original shoulder It is important that the following procedures are strictly followed to avoid damage and cracking of the driver The same type of wear will also occur on the replaceable drive ring if you are using this design of driver However in this case all that
13. ver SD18 CDS560DH096RS 1 2 Ring Bit CDS560RRING 1 3 Seloc Pin Set CDS560RSP 1 4 Solid Retaining Pin CDS560RRP 1 5 Segments CDS560RSEG 3 6 Segment Bush CDS560RSEGS 3 7 Drive Plates N180 DP180 1 Ta Drive Plates SD18 DP096 1 8 Foot Valve N180 BBF180 1 8a Foot Valve SD18 BBF096 1 Complete System N180 CDS560180RS Complete System SD18 CDS560096RS 5 CDS 560RS SERVICING The CDS 560RS system is designed to require the minimum amount of service and maintenance However it is recommended that the system be stripped down every 500 metres and all the component parts checked for wear or damage Eventually the segments will need to be replaced and most likely the buttons on the ring bit will require re grinding At this time the following procedures must be followed 1 First remove both the Retaining Pin 4 and Seloc Pins 3 holding the Ring Bit by grinding out the tack weld push out as shown Hammering gently will force the Pins out of their housing but should this prove difficult applying liberal amount of penetrating oil should ease the process 2 Once the Pins are removed rotate the ring until it stops 3 The segments are now free to be withdrawn from their sockets 6 CDS 560RS SERVICING CONTINUED At this point the segment bushes or sleeves can be examined These bushes are pressed into the driver to prevent wear whilst the segments are cutting and they are manufactured fro
14. y in feet min Y Volume of air passed by Hammer at the selected pressure Ft min DI Diameter of casing bore squared in inches Di Diameter of tube sleeve squared in inches 3 Calculating Iengths for starter casings 2450mm Starter Casing including shoe 3m Casing 70mm Shoe length fi A 670mm 2185mm hammer length 3m Rod The above diagram shows the length of starter casing required when using standard CDS equipment with the Bulroc HYPER 181 hammer If an alternative hammer is to be used the starter casing length can be calculated by either adding or subtracting the difference in effective length of the alternative hammer from that of the HYPER 181 hammer If Hexagon type Drill rods are used then an Adaptor will need to be fitted between the Hammer and the first Drill Rod To make sure the Starter Casing finishes in the correct position just below the spanner flats on the Adaptor its length will need increasing from that shown on the diagram 610mm 584 2mm 120mm 190mm JR Casing Shoe Size System parameters CDS 560RS PARTS LIST Ref Description Part Number Qty 1 Drive N180 CDS560DH180RS 1 1a Dri

Download Pdf Manuals

image

Related Search

Related Contents

ロイヤルクロック 取扱説明書  USER MANUAL    Christie DHD800 Network and Operations User Manual  Computo metrico impianti elettrici  Les produits de nettoyage : hygiène, évolution avec la technologie  Contec RT-U50-25S Universal Remote User Manual  Integration Pack 3.4 für Altiris Deployment Server  ChipworkX Development System  - Medaval  

Copyright © All rights reserved.
Failed to retrieve file